JP4073105B2 - Water stop device - Google Patents
[go: Go Back, main page]

JP4073105B2 - Water stop device - Google Patents

Water stop device Download PDF

Info

Publication number
JP4073105B2
JP4073105B2 JP07075599A JP7075599A JP4073105B2 JP 4073105 B2 JP4073105 B2 JP 4073105B2 JP 07075599 A JP07075599 A JP 07075599A JP 7075599 A JP7075599 A JP 7075599A JP 4073105 B2 JP4073105 B2 JP 4073105B2
Authority
JP
Japan
Prior art keywords
main frame
downstream
upstream
water stop
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP07075599A
Other languages
Japanese (ja)
Other versions
JP2000265537A (en
Inventor
茂木 阿部
孝幸 岩井
定雄 宇野
謙治 川口
敏 松田
成郎 北原
茂男 藤井
紘一郎 桑原
真吾 立岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Kumagai Gumi Co Ltd
Original Assignee
IHI Corp
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp, Kumagai Gumi Co Ltd filed Critical IHI Corp
Priority to JP07075599A priority Critical patent/JP4073105B2/en
Publication of JP2000265537A publication Critical patent/JP2000265537A/en
Application granted granted Critical
Publication of JP4073105B2 publication Critical patent/JP4073105B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は管路の補修工事に用いる止水装置に関するものである。
【0002】
【従来の技術】
図11はシールド工法によって構築された下水管路の一例であり、この下水管路は、地山荷重を鉄筋コンクリート製あるいは鋼製のセグメントで構成される管路躯体1によって支持し、該管路躯体1内に導水路を形成する2次巻きコンクリート層2を施工している。
【0003】
このような下水管路の2次巻きコンクリート層2は、硫化水素4のような気体が含まれる雰囲気に曝されて、経年的に腐食5などの劣化が生じる。
【0004】
そこで、近年、下水管路の2次巻きコンクリート層2に対する補修工事が実施されている。
【0005】
図12及び図13は従来の下水管路補修工法の一例であり、この補修工法は、耐酸性及び耐塩基性を具備した合成樹脂製の長尺帯状のライニング材(被覆材)6を、たとえば、2次巻きコンクリート層2の内面に沿うように且つ下水管路一端側から他端側へ向かって螺旋状に敷設し、ライニング材6と2次巻きコンクリート層2との間に形成される空隙に裏込め材を打設して、既設の管路躯体1内に滑らかな導水路を再構築するものである。
【0006】
ライニング材6の幅方向一縁部には、ライニング材6長手方向に延び且つ2次巻きコンクリート層2の内面へ向かって突出する突起部7が形成されている。
【0007】
ライニング材6の幅方向中間部には、ライニング材6長手方向に延び且つ2次巻きコンクリート層2の内面へ向かって突出して裏込め材に埋め込まれるリブ8,9が形成されている。
【0008】
ライニング材6の幅方向他縁部には、ライニング材6長手方向に延び且つライニング材6を2次巻きコンクリート層2の内面に沿って螺旋状に敷設する際に前記の突起部7が嵌入可能な嵌合部10と、ライニング材6長手方向に延び且つ嵌合部10から2次巻きコンクリート層2の内面へ向かって突出して裏込め材に埋め込まれるリブ11と、ライニング材6長手方向に延び且つライニング材6を2次巻きコンクリート層2の内面に沿って螺旋状に敷設する際に前記の突起部7に隣接するリブ8に当接可能なリップ12とが形成されている。
【0009】
また、リブ8,9の間にライニング材6長手方向に延びる鋼製の補強部材13を嵌入しつつ、2次巻きコンクリート層2の内面へライニング材6を敷設することもある。
【0010】
【発明が解決しようとする課題】
上述したように、2次巻きコンクリート層2の内面全周にわたって補修工事を行なう場合には、下水管路の補修工事対象区間への下水3の進入を阻止しなければならない。
【0011】
しかしながら、単に補修工事対象区間の上流端を閉塞したとすると、下水3の流通が妨げられることになるため、何らかの手段によって、下水3を迂回させて補修工事対象区間の下流側へ導く必要がある。
【0012】
本発明は上述した実情に鑑みてなしたもので、下水管路を供用した状態で補修工事対象区間への下水の流入を阻止可能な止水装置を提供することを目的としている。
【0013】
【課題を解決するための手段】
上記目的を達成するため、本発明の請求項1に記載の止水装置では、補修すべき管路内に配置される下流側副フレームと、該下流側副フレームの内方に昇降可能に配置され且つ管路軸線方向に貫通する導水空間を有する下流側主フレームと、管路内面下側寄り部分に当接し得るように下流側主フレームに設けた下流側止水部材と、下流側主フレームの下水管路上流側端部に接続されるフレキシブルホースとを備えている。
【0014】
本発明の請求項2に記載の止水装置では、補修すべき管路内に配置され且つ管路軸線方向に貫通する導水空間を有する上流側主フレームと、該上流側主フレームを周方向に取り囲み且つ流体圧によって管路内面に圧接し得る環状の膨張部材と、上流側主フレームの管路上流側端面に当接し得る上流側止水部材と、上流側主フレームを管路内面に対して拘束し得るロック機構と、補修すべき管路内に配置される下流側副フレームと、該下流側副フレームの内方に昇降可能に配置され且つ管路軸線方向に貫通する導水空間を有する下流側主フレームと、管路内面下側寄り部分に当接し得るように下流側主フレームに設けた下流側止水部材と、一端が上流側主フレームの管路下流側端部に接続され且つ他端が下流側主フレームの管路上流側端部に接続されるフレキシブルホースとを備えている。
【0015】
本発明の請求項3に記載の止水装置では、本発明の請求項2に記載の止水装置の構成に加えて、膨張部材を管路径方向へ変位可能に且つ上流側主フレームに対して水密を保つように支持するスライド機構を備えている。
【0016】
本発明の請求項4に記載の止水装置では、本発明の請求項2に記載の止水装置の構成に加えて、上流側主フレームと下流側主フレームとの間に配置され且つフレキシブルホースが挿通可能な筒状体を備えている。
【0017】
本発明の請求項5に記載の止水装置では、本発明の請求項2乃至請求項4のいずれかに記載の止水装置の構成に加えて、上流側主フレームの管路下流側端部の外面に沿って延びるフープ部材と、該フープ部材を覆うように上流側主フレームに外嵌するフレキシブルホースを周方向に取り囲んでフープ部材に嵌着させ得る固定具とを備えている。
【0018】
本発明の請求項6に記載の止水装置では、本発明の請求項1乃至請求項4のいずれかに記載の止水装置の構成に加えて、下流側主フレームの管路上流側端部の外面に沿って延びるフープ部材と、該フープ部材を覆うように下流側主フレームに外嵌するフレキシブルホースを周方向に取り囲んでフープ部材に嵌着させ得る固定具とを備えている。
【0019】
本発明の請求項2乃至請求項4に記載の止水装置のいずれにおいても、管路内面に膨張部材を圧接させ、管路上流側から下水が管路内面に沿って補修工事対象区画へ流入することを抑制するとともに、補修工事対象区画の管路上流側の下水を、上流側主フレームの導水空間、及びフレキシブルホースを介して補修工事対象区間の管路下流側へ導く。
【0020】
更に、上流側止水部材を上流側主フレームの管路上流側端面に当接させて、上流側主フレームの導水空間への下水の流入を抑止する。
【0021】
本発明の請求項3に記載の止水装置においては、スライド機構により膨張部材を上流側主フレームに対して管路径方向へ変位させ、管路内面への膨張部材の圧接性の向上を図る。
【0022】
本発明の請求項1乃至請求項4に記載の止水装置のいずれにおいても、下流側副フレームに対して下流側主フレームを下降させることにより、管路内面に下流側止水部材を当接させ、管路下流側から下水が管路内面に沿って補修工事対象区画へ逆流することを抑制するとともに、補修工事対象区画の管路上流側の下水を、フレキシブルホース、及び下流側主フレームの導水空間を介して補修工事対象区間の管路下流側へ導く。
【0023】
本発明の請求項4に記載の止水装置においては、上流側主フレームと下流側主フレームとの間に配置した筒状体にフレキシブルホースを挿通させ、下水の流通に起因したフレキシブルホースの変形を防止する。
【0024】
本発明の請求項5に記載の止水装置においては、フープ部材と固定具とによって、上流側主フレームに外嵌させたフレキシブルホースの脱落を防止する。
【0025】
本発明の請求項6に記載の止水装置においては、フープ部材と固定具とによって、下流側主フレームに外嵌させたフレキシブルホースの脱落を防止する。
【0026】
【発明の実施の形態】
以下、本発明の実施の形態を図面に基づいて説明する。
【0027】
図1乃至図10は本発明の止水装置の実施の形態の一例を示すもので、この止水装置の適用対象となる2次巻きコンクリート層2は、腐蝕などによる内面の劣化部分が削り取られた状態になっており、2次巻きコンクリート層2の内底部には、複数のレール固定フレーム33が下水管路軸線方向に所定間隔で配置されている。
【0028】
また、各レール固定フレーム33には、下水管路軸線方向に延びる左右のレール32が、下水管路軸線方向に見て頭部が2次巻きコンクリート層2の中心を向くように斜めに取り付けられている。
【0029】
止水装置は、補修工事対象区間の下水管路上流A側に配置される上流側止水手段64と、当該補修工事対象区間の下水管路下流B側に配置される下流側止水手段65と、上流側止水手段64から下流側止水手段65へ下水3を2次巻きコンクリート層2の内面に触れさせることなく流通させるフレキシブルホース66と、両止水手段64,65の間に配置され且つフレキシブルホース66が挿通される筒状体67とによって構成されている。
【0030】
上流側止水手段64は、補修すべき2次巻きコンクリート層2内に配置され且つ下水管路軸線方向に貫通する導水空間68が形成された円筒状の上流側主フレーム69と、該上流側主フレーム69に遊嵌し且つ流体圧によって2次巻きコンクリート層2の内面に圧接し得る環状の膨張部材70と、該膨張部材70を下水管路軸線方向へ変位可能に且つ上流側主フレーム69に対して水密を保つように支持するスライド機構71と、上流側主フレーム69の下水管路上流A側端面に当接し得る蓋状の上流側止水部材72と、上流側主フレーム69を2次巻きコンクリート層2の内面に対して拘束し得るロック機構73とを備えている。
【0031】
上流側主フレーム69は、側方から見ると中間部分で略S字状に屈曲し、下水管路上流A側端寄り部分の軸線に対して下水管路下流B側端寄り部分の軸線が略平行に下方へ偏った形状を呈している。
【0032】
また、上流側主フレーム69の下水管路軸線方向前端部及び後端部の左右に設けた下方へ突出するブラケット74には、レール32上を転動可能な車輪75を2つずつ枢支した車輪枠74aがピン連結される。
【0033】
膨張部材70は、合成ゴム系樹脂などの弾力性に富んだ環状の中空構造体であり、該膨張部材70の内部には、上流側主フレーム69の下水管路下流B側寄り端部に搭載の油圧ユニット(図示せず)から作動油圧が付与されるようになっている。
【0034】
スライド機構71は、上流側主フレーム69の下水管路上流A側寄り部分に外嵌するように取り付けられ且つ外面に周方向に延びる開口を有する中空構造のケーシング76と、該ケーシング76内に開口の前後縁部に沿うように設けたライナ材77と、上流側主フレーム69に遊嵌し且つ両ライナ材77に摺動可能に接する摺動環78と、該摺動環78の外縁部に外嵌装着した支持環79と、該支持環79を上流側主フレーム69に対して昇降させる油圧ジャッキ80とによって構成されている。
【0035】
支持環79には、前記の膨張部材70が外嵌装着されており、支持環79とともに膨張部材70が下水管路系方向に変位できるようになっている。
【0036】
油圧ジャッキ80は、ハウジングが上流側主フレーム69の外面下部にピン連結され、ロッドが支持環79の下部にピン連結されている。
【0037】
この油圧ジャッキ80には、膨張部材70と同様に、上流側主フレーム69に搭載の油圧ユニットから作動油圧が付与されるようになっており、油圧ジャッキ80を、ロッドがハウジングへ収納されるように作動させると、支持環79及び膨張部材70が上流側主フレーム69に対して上昇し、また、ロッドがハウジングから突出するように作動させると、支持環79及び膨張部材70が上流側主フレーム69に対して下降する。
【0038】
上流側止水部材72の下水管路下流B側面の周縁部には、上流側主フレーム69の下水管路上流A側端面に密着可能なシール部材81が、全周にわたって装着されている。
【0039】
上流側止水部材72の外縁部に周方向に略等間隔に固着したブラケット82には、油圧ジャッキ83のロッドがピン連結され、油圧ジャッキ83のハウジングは、ケーシング76に固着したブラケット84にピン連結されている。
【0040】
この油圧ジャッキ83には、膨張部材70と同様に、上流側主フレーム69に搭載の油圧ユニットから作動油圧が付与されるようになっており、油圧ジャッキ83を、ロッドがハウジングから突出するように作動させると、上流側止水部材72が上流側主フレーム69の端面から下水管路上流A側へ離隔し、また、油圧ジャッキ83をロッドがハウジングに収納されるように作動させると、シール部材81が上流側主フレーム69の端面に密着する。
【0041】
ロック機構73は、上流側主フレーム69の略S字状屈曲部分の下水管路上流A側寄り部分に外嵌固着した環状の架台85と、該架台85の外面に周方向に略等間隔に配置され且つ下水管路上流A側から下流B側へ向かって下水管路径方向の寸法が徐々に小さくなる楔形状の第1のブロック86と、該第1のブロック86の2次巻きコンクリート層2側の面に下水管路軸線方向へ相対的に摺動可能に接し且つ下水管路上流A側から下流B側へ向かって下水管路径方向の寸法が徐々に大きくなる楔形状の第2のブロック87と、該第2のブロック87から2次巻きコンクリート層2の接線に対して略平行に突出するピン88と、該ピン88が挿入される下水管路径方向に延びる長孔89を有し且つ架台85に固着した案内部材90と、前記の第1のブロック86を上流側主フレーム69に対して下水管路軸線方向へ前後動させる油圧ジャッキ91とによって構成されている。
【0042】
油圧ジャッキ91は、ハウジングが架台85に取り付けられ、また、ロッドが第1のブロック86にピン連結されている。
【0043】
この油圧ジャッキ91には、膨張部材70と同様に、上流側主フレーム69に搭載の油圧ユニットから作動油圧が付与されるようになっており、油圧ジャッキ91を、ロッドがハウジングから突出するように作動させると、両ブロック86,87の楔効果により第2のブロック87が2次巻きコンクリート層2内面に対して押圧され、また、ロッドがハウジングに収納されるように作動させると、両ブロック86,87の楔効果が解消されて2次巻きコンクリート層2内面への第2のブロック87の押圧が解除される。
【0044】
第2のブロック87の2次巻きコンクリート層2に圧着する面は、凹凸状に形成され、2次巻きコンクリート層2内面に対する拘束力の増大が図られている。
【0045】
更に、上流側主フレーム69の下水管路上流A側端部外面には、補修工事対象区間よりも下水管路上流A側の立坑に設置したウインチから繰り出されるワイヤロープ(図示せず)が係止可能なアイプレート92が固着されている。
【0046】
下流側止水手段65は、補修すべき2次巻きコンクリート層2内に配置され且つ下水管路軸線方向に見て門型に形成された下流側副フレーム93と、該下流側副フレーム93の内方に配置され且つ下水管路軸線方向に貫通する導水空間94を有する下流側主フレーム95と、2次巻きコンクリート層2の内面下側寄り部分に当接し得るように下流側主フレーム95に設けた下流側止水部材96と、該下流側止水部材96及び下流側主フレーム95を下流側副フレーム93に対して昇降させる油圧ジャッキ97とを備えている。
【0047】
下流側副フレーム93は、下水管路軸線方向に延びる梁部材98と、該梁部材98の前後端部に取り付けられる下方左右へ延びる脚部材99と、該脚部材99の下端部にレール32上を転動し得るように枢支される車輪100とによって構成されている。
【0048】
下流側止水部材96は、下流側主フレーム95の外面下側寄り部分に水密を保持し得るように取り付けられる止水板101と、該止水板101の下縁部に固着され且つ2次巻きコンクリート層2の周方向へ延びる支持座102と、該支持座102に沿って嵌着され且つ下水管路下流B側へ突出して2次巻きコンクリート層2の内面下側寄り部分に接し得るリップ103を有するシール部材104とによって構成されている。
【0049】
また、止水板101及び支持座102には、下流側止水部材96が2次巻きコンクリート層2の内面に接触する際に、レール32に装着したレール止水具105との干渉を回避するための凹陥Tが形成されている。
【0050】
油圧ジャッキ97は、ハウジングが下流側副フレーム93にピン連結され、また、ロッドが下流側止水部材96の止水板101にピン連結されている。
【0051】
この油圧ジャッキ97には、下流側副フレーム93に搭載の油圧ユニット(図示せず)から作動油圧が付与されるようになっており、油圧ジャッキ97を、ロッドがハウジングから突出するように作動させると、下流側主フレーム95及び下流側止水部材96が下降して、シール部材104が2次巻きコンクリート層2の内面に圧着し、また、ロッドがハウジングに収納されるように作動させると、下流側主フレーム95及び下流側止水部材96が上昇して、2次巻きコンクリート層2に対するシール部材104の圧着が解除される。
【0052】
シール部材104のリップ103が2次巻きコンクリート層2の内面に接した状態で、下流側止水部材96の下水管路下流B側に下水3が溜まると、シール部材104の支持座102に対する嵌着部分とリップ103との間に空隙に下水3の水圧が作用して、リップ103が効果的に2次巻きコンクリート層2の内面に圧着することになる。
【0053】
上記のレール止水具105は、先に述べた上流側止水手段64にも適用できるもので、各レール32に対してその左側及び右側より嵌着され且つレール32の路面から2次巻きコンクリート層2の内面へ向かって連なる断面形状を有する一対の止水用ブロック106と、止水用ブロック106のレール32嵌着部とレール32の側部との間、並びに止水用ブロック106の底部と2次巻きコンクリート層2の内面との間に介在するシール部材107と、左右の止水用ブロック106を相互に締結するボルト108とによって構成されている。
【0054】
このレール止水具105をレール32に装着することにより、上流側止水手段64の膨張部材70、あるいは下流側止水手段65のシール部材104が2次巻きコンクリート層2の内面及びレール止水具105に圧着して、下水管路上流A側、あるいは下流B側から補修工事対象区間への下水3の漏水が効果的に抑制されることになる。
【0055】
フレキシブルホース66は、屈曲性を具備し且つ軽量化が図られるように、合成樹脂材料などによって形成されている。
【0056】
フレキシブルホース66の一端は、上流側止水手段64の上流側主フレーム69の下水管路下流B側端部に外嵌され、また、フレキシブルホース66の他端は、下流側止水手段65の下流側主フレーム95の下水管路上流A側端部に外嵌されている。
【0057】
上流側主フレーム69の下水管路下流B側端部の外面、及び下流側主フレーム95の下水管路上流A側端部の外面には、これらに外嵌させるべきフレキシブルホース66の脱落を防止するために、周方向に延びるフープ部材109が固着されている。
【0058】
更に、フープ部材109を覆うように上流側主フレーム69あるいは下流側主フレーム95に外嵌するフレキシブルホース66を周方向に取り囲んでフープ部材109に嵌着させ得る固定具110が、各止水手段64,65ごとに設けられている。
【0059】
この固定具110は、上流側主フレーム69あるいは下流側主フレーム95に外嵌したフレキシブルホース66に外接するように周方向に順に配置され且つ両端部が主フレーム69,95の径方向外方へ屈曲した湾曲帯状の押え部材111と、隣接する押え部材111の屈曲部分を相互に締結するボルト112及びナット113とによって構成されている。
【0060】
筒状体67は、上流側止水手段64と下流側止水手段65との間に複数配置され且つ内部に上記のフレキシブルホース66が挿通される。
【0061】
図1乃至図10に示す止水装置を用いて下水管路の補修工事対象区間への下水3の流入を阻止する際には、上流側止水手段64を、上流側主フレーム69、膨張部材70、スライド機構71、上流側止水部材72、ロック機構73、及び車輪枠74aに分割し、これらの各部材を、地表から下水管路へ延びる既設の立坑に搬入し、該立坑の底部で上流側止水手段64を組み立てる。
【0062】
上流側止水手段64の組み立てが完了したならば、車輪75をレール32上に載置し、上流側止水手段64を下水管路の所定の補修工事対象区間の最上流端へ移動させる。
【0063】
このとき、油圧ジャッキ80によって、上流側主フレーム69に対する支持環79の上下方向の位置を適宜調整し、膨張部材70の外面と2次巻きコンクリート層2との接触を防止する。
【0064】
また、計画に従ってレール32の膨張部材70直下に位置する部分に対してレール止水具105を装着しておく。
【0065】
次いで、油圧ジャッキ91をロッドがハウジングから突出するように作動させ、両ブロック86,87の楔効果によって第2のブロック87を2次巻きコンクリート層2内面に対して押圧させ、上流側主フレーム69を2次巻きコンクリート層2に対して拘束する。
【0066】
また、筒状体67を立坑へ順次搬入し、レール32の案内される移動する台車など搬送手段によって、上流側止水手段64の下水管路下流B側に複数の筒状体67を直列に配置する。
【0067】
このとき、最後に立坑へ搬入される筒状体67内に、フレキシブルホース66を巻き取った状態、あるいは折り畳んだ状態で搭載しておく。
【0068】
更に、下流側止水手段65を、下流側副フレーム93、下流側主フレーム95、下流側止水部材96、油圧ジャッキ97、及び車輪100に分解し、これらの各部材を立坑へ搬入し、該立坑の底部で下流側止水手段65を組み立てる。
【0069】
下流側止水手段65の組み立てが完了したならば、車輪100をレール32上に載置し、下流側止水手段65を下水管路の所定の補修対象区間の最下流端へ移動させる。
【0070】
上流側止水手段64、筒状体67、及び下流側止水手段65を所定位置に設置したならば、2次巻きコンクリート層2の内面に膨張部材70が圧接するように、該膨張部材70の内部へ上流側主フレーム69に搭載の油圧ユニットから作動油圧を付与し、また、上流側止水部材72のシール部材81が上流側主フレーム69の端面に密着するように油圧ジャッキ83を作動させ、上流側止水手段64よりも下水管路下流B側への下水3の流通を一時的に中断させる。
【0071】
また、下水3が補修工事対象区間の下水管路下流B側へ後退した後、レール32の下流側止水部材96の直下に位置する部分に対してレール止水具105を装着しておき、2次巻きコンクリート層2の内面及びレール止水具105にシール部材104が圧接するように油圧ジャッキ97を作動させる。
【0072】
この間に、先に述べた筒状体67内に搭載されているフレキシブルホース66を、下水管路上流A側に隣接する他の筒状体67に挿通しながら展開し、上流側主フレーム69及び下流側主フレーム95にフレキシブルホース66端部を固定具110を用いて接続する。
【0073】
次いで、油圧ジャッキ83を作動させて、上流側止水部材72を上流側主フレーム69から離隔させると、補修工事対象区画の下水管路上流A側に滞留していた下水3が、上流側主フレーム69の導水空間68、各筒状体67に順に挿通されているフレキシブルホース66、及び下流側主フレーム95の導水空間94を経て、補修工事対象区画の2次巻きコンクリート層2の内面に触れることなく、補修工事対象区間の下水管路下流B側へ流通する。
【0074】
更に、補修工事対象区画の2次巻きコンクリート層2に対して水洗浄を行ない、また、洗浄による濁水を水中ポンプなどを用いて下流側止水手段65の下水管路下流B側へ排出した後、2次巻きコンクリート層2の補修作業を開始する。
【0075】
上流側止水手段64と下流側止水手段65との間における2次巻きコンクリート層2の補修作業が完了したならば、膨張部材70及び下流側止水部材96による止水とロック機構73による上流側止水手段64の拘束とを解除し、上流側止水手段64、筒状体67、下流側止水手段65、及びフレキシブルホース66を下水管路上流A側へ移動させる。
【0076】
これにより、上流側止水手段64を下水管路の次なる補修工事対象区間の最上流端に、また、下流側止水手段65を下水管路の次なる補修工事対象区間の最下流端に位置させるとともに、両止水手段64,65の間に複数の筒状体67を直列に配置させ、先に述べた手順によって、下水管路の次なる補修工事対象区間に対する止水を行なう。
【0077】
このように、図1乃至図10に示す止水装置においては、2次巻きコンクリート層2の内面に膨張部材70を圧接させて、下水管路上流A側から下水3が2次巻きコンクリート層2の内面に沿って補修工事対象区画へ流入することを抑制し、また、2次巻きコンクリート層2の内面に下流側止水部材96を当接させて、下水管路下流B側から下水3が2次巻きコンクリート層2の内面に沿って補修工事対象区画へ逆流することを抑制するとともに、下水3を補修工事対象区画の下水管路上流A側から下流B側へ、上流側主フレーム69の導水空間68、フレキシブルホース66、及び下流側主フレーム95の導水空間94を介して導くので、下水3の流通を妨げずに下水管路の補修工事対象区間への下水3の流入を阻止することができる。
【0078】
また、スライド機構71により膨張部材70が下水管路径方向へ変位するので、2次巻きコンクリート層2の内面に対して膨張部材70を効果的に圧接させることができる。
【0079】
更に、上流側止水部材72を上流側主フレーム69の下水管路上流A側端面に当接させて、上流側主フレーム69の導水空間68への下水3の流入を抑止するので、上流側主フレーム69及び下流側主フレーム95に対するフレキシブルホース66の着脱作業を容易に行なえる。
【0080】
これに加えて、ロック機構73の第1のブロック86が、下水管路上流A側から下流B側へ向かって下水管路径方向の寸法が徐々に小さくなる楔形状であり、ロック機構73の第2のブロック87が、下水管路上流A側から下流B側へ向かって下水管路径方向の寸法が徐々に大きくなる楔形状であるので、雨水などが下水管路へ急激に流れ込むことにより上流側止水手段64が下水管路下流B側へ付勢されると、両ブロック86,87の楔効果によって、2次巻きコンクリート層2の内面への第2のブロック87の押圧力が増大し、上流側止水手段64の下水管路下流B側への後退が防止される。
【0081】
また、上流側主フレーム69と下流側主フレーム95との間に配置した筒状体67にフレキシブルホース66を挿通するので、下水3の流通に起因したフレキシブルホース66の変形を防止することができる。
【0082】
更にまた、上流側主フレーム69の下水管路下流B側端部外面、及び下流側主フレーム95の下水管路上流A側端部外面にフープ部材109を設け、該フープ部材109を覆うように主フレーム69,95に外嵌するフレキシブルホース66を周方向に取り囲む固定具110によってフープ部材109に嵌着させるので、主フレーム69,95からのフレキシブルホース66の脱落を防止することができる。
【0083】
なお、本発明の止水装置は上述した実施の形態のみに限定されるものではなく、本発明の要旨を逸脱しない範囲において変更を加え得ることは勿論である。
【0084】
【発明の効果】
以上述べたように、本発明の止水装置によれは下記のような種々の優れた効果を奏し得る。
【0085】
(1)本発明の請求項2乃至請求項4に記載の止水装置のいずれにおいても、管路内面に膨張部材を圧接させ、管路上流側から下水が管路内面に沿って補修工事対象区画へ流入することを抑制するとともに、補修工事対象区画の管路上流側の下水を、上流側主フレームの導水空間、及びフレキシブルホースを介して補修工事対象区間の管路下流側へ導くので、下水管路を供用した状態で補修工事対象区間への下水の流入を阻止することができる。
【0086】
(2)更に、上流側止水部材を上流側主フレームの管路上流側端面に当接させて、上流側主フレームの導水空間への下水の流入を抑止するので、上流側主フレームに対するフレキシブルホースの着脱作業を容易に行なえる。
【0087】
(3)本発明の請求項1乃至請求項4に記載の止水装置のいずれにおいても、下流側副フレームに対して下流側主フレームを下降させることにより、管路内面に下流側止水部材を当接させ、管路下流側から下水が管路内面に沿って補修工事対象区画へ逆流することを抑制するとともに、補修工事対象区画の管路上流側の下水を、フレキシブルホース、及び下流側主フレームの導水空間を介して補修工事対象区間の管路下流側へ導くので、下水管路を供用した状態で補修工事対象区間への下水の流入を阻止することができる。
【0088】
(4)本発明の請求項3に記載の止水装置においては、スライド機構により膨張部材が管路径方向へ変位するので、管路内面に対して膨張部材を効果的に圧接させることができる。
【0089】
(5)本発明の請求項4に記載の止水装置においては、上流側主フレームと下流側主フレームとの間に配置した筒状体にフレキシブルホースを挿通させることにより、下水の流通に起因したフレキシブルホースの変形を防止できる。
【0090】
(6)本発明の請求項5に記載の止水装置においては、フープ部材と固定具とによって、上流側主フレームに外嵌させたフレキシブルホースの脱落を防止することができる。
【0091】
(7)本発明の請求項6に記載の止水装置においては、フープ部材と固定具とによって、下流側主フレームに外嵌させたフレキシブルホースの脱落を防止することができる。
【図面の簡単な説明】
【図1】 本発明の止水装置の実施の形態の一例における上流側止水手段を示す概念図である。
【図2】 図1のII−II矢視図である。
【図3】 図1のIII−III矢視図である。
【図4】 本発明の止水装置の実施の形態の一例における下流側止水手段を示す概念図である。
【図5】 図4のV−V矢視図である。
【図6】 図5における下流側主フレーム及び下流側止水部材が上昇した状態を示す図である。
【図7】 本発明の止水装置の実施の形態の一例に適用するレール止水具を示す概念図である。
【図8】 図1における上流側主フレームに対するフレキシブルホースの接続及び図4における下流側主フレームに対するフレキシブルホースの接続に用いる固定具を示す概念図である。
【図9】 図8における押え部材端部の締結状態を示す拡大図である。
【図10】 図9のX−X矢視図である。
【図11】 シールド工法によって構築された下水管路の一例を示す横断面図である。
【図12】 従来の下水管路補修工法の一例を示す概念図である。
【図13】 図12におけるライニング材の嵌合状態を示す断面図である。
【符号の説明】
2 2次巻きコンクリート層(管路)
66 フレキシブルホース
68 導水空間
69 上流側主フレーム
70 膨張部材
71 スライド機構
72 上流側止水部材
73 ロック機構
93 下流側副フレーム
94 導水空間
95 下流側主フレーム
96 下流側止水部材
109 フープ部材
110 固定具
A 下水管路上流
B 下水管路下流
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a water stop device used for pipe repair work.
[0002]
[Prior art]
FIG. 11 shows an example of a sewage pipe constructed by a shield construction method. This sewage pipe supports a natural ground load by a pipe housing 1 composed of a reinforced concrete or steel segment, and the pipe housing. The secondary winding concrete layer 2 which forms a water conduit in 1 is constructed.
[0003]
The secondary winding concrete layer 2 of such a sewage pipe line is exposed to an atmosphere containing a gas such as hydrogen sulfide 4 to cause deterioration such as corrosion 5 over time.
[0004]
Therefore, in recent years, repair work has been performed on the secondary winding concrete layer 2 of the sewage pipe.
[0005]
FIGS. 12 and 13 show an example of a conventional sewage pipe repair method. This repair method uses a long strip-like lining material (coating material) 6 made of synthetic resin having acid resistance and base resistance, for example, An air gap is formed between the lining material 6 and the secondary winding concrete layer 2 along the inner surface of the secondary winding concrete layer 2 and spirally laid from one end of the sewer pipe to the other end. A backfilling material is placed on the surface of the existing pipe housing 1 to reconstruct a smooth water conduit.
[0006]
At one edge of the lining material 6 in the width direction, a protrusion 7 is formed that extends in the longitudinal direction of the lining material 6 and protrudes toward the inner surface of the secondary winding concrete layer 2.
[0007]
Ribs 8 and 9 extending in the longitudinal direction of the lining material 6 and projecting toward the inner surface of the secondary winding concrete layer 2 and embedded in the backfill material are formed at the intermediate portion in the width direction of the lining material 6.
[0008]
The protrusion 7 can be inserted into the other edge of the lining material 6 in the width direction when extending in the longitudinal direction of the lining material 6 and laying the lining material 6 spirally along the inner surface of the secondary winding concrete layer 2. A fitting portion 10, a rib 11 extending in the longitudinal direction of the lining material 6 and projecting from the fitting portion 10 toward the inner surface of the secondary winding concrete layer 2 and embedded in the backfill material, and extending in the longitudinal direction of the lining material 6. Further, when the lining material 6 is spirally laid along the inner surface of the secondary winding concrete layer 2, a lip 12 is formed that can come into contact with the rib 8 adjacent to the protrusion 7.
[0009]
Further, the lining material 6 may be laid on the inner surface of the secondary winding concrete layer 2 while inserting a steel reinforcing member 13 extending in the longitudinal direction of the lining material 6 between the ribs 8 and 9.
[0010]
[Problems to be solved by the invention]
As described above, when the repair work is performed over the entire inner circumference of the secondary winding concrete layer 2, entry of the sewage 3 into the repair work target section of the sewage pipe line must be prevented.
[0011]
However, if the upstream end of the section to be repaired is simply blocked, the distribution of the sewage 3 will be hindered, so it is necessary to bypass the sewage 3 by some means and lead it downstream to the section to be repaired. .
[0012]
This invention is made | formed in view of the situation mentioned above, and it aims at providing the water stop apparatus which can prevent the inflow of the sewage to the repair work area in the state which used the sewer pipe.
[0013]
[Means for Solving the Problems]
In order to achieve the above object, in the water stop device according to claim 1 of the present invention, the downstream side subframe disposed in the pipeline to be repaired, and the lower side subframe can be moved up and down. A downstream main frame having a water guide space penetrating in the pipe axis direction, a downstream water stop member provided on the downstream main frame so as to be in contact with the lower part of the inner surface of the pipe, and a downstream main frame And a flexible hose connected to the upstream end of the sewage pipe.
[0014]
In the water stop device according to claim 2 of the present invention, an upstream main frame having a water guide space disposed in the pipeline to be repaired and penetrating in the pipeline axial direction, and the upstream main frame in the circumferential direction. An annular expansion member that surrounds and can be pressed against the inner surface of the pipeline by fluid pressure, an upstream water stop member that can abut on the upstream end surface of the upstream main frame, and the upstream main frame with respect to the inner surface of the pipeline A downstream having a lock mechanism that can be restrained, a downstream side sub-frame disposed in the pipeline to be repaired, and a water guide space that is disposed so as to be movable up and down inward of the downstream side sub-frame and penetrates in the pipeline axial direction A side main frame, a downstream water stop member provided on the downstream main frame so as to be in contact with the lower portion of the inner surface of the pipe line, one end connected to the pipe downstream end of the upstream main frame, and the other The end is in contact with the upstream end of the pipe on the downstream main frame. And a flexible hose to be.
[0015]
In the water stop device according to claim 3 of the present invention, in addition to the structure of the water stop device according to claim 2 of the present invention, the expansion member is displaceable in the radial direction of the pipe line and relative to the upstream main frame. A slide mechanism is provided to support watertightness.
[0016]
In the water stop device according to claim 4 of the present invention, in addition to the structure of the water stop device according to claim 2 of the present invention, the flexible hose is arranged between the upstream main frame and the downstream main frame. Is provided with a cylindrical body that can be inserted.
[0017]
In the water stop device according to claim 5 of the present invention, in addition to the structure of the water stop device according to any one of claims 2 to 4 of the present invention, the pipe downstream end of the upstream main frame A hoop member extending along the outer surface of the hose member, and a fixing tool that surrounds the flexible hose that is fitted to the upstream main frame so as to cover the hoop member in the circumferential direction and can be fitted to the hoop member.
[0018]
In the water stop device according to claim 6 of the present invention, in addition to the structure of the water stop device according to any one of claims 1 to 4 of the present invention, the upstream end portion of the downstream main frame pipe line A hoop member that extends along the outer surface of the hose member, and a fixture that surrounds the flexible hose that is fitted to the downstream main frame so as to cover the hoop member in the circumferential direction and can be fitted to the hoop member.
[0019]
In any of the water stop devices according to claims 2 to 4 of the present invention, the expansion member is pressed against the inner surface of the pipe, and sewage flows from the upstream side of the pipe along the inner surface of the pipe into the section to be repaired. In addition, the sewage on the upstream side of the pipeline in the section to be repaired is guided to the downstream side of the pipeline in the section to be repaired through the water guide space of the upstream main frame and the flexible hose.
[0020]
Further, the upstream water stop member is brought into contact with the pipe upstream end surface of the upstream main frame to suppress the inflow of sewage into the water guide space of the upstream main frame.
[0021]
In the water stop device according to the third aspect of the present invention, the expansion member is displaced in the pipe radial direction with respect to the upstream main frame by the slide mechanism, and the press contact property of the expansion member to the inner surface of the pipe is improved.
[0022]
In any of the water stop devices according to claims 1 to 4 of the present invention, the downstream side water stop member is brought into contact with the inner surface of the pipe line by lowering the downstream side main frame with respect to the downstream side sub frame. The sewage from the downstream side of the pipeline is prevented from flowing back along the inner surface of the pipeline to the repair target section, and the sewage upstream of the pipeline in the repair target section is supplied to the flexible hose and the downstream main frame. Guide to the downstream side of the pipeline in the section to be repaired through the water conveyance space.
[0023]
In the water stop device according to claim 4 of the present invention, a flexible hose is inserted into a cylindrical body disposed between the upstream main frame and the downstream main frame, and the flexible hose is deformed due to the flow of sewage. To prevent.
[0024]
In the water stop device according to claim 5 of the present invention, the hose member and the fixture prevent the flexible hose externally fitted to the upstream main frame from falling off.
[0025]
In the water stop device according to claim 6 of the present invention, the hose member and the fixture prevent the flexible hose externally fitted to the downstream main frame from falling off.
[0026]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0027]
FIG. 1 to FIG. 10 show an example of an embodiment of a water stop device of the present invention. A secondary winding concrete layer 2 to which this water stop device is applied has its inner surface deteriorated due to corrosion or the like. In this state, a plurality of rail fixing frames 33 are arranged at predetermined intervals in the direction of the sewer pipe axis at the inner bottom portion of the secondary winding concrete layer 2.
[0028]
Further, left and right rails 32 extending in the sewer pipe axis direction are obliquely attached to each rail fixing frame 33 so that the head faces the center of the secondary winding concrete layer 2 when viewed in the sewer pipe axis direction. ing.
[0029]
The water stop device includes an upstream water stop means 64 disposed on the sewage pipe upstream A side of the repair work section, and a downstream water stop means 65 disposed on the sewage pipe downstream B side of the repair work section. And a flexible hose 66 that allows the sewage 3 to flow from the upstream water stop means 64 to the downstream water stop means 65 without touching the inner surface of the secondary winding concrete layer 2, and between the water stop means 64 and 65. And a cylindrical body 67 through which the flexible hose 66 is inserted.
[0030]
The upstream water stop means 64 includes a cylindrical upstream main frame 69 disposed in the secondary winding concrete layer 2 to be repaired and having a water guide space 68 penetrating in the axial direction of the sewage pipe line. An annular expansion member 70 that can be loosely fitted to the main frame 69 and press-contacted to the inner surface of the secondary winding concrete layer 2 by fluid pressure, and the expansion member 70 can be displaced in the sewage line axial direction and can be displaced upstream. The slide mechanism 71 that supports the water-tightness against the upstream side, the lid-shaped upstream water stop member 72 that can come into contact with the end surface of the upstream side A of the upstream main frame 69, and the upstream main frame 69 And a lock mechanism 73 capable of restraining the inner surface of the next roll concrete layer 2.
[0031]
When viewed from the side, the upstream main frame 69 bends in a substantially S shape at an intermediate portion, and the axis of the portion near the sewage pipe downstream B side is substantially the axis of the portion near the sewage pipe upstream A side end. It has a shape that is parallel and biased downward.
[0032]
In addition, two wheels 75 that can roll on the rail 32 are pivotally supported by brackets 74 that protrude downward on the left and right sides of the front end and the rear end of the upstream main frame 69 in the sewage pipe axis direction. The wheel frame 74a is pin-connected.
[0033]
The expansion member 70 is a ring-shaped hollow structure body rich in elasticity, such as a synthetic rubber-based resin. The expansion member 70 is mounted at the end of the upstream main frame 69 near the downstream B downstream side of the sewage pipe. The hydraulic pressure is applied from a hydraulic unit (not shown).
[0034]
The slide mechanism 71 is attached so as to be fitted to a portion closer to the upstream A side of the upstream main frame 69 and has a hollow casing 76 having an opening extending in the circumferential direction on the outer surface, and an opening in the casing 76. A liner material 77 provided along the front and rear edge portions of the sliding ring 78, a sliding ring 78 loosely fitted to the upstream main frame 69 and slidably in contact with both liner materials 77, and an outer edge portion of the sliding ring 78 A support ring 79 that is externally fitted and a hydraulic jack 80 that raises and lowers the support ring 79 relative to the upstream main frame 69 are configured.
[0035]
The expansion member 70 is fitted on the support ring 79 so that the expansion member 70 can be displaced along with the support ring 79 in the direction of the sewage pipe system.
[0036]
In the hydraulic jack 80, the housing is pin-connected to the lower part of the outer surface of the upstream main frame 69, and the rod is pin-connected to the lower part of the support ring 79.
[0037]
Like the expansion member 70, the hydraulic jack 80 is provided with an operating hydraulic pressure from a hydraulic unit mounted on the upstream main frame 69, so that the rod is accommodated in the housing. When operated, the support ring 79 and the expansion member 70 are raised with respect to the upstream main frame 69, and when the rod is operated so as to protrude from the housing, the support ring 79 and the expansion member 70 are connected to the upstream main frame 69. Descends to 69.
[0038]
A seal member 81 that can be in close contact with the end surface of the upstream main frame 69 on the upstream side A of the downstream side of the upstream main frame 69 is attached to the peripheral edge of the downstream side B of the downstream side of the upstream water blocking member 72.
[0039]
A rod of a hydraulic jack 83 is pin-connected to a bracket 82 fixed to the outer edge of the upstream water stop member 72 at substantially equal intervals in the circumferential direction, and the housing of the hydraulic jack 83 is pinned to a bracket 84 fixed to the casing 76. It is connected.
[0040]
As with the expansion member 70, the hydraulic jack 83 is provided with operating hydraulic pressure from a hydraulic unit mounted on the upstream main frame 69, and the rod is protruded from the housing. When operated, the upstream water stop member 72 is separated from the end surface of the upstream main frame 69 toward the upstream side A of the sewage pipe, and when the hydraulic jack 83 is operated so that the rod is housed in the housing, the seal member 81 closely contacts the end surface of the upstream main frame 69.
[0041]
The lock mechanism 73 includes an annular gantry 85 that is fitted and fixed to a portion near the sewage pipe upstream A side of the substantially S-shaped bent portion of the upstream main frame 69, and the outer surface of the gantry 85 at substantially equal intervals in the circumferential direction. A wedge-shaped first block 86 which is disposed and gradually decreases in the sewage pipe radial direction from the upstream A side to the downstream B side, and the secondary winding concrete layer 2 of the first block 86. Wedge-shaped second block that is slidably in contact with the surface of the sewage pipe in the axial direction of the sewage pipe and whose dimension in the radial direction of the sewage pipe gradually increases from the upstream A side to the downstream B side. 87, a pin 88 projecting substantially parallel to the tangent to the secondary winding concrete layer 2 from the second block 87, and a long hole 89 extending in the sewage pipe radial direction into which the pin 88 is inserted, and A guide member 90 fixed to the gantry 85; It is constituted by a hydraulic jack 91 to move back and forth to the sewer pipe axial direction of the block 86 to the upstream-side main frame 69.
[0042]
The hydraulic jack 91 has a housing attached to the gantry 85 and a rod connected to the first block 86 by a pin.
[0043]
Similar to the expansion member 70, the hydraulic jack 91 is provided with operating hydraulic pressure from a hydraulic unit mounted on the upstream main frame 69 so that the rod protrudes from the housing. When operated, the second block 87 is pressed against the inner surface of the secondary winding concrete layer 2 by the wedge effect of both blocks 86 and 87, and when operated so that the rod is housed in the housing, both blocks 86 , 87 is eliminated, and the second block 87 is released from the inner surface of the secondary winding concrete layer 2.
[0044]
The surface of the second block 87 to be pressure-bonded to the secondary winding concrete layer 2 is formed in an uneven shape so that the restraining force on the inner surface of the secondary winding concrete layer 2 is increased.
[0045]
Further, a wire rope (not shown) fed from a winch installed in a vertical shaft on the upstream side A of the sewage pipeline from the section to be repaired is related to the outer surface of the upstream side A side end portion of the upstream main frame 69. A stopable eye plate 92 is fixed.
[0046]
The downstream water stop means 65 is disposed in the secondary winding concrete layer 2 to be repaired, and has a downstream side subframe 93 formed in a gate shape when viewed in the direction of the sewer pipe axis, and the downstream side subframe 93 A downstream main frame 95 having a water guide space 94 disposed inward and penetrating in the axial direction of the sewage pipe line, and a downstream main frame 95 so as to be in contact with a lower portion of the inner surface of the secondary winding concrete layer 2 A provided downstream water stop member 96 and a hydraulic jack 97 that moves the downstream water stop member 96 and the downstream main frame 95 up and down with respect to the downstream sub frame 93 are provided.
[0047]
The downstream side subframe 93 includes a beam member 98 extending in the sewage pipe axis direction, a leg member 99 extending to the left and right ends attached to the front and rear end portions of the beam member 98, and a rail 32 at the lower end portion of the leg member 99. And a wheel 100 that is pivotally supported so as to be able to roll.
[0048]
The downstream side water stop member 96 is fixed to the water stop plate 101 attached so as to be able to maintain water tightness at the lower part of the outer surface of the downstream side main frame 95, and is fixed to the lower edge portion of the water stop plate 101 and is secondary. A support seat 102 extending in the circumferential direction of the wound concrete layer 2 and a lip that is fitted along the support seat 102 and protrudes toward the downstream B side of the sewage pipe and can be in contact with the lower portion of the inner surface of the secondary wound concrete layer 2 And a seal member 104 having 103.
[0049]
Moreover, when the downstream water stop member 96 contacts the inner surface of the secondary winding concrete layer 2, the water stop plate 101 and the support seat 102 avoid interference with the rail water stop device 105 attached to the rail 32. A recess T is formed.
[0050]
The hydraulic jack 97 has a housing pin-connected to the downstream side sub-frame 93 and a rod pin-connected to the water stop plate 101 of the downstream side water stop member 96.
[0051]
The hydraulic jack 97 is provided with an operating hydraulic pressure from a hydraulic unit (not shown) mounted on the downstream side subframe 93, and the hydraulic jack 97 is operated so that the rod protrudes from the housing. When the downstream main frame 95 and the downstream water stop member 96 are lowered, the seal member 104 is crimped to the inner surface of the secondary winding concrete layer 2, and the rod is accommodated in the housing. The downstream main frame 95 and the downstream water stop member 96 are raised, and the pressure bonding of the seal member 104 to the secondary winding concrete layer 2 is released.
[0052]
When the sewage 3 accumulates on the downstream side B of the downstream water stop member 96 with the lip 103 of the seal member 104 in contact with the inner surface of the secondary winding concrete layer 2, the seal member 104 fits to the support seat 102. The water pressure of the sewage 3 acts on the gap between the landing portion and the lip 103, and the lip 103 is effectively pressed against the inner surface of the secondary winding concrete layer 2.
[0053]
The rail water stop device 105 can also be applied to the upstream water stop means 64 described above, and is fitted to each rail 32 from the left side and the right side thereof, and the secondary winding concrete from the road surface of the rail 32. A pair of water blocking blocks 106 having a cross-sectional shape continuous toward the inner surface of the layer 2, between the rail 32 fitting portion of the water blocking block 106 and the side portion of the rail 32, and the bottom of the water blocking block 106. And the inner surface of the secondary winding concrete layer 2 and a bolt 108 for fastening the right and left water blocking blocks 106 to each other.
[0054]
By mounting the rail water stop 105 on the rail 32, the expansion member 70 of the upstream water stop means 64 or the seal member 104 of the downstream water stop means 65 can be attached to the inner surface of the secondary winding concrete layer 2 and the rail water stop. By crimping to the tool 105, leakage of the sewage 3 from the upstream A side or the downstream B side to the repair work target section is effectively suppressed.
[0055]
The flexible hose 66 is formed of a synthetic resin material or the like so as to be flexible and light in weight.
[0056]
One end of the flexible hose 66 is externally fitted to the end of the upstream main frame 69 of the upstream main water stopping means 64 on the downstream B side of the downstream main pipe 69, and the other end of the flexible hose 66 is connected to the downstream water stopping means 65. The downstream main frame 95 is externally fitted to the end of the sewage pipe upstream A side.
[0057]
The outer surface of the downstream main frame 69 downstream end on the downstream B side and the outer surface of the downstream main frame 95 downstream end on the downstream side of the downstream main frame 95 are prevented from dropping off the flexible hose 66 to be fitted on them. For this purpose, a hoop member 109 extending in the circumferential direction is fixed.
[0058]
Furthermore, a fixing device 110 that surrounds the flexible hose 66 that is fitted to the upstream main frame 69 or the downstream main frame 95 so as to cover the hoop member 109 in the circumferential direction and is fitted to the hoop member 109 is provided with each water stop means. 64 and 65 are provided.
[0059]
The fixtures 110 are sequentially arranged in the circumferential direction so as to circumscribe the flexible hose 66 fitted on the upstream main frame 69 or the downstream main frame 95, and both ends are radially outward of the main frames 69 and 95. A bent belt-shaped presser member 111 and a bolt 112 and a nut 113 that fasten bent portions of adjacent presser members 111 to each other are configured.
[0060]
A plurality of cylindrical bodies 67 are arranged between the upstream water stop means 64 and the downstream water stop means 65, and the flexible hose 66 is inserted inside.
[0061]
When the sewage 3 is prevented from flowing into the sewage pipe repair target section using the water stop device shown in FIGS. 1 to 10, the upstream side water stop means 64 is connected to the upstream main frame 69, the expansion member. 70, a slide mechanism 71, an upstream water stop member 72, a lock mechanism 73, and a wheel frame 74a. Each of these members is carried into an existing shaft extending from the ground surface to the sewer pipe, and at the bottom of the shaft. The upstream water stop means 64 is assembled.
[0062]
When the assembly of the upstream water stop means 64 is completed, the wheel 75 is placed on the rail 32, and the upstream water stop means 64 is moved to the uppermost stream end of the predetermined repair work target section of the sewer pipe.
[0063]
At this time, the hydraulic jack 80 appropriately adjusts the vertical position of the support ring 79 with respect to the upstream main frame 69 to prevent contact between the outer surface of the expansion member 70 and the secondary winding concrete layer 2.
[0064]
In addition, the rail water stop 105 is attached to the portion of the rail 32 located immediately below the expansion member 70 according to the plan.
[0065]
Next, the hydraulic jack 91 is operated so that the rod protrudes from the housing, and the second block 87 is pressed against the inner surface of the secondary winding concrete layer 2 by the wedge effect of both blocks 86 and 87, and the upstream main frame 69. Is restrained with respect to the secondary winding concrete layer 2.
[0066]
Moreover, the cylindrical body 67 is sequentially carried into the shaft, and a plurality of cylindrical bodies 67 are serially connected to the downstream B downstream side of the upstream water stop means 64 by a conveying means such as a moving carriage guided by the rail 32. Deploy.
[0067]
At this time, the flexible hose 66 is mounted in the cylindrical body 67 finally carried into the shaft in a wound state or a folded state.
[0068]
Further, the downstream side water stop means 65 is disassembled into a downstream side subframe 93, a downstream side main frame 95, a downstream side water stop member 96, a hydraulic jack 97, and a wheel 100, and these members are carried into the shaft, The downstream water stop means 65 is assembled at the bottom of the shaft.
[0069]
When the assembly of the downstream water stop means 65 is completed, the wheel 100 is placed on the rail 32, and the downstream water stop means 65 is moved to the most downstream end of the predetermined repair target section of the sewer pipe.
[0070]
If the upstream side water stop means 64, the cylindrical body 67, and the downstream side water stop means 65 are installed at predetermined positions, the expansion member 70 so that the expansion member 70 comes into pressure contact with the inner surface of the secondary winding concrete layer 2. Hydraulic pressure is applied from the hydraulic unit mounted on the upstream main frame 69, and the hydraulic jack 83 is operated so that the seal member 81 of the upstream water stop member 72 is in close contact with the end surface of the upstream main frame 69. Then, the flow of the sewage 3 to the sewage pipe downstream B side rather than the upstream water stop means 64 is temporarily interrupted.
[0071]
In addition, after the sewage 3 has retreated to the sewage pipe downstream B side of the section to be repaired, a rail water stop 105 is attached to a portion located immediately below the downstream water stop member 96 of the rail 32, The hydraulic jack 97 is operated so that the seal member 104 is pressed against the inner surface of the secondary winding concrete layer 2 and the rail water stop 105.
[0072]
During this time, the flexible hose 66 mounted in the cylindrical body 67 described above is expanded while being inserted into another cylindrical body 67 adjacent to the upstream A side of the sewage pipe, and the upstream main frame 69 and The end of the flexible hose 66 is connected to the downstream main frame 95 using the fixture 110.
[0073]
Next, when the hydraulic jack 83 is actuated to separate the upstream water stop member 72 from the upstream main frame 69, the sewage 3 staying on the upstream side A of the sewage pipe in the repair work target section is It touches the inner surface of the secondary winding concrete layer 2 of the section to be repaired through the water conveyance space 68 of the frame 69, the flexible hose 66 inserted through each cylindrical body 67 in order, and the water conveyance space 94 of the downstream main frame 95. Without any problem, it circulates to the sewage pipe downstream B side of the repair work section.
[0074]
Further, after washing the secondary winding concrete layer 2 of the section subject to repair work and discharging muddy water from the washing to the downstream B downstream side of the sewage pipe 65 using a submersible pump or the like. Repair work on the secondary winding concrete layer 2 is started.
[0075]
If the repair work of the secondary winding concrete layer 2 between the upstream water stop means 64 and the downstream water stop means 65 is completed, the water stop by the expansion member 70 and the downstream water stop member 96 and the lock mechanism 73 are performed. The restriction of the upstream water stop means 64 is released, and the upstream water stop means 64, the cylindrical body 67, the downstream water stop means 65, and the flexible hose 66 are moved to the sewage pipe upstream A side.
[0076]
As a result, the upstream water stop means 64 is at the most upstream end of the next repair work section of the sewer pipe, and the downstream water stop means 65 is at the most downstream end of the next repair work section of the sewer pipe. A plurality of cylindrical bodies 67 are arranged in series between the both water stop means 64 and 65, and the water for the next repair work target section of the sewer pipe line is performed by the procedure described above.
[0077]
As described above, in the water stopping device shown in FIGS. 1 to 10, the expansion member 70 is pressed against the inner surface of the secondary winding concrete layer 2, so that the sewage 3 flows from the upstream side A of the sewage pipe to the secondary winding concrete layer 2. And the downstream side water stop member 96 is brought into contact with the inner surface of the secondary winding concrete layer 2 so that the sewage 3 flows from the downstream B side of the sewage pipe line. While suppressing backflow along the inner surface of the secondary winding concrete layer 2 to the section to be repaired, the sewage 3 from the sewage pipe upstream A side to the downstream B side of the section to be repaired is moved to the downstream B side. Since the water is guided through the water conveyance space 68, the flexible hose 66, and the water conveyance space 94 of the downstream main frame 95, the inflow of the sewage 3 to the repair target section of the sewage pipeline is prevented without disturbing the flow of the sewage 3. Can do.
[0078]
Further, since the expansion member 70 is displaced in the sewage pipe radial direction by the slide mechanism 71, the expansion member 70 can be effectively pressed against the inner surface of the secondary winding concrete layer 2.
[0079]
Further, since the upstream water stop member 72 is brought into contact with the end surface of the upstream main frame 69 on the downstream side A of the upstream main frame 69, the inflow of the sewage 3 into the water guide space 68 of the upstream main frame 69 is suppressed. The flexible hose 66 can be easily attached to and detached from the main frame 69 and the downstream main frame 95.
[0080]
In addition, the first block 86 of the lock mechanism 73 has a wedge shape in which the dimension in the sewage pipe radial direction gradually decreases from the upstream A side to the downstream B side. Since the second block 87 has a wedge shape in which the dimension in the radial direction of the sewage pipe gradually increases from the upstream A side to the downstream B side, rainwater or the like suddenly flows into the sewage pipe, so that the upstream side When the water stop means 64 is urged to the downstream B side of the sewer pipe, the pressing effect of the second block 87 on the inner surface of the secondary winding concrete layer 2 increases due to the wedge effect of both blocks 86 and 87. Retreat of the upstream water stop means 64 to the downstream B side of the sewage pipe is prevented.
[0081]
Further, since the flexible hose 66 is inserted into the cylindrical body 67 disposed between the upstream main frame 69 and the downstream main frame 95, the deformation of the flexible hose 66 due to the circulation of the sewage 3 can be prevented. .
[0082]
Furthermore, a hoop member 109 is provided on the outer surface of the downstream side B-side end of the upstream main frame 69 and on the outer surface of the downstream side upstream end A-side of the downstream main frame 95 so as to cover the hoop member 109. Since the flexible hose 66 fitted to the main frames 69 and 95 is fitted to the hoop member 109 by the fixture 110 surrounding the circumferential direction, the flexible hose 66 can be prevented from falling off the main frames 69 and 95.
[0083]
In addition, the water stop apparatus of this invention is not limited only to embodiment mentioned above, Of course, it can add a change in the range which does not deviate from the summary of this invention.
[0084]
【The invention's effect】
As described above, according to the water stop device of the present invention, the following various excellent effects can be obtained.
[0085]
(1) In any of the water stop devices according to claims 2 to 4 of the present invention, the expansion member is pressed against the inner surface of the pipeline, and sewage is repaired along the inner surface of the pipeline from the upstream side of the pipeline. In addition to suppressing the flow into the section, the sewage on the upstream side of the pipeline in the section to be repaired is guided to the downstream side of the pipe in the section to be repaired through the water conveyance space of the upstream main frame and the flexible hose. The inflow of sewage to the repair work section can be prevented with the sewage pipes in service.
[0086]
(2) Furthermore, since the upstream water stop member is brought into contact with the upstream end surface of the upstream main frame, the inflow of sewage into the water guide space of the upstream main frame is suppressed. The hose can be attached and detached easily.
[0087]
(3) In any of the water stop devices according to claims 1 to 4 of the present invention, the downstream side water stop member is formed on the pipe inner surface by lowering the downstream side main frame with respect to the downstream side sub frame. To prevent the sewage from flowing backward from the downstream side of the pipeline to the repair target section along the inner surface of the pipe, and the sewage on the upstream side of the pipeline in the repair target section is connected to the flexible hose and the downstream side. Since it guides to the pipe downstream side of the repair work section through the water guide space of the main frame, the inflow of sewage into the repair work section can be prevented with the sewage pipe in service.
[0088]
(4) In the water stop device according to claim 3 of the present invention, since the expansion member is displaced in the pipe radial direction by the slide mechanism, the expansion member can be effectively pressed against the inner surface of the pipe.
[0089]
(5) In the water stop device according to claim 4 of the present invention, the flexible hose is inserted through the cylindrical body disposed between the upstream main frame and the downstream main frame, thereby causing the sewage flow. The deformation of the flexible hose can be prevented.
[0090]
(6) In the water stop device according to claim 5 of the present invention, the hose member and the fixture can prevent the flexible hose externally fitted to the upstream main frame from falling off.
[0091]
(7) In the water stop device according to claim 6 of the present invention, the hose member and the fixture can prevent the flexible hose externally fitted to the downstream main frame from falling off.
[Brief description of the drawings]
FIG. 1 is a conceptual diagram showing upstream water stop means in an example of an embodiment of a water stop device of the present invention.
FIG. 2 is a view taken in the direction of arrows II-II in FIG.
FIG. 3 is a view taken in the direction of arrows III-III in FIG.
FIG. 4 is a conceptual diagram showing downstream water stop means in an example of an embodiment of a water stop device of the present invention.
5 is a VV arrow view of FIG. 4;
6 is a view showing a state where the downstream main frame and the downstream water stop member in FIG. 5 are raised. FIG.
FIG. 7 is a conceptual diagram showing a rail water stop device applied to an example of an embodiment of a water stop device of the present invention.
8 is a conceptual diagram showing a fixture used for connection of the flexible hose to the upstream main frame in FIG. 1 and connection of the flexible hose to the downstream main frame in FIG.
9 is an enlarged view showing a fastening state of the end portion of the presser member in FIG. 8. FIG.
10 is a view taken in the direction of arrows XX in FIG.
FIG. 11 is a transverse sectional view showing an example of a sewer pipe constructed by a shield method.
FIG. 12 is a conceptual diagram showing an example of a conventional sewage pipe repair method.
13 is a cross-sectional view showing a fitting state of the lining material in FIG. 12. FIG.
[Explanation of symbols]
2 Secondary winding concrete layer (pipe)
66 Flexible hose
68 Water transfer space
69 Upstream main frame
70 Expansion member
71 Slide mechanism
72 Upstream water stop member
73 Locking mechanism
93 Downstream sub-frame
94 Water transfer space
95 Downstream main frame
96 Downstream water stop member
109 Hoop member
110 Fixing tool
A Sewage pipe upstream
B Sewage pipe downstream

Claims (6)

補修すべき管路内に配置される下流側副フレームと、該下流側副フレームの内方に昇降可能に配置され且つ管路軸線方向に貫通する導水空間を有する下流側主フレームと、管路内面下側寄り部分に当接し得るように下流側主フレームに設けた下流側止水部材と、下流側主フレームの下水管路上流側端部に接続されるフレキシブルホースとを備えてなることを特徴とする止水装置。  A downstream sub-frame arranged in a pipe line to be repaired, a downstream main frame having a water guide space which is arranged so as to be movable up and down inside the downstream sub-frame and penetrates in the pipe axial direction, and a pipe line A downstream water stop member provided on the downstream main frame so as to be in contact with the lower part of the inner surface, and a flexible hose connected to the upstream end of the downstream main frame in the lower water pipe. A water stop device. 補修すべき管路内に配置され且つ管路軸線方向に貫通する導水空間を有する上流側主フレームと、該上流側主フレームを周方向に取り囲み且つ流体圧によって管路内面に圧接し得る環状の膨張部材と、上流側主フレームの管路上流側端面に当接し得る上流側止水部材と、上流側主フレームを管路内面に対して拘束し得るロック機構と、補修すべき管路内に配置される下流側副フレームと、該下流側副フレームの内方に昇降可能に配置され且つ管路軸線方向に貫通する導水空間を有する下流側主フレームと、管路内面下側寄り部分に当接し得るように下流側主フレームに設けた下流側止水部材と、一端が上流側主フレームの管路下流側端部に接続され且つ他端が下流側主フレームの管路上流側端部に接続されるフレキシブルホースとを備えてなることを特徴とする止水装置。  An upstream main frame that is disposed in the pipeline to be repaired and has a water guide space penetrating in the axial direction of the pipeline, and an annular shape that surrounds the upstream main frame in the circumferential direction and can be pressed against the inner surface of the pipeline by fluid pressure An expansion member, an upstream water stop member that can contact the upstream end surface of the upstream main frame, a lock mechanism that can restrain the upstream main frame against the inner surface of the pipeline, and a pipe to be repaired The downstream side sub-frame to be disposed, the downstream side main frame having a water guide space that can be moved up and down inward of the downstream side sub-frame and penetrated in the pipe line axial direction, and a portion closer to the lower side of the pipe inner surface A downstream water stop member provided in the downstream main frame so as to be in contact with one end of the downstream main frame and the other end connected to the upstream end of the downstream main frame. With a flexible hose to be connected Waterproofing and wherein the. 膨張部材を管路径方向へ変位可能に且つ上流側主フレームに対して水密を保つように支持するスライド機構を備えた請求項2に記載の止水装置。  The water stop device according to claim 2, further comprising a slide mechanism that supports the expansion member so that the expansion member can be displaced in the pipe radial direction and is watertight with respect to the upstream main frame. 上流側主フレームと下流側主フレームとの間に配置され且つフレキシブルホースが挿通可能な筒状体を備えた請求項2に記載の止水装置。  The water stop device according to claim 2, further comprising a cylindrical body that is disposed between the upstream main frame and the downstream main frame and through which the flexible hose can be inserted. 上流側主フレームの管路下流側端部の外面に沿って延びるフープ部材と、該フープ部材を覆うように上流側主フレームに外嵌するフレキシブルホースを周方向に取り囲んでフープ部材に嵌着させ得る固定具とを備えた請求項2乃至請求項4のいずれかに記載の止水装置。  A hoop member extending along the outer surface of the downstream downstream end of the upstream main frame, and a flexible hose that is externally fitted to the upstream main frame so as to cover the hoop member are circumferentially fitted to the hoop member. The water stop apparatus in any one of Claim 2 thru | or 4 provided with the fixing tool obtained. 下流側主フレームの管路上流側端部の外面に沿って延びるフープ部材と、該フープ部材を覆うように下流側主フレームに外嵌するフレキシブルホースを周方向に取り囲んでフープ部材に嵌着させ得る固定具とを備えた請求項1乃至請求項4のいずれかに記載の止水装置。  A hoop member extending along the outer surface of the upstream end of the pipe line of the downstream main frame and a flexible hose externally fitted to the downstream main frame so as to cover the hoop member are circumferentially fitted and fitted to the hoop member. The water stop apparatus in any one of Claim 1 thru | or 4 provided with the fixing tool obtained.
JP07075599A 1999-03-16 1999-03-16 Water stop device Expired - Fee Related JP4073105B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07075599A JP4073105B2 (en) 1999-03-16 1999-03-16 Water stop device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07075599A JP4073105B2 (en) 1999-03-16 1999-03-16 Water stop device

Publications (2)

Publication Number Publication Date
JP2000265537A JP2000265537A (en) 2000-09-26
JP4073105B2 true JP4073105B2 (en) 2008-04-09

Family

ID=13440654

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07075599A Expired - Fee Related JP4073105B2 (en) 1999-03-16 1999-03-16 Water stop device

Country Status (1)

Country Link
JP (1) JP4073105B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6448940B2 (en) * 2014-07-25 2019-01-09 太三機工株式会社 Moving water barrier

Also Published As

Publication number Publication date
JP2000265537A (en) 2000-09-26

Similar Documents

Publication Publication Date Title
US12253203B2 (en) Device and method for repairing pipe
WO1997035707A1 (en) Method for lining of lateral pipelines with flow-through apparatus
JPH04231595A (en) Method and device for sanitary disposal in sewer
JP4073105B2 (en) Water stop device
JP4073106B2 (en) Pipe repair method and equipment
JP4035421B2 (en) Pipe wall water barrier device and temporary waterway device in the pipe wall using the same
KR102140417B1 (en) Sewage bypass device for repair of an intercepting sewer
US20200370699A1 (en) Device and Method for Repairing Pipe
JP5912461B2 (en) Pipe repair method
JPH08109672A (en) Method of regenerating construction of joint section in existing pipe conduit and covering body for regeneration used for method of regenerating construction thereof
JP3422245B2 (en) Optical fiber laying rehabilitation method
KR101167224B1 (en) The method of liquid resin immersion tube using air-chamber pressure control feeder air presseurized inside pipe inversing insertion device
WO2009028751A1 (en) Conduit regenerating liner, heat generating unit, and conduit lining apparatus
KR102804509B1 (en) Non-excavated pipeline repair device and method using a multi-pipe diameter applied frame while securing the thickness of the liner forming surface
KR102710250B1 (en) Sewer pipe non-digging partial repair device comprising length-variable fluid supply part and a sewer pipe non-digging partial repair method using thereof
KR101918897B1 (en) Non-digging Sewerage Mending Apparatus and its manufacturing method
JP3221837B2 (en) Lining material for pipeline
JP6517892B2 (en) Water plug device
JP2007285419A (en) Tubular space cutoff method and device
JP4305803B2 (en) Structure for backfilling the end of the lining material for pipes
JPH10305483A (en) Lining liner of pipe groove and lining construction method thereof
KR100787475B1 (en) Lining construction method of existing pipe line
JP2026068095A (en) Expandable sewer bypass pipe system
AU2020247171A1 (en) A liner arrangement for installing in a pipe structure, and a method for relining a pipe structure
KR20200099877A (en) A bypass device using a tail pump

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070822

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070828

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071011

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080115

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080122

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110201

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120201

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120201

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120201

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120201

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130201

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees