JP4070089B2 - Tide protection system - Google Patents
Tide protection system Download PDFInfo
- Publication number
- JP4070089B2 JP4070089B2 JP2002155364A JP2002155364A JP4070089B2 JP 4070089 B2 JP4070089 B2 JP 4070089B2 JP 2002155364 A JP2002155364 A JP 2002155364A JP 2002155364 A JP2002155364 A JP 2002155364A JP 4070089 B2 JP4070089 B2 JP 4070089B2
- Authority
- JP
- Japan
- Prior art keywords
- curtain film
- curtain
- cable
- film
- support portions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、河川、港湾、海岸等における高潮対策や津波対策のための防潮システムに関する。
【0002】
【従来の技術】
従来、例えば、津波の港内侵入を防止するために、特開平8−226116号公報による浮沈自在堰が知られている。この浮沈自在堰は、それぞれが気密性を有する複数の筒状体を一連にかつ一体的に相互連結し、該一連に連結した筒状体を港口の両端堤壁間の床部に、その港口の開口部において、開口部幅方向に延長する横軸により枢着するとともに、港口外方に敷設したシンカーに港口内方への倒屈防止用引張材を介して連結し、各筒状体の内部を気体圧送装置に連通させるようにしている。
【0003】
【発明が解決しようとする課題】
しかしながら、上記従来の浮沈自在堰においては、全体を構成する部材の数が非常に多いため部材コストが増大するとともに、筒状体同士の連結、筒状体と床部との連結、筒状体とシンカーとの連結などの施工作業が膨大で、施工コストが増大するという問題を有している。
【0004】
また、複数の筒状体へコンプレッサにより気体を供給しているが、各筒状体に常に均一に気体が供給されないと、筒状体の浮上途中で筒状体に異常な応力が作用するとともに、浮上途中で停止状態が発生した場合、筒状体が急浮上して一気に海面上に飛び出してしまう恐れがあるという問題を有している。
【0005】
また、平常時は、海底下に倒屈して保管しておくために、引張材を始めとする各種鋼材が腐食してしまい、点検、補修等のメンテナンス費用が増大するという問題を有している。
【0006】
さらに、床部およびシンカーの構築はコンクリートで施工しなければならず、その施工は、当該箇所の海水を排除にてドライ状態で行う必要があり、また、床部と筒状体の結合もドライ状態で行う必要があり、そのため、航路を確保しつつ施工するには片側ごとに施工しなければならず、工事期間が増大するという問題を有している。
【0007】
本発明は、上記従来の問題を解決するものであって、極めてシンプルな構成で高潮や津波による被害を確実に防ぐことができるとともに、部材コスト、施工コストおよびメンテナンスコストを低減させ、また、工事期間を短縮することができる防潮システムを提供することを目的とする。
【0008】
【課題を解決するための手段】
上記目的を達成するために、本発明の請求項1記載の防潮システムは、河川の両岸、港口または海底に対向して構築された一対の支持部と、該一対の支持部に立設されたアンカーと、両アンカー間に張架されるカーテン膜と、該カーテン膜の上部に配設され給気管と排気管が連結される複数のエアバッグと、該カーテン膜の下部に連結される止水膜を備え、前記アンカーは起伏可能にされ、前記カーテン膜は、一対の支持部に張架される炭素繊維横ケーブルからなる複数の横ケーブル、該複数の横ケーブルを縦方向に密に縫製した化学繊維ケーブルからなる縦ケーブルとからなることを特徴とする。
以上
【0009】
【発明の実施の形態】
以下、本発明の実施の形態を図面を参照しつつ説明する。図1〜図5は、本発明の防潮システムの1実施形態を示し、図1は模式的斜視図、図2は図1の支持部の平面図、図3は図1の縦断面図、図4および図5は図1のカーテン膜の例を示す模式的断面図である。なお、本実施形態は、主として高潮対策に適用するもので、港湾における港口にも適用可能である。
【0010】
図1〜図3において、河川1の対向する両岸には、一対の支持部2、3が構築される。支持部2、3には、河川1に開口する開口部4が形成されるとともに、支持部2、3の内部にはロッド状のアンカー5、6が立設されている。アンカー5、6は、図2に示すように、回転ドラム8により回転可能に設置されている。なお、図1では、説明を簡単にするためにアンカー5、6の上端を開放して示しているが、実際にはアンカー5、6の上端を軸受部材で支持部2、3に固定し、歯車等を介して回転ドラム8に連結している。
【0011】
平常時には、一方の支持部2のアンカー5には、本発明の特徴であるカーテン膜7が巻き付けられており、カーテン膜7の端部は、対岸の支持部3のアンカー6にワイヤーロープ等により連結されている。カーテン膜7の上部には、複数のエアバッグ9が設けられるとともに、カーテン膜7の下部には止水膜10が連結されている。そして、高潮等の非常時には、対岸の支持部3のアンカー6を回動させて、カーテン膜7を引き出すとともに、エアバッグ自動取付装置11によりエアバッグ9をカーテン膜7に順次取り付けるとともに、ガスボンベ12より窒素ガスや炭酸ガス等の気体を充填していく。
【0012】
図1は、カーテン膜7が両岸の支持部2、3間に張架された状態を示している。図で1aは海側の水面の高さを、1bは上流側の水面の高さを示し、海面の高さが上昇したとき、図示矢印に示す水圧に押されてカーテン膜7は上流側に放物線を描くように張架されることになる。カーテン膜7の上流側と下流側とでは水位差が生じ、その水位差によりカーテン膜7の河床部で漏水が発生するため、カーテン膜7の下部に止水膜10を連結し、図3に示すように、水重により河床1cに密着させ河床部での漏水を防止している。
【0013】
本実施形態においては、基本的には両岸に支持部2、3を構築し、必要に応じて河床部の整地を行うだけの施工で、船舶等への影響は殆どない。ただし、河床部の変動(洗掘、堆砂)が予想される場合には、河床部に水中コンクリート等による河床の工程化や鉄板の敷設を行うが、施工期間は極短期間である。
【0014】
図4は、図1のカーテン膜7の1例を示している。カーテン膜7は、アンカー5、6間に張架される複数の横ケーブル7aと、複数の横ケーブル7aを縦方向に密に縫製した縦ケーブル7bとから構成されている。
【0015】
横ケーブル7aは、高強度、高弾性、軽量、高耐食性、非磁性、低線膨張係数の特性を備えた炭素繊維ケーブルを用いる。本実施形態においては、炭素繊維ケーブルとして、CFCC(Carbon Fiber Composite Cable、東京製網株式会社製)を用いる。CFCCは、炭素繊維と熱硬化性樹脂を複合化し、撚り合わせて形成したケーブルで、上記の特性を有し、かつ、撚り線状であることからコイル巻きが可能で長尺ケーブルへの対応が可能である。表1は、7本撚りのCFCCケーブルの仕様を示している。
【0016】
【表1】
許容応力を破断荷重の1/4としたとき、水圧荷重(5t/m2)での高さ1m当たりの必要本数を表2に示す。例えば、7本撚りで直径が15.2mmのケーブルの必要本数は52本/mである。以下、これに基づいてカーテン膜の厚みおよび総重量を試算する。
【0017】
【表2】
横ケーブル7aが、カーテン膜7に作用する水圧を受ける役割を果たすのに対して、縦ケーブル7bは、横ケーブル7aの連結と止水を目的とするものである。縦ケーブル7bとしては、化学繊維ケーブルを用いる。また、止水膜10も同様である。本実施形態においては、エースラインD(東洋紡績株式会社製)を用いている。これは、超高分子ポリエチレンからなる繊維と他の繊維、樹脂を組み合わせたもので、ワイヤー並の高強度、低伸度であり、超軽量で水に浮き、曲げ疲労に強く、耐摩耗性、耐候性に優れ外層なしでも屋外仕様が可能であり、耐薬品性に優れ吸水性がないという特性を有している。表3に仕様を示す。
【0018】
【表3】
ここで、前記の直径が15.2mmの横ケーブル7aに、縦ケーブル7bの織り込み幅は、
(1000(mm)−15.2(mm)×52(本))/52(本)
=4.0(mm)
となり、縦ケーブル7bの直径は4mmのものを用いる。従って、横ケーブル7aに縦ケーブル7bを縫製すると、高さ1m当たりの縦ケーブル7bの延長は、π×(15.2+4.0)÷2×52=1568(mm)、幅1m当たりの本数は1000(mm)÷4(mm)=250(本)となる。
横ケーブル7aの質量は、
52(本)×226(g/m)=11.8(kg/m)
縦ケーブル7bの質量は、
250(本)×1.568(m)×9.7(g/m)=3.80(kg/m)従って、カーテン膜7の1平方メートル当たりの総重量は、
11.8+3.8=15.6(kg/m2)
となり、従来の鋼製の防潮水門と比較して、カーテン膜7の厚みは20mm程度で且つ格段に超軽量化を図ることができる。
【0019】
図5は、図1のカーテン膜7の他の例を示している。本例においては、縦ケーブル7bの代わりに、横ケーブル7aを、ゴム、樹脂等の弾性材料からなる弾性部材7cで覆うように一体成形して止水を図っている。
【0020】
図6および図7は、本発明の防潮システムの他の実施形態を示し、図6は支持部の模式的斜視図、図7は図6のカーテン膜の斜視図である。前記実施形態は主として高潮対策に適用するものであるが、本実施形態は、緊急時の津波対策にも適用するものである。
【0021】
高潮対策は、台風等、時期が限定され、かつ、事前に予測が可能で時間的にも余裕があるため、カーテン膜7をアンカー5に巻き取って保管しておくことが可能であるが、津波の場合は、通年で且つ突発的に発生するので、特別の対策が必要となる。
【0022】
そこで、本実施形態は、予め、カーテン膜7を河床に沈設しておく方式であり、そのために、アンカー5、6を支持部2、3に図示矢印に示すように起伏可能に設置している。また、エアバッグ9は予めカーテン膜7の上部に取付金具13により固定されており、各エアバッグ9は、給気管14および排気管15により接続されている。
【0023】
そして、高潮や津波等の非常時には、給気管14から気体を供給してエアバッグ9を浮上させるとともに、アンカー5、6を起立させて図1に示す状態にし、また、平常時には、排気管15からエアバッグ9内の気体を排出させるとともに、アンカー5、6を倒してカーテン膜7を河床に沈設する。
【0024】
図8〜図10は、本発明の防潮システムの他の実施形態を示し、図8は本実施形態の課題を説明するための模式的断面図、図9および図10は作用を説明するための図であり、図(A)は平面図、図(B)は断面図である。本実施形態は主として港口に適用するものである。
【0025】
図8に示すように、漁港や港湾の港口の防波堤17にカーテン幕7を張架する場合、高波の周期により港内の水位と海側の水位が逆転する場合も想定される。この場合には、図9および図10に示すように、カーテン幕7の放物線の形は、水位条件により港内側と海側に逆転することになるため、エアバッグ9をカーテン幕7の上部両側に装着する。
【0026】
図11は、本発明の防潮システムの他の実施形態を示す模式的斜視図である。前記の各実施形態は主として河川や港口に適用するものであるが、本実施形態は、海岸に適用するものである。
【0027】
海底に一対のコンクリート製の支持部16を構築し、一対の支持部16間にカーテン膜7を設置する。このようなカーテン膜7を図(C)に示すように、複数並べて設置する。そして、平常時は、エアバッグ9内の気体を排出して、海底に沈設しておき、津波等の非常時には、図7の例と同様に、給気管14から気体を供給してエアバッグ9を浮上させカーテン膜7を起立させる。
【0028】
以上、本発明の実施の形態について説明したが、本発明はこれに限定されるものではなく種々の変更が可能である。例えば、上記実施形態においては、横ケーブルとして炭素繊維ケーブルを採用しているが、必ずしもこれに限定されるものではなく、将来の技術開発により出現するであろう、高強度、高弾性、軽量、高耐食性、非磁性、低線膨張係数の特性を備えたケーブルを採用してもよいことは勿論である。
【0029】
【発明の効果】
以上の説明から明らかなように、本発明によれば、炭素繊維ケーブルを用いた薄くて軽量なカーテン膜を張架するだけで水圧に抗することができるため、極めてシンプルな構成で高潮や津波による被害を確実に防ぐことができるとともに、部材コスト、施工コストおよびメンテナンスコストを低減させ、また、工事期間を短縮することができる。
【図面の簡単な説明】
【図1】本発明の防潮システムの1実施形態を示す模式的斜視図である。
【図2】図1の支持部の平面図である。
【図3】図1の縦断面図である。
【図4】図1のカーテン膜の1例を示す模式的断面図である。
【図5】図1のカーテン膜の他例を示す模式的断面図である。
【図6】本発明の防潮システムの他の実施形態を示す支持部の模式的斜視図である。
【図7】図6のカーテン膜の斜視図である。
【図8】本発明の防潮システムの他の実施形態を示し、課題を説明するための模式的断面図である。
【図9】本発明の防潮システムの他の実施形態を示す作用を説明するための図であり、図(A)は平面図、図(B)は断面図である。
【図10】本発明の防潮システムの他の実施形態を示す作用を説明するための図であり、図(A)は平面図、図(B)は断面図である。
【図11】本発明の防潮システムの他の実施形態を示す模式的斜視図である。
【符号の説明】
1…河川
2、3、16…支持部
5、6…アンカー
7…カーテン膜
7a…横ケーブル
7b…縦ケーブル
7c…弾性部材
9…エアバッグ
10…止水膜[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tide system for countermeasures against storm surges and tsunamis in rivers, harbors, coasts, and the like.
[0002]
[Prior art]
Conventionally, for example, in order to prevent a tsunami from entering a port, a floating weir according to Japanese Patent Laid-Open No. 8-226116 is known. This swellable weir is composed of a plurality of cylindrical bodies, each of which has airtightness, interconnected in series and integrally, and the serially connected cylindrical bodies are connected to the floor portion between the both ends of the port entrance. In the opening portion of the cylindrical body, it is pivotally attached by a horizontal axis extending in the width direction of the opening portion, and connected to a sinker laid outside the port entrance via a pulling prevention material to the inside of the port entrance. The interior is communicated with a gas pumping device.
[0003]
[Problems to be solved by the invention]
However, in the above-described conventional floatable weir, the number of members constituting the whole is very large, so that the member cost increases, the connection between the tubular bodies, the connection between the tubular body and the floor, and the tubular body There is a problem that the construction work such as the connection between the car and the sinker is enormous and the construction cost increases.
[0004]
In addition, gas is supplied to a plurality of cylindrical bodies by a compressor, but if the gas is not always supplied uniformly to each cylindrical body, abnormal stress acts on the cylindrical bodies during the floating of the cylindrical bodies. When the stop state occurs during the ascent, there is a problem that the cylindrical body may rise rapidly and jump out onto the sea surface at once.
[0005]
In addition, during normal times, because the steel is bent and stored under the seabed, various steel materials such as tensile materials are corroded, and there is a problem that maintenance costs such as inspection and repair increase. .
[0006]
In addition, the floor and sinker must be constructed with concrete, and the construction must be performed in a dry state with the seawater removed from the location, and the connection between the floor and the tubular body must also be dry. Therefore, it is necessary to carry out construction on each side in order to carry out construction while securing the navigation route, and there is a problem that the construction period increases.
[0007]
The present invention solves the above-described conventional problems, can prevent damage caused by storm surges and tsunamis with an extremely simple configuration, and reduce member costs, construction costs and maintenance costs, and An object is to provide a tide system that can shorten the period.
[0008]
[Means for Solving the Problems]
In order to achieve the above object, a tide system according to
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings. 1 to 5 show an embodiment of a tide system according to the present invention, FIG. 1 is a schematic perspective view, FIG. 2 is a plan view of a support portion of FIG. 1, FIG. 3 is a longitudinal sectional view of FIG. 4 and 5 are schematic sectional views showing examples of the curtain film of FIG. In addition, this embodiment is mainly applied to a storm surge countermeasure and can also be applied to a port entrance in a harbor.
[0010]
In FIG. 1 to FIG. 3, a pair of support portions 2 and 3 are constructed on opposite banks of the
[0011]
In a normal state, the
[0012]
FIG. 1 shows a state in which the
[0013]
In the present embodiment, basically, the support portions 2 and 3 are constructed on both banks and the riverbed portion is leveled as necessary, and there is almost no influence on the ship or the like. However, if changes in the riverbed (scouring, sedimentation) are anticipated, the riverbed will be processed with underwater concrete or a steel plate, but the construction period will be extremely short.
[0014]
FIG. 4 shows an example of the
[0015]
As the
[0016]
[Table 1]
Table 2 shows the necessary number per 1 m height under a hydraulic load (5 t / m 2 ) when the allowable stress is ¼ of the breaking load. For example, the required number of cables with a twist of 7 and a diameter of 15.2 mm is 52 / m. Hereinafter, based on this, the thickness and the total weight of the curtain film are estimated.
[0017]
[Table 2]
The
[0018]
[Table 3]
Here, the weaving width of the
(1000 (mm)-15.2 (mm) x 52 (book)) / 52 (book)
= 4.0 (mm)
Thus, the
The mass of the
52 (books) x 226 (g / m) = 11.8 (kg / m)
The mass of the
250 (pieces) × 1.568 (m) × 9.7 (g / m) = 3.80 (kg / m) Therefore, the total weight per square meter of the
11.8 + 3.8 = 15.6 (kg / m 2 )
Thus, the
[0019]
FIG. 5 shows another example of the
[0020]
6 and 7 show another embodiment of the tide prevention system of the present invention, FIG. 6 is a schematic perspective view of a support portion, and FIG. 7 is a perspective view of the curtain film of FIG. The above embodiment is mainly applied to measures against storm surges, but this embodiment is also applied to measures against tsunamis in an emergency.
[0021]
The storm surge countermeasure is limited in time, such as a typhoon, and can be predicted in advance and has enough time, so the
[0022]
Therefore, the present embodiment is a method in which the
[0023]
In an emergency such as a storm surge or a tsunami, gas is supplied from the
[0024]
8 to 10 show another embodiment of the tide system of the present invention, FIG. 8 is a schematic cross-sectional view for explaining the problem of this embodiment, and FIGS. 9 and 10 are for explaining the operation. FIG. 2A is a plan view, and FIG. 2B is a cross-sectional view. This embodiment is mainly applied to a port entrance.
[0025]
As shown in FIG. 8, when the
[0026]
FIG. 11 is a schematic perspective view showing another embodiment of the tide system of the present invention. Each of the above embodiments is mainly applied to a river or a port entrance, but this embodiment is applied to a coast.
[0027]
A pair of
[0028]
Although the embodiment of the present invention has been described above, the present invention is not limited to this, and various modifications are possible. For example, in the above embodiment, a carbon fiber cable is adopted as the lateral cable, but it is not necessarily limited to this, and high strength, high elasticity, light weight, which will appear by future technological development, Of course, a cable having characteristics of high corrosion resistance, non-magnetic property, and low linear expansion coefficient may be adopted.
[0029]
【The invention's effect】
As is clear from the above description, according to the present invention, it is possible to withstand water pressure simply by stretching a thin and lightweight curtain membrane using a carbon fiber cable. Damage can be surely prevented, the member cost, the construction cost and the maintenance cost can be reduced, and the construction period can be shortened.
[Brief description of the drawings]
FIG. 1 is a schematic perspective view showing one embodiment of a tide system of the present invention.
FIG. 2 is a plan view of the support portion of FIG.
FIG. 3 is a longitudinal sectional view of FIG. 1;
4 is a schematic cross-sectional view showing an example of the curtain film of FIG. 1. FIG.
FIG. 5 is a schematic cross-sectional view showing another example of the curtain film in FIG. 1;
FIG. 6 is a schematic perspective view of a support portion showing another embodiment of the tide system of the present invention.
7 is a perspective view of the curtain film of FIG. 6. FIG.
FIG. 8 is a schematic cross-sectional view for explaining a problem, showing another embodiment of the tide system of the present invention.
FIGS. 9A and 9B are diagrams for explaining the operation of another embodiment of the tide system according to the present invention, FIG. 9A is a plan view, and FIG.
FIGS. 10A and 10B are views for explaining the operation of another embodiment of the tide system according to the present invention, wherein FIG. 10A is a plan view and FIG.
FIG. 11 is a schematic perspective view showing another embodiment of the tide system of the present invention.
[Explanation of symbols]
DESCRIPTION OF
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002155364A JP4070089B2 (en) | 2002-05-29 | 2002-05-29 | Tide protection system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002155364A JP4070089B2 (en) | 2002-05-29 | 2002-05-29 | Tide protection system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2003342938A JP2003342938A (en) | 2003-12-03 |
| JP4070089B2 true JP4070089B2 (en) | 2008-04-02 |
Family
ID=29771906
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002155364A Expired - Fee Related JP4070089B2 (en) | 2002-05-29 | 2002-05-29 | Tide protection system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4070089B2 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007231574A (en) * | 2006-02-28 | 2007-09-13 | Kaneso Co Ltd | Water cut-off device |
| JP4519816B2 (en) * | 2006-08-09 | 2010-08-04 | 三菱重工業株式会社 | Seawall / breakwater |
| JP4719288B2 (en) * | 2009-06-04 | 2011-07-06 | 三菱重工業株式会社 | Membrane dike |
| JP4719287B2 (en) * | 2009-06-04 | 2011-07-06 | 三菱重工業株式会社 | Membrane dike |
| JP2020169484A (en) * | 2019-04-03 | 2020-10-15 | 学校法人 中村産業学園 | Water cut-off device and water cut-off method |
-
2002
- 2002-05-29 JP JP2002155364A patent/JP4070089B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2003342938A (en) | 2003-12-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3357192A (en) | Breakwaters | |
| US20020168228A1 (en) | Permanent and semi-permanent groyne structures and method for shoreline and land mass reclamation | |
| JP6305940B2 (en) | Self-operating flood waterproof wall | |
| US20050058509A1 (en) | Floating modular breakwater | |
| US20170233966A1 (en) | Integrated marine barrier | |
| CN115009454A (en) | Offshore photovoltaic floating body and offshore photovoltaic system | |
| JP4070089B2 (en) | Tide protection system | |
| KR20250130340A (en) | Mooring systems and installation methods for floating structures | |
| CN115298391A (en) | Floating type wave attenuation device | |
| FR2850425A1 (en) | Sub-sea collector for e.g. oil released from wreck, comprises modular textile column with upward and downward funneled terminations located by anchoring weights and flotation rings | |
| WO2016114478A1 (en) | Semi-submersible offshore structure | |
| KR102217837B1 (en) | Sediment transport reduction apparatus | |
| WO2007105955A1 (en) | A floating pontoon body to be tied together with at least another pontoon body | |
| KR100523238B1 (en) | Installation method of float fence using anchors | |
| KR100225025B1 (en) | Oil fence | |
| JP3861208B2 (en) | Breakwater fixed in the land and installed in the deep sea | |
| Harms | Data and procedures for the design of floating tire breakwaters | |
| JPS60144408A (en) | Buffer facility for underwater structure | |
| JPH08226116A (en) | Freely sinkable weir | |
| KR102923331B1 (en) | Protection device for offshore wind turbine foundation structure | |
| KR102606363B1 (en) | Silt prevent the spread of temporary for harbor renovation and, marine dredging and reclamation | |
| CN109914366A (en) | A kind of Anti-pollution barrier | |
| JPH11222838A (en) | Pollution preventive curtain | |
| US20240133143A1 (en) | Bouyancy-assisted weir | |
| JP4100768B2 (en) | Floating body mooring device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041119 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070530 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070724 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071114 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071116 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080109 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080110 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4070089 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110125 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110125 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120125 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130125 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130125 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |