JP4082526B2 - Pipe with spiral guide - Google Patents
Pipe with spiral guide Download PDFInfo
- Publication number
- JP4082526B2 JP4082526B2 JP20171897A JP20171897A JP4082526B2 JP 4082526 B2 JP4082526 B2 JP 4082526B2 JP 20171897 A JP20171897 A JP 20171897A JP 20171897 A JP20171897 A JP 20171897A JP 4082526 B2 JP4082526 B2 JP 4082526B2
- Authority
- JP
- Japan
- Prior art keywords
- guide path
- tube
- pipe
- spiral guide
- air core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rigid Pipes And Flexible Pipes (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、自然流下式の垂直下水道管路に好適に使用される螺旋案内路付き管に関する。
【0002】
【従来の技術】
従来から、マンホールの側壁からマンホール内に突出された流入管の一端に曲り管を介して縦管の上端を接続し、縦管の下端をマンホール内の底部に設置して流入管によりマンホール内に流入された下水を縦管によりマンホール内の底部に導入することが知られている。
【0003】
しかしながら、このようにマンホール内に設けられる縦管が長い場合には、縦管下端から流出される下水の落下衝撃が大きいためにマンホールの底部を損傷するおそれがある。
【0004】
そこで、例えば、特開平8−41915号公報には、図4に示すように、縦管本体a内面に沿って上端から下端まで螺旋状に形成された屈曲流下路が設けられた下水道用縦管が提案されている。
この下水道用縦管の上端に十字型継手bが接続され、その十字型継手を介してマンホールc内に導入された流入管dの一端が接続されて、流入管d内の下水は継手bを経由して下水道用縦管内に導入されるようになっている。
【0005】
上記の下水道用縦管を製造するには、軸心部が空洞となった螺旋案内路を管本体内で回転する内型によりフィラメントワインディング法によって一体成形する(特願平7−325494号)。
短管本体部内に螺旋案内路が設けられた短管を重ね合わせて接合する(特願平8−105330号)。
などの方法によっていた。
【0006】
しかしながら上記の方法によって得られた下水道用縦管は、縦管と螺旋案内路が固定されているので、縦管内の保守管理は、
a)縦管の任意な場所に孔を空ける。
b)縦管上部より小型カメラを挿入する。
という方法によっていた。
【0007】
【発明が解決しようとする課題】
しかし、a)の方法では、孔を空けることにより、螺旋案内路の効果が損なわれ、b)の方法では、水流により水の飛沫がかかり、又カメラの画面がぶれて、十分な保守管理ができないという問題があった。
【0008】
さらに、案内路の無い既設の縦管を案内路付き管に変更する際には、既設管を取り外す必要があり、工数がかかっていた。
【0009】
本発明は上記の課題を解決し、縦管内の保守管理を容易にでき、かつ、既設管に簡単に案内路を設置することのできる螺旋案内路付き管を提供することを目的とする。
【0010】
【課題を解決するための手段】
本発明の螺旋案内路付き管は、直管状の縦管本体部の内部に、中空の空気芯筒およびこの空気芯筒の外周面に一体的に設けられた螺旋案内路を備える螺旋案内路付き管であって、前記空気芯筒の上端部には、縦管本体部の上端に被さるように取り付け固定される係止部が設けられ、前記係止部および空気芯筒が一体化した状態で縦管本体部から取り外し可能となされているものである。
【0011】
本発明の螺旋案内路付き管において、前記係止部は、上部が開口されており、空気芯筒から脱気可能とされていることが好ましく、また、前記空気芯筒にはガイド板が一体的に取り付けられており、このガイド板により前記空気芯筒および螺旋案内路が縦管本体部内に誘導されつつ挿入されるように構成されてもよい。また、一体化されている空気芯筒および螺旋案内路が縦管本体部内に挿入されて縦管本体部の上端に被され、この係止部の外周を帯金によって締め付けることにより取り付け固定されており、さらにこの係止部の帯金を緩めることで取り外し可能であり、この帯金が、内面にゴムが装着された構成であってもよい。さらに、前記螺旋案内路の外周縁には、その全長にわたってゴム製の帯状の弾性体が一体的に接着されていてもよい。
【0012】
本発明において空気芯筒は、縦管に流入される最上位の流入管の管底よりも下方に達するように設けられるのが好ましく、又、螺旋案内路は、縦管に流入される最下位の流入管の管底よりも下方に達するように設けられるのが好ましい。
【0013】
本発明に使用される螺旋案内路の材質としては、熱可塑性樹脂、熱硬化性樹脂あるいは金属によって製造することが好ましい。熱可塑性樹脂としては、塩化ビニル系樹脂;ポリエチレン、ポリプロピレン等のオレフィン系樹脂;メタクリル樹脂等が挙げられる。
【0014】
熱硬化性樹脂としては、不飽和ポリエステル樹脂、ビニルエステル樹脂、エポキシ樹脂等が挙げられる。さらに、これらの樹脂を、無機繊維、ガラス繊維、有機繊維、炭素繊維、アラミド繊維、ビニロン繊維等の繊維によって強化したものも使用することができる。
中でも、作業性、軽量性の面から塩化ビニル系樹脂、ガラス繊維強化不飽和ポリエステル樹脂等が好ましい。
【0015】
上記螺旋案内路の高さは、案内路の径の1/20〜5/12が好ましい。
上記螺旋案内路の肉厚は、縦管本体の口径の0.5〜15%が好ましい。
【0016】
【発明の実施の形態】
以下、本発明の実施の形態を、図面を参照して説明する。
図1は、本発明の螺旋案内路付き管を示す部分断面図である。
図1において、螺旋案内路付き管10は縦管であって、縦管本体部11と、螺旋案内路12、12′とからなる。
縦管本体部11の上端には、係止部111が設けられている。
縦管本体部11内の上部には、略中心部に、内部が中空とされた空気芯筒13が立設され、係止部111に固定されている。
縦管本体部11の内周面と、空気芯筒13の外周面との間に、第1の螺旋案内路12が配設され、第1の螺旋案内路12の内周面は、空気芯筒13の外周面に一体的に取り付けられている。
【0017】
縦管本体部11の下端には、流出管15が接続されており、流出管15の管頂のやや上方の縦管本体部11の内部には、第2の螺旋案内路12′が配設されている。
第2の螺旋案内路12′は、空気芯筒13には取り付けられていない。
縦管本体部11の内部の第1の螺旋案内路12と第2の螺旋案内路12′間には、螺旋案内路は配設されていない。
【0018】
図2は、第1の螺旋案内路12、空気芯筒13及び係止部111とを一体化して示す側面図である。
図2に示すように、第1の螺旋案内路12の内周面は、空気芯筒13の外周面に一体的に取り付けられ、第1の螺旋案内路12の外周縁には、その全長にわたって、例えば、ゴム製の帯状の弾性体14が接着剤により一体的に接着されている。この弾性体14は縦管本体部11の内周面に圧接されることによって、螺旋案内路12を縦管本体部11内に支持している。
さらに、空気芯筒13の上部の外周面には、ガイド16が一体的に取り付けられている。
なお、第2の螺旋案内路12′の外周縁にも、上記と同様の弾性体が接着剤により一体的に接着されている(図示せず)。
【0019】
図3は空気芯筒13と係止部111を固定する方法を説明する平面図である。図3に示すように短管からなる係止部111は、4本のステンレス製支持ボルト17によって空気芯筒13に固定されており、図2に示したように第1の螺旋案内路12とともに固定一体化されている。なお、係止部111は上部が開口されており、空気芯筒13から脱気可能となされている。
【0020】
そして、縦管本体部11内に気芯筒13及び係止部111とが一体化された第1の螺旋案内路12を、ガイド16により縦管本体部11内に誘導されつつ挿入され、係止部111が縦管本体部11上端に被され、係止部111の外周を図示しないステンレス製帯金によって締めつけることにより、螺旋案内路付き管10が完成する。
【0021】
【実施例】
以下に、本発明を実施例をもってさらに詳細に説明する。
(実施例1)
図1に示す本発明の螺旋案内路付き管10を次のようにして製造した。
まず縦管本体部11(塩化ビニル系樹脂製、内径350mm、肉厚6mm)をマンホール内に配置した。次いで、縦管本体部11の下部に、厚み8mmの塩化ビニル系樹脂製板を、螺旋状にピッチ200mm、6山配置し、外周縁に厚み2mmのゴム製の帯状の弾性体を接着し、第2の螺旋案内路12′として縦管本体部11の下部に挿入し、ボルトで固定した。
【0022】
一方、外径110mmの空気芯筒13(塩化ビニル系樹脂製)の外周に、厚み8mmの塩化ビニル系樹脂製板を螺旋状にピッチ200mm、3山配置し、溶接接着した。上記塩化ビニル系樹脂製板の外周縁には厚み2mmのゴム製の帯状の弾性体14を接着し、略中心部に空気芯筒13が固定された第1の螺旋案内路12を得た。
【0023】
次いで、塩化ビニル製脂製板を図3に示したように、ステンレス製ボルト17で空気芯筒13にガイド板16とともに固定し一体化した。
【0024】
この塩化ビニル製短管を係止部111として縦管本体部11の上部より、挿入し、係止部111の外周をステンレス製帯金(内面に2mm厚のゴムを装着)を締めつけ固定し、螺旋案内路付き管10を得、施工を完了した。
【0025】
以上の作業に要した時間は50分であり、従来の工程(特願平7−325494号記載の方法)に比べ、脱型時間を含めると約1/3に短縮した。
【0026】
施工後1月後、ステンレス製帯金を緩め、係止部111、空気芯筒13が一体化した第1の螺旋案内路12を取り外し、異物のつまり等が無いことを確認すると同時に、第2の螺旋案内路12’についても異物のつまり等が無いこと等が確認できた。
【0027】
(実施例2)
不飽和ポリエステル樹脂100重量部に対して、メチルエチルケトンパーオキシド硬化剤1.2重量部と、適量の硬化促進剤とを添加した熱硬化性樹脂を準備するとともに、2230g/m2 のロービング(旭ファイバー社製)と、450g/m2 のガラスクロス(旭ファイバー社製)と、330g/m2 のチョップドストランドマット(旭ファイバー社製)とを、それぞれ、準備した。そして、ロービング、ガラスクロス、およびチョップドストランドマットに、不飽和ポリエステル樹脂をそれぞれ含浸させて、厚さ5mm、外径が700mm、内径が240mm軸方向長さが340mmの第2の螺旋案内路12’用短管を6本製造した。
【0028】
その後、製造された短管を繊維強化プラスチックモルタル製の縦管本体部11(肉厚14mm)内に、第2の螺旋案内路12’を積み重ねつつ挿入した。
【0029】
一方、第2の螺旋案内路12’用短管と同様にして、略中心部に空気芯筒13が固定された第1の螺旋案内路12をハンドレアップ法によって得た。
【0030】
以下、実施例1と同様にして、係止部111を取り付け係止部111とを一体化し、螺旋案内路付き管10を得、施工を完了した。
【0031】
以上の作業に要した時間は20分であり、従来の工程(特願平7−325494号記載の方法)に比べ、脱型時間を含めると約1/3に短縮した。
【0032】
施工後1月後、ステンレス製帯金を緩め、係止部111、空気芯筒13が一体化した第1の螺旋案内路12を取り外し、異物のつまり等が無いことを確認すると同時に、第2の螺旋案内路12’についても異物のつまり等が無いこと等が確認できた。
【0033】
【発明の効果】
本発明の螺旋案内路付き管は、直管状の縦管本体の上部に係止部が取り付けられ、縦管本体部内には、外周に螺旋案内路を有する空気芯筒が、係止部と一体化されて縦管本体から着脱可能となされているので、縦管内の保守管理を容易にでき、かつ、既設管に簡単に案内路を設置することのできる。
【図面の簡単な説明】
【図1】本発明の螺旋案内路付き管を示す部分断面図である。
【図2】図1の示す螺旋案内路付き管に使用される第1の螺旋案内路、空気芯筒及び係止部とを一体化して示す側面図である。
【図3】空気芯筒と係止部とを固定する方法を説明する平面図である。
【図4】従来の螺旋案内路付き管を示す断面図である。
【符号の説明】
10 螺旋案内路付き管縦管
11 縦管本体部
111 係止部
12,12′ 螺旋案内路
13 空気芯筒
14 弾性体
15 流出管
16 ガイド板
17 ボルト[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pipe with a spiral guide path that is suitably used for a natural flow type vertical sewer pipe.
[0002]
[Prior art]
Conventionally, the upper end of the vertical pipe is connected to one end of the inflow pipe projecting from the side wall of the manhole into the manhole through a bent pipe, and the lower end of the vertical pipe is installed at the bottom of the manhole and is placed in the manhole by the inflow pipe. It is known to introduce the introduced sewage into the bottom of the manhole by a vertical pipe.
[0003]
However, when the vertical pipe provided in the manhole is long as described above, there is a possibility that the bottom of the manhole may be damaged due to a large drop impact of the sewage flowing out from the lower end of the vertical pipe.
[0004]
Therefore, for example, in JP-A-8-41915, as shown in FIG. 4, a sewer vertical pipe provided with a bent flow path spirally formed from the upper end to the lower end along the inner surface of the vertical pipe body a. Has been proposed.
A cruciform joint b is connected to the upper end of the sewer vertical pipe, and one end of the inflow pipe d introduced into the manhole c is connected through the cruciform joint. The sewage in the inflow pipe d is connected to the joint b. It is designed to be introduced into the vertical sewer pipe.
[0005]
In order to manufacture the above-mentioned vertical pipe for sewerage, a spiral guide path having a hollow axial center portion is integrally formed by the filament winding method with an inner mold rotating within the pipe body (Japanese Patent Application No. 7-325494).
A short pipe provided with a spiral guide path in the short pipe main body is overlapped and joined (Japanese Patent Application No. 8-105330).
And so on.
[0006]
However, since the vertical pipe and the spiral guideway are fixed in the vertical pipe for sewer obtained by the above method, the maintenance management in the vertical pipe is
a) A hole is made at an arbitrary position of the vertical pipe.
b) Insert a small camera from the top of the vertical tube.
It was by the method.
[0007]
[Problems to be solved by the invention]
However, in the method a), the effect of the spiral guide path is impaired by making a hole, and in the method b), water is splashed by the water flow, and the camera screen is shaken. There was a problem that I could not.
[0008]
Furthermore, when an existing vertical pipe without a guide path is changed to a pipe with a guide path, it is necessary to remove the existing pipe, which takes time.
[0009]
An object of the present invention is to solve the above-described problems, and to provide a pipe with a spiral guideway that can easily maintain and manage a vertical pipe and can easily install a guideway in an existing pipe.
[0010]
[Means for Solving the Problems]
The pipe with a spiral guide path of the present invention is provided with a spiral guide path provided with a hollow air core cylinder and a spiral guide path integrally provided on the outer peripheral surface of the air core cylinder inside a straight tubular vertical pipe main body. a tube, the upper end of the air core barrel, the locking portion is provided which is mounted and fixed so as to cover the upper end of the vertical pipe main body, in a state where the locking portion and the air core tube are integrated It can be removed from the vertical tube body .
[0011]
Oite helically guideway with tubes of the present invention, the locking portion has an upper has been opened, preferably being capable degassed from the air core tube, also the guide plate to the air core tube The air core tube and the spiral guide path may be inserted while being guided by the guide plate into the vertical tube main body. Further, the integrated air core cylinder and the spiral guide path are inserted into the vertical pipe main body part and covered by the upper end of the vertical pipe main body part, and the outer periphery of this locking part is attached and fixed by tightening with a band. Further, it can be removed by loosening the band of this locking part, and this band may have a configuration in which rubber is mounted on the inner surface. Furthermore, a rubber band-shaped elastic body may be integrally bonded to the outer peripheral edge of the spiral guide path over the entire length thereof .
[0012]
In the present invention, the air core cylinder is preferably provided so as to reach below the bottom of the uppermost inflow pipe that flows into the vertical pipe, and the spiral guide path is the lowest position that flows into the vertical pipe. It is preferable to be provided so as to reach below the bottom of the inflow pipe.
[0013]
The material of the spiral guide path used in the present invention is preferably manufactured from a thermoplastic resin, a thermosetting resin, or a metal. Examples of the thermoplastic resin include vinyl chloride resins; olefin resins such as polyethylene and polypropylene; methacrylic resins and the like.
[0014]
Examples of the thermosetting resin include unsaturated polyester resins, vinyl ester resins, and epoxy resins. Furthermore, what reinforced these resin with fibers, such as an inorganic fiber, glass fiber, organic fiber, carbon fiber, aramid fiber, vinylon fiber, can also be used.
Of these, vinyl chloride resins, glass fiber reinforced unsaturated polyester resins, and the like are preferable in terms of workability and lightness.
[0015]
The height of the spiral guide path is preferably 1/20 to 5/12 of the diameter of the guide path.
The thickness of the spiral guide path is preferably 0.5 to 15% of the diameter of the vertical pipe body.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a partial cross-sectional view showing a pipe with a spiral guideway according to the present invention.
In FIG. 1, a
A
At the upper part in the vertical tube
A first
[0017]
An
The second
No spiral guide path is disposed between the first
[0018]
FIG. 2 is a side view showing the first
As shown in FIG. 2, the inner peripheral surface of the first
Further, a
An elastic body similar to the above is also integrally bonded to the outer peripheral edge of the second spiral guide path 12 'with an adhesive (not shown).
[0019]
FIG. 3 is a plan view for explaining a method of fixing the
[0020]
Then, the first
[0021]
【Example】
Hereinafter, the present invention will be described in more detail with reference to examples.
Example 1
A
First, the vertical tube body 11 (made of vinyl chloride resin, inner diameter 350 mm, wall thickness 6 mm) was placed in a manhole. Next, a vinyl chloride resin plate having a thickness of 8 mm is spirally disposed at the lower portion of the vertical tube
[0022]
On the other hand, on the outer periphery of an air core cylinder 13 (made of vinyl chloride resin) having an outer diameter of 110 mm, three vinyl chloride resin plates having a thickness of 8 mm were arranged in a spiral manner with a pitch of 200 mm and welded. A rubber band-like
[0023]
Next, as shown in FIG. 3, the vinyl chloride grease plate was fixed to the
[0024]
This vinyl chloride short tube is inserted as an engaging
[0025]
The time required for the above work was 50 minutes, which was shortened to about 1/3 including the demolding time as compared with the conventional process (method described in Japanese Patent Application No. 7-325494).
[0026]
One month after the construction, the stainless steel strip is loosened, the first
[0027]
(Example 2)
A thermosetting resin prepared by adding 1.2 parts by weight of a methyl ethyl ketone peroxide curing agent and an appropriate amount of a curing accelerator to 100 parts by weight of an unsaturated polyester resin was prepared, and roving of 2230 g / m 2 (Asahi Fiber) ), 450 g / m 2 glass cloth (Asahi Fibers Co., Ltd.), and 330 g / m 2 chopped strand mat (Asahi Fibers Co., Ltd.) were prepared. Then, a roving, a glass cloth, and a chopped strand mat are impregnated with an unsaturated polyester resin, respectively, and a second
[0028]
Thereafter, the manufactured short pipe was inserted into the vertical pipe main body 11 (wall thickness: 14 mm) made of fiber reinforced plastic mortar while stacking the second
[0029]
On the other hand, in the same manner as the second short pipe for the
[0030]
Thereafter, in the same manner as in Example 1, the locking
[0031]
The time required for the above work was 20 minutes, which was shortened to about 1/3 including the demolding time as compared with the conventional process (method described in Japanese Patent Application No. 7-325494).
[0032]
One month after the construction, the stainless steel strip is loosened, the first
[0033]
【The invention's effect】
In the pipe with a spiral guide path of the present invention, a locking part is attached to the upper part of a straight tubular vertical pipe body, and an air core cylinder having a spiral guide path on the outer periphery is integrated with the locking part in the vertical pipe body part. Since it is made detachable from the vertical pipe body, maintenance management in the vertical pipe can be facilitated, and a guide path can be easily installed in the existing pipe.
[Brief description of the drawings]
FIG. 1 is a partial cross-sectional view showing a pipe with a spiral guideway of the present invention.
FIG. 2 is a side view showing a first spiral guide path, an air core tube, and a locking part used in the tube with the spiral guide path shown in FIG.
FIG. 3 is a plan view for explaining a method of fixing the air core tube and the locking portion.
FIG. 4 is a cross-sectional view showing a conventional tube with a spiral guide path.
[Explanation of symbols]
DESCRIPTION OF
Claims (5)
前記空気芯筒の上端部には、縦管本体部の上端に被さるように取り付け固定される係止部が設けられ、前記係止部および空気芯筒が一体化した状態で縦管本体部から取り外し可能となされていることを特徴とする螺旋案内路付き管。A tube with a spiral guide path provided with a hollow air core cylinder and a spiral guide path integrally provided on the outer peripheral surface of the air core cylinder inside the straight tubular vertical tube main body,
The upper end portion of the air core cylinder is provided with a locking portion that is attached and fixed so as to cover the upper end of the vertical tube main body portion. From the vertical tube main body portion in a state where the locking portion and the air core tube are integrated. A tube with a spiral guideway, characterized in that it is removable .
前記係止部は、上部が開口されており、空気芯筒から脱気可能とされていることを特徴とする螺旋案内路付き管。 The pipe with a spiral guide according to claim 1,
An upper part of the locking part is opened, and the pipe with a spiral guide path can be deaerated from the air core tube.
前記空気芯筒にはガイド板が一体的に取り付けられており、このガイド板により前記空気芯筒および螺旋案内路が縦管本体部内に誘導されつつ挿入されることを特徴とする螺旋案内路付き管。A guide plate is integrally attached to the air core cylinder, and the air core cylinder and the spiral guide path are guided and inserted into the vertical tube main body by the guide plate. tube.
前記係止部は、一体化されている空気芯筒および螺旋案内路が縦管本体部内に挿入されて縦管本体部の上端に被され、この係止部の外周を帯金によって締め付けることにより取り付け固定されており、さらにこの係止部の帯金を緩めることで取り外し可能であるとともに、前記帯金は、内面にゴムが装着されていることを特徴とする螺旋案内路付き管。The locking portion is formed by inserting an integrated air core tube and a spiral guide path into the vertical tube main body portion and covering the upper end of the vertical tube main body portion, and tightening the outer periphery of the locking portion with a band. A pipe with a spiral guideway, which is fixedly attached and can be removed by loosening the strap of the locking portion, and the strap is provided with rubber on the inner surface.
前記螺旋案内路の外周縁には、その全長にわたってゴム製の帯状の弾性体が一体的に接着されていることを特徴とする螺旋案内路付き管。A tube with a spiral guide path, wherein a rubber band-like elastic body is integrally bonded to the outer peripheral edge of the spiral guide path over the entire length thereof.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20171897A JP4082526B2 (en) | 1997-07-28 | 1997-07-28 | Pipe with spiral guide |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20171897A JP4082526B2 (en) | 1997-07-28 | 1997-07-28 | Pipe with spiral guide |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1144383A JPH1144383A (en) | 1999-02-16 |
| JP4082526B2 true JP4082526B2 (en) | 2008-04-30 |
Family
ID=16445789
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP20171897A Expired - Fee Related JP4082526B2 (en) | 1997-07-28 | 1997-07-28 | Pipe with spiral guide |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4082526B2 (en) |
-
1997
- 1997-07-28 JP JP20171897A patent/JP4082526B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1144383A (en) | 1999-02-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100443648B1 (en) | Manhole Lining Material and Manhole Lining Method | |
| JP3306295B2 (en) | Pipe with spiral guideway | |
| KR101966015B1 (en) | One-piece septic tank with excellent workability and durability | |
| JP4082526B2 (en) | Pipe with spiral guide | |
| JP3387737B2 (en) | Pipe with spiral guideway | |
| KR20190114613A (en) | Pipe Stiff Reinforcing And Reinforcement | |
| JP3561393B2 (en) | Vertical pipe with guideway | |
| JP3425503B2 (en) | Pipe with spiral guideway | |
| JP3499695B2 (en) | Pipe with spiral guideway | |
| JP4082527B2 (en) | Tube with internal spiral guideway | |
| JPH10152882A (en) | Vertical pipe structure for sewerage | |
| JPH1163316A (en) | Pipe with spiral guideway | |
| JP4235737B2 (en) | Tube with internal spiral guideway | |
| JP4132345B2 (en) | Vertical pipe line | |
| JPH10168989A (en) | Fluid pipe with guideway | |
| JP3550286B2 (en) | Connection structure between vertical pipe and sewer pipe | |
| JP3164638B2 (en) | Forming method of inclined tube | |
| JP3545936B2 (en) | Pipe with spiral guideway | |
| JP4434476B2 (en) | Connection structure of vertical sewer pipe with spiral guideway and sewer pipe | |
| CN224173374U (en) | High-strength resin prefabricated part for inspection well adjusting part | |
| JP2000146036A (en) | Vertical pipe with spiral guideway | |
| JP4140933B2 (en) | Tube with internal spiral guideway | |
| KR930005347Y1 (en) | Reinforced pressure resistant corrugated sewer pipe | |
| JP3566386B2 (en) | Sewer system | |
| JP2010064410A (en) | Method and structure for earthquake-proof processing of underground burial duct lining processing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040405 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070305 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070821 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071019 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080115 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080207 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110222 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110222 Year of fee payment: 3 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110222 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110222 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120222 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120222 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130222 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130222 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |