Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4070087B2 - Equipment information management system - Google Patents
[go: Go Back, main page]

JP4070087B2 - Equipment information management system - Google Patents

Equipment information management system Download PDF

Info

Publication number
JP4070087B2
JP4070087B2 JP2002141868A JP2002141868A JP4070087B2 JP 4070087 B2 JP4070087 B2 JP 4070087B2 JP 2002141868 A JP2002141868 A JP 2002141868A JP 2002141868 A JP2002141868 A JP 2002141868A JP 4070087 B2 JP4070087 B2 JP 4070087B2
Authority
JP
Japan
Prior art keywords
information
facility
equipment
access right
access
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002141868A
Other languages
Japanese (ja)
Other versions
JP2003058406A (en
Inventor
覚 坊
照昌 安井
景一 塩谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2002141868A priority Critical patent/JP4070087B2/en
Publication of JP2003058406A publication Critical patent/JP2003058406A/en
Application granted granted Critical
Publication of JP4070087B2 publication Critical patent/JP4070087B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Storage Device Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、設備情報管理システムに関し、より詳しくは、設備構成・計測情報等を含む設備情報に基づきアクセス権の判定を行ない、設備状態に応じたアクセス権を動的に設定することのできる設備情報管理システムに関するものである。
【0002】
【従来の技術】
図23は、例えば特開平9−185541号公報に記載された従来の設備情報管理システムを示す構成図である。
図において、1は図面、規格、設計データ、仕様等の電子データを格納した電子データ格納手段、2は品番/版数等の電子データを特定する情報、基本アクセス権、STATUS等の管理データを格納した管理データ格納手段、3は会社の組織構成等の組織情報を格納した組織情報格納手段、4はユーザ/グループ名、ユーザ/グループ毎のデフォルト・アクセス権、資格等を格納したユーザ情報格納手段、5は特例アクセス権を格納した特例アクセス権情報格納手段である。また、6はデータを読み込み、ユーザ、グループ、ワールドに対するアクセス権を判定するデータ読込み/アクセス権判定手段、7はデータの新規登録/データ配付/アクセス権変更時の処理を行なうデータ書込み/アクセス権設定手段である。
【0003】
次に、上記構成における従来の設備情報管理システムの動作について説明する。特例アクセス権情報格納手段5は、管理データ格納手段2に上記データの品番、版数等のデータを特定する情報、該データに対する基本アクセス権、データの状態、データ公開の可否、データの所在、および、特例アクセス権の有無等を格納し、特定のユーザ/グループあるいはワールドに対するアクセス権の追加/剥奪を設定するため、特例アクセス権を登録する。
【0004】
データ読込み/アクセス権判定手段6は電子データ格納手段1に格納されたデータに対するアクセス要求があったとき、上記管理データ格納手段2と、組織情報格納手段3と、ユーザ情報格納手段4と、特例アクセス権情報格納手段5を参照して、アクセス要求した者が、上記データの所有者か、所有者と同一のグループに属するものか、それ以外の第3者であるワールドかを判定し、所有者/グループ/ワールドに対する基本アクセス権、データの状態、公開/非公開、および、特例アクセス権に基づきアクセス可否を判定する。
【0005】
データ書込み/アクセス設定手段7は、データの新規登録時、ユーザ情報格納手段4に設定されるデフォルト・アクセス権に基づき、管理データ格納手段2に基本アクセス権を登録するとともに、管理データ格納手段2に登録されるデータ状態、公開モードをそれぞれ「設計中」、「非公開」に設定し、さらに、特例アクセス権の設定があったとき、特例アクセス権情報格納手段5に特例アクセス権を設定する。
【0006】
また、データの配付時、データ書込み/アクセス設定手段7は、管理データ格納手段2のデータ状態を登録済に変更するとともに、公開モードを「公開」に変更し、特例アクセス権の設定があったとき、特例アクセス権情報格納手段5に特例アクセス権を設定する。さらに、アクセス権の変更要求があったとき、該アクセス権の変更要求に基づき、管理データ格納手段2の基本アクセス権および公開モードを変更するとともに、特例アクセス権の設定に応じて、特例アクセス権情報格納手段2に特例アクセス権を登録する。
【0007】
図面データのアクセス権を管理する際、ユーザ情報格納手段4に、設計者、検図者、承認者の資格情報を付加し、データ読込み/アクセス権判定手段6は上記資格情報を用いて、電子データ格納手段1に格納された図面データのアクセスの可否を判定する。データ読込み/アクセス権判定手段6は、管理データ格納手段2に格納された基本アクセス権、データ状態、データ公開の可否情報に基づき、電子データ格納手段1に格納された図面データの状態が設計中のとき、当該図面データの製造部門のアクセスを不可とし、上記データの状態が登録済のとき、当該図面データの製造部門のアクセスを可能とする。
【0008】
製造部門が設計中の図面データのアクセスを必要とするとき、データ書込み/アクセス設定部により、上記図面データの公開モードを「公開」に設定し、製造部門のアクセスが可能になるように特例アクセス権情報格納手段に特例アクセス権を設定する。
【0009】
以上のように、各種電子データを一元的に管理することができるとともに、各種電子データのアクセスを、データの状態、データの公開/非公開状態、あるいは、利用者/利用者が属するグループ等に対応させてきめ細かく管理することができる。
【0010】
また、データ書込み/アクセス設定手段7を設けデータの新規登録/データ配付/アクセス権の変更時の処理を行なうようにしたので、新規登録時、データ配付時におけるデータ状態/公開モードの設定等を自動的に行なうことができ、また、データ状態/公開モードによっては、本来アクセス権を持たないものにアクセス権を付与することができる等、電子データの実際の使用状況に応じた適切なアクセス権の管理を行なうことが可能となる。
【0011】
【発明が解決しようとする課題】
従来の設備情報管理システムは以上のように構成されているので、各種電子データが表現する対象の状態入手/管理をすることはできず、表現対象の状態に応じて動的にアクセス権の設定をすることができないといった問題があった。
【0012】
この発明は、上記のような問題を解決するためになされたもので、各種設備の状態情報を含む設備情報に基づきアクセス権の判定ロジックを変更させ、変更された判定ロジックに基づき設備間の接続情報と設備情報とによってアクセス権を判定することにより、設備状態に応じた最適なアクセス権を動的に設定することのできる設備情報管理システムを実現することを目的とするものである。
【0013】
【課題を解決するための手段】
この発明に係る設備情報管理システムは、個人識別情報およびアクセス要求情報に応じた設備情報の設定または閲覧を行なう設備情報設定・閲覧手段と、設備情報を格納した設備情報格納手段と、各設備機器の状態情報を格納した状態情報格納手段と、上記個人識別情報および各設備状態情報毎に対応づけて、各設備情報へのアクセス権を判定する設備情報の予め設定された閾値を有する複数のアクセス権判定ロジックを格納したアクセス権判定ロジック格納手段と、上記アクセス要求情報によりアクセス要求されている設備情報を上記設備情報格納手段より抽出し、現時点における設備状態情報を上記状態情報格納手段より抽出する情報抽出手段と、アクセス要求のあった個人識別情報と、上記情報抽出手段が上記状態情報格納手段より抽出した現時点における設備状態情報とに対応するアクセス権判定ロジックを上記アクセス権判定ロジック格納手段より選定し、上記情報抽出手段により抽出したアクセス要求されている設備情報を読み取り、該アクセス要求されている設備情報から得られる値を、上記選定されたアクセス権判定ロジックに予め設定された設備情報の閾値と対比することにより、アクセス権の有無を判定する設定・閲覧アクセス権判定手段とを備えたものである。
【0014】
また、上記設備情報格納手段は、上記設備情報として各設備間の距離を示す設備間情報を格納したものである。
【0015】
また、上記状態情報格納手段は、設備状態情報として各設備機器の状態を計測した計測情報を格納したものである。
【0016】
また、上記設備情報格納手段は、設備情報として設備が設置される場所毎にエリアが設定された配置図面を格納したものである。
【0017】
また、上記設備情報格納手段は、設備情報として線分の接続関係を主体に作成する図面を格納し、該図面は1個または複数のノードに接続する図形群を一つの設備に対応する図形とするものである。
【0018】
また、ネットワークを介してシステムに接続された各設備機器の状態を計測する識別情報を有する計測器を備え、上記計測器の識別情報に基づき、上記設定・閲覧アクセス権判定手段は、上記計測器から上記設備情報へのアクセス権の有無を判定するものである。
【0019】
また、上記計測器は、計測器自身の設備情報と、上記設備情報格納手段に蓄積されている設備情報との比較に基づき、上記設備情報格納手段対して上記計測器自身の設備情報を追加・編集するものである。
【0020】
また、上記アクセス要求情報には、任意の時刻における設備情報に対してアクセスを要求するアクセス要求時刻情報が含まれ、上記設備情報格納手段は、上記設備情報に対して該設備情報が有効に適応される有効期間情報を付加し、上記状態情報格納手段は、上記有効期間情報毎の設備状態情報を格納し、上記アクセス権判定ロジック格納手段は、上記個人識別情報および有効期間情報を付加した各設備状態情報に対応づけて、各設備情報へのアクセス権を判定する設備情報の予め設定された閾値を有する複数のアクセス権判定ロジックを格納し、上記情報抽出手段は、上記アクセス要求情報によりアクセス要求されている要求時刻の設備情報が上記設備情報格納手段に格納されている設備情報の有効期間内である場合に上記状態情報格納手段より上記要求時刻を含む有効期間の設備状態情報を抽出し、上記設定・閲覧アクセス権判定手段は、アクセス要求のあった個人識別情報と、上記情報抽出手段が上記状態情報格納手段より抽出した上記有効期間の設備状態情報とに対応するアクセス権判定ロジックを上記アクセス権判定ロジック格納手段より選定し、上記要求時刻に有効な設備情報に対するアクセス権の有無を判定するものである。
【0021】
【発明の実施の形態】
実施の形態1.
図1は、この発明の実施の形態1に係る設備情報管理システムの構成を示すブロック図である。以下に、図1について説明する。
なお、ここでは設備管理関係者のうち、設備情報を閲覧する者を設備情報閲覧者と呼び、設備情報を設定・編集、設備関連プログラムを実行、設備を操作する者を設備情報設定者と呼ぶ。
【0022】
図において、8は設備情報供給・閲覧サーバ、9は各設備情報設定部、10は設備情報閲覧部、11は設備付属計測器、12,13,14はネットワークであり、各設備情報設定部9、設備情報閲覧部10、設備付属計測器11はそれぞれネットワーク12〜14を介して設備情報供給・閲覧サーバ8と接続されている。
【0023】
次に、設備情報供給・閲覧サーバ8内の構成について説明する。15は設備情報データベースであり、設備図面、回路図、カタログ、取扱い説明書、および要素間の関係付け情報が格納されている。特に、本実施の形態1においては配置図面、回路図における接続関係をたどるための接続関係情報を格納する。16は逐次計測される設備の計測情報を格納した計測情報データベースである。17は設備情報アクセス権情報データベースであり、設備情報に対して各設備情報設定者、閲覧者がどのようなアクセス権限を持つのかを情報として保持する。18はアクセス権判定ロジック情報データベースであり、各設備の設備状態毎に「設備間距離」の種類とその閾値の情報を持つ。
【0024】
また、19は前記計測情報データベース16より得た計測情報に基づき、各「設備間距離」の計測をする各種距離情報計測部、20は前記設備情報アクセス権情報データベース17より設備情報アクセス権情報を抽出する設備アクセス情報抽出部、21は前記設備情報データベース15より設備情報を抽出する設備状態情報抽出部である。
22は設定・閲覧アクセス権判定部であり、各種距離情報計測部19、設備アクセス情報抽出部20、設備状態情報抽出部21より取得した情報に基づき、アクセス権判定ロジック情報データベース18よりアクセス権判定ロジックを選定し、このアクセス権判定ロジックにしたがって、設備情報に対するアクセスの可否を判定する。
【0025】
23は閲覧コンテンツ作成部であり、設定・閲覧アクセス権判定部22で判定された各設備に対するアクセス権に基づき、アクセス権のある情報だけからコンテンツを作成する。24は設備情報登録部であり、設定・閲覧アクセス権判定部22で判定された結果に基づき、設定可能な設備情報について設定を行なう。
25は設備情報登録準備部であり、設備付属計測器11が最初に接続されたとき、初期設定情報と、設備情報データベース15の情報とを比較し、適切な位置に設備情報を設定するよう設備情報登録部24に指令する。また、設備情報設定部9による初期設定、設定変更時にも作用し、現在の設備情報についての内容の提示も行なう。これらの処理は、設備付属計測器11に対するものも、設備情報設定部9に対するものも同様である。
また、26は計測情報登録部であり、設備付属計測器11から順次送信される計測情報を計測情報データベース16に蓄積する。
【0026】
次に、図2は上記構成における設備情報管理システムの全体処理フローを示す。
処理2−1では初期設備情報設定を行ない、次いで処理2−2では設備変更の有無を判断し、設備変更が無い場合(No)は、処理2−3による設備情報の閲覧、および処理2−4による設備計測情報の格納の各処理を行なう。設備変更がある場合(Yes)は、処理2−5での設備情報の設定により、設備情報の変更を行なう。
【0027】
また、図3は設備情報の設定・閲覧時の処理フローを示す。なお、ここでは、設備情報閲覧の場合について説明する。
まず、処理3−1では、設定情報閲覧部10は、IDまたはパスワード等による個人識別情報と、閲覧要求する設備情報(閲覧要求情報)とを認識し、設定・閲覧アクセス権判定部22に対して個人識別情報と閲覧要求情報を送信する。
次いで、処理3−2では、設定・閲覧アクセス権判定部22は設定情報閲覧部10より送信された閲覧要求情報に基づき、閲覧者が閲覧したい設備情報を選択する。
また、処理3−3では、設定・閲覧アクセス権判定部22は設備状態、当該状態におけるアクセス権判定ロジック、および設備間距離計測により、閲覧者の閲覧要求情報に対するアクセス権を判定する(図4に詳細を示す)。
次いで、処理3−4では、閲覧コンテンツ作成部23は上記処理3−3で求めた閲覧要求情報に対するアクセス権に基づき、アクセス権があるものから閲覧用コンテンツを作成する。
そして、処理3−5では、上記処理3−4で作成された閲覧コンテンツを通信処理部、ネットワークを介して設備情報閲覧部10へ送信する。
【0028】
図4は、図3に示した設備情報閲覧処理フローにおける閲覧アクセス権判定(処理3−3)の処理を詳述するための閲覧アクセス権判定処理フローである。
図において、処理4−1では、設定・閲覧アクセス権判定部22は、設備情報閲覧部10より閲覧者識別IDと閲覧要求情報とを取得する。
【0029】
処理4−2では、設定・閲覧アクセス権判定部22は、設備状態情報抽出部21に計測情報データベース16の内容から現時点における設備状態を抽出させ、この抽出された設備状態が警報、注意、正常等のいずれの状態であるかを判定する。なお、判定結果の正常以外の状態である設備を異常設備とする。
設定・閲覧アクセス権判定部22はアクセス権判定ロジック情報データベース18から、判定された設備状態(異常設備の異常レベル)に応じたアクセス権判定ロジックを選択する。なお、アクセス権判定ロジック情報は、アクセスを許可する内容(閲覧・設定)、設備間距離の種類、閾値となる距離、および閾値以上でアクセスを許可または閾値以下でアクセスを許可より構成される。また、アクセス権判定ロジックは複数設定することも可能である。
【0030】
次いで、以下の処理では閲覧要求のあったすべての設備について以下の処理を行なう。
処理4−3では、設定・閲覧アクセス権判定部22は、処理4−1で取得した閲覧者識別情報IDに基づき、設備アクセス情報抽出部20に設備情報アクセス権情報データベース17の内容から、設備に対して予め設定されている閲覧者の基本アクセス権を抽出させる。
【0031】
処理4−4では、上記処理4−3で抽出した基本アクセス権を有する設備情報をもとに、いずれの閲覧対象設備に対するアクセス権を有するかを判定する。判定の結果、アクセス権を有するとされた設備情報に対しては処理4−5を行ない、アクセス権を有さないとされた設備情報に対しては処理4−6を行なう。
【0032】
処理4−5では、上記処理4−4でアクセス権を有すると判定された設備情報に対してアクセス権を有効とし、当該設備のアクセス権を一時アクセス権格納エリアに格納する。そして処理4−10へ進む。
【0033】
処理4−6では、各種距離情報計測部19は、上記処理4−4でアクセス権を有さないと判定された設備情報と、上記処理4−2によって抽出された現時点での異常設備との設備情報を設備情報データベース15より抽出し、両者の設備間距離を算出する。
【0034】
次いで、処理4−7では、上記処理4−6で算出された設備間距離をアクセス権判定ロジックに当てはめて閾値と対比することにより、設備間距離が閾値に対して大きい場合には処理4−5へ行き、かかる設備間距離の算出に用いた設備情報へのアクセス権を有効とする。また、設備間距離が閾値に対して小さい場合には処理4−8へ進む。
【0035】
処理4−8では、すべてのカレントアクセス権ロジックについて判定が終了したか否かを調べ、すべて終了していれば処理4−9へ進み、終了していなければ処理4−6へ戻り処理を繰り返す。
【0036】
処理4−9では、設備情報へのアクセス権は無いものと判定し、次いで、処理4−10では、すべての閲覧要求対象設備についての判定が終了したか否かを調べ、終了していなければ、再度処理4−3へ戻り処理を繰り返す。すべての閲覧要求対象設備についての判定が終了していれば、閲覧アクセス権判定処理を終了し、設定・閲覧アクセス権判定部19はアクセス権を有効とした設備情報のみを設備情報閲覧コンテンツ作成部20へ送信する。
【0037】
次に、図5〜8は「設備間距離」に関する概念を示したアクセス権の設定の説明図である。「設備間距離」には、複数の種類があるが、例えば、(a)配置図上の直線距離(平面図上の2次元直線距離)、(b)配置図上の接続線に沿った距離、(c)回路図上の接続線に沿った経由する設備数、(d)回路図上の接続線に沿った経由する設備の電気的特性量の和などがある。
図5は、配置図上の直線距離(平面図上の2次元直線距離)を「設備間距離」とする場合の説明図である。
図において、27はBバンクTr、28はBバンクGIS、29はAバンクTr、30はAバンクGIS、31はGIS母線、32、33は幹線GISを示す。以上の設備27〜33は閲覧対象設備であり、BバンクTr27が異常設備と判定されている状態において、アクセス権判定ロジックで「設備間距離」の種類が直線距離である場合を表している。この例では、判定ロジックの閾値を半径とする円弧34を描き、この円弧34内にある設備が、アクセス権の有る設備として太線で示している。
【0038】
図6は、配置図上の接続線に沿った距離を「設備間距離」とする場合の説明図である。新たな符号として、35は設備の接続線、36は設備の接続線35上に沿ってBバンクTr27からとった線により判定ロジックの閾値の距離である。図5と同様な状態において、アクセス権判定ロジックで「設備間距離」の種類が接続線に沿った距離36である場合を表している。この例では、この折れ線36が存在する設備をアクセス権の有る設備として太線で示している。
【0039】
図7は、回路図上の接続線に沿って経由する設備数を「設備間距離」とする場合の説明図である。図において、37〜43は各種設備を示す閲覧対象設備であり、設備37が異常設備と判定されている状態において、アクセス権判定ロジックで「設備間距離」の種類が接続線に沿った経由する設備数である場合を表している。この例では、判定ロジックの閾値が3である場合を示し、アクセス権の有る設備として太線で示す各設備37、38、41が判定された。
【0040】
図8は、回路図上の接続線に沿って経由する設備の電気的特性量の和を「設備間距離」とする場合の説明図である。図5(c)と同様な状態において、アクセス権判定ロジックで「設備間距離」の種類が接続線に沿った設備の電気的特性である場合を表している。この例では、判定ロジックの閾値が100である場合を示し、アクセス権の有る設備として太線で示す各設備37,38が判定された。
【0041】
図9は、設備情報と計測情報の内容とその関係を示している。設備情報の構成は、設備構成情報、属性情報、設備情報関連付けデータ、図面データ、3Dモデルデータ、カタログ・取扱説明書データからなる。図において、44は設備構成情報、45は属性情報、46は設備情報関連付けデータ、47は図面データ、48は3Dモデルデータ、49はカタログ・取扱説明書データ、50は計測情報データベースである。上記設備情報44〜49、計測情報50は、設備識別IDを基として関係付けされる。
設備構成情報44は、設備を階層的に記述した階層関係、および機械的な隣接関係・電気的接続を記述した接続関係情報を持つ。属性情報45は、設備に対して、その設備の属性値を保持する。設備情報関連付けデータ46は、設備が各種情報のいずれの要素に対応するかを記述したものである。
【0042】
図10は、アクセス権判定ロジック情報データベース18の例を示したものである。
アクセス権判定ロジック情報データベース18は、アクセス権判定ロジックテーブル、評価式テーブルからなる。アクセス権判定ロジックテーブルは、各設備の持つ情報の状態に対して、論理式と、その論理式が真であった場合に与えられるアクセス権を記述する。
ここで論理式は、評価式テーブル中の評価式を名称で参照して定義される。評価式テーブル中の評価式は、2つの設備(ここではa,b)間の「設備間距離」を用いた不等式で表わされる。
f(a,b)<TH
ここで、関数fは「設備間距離算出関数」、THは「設備間距離」の閾値
である。
【0043】
図11は、設備情報基本アクセス権情報17を示したものである。
このテーブルは設備識別IDの設備の対象情報の種類に対して、設備管理関係者の識別IDで定められる者にアクセス権を与える。ここで設備管理関係者として、複数の設備管理関係者のグループを指定することもできる。
【0044】
図12は、設備構成情報44を示したものである。
ここでは、設備の階層関係を記述する階層関係情報テーブル、電気的接続関係を記述する電気的接続関係情報テーブル、機械的接続関係を記述する機械的接続関係情報テーブルからなる。各テーブルは、各テーブルが記述している概念図中の太線を施した設備に対する情報の例を示している。接続関係はポートと呼ぶ接続用のノードで接続を表現する。例えば、電気的接続関係情報テーブルの例では、GIS001設備51の2つのポート52,53にそれぞれBUS001設備54のEP2ポートとTr001設備55のEP1ポートが接続されることを表している。
【0045】
図13は、設備情報関連付け情報46の例を示したものである。
ここでは各設備ファイルにおける、設備GIS001に対応する情報の位置を表す。haitizu01という設備ファイルは、配置図であり、この配置図中のBlock001という図形要素(この場合は複数の線分が集まったブロック)56が、設備GIS001に対応することを表現している。また、mesuredGas01という設備ファイルは計測値であり、その中のGIS001GasPというテーブル中にガス圧の計測値が含まれていることを表現している。
【0046】
以上のように、本実施の形態1に係る設備情報管理システムによれば、現在の設備状態を把握し、設備の状態毎に設定された、アクセス権設定ロジックに基づきアクセス権が判定され、情報閲覧者にはアクセス権のある情報のみ提供され、また、設備情報設定者にはアクセス権のある情報のみ設定・操作を可能とする。従って、設備状態毎にアクセス権が判定され、設備状態に応じて適切な閲覧者、設備設定者に対して、情報提供、情報設定、設備操作が可能となる。
【0047】
実施の形態2.
本実施の形態2に係る設備情報管理システムにおいては、設備情報における配置図データについて、アクセス権を設定した場合の図面登録、および空間的距離、接続関係、電気的特性量を定義する実施の形態について述べる。
システム構成は図1と同様であり、特に本実施の形態2の例では設備情報登録部24の詳細説明にあたる。
【0048】
図14は、配置図面の初期設定の概念を示すものである。配置図面中の各設備が設置されるエリア57〜61を設定する。図14においては長方形領域であるが、折れ線、円弧を含む領域なども考えられる。
各設備のエリアに対して、階層関係(プラント○○中に57〜61が属するなどの内部表現については、図12を参照)、接続関係(例えば、57と58が接続などの内部表現は図12を参照)、設備情報アクセスロジック(内部表現は図10を参照)、設備状態(警報・注意・正常など)、設備間距離の種類、閾値となる距離、閾値以上でアクセスを許可/閾値以下でアクセスを許可といった情報を設定する。
【0049】
以上のように、本実施の形態2に係る設備情報管理システムによれば、設備情報の図面として登録される。
以下、他の設備情報設定者が図面を登録する場合の例を図15に示す。
図15は、Aバンクトランスの設定権を持つ設備情報設定者が、Aバンクトランスエリア57にトランスの平面図62を記入している。
以上により、複数の設備設定者が配置図面を作成する場合、許可された者のみが対象に記述できるようにする仕組みを実現できる。
【0050】
実施の形態3.
本実施の形態3に係る設備情報管理システムにおいては、接続関係を主体に記述する図面(回路図など)について、アクセス権を設定する場合の図面登録、および接続関係、電気的特性量を定義する実施の形態について述べる。
システム構成は図1と同様であり、特に本実施の形態3の例では設備情報登録部24の詳細説明にあたる。
【0051】
図16(a)は、回路図の概念を示すものである。上記実施の形態2との違いは、実施の形態2では配置図であるため、領域を指示したが、本実施の形態3では接続関係を指示する。
図において、63〜69は設備を表す概念(実際図面上には表示されない)を示すブロックであり、70〜75は接続ノード(図面上に表示される)を示す円である。また、76〜82は、設備に対する基本アクセス権(図面上には表示されない)を示す属性である。
設備に対する接続関係は、接続ノードを使って定義する。具体的には、設備64は接続ノード70と71を接続するものと定義し、設備64の設定権を持つ設備情報設定者のみが、このノードに接続する図形を描くことができる。
【0052】
図16(b)は、設備64に対する設定許可を持つ設備情報設定者が、設備64に対して接続ノード70と71に接続する回路図の一部として図面76を記入している。
【0053】
以上により、本実施の形態3に係る設備情報管理システムによれば、複数の設備設定者が接続関係を主体に記述する図面を作成する場合、許可されたもののみが対象に記述できるようにする仕組みを実現できる。
【0054】
実施の形態4.
本実施の形態4に係る設備情報管理システムにおいては、設備付属計測器(計算機)11が計測した設備情報を格納した設備情報データベース15に対して、上記アクセス権判定方法を用いてアクセス権を調べ、他の設備付属計測器(計算機)11が計測した設備情報を得て、自律的に設備付属計測器11を起動するまでの処理を示した例であり、図17を用いて説明する。
【0055】
図17は、設備を概念的に表す図で、接続関係は電気的接続関係を表す。この情報は設備情報における設備構成情報44の電気的接続関係により表現されている。図中の太い接続線が、電気的に接続していることを示しいている。図において、77〜83は各種設備を示しており、それぞれの設備は各設備付属計測器11により設備状態を計測されている。
以下、この図における、設備78の振る舞いについて順を追って説明する。
【0056】
(1)設備78を計測している設備付属計測器11は、接続関係を基に、隣接する設備を調べる。この場合、接続がある矢印84、85に沿って調べ、設備77、81、82が隣接設備としてあげられる。
(2)設備情報データベース15に格納された隣接する設備77、81、82の設備情報に対する設備78の設備付属計測のアクセス権判定を設備情報供給・閲覧サーバ8に要求し、上述した本実施の形態1のアクセス権判定方法を用いて設備情報供給・閲覧サーバ8がアクセス権を判定する。この場合、現状の設備状態では設備77が異常であるので、設備77が異常時のアクセス権ロジックとして電気的接続に沿った経由するノード数が1以下と設定されているとする。すると上記隣接設備中、設備77、78に対するアクセス権があると判定される。
(3)アクセス権を有すると判定された隣接する設備77の関連情報を、設備77を計測している設備付属計測器11の計測値より取得する。
(4)設備78の設備付属計測器11が有する隣接設備の正常/異常状態判定処理ロジックにより、上記でアクセス権があると判定された隣接設備の関連情報に基づき判断を行ない、隣接設備の正常/異常状態の判定を実行する。この結果、設備77の計測値が、設備78の設備付属計測器11が有する隣接設備の正常/異常状態判定処理ロジックにより異常と判定され、設備78を計測する設備付属計測器11が起動される。
【0057】
以上のように、本実施の形態4に係る設備情報管理システムによれば、設備78の設備状態を計測する設備付属計測器11が自律的に異常を判断する上で、本実施の形態1で説明したアクセス権判定方法が有効に作用し、正常時には情報を見ることができない情報に対して、異常時に閲覧ができ、処理が可能となる。従って、設備付属計測器11に対しても、通常時はセキュリティ性が高く、また異常時には柔軟な運用を行なうことができる。
【0058】
実施の形態5.
本実施の形態5においては、過去/現在/未来の任意の時点の設備状態情報を用いて、過去/現在/未来の任意の時点(要求時刻)における設備情報に関するアクセス権を判定する処理を行う。
本実施の形態5におけるシステム構成は、上記実施の形態1と同一のため図1を用いて説明するが、同一符号の構成要素であっても以下に説明する相違点を有している。なお、ここでは上記実施の形態1と異なる点を中心に説明する。
【0059】
図1における設備情報データベース15に格納されている設備図面、回路図、カタログ、取り扱い説明書は、設備の更新や増設等があると変更される。したがって、本実施の形態5では、設備情報データベース15に対し、ファイル毎にその有効期間を保持させる。
また、本実施の形態5における設備情報データベース15は、外部から、任意の時刻と、設備情報種類が要求されると、その要求時刻に有効な(要求された時刻を上記有効期間に含んでいる)設備情報ファイルを提示する機能を持つ。
【0060】
次に、設備情報アクセス権情報データベース17は、時系列変化する設備対象に対して、各設備情報設定者、閲覧者がどのようなアクセス権限を持つのかを情報として保持しているが、本実施の形態5ではこの情報を期間毎にファイル化している。
【0061】
また、本実施の形態5では、アクセス権判定ロジック情報データベース18は、時系列で変化する各設備の設備状態毎に「設備間距離」の種類とその閾値の情報を持つ。
【0062】
設定・閲覧アクセス権判定部22は、要求された時刻に有効な設備情報に対するアクセス権を判定する。即ち、設備情報アクセス権情報データベース17、アクセス権判定ロジック情報データベース18、および各種距離情報計測部19、設備アクセス情報抽出部20、設備状態情報抽出部21に基づいて、任意の時刻に有効な設備情報に対する設定・閲覧のアクセス権を判定する。
【0063】
閲覧コンテンツ作成部23は、設定・閲覧アクセス権判定部22で判定された指示された時刻に有効な設備情報に対するアクセス権に基づき、アクセス権のある情報だけからコンテンツを作成する。
設備情報登録部24は、設定・閲覧アクセス権判定部22で判定された結果に基づき、設定可能な設備情報について設定を行う。設備情報ファイルが変更される場合は、元の設備情報ファイルとの関係、および設備情報ファイルの有効期間を設定する。また、既に登録されている設備情報ファイルについて、有効期間の変更を行える。
【0064】
設備情報登録準備部25は、設備付属計測器11が最初に接続されたとき、初期設定情報と、設備情報データベース15の情報とを比較し、適切な位置に設備情報設定するよう設備情報登録部24に指令する。このとき、この設備の有効期間の開始時刻を最初に接続された時刻とする。また、この有効時刻は、アクセス権を持つ設定者により設定、変更ができる。
【0065】
この構成によると、任意の時刻の設備状態を把握し、当該時刻の設備の状態毎に設定されたアクセス権設定ロジックに基づきアクセス権が判定され、当該時刻にアクセス権のある情報のみ情報閲覧者に提供され、当該時刻にアクセス権のある情報のみ設備情報設定者が設定、操作可能となる。
【0066】
したがって、任意の時刻の設備状態毎にアクセス権が判定され、任意の時刻の設備状態に応じて適切な閲覧者、設備設定者に対して、情報提供、情報設定、設備操作が可能となる。
【0067】
次に、本実施の形態5に係る設備情報管理システムにおける設備情報設定・閲覧時のアクセス権判定処理の動作を上記実施の形態1で説明した図3に示したフローを用いて説明する。なお、ここでは設備情報を閲覧する場合について説明する。
【0068】
図3において、処理3−1では、設定情報閲覧部10は、IDまたはパスワード等による個人識別情報と、閲覧しようとする設備情報の要求時刻の情報(アクセス要求時刻情報)を含んだ閲覧対象設備情報(アクセス要求情報)とを認識し、設定・閲覧アクセス権判定部22に対して個人識別情報とアクセス要求情報を送信する。
【0069】
次いで、処理3−2では、閲覧者が閲覧したいアクセス要求時刻と設備情報とを選択する。
また、処理3−3では、設定・閲覧アクセス権判定部22は当該アクセス要求時刻の設備状態、当該状態におけるアクセス権判定ロジック、および設備間距離計測により、閲覧者のアクセス要求情報に対するアクセス権を判定する(図18に詳細を示す)。
【0070】
次いで、処理3−4では、閲覧コンテンツ作成部23は上記処理3−3で求めたアクセス要求情報に対するアクセス権に基づき、アクセス権があるものから閲覧用コンテンツを作成する。
そして、処理3−5では、上記処理3−4で作成された閲覧コンテンツを通信処理部、ネットワークを介して設備情報閲覧部10へ送信する。
【0071】
次に、上記処理3−3における閲覧者のアクセス要求情報に対するアクセス権を判定する動作について図18に示す処理フローにしたがって説明する。
処理18−1では、設定・閲覧アクセス権判定部22は、設備情報閲覧部10より入力された閲覧者識別ID(個人識別情報)、および閲覧しようとする設備情報の要求時刻の情報(アクセス要求時刻情報)を含んだ閲覧対象設備情報(アクセス要求情報)を取得する。
【0072】
処理18−2では、設定・閲覧アクセス権判定部22は、設備情報抽出部21に計測情報データベース16の内容からアクセス要求時刻における設備状態を抽出させ、この抽出された設備状態が警報、注意、正常等のいずれの状態であるかを判定する。
また、設定・閲覧アクセス権判定部22は、当該アクセス要求時刻における正常以外の状態である設備を異常設備とし、アクセス権判定ロジック情報データベース18から、当該アクセス要求時刻における設備状態に応じたアクセス権判定ロジック(設備間距離種類、閾値)を選択する。
【0073】
次いで、以下の処理では閲覧要求のあったすべての設備に対して処理を行なう。処理18−3では、設定・閲覧アクセス権判定部22は、処理18−1で取得した閲覧者識別情報IDに基づき、設備情報アクセス権情報データベース17の内容から、当該アクセス要求時刻の設備に対して予め設定されている閲覧者の基本アクセス権を設備アクセス情報抽出部20に抽出させる。
【0074】
処理18−4では、上記処理18−3で抽出した基本アクセス権を有する設備情報をもとに、いずれの閲覧対象設備に対してアクセス権を有するかを判定する。判定の結果、アクセス権を有するとされた設備情報に対しては処理18−5を行ない、アクセス権を有さないとされた設備情報に対しては処理18−6を行なう。
【0075】
処理18−5では、上記処理18−4でアクセス権を有すると判定された設備情報に対してアクセス権を有効とし、当該設備のアクセス権を一時アクセス権格納エリアに格納する。そして処理18−10へ進む。
【0076】
処理18−6では、各種距離情報計測部19は、上記処理18−4でアクセス権を有さないと判定された設備情報と、上記処理18−2によって抽出されたアクセス要求時刻における異常設備との設備情報を設備情報データベース15より抽出し、両者の設備間距離を算出する。
【0077】
次いで、処理18−7では、上記処理18−6で算出された設備間距離をアクセス権判定ロジックに当てはめて閾値と対比することにより、設備間距離が閾値に対して大きい場合には処理18−5へ行き、かかる設備間距離の算出に用いた設備情報へのアクセス権を有効とする。また、設備間距離が閾値に対して小さい場合には処理18−8へ進む。
【0078】
処理18−8では、すべてのカレントアクセス権ロジックについて判定が終了したか否かを調べ、すべて終了していれば処理18−9へ進み、終了していなければ処理18−6へ戻り処理を繰り返す。
【0079】
処理18−9では、設備情報へのアクセス権は無いものと判定し、次いで、処理18−10では、すべての閲覧要求対象設備についての判定が終了したか否かを調べ、終了していなければ、再度処理18−3へ戻り処理を繰り返す。すべての閲覧要求対象設備についての判定が終了していれば、閲覧アクセス権判定処理を終了し、設定・閲覧アクセス権判定部19はアクセス権を有効とした設備情報のみを設備情報閲覧コンテンツ作成部20へ送信する。
【0080】
次に、図19は本実施の形態5に係る設備情報管理システムにおける設備情報と計測情報の関係図であり、上記実施の形態1における設備情報と計測情報の関係図である図9との相違点について説明する。
【0081】
まず、設備情報の全体構成に相違はなく、設備情報44〜49と計測情報50は、設備識別IDを基に関係付けされている点に相違はない。
しかし、本実施の形態5における属性情報45は、設備に対してその設備の属性値を保持するが、属性の種類の1つとして、有効期間開始時刻、終了時刻を設定することで、設備の有効期間を格納することができる。また、本実施の形態5における設備情報関連付けデータ46は、設備に対する図面要素番号、ファイル名を持つが、それぞれに対して有効期間情報を保持している。
【0082】
また、図20,21,22はそれぞれ上記実施の形態1で説明した図10,11,13に対応しており、以下の相違点を有する。
図20は、アクセス権判定ロジック情報を例示したものであり、アクセス権判定ロジックテーブルの設備識別ID毎に有効期間情報が格納されている。
図21は、設備情報基本アクセス権情報を例示したものであり、設備情報基本アクセス権情報は、各設備識別ID、対象種類、設備管理関係者識別ID、グループ識別ID毎に有効期間情報が格納されている。
図22は、設備情報関連付け情報を例示したものであり、設備情報関連付けテーブルは、各設備識別ID、設備情報種類、設備ファイル名毎に有効期間情報が格納されている。
【0083】
以上のように、本実施の形態5に係る設備情報管理システムによれば、アクセス権判定ロジック情報、設備情報基本アクセス権情報、設備、設備ファイル毎に有効期間情報を保持できるように構成したことにより、所定時刻の設備情報に対するアクセス権を、当該所定時刻の設備状態情報を用いて判定することができ、時間変化する設備情報に対して、より細かくアクセス権管理を行うことができる。
【0084】
【発明の効果】
以上のように、この発明に係る設備情報管理システムによれば、設備情報設定・閲覧手段と、設備情報格納手段と、状態情報格納手段と、アクセス権判定ロジック格納手段と、情報抽出手段と、設定・閲覧アクセス権判定手段とを備えたことにより、設備情報に対して固定したアクセス権ではなく、設備状態に応じて適切なアクセス権を許容することができる。
【0085】
また、設備情報格納手段は、設備情報として設備が設置される場所毎にエリアが設定された配置図面を格納したことにより、設備平面図など作図領域が設備毎に決めることができ、設備図面を複数人で作図する場合には、責任範囲を明確にすることができ、誤りの防止にもなる。
【0086】
また、設備情報格納手段は、設備情報として線分の接続関係を主体に作成する図面を格納し、該図面は1個または複数のノードに接続する図形群を一つの設備に対応する図形としたことにより、線分の接続関係を主体に作成する図面に対してアクセス権を設定できるので、設備図面を複数人で作図する場合には、責任範囲を明確にすることができ、誤りの防止にもなる。
【0087】
また、ネットワークを介してシステムに接続された各設備機器の状態を計測する識別情報を有する計測器を備え、上記計測器の識別情報に基づき、上記設定・閲覧アクセス権判定手段は、上記計測器の上記計測情報格納手段へのアクセス権の有無を判定することにより、設備をネットワークに接続するだけで設備情報を容易に設定することができる。
【0088】
また、所定時刻の設備情報に対するアクセス権を、当該所定時刻の設備状態情報を用いて判定することができ、時間変化する設備情報に対して、より細かくアクセス権管理を行うことができる。
【図面の簡単な説明】
【図1】 この発明の実施の形態1に係る設備情報管理システムの構成を示すブロック図である。
【図2】 この発明の実施の形態1に係る設備情報管理システムの構成における設備情報管理システムの全体処理フローである。
【図3】 この発明の実施の形態1に係る設備情報管理システムの構成における設備情報の設定・閲覧時の処理フローである。
【図4】 この発明の実施の形態1に係る設備情報管理システムの構成における閲覧アクセス権判定処理フローである。
【図5】 この発明の実施の形態1に係る設備情報管理システムにおける「設備間距離」に関する概念図である。
【図6】 この発明の実施の形態1に係る設備情報管理システムにおける「設備間距離」に関する概念図である。
【図7】 この発明の実施の形態1に係る設備情報管理システムにおける「設備間距離」に関する概念図である。
【図8】 この発明の実施の形態1に係る設備情報管理システムにおける「設備間距離」に関する概念図である。
【図9】 この発明の実施の形態1に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図10】 この発明の実施の形態1に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図11】 この発明の実施の形態1に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図12】 この発明の実施の形態1に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図13】 この発明の実施の形態1に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図14】 この発明の実施の形態2に係る設備情報管理システムにおける配置図面の設定例の概念図である。
【図15】 この発明の実施の形態2に係る設備情報管理システムにおける配置図面の設定例の概念図である。
【図16】 この発明の実施の形態3に係る設備情報管理システムにおける回路図の設定例の概念図である。
【図17】 この発明の実施の形態4に係る設備情報管理システムにおける設備機器の電気的接続関係を示した概念図である。
【図18】 この発明の実施の形態5に係る設備情報管理システムの構成における閲覧アクセス権判定処理フローである。
【図19】 この発明の実施の形態5に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図20】 この発明の実施の形態5に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図21】 この発明の実施の形態5に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図22】 この発明の実施の形態5に係る設備情報管理システムにおける設備情報と計測情報の関係図である。
【図23】 従来の設備情報管理システムの構成を示すブロック図である。
【符号の説明】
1 電子データ格納手段、2 管理データ格納手段、3 組織情報格納手段、4 ユーザ情報格納手段、5 特例アクセス権情報格納手段、6 データ読込み/アクセス権判定手段、7 データ書込み/アクセス権設定手段、8 設備情報供給・閲覧サーバ、9 各設備情報設定部、10 設備情報閲覧部、11 設備付属計測器、12〜14はネットワーク、15 設備情報データベース、16 計測情報データベース、17 設備情報アクセス権情報データベース、18 アクセス権判定ロジック情報データベース、19 各種距離情報計測部、20 設備アクセス情報抽出部、21 設備状態情報抽出部、22 設定・閲覧アクセス権判定部、23 閲覧コンテンツ作成部、24 設備情報登録部、25 設備情報登録準備部、26 計測情報登録部、27 BバンクTr、28 BバンクGIS、29 AバンクTr、30 AバンクGIS、31 GIS母線、32 幹線GIS、33 幹線GIS、34 閾値を半径とする円弧、35 接続線、36 閾値の距離、37〜43 設備機器、44 設備構成情報、45 属性情報、46 設備情報関連付けデータ、47 図面データ、48 3Dモデルデータ、49 カタログ・取扱説明書データ、50 計測情報データベース、51 設備GIS001、52 ポート、53 ポート、54 設備BUS001設備、55 設備Tr001、56 図形要素、57〜61 エリア、62 平面図、63〜69 設備ブロック、70〜75 接続ノード、76〜83 設備、84〜85 矢印。
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a facility information management system, and more specifically, a facility that can determine an access right based on facility information including facility configuration / measurement information and can dynamically set an access right according to the facility state. The present invention relates to an information management system.
[0002]
[Prior art]
FIG. 23 is a block diagram showing a conventional facility information management system described in, for example, Japanese Patent Laid-Open No. 9-185541.
In the figure, 1 is an electronic data storage means for storing electronic data such as drawings, standards, design data, specifications, etc. 2 is information for specifying electronic data such as product number / version number, basic access rights, management data such as STATUS, etc. Stored management data storage means, 3 is an organization information storage means storing organization information such as the organization structure of a company, 4 is a user information storage storing user / group names, default access rights for each user / group, qualifications, etc. Means 5 is special access right information storage means for storing special access rights. Further, 6 is a data read / access right judging means for reading data and judging access rights to users, groups and worlds, and 7 is a data write / access right for performing new registration / data distribution / access right change processing. It is a setting means.
[0003]
Next, the operation of the conventional facility information management system having the above configuration will be described. The special access right information storage means 5 includes information for specifying data such as the product number and version number of the data in the management data storage means 2, basic access right for the data, data status, availability of data disclosure, data location, In addition, special access rights are registered in order to store the presence / absence of special access rights, etc., and to set addition / removal of access rights for specific users / groups or worlds.
[0004]
When there is an access request for the data stored in the electronic data storage unit 1, the data read / access right determination unit 6 receives the management data storage unit 2, the organization information storage unit 3, the user information storage unit 4, and the special case. Refer to the access right information storage means 5 to determine whether the person who requested the access is the owner of the above data, belongs to the same group as the owner, or is a third party other than the above. Access is determined based on the basic access right, data status, public / private access, and special access right for the user / group / world.
[0005]
The data write / access setting means 7 registers the basic access right in the management data storage means 2 based on the default access right set in the user information storage means 4 at the time of new data registration, and the management data storage means 2 The data state and the public mode registered in the are set to “designing” and “private”, respectively, and when the special access right is set, the special access right is set in the special access right information storage means 5. .
[0006]
At the time of data distribution, the data writing / access setting means 7 changes the data state of the management data storage means 2 to registered, changes the public mode to “public”, and sets a special access right. At this time, a special access right is set in the special access right information storage means 5. Further, when an access right change request is made, the basic access right and the disclosure mode of the management data storage means 2 are changed based on the access right change request, and the special access right is set according to the setting of the special access right. A special access right is registered in the information storage means 2.
[0007]
When managing the access right of drawing data, the qualification information of the designer, the examiner, and the approver is added to the user information storage means 4, and the data reading / access right determination means 6 uses the qualification information to It is determined whether or not the drawing data stored in the data storage means 1 is accessible. The data reading / access right judging means 6 is designing the state of the drawing data stored in the electronic data storage means 1 based on the basic access right, the data state, and the data disclosure possibility information stored in the management data storage means 2. In this case, access to the manufacturing department of the drawing data is disabled, and when the data state is registered, the manufacturing department of the drawing data can be accessed.
[0008]
When the manufacturing department needs access to the drawing data being designed, the data writing / access setting section sets the drawing mode of the drawing data to “public” and allows special access so that the manufacturing department can access it. A special access right is set in the right information storage means.
[0009]
As described above, various types of electronic data can be managed in a centralized manner, and various types of electronic data can be accessed in a data state, a data public / private state, or a group to which a user / user belongs. It can be managed finely.
[0010]
In addition, since the data writing / access setting means 7 is provided to perform processing when data is newly registered / data distributed / access rights are changed, the data state / publication mode setting at the time of new registration, data distribution, etc. can be performed. Appropriate access rights according to the actual usage of electronic data, such as being able to perform automatically, and depending on the data state / publication mode, it is possible to grant access rights to those that do not originally have access rights. Can be managed.
[0011]
[Problems to be solved by the invention]
The conventional equipment information management system is configured as described above, so it is not possible to obtain / manage the status represented by various electronic data, and dynamically set access rights according to the status of the representation target. There was a problem that I could not do.
[0012]
The present invention has been made to solve the above-described problems. The access right determination logic is changed based on facility information including state information of various facilities, and the connection between facilities is changed based on the changed determination logic. An object of the present invention is to realize an equipment information management system capable of dynamically setting an optimum access right according to the equipment state by determining the access right based on information and equipment information.
[0013]
[Means for Solving the Problems]
The facility information management system according to the present invention includes facility information setting / browsing means for setting or browsing facility information according to personal identification information and access request information, facility information storage means for storing facility information, and each facility device. A plurality of accesses having a preset threshold value of facility information for determining the right to access each piece of equipment information in association with the state identification information storing means for storing the state information, and the individual identification information and each piece of equipment state information The access right determination logic storage means storing the right determination logic and the facility information requested to be accessed by the access request information are extracted from the facility information storage means, and the current equipment state information is extracted from the state information storage means. Information extracting means, personal identification information requested for access, and the information extracting means are extracted from the status information storing means. The access right determination logic corresponding to the current equipment state information is selected from the access right determination logic storage means, the access requested equipment information extracted by the information extraction means is read, and the access requested equipment A setting / viewing access right determination means for determining the presence / absence of an access right by comparing a value obtained from information with a threshold value of facility information set in advance in the selected access right determination logic. is there.
[0014]
Moreover, the said facility information storage means stores the information between facilities which shows the distance between each facility as said facility information.
[0015]
Moreover, the said status information storage means stores the measurement information which measured the state of each equipment apparatus as equipment status information.
[0016]
The facility information storage means stores a layout drawing in which an area is set for each place where the facility is installed as facility information.
[0017]
The facility information storage means stores a drawing created mainly by connection relations of line segments as facility information, and the drawing includes a group of figures connected to one or a plurality of nodes as a figure corresponding to one facility. To do.
[0018]
In addition, a measuring instrument having identification information for measuring the state of each facility device connected to the system via a network is provided. Based on the identification information of the measuring instrument, the setting / viewing access right determining means includes the measuring instrument. To determine whether there is an access right to the facility information.
[0019]
Further, the measuring instrument adds the facility information of the measuring instrument itself to the facility information storage means based on the comparison between the facility information of the measuring instrument itself and the facility information stored in the facility information storage means. To edit.
[0020]
The access request information includes access request time information for requesting access to equipment information at an arbitrary time, and the equipment information storage means adapts the equipment information to the equipment information effectively. Effective state information is added, the state information storage means stores equipment state information for each effective period information, and the access right determination logic storage means adds the individual identification information and the effective period information. A plurality of access right determination logic having a preset threshold value of facility information for determining access right to each facility information is stored in association with the facility state information, and the information extracting means is accessed by the access request information. When the requested equipment information at the requested time is within the validity period of the equipment information stored in the equipment information storage means, The equipment status information of the effective period including the request time is extracted, and the setting / viewing access right determination means is the personal identification information requested for access and the information extraction means extracted from the status information storage means Access right determination logic corresponding to the equipment state information of the effective period is selected from the access right determination logic storage means, and the presence / absence of access right to the equipment information effective at the request time is determined.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 FIG.
1 is a block diagram showing a configuration of a facility information management system according to Embodiment 1 of the present invention. In the following, FIG. 1 will be described.
Here, among those related to equipment management, those who browse equipment information are called equipment information viewers, equipment information is set / edited, equipment related programs are executed, and those who operate equipment are called equipment information setters. .
[0022]
In the figure, 8 is an equipment information supply / browsing server, 9 is each equipment information setting section, 10 is an equipment information browsing section, 11 is an equipment measuring instrument, 12, 13 and 14 are networks, and each equipment information setting section 9 The equipment information browsing unit 10 and the equipment-attached measuring instrument 11 are connected to the equipment information supply / viewing server 8 via the networks 12 to 14 respectively.
[0023]
Next, the configuration in the facility information supply / browsing server 8 will be described. An equipment information database 15 stores equipment drawings, circuit diagrams, catalogs, instruction manuals, and association information between elements. Particularly, in the first embodiment, connection relation information for tracing the connection relation in the layout drawing and the circuit diagram is stored. Reference numeral 16 denotes a measurement information database that stores measurement information of equipment that is sequentially measured. Reference numeral 17 denotes an equipment information access right information database, which holds information on what access authority each equipment information setter and viewer has for equipment information. Reference numeral 18 denotes an access right determination logic information database having information on the type of “distance between facilities” and its threshold value for each equipment state of each equipment.
[0024]
Reference numeral 19 denotes various distance information measuring units for measuring each “distance between facilities” based on the measurement information obtained from the measurement information database 16, and 20 denotes facility information access right information from the facility information access right information database 17. An equipment access information extracting unit 21 for extracting equipment information information extracting unit 21 extracts equipment information from the equipment information database 15.
Reference numeral 22 denotes a setting / browsing access right determination unit, which determines access right from the access right determination logic information database 18 based on information acquired from various distance information measurement unit 19, equipment access information extraction unit 20, and equipment state information extraction unit 21. A logic is selected, and whether to access the facility information is determined according to the access right determination logic.
[0025]
Reference numeral 23 denotes a browsing content creation unit that creates content based only on information with access rights based on the access rights for each facility determined by the setting / browsing access right determination unit 22. Reference numeral 24 denotes an equipment information registration unit, which sets the settable equipment information based on the result determined by the setting / viewing access right determination unit 22.
Reference numeral 25 denotes an equipment information registration preparation unit, which compares the initial setting information with the information in the equipment information database 15 when the equipment attached measuring instrument 11 is connected for the first time, and sets the equipment information at an appropriate position. Commands the information registration unit 24. Also, it acts at the time of initial setting and setting change by the facility information setting unit 9, and presents the contents of the current facility information. These processes are the same for the equipment attached measuring instrument 11 and the equipment information setting unit 9.
Reference numeral 26 denotes a measurement information registration unit that accumulates measurement information sequentially transmitted from the equipment-attached measuring instrument 11 in the measurement information database 16.
[0026]
Next, FIG. 2 shows the overall processing flow of the facility information management system in the above configuration.
In the process 2-1, initial equipment information is set, and then in the process 2-2, it is determined whether or not the equipment has been changed. When there is no equipment change (No), the browsing of the equipment information by the process 2-3 and the process 2- Each process of storing the equipment measurement information by 4 is performed. When there is an equipment change (Yes), the equipment information is changed by setting the equipment information in process 2-5.
[0027]
FIG. 3 shows a processing flow when setting / browsing facility information. Here, the case of viewing facility information will be described.
First, in the process 3-1, the setting information browsing unit 10 recognizes the personal identification information by ID or password and the facility information (browsing request information) requested to be browsed, and the setting / browsing access right determination unit 22 is recognized. Personal identification information and browsing request information.
Next, in process 3-2, the setting / browsing access right determination unit 22 selects facility information that the viewer wants to browse based on the browsing request information transmitted from the setting information browsing unit 10.
Further, in the process 3-3, the setting / browsing access right determination unit 22 determines the access right for the browsing request information of the viewer by the equipment state, the access right judgment logic in the state, and the distance measurement between the equipments (FIG. 4). Details).
Next, in processing 3-4, the browsing content creation unit 23 creates browsing content from those having access rights based on the access rights to the browsing request information obtained in the processing 3-3.
In process 3-5, the browsing content created in process 3-4 is transmitted to the facility information browsing unit 10 via the communication processing unit and the network.
[0028]
FIG. 4 is a browsing access right determination processing flow for explaining in detail the browsing access right determination (processing 3-3) in the facility information browsing processing flow shown in FIG.
In the figure, in process 4-1, the setting / browsing access right determination unit 22 acquires the browser identification ID and the browsing request information from the facility information browsing unit 10.
[0029]
In process 4-2, the setting / viewing access right determination unit 22 causes the equipment state information extraction unit 21 to extract the current equipment state from the contents of the measurement information database 16, and the extracted equipment state is alarmed, cautioned, or normal. Or the like. In addition, the equipment which is in a state other than normal in the determination result is regarded as abnormal equipment.
The setting / viewing access right determination unit 22 selects an access right determination logic corresponding to the determined equipment state (abnormal level of the abnormal equipment) from the access right determination logic information database 18. Note that the access right determination logic information is composed of contents permitting access (viewing / setting), the type of distance between facilities, a distance serving as a threshold, and permitting access above or below the threshold or permitting access below the threshold. Also, a plurality of access right determination logics can be set.
[0030]
Next, in the following processing, the following processing is performed for all facilities requested to be browsed.
In process 4-3, the setting / browsing access right determination unit 22 uses the contents of the facility information access right information database 17 to the equipment access information extraction unit 20 based on the viewer identification information ID acquired in process 4-1. The basic access right of the viewer set in advance is extracted.
[0031]
In process 4-4, it is determined based on the facility information having the basic access right extracted in process 4-3 which access right is to be browsed. As a result of the determination, processing 4-5 is performed on the facility information determined to have the access right, and processing 4-6 is performed on the facility information determined not to have the access right.
[0032]
In the process 4-5, the access right is validated for the equipment information determined to have the access right in the process 4-4, and the access right of the equipment is stored in the temporary access right storage area. Then, the process proceeds to process 4-10.
[0033]
In the process 4-6, the various distance information measuring unit 19 compares the facility information determined to have no access right in the process 4-4 and the current abnormal equipment extracted in the process 4-2. The facility information is extracted from the facility information database 15 and the distance between the facilities is calculated.
[0034]
Next, in process 4-7, the distance between facilities calculated in the above process 4-6 is applied to the access right determination logic and compared with the threshold value. Go to 5 and validate the access right to the facility information used to calculate the distance between the facilities. Moreover, when the distance between facilities is small with respect to a threshold value, it progresses to the process 4-8.
[0035]
In process 4-8, it is checked whether or not the determination is completed for all current access right logics. If all the processes are completed, the process proceeds to process 4-9. If not completed, the process returns to process 4-6 to repeat the process. .
[0036]
In process 4-9, it is determined that there is no right to access the facility information. Then, in process 4-10, it is checked whether or not the determination for all the browse request target facilities has been completed. Then, the process returns to process 4-3 again to repeat the process. If the determination for all the browsing request target facilities is completed, the browsing access right determination process is terminated, and the setting / browsing access right determination unit 19 sets only the facility information for which the access right is valid as the facility information browsing content creation unit. 20 is transmitted.
[0037]
Next, FIG. 5 to FIG. 8 are explanatory diagrams of setting of the access right showing the concept regarding “distance between facilities”. There are a plurality of types of “distance between facilities”. For example, (a) a linear distance on the layout diagram (two-dimensional linear distance on the plan view), and (b) a distance along the connection line on the layout diagram. (C) the number of facilities that pass along the connection line on the circuit diagram; (d) the sum of the electrical characteristic quantities of the facilities that pass along the connection line on the circuit diagram;
FIG. 5 is an explanatory diagram in a case where the linear distance on the layout diagram (two-dimensional linear distance on the plan view) is set as “distance between facilities”.
In the figure, 27 indicates the B bank Tr, 28 indicates the B bank GIS, 29 indicates the A bank Tr, 30 indicates the A bank GIS, 31 indicates the GIS bus, and 32 and 33 indicate the main line GIS. The above facilities 27 to 33 are browsing target facilities, and represent a case where the type of “distance between facilities” is a linear distance in the access right determination logic in a state where the B bank Tr27 is determined as an abnormal facility. In this example, an arc 34 whose radius is the threshold value of the determination logic is drawn, and equipment in the arc 34 is indicated by a bold line as equipment with access rights.
[0038]
FIG. 6 is an explanatory diagram in a case where the distance along the connection line on the layout diagram is “distance between facilities”. As a new code, reference numeral 35 denotes a facility connection line, and 36 denotes a threshold distance of the determination logic by a line taken from the B bank Tr 27 along the facility connection line 35. In the same state as in FIG. 5, the type of “distance between facilities” is the distance 36 along the connection line in the access right determination logic. In this example, the facility where the broken line 36 exists is indicated by a thick line as a facility having an access right.
[0039]
FIG. 7 is an explanatory diagram in the case where the number of facilities passing along the connection line on the circuit diagram is “distance between facilities”. In the figure, reference numerals 37 to 43 denote browsing target equipments indicating various equipments. When the equipment 37 is determined to be an abnormal equipment, the type of “distance between equipments” passes along the connection line in the access right judgment logic. This represents the number of facilities. In this example, the case where the threshold value of the determination logic is 3 is shown, and the facilities 37, 38, and 41 indicated by bold lines are determined as the facilities having the access right.
[0040]
FIG. 8 is an explanatory diagram in the case where the sum of the electrical characteristic quantities of the facilities passing along the connection line on the circuit diagram is set as “distance between facilities”. In the same state as FIG. 5C, the case where the type of “distance between facilities” is the electrical characteristic of the facility along the connection line in the access right determination logic is shown. In this example, the case where the threshold value of the determination logic is 100 is shown, and the facilities 37 and 38 indicated by bold lines are determined as the facilities having the access right.
[0041]
FIG. 9 shows the contents of facility information and measurement information and the relationship between them. The configuration of the facility information includes facility configuration information, attribute information, facility information association data, drawing data, 3D model data, and catalog / instruction manual data. In the figure, 44 is equipment configuration information, 45 is attribute information, 46 is equipment information association data, 47 is drawing data, 48 is 3D model data, 49 is catalog / instruction manual data, and 50 is a measurement information database. The facility information 44 to 49 and the measurement information 50 are related based on the facility identification ID.
The facility configuration information 44 has a hierarchical relationship describing facilities hierarchically and connection relationship information describing mechanical adjacency relationships / electrical connections. The attribute information 45 holds an attribute value of the equipment for the equipment. The facility information association data 46 describes which element of the various types of information the facility corresponds to.
[0042]
FIG. 10 shows an example of the access right determination logic information database 18.
The access right determination logic information database 18 includes an access right determination logic table and an evaluation expression table. The access right determination logic table describes a logical expression and an access right given when the logical expression is true for the information state of each facility.
Here, the logical expression is defined by referring to the evaluation expression in the evaluation expression table by name. The evaluation formula in the evaluation formula table is represented by an inequality using “distance between facilities” between two facilities (here, a and b).
f (a, b) <TH
Here, the function f is a “distance calculation function between facilities”, and TH is a threshold value of “distance between facilities”.
It is.
[0043]
FIG. 11 shows the facility information basic access right information 17.
This table gives an access right to the person defined by the identification ID of the facility management related person for the type of the target information of the facility of the facility identification ID. Here, a group of a plurality of facility management personnel can be designated as the facility management personnel.
[0044]
FIG. 12 shows the equipment configuration information 44.
Here, it consists of a hierarchical relationship information table describing the hierarchical relationship of equipment, an electrical connection relationship information table describing the electrical connection relationship, and a mechanical connection relationship information table describing the mechanical connection relationship. Each table shows an example of information on the equipment with the bold line in the conceptual diagram described in each table. A connection relationship represents a connection with a node for connection called a port. For example, the example of the electrical connection relation information table indicates that the two ports 52 and 53 of the GIS001 facility 51 are connected to the EP2 port of the BUS001 facility 54 and the EP1 port of the Tr001 facility 55, respectively.
[0045]
FIG. 13 shows an example of the facility information association information 46.
Here, the position of information corresponding to the facility GIS001 in each facility file is represented. The equipment file named haitizu01 is a layout diagram, and expresses that a graphic element named Block001 (in this case, a block in which a plurality of line segments are gathered) 56 corresponds to the equipment GIS001. The equipment file named measuredGas01 is a measured value, and expresses that a measured value of gas pressure is included in a table called GIS001GasP.
[0046]
As described above, according to the facility information management system according to the first embodiment, the current facility state is grasped, the access right is determined based on the access right setting logic set for each state of the facility, and the information Only information with access rights is provided to the viewer, and only information with access rights can be set and operated by the facility information setter. Accordingly, the access right is determined for each equipment state, and information provision, information setting, and equipment operation can be performed for an appropriate viewer and equipment setter according to the equipment state.
[0047]
Embodiment 2. FIG.
In the facility information management system according to the second embodiment, for the layout data in the facility information, an embodiment is defined in which the drawing registration and the spatial distance, connection relationship, and electrical characteristic amount are defined when the access right is set. Is described.
The system configuration is the same as that in FIG. 1, and in particular, in the example of the second embodiment, the detailed description of the facility information registration unit 24 will be given.
[0048]
FIG. 14 shows the concept of the initial setting of the layout drawing. Areas 57 to 61 in which each facility in the layout drawing is installed are set. In FIG. 14, although it is a rectangular area | region, the area | region etc. which include a broken line and a circular arc are also considered.
For each facility area, refer to FIG. 12 for hierarchical relationships (see FIG. 12 for internal representations such as 57 to 61 belonging to the plant XX), and internal representations such as 57 and 58 are connected. 12), equipment information access logic (see Fig. 10 for internal representation), equipment status (alarm, caution, normal, etc.), type of distance between equipment, threshold distance, access permitted above threshold or below threshold Set information such as permission to access.
[0049]
As described above, according to the facility information management system according to the second embodiment, it is registered as a drawing of facility information.
Hereinafter, an example in which another facility information setter registers a drawing is shown in FIG.
In FIG. 15, the facility information setter who has the right to set the A bank transformer has entered a plan view 62 of the transformer in the A bank transformer area 57.
As described above, when a plurality of equipment setters create a layout drawing, it is possible to realize a mechanism that allows only authorized persons to describe the object.
[0050]
Embodiment 3 FIG.
In the facility information management system according to the third embodiment, with respect to a drawing (circuit diagram or the like) that mainly describes the connection relationship, drawing registration, connection relationship, and electrical characteristic amount are defined when setting the access right. Embodiments will be described.
The system configuration is the same as that shown in FIG.
[0051]
FIG. 16A shows the concept of a circuit diagram. The difference from the second embodiment is that the layout is shown in the second embodiment, and thus the area is designated, but the connection relation is designated in the third embodiment.
In the figure, reference numerals 63 to 69 are blocks showing concepts (not actually displayed on the drawing) representing facilities, and reference numerals 70 to 75 are circles showing connection nodes (displayed on the drawing). Further, 76 to 82 are attributes indicating basic access rights (not displayed on the drawing) for the facility.
Connection relations to equipment are defined using connection nodes. Specifically, the facility 64 is defined as connecting the connection nodes 70 and 71, and only a facility information setter having the setting right of the facility 64 can draw a figure connected to this node.
[0052]
In FIG. 16B, a facility information setter who has setting permission for the facility 64 has entered the drawing 76 as a part of a circuit diagram for connecting the facility 64 to the connection nodes 70 and 71.
[0053]
As described above, according to the facility information management system according to the third embodiment, when a plurality of facility setters create a drawing that mainly describes the connection relationship, only permitted items can be described in the object. The mechanism can be realized.
[0054]
Embodiment 4 FIG.
In the facility information management system according to the fourth embodiment, the access right is checked using the access right determination method for the facility information database 15 storing the facility information measured by the facility attached measuring instrument (computer) 11. FIG. 17 shows an example of processing from obtaining equipment information measured by another equipment-attached measuring instrument (computer) 11 to autonomously starting the equipment-attached measuring instrument 11, and will be described with reference to FIG.
[0055]
FIG. 17 is a diagram conceptually illustrating equipment, and the connection relationship represents an electrical connection relationship. This information is expressed by the electrical connection relationship of the equipment configuration information 44 in the equipment information. The thick connection lines in the figure indicate that they are electrically connected. In the figure, reference numerals 77 to 83 denote various facilities, and the state of each facility is measured by each facility-attached measuring instrument 11.
Hereinafter, the behavior of the equipment 78 in this figure will be described in order.
[0056]
(1) The equipment-attached measuring instrument 11 that measures the equipment 78 examines adjacent equipment based on the connection relationship. In this case, the equipment 77, 81, and 82 are listed as adjacent equipment by checking along the connected arrows 84 and 85.
(2) The facility information supply / browsing server 8 is requested to determine the access right of the equipment attached measurement of the equipment 78 with respect to the equipment information of the adjacent equipment 77, 81, 82 stored in the equipment information database 15, and the above-described embodiment The facility information supply / browsing server 8 determines the access right using the access right determination method of the first mode. In this case, since the equipment 77 is abnormal in the current equipment state, it is assumed that the number of nodes through which the equipment 77 passes along the electrical connection is set as 1 or less as the access right logic when the equipment 77 is abnormal. Then, it is determined that there is an access right to the facilities 77 and 78 among the adjacent facilities.
(3) The related information of the adjacent equipment 77 determined to have the access right is acquired from the measurement value of the equipment attached measuring instrument 11 measuring the equipment 77.
(4) By the normal / abnormal state determination processing logic of the adjacent equipment included in the equipment attached measuring instrument 11 of the equipment 78, the determination is made based on the related information of the adjacent equipment determined to have the access right, and the normal of the adjacent equipment is determined. / Execute the judgment of abnormal state. As a result, the measured value of the equipment 77 is determined to be abnormal by the normal / abnormal state determination processing logic of the adjacent equipment included in the equipment attached measuring instrument 11 of the equipment 78, and the equipment attached measuring instrument 11 that measures the equipment 78 is activated. .
[0057]
As described above, according to the equipment information management system according to the fourth embodiment, the equipment-attached measuring instrument 11 that measures the equipment state of the equipment 78 autonomously determines an abnormality in the first embodiment. The access right determination method described above works effectively, and information that cannot be viewed when it is normal can be viewed and processed when it is abnormal. Therefore, the equipment-attached measuring instrument 11 is also highly secure during normal times and can be operated flexibly when abnormal.
[0058]
Embodiment 5. FIG.
In the fifth embodiment, processing for determining an access right related to facility information at an arbitrary point in the past / present / future (request time) is performed using facility state information at an arbitrary point in the past / present / future. .
The system configuration of the fifth embodiment is the same as that of the first embodiment, and will be described with reference to FIG. 1. However, even components having the same reference numerals have differences described below. Here, the description will focus on the differences from the first embodiment.
[0059]
The equipment drawings, circuit diagrams, catalogs, and instruction manuals stored in the equipment information database 15 in FIG. 1 are changed when equipment is updated or expanded. Therefore, in the fifth embodiment, the facility information database 15 holds the valid period for each file.
In addition, the facility information database 15 according to the fifth embodiment is effective at the requested time when an arbitrary time and facility information type are requested from the outside (the requested time includes the requested time in the valid period). ) Has the function of presenting equipment information files.
[0060]
Next, the facility information access right information database 17 holds, as information, what access authority each facility information setter and viewer has for the facility objects that change in time series. In this form 5, this information is filed for each period.
[0061]
In the fifth embodiment, the access right determination logic information database 18 has information on the type of “distance between facilities” and its threshold value for each facility state of each facility that changes in time series.
[0062]
The setting / viewing access right determination unit 22 determines an access right for the facility information effective at the requested time. That is, based on the facility information access right information database 17, the access right determination logic information database 18, the various distance information measuring unit 19, the facility access information extracting unit 20, and the facility state information extracting unit 21, the equipment effective at an arbitrary time. Determine access rights for setting / viewing information.
[0063]
The browsing content creation unit 23 creates content only from information with access rights based on the access rights to the facility information valid at the specified time determined by the setting / browsing access right determination unit 22.
The facility information registration unit 24 sets the settable facility information based on the result determined by the setting / viewing access right determination unit 22. When the equipment information file is changed, the relationship with the original equipment information file and the validity period of the equipment information file are set. In addition, the validity period can be changed for an already registered facility information file.
[0064]
The facility information registration preparation unit 25 compares the initial setting information with the information in the facility information database 15 when the facility attached measuring instrument 11 is connected for the first time, and sets the facility information at an appropriate position. 24. At this time, the start time of the effective period of this equipment is set as the time of the first connection. This valid time can be set and changed by a setter having access rights.
[0065]
According to this configuration, the equipment state at an arbitrary time is grasped, the access right is determined based on the access right setting logic set for each state of the equipment at the time, and only the information viewer who has the access right at the time. The facility information setter can set and operate only the information provided at the time and having the access right.
[0066]
Therefore, an access right is determined for each equipment state at an arbitrary time, and information provision, information setting, and equipment operation can be performed for an appropriate viewer and equipment setter according to the equipment state at an arbitrary time.
[0067]
Next, the operation of access right determination processing at the time of facility information setting / browsing in the facility information management system according to the fifth embodiment will be described using the flow shown in FIG. 3 described in the first embodiment. Here, the case where the facility information is browsed will be described.
[0068]
In FIG. 3, in the process 3-1, the setting information browsing unit 10 includes personal identification information based on an ID or a password, and browsing target equipment including information on request time of equipment information to be browsed (access request time information). Recognizing the information (access request information), the personal identification information and the access request information are transmitted to the setting / viewing access right determination unit 22.
[0069]
Next, in process 3-2, the access request time and facility information that the viewer wants to browse are selected.
In process 3-3, the setting / browsing access right determination unit 22 obtains the access right to the access request information of the viewer by the equipment state at the access request time, the access right judgment logic in the state, and the distance measurement between the equipments. Determine (details are shown in FIG. 18).
[0070]
Next, in processing 3-4, the browsing content creation unit 23 creates browsing content from those having access rights based on the access rights to the access request information obtained in the processing 3-3.
In process 3-5, the browsing content created in process 3-4 is transmitted to the facility information browsing unit 10 via the communication processing unit and the network.
[0071]
Next, the operation of determining the access right for the access request information of the viewer in the above process 3-3 will be described according to the process flow shown in FIG.
In the process 18-1, the setting / browsing access right determination unit 22 receives the viewer identification ID (personal identification information) input from the facility information browsing unit 10 and information on the request time of the facility information to be browsed (access request). The browsing target facility information (access request information) including the time information) is acquired.
[0072]
In process 18-2, the setting / browsing access right determination unit 22 causes the facility information extraction unit 21 to extract the facility state at the access request time from the contents of the measurement information database 16, and the extracted facility state is an alarm, caution, It is determined whether the state is normal or the like.
In addition, the setting / viewing access right determination unit 22 sets the equipment in a state other than normal at the access request time as an abnormal equipment, and accesses the access right according to the equipment state at the access request time from the access right determination logic information database 18. Select the decision logic (distance type between facilities, threshold).
[0073]
Next, in the following processing, processing is performed for all the facilities requested to be browsed. In process 18-3, the setting / browsing access right determination unit 22 uses the contents of the equipment information access right information database 17 to the equipment at the access request time based on the viewer identification information ID acquired in process 18-1. Thus, the basic access right of the viewer set in advance is extracted by the facility access information extraction unit 20.
[0074]
In process 18-4, it is determined based on the facility information having the basic access right extracted in process 18-3 which access target equipment has the access right. As a result of the determination, the process information 18-5 is performed for the facility information determined to have the access right, and the process 18-6 is performed for the facility information determined not to have the access right.
[0075]
In the process 18-5, the access right is validated for the equipment information determined to have the access right in the process 18-4, and the access right of the equipment is stored in the temporary access right storage area. Then, the process proceeds to process 18-10.
[0076]
In the process 18-6, the various distance information measuring unit 19 includes the equipment information determined to have no access right in the process 18-4, and the abnormal equipment at the access request time extracted by the process 18-2. Are extracted from the facility information database 15 and the distance between the facilities is calculated.
[0077]
Next, in process 18-7, when the inter-equipment distance calculated in the above process 18-6 is applied to the access right determination logic and compared with the threshold, the process 18- Go to 5 and validate the access right to the facility information used to calculate the distance between the facilities. Moreover, when the distance between facilities is small with respect to a threshold value, it progresses to process 18-8.
[0078]
In the process 18-8, it is checked whether or not the determination is completed for all current access right logics. If all the processes are completed, the process proceeds to the process 18-9. If not completed, the process returns to the process 18-6 and the process is repeated. .
[0079]
In the process 18-9, it is determined that there is no access right to the facility information. Next, in the process 18-10, it is checked whether or not the determination for all the browse request target facilities is completed. Then, the process returns to the process 18-3 again to repeat the process. If the determination for all the browsing request target facilities is completed, the browsing access right determination process is terminated, and the setting / browsing access right determination unit 19 sets only the facility information for which the access right is valid as the facility information browsing content creation unit. 20 is transmitted.
[0080]
Next, FIG. 19 is a relationship diagram between facility information and measurement information in the facility information management system according to the fifth embodiment, and is different from FIG. 9 which is a relationship diagram between facility information and measurement information in the first embodiment. The point will be described.
[0081]
First, there is no difference in the overall configuration of the facility information, and there is no difference in that the facility information 44 to 49 and the measurement information 50 are related based on the facility identification ID.
However, the attribute information 45 in the fifth embodiment holds the attribute value of the equipment for the equipment, but by setting the effective period start time and end time as one of the attribute types, The validity period can be stored. Further, the facility information association data 46 in the fifth embodiment has a drawing element number and a file name for the facility, but holds validity period information for each.
[0082]
20, 21, and 22 correspond to FIGS. 10, 11, and 13 described in the first embodiment, respectively, and have the following differences.
FIG. 20 illustrates access right determination logic information, in which valid period information is stored for each equipment identification ID in the access right determination logic table.
FIG. 21 exemplifies the facility information basic access right information. The facility information basic access right information stores valid period information for each facility identification ID, target type, facility management related person identification ID, and group identification ID. Has been.
FIG. 22 illustrates the facility information association information, and the facility information association table stores valid period information for each facility identification ID, facility information type, and facility file name.
[0083]
As described above, according to the facility information management system according to the fifth embodiment, it is configured to be able to hold the validity period information for each access right determination logic information, facility information basic access right information, facility, and facility file. Thus, the access right to the equipment information at the predetermined time can be determined using the equipment state information at the predetermined time, and the access right can be more finely managed with respect to the equipment information that changes with time.
[0084]
【The invention's effect】
As described above, according to the facility information management system according to the present invention, the facility information setting / browsing means, the facility information storage means, the state information storage means, the access right determination logic storage means, the information extraction means, By providing the setting / browsing access right determination means, it is possible to allow an appropriate access right according to the equipment state, not the access right fixed to the equipment information.
[0085]
Moreover, the facility information storage means stores the layout drawing in which the area is set for each place where the facility is installed as the facility information, so that the drawing area such as the facility plan view can be determined for each facility. When drawing by multiple people, the scope of responsibility can be clarified, and errors can be prevented.
[0086]
In addition, the facility information storage means stores a drawing created mainly by connection relations of line segments as the facility information, and the drawing has a graphic group connected to one or a plurality of nodes as a graphic corresponding to one facility. As a result, access rights can be set for drawings created mainly based on the connection relations of line segments, so when drawing equipment drawings by multiple people, the scope of responsibility can be clarified, and errors can be prevented. Also become.
[0087]
In addition, a measuring instrument having identification information for measuring the state of each facility device connected to the system via a network is provided. Based on the identification information of the measuring instrument, the setting / viewing access right determining means includes the measuring instrument. By determining whether or not there is an access right to the measurement information storage means, the facility information can be easily set only by connecting the facility to the network.
[0088]
Further, the access right to the facility information at the predetermined time can be determined using the facility state information at the predetermined time, and the access right can be more finely managed for the facility information that changes with time.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of a facility information management system according to Embodiment 1 of the present invention.
FIG. 2 is an overall processing flow of the facility information management system in the configuration of the facility information management system according to Embodiment 1 of the present invention;
FIG. 3 is a processing flow at the time of setting / viewing facility information in the configuration of the facility information management system according to Embodiment 1 of the present invention;
FIG. 4 is a viewing access right determination processing flow in the configuration of the facility information management system according to the first embodiment of the present invention.
FIG. 5 is a conceptual diagram related to “distance between facilities” in the facility information management system according to Embodiment 1 of the present invention;
FIG. 6 is a conceptual diagram related to “distance between facilities” in the facility information management system according to Embodiment 1 of the present invention;
FIG. 7 is a conceptual diagram relating to “distance between facilities” in the facility information management system according to Embodiment 1 of the present invention;
FIG. 8 is a conceptual diagram related to “distance between facilities” in the facility information management system according to Embodiment 1 of the present invention;
FIG. 9 is a relationship diagram between facility information and measurement information in the facility information management system according to Embodiment 1 of the present invention;
FIG. 10 is a relationship diagram between facility information and measurement information in the facility information management system according to Embodiment 1 of the present invention;
FIG. 11 is a relationship diagram between facility information and measurement information in the facility information management system according to Embodiment 1 of the present invention;
FIG. 12 is a relationship diagram between facility information and measurement information in the facility information management system according to Embodiment 1 of the present invention;
FIG. 13 is a relationship diagram between facility information and measurement information in the facility information management system according to Embodiment 1 of the present invention;
FIG. 14 is a conceptual diagram of a layout drawing setting example in the facility information management system according to the second embodiment of the present invention.
FIG. 15 is a conceptual diagram of a layout drawing setting example in the facility information management system according to Embodiment 2 of the present invention;
FIG. 16 is a conceptual diagram of a setting example of a circuit diagram in the facility information management system according to the third embodiment of the present invention.
FIG. 17 is a conceptual diagram showing an electrical connection relationship of facility equipment in a facility information management system according to Embodiment 4 of the present invention;
FIG. 18 is a browsing access right determination processing flow in the configuration of the facility information management system according to Embodiment 5 of the present invention;
FIG. 19 is a relationship diagram between facility information and measurement information in a facility information management system according to Embodiment 5 of the present invention;
FIG. 20 is a relationship diagram between facility information and measurement information in the facility information management system according to Embodiment 5 of the present invention;
FIG. 21 is a diagram showing the relationship between facility information and measurement information in a facility information management system according to Embodiment 5 of the present invention;
FIG. 22 is a relationship diagram of facility information and measurement information in the facility information management system according to Embodiment 5 of the present invention;
FIG. 23 is a block diagram showing a configuration of a conventional facility information management system.
[Explanation of symbols]
1 electronic data storage means, 2 management data storage means, 3 organization information storage means, 4 user information storage means, 5 special access right information storage means, 6 data read / access right determination means, 7 data write / access right setting means, 8 equipment information supply / browsing server, 9 equipment information setting section, 10 equipment information browsing section, 11 equipment attached measuring instrument, 12 to 14 are network, 15 equipment information database, 16 measurement information database, 17 equipment information access right information database , 18 Access right determination logic information database, 19 Various distance information measurement unit, 20 Equipment access information extraction unit, 21 Equipment state information extraction unit, 22 Setting / browsing access right judgment unit, 23 Browsing content creation unit, 24 Equipment information registration unit 25 Equipment information registration preparation section, 26 Measurement information registration section, 27 B bank T , 28 B bank GIS, 29 A bank Tr, 30 A bank GIS, 31 GIS bus, 32 trunk GIS, 33 trunk GIS, 34 arc with threshold radius, 35 connecting line, 36 threshold distance, 37-43 equipment , 44 Equipment configuration information, 45 Attribute information, 46 Equipment information association data, 47 Drawing data, 48 3D model data, 49 Catalog and instruction manual data, 50 Measurement information database, 51 Equipment GIS001, 52 ports, 53 ports, 54 Equipment BUS001 equipment, 55 equipment Tr001, 56 Graphic element, 57-61 area, 62 plan view, 63-69 equipment block, 70-75 connection node, 76-83 equipment, 84-85 arrows.

Claims (8)

個人識別情報およびアクセス要求情報に応じた設備情報の設定または閲覧を行なう設備情報設定・閲覧手段と、
設備情報を格納した設備情報格納手段と、
各設備機器の状態情報を格納した状態情報格納手段と、
上記個人識別情報および各設備状態情報毎に対応づけて、各設備情報へのアクセス権を判定する設備情報の予め設定された閾値を有する複数のアクセス権判定ロジックを格納したアクセス権判定ロジック格納手段と、
上記アクセス要求情報によりアクセス要求されている設備情報を上記設備情報格納手段より抽出し、現時点における設備状態情報を上記状態情報格納手段より抽出する情報抽出手段と、
アクセス要求のあった個人識別情報と、上記情報抽出手段が上記状態情報格納手段より抽出した現時点における設備状態情報とに対応するアクセス権判定ロジックを上記アクセス権判定ロジック格納手段より選定し、上記情報抽出手段により抽出したアクセス要求されている設備情報を読み取り、該アクセス要求されている設備情報から得られる値を、上記選定されたアクセス権判定ロジックに予め設定された設備情報の閾値と対比することにより、アクセス権の有無を判定する設定・閲覧アクセス権判定手段と
を備えた設備情報管理システム。
Facility information setting / browsing means for setting or browsing facility information according to personal identification information and access request information;
Equipment information storage means for storing equipment information;
Status information storage means for storing status information of each equipment;
An access right determination logic storage means for storing a plurality of access right determination logics having a preset threshold value of facility information for determining the access right to each facility information in association with each individual identification information and each facility state information When,
Information extraction means for extracting the equipment information requested to be accessed by the access request information from the equipment information storage means, and extracting the current equipment state information from the state information storage means;
The access right determination logic corresponding to the personal identification information requested for access and the current equipment state information extracted from the state information storage unit by the information extraction unit is selected from the access right determination logic storage unit, and the information Read the access-requested equipment information extracted by the extraction means, and compare the value obtained from the access-requested equipment information with the threshold of the equipment information preset in the selected access right determination logic. A facility information management system comprising setting / browsing access right determination means for determining whether or not there is an access right.
請求項1に記載の設備情報管理システムにおいて、
上記設備情報格納手段は、上記設備情報として各設備間の距離を示す設備間情報を格納したことを特徴とする設備情報管理システム。
In the facility information management system according to claim 1,
The facility information management system, wherein the facility information storage means stores inter-facility information indicating the distance between the facilities as the facility information.
請求項1または2に記載の設備情報管理システムにおいて、
上記状態情報格納手段は、上記設備状態情報として各設備機器の状態を計測した計測情報を格納したことを特徴とする設備情報管理システム。
In the equipment information management system according to claim 1 or 2,
The facility information management system, wherein the state information storage means stores measurement information obtained by measuring the state of each facility device as the facility state information.
請求項1ないし3のいずれか一項に記載の設備情報管理システムにおいて、
上記設備情報格納手段は、上記設備情報として設備が設置される場所毎にエリアが設定された配置図面を格納したことを特徴とする設備情報管理システム。
In the equipment information management system according to any one of claims 1 to 3,
The facility information management system, wherein the facility information storage means stores an arrangement drawing in which an area is set for each place where the facility is installed as the facility information.
請求項1ないし3のいずれか一項に記載の設備情報管理システムにおいて、
上記設備情報格納手段は、上記設備情報として線分の接続関係を主体に作成する図面を格納し、該図面は1個または複数のノードに接続する図形群を一つの設備に対応する図形とすることを特徴とする設備情報管理システム。
In the equipment information management system according to any one of claims 1 to 3,
The facility information storage means stores a drawing created mainly by connection relations of line segments as the facility information, and the drawing sets a graphic group connected to one or a plurality of nodes as a graphic corresponding to one facility. Equipment information management system characterized by that.
請求項1ないし5のいずれか一項に記載の設備情報管理システムにおいて、
ネットワークを介してシステムに接続された各設備機器の状態を計測する識別情報を有する計測器を備え、
上記計測器の識別情報に基づき、上記設定・閲覧アクセス権判定手段は、上記計測器から上記設備情報へのアクセス権の有無を判定することを特徴とする設備情報管理システム。
In the equipment information management system according to any one of claims 1 to 5,
A measuring instrument having identification information for measuring the state of each equipment connected to the system via the network,
The facility information management system, wherein the setting / viewing access right determining means determines whether or not there is an access right to the facility information from the measuring device based on the identification information of the measuring device.
請求項6に記載の設備情報管理システムにおいて、
上記計測器は、計測器自身の設備情報と、上記設備情報格納手段に蓄積されている設備情報との比較に基づき、
上記設備情報格納手段対して上記計測器自身の設備情報を追加・編集することを特徴とする設備情報管理システム。
In the facility information management system according to claim 6,
The measuring instrument is based on a comparison between the facility information of the measuring instrument itself and the facility information stored in the facility information storage means.
A facility information management system for adding / editing the facility information of the measuring instrument itself to the facility information storage means.
請求項1ないし7のいずれか一項に記載の設備情報管理システムにおいて、
上記アクセス要求情報には、任意の時刻における設備情報に対してアクセスを要求するアクセス要求時刻情報が含まれ、
上記設備情報格納手段は、上記設備情報に対して該設備情報が有効に適応される有効期間情報を付加し、
上記状態情報格納手段は、上記有効期間情報毎の設備状態情報を格納し、
上記アクセス権判定ロジック格納手段は、上記個人識別情報および有効期間情報を付加した各設備状態情報に対応づけて、各設備情報へのアクセス権を判定する設備情報の予め設定された閾値を有する複数のアクセス権判定ロジックを格納し、
上記情報抽出手段は、上記アクセス要求情報によりアクセス要求されている要求時刻の設備情報が上記設備情報格納手段に格納されている設備情報の有効期間内である場合に上記状態情報格納手段より上記要求時刻を含む有効期間の設備状態情報を抽出し、
上記設定・閲覧アクセス権判定手段は、アクセス要求のあった個人識別情報と、上記情報抽出手段が上記状態情報格納手段より抽出した上記有効期間の設備状態情報とに対応するアクセス権判定ロジックを上記アクセス権判定ロジック格納手段より選定し、上記要求時刻に有効な設備情報に対するアクセス権の有無を判定する
ことを特徴とする設備情報管理システム。
In the equipment information management system according to any one of claims 1 to 7,
The access request information includes access request time information for requesting access to facility information at an arbitrary time,
The facility information storage means adds validity period information to which the facility information is effectively adapted to the facility information,
The state information storage means stores equipment state information for each effective period information,
The access right determination logic storage means includes a plurality of preset threshold values of facility information for determining access right to each piece of equipment information in association with each piece of equipment state information to which the personal identification information and validity period information are added. Store the access right decision logic of
The information extracting means receives the request from the state information storage means when the equipment information at the request time requested by the access request information is within the validity period of the equipment information stored in the equipment information storage means. Extract equipment status information for the effective period including the time,
The setting / browsing access right determination means includes the access right determination logic corresponding to the personal identification information requested for access and the equipment state information of the validity period extracted from the state information storage means by the information extraction means. A facility information management system, characterized in that it is selected from access right determination logic storage means and determines whether or not there is an access right for the facility information effective at the request time.
JP2002141868A 2001-05-21 2002-05-16 Equipment information management system Expired - Fee Related JP4070087B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002141868A JP4070087B2 (en) 2001-05-21 2002-05-16 Equipment information management system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2001-151459 2001-05-21
JP2001151459 2001-05-21
JP2002141868A JP4070087B2 (en) 2001-05-21 2002-05-16 Equipment information management system

Publications (2)

Publication Number Publication Date
JP2003058406A JP2003058406A (en) 2003-02-28
JP4070087B2 true JP4070087B2 (en) 2008-04-02

Family

ID=26615438

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002141868A Expired - Fee Related JP4070087B2 (en) 2001-05-21 2002-05-16 Equipment information management system

Country Status (1)

Country Link
JP (1) JP4070087B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101621665B (en) * 2004-08-20 2012-07-25 松下电器产业株式会社 Content reproducing device and content reproducing method
JP6026377B2 (en) * 2013-09-13 2016-11-16 株式会社 日立産業制御ソリューションズ Equipment management system
CA3111812A1 (en) * 2018-09-13 2020-03-19 Built Environment Compliance Pty Ltd Safety management system and method for multiple occupancy building

Also Published As

Publication number Publication date
JP2003058406A (en) 2003-02-28

Similar Documents

Publication Publication Date Title
CN102541974B (en) System, method and manufacture for providing search service for Process Control System
CN100437576C (en) Method, system, and apparatus for discovering and connecting to data sources
CN105022769B (en) A kind of City Underground Pipeline interactive system and its method
CN101198953B (en) Generating unique representations of physical assets
US7237119B2 (en) Method, system and computer program for managing user authorization levels
US20040107214A1 (en) Customized document portfolio system integrating IP libraries and technology documents
CN105302954A (en) Multiplayer online intelligent transformer substation design system
CN117829291B (en) Whole-process consultation knowledge integrated management system and method
US11507068B2 (en) Method for life cycle management of a complex utility facility and system for its implementation
EP3545372A1 (en) Building management system having knowledge base
CN109857827A (en) A kind of geography information archives integrated management approach and system
CN106936812A (en) File privacy leakage detection method based on Petri network under a kind of cloud environment
WO2007028160A2 (en) Database system and method for access control and workflow routing
JP7520331B1 (en) PROGRAM, SERVER, TERMINAL DEVICE, INFORMATION PROCESSING SYSTEM AND INFORMATION PROCESSING METHOD
US8195723B2 (en) Document management system for building maintenance and operational documents
KR101849648B1 (en) Process and system for providing an architectural design model
JP4070087B2 (en) Equipment information management system
JP5510031B2 (en) Information security management support method and apparatus
KR102031945B1 (en) Equipment information management system
Kirubakaran et al. Secure Housing Rental Management Data Infra and Analytics
CN109598130A (en) Intellectual property data inquiry system, method, apparatus, equipment and storage medium
JP5033322B2 (en) Information management method and apparatus using connection relation information
JP7607537B2 (en) System and method for displaying causal loop diagrams to a user - Patents.com
CN106909817B (en) A kind of generation method of user oriented intelligent substation integrated configuration access authority
KR102588900B1 (en) A method and an appratus for processing action information

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070928

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071211

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080110

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110125

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120125

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130125

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130125

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees