Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4082457B2 - Propulsion concrete pipe and its propulsion method - Google Patents
[go: Go Back, main page]

JP4082457B2 - Propulsion concrete pipe and its propulsion method - Google Patents

Propulsion concrete pipe and its propulsion method Download PDF

Info

Publication number
JP4082457B2
JP4082457B2 JP2004055019A JP2004055019A JP4082457B2 JP 4082457 B2 JP4082457 B2 JP 4082457B2 JP 2004055019 A JP2004055019 A JP 2004055019A JP 2004055019 A JP2004055019 A JP 2004055019A JP 4082457 B2 JP4082457 B2 JP 4082457B2
Authority
JP
Japan
Prior art keywords
propulsion
concrete pipe
pipe
transparent plate
observation hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004055019A
Other languages
Japanese (ja)
Other versions
JP2005240515A (en
Inventor
強 宮原
佳和 岡本
Original Assignee
栗本コンクリート工業株式会社
株式会社岡本建設用品製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 栗本コンクリート工業株式会社, 株式会社岡本建設用品製作所 filed Critical 栗本コンクリート工業株式会社
Priority to JP2004055019A priority Critical patent/JP4082457B2/en
Publication of JP2005240515A publication Critical patent/JP2005240515A/en
Application granted granted Critical
Publication of JP4082457B2 publication Critical patent/JP4082457B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

この発明は、トンネル地山の観察が可能な推進用コンクリート管およびその推進工法に関するものである。   The present invention relates to a concrete pipe for propulsion capable of observing tunnel ground and its propulsion method.

近年、コンクリート管路の敷設は、都市道路事情による制約から開削工事が困難な場合が多いため、推進用コンクリート管を使用した推進工法が多用されている。この推進工法は、推進用コンクリート管を図示しない発進立坑に吊り降ろし、常法のセミシールドマシン工法により土砂を掘削しながら、上記推進用コンクリート管を推進と接続を繰り返して推進管路を敷設するものである。   In recent years, laying concrete pipes is often difficult to perform due to restrictions due to urban road conditions, so propulsion methods using concrete pipes for propulsion have been used frequently. In this propulsion method, the propulsion concrete pipe is suspended from a start shaft (not shown), and the propulsion concrete pipe is repeatedly propelled and connected while laying the propulsion pipe while excavating the earth and sand by a conventional semi-shield machine method. Is.

上記工法に使用される推進用コンクリート管は、この発明の実施形態である図1に示すように、推進用コンクリート管Pの管壁1を貫通して形成した注入孔4を具え、長手方向に間隔をあけて少なくとも2ヵ所形成されたものである。
推進管路の構築は、まず、推進用コンクリート管Pを2ヵ所の注入孔4を利用して吊り上げ、発進立坑へ吊り降す。ついで、常法により土砂を掘削しながら、推進用コンクリート管Pの推進と接続を繰り返す。推進の過程で、所定の推進用コンクリート管Pの注入孔4を利用して滑剤を推進用コンクリート管Pの外周に注入して推進力を低減する。
推進終了後、注入孔4からモルタルを上記滑剤と同様にトンネル地山と推進用コンクリート管Pとの隙間に充填して地表の地盤沈下を防止する。
As shown in FIG. 1 which is an embodiment of the present invention, the concrete pipe for propulsion used in the above construction method has an injection hole 4 formed through the pipe wall 1 of the concrete pipe P for propulsion, and in the longitudinal direction. At least two places are formed at intervals.
For the construction of the propulsion pipe, first, the concrete pipe P for propulsion is lifted using the two injection holes 4 and hung down to the starting shaft. Next, the excavation and connection of the propulsion concrete pipe P is repeated while excavating the earth and sand by a conventional method. In the process of propulsion, the lubricant is injected into the outer periphery of the concrete pipe P for propulsion using the injection hole 4 of the predetermined concrete pipe P for propulsion to reduce the propulsive force.
After the completion of the propulsion, the mortar is filled from the injection hole 4 into the gap between the tunnel ground and the propulsion concrete pipe P in the same manner as the above-mentioned lubricant to prevent ground subsidence.

なお、推進用コンクリート管Pの圧入に必要な推力の大きさは、推進用コンクリート管Pの外周面とトンネル地山(トンネル内周面)との接触による摩擦抵抗力の大きさにより決まるが、最近では、推進管路が長距離化および曲線化する傾向にある。このように推進管路が長距離化すれば、推進管列全体とトンネル地山の接触面積が増大するだけ、摩擦抵抗が大きくなり、必要な元押し推力が大きくなってしまう。
そこで、推進工法においては、通常、摩擦抵抗を低減するために、推進管外周とトンネル地山間に滑材を注入する処理が行なわれる。
ところが、このような滑材注入処理を推進用コンクリート管Pとトンネル地山間の全域に行なったのでは大量の滑材が必要となり、不経済である。
このため、このような滑材注入を推進管とトンネル地山間の摩擦抵抗力が特に大きいと思われる場所に重点的に行なうことが試みられてきた。
In addition, although the magnitude | size of a thrust required for the press injection of the concrete pipe P for propulsion is decided by the magnitude | size of the frictional resistance force by the contact with the outer peripheral surface of the concrete pipe P for propulsion, and a tunnel natural ground (tunnel inner peripheral surface), Recently, propulsion pipelines tend to be longer and curved. As the propulsion pipe length increases in this way, the frictional resistance increases and the necessary thrust force increases as the contact area between the entire propulsion pipe row and the tunnel ground increases.
Therefore, in the propulsion method, usually, a process of injecting a lubricant between the outer periphery of the propulsion pipe and the tunnel ground is performed in order to reduce the frictional resistance.
However, if such a lubricant injection process is performed over the entire area between the propulsion concrete pipe P and the tunnel ground, a large amount of lubricant is required, which is uneconomical.
For this reason, it has been attempted to focus on such a place where the frictional resistance between the propulsion pipe and the tunnel ground is particularly large.

ところが、従来の施工管理においては、推進管とトンネル地山との摩擦抵抗力が特に大きくなる場所の把握は十分になされていたとは言えず、前述の様な滑材の注入が合理的に行なわれているとは言えなかった。これを改良する推進装置が提案されている。
すなわち、この装置は、図11、12に示すように、推進用コンクリート管P列の所定位置(接続部)に応力緩衝層42を介して挟み込まれた計測層41の3重層とこの計測層41の内周側に取り付けられた複数の歪み検出手段(歪みゲージ)43とを備えた応力計測手段40を推進管列の長さ方向に適切な間隔で複数個配置し、これらの応力計測手段40の歪みゲージ43により計測層41の各点における観測応力を検出し、この計測された推進用コンクリート管Pに作用する応力に基づいて、各応力計測手段40の設置部分において、推進用コンクリート管Pに作用する推力(各計測断面における作用推力)を演算する演算手段44を備えたものである。これによって、観測応力のデータから決まる応力平面(回帰平面)に基づいて、応力計測断面の各点における計算応力を算出するものである。なお、45はシールド式推進機、46は元押しジャッキおよび47は中押しジャッキである。(例えば特許文献1参照)。
特開2000−160985号公報
However, in the conventional construction management, it has not been fully understood where the frictional resistance between the propulsion pipe and the tunnel ground is particularly large. I couldn't say that. Propulsion devices that improve this have been proposed.
That is, as shown in FIGS. 11 and 12, this apparatus includes a triple layer of a measurement layer 41 sandwiched by a stress buffer layer 42 at a predetermined position (connection portion) of the concrete pipe P row for propulsion and the measurement layer 41. A plurality of stress measuring means 40 provided with a plurality of strain detecting means (strain gauges) 43 attached to the inner peripheral side of the tube are arranged at appropriate intervals in the length direction of the propelling pipe row, and these stress measuring means 40 The observed stress at each point of the measurement layer 41 is detected by the strain gauge 43 and the propulsion concrete pipe P is installed at the installation portion of each stress measuring means 40 based on the measured stress acting on the propulsion concrete pipe P. Is provided with a calculation means 44 for calculating the thrust acting on (the thrust acting on each measurement section). Thus, the calculated stress at each point of the stress measurement cross section is calculated based on the stress plane (regression plane) determined from the observed stress data. In addition, 45 is a shield type propulsion device, 46 is a main pushing jack, and 47 is an intermediate pushing jack. (For example, refer to Patent Document 1).
JP 2000-160985 A

しかし、観測応力データから応力計算断面の各点における計算応力を算出してその応力が所定値以上であれば、滑材を注入することになるが、その応力値では、その隙間が小さいためなのか、隙間に滑材が行き渡っていない(または注入不足)ためなのかを判断することがはなはだ困難である。したがって、滑材の重点注入箇所が決定されたとして、上記のことから、無駄に滑材を注入したり、また推進力の低減につながらなかったりするという問題が生じる場合がある。
また、計測層41に多数の歪み検出手段43を配設してなるので、構造が複雑であるとともに、その配設や取り外しのための作業が煩雑となる問題がある。
However, if the calculated stress at each point of the stress calculation cross section is calculated from the observed stress data and the stress is greater than or equal to a predetermined value, the lubricant will be injected, but the gap is small at that stress value. It is very difficult to judge whether the lubricant is not spread in the gap (or insufficient injection). Therefore, even if the point of important injection of the lubricant is determined, there may be a problem that the lubricant may be injected unnecessarily or the propulsive force may not be reduced.
In addition, since a large number of strain detection means 43 are arranged on the measurement layer 41, there are problems that the structure is complicated and the work for the arrangement and removal is complicated.

この発明は、推進時におけるトンネル地山の状況を確実に観察し、その結果に基づき過不足のない滑材の注入によって推進力の低減を図るとともに、構造が簡単、かつ、段取り作業が容易であることを課題とする。   The present invention reliably observes the condition of the tunnel ground during propulsion, and based on the result, aims to reduce the propulsion force by injecting lubricant without excess or deficiency, and has a simple structure and easy setup work. There is a problem.

上記の課題を解決するために、この発明は、滑材及び/又は裏込め材の注入孔を有する推進用コンクリート管において、その管壁に、その内面から外面に向けて地山観察孔を形成し、上記地山観察孔に、上記管壁の外面に臨む透明板を設けた構成を採用したのである。
この構成によれば、上記地山観察孔から上記透明板越しにトンネル地山状況、すなわち、推進用コンクリート管とトンネル地山の隙間への滑材充填状態を上記透明板越しに目視により容易かつ確実に観察することができる。その結果、上記隙間が狭かったり、滑材の充填が不充分であると、その状態に応じて上記注入孔から滑材を充填することによって、推進力が低減される。しかも、上記隙間への滑材注入状態を観察孔により確認もできるから、過不足のない滑材の注入が可能となり、注入量の節約になる。
また、上記管壁に上記地山観察孔を形成し、上記地山観察孔に透明板を設けた構成であるから、シンプルな構造であり、かつ、地山観察のための段取り作業が容易である。
In order to solve the above-described problems, the present invention is directed to a concrete pipe for propulsion having an injection hole for a lubricant and / or a backfill material, and a natural observation hole is formed on the pipe wall from the inner surface toward the outer surface. And the structure which provided the transparent plate which faces the outer surface of the said pipe wall in the said natural mountain observation hole was employ | adopted.
According to this configuration, the tunnel ground condition from the ground observation hole through the transparent plate, that is, the state of filling the sliding material into the gap between the concrete pipe for propulsion and the tunnel ground is easily and visually observed through the transparent plate. It can be observed reliably. As a result, when the gap is narrow or the filling of the lubricant is insufficient, the propulsive force is reduced by filling the lubricant from the injection hole according to the state. Moreover, since the state of injection of the lubricant into the gap can also be confirmed through the observation hole, it is possible to inject the lubricant without excess or deficiency, thereby saving the injection amount.
In addition, since the natural ground observation hole is formed in the tube wall and a transparent plate is provided in the natural ground observation hole, the structure is simple and the setup work for natural ground observation is easy. is there.

また、上記地山観察孔に筒状ソケットを埋設し、この筒状ソケットに上記管壁の外面に臨む透明板をねじ込んだ構成を採用したのである。この構成によれば、推進完了後、上記透明板を筒状ソケットからねじり戻し、再利用できる。
また、上記地山観察孔を含む管壁の外周面に鋼製リングを設けた構成を採用したのである。この構成によれば、この鋼製リングにより、上記地山観察孔の形成に伴う管壁の強度低下が補強される。
また、上記筒状ソケットに筒状体を着脱自在に設けるとともに、上記筒状体に上記管壁の外面に臨む透明板をねじ込んでなる構成を採用したのである。この構成によれば、推進完了後、透明板を含む内筒を筒状ソケットから取外して再利用できる。
また、上記透明板を、上記地山観察孔の上記管壁の外面から凹んだ内面位置に設けた構成を採用したのである。この構成によれば、上記透明板は、推進時におけるトンネル地山との接触(摺接)に伴うその透明板外表面の摩耗や傷つきが軽減される。
Further, a configuration is adopted in which a cylindrical socket is embedded in the natural mountain observation hole and a transparent plate facing the outer surface of the tube wall is screwed into the cylindrical socket. According to this configuration, after the completion of propulsion, the transparent plate can be twisted back from the cylindrical socket and reused.
Moreover, the structure which provided the steel ring in the outer peripheral surface of the pipe wall containing the said natural ground observation hole was employ | adopted. According to this configuration, this steel ring reinforces the strength reduction of the tube wall that accompanies the formation of the natural ground observation hole.
In addition, a configuration is adopted in which a cylindrical body is detachably provided in the cylindrical socket, and a transparent plate facing the outer surface of the tube wall is screwed into the cylindrical body. According to this configuration, after the propulsion is completed, the inner cylinder including the transparent plate can be removed from the cylindrical socket and reused.
Moreover, the structure which provided the said transparent plate in the inner surface position dented from the outer surface of the said tube wall of the said natural mountain observation hole was employ | adopted. According to this configuration, the transparent plate is less worn or damaged on the outer surface of the transparent plate due to contact (sliding contact) with the tunnel ground during propulsion.

また、上記透明板の外方に形成される凹部に一端を開口し、他端を管壁の内面に開口する洗浄水供給路を形成した構成を採用したのである。この構成によれば、推進時中に、透明板の外側の凹部に溜まった土砂を、上記洗浄水供給路から開口を経て噴出する洗浄水により洗浄することで、透明板越しのトンネル地山の状況を正確に観察できる。   Further, a configuration is adopted in which a cleaning water supply passage is formed in which one end is opened in the recess formed outside the transparent plate and the other end is opened in the inner surface of the tube wall. According to this configuration, during propulsion, the earth and sand collected in the concave portion on the outer side of the transparent plate is washed with the washing water ejected from the washing water supply passage through the opening, so that the tunnel ground through the transparent plate is removed. You can observe the situation accurately.

また、上記管壁に上記地山観察孔を形成し、上記地山観察孔に透明板を設けてなる推進用コンクリート管を推進工法により地中埋設するとともに、上記地山観察孔に向けて照明具を照らして上記透明板を通してトンネル地山の状況を観察するようにした構成を採用したのである。この構成によれば、上記照明具によりトンネル地中を照らすことで、上記透明板を通してトンネル地山の状況を(目視により)より確実に観察できる。   Also, the ground wall observation hole is formed in the tube wall, and a concrete pipe for propulsion in which a transparent plate is provided in the ground surface observation hole is buried in the ground by a propulsion method, and illumination is performed toward the ground mountain observation hole. A configuration was adopted in which the condition of the tunnel ground was observed through the transparent plate in light of the tool. According to this configuration, the tunnel ground can be more reliably observed (by visual observation) through the transparent plate by illuminating the inside of the tunnel with the illuminator.

この発明は、以上のように、推進用コンクリート管の管壁に、その内面から外面に向けて地山観察孔を形成し、上記地山観察孔に、上記管壁の外面に臨む透明板を設けたので、上記透明板の外側のトンネル地山状況、すなわち推進用コンクリート管とトンネル地山の隙間の大きさやその隙間の滑材充填状態を容易かつ確実に観察することができる。その結果、上記隙間に滑材を充填することで、推進力が低減され、一層の長距離推進が可能となる。   As described above, according to the present invention, a natural ground observation hole is formed in the tube wall of the concrete pipe for propulsion from the inner surface toward the outer surface, and the transparent plate facing the outer surface of the tube wall is formed in the natural mountain observation hole. Since it is provided, it is possible to easily and reliably observe the tunnel ground condition outside the transparent plate, that is, the size of the gap between the propulsion concrete pipe and the tunnel ground and the state of filling the sliding material in the gap. As a result, by filling the gap with a lubricant, the propulsive force is reduced and further long-distance propulsion is possible.

以下、この発明の実施の形態を添付の図面に基づいて説明する。図1〜4は第1の実施形態を示し、推進用コンクリート管Pは、管壁1の一端に固着したカラー2aにより形成した受口2と、他端に周溝3aを形成した挿し口3とを備え、さらに管壁1を貫通して形成した滑材及び裏込め材の注入孔4を有するものである。そして、一方の管Pの受口2に他方の管Pの挿し口3を周溝3aに嵌装した止水ゴム(図示省略)を介装して接続する。
5は推進用コンクリート管Pの管壁1に、その内面から外面を貫通して形成した地山観察孔で、管壁1に内面から外面にかけて凹所6およびめねじ7aが切られた筒状ソケット7を同心状に配置したものである。地山観察孔5は推進用コンクリート管Pの円周方向上下および左右の4ヵ所に形成する。
9はおねじ9aとめねじ9bを形成した筒状体で、その筒状体9のおねじ9bを筒状ソケット7のめねじ7aにねじ込んで着脱自在に固定したものである。
Embodiments of the present invention will be described below with reference to the accompanying drawings. 1 to 4 show a first embodiment, and a propulsion concrete pipe P includes a receiving port 2 formed by a collar 2a fixed to one end of a tube wall 1, and an insertion port 3 having a circumferential groove 3a formed at the other end. , And further has an injection hole 4 for a lubricant and a backfill material formed through the tube wall 1. Then, the insertion port 3 of the other pipe P is connected to the receiving port 2 of the one pipe P through a water stop rubber (not shown) fitted in the circumferential groove 3a.
Reference numeral 5 denotes a natural mountain observation hole formed in the pipe wall 1 of the propulsion concrete pipe P so as to penetrate the outer surface from the inner surface thereof. The tubular wall 1 has a recess 6 and a female screw 7a cut from the inner surface to the outer surface. Sockets 7 are arranged concentrically. The natural ground observation holes 5 are formed at four positions in the circumferential direction of the concrete pipe P for propulsion in the circumferential direction.
Reference numeral 9 denotes a cylindrical body in which a male screw 9a and a female screw 9b are formed. The male screw 9b of the cylindrical body 9 is screwed into the female screw 7a of the cylindrical socket 7 and is detachably fixed.

10は地山観察孔5の管壁1の外面に臨む透明板で、その透明板のおねじ10aを筒状体9のめねじ9aにねじ込んで固定する。透明板10は、好ましくは管壁1の外面から少し凹んだ内面位置に配置して、透明板10の外側に凹部12を形成する。11は照明具で、例えば人が透明板10に向けて照らす電燈である。
13は管壁1に形成した洗浄水供給路、例えば、洗浄水供給パイプで、その一端を管壁1の内面に開口(給水口14)し、その他端を凹部12の側面に開口(洗浄口15)する。給水口14には洗浄水用ホース(図示省略)を接続したり、洗浄後は止水用プラグ(図示省略)をねじ込んで外水の止水をする。
16,17は筒状ソケット7の下端面と筒状体9のフランジ部9cとの間および筒状体9と透明板10との間にそれぞれ介装したシール材である。
Reference numeral 10 denotes a transparent plate facing the outer surface of the tube wall 1 of the natural ground observation hole 5, and the male screw 10 a of the transparent plate is screwed into the female screw 9 a of the cylindrical body 9 and fixed. The transparent plate 10 is preferably disposed at an inner surface position slightly recessed from the outer surface of the tube wall 1 to form a recess 12 on the outer side of the transparent plate 10. Reference numeral 11 denotes an illuminator, for example, an electric lamp that a person shines toward the transparent plate 10.
Reference numeral 13 denotes a cleaning water supply passage formed on the pipe wall 1, for example, a cleaning water supply pipe. One end of the cleaning water supply pipe is opened on the inner surface of the pipe wall 1 (water supply port 14), and the other end is opened on the side surface of the recess 12. 15) A wash water hose (not shown) is connected to the water supply port 14, and after washing, a water stop plug (not shown) is screwed to stop external water.
Reference numerals 16 and 17 denote sealing materials interposed between the lower end surface of the cylindrical socket 7 and the flange portion 9c of the cylindrical body 9 and between the cylindrical body 9 and the transparent plate 10, respectively.

上記推進用コンクリート管Pを用いて推進するには、図10に示すように、先ず、トンネル地山Rの所定位置に設けた発進立坑Qに推進用コンクリート管Pを吊り降す。次いで、常法の推進工法、すなわち、セミシールドマシンSで土砂を掘削しながら推進用コンクリート管Pを推進ジャッキTで推進し、順次、管P1、P2、P3、Pnの接続を繰り返して推進管路を敷設するのである。
この推進中に、注入孔4を利用して滑剤Kを推進用コンクリート管Pの外周とトンネル地山Rの隙間18に注入して、推進用コンクリート管Pの推進力を低減しながら、推進管路を形成する。
また、透明板10は、管壁1の外面から凹んだ位置にあるから、推進時におけるトンネル地山Rとの接触(摺接)に伴うその外表面の摩耗や傷つきが少ない。
In order to propel using the propulsion concrete pipe P, as shown in FIG. 10, first, the propulsion concrete pipe P is suspended from a start shaft Q provided at a predetermined position of a tunnel ground R. Next, the propulsion concrete pipe P is propelled with the propulsion jack T while excavating the earth and sand with the semi-shield machine S, and the connection of the pipes P 1 , P 2 , P 3, Pn is repeated in sequence. Pipes are laid.
During this propulsion, the lubricant pipe K is injected into the gap 18 between the outer periphery of the concrete pipe P for propulsion and the tunnel ground R using the injection hole 4 to reduce the propulsive force of the concrete pipe P for propulsion. Form a road.
Further, since the transparent plate 10 is in a position recessed from the outer surface of the tube wall 1, the outer surface is less worn or damaged due to contact (sliding contact) with the tunnel ground R during propulsion.

そして、上記推進中において、推進用コンクリート管Pの地山観察孔5の内側から、手に持った照明具11を透明板10に向けて照らして透明板10外周のトンネル地山Rの状況、すなわち、推進用コンクリート管Pとトンネル地山Rの隙間18の大きさや隙間18への滑材充填状態を目視により観察する。
地山観察孔5からの観察に当り、透明板10の外面に土砂が付着して汚れているため、洗浄用水を、洗浄水供給パイプ13を経て凹部12内に噴出して、透明板10の外面を洗浄することで、透明板10越しのトンネル地山R(の隙間18)の状況をより確実に観察できる。この観察の結果、隙間18が狭かったり、滑材Kの充填が不充分であると、推進用コンクリート管Pの注入孔4から滑材Kを充填する。すなわち、この場合、隙間18が狭い場合は滑材Kを多く注入しても無駄になり、また、所定の隙間18はあるが、滑材Kがほとんど注入されていない場合には多くの滑材Kを充填してその隙間18を埋める。これによって、過不足のない滑材Kの注入が行なわれて推進力が低減される。しかも隙間18への充填状態は地山観察孔5から確認できて注入量の節約になる。なお、洗浄後、給水口14を閉栓して地中からの管P内への水の浸入を防ぐ。
And, during the propulsion, from the inside of the natural ground observation hole 5 of the concrete pipe P for propulsion, the lighting fixture 11 held in the hand is illuminated toward the transparent plate 10, and the situation of the tunnel natural mountain R on the outer periphery of the transparent plate 10; That is, the size of the gap 18 between the concrete pipe P for propulsion and the tunnel ground R and the state of filling the lubricant in the gap 18 are visually observed.
In the observation from the natural mountain observation hole 5, since the earth and sand adhere to the outer surface of the transparent plate 10 and is dirty, the cleaning water is jetted into the recess 12 through the cleaning water supply pipe 13, and the transparent plate 10 By cleaning the outer surface, the condition of the tunnel ground mountain R (the gap 18) over the transparent plate 10 can be more reliably observed. As a result of this observation, if the gap 18 is narrow or the filling of the lubricant K is insufficient, the lubricant K is filled from the injection hole 4 of the propulsion concrete pipe P. That is, in this case, when the gap 18 is narrow, it is useless to inject a large amount of the lubricant K, and when there is a predetermined gap 18 but the lubricant K is hardly injected, a lot of the lubricant is used. Fill the gap 18 with K. As a result, the lubricant K without excess or deficiency is injected and the driving force is reduced. Moreover, the filling state of the gap 18 can be confirmed from the natural ground observation hole 5, which saves the injection amount. After cleaning, the water inlet 14 is closed to prevent water from entering the pipe P from the ground.

推進の終了後、裏込め材、例えばモルタルMを注入孔4からトンネル地山Rと推進用コンクリート管Pとの隙間18に充填し、次いで、透明板10を含む筒状体9を取外した後、地山観察孔5および凹所6内にもモルタルmを充填すれば、推進工事が完了する。
なお、上記透明板10を含む筒状体9は、それを筒状ソケット7から取り外すことにより、再使用できる。
After completion of the propulsion, after filling the backfilling material, for example, mortar M, into the gap 18 between the tunnel ground R and the propulsion concrete pipe P from the injection hole 4, and then removing the cylindrical body 9 including the transparent plate 10 If the mortar m is also filled into the natural mountain observation hole 5 and the recess 6, the propulsion work is completed.
The cylindrical body 9 including the transparent plate 10 can be reused by removing it from the cylindrical socket 7.

セミシールドマシンSの外径は、これに接続される推進用コンクリート管Pの外径よりも10〜80mm程度大きく設定される。このため、セミシールドマシンSに接続される先頭の推進用コンクリート管Pの先端部は、セミシールドマシンSと同心状に接続(支持)され、先頭の推進用コンクリート管Pの外周とトンネル地山Rとの隙間18はほぼ均等となる。したがって、推進用コンクリート管Pの円周4ヵ所の観察孔5からトンネル地山Rの観察が可能である。一方、この先頭の推進用コンクリート管Pから数本あとの推進用コンクリート管Pはその自重などにより、その下面がトンネル底部に接触して(掘削された地面に接して)観察が不可能になるから、その後に接続される推進用コンクリート管Pの観察孔5は、下部を除いた上部および左右の3ヵ所であってもよい。また、掘削されるトンネル地山R周辺の土質の変動が少ない場合には、観察孔は1ヵ所でもよい。
後続する推進用コンクリート管Pは、通常の推進管が使用され、50〜100m毎に観察孔付きの推進用コンクリート管Pが接続され、観察孔5から滑剤の充填状況を観察する。
The outer diameter of the semi-shield machine S is set to be about 10 to 80 mm larger than the outer diameter of the propulsion concrete pipe P connected thereto. For this reason, the tip of the leading propulsion concrete pipe P connected to the semi-shielding machine S is connected (supported) concentrically with the semi-shielding machine S, and the outer periphery of the leading propulsion concrete pipe P and the tunnel ground The gaps 18 with R are almost equal. Therefore, it is possible to observe the tunnel ground R from the observation holes 5 at four places on the circumference of the concrete pipe P for propulsion. On the other hand, the propulsion concrete pipe P several times after the leading propulsion concrete pipe P is not able to be observed because its lower surface comes into contact with the bottom of the tunnel (in contact with the excavated ground) due to its own weight or the like. Thus, the observation holes 5 of the concrete pipe for propulsion P connected thereafter may be at three places on the upper and left and right sides excluding the lower part. Further, when there is little variation in the soil around the tunnel ground R to be excavated, the observation hole may be one.
As the subsequent propulsion concrete pipe P, a normal propulsion pipe is used, and the propulsion concrete pipe P with an observation hole is connected every 50 to 100 m, and the filling state of the lubricant is observed from the observation hole 5.

図5は第2の実施形態を示し、この実施形態は、第1の実施形態の筒状体9に透明な密閉板20を着脱自在にセットしたものである。この場合、密閉板20のおねじ20aを筒状体9のめねじ9bにねじ込んで固定するとともに筒状体9の端面と密閉板20のフランジ20bとの間にシール材22を介装する。そして、筒状体9と透明板10および密閉板20とにより形成される密閉空間に、水を、ホース21を経て注入口20cから注入して満水にする。これにより、透明板10内面の結露を防ぎ、トンネル地山Rの状況をより確実に観察できる。   FIG. 5 shows a second embodiment. In this embodiment, a transparent sealing plate 20 is detachably set on the cylindrical body 9 of the first embodiment. In this case, the male screw 20 a of the sealing plate 20 is screwed and fixed to the female screw 9 b of the cylindrical body 9, and the sealing material 22 is interposed between the end surface of the cylindrical body 9 and the flange 20 b of the sealing plate 20. Then, water is poured into the sealed space formed by the cylindrical body 9, the transparent plate 10, and the sealed plate 20 from the inlet 20 c through the hose 21 to fill the water. Thereby, dew condensation on the inner surface of the transparent plate 10 can be prevented, and the situation of the tunnel ground mountain R can be observed more reliably.

図6(a)は、第3の実施形態を示し、この実施形態は、第1の実施形態における筒状体9を省略して筒状ソケット7に透明板25を管壁1の外面に臨ませてセットしたものである。この場合、透明板25のおねじ25aを筒状ソケット7のめねじ7aにねじ込んで固定する。なお、透明板25は推進後、地山観察孔5内にモルタルmを充填するに当り、そのまま残してもよいし、取り除いてもよい。   FIG. 6A shows a third embodiment. In this embodiment, the cylindrical body 9 in the first embodiment is omitted, and the transparent plate 25 is exposed to the outer surface of the tube wall 1 in the cylindrical socket 7. It is a set. In this case, the male screw 25 a of the transparent plate 25 is screwed into the female screw 7 a of the cylindrical socket 7 and fixed. The transparent plate 25 may be left as it is or may be removed when the mortar m is filled in the ground observation hole 5 after propulsion.

図6(b)は第4の実施形態を示し、この実施形態は、第3の実施形態と同様に筒状体9を省略して筒状ソケット26に透明板27を管壁1の外面に臨ませてセットしたものである。この場合、透明板27のおねじ27aを筒状ソケット26のめねじ26aにねじ込んで固定するとともに筒状ソケット26と透明板27の段部にシール材28を介装する。   FIG. 6B shows a fourth embodiment. In this embodiment, the cylindrical body 9 is omitted and the transparent plate 27 is attached to the outer surface of the tube wall 1 in the cylindrical socket 26 as in the third embodiment. It is a set that we faced. In this case, the male screw 27 a of the transparent plate 27 is screwed into the female screw 26 a of the cylindrical socket 26 and fixed, and the sealing material 28 is interposed between the cylindrical socket 26 and the stepped portion of the transparent plate 27.

図7および図8は第5の実施形態を示し、この実施形態は、筒状ソケット7に透明板25をセットした第3の実施形態(図6(a)参照)のものに、鋼板を円弧曲げして形成した鋼製リング30を管壁1の外周面に一体的に設けたもので、この鋼製リング30に形成した円周4ヵ所の貫通孔31に同心状に筒状ソケット7を溶接により一体化して観察孔5を形成したものである。この鋼製リング30により、地山観察孔5の形成に伴う管壁1の強度低下を補強するものである。この場合、透明板25のおねじ25aを筒状ソケット7のめねじ7aにねじ込んで固定する。鋼製リング30の両端側には、内向きリブ32が全周にわたって形成される。このリブ32により、鋼製リング30の剛性を高め、管壁1と強固に一体化する。33は埋込用止水材である。
なお、透明板25は推進後、地山観察孔5内にモルタルを充填するに当り、そのまま残してもよいし、取り外してもよい。
上記第5の実施の形態は、第3の実施形態のものに鋼製リング30を組み込んだものとしたが、上記他の実施形態のものにも鋼製リング30を適用できる。
7 and 8 show a fifth embodiment. In this embodiment, a steel plate is arcuated in the third embodiment (see FIG. 6A) in which a transparent plate 25 is set in a cylindrical socket 7. FIG. A steel ring 30 formed by bending is integrally provided on the outer peripheral surface of the pipe wall 1, and the cylindrical socket 7 is concentrically formed in four through holes 31 formed in the steel ring 30. The observation hole 5 is formed integrally by welding. The steel ring 30 reinforces the decrease in strength of the tube wall 1 due to the formation of the natural ground observation hole 5. In this case, the male screw 25 a of the transparent plate 25 is screwed into the female screw 7 a of the cylindrical socket 7 and fixed. Inward ribs 32 are formed on both ends of the steel ring 30 over the entire circumference. The ribs 32 increase the rigidity of the steel ring 30 and firmly integrate with the tube wall 1. Reference numeral 33 denotes an embedding waterproofing material.
The transparent plate 25 may be left as it is or may be removed when the mortar is filled in the natural mountain observation hole 5 after propulsion.
In the fifth embodiment, the steel ring 30 is incorporated in the third embodiment. However, the steel ring 30 can be applied to the other embodiments.

地山観察孔5の形成は次の順序で行う。図9において、遠心力成形用円筒型枠36に地山観察孔成形用型37をセットする。地山観察孔形成用型37は型枠兼用の筒状ソケット7と上型37aと円錐形の下型37bとからなり、筒状ソケット7のめねじ7aに上型37aのおねじをねじ込んで組立て、型枠36の内壁にあてがい、筒状ソケット7に下型37bを嵌め、その下型37bに型枠36の外側から固定ボルト38をねじ込んで型枠36に固定する。地山観察孔形成用型37が型枠36にセットされた状態で、常法により図示しない遠心鋳造機上で回転する型枠36内にコンクリートを流し込んで推進用コンクリート管を遠心力成形する。製管後、型枠36とともにスチーム養生を行い、コンクリートの硬化後、固定ボルト38を取外して下型37bを取り除く。次いで、管Pを型枠36から脱型して養生後、上型37aを筒状ソケット7から取り外すと地山観察孔5が形成された推進用コンクリート管Pが得られる。したがって、地山観察孔5は、管壁1にその管壁1の内面から外面にかけて凹所6と埋設された筒状ソケット7により形成される。なお、筒状ソケット7は、アンカー39によりコンクリート層の管壁1に埋設されて一体化する。   The formation of the natural ground observation hole 5 is performed in the following order. In FIG. 9, the ground observation hole forming die 37 is set in the centrifugal force forming cylindrical mold 36. The ground mountain observation hole forming die 37 is composed of a cylindrical socket 7 also serving as a mold, an upper die 37a, and a conical lower die 37b, and a male screw 7a of the cylindrical socket 7 is screwed with a male screw of the upper die 37a. The lower die 37b is fitted to the inner wall of the mold 36 and assembled to the cylindrical socket 7, and a fixing bolt 38 is screwed into the lower die 37b from the outside of the mold 36 and fixed to the mold 36. In a state where the ground mountain observation hole forming die 37 is set in the mold 36, concrete is poured into the mold 36 rotating on a centrifugal casting machine (not shown) by a conventional method to form a propulsion concrete tube with centrifugal force. After pipe making, steam curing is performed together with the mold 36, and after the concrete is hardened, the fixing bolt 38 is removed and the lower mold 37b is removed. Next, after the pipe P is removed from the mold 36 and cured, the upper mold 37a is removed from the cylindrical socket 7 to obtain the propulsion concrete pipe P in which the ground observation hole 5 is formed. Therefore, the natural ground observation hole 5 is formed in the tube wall 1 by the cylindrical socket 7 embedded in the recess 6 from the inner surface to the outer surface of the tube wall 1. The cylindrical socket 7 is embedded in the pipe wall 1 of the concrete layer by an anchor 39 and integrated.

なお、筒状ソケット7と筒状体9の間にシール材16,17、筒状体9と密閉板20の間にシール材22、筒状ソケット26と透明板27との間にシール材28を介装して、止水性を高め、推進時における外水の管P内への流入を防止する。
また、上記の実施形態では、管壁1の地山観察孔5を管壁1に内面から外面にかけて凹所6、筒状ソケット7を連設したものとしたが、筒状ソケット7を、その端部を管壁1の内面まで延ばして凹所6を省略することもできる。
また、筒状ソケット7の材質を不錆鋼とすることで、管P内を流れる下水等の流体による腐食が大幅に軽減される。
The sealing materials 16 and 17 are provided between the cylindrical socket 7 and the cylindrical body 9, the sealing material 22 is provided between the cylindrical body 9 and the sealing plate 20, and the sealing material 28 is provided between the cylindrical socket 26 and the transparent plate 27. To increase the water-stopping property and prevent the outside water from flowing into the pipe P during propulsion.
In the above embodiment, the natural mountain observation hole 5 of the tube wall 1 is formed by connecting the recess 6 and the cylindrical socket 7 from the inner surface to the outer surface of the tube wall 1. The recess 6 can be omitted by extending the end to the inner surface of the tube wall 1.
Moreover, the corrosion by the fluids, such as the sewage which flows through the inside of the pipe | tube P, is reduced significantly by making the material of the cylindrical socket 7 into non-rust steel.

本発明の第1の実施形態に係る推進用コンクリート管を示し、(a)は一部切欠正面図、(b)は同図(a)のA−A線矢視図The concrete pipe for propulsion concerning a 1st embodiment of the present invention is shown, (a) is a partially notched front view, (b) is an AA line arrow view of the figure (a). 第2の実施形態における地山観察孔を示す部分拡大断面図The partial expanded sectional view which shows the natural ground observation hole in 2nd Embodiment 図2のB−B線矢視図BB line view of FIG. 本発明の第1の実施形態における地山観察孔にモルタル注入後の状態を示す部分断面図The fragmentary sectional view which shows the state after mortar injection | pouring into the natural ground observation hole in the 1st Embodiment of this invention 本発明の第2の実施形態における地山観察孔を示す部分拡大断面図The partial expanded sectional view which shows the natural ground observation hole in the 2nd Embodiment of this invention 本発明の実施形態における地山観察孔を示し、(a)は第3の実施形態の部分拡大断面図、(b)は第4の実施形態の部分拡大断面図The natural mountain observation hole in embodiment of this invention is shown, (a) is the partial expanded sectional view of 3rd Embodiment, (b) is the partially expanded sectional view of 4th Embodiment. 本発明の第5の実施形態に係る推進用コンクリート管を示す一部切欠正面図Partially cutaway front view showing a concrete pipe for propulsion according to a fifth embodiment of the present invention 本発明の第5の実施形態における地山観察孔を示し、(a)は部分拡大断面図、(b)は同図(a)のC−C線矢視図The ground observation hole in the 5th Embodiment of this invention is shown, (a) is a partial expanded sectional view, (b) is the CC arrow directional view of the same figure (a). 本発明の第1の実施形態に係る地山観察孔形成用型を型枠に取付けた状態の部分断面図The fragmentary sectional view of the state which attached the mold for earth ground observation hole formation concerning a 1st embodiment of the present invention to a formwork 本発明に係る推進工法の全体構成図Overall configuration diagram of the propulsion method according to the present invention 従来例の推力監視装置の全体構成図Overall configuration diagram of conventional thrust monitoring device 従来例に係る応力計測装置を示し、(a)は断面図、(b)は同図(a)のD−D線矢視図The stress measuring device which concerns on a prior art example is shown, (a) is sectional drawing, (b) is the DD arrow line view of the figure (a).

符号の説明Explanation of symbols

P 推進用コンクリート管
K 滑材
1 管壁(コンクリート層)
2 受口
3 挿し口
4 注入孔
5 地山観察孔
6 凹所
6a 段部
7 筒状ソケット(外筒)
7a めねじ
9 筒状体(内筒)
9a おねじ
9b めねじ
9c フランジ部
10 透明板
10a おねじ
11 照明具(光源)
12 凹部
13 洗浄水供給パイプ
14 給水口
15 洗浄口
16,17 シール材
18 隙間
20 密閉板
21 注水ホース
25 透明板
26 筒状ソケット
27 透明板
30 鋼製リング
31 貫通孔
P Concrete pipe for propulsion K Lubricant 1 Pipe wall (concrete layer)
2 Receiving port 3 Insertion port 4 Injection hole 5 Ground mountain observation hole 6 Recess 6a Step part 7 Cylindrical socket (outer cylinder)
7a Female thread 9 Cylindrical body (inner cylinder)
9a Male thread 9b Female thread 9c Flange part 10 Transparent plate 10a Male thread 11 Illuminator (light source)
12 Concave portion 13 Washing water supply pipe 14 Water supply port 15 Cleaning ports 16 and 17 Sealing material 18 Clearance 20 Sealing plate 21 Water injection hose 25 Transparent plate 26 Cylindrical socket 27 Transparent plate 30 Steel ring 31 Through hole

Claims (5)

滑材と裏込め材のいずれか一方、または双方を管壁(1)とトンネル地山との間に注入するための注入孔(4)を有し、その管壁(1)にその内面から外面に向けて前記地山を観察する地山観察孔(5)を形成し、この地山観察孔(5)に上記管壁(1)の外面に臨む透明板(10、25、27)を設けた推進用コンクリート管において、上記透明板(10、25、27)を上記地山観察孔(5)の上記管壁(1)の外面から凹んだ内面位置に設けたことを特徴とする推進用コンクリート管。 Either one of the lubricant and back-filling material, or possess both and the tube wall (1) of the injection hole (4) for injecting between the tunnel natural ground from its inner surface to the pipe wall (1) A natural ground observation hole (5) for observing the natural ground is formed toward the outer surface, and a transparent plate (10, 25, 27) facing the outer surface of the pipe wall (1) is formed in the natural ground observation hole (5). Propulsion characterized in that in the provided concrete pipe for propulsion, the transparent plate (10, 25, 27) is provided at an inner surface position recessed from the outer surface of the pipe wall (1) of the ground observation hole (5). Concrete pipe. 上記透明板(10、25、27)の外方に形成される凹部(12)に一端を開口し、他端を管壁(1)の内面に開口する洗浄水供給路(13)を形成したことを特徴とする請求項1に記載の推進用コンクリート管。 A washing water supply path (13) is formed in which one end is opened in the recess (12) formed outside the transparent plate (10, 25, 27) and the other end is opened in the inner surface of the tube wall (1). The concrete pipe for propulsion according to claim 1 characterized by things. 上記地山観察孔(5)に筒状ソケット(7、26)を埋設し、この筒状ソケット(7、26)の内周に上記管壁(1)の外面に臨む透明板(25、27)をねじ込んだことを特徴とする請求項1または2に記載の推進用コンクリート管。 Cylindrical sockets (7, 26) are embedded in the natural mountain observation hole (5), and transparent plates (25, 27) facing the outer surface of the tube wall (1) on the inner periphery of the cylindrical sockets (7, 26). The concrete pipe for propulsion according to claim 1 or 2, characterized by being screwed . 上記管壁(1)の外周面に鋼製リング(30)を設け、その鋼製リング(30)に形成した貫通孔(31)に同心状に上記筒状ソケット(7)を溶接により一体化して上記の地山観察孔(5)を形成したことを特徴とする請求項1から3のいずれかに記載の推進用コンクリート管。 A steel ring (30) is provided on the outer peripheral surface of the pipe wall (1), and the cylindrical socket (7) is integrated concentrically with a through hole (31) formed in the steel ring (30) by welding. The concrete pipe for propulsion according to any one of claims 1 to 3, wherein the ground observation hole (5) is formed . 上記筒状ソケット(7)のめねじ(7a)に筒状体(9)をねじ込んで着脱自在に固定し、上記筒状ソケット(7)の内周に上記筒状体(9)を介して上記透明板(10)をねじ込んだことを特徴とする請求項1から4のいずれかに記載の推進用コンクリート管。 A cylindrical body (9) is screwed into a female screw (7a) of the cylindrical socket (7) and is detachably fixed, and the inner periphery of the cylindrical socket (7) is interposed via the cylindrical body (9). The propulsion concrete pipe according to any one of claims 1 to 4, wherein the transparent plate (10) is screwed .
JP2004055019A 2004-02-27 2004-02-27 Propulsion concrete pipe and its propulsion method Expired - Fee Related JP4082457B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004055019A JP4082457B2 (en) 2004-02-27 2004-02-27 Propulsion concrete pipe and its propulsion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004055019A JP4082457B2 (en) 2004-02-27 2004-02-27 Propulsion concrete pipe and its propulsion method

Publications (2)

Publication Number Publication Date
JP2005240515A JP2005240515A (en) 2005-09-08
JP4082457B2 true JP4082457B2 (en) 2008-04-30

Family

ID=35022534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004055019A Expired - Fee Related JP4082457B2 (en) 2004-02-27 2004-02-27 Propulsion concrete pipe and its propulsion method

Country Status (1)

Country Link
JP (1) JP4082457B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102912510B1 (en) * 2025-06-04 2026-01-14 주식회사 엔코텍홀딩스 Tunnel boring machine that can Verify the ground

Also Published As

Publication number Publication date
JP2005240515A (en) 2005-09-08

Similar Documents

Publication Publication Date Title
CN109653767A (en) For the anti-floating type section of jurisdiction of shield tunnel and its processing method and application method
CN112031812A (en) Drainage positioning grouting pipe piece and construction method thereof
CN113863954A (en) Double-layer lining large-diameter shield tunnel segment health monitoring arrangement method
CN207567836U (en) Compression test stake ess-strain comprehensive detection system
CN111810198A (en) Directional large-diameter deep hole grouting device and grouting method on tunnel surface
CN106988308A (en) Grouting behind shaft or drift lining pile for prestressed pipe and its construction technology
KR102014460B1 (en) Diagnosis of the depression amount of the back of the pipeline and filler injection device and diagnosis of the backside depression of the pipeline using the same and filling method
CN109630173B (en) Prestressed anchor cable cleaning device and method
CN103174436B (en) A kind of grouting pipe and there is the grouting equipment of this grouting pipe
CN111305285B (en) Installation method of safety monitoring instrument for ultra-deep covering layer working well
CN102747722B (en) Underground continuous wall joint close grouting and covering construction method and expansion rubber plug
JP4082457B2 (en) Propulsion concrete pipe and its propulsion method
CN205206847U (en) Shield constructs business turn over hole portal annular and freezes sealed sealing device
CN113374931B (en) Non-excavation capacity-expansion method for old urban pipeline
CN210716265U (en) Large-diameter steel cylinder concrete jacking pipe
CN209839370U (en) Steel fiber concrete pipe
CN206386125U (en) A kind of inside interstitital texture of built-in groove
CN220451030U (en) Concrete sewage pipe system convenient to desilting
CN218265952U (en) Water stop device for shield tunnel well joint
CN110778329A (en) Tunnel segment measuring element wire sealing device and using method thereof
CN211395777U (en) Leakage detection and grouting plugging device for diaphragm wall joint
CN214460466U (en) A profiled steel structure applied to SMW method
CN111244859B (en) A pre-embedded device and method for monitoring cables in the lining of a water diversion tunnel
CN212336351U (en) Novel prefabricated shear wall easy to control assembling quality
JP4467477B2 (en) Entrance entrance for propulsion pipe, structure of entrance for arrival, and water stop method for entrance entrance

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070928

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071009

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080205

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110222

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110222

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120222

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120222

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120222

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120222

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130222

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140222

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees