Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4078367B2 - Cable-stayed cable fixing structure - Google Patents
[go: Go Back, main page]

JP4078367B2 - Cable-stayed cable fixing structure - Google Patents

Cable-stayed cable fixing structure Download PDF

Info

Publication number
JP4078367B2
JP4078367B2 JP2005235701A JP2005235701A JP4078367B2 JP 4078367 B2 JP4078367 B2 JP 4078367B2 JP 2005235701 A JP2005235701 A JP 2005235701A JP 2005235701 A JP2005235701 A JP 2005235701A JP 4078367 B2 JP4078367 B2 JP 4078367B2
Authority
JP
Japan
Prior art keywords
cable
steel side
steel
stayed
concrete member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005235701A
Other languages
Japanese (ja)
Other versions
JP2007051432A (en
Inventor
昭夫 春日
喜彦 平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2005235701A priority Critical patent/JP4078367B2/en
Publication of JP2007051432A publication Critical patent/JP2007051432A/en
Application granted granted Critical
Publication of JP4078367B2 publication Critical patent/JP4078367B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本願発明は、橋梁の一形式である斜張橋の主塔上部に形成され、橋桁を吊り支持するための斜張ケーブルを定着する構造に関するものである。   The present invention relates to a structure for fixing a cable staying cable, which is formed on the upper part of a main tower of a cable-stayed bridge, which is one type of bridge, and is used to support a bridge girder.

斜張橋は、橋脚上に立設された主塔上部から橋桁の軸線方向(橋軸方向)における斜下方に複数の斜張ケーブルを張架し、この斜張ケーブルによって桁を吊り支持するものとなっている。そして、大規模な斜張橋ではほとんどの場合、主塔から橋軸方向の前後双方に斜張ケーブルを張架して橋脚の両側に伸びた橋桁を支持するものとなっている。このような斜張橋では、主塔の上部に双方からのケーブルが定着されるとともに、複数の斜張ケーブルが上下方向に配列して定着される。特に、一般にエクストラドーズド形式と称される斜張橋では主塔の高さが小さく、複数のケーブルの上下方向における間隔が小さくなっているため、主塔の上部では多くの斜張ケーブルが小さな間隔で定着される。このため、主塔上部には、小さな範囲に複数の斜張ケーブルから大きな引張力が伝達される。また、両側に張架された双方のケーブル間では、引張力が互いの間で伝達されるように定着し、双方のケーブルから伝達される引張力の水平成分を相殺して、主塔の全体には大きな水平方向力が作用しない構造としている。   A cable-stayed bridge is one in which a plurality of cable-stayed cables are stretched from the upper part of the main tower erected on the pier to the lower part of the bridge girder in the axial direction (the direction of the bridge axis). It has become. And in most large cable-stayed bridges, the cable girders that extend from both sides of the bridge pier are supported by extending cable-stayed cables from the main tower both in the longitudinal direction of the bridge. In such a cable-stayed bridge, cables from both sides are fixed on the upper part of the main tower, and a plurality of cable-stayed cables are arranged and fixed vertically. In particular, in the cable-stayed bridge, generally called the extradosed type, the height of the main tower is small and the distance between the cables in the vertical direction is small, so many cable-stayed cables are small in the upper part of the main tower. Fixed at intervals. For this reason, a large tensile force is transmitted to the upper part of the main tower from a plurality of cable stays in a small range. In addition, between the two cables stretched on both sides, it is fixed so that the tensile force is transmitted between each other, and the horizontal component of the tensile force transmitted from both cables is offset, so that the entire main tower is The structure has no large horizontal force.

上記のように複数の斜張ケーブルから大きな引張力が作用する主塔上部は、ケーブルの定着位置を正確に設定して、過度の応力集中が生じないように構築する必要があり、さらに、主張の両側に張架された斜張ケーブル間で水平方向の大きな力が円滑に伝達される構造とする必要がある。このため、特許文献1には、主塔上部に鋼部材を用いて斜張ケーブルをこの鋼部材に定着するともに、この鋼部材にコンクリートを巻き立てて橋脚上に支持する構造が開示されている。   As mentioned above, the upper part of the main tower where a large tensile force is applied from multiple cable stays must be constructed so that the cable fixing position is set accurately and excessive stress concentration does not occur. It is necessary to have a structure in which a large horizontal force is smoothly transmitted between the cable stays stretched on both sides of the cable. For this reason, Patent Document 1 discloses a structure in which a steel member is used for the upper part of the main tower and the cable is fixed to the steel member, and concrete is wound around the steel member and supported on the pier. .

この定着構造は、図8に側面図、図9に平断面図をに示すように、主塔の上部に鋼からなる箱状の鋼殻部100を有するものであり、この鋼殻部100に複数の斜張ケーブル110が定着されている。鋼殻部100は、斜張ケーブル110の両側部に、該斜張ケーブル110と平行で鉛直となる方向に支持された側面板101を有しており、この側面板101の橋軸方向における端部と直角に連続するように設けられた端面板102とで箱状に形成されている。そして、平行な二つの側面板101の橋軸方向における両端付近に、これらを連結するように支持部材103が設けられ、この支持部材103に斜張ケーブル110の端部が係止されている。上記支持部材103は、斜張ケーブルの軸線と直角方向の板状部材103aと、これと直角に接合されて充分な剛性を付与する板状部材103bとを有する梁状の部材となっており、この支持部材103を介して両側の側面板101に、斜張ケーブル110の反力が伝達されるものとなっている。そして、鋼殻部100の橋軸方向における両端付近に支持部材103を介してそれぞれ斜張ケーブル110からの反力が伝達されるので、これらの斜張ケーブル110から作用する反力の水平成分は両端付近で反対方向に作用し、側面板101の水平方向の引張力となって相殺される。また、鉛直方向の成分は両側のケーブルの反力が合成され、鋼殻部100の周囲を囲むように形成されたコンクリート部材104にスタッドジベル105を介して、又は鋼殻部の底面106から主塔のコンクリートに伝達され、主塔の鉛直方向の軸力となって橋脚に支持される。   This fixing structure has a box-shaped steel shell 100 made of steel at the upper part of the main tower as shown in a side view in FIG. A plurality of cable stays 110 are fixed. The steel shell portion 100 has side plates 101 supported on both sides of the cable 110 in a direction parallel to the cable 110 and perpendicular to the cable, and ends of the side plate 101 in the bridge axis direction. It is formed in a box shape with an end face plate 102 provided so as to be continuous with the portion at a right angle. A support member 103 is provided in the vicinity of both ends in the bridge axis direction of the two parallel side plates 101 so as to connect them, and the end of the cable cable 110 is locked to the support member 103. The support member 103 is a beam-like member having a plate-like member 103a in a direction perpendicular to the axis of the cable cable and a plate-like member 103b joined at a right angle to give sufficient rigidity, The reaction force of the cable cable 110 is transmitted to the side plates 101 on both sides via the support member 103. And since the reaction force from the cable tension cable 110 is transmitted to the vicinity of both ends in the bridge axis direction of the steel shell portion 100 through the support member 103, the horizontal component of the reaction force acting from the cable tension cable 110 is It acts in the opposite direction near both ends, and cancels out as a horizontal tensile force of the side plate 101. Also, the vertical component is composed of the reaction force of the cables on both sides, and the concrete member 104 formed so as to surround the steel shell 100 is connected to the concrete member 104 via the stud gibber 105 or from the bottom 106 of the steel shell. It is transmitted to the concrete of the tower and is supported by the bridge pier as the vertical axial force of the main tower.

このような定着構造では、鋼殻部100が工場等において正確に製作され、現場において正確に据え付けられることによって斜張ケーブル110の定着位置は正確に定められ、精度の高い施工が可能となる。また、斜張ケーブル110は鋼からなる支持部材103に定着され、確実に反力が伝達される構造とすることができる。
特開2002−348813号公報
In such a fixing structure, the steel shell 100 is accurately manufactured in a factory or the like, and is accurately installed in the field, whereby the fixing position of the cable-cable 110 is accurately determined, and high-precision construction is possible. Further, the cable-cable 110 can be fixed to the support member 103 made of steel so that the reaction force can be reliably transmitted.
JP 2002-348813 A

しかしながら、上記のような従来の定着構造では、斜張ケーブル110が定着される鋼殻部100の重量が過大になるという問題点がある。特に、斜張ケーブル110が定着される支持部材103は、両端が側面板101に接合され、これらの側面板間で梁のように曲げモーメントに抵抗する構造として反力を側面板101に伝達するものとなっており、部材寸法が大きくなってこの部分の鋼重量が大きくなる。また、側面板101も水平方向の大きな力に抵抗するものであり、板厚が大きななって鋼重量が大きくなってしまう。
このように鋼殻部100の重量が大きくなると、主塔上部に据え付けるためにクレーン等で吊り上げるのが難しくなり、複数の部分に分割する必要が生じて、構築の効率が著しく悪くなってしまう。また、それぞれの部分の鋼板厚が大きくなり、溶接による接合のための作業量が著しく多くなって費用も過大となる。
However, the conventional fixing structure as described above has a problem that the weight of the steel shell portion 100 to which the cable-cable 110 is fixed becomes excessive. In particular, the support member 103 to which the cable cable 110 is fixed is joined to the side plate 101 at both ends, and transmits a reaction force to the side plate 101 as a structure that resists bending moment like a beam between the side plates. As a result, the member size increases and the steel weight of this portion increases. Further, the side plate 101 also resists a large horizontal force, which increases the plate thickness and the steel weight.
When the weight of the steel shell portion 100 is increased in this way, it becomes difficult to lift the steel shell portion 100 with a crane or the like for installation on the upper part of the main tower, and it becomes necessary to divide it into a plurality of portions, so that the construction efficiency is remarkably deteriorated. Moreover, the steel plate thickness of each part becomes large, the work amount for joining by welding becomes remarkably large, and the cost becomes excessive.

本発明は、上記のような事情に鑑みてなされたものであり、主塔上部における斜張ケーブルの定着部をできるだけ少ない鋼材量で構築し、作業を効率化するとともに、構築のための費用を低減することを目的とするものである。   The present invention has been made in view of the circumstances as described above. The cable-stayed cable fixing portion in the upper part of the main tower is constructed with as little steel material as possible to improve work efficiency and reduce the cost for construction. The purpose is to reduce.

上記課題を解決するために、請求項1に記載の発明は、 斜張橋の主塔上部に設けられ、該主塔から斜張橋の軸線方向(橋軸方向)における前後双方の斜め下方に張架されて橋桁を吊り支持する複数の斜張ケーブルの定着構造であって、 前記斜張ケーブルの端部が橋軸方向の双方から対峙するように定着される定着部の両側に、該斜張ケーブルの張架面と平行に二つの鋼側板が配置され、 該鋼側板の橋軸方向における両端部には、2つの前記鋼側板の双方を互いに連結するようにコンクリート部材が形成され、 前記斜張ケーブルは、前記コンクリート部材を貫通し、平行に配置された前記鋼側板の間で、該コンクリート部材に反力を伝達するように定着され、 該コンクリート部材と前記鋼側板とは、前記斜張ケーブルから作用する反力が前記鋼側板に伝達されるように連結されていることを特徴とする斜張ケーブルの定着構造を提供する。 In order to solve the above-mentioned problem, the invention according to claim 1 is provided at the upper part of the main tower of the cable-stayed bridge, and obliquely below both the front and rear in the axial direction (bridge axis direction) of the cable-stayed bridge from the main tower. a fixing structure of a plurality of cable-stayed cables is stretched hanging bridge girder supporting, on both sides of the fixing portion in which the end portion of the cable-stayed cable is fixed so as to face from both bridge axis direction, the swash Two steel side plates are arranged in parallel with the tension surface of the tension cable, and concrete members are formed at both ends in the bridge axis direction of the steel side plates so as to connect the two steel side plates to each other, The cable staying cable is fixed so as to transmit reaction force to the concrete member between the steel side plates arranged in parallel through the concrete member, and the concrete member and the steel side plate are The reaction force acting from the cable Provided is a cable-stretched cable fixing structure which is connected to a steel side plate so as to be transmitted.

この定着構造では、斜張ケーブルの反力は一旦コンクリート部材に伝達され、コンクリート部材から斜張ケーブル端部の両側に配置された鋼側板に伝達される。そして、主塔から橋軸方向の前後双方に張架された斜張ケーブルの反力の水平成分は、鋼側板の橋軸方向における両端部に互いに逆方向の引張力となって作用し、相殺される。したがって、斜張ケーブルの反力を鋼側板に伝達する部分に大きな鋼部材が不要となり、鋼材量を大幅に低減することができる。また、コンクリート部材は主塔の下部を構成するコンクリートと連続するものとすることができ、斜張ケーブルの反力の鉛直成分も主塔の軸力となって橋脚に伝達される。   In this fixing structure, the reaction force of the cable staying cable is once transmitted to the concrete member, and then transmitted from the concrete member to the steel side plates arranged on both sides of the end portion of the cable staying cable. And the horizontal component of the reaction force of the cable staying stretched from the main tower to both the front and back in the bridge axis direction acts as opposite tensile forces on both ends of the steel side plate in the bridge axis direction, canceling each other. Is done. Therefore, a large steel member is not required in the portion that transmits the reaction force of the cable stay to the steel side plate, and the amount of steel material can be greatly reduced. Further, the concrete member can be continuous with the concrete constituting the lower part of the main tower, and the vertical component of the reaction force of the cable stayed cable is also transmitted to the pier as the axial force of the main tower.

請求項2に係る発明は、請求項1に記載の定着構造において、 前記鋼側板の橋軸方向における両端部に、互いに平行となるように配置された2つの鋼側板の双方を連結するように鋼からなるケーブル位置決め板が設けられ、 前記コンクリート部材は、橋軸方向に対向する2つのケーブル位置決め板の外面と密着するように打設されたものであり、 前記斜張ケーブルの端部に装着された定着具は、該ケーブル位置決め板に当接して固定されるものとする。   The invention according to claim 2 is the fixing structure according to claim 1, wherein both the steel side plates arranged so as to be parallel to each other are connected to both ends of the steel side plate in the bridge axis direction. A cable positioning plate made of steel is provided, and the concrete member is placed so as to be in close contact with the outer surfaces of the two cable positioning plates facing in the bridge axis direction, and is attached to the end of the cable stayed cable The fixed fixing tool is fixed in contact with the cable positioning plate.

この定着構造では、鋼からなるケーブル位置決め板を工場等において鋼側板に正確に取り付けておくことができる。したがって、このケーブル位置決め板にしたがってケーブル端部に装着された定着具を固定することにより、斜張ケーブルを正確な位置に容易に配置することが可能となる。また、このケーブル位置決め板に密接するようにコンクリート部材を形成することにより、斜張ケーブルの反力を確実かつ円滑にコンクリート部材に作用させることができる。   In this fixing structure, the cable positioning plate made of steel can be accurately attached to the steel side plate in a factory or the like. Therefore, by fixing the fixing tool attached to the end of the cable according to the cable positioning plate, the cable can be easily placed at an accurate position. Further, by forming the concrete member so as to be in close contact with the cable positioning plate, the reaction force of the cable can be applied to the concrete member reliably and smoothly.

請求項3に係る発明は、請求項2に記載の定着構造において、前記ケーブル位置決め板は、上下に複数段が配置される斜張ケーブルのそれぞれに対して設けられ、これらが上下に連続するものであり、 前記コンクリート部材を補強する鉄筋が、前記ケーブル位置決め板と鋼側板との外側を水平方向に囲むように連続して配置されているものとする。 According to a third aspect of the present invention, in the fixing structure according to the second aspect, the cable positioning plate is provided for each of the cable stays arranged in a plurality of stages above and below, and these are continuous vertically. And the reinforcing bars which reinforce the concrete member shall be continuously arranged so that the outside of the cable positioning board and the steel side board may be surrounded horizontally.

この定着構造では、ケーブル位置決め板が、複数段に配置される斜張ケーブルのそれぞれに対して設けられ、これらが上下に連続しているので、これらのケーブル位置決め板及び鋼側板の外側に密接し、これらを取り囲むようにコンクリート部材を容易に形成することができる。したがって、このように打設されたコンクリート部材は、鋼側板及びケーブル位置決め板と強固に一体となる。そして、コンクリート部材内に配置された鉄筋が斜張ケーブルの引張力の水平成分の一部を負担し、主塔上部を強固な構造とすることができる。   In this fixing structure, a cable positioning plate is provided for each of the cable cables arranged in a plurality of stages, and these are continuous vertically, so that they are in close contact with the outside of the cable positioning plate and the steel side plate. The concrete member can be easily formed so as to surround them. Therefore, the concrete member placed in this manner is firmly integrated with the steel side plate and the cable positioning plate. And the reinforcing bar arrange | positioned in a concrete member bears a part of horizontal component of the tensile force of a cable-stayed cable, and can make the main tower upper part a firm structure.

以上説明したように、本願発明に係る斜張ケーブルの定着構造では、コンクリート部材を有効に利用して斜張ケーブルを定着し、その反力が円滑に伝達される構造とすることができる。したがって、鋼材の重量を低減することができるとともに、溶接の作業量を低減して主塔上部を構築するための費用を削減することが可能となる。   As described above, in the cable-stretched cable fixing structure according to the present invention, the cable can be fixed using the concrete member effectively, and the reaction force can be smoothly transmitted. Therefore, it is possible to reduce the weight of the steel material and reduce the cost for constructing the upper part of the main tower by reducing the welding work amount.

以下、本願発明の実施形態を図に基づいて説明する。
図1は、本願発明の定着構造が好適に採用できるエクストラドーズド形式の斜張橋を示す概略側面図である。
この斜張橋は、橋台1及び橋脚2の上に架け渡された橋桁3と、橋脚状に立ち上げられた主塔4と、この主塔4の上部から橋桁3の軸線方向における両側の斜下方に張架され、橋桁を斜め方向に吊り支持する複数の斜張ケーブル5とを有するものである。
エクストラドーズド形式の斜張橋は橋桁3の曲げ剛性を比較的大きくするとともに、主塔4の高さを小さく抑えたものであり、斜張ケーブル5の傾斜角は小さくなっており、複数段に配置された斜張ケーブルは、図1に示すように、主塔上部Aで小さい範囲に集中して定着されている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a schematic side view showing an extradosed type cable-stayed bridge in which the fixing structure of the present invention can be suitably employed.
This cable-stayed bridge is composed of a bridge girder 3 laid over the abutment 1 and the pier 2, a main tower 4 raised in the shape of a pier, and an oblique line on both sides in the axial direction of the bridge girder 3 from the upper part of the main tower 4. It has a plurality of cable stays 5 that are stretched downward and support the bridge girder in an oblique direction.
The extradosed type cable-stayed bridge has a relatively large bending rigidity of the bridge girder 3 and a small height of the main tower 4. As shown in FIG. 1, the cable stayed at is fixed in a small range in the upper part A of the main tower.

図2は、上記主塔の上部を拡大した側面図である。また、図3は同じ主塔上部の平断面図、図4は立断面図である。
この主塔上部の斜張ケーブル5が定着される範囲には、橋桁3の軸線方向(橋軸方向)と平行で鉛直となるように鋼側板11が配置されている。この鋼側板11は、斜張ケーブル5の定着される端部の両側に2枚が平行に設けられており、これらの鋼側板11の橋軸方向における両端付近に、これらの鋼側板11を互いに連結するようにケーブル位置決め板12が設けられている。そして、このケーブル位置決め板12と鋼側板11とで箱状となっている。上記鋼側板11とケーブル位置決め板12との外側には、これらの外面と密着し、取り囲むように連続したコンクリート部材13が形成されている。そして、鋼側板11に植設されたスタッドジベル14によって強固に一体となっている。
FIG. 2 is an enlarged side view of the upper part of the main tower. 3 is a plan sectional view of the same main tower, and FIG. 4 is a vertical sectional view.
In the range where the cable stay cable 5 at the upper part of the main tower is fixed, the steel side plate 11 is arranged so as to be parallel to and perpendicular to the axial direction of the bridge girder 3 (bridge axial direction). Two steel side plates 11 are provided in parallel on both sides of the fixed end portion of the cable-cable 5, and these steel side plates 11 are connected to each other in the vicinity of both ends in the bridge axis direction of the steel side plates 11. A cable positioning plate 12 is provided so as to be connected. The cable positioning plate 12 and the steel side plate 11 form a box shape. A continuous concrete member 13 is formed on the outside of the steel side plate 11 and the cable positioning plate 12 so as to be in close contact with and surround the outer surfaces. And it is firmly united by the stud dowel 14 planted by the steel side board 11. FIG.

上記ケーブル位置決め板12は、図5に示すように斜張ケーブル5を定着する位置に貫通孔が設けられており、さらに外側には該貫通孔と連続してダクト15が設けられ、斜張ケーブル5の端部をこれらのダクト及び貫通孔に挿通して箱状となった2枚の鋼側板11の間に突き入れることができるようになっている。そして、このダクト15及び貫通孔に挿通した位置で斜張ケーブル5を定着することによって定着位置が正確に設定されるものとなっている。   As shown in FIG. 5, the cable positioning plate 12 is provided with a through hole at a position where the cable is fixed, and a duct 15 is provided outside the cable positioning plate 12 so as to be continuous with the through hole. The end of 5 can be inserted into these ducts and through-holes so as to be inserted between the two steel side plates 11 formed into a box shape. Then, the fixing position is accurately set by fixing the cable cable 5 at a position inserted through the duct 15 and the through hole.

また、このケーブル位置決め板12は、斜張ケーブル5が定着される部分では、この斜張ケーブル5の傾斜に合わせて斜張ケーブル5の軸線と垂直となるように傾斜して設けられる。そして複数段に配置される斜張ケーブル5が定着される位置の間では、折れ曲がるような形状となって上下方向に連続するものとなっている。   In addition, the cable positioning plate 12 is provided at a portion where the cable staying cable 5 is fixed, and is inclined so as to be perpendicular to the axis of the cable staying cable 5 in accordance with the inclination of the cable staying cable 5. Between the positions where the cable stays 5 arranged in a plurality of stages are fixed, the cable is bent and continuous in the vertical direction.

上記コンクリート部材13は、ケーブル位置決め板12及び鋼側板11の外面に密着しているので、斜張ケーブル5が配置されて引張力が導入されると、その反力はこのコンクリート部材13に作用する。そして、コンクリート部材13は両端が鋼側板11に支持された梁のように機能して、斜張ケーブル5から作用する反力の水平成分が鋼側板11に伝達されるものとなっている。また、コンクリート部材13にはケーブル位置決め板12及び鋼側板11の外面に沿って巻き回すように鉄筋16が配置されており、箱状となった鋼側板11とケーブル位置決め板12とで形成された箱状部材の全周を取り囲むように補強されている。
また、このコンクリート部材13の下方は、主塔を形成するコンクリート17と連続しており、このコンクリート部材13は主塔の上部に強固に支持されるものとなっている。
Since the concrete member 13 is in close contact with the outer surfaces of the cable positioning plate 12 and the steel side plate 11, the reaction force acts on the concrete member 13 when the cable is placed and a tensile force is introduced. . The concrete member 13 functions as a beam supported at both ends by the steel side plate 11, and the horizontal component of the reaction force acting from the cable cable 5 is transmitted to the steel side plate 11. In addition, a reinforcing bar 16 is disposed on the concrete member 13 so as to be wound along the outer surfaces of the cable positioning plate 12 and the steel side plate 11, and is formed by the steel side plate 11 and the cable positioning plate 12 that are box-shaped. It is reinforced to surround the entire circumference of the box-shaped member.
The lower part of the concrete member 13 is continuous with the concrete 17 forming the main tower, and the concrete member 13 is firmly supported by the upper part of the main tower.

上記鋼側板11は、橋軸方向の両端部がそれぞれコンクリート部材13に連結されており、斜張ケーブル5からの反力はコンクリート部材13を介して互いに逆方向の水平成分が伝達されるものとなっている。したがって、鋼側板11の双方からの水平力によって引張力が作用するものとなっており、この引張力に抵抗できるように厚さが決定されている。   The steel side plate 11 is connected to the concrete member 13 at both ends in the bridge axis direction, and the reaction force from the cable 5 is transmitted to the horizontal component in the opposite direction via the concrete member 13. It has become. Therefore, the tensile force acts by the horizontal force from both of the steel side plates 11, and the thickness is determined so as to resist this tensile force.

次に、上記のような主塔上部における斜張ケーブルの定着構造を構築する方法について簡単に説明する。
主塔の下部は鉄筋コンクリート構造となっており、橋脚上から順次コンクリートを打設して立ち上げる。そして、所定の高さまで立ち上げられると、工場で鋼側板とケーブル位置決め板12とが接合された箱状の鋼部材を吊り上げ、立ち上がられた主塔の上部に支持する。このとき、鋼重量が大きくなって主塔上部への設置が困難となる場合には、上記鋼部材を分割して製作し、これらを上下に積み上げて所定の段数の斜張ケーブルが定着できるように設置してもよい。
Next, a method for constructing the cable-stretched cable fixing structure in the upper part of the main tower as described above will be briefly described.
The lower part of the main tower has a reinforced concrete structure, and concrete is placed in order starting from the pier. And if it raises to predetermined height, the box-shaped steel member with which the steel side board and the cable positioning board 12 were joined will be lifted in a factory, and it will support on the upper part of the main tower which stood up. At this time, if the steel weight becomes large and it is difficult to install it on the upper part of the main tower, the steel members are divided and manufactured, and these are stacked up and down so that a cable with a predetermined number of stages can be fixed. You may install in.

上記鋼部材が設置されると、その周囲に必要な鉄筋16を配置し、型枠を組み立てる。そして、既に打設したコンクリート17の上に連続するとともに、上記箱状の鋼部材の外側にコンクリートを打設し、鋼側板11及びケーブル位置決め板12と密着するようにコンクリート部材13を形成する。   When the steel member is installed, the necessary reinforcing bars 16 are arranged around the steel member to assemble the formwork. Then, the concrete member 13 is formed so as to be in close contact with the steel side plate 11 and the cable positioning plate 12 while being placed on the outside of the box-shaped steel member while continuing on the already placed concrete 17.

コンクリートが硬化した後、ダクト15及び貫通孔に斜張ケーブルの端部を挿通し、箱状となった鋼部材の内側つまり2枚の平行な鋼側板11の間で斜張ケーブル5の端部に定着具6を装着し、ケーブル位置決め板12を介してコンクリート部材13に押し付ける。そして、ジャッキ(図示しない)によって斜張ケーブル5に引張力を導入する。ジャッキが平行な2枚の鋼側板11間に装着できる場合には、この主塔上部で斜張ケーブル5に引張力を導入することができる。また、ジャッキが主塔上部で装着できないときには、橋桁3に斜張ケーブル5が定着される位置でジャッキを装着し、引張力を導入することもできる。   After the concrete is hardened, the end of the cable staying cable 5 is inserted into the duct 15 and the through hole, and the end of the cable staying cable 5 inside the box-shaped steel member, that is, between the two parallel steel side plates 11. The fixing tool 6 is mounted on the concrete member 13 and pressed against the concrete member 13 through the cable positioning plate 12. Then, a tensile force is introduced into the cable cable 5 by a jack (not shown). When a jack can be mounted between two parallel steel side plates 11, a tensile force can be introduced into the cable cable 5 at the upper part of the main tower. When the jack cannot be mounted on the upper part of the main tower, the jack can be mounted at a position where the cable staying cable 5 is fixed to the bridge girder 3 to introduce a tensile force.

なお、上記コンクリート部材13は、図6に示すように鋼側板11の橋軸方向における中央部分13は、最初にコンクリート部材を形成するときにはコンクリートを打設せずに残しておき、鋼側板11の両端部をそれぞれ取り囲む二つの部分に分けて形成するのが望ましい。そして、斜張ケーブル5に引張力を導入し、鋼側板11に水平方向の大きな引張力が導入された後にコンクリートを打設して連続させる。これにより、鋼側板11の中央部分の外側でコンクリート部材13に鉛直方向のひび割れが生じるのを有効に防止することができる。   As shown in FIG. 6, the concrete portion 13 is left without placing the concrete at the center portion 13 in the bridge axis direction of the steel side plate 11 when the concrete member is first formed. It is desirable to form it in two parts surrounding each end. Then, a tensile force is introduced into the cable cable 5, and after a large horizontal tensile force is introduced into the steel side plate 11, the concrete is placed and continued. Thereby, it is possible to effectively prevent a vertical crack from occurring in the concrete member 13 outside the central portion of the steel side plate 11.

このような斜張ケーブルの定着構造では、引張力が導入される斜張ケーブル5の反力がコンクリート部材13に作用し、このコンクリート部材13から鋼側板11に伝達される。そして主塔4の両側に配置された斜張ケーブル5から逆方向の水平成分が、鋼側板11の橋軸方向における両端付近に作用し、鋼側板11の引張力となってほぼつり合った状態となる。このように斜張ケーブル5がコンクリート部材13に定着されるので、この部分に鋼からなる梁状の部材を設ける必要がなく、鋼重量を低減して溶接量を減少させることができる。特に、斜張ケーブル5の定着部は、鋼部材で形成すると部材厚が大きくなり、溶接に多くの作業を要することになるが、上記のように構成することによって溶接の作業量を大幅に低減し、コストの削減が可能となる。   In such a cable-stretched cable fixing structure, a reaction force of the cable-cable 5 to which a tensile force is introduced acts on the concrete member 13 and is transmitted from the concrete member 13 to the steel side plate 11. And the horizontal component of a reverse direction from the cable stayed cable 5 arrange | positioned at the both sides of the main tower 4 acts on the both ends vicinity in the bridge-axis direction of the steel side board 11, and it is the state which almost balanced as the tensile force of the steel side board 11 It becomes. Thus, since the cable cable 5 is fixed to the concrete member 13, it is not necessary to provide a beam-like member made of steel at this portion, and the steel weight can be reduced and the welding amount can be reduced. In particular, if the fixing portion of the cable cable 5 is made of a steel member, the thickness of the fixing member increases, and a lot of work is required for welding. However, the amount of welding work is greatly reduced by the above configuration. In addition, the cost can be reduced.

また、斜張ケーブル5から作用する反力の鉛直成分は、コンクリート部材13から直接主塔下部のコンクリート17に、又は鋼側板11に伝達された後この鋼側板11を介して主塔下部のコンクリートに円滑に伝達される。   Further, the vertical component of the reaction force acting from the cable stayed cable 5 is transmitted directly from the concrete member 13 to the concrete 17 at the lower part of the main tower or to the steel side plate 11 and then the concrete at the lower part of the main tower through the steel side plate 11. Is transmitted smoothly.

図7は、本願に係る発明の他の実施形態である斜張ケーブルの定着構造を示す平断面図である。
この定着構造では、図2から図5までに示す構造と同様に、鉛直方向に平行な二つの鋼側板51を有し、橋軸方向の両端部付近で2つのケーブル位置決め板52によって連結されて箱状となっている。また、この鋼側板51とケーブル位置決め板52との外側に密着するようにコンクリート部材53が形成され、斜張ケーブル55はこのコンクリート部材53を貫通してケーブル位置決め板52の内側で、定着具56によって定着されている。そして、斜張ケーブル55の反力がコンクリート部材53に伝達され、さらに鋼側板51に伝達されるものとなっている。
FIG. 7 is a cross-sectional plan view showing a cable-cable fixing structure according to another embodiment of the present invention.
As in the structure shown in FIGS. 2 to 5, this fixing structure has two steel side plates 51 parallel to the vertical direction, and is connected by two cable positioning plates 52 near both ends in the bridge axis direction. It is box-shaped. In addition, a concrete member 53 is formed so as to be in close contact with the outside of the steel side plate 51 and the cable positioning plate 52, and the cable staying cable 55 penetrates the concrete member 53 inside the cable positioning plate 52, and the fixing tool 56. Has been fixed by. The reaction force of the cable cable 55 is transmitted to the concrete member 53 and further transmitted to the steel side plate 51.

この定着構造では、コンクリート部材53と鋼側板51との接合部分は、図2に示す定着構造のスタッドジベルに代え、鋼側板51に設けた貫通孔57に挿通された鉄筋58によって一体化するものとなっている。貫通孔57は、鋼側板51にケーブル位置決め板52が接合された位置より、端部側に上下方向及び水平方向に複数が配列され、これらのそれぞれに鉄筋58が挿通されている。そして、これらの鉄筋58は平行な2つの鋼側板51のいずれをも貫通し、コンクリート部材53を補強する機能を有するものとなっている。   In this fixing structure, the joint portion between the concrete member 53 and the steel side plate 51 is integrated by a reinforcing bar 58 inserted through a through hole 57 provided in the steel side plate 51 in place of the stud gibber of the fixing structure shown in FIG. It has become. From the position where the cable positioning plate 52 is joined to the steel side plate 51, a plurality of the through holes 57 are arranged in the vertical direction and the horizontal direction on the end side, and the rebar 58 is inserted through each of these. These reinforcing bars 58 penetrate through both of the two parallel steel side plates 51 and have a function of reinforcing the concrete member 53.

また、鋼側板51の外側側面からは、水平に突き出した張り出し板59が設けられ、この張り出し板にも貫通孔60が設けられている。この張り出し板59は、上下方向に間隔をあけて複数が設けられており、これらの張り出し板に設けられた貫通孔60に鉛直方向の鉄筋61が挿通され、コンクリート部材53と鋼側板51とを強固に一体化するものとなっている。   Further, a protruding plate 59 protruding horizontally is provided from the outer side surface of the steel side plate 51, and a through hole 60 is also provided in this protruding plate. A plurality of the projecting plates 59 are provided at intervals in the vertical direction, and the vertical reinforcing bars 61 are inserted into the through holes 60 provided in these projecting plates so that the concrete member 53 and the steel side plate 51 are connected to each other. It is a solid unity.

一方、コンクリート部材53の橋軸方向の両端部には、水平方向にコンクリート部材53を貫通してPC鋼材62が配置され、緊張力を導入してコンクリート部材53にプレストレスが導入されている。これにより、コンクリート部材53は補強され、斜張ケーブル55の反力を確実に鋼側板51に伝達するものとなっている。   On the other hand, at both ends of the concrete member 53 in the bridge axis direction, the PC steel material 62 is disposed through the concrete member 53 in the horizontal direction, and prestress is introduced into the concrete member 53 by introducing tension. Thereby, the concrete member 53 is reinforced, and the reaction force of the cable stayed cable 55 is reliably transmitted to the steel side plate 51.

本願発明の定着構造が好適に採用できるエクストラドーズド形式の斜張橋を示す概略側面図である。It is a schematic side view showing an extradosed type cable-stayed bridge in which the fixing structure of the present invention can be suitably employed. 図1に示す斜張橋の主塔上部の側面図である。It is a side view of the upper part of the main tower of a cable-stayed bridge shown in FIG. 図2に示す主塔上部の平断面図である。FIG. 3 is a plan sectional view of the upper part of the main tower shown in FIG. 2. 図2に示す主塔上部の立断面図である。FIG. 3 is a vertical sectional view of the upper part of the main tower shown in FIG. 2. 図2に示す主塔の斜張ケーブル定着部を示す断面図である。It is sectional drawing which shows the cable-stayed cable fixing | fixed part of the main tower shown in FIG. 図2に示す主塔上部のコンクリート部材の打設方法を示す平断面図である。It is a plane sectional view which shows the placement method of the concrete member of the main tower upper part shown in FIG. 本願発明の他の実施形態である斜張ケーブルの定着構造を示す平断面図である。It is a plane sectional view which shows the fixing structure of the cable-stayed cable which is other embodiment of this invention. 従来の斜張橋における主塔上部の構造を示す概略側面図である。It is a schematic side view which shows the structure of the main tower upper part in the conventional cable-stayed bridge. 図8に示す主塔上部の構造の平断面図である。It is a plane sectional view of the structure of the main tower upper part shown in FIG.

符号の説明Explanation of symbols

1:橋台、 2:橋脚、 3:橋桁、 4:主塔、 5:斜張ケーブル、 6:定着具、
11:鋼側板、 12:ケーブル位置決め板、 13:コンクリート部材、 14:スタッドジベル、 15:ダクト、 16:鉄筋、 17:主塔下部のコンクリート、
51:鋼側板、 52:ケーブル位置決め板、 53:コンクリート部材、 55:斜張ケーブル、 56:定着具、 57:貫通孔、 58:鉄筋、 59:張り出し板、 60:貫通孔、 61:鉄筋、 62:PC鋼材


1: abutment, 2: pier, 3: bridge girder, 4: main tower, 5: cable-stayed cable, 6: fixing tool,
11: Steel side plate, 12: Cable positioning plate, 13: Concrete member, 14: Stud gibber, 15: Duct, 16: Rebar, 17: Concrete under the main tower,
51: Steel side plate, 52: Cable positioning plate, 53: Concrete member, 55: Oblique cable, 56: Fixing tool, 57: Through hole, 58: Reinforcing bar, 59: Overhang plate, 60: Through hole, 61: Reinforcing bar, 62: PC steel


Claims (3)

斜張橋の主塔上部に設けられ、該主塔から斜張橋の軸線方向(橋軸方向)における前後双方の斜め下方に張架されて橋桁を吊り支持する複数の斜張ケーブルの定着構造であって、
前記斜張ケーブルの端部が橋軸方向の双方から対峙するように定着される定着部の両側に、該斜張ケーブルの張架面と平行に二つの鋼側板が配置され、
該鋼側板の橋軸方向における両端部には、2つの前記鋼側板の双方を互いに連結するようにコンクリート部材が形成され、
前記斜張ケーブルは、前記コンクリート部材を貫通し、平行に配置された前記鋼側板の間で、該コンクリート部材に反力を伝達するように定着され、
該コンクリート部材と前記鋼側板とは、前記斜張ケーブルから作用する反力が前記鋼側板に伝達されるように連結されていることを特徴とする斜張ケーブルの定着構造。
Fixing structure of a plurality of cable-stayed cables provided at the upper part of the main tower of the cable-stayed bridge and suspended from the main tower obliquely below both the front and rear in the axial direction of the cable-stayed bridge (bridge axial direction) Because
Two steel side plates are arranged on both sides of the fixing portion fixed so that the end portion of the cable stays opposite each other in the direction of the bridge axis , parallel to the stretched surface of the cable stay ,
Concrete members are formed at both ends in the bridge axis direction of the steel side plate so as to connect both of the two steel side plates to each other,
The cable stayed cable is fixed so as to transmit a reaction force to the concrete member between the steel side plates arranged in parallel through the concrete member,
The fixing structure of the cable stayed cable, wherein the concrete member and the steel side plate are connected so that a reaction force acting from the cable stayed cable is transmitted to the steel side plate.
前記鋼側板の橋軸方向における両端部に、互いに平行となるように配置された2つの鋼側板の双方を連結するように鋼からなるケーブル位置決め板が設けられ、
前記コンクリート部材は、橋軸方向に対向する2つのケーブル位置決め板の外面と密着するように打設されたものであり、
前記斜張ケーブルの端部に装着された定着具は、該ケーブル位置決め板に当接して固定されるものであることを特徴等する特徴とする請求項1に記載の斜張ケーブルの定着構造。
A cable positioning plate made of steel is provided at both ends in the bridge axis direction of the steel side plate so as to connect both of the two steel side plates arranged so as to be parallel to each other,
The concrete member is placed so as to be in close contact with the outer surfaces of the two cable positioning plates facing in the bridge axis direction,
2. The fixing structure for a cable-stretched cable according to claim 1, wherein the fixing tool attached to the end of the cable-cable is fixed in contact with the cable positioning plate.
前記ケーブル位置決め板は、上下に複数段が配置される斜張ケーブルのそれぞれに対して設けられ、これらが上下に連続するものであり、
前記コンクリート部材を補強する鉄筋が、前記ケーブル位置決め板と鋼側板との外側を水平方向に囲むように連続して配置されていることを特徴とする請求項2に記載の斜張ケーブルの定着構造。
The cable positioning plate is provided for each of the cable stays arranged in a plurality of stages above and below, and these are continuous up and down,
3. The cable-stretched cable fixing structure according to claim 2, wherein the reinforcing bars that reinforce the concrete member are continuously arranged so as to horizontally surround the outside of the cable positioning plate and the steel side plate. .
JP2005235701A 2005-08-16 2005-08-16 Cable-stayed cable fixing structure Expired - Fee Related JP4078367B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005235701A JP4078367B2 (en) 2005-08-16 2005-08-16 Cable-stayed cable fixing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005235701A JP4078367B2 (en) 2005-08-16 2005-08-16 Cable-stayed cable fixing structure

Publications (2)

Publication Number Publication Date
JP2007051432A JP2007051432A (en) 2007-03-01
JP4078367B2 true JP4078367B2 (en) 2008-04-23

Family

ID=37916049

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005235701A Expired - Fee Related JP4078367B2 (en) 2005-08-16 2005-08-16 Cable-stayed cable fixing structure

Country Status (1)

Country Link
JP (1) JP4078367B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643634A (en) * 2013-12-25 2014-03-19 招商局重庆交通科研设计院有限公司 Anchoring structure for arch spring of concrete-filled steel tube arch bridge

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5894039B2 (en) * 2012-08-30 2016-03-23 三井住友建設株式会社 Anchor cable fixing structure
JP6346847B2 (en) * 2014-11-11 2018-06-20 三井住友建設株式会社 Anchor cable fixing structure
CN104562932B (en) * 2015-01-06 2016-04-13 大连理工大学 A kind of flush type steel anchor box
CN104727222B (en) * 2015-04-07 2017-01-18 林同棪国际工程咨询(中国)有限公司 Separated steel and concrete combined cable tower anchorage zone structure
JP6491030B2 (en) * 2015-04-23 2019-03-27 三井住友建設株式会社 Anchor cable fixing structure
CN106758814A (en) * 2016-12-14 2017-05-31 中交公局第三工程有限公司 For the platform and its construction method of king-tower
CN106638310A (en) * 2017-03-05 2017-05-10 郑州大学 Efficient steel strand wire stay cable saddle
CN114016405A (en) * 2021-11-26 2022-02-08 中铁二局集团有限公司 Method for installing pylon cable guide pipe of cable-stayed bridge
CN114855644A (en) * 2022-03-25 2022-08-05 浙江恒炜建设集团有限公司 Bridge main tower structure convenient to maintain and construction method thereof
CN115058969B (en) * 2022-07-01 2024-07-02 合肥工业大学 A self-resetting cluster anchor for towers of floating cable-stayed bridges

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643634A (en) * 2013-12-25 2014-03-19 招商局重庆交通科研设计院有限公司 Anchoring structure for arch spring of concrete-filled steel tube arch bridge
CN103643634B (en) * 2013-12-25 2016-04-06 招商局重庆交通科研设计院有限公司 Concrete-filled steel tubes arch bridge arch springing anchor structure

Also Published As

Publication number Publication date
JP2007051432A (en) 2007-03-01

Similar Documents

Publication Publication Date Title
JP4078367B2 (en) Cable-stayed cable fixing structure
JP2005256341A (en) Corrugated steel-plate web u component bridge
JP2011074604A (en) Bridge movement restraining apparatus and movement restraining method
JP6147621B2 (en) Tower crane support structure and tower crane equipment
JP6346847B2 (en) Anchor cable fixing structure
JP2006316580A (en) Corrugated steel plate web pc composite beam and construction method of bridge using corrugated steel plate web pc composite beam
KR100923564B1 (en) Precast bridge deck using steel plate, construction method and structure
JP6535704B2 (en) Column-beam frame
JP3830767B2 (en) Continuous girder for bridge
JP6529241B2 (en) Building foundation structure and construction method of building foundation structure
KR20100045740A (en) Support assembly for precast half depth cantilever deck, constructing method of such cantilever deck, bridge using such assembly and constructing method for such bridge
JP7032051B2 (en) Floor structure construction method and floor structure reuse method
JP4960788B2 (en) Girder end structure of steel and concrete composite girder
JP4644146B2 (en) PC box girder bridge
JP4842093B2 (en) Flat plate construction method
JP2009215775A (en) Half-precast concrete board
JP2019196637A (en) Column-beam joint structure, and construction method of column-beam joint structure
JP6961408B2 (en) Precast concrete boards and concrete structural slabs
KR100638673B1 (en) Joint structure of shift and steel girder and its construction method in integral shift bridge
JP4658826B2 (en) SC wall block, SC wall block manufacturing method, and SC structure construction method
JP7773912B2 (en) Joint structure and joining method between reinforced concrete column and steel beam at joint
KR102029001B1 (en) Wall structure and the construction method therefor
JP7788833B2 (en) New foundation for machinery installation
JP7765281B2 (en) Beam member erection method
JP7520617B2 (en) building

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070829

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071023

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080204

R150 Certificate of patent or registration of utility model

Ref document number: 4078367

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110208

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140208

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees