Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4097075B2 - How to lay Futon Pass - Google Patents
[go: Go Back, main page]

JP4097075B2 - How to lay Futon Pass - Google Patents

How to lay Futon Pass Download PDF

Info

Publication number
JP4097075B2
JP4097075B2 JP2003172981A JP2003172981A JP4097075B2 JP 4097075 B2 JP4097075 B2 JP 4097075B2 JP 2003172981 A JP2003172981 A JP 2003172981A JP 2003172981 A JP2003172981 A JP 2003172981A JP 4097075 B2 JP4097075 B2 JP 4097075B2
Authority
JP
Japan
Prior art keywords
futon
plate portion
laying
scissors
linear member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003172981A
Other languages
Japanese (ja)
Other versions
JP2005009132A (en
Inventor
英二 安田
Original Assignee
近畿砕石株式会社
英二 安田
田中 久嗣
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 近畿砕石株式会社, 英二 安田, 田中 久嗣 filed Critical 近畿砕石株式会社
Priority to JP2003172981A priority Critical patent/JP4097075B2/en
Publication of JP2005009132A publication Critical patent/JP2005009132A/en
Application granted granted Critical
Publication of JP4097075B2 publication Critical patent/JP4097075B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Revetment (AREA)

Description

【0001】
【産業上の利用分野】
本発明は、河川や道路工事などで使用するフトン籠の敷設方法に関する。
【0002】
【従来の技術】
従来の河川や道路工事においては、人力によって、フトン籠を製造・敷設していた。すなわち、金網製のフトン籠用容体を敷設箇所に運ぶか、或いは敷設箇所で組み立てた後、このフトン籠用容体の内部に石材を充填して蓋をすることによりフトン籠を形成し、この工程を繰返し行うことによって、複数のフトン籠を敷設していた。
【0003】
しかし、前記の方法は、その殆どを人力により行うため、フトン籠用容体内の石材が十分に密な状態にすることができず、また雨天時などの悪天候の際では、フトン籠用容体の組み立てや石材の充填などの作業を行うことは作業員にとって多大な危険性を伴い、工期の遅延や人件費の増大の要因となっていた。
【0004】
そこで、本発明者は、フトン籠の内部に十分密な石材を充填することができ、更に、予め複数のフトン籠を工場等で製造しておき、このフトン籠を施工箇所に敷設するという発明を提供した(特許文献1参照)。この発明によって、工期の遅延や人件費の増大などについては十分に解決された。
【0005】
しかし、前記の発明によれば、設置箇所と異なる場所で複数のフトン籠を製造した後、このフトン籠をクレーンやショベルなどで吊上げ、所定の箇所に順次降ろしていくことによって敷設していたので、規則正しく並べることが難しく、また、各フトン籠同士に間隙が形成され、フトン籠の連結が困難であるという問題がある。
【0006】
【特許文献1】
特開2002−97616号公報
【0007】
【発明が解決しようとする課題】
そこで、本発明は、前記した問題点に鑑み、複数のフトン籠を規則正しく並べることができ、それによって、フトン籠同士を容易に連結できるフトン籠の敷設方法を提供する。従って、各フトン籠を全体として一体の軟構造に形成することができるので、地形の変動に対しても柔軟に適合することができ、フトン籠の機能を十分に発揮することができる。
【0008】
【課題を解決するための手段】
本発明に係るフトン籠の敷設方法は、実質的に直方体のフトン籠を敷設する方法において、フトン籠の長辺又は短辺と略同一の長さの線状部材を準備し、2つのフトン籠の対向する側面の底辺を、少なくとも1つの前記線状部材で連結し、線状部材を緊張した状態で各フトン籠を平行に敷設することにより、各フトン籠間にフトン籠の面積に相当する空間部を形成し、その後、各フトン籠の対向する側面にフトン籠を導くためのガイド手段を設置し、他のフトン籠をガイド手段に沿って空間部に収容することを特徴とする。
【0009】
好ましくは、線状部材は、開閉可能なリング状部を両端部に設けており、リング状部の開閉によってフトン籠に着脱自在であることを特徴とする。
【0010】
また、ガイド手段は、垂直プレート部と、この垂直プレート部の一辺側より突出するように傾斜する傾斜プレート部とを備えており、垂直プレート部がフトン籠の側面に沿い、且つ傾斜プレート部がフトン籠の上方に位置してフトン籠の内側に向くように着脱する手段を有することを特徴としても良い。
【0011】
【発明の実施の形態】
以下、添付図面に基づいて本発明の一実施例を詳細に説明する。
【0012】
図1は、本発明のフトン籠の敷設方法の工程を示す説明図である。図1Aの通り、先ず、予め工場等で製造した実質的に直方体からなる第1のフトン籠3にリフタ手段4を取り付ける。そして、ワイヤを介してリフタ手段4を油圧ショベル5のバケットフックに連結し、この油圧ショベル5でフトン籠3を所望の設置箇所に載置する。その際、フトン籠3を地面より若干浮かせた状態で、フトン籠3の一側面の底辺30に、少なくとも1つの線状部材1の一端部10を取り付ける。本実施例では、4つの線状部材1を並設した。
【0013】
図1Bの通り、第1のフトン籠3を地面に載置した後、リフタ手段4と油圧ショベル5とにより第2のフトン籠3’を準備し、このフトン籠3’の他側面の底辺31’に、前記の線状部材1の他端部11を取り付ける。第1のフトン籠3の一側面の底辺30と第2のフトン籠3’の他側面の底辺31’とは、互いに対向する。そして、線状部材1を緊張させて、第1のフトン籠3に平行な状態で、第2のフトン籠3’を敷設する。
【0014】
このように、各フトン籠3,3’間に所要の距離を確保することにより、第3のフトン籠3’’を収容するための空間部8が形成される。この線状部材1は、後述するが、フトン籠3,3’間に挿入する第3のフトン籠3’’の長辺又は短辺と略同一の長さであるので、空間部8の面積は、第3のフトン籠3’’の面積に相当することになる。そして、第2のフトン籠3’を地面より若干浮かせた状態で、フトン籠3’の一側面の底辺30’に、別の線状部材1’の一端部10’を取り付けておく。
【0015】
図2は、線状部材を示す説明図である。図2A及びBは、第一実施例を示す。この例による線状部材1は、鉄線からなっており、その両端部10,11がリング状に形成されている。線状部材1の長さLは、フトン籠3の長辺又は短辺に対応た長さであって、フトン籠3’’を縦方向に敷設するときは、長さLが約2.05mの線状部材1を用い、横方向に敷設するときは、長さLが約1.05mの線状部材1を用いる。フトン籠3は、一般に長辺が2.0m、短辺が1.0mであるので、前記の線状部材1を適宜に選択して用いることにより、フトン籠3,3’間に所要の距離を設けることができる。
【0016】
図2Aは、両端部10,11のリング状部を閉じた状態を示し、図2Bは、両端部10,11のリング状部を開いた状態を示す。各図に示す通り、フック部10a,11aと掛止部10b,11bとを係合・離脱することにより、両端部10,11のリング状部が開閉するように構成されている。そして、両端部10,11のリング状部を開くことにより、線状部材1の両端部10,11をフトン籠3の外側金網に掛止でき、その後、リング状部を閉じることによって、フトン籠3に固着することができる。
【0017】
図2C及びDは、線状部材1の第二実施例を示す。前記の第1実施例と異なる点は、両端部10,11のリング状部が、掛止部10c,11cと環状体10d,11dとにより開閉する点である。図2Dの通り、環状体10d,11dを掛止部10c,11cから離脱することにより、両端部10,11のリング状部を開いた状態にすることができ、図2Cの通り、環状体10d,11dを掛止部10c,11cに係合することによって、リング状部を閉じることができる。
【0018】
この線状部材1は、鉄筋に限らず、強固なワイヤやチェーン、或いは棒鋼などで形成しても良く、要は、各フトン籠3,3’間にフトン籠の面積に相当する空間部8を設けることができれば良い。
【0019】
図3は、図1に続く工程を示す説明図である。図3の通り、第1のフトン籠3と第2のフトン籠3’との間の距離は、線状部材1の長さLであり、この長さLはフトン籠3の長辺又は短辺と略同一であるので、各フトン籠3,3’間に形成された空間部8の面積は、フトン籠の面積に相当するものであって、第3のフトン籠3’’を適宜に収容できる。その際、第1のフトン籠3と第2のフトン籠3’との互いに対向する側面の夫々にガイド手段2,2’を設置し、各フトン籠3,3’の間に第3のフトン籠3’’が引っ掛からずに、滑り込むように挿入することができるようにする。
【0020】
この例は、縦方向にフトン籠3,3’,3’’を敷設した例であるので、フトン籠3’’の長辺と略同一長さの線状部材1を使用したが、横方向にフトン籠3,3’,3’’を敷設するときは、フトン籠3’’の短辺と略同一長さの線状部材1を使用することにより、空間部8に第3のフトン籠3’’を収容することができ、各フトン籠3,3’,3’’が適宜に整列される。
【0021】
図4は、ガイド手段を示す斜視図である。ガイド手段2は、垂直プレート部20、傾斜プレート部21、水平プレート部22により構成されている。垂直プレート部20及び傾斜プレート部21の幅Wは、フトン籠3の短辺に対応する約1.0mからなっており、垂直プレート部20の一辺側に設けた傾斜プレート部21の角度θは、垂直プレート部20に対して約20度である。
【0022】
そして、傾斜プレート部21と垂直プレート部20との屈曲部には、垂直プレート部20に直立する水平プレート部22が設けられている。垂直プレート部20の高さH1は約0.5mであり、傾斜プレート部21の高さH2は約0.25mである。
【0023】
垂直プレート部20をフトン籠3の側面に沿わせ、その状態で、水平プレート部22をフトン籠3の上面に載置することにより、垂直プレート部20をフトン籠3の側面に沿わせた状態で、ガイド手段2をフトン籠3,3’に設置することができる。また、水平プレート部22は、傾斜プレート部21の傾斜する方向に設けられているので、各フトン籠3,3’にガイド手段2,2’を設置すると、各傾斜プレート部21,21’は、各フトン籠3,3’の上面より上方に位置し、逆ハの字状に配置される。
【0024】
従って、第3のフトン籠3’’を傾斜プレート部21,21’に沿って挿入することにより、フトン籠3’’が若干膨張していても、逆ハの字状に配置された傾斜プレート部21によって、各フトン籠3,3’間にフトン籠3’’をスムーズに収納することができる。
【0025】
このガイド手段2,2’は、フトン籠3,3’,3’’同士の摩擦を減らし、滑り込むようにスムーズに挿入することができれば良いのであって、前記の構成に限定されないことは当然である。例えば、水平プレート部22は、垂直プレート部20をフトン籠の側面に沿わせて、傾斜プレート部21をフトン籠の上面の上方に位置するための手段であるので、複数フック等の掛止部材を垂直プレート部20に設けることにより、ガイド手段2をフトン籠3に設置しても良い。
【0026】
図5乃至7は、図3に対応する斜視図である。図5に示す通り、フトン籠3’’を縦方向に挿入する際には、各フトン籠3,3’の対向する短辺側の側面の夫々にガイド手段2,2’を設置する。図6に示す通り、フトン籠3’’を横方向にに挿入する際には、各フトン籠3,3’の対向する長辺側の側面の夫々に2枚を一組とするガイド手段2,2’を設置する。
【0027】
図7は、周囲に配置されたフトン籠3,3’,・・・の中央に形成された空間部8に、フトン籠3’’を収容する際の斜視図を示し、この図に示すように、各フトン籠3,3’,・・・の対向する側面に、それぞれガイド手段2,2’,・・・を設置して、フトン籠3’’を挿入する。
【0028】
図8は、図3に続く工程を示す説明図である。図8Aに示す通り、フトン籠3’’を挿入した際、ガイド手段2,2’に近接する部分が完全に挿入されず、盛り上がった状態になるときがあるので、その盛り上がった部分に、約15cm角の木材6,6’を載せ、ショベル5のバケットで軽く抑えてフトン籠3,3’,3’’の上面を揃える。この木材6,6’を介して抑えることにより、フトン籠3,3’の金網メッキの剥離を防止することができる。
【0029】
その後、図8Bに示す通り、ガイド手段2,2’に設けたワイヤをリフト手段4に取り付け、ショベル5でこのリフト手段4を引き上げることにより、フトン籠3,3’,3’’間に挟まれたガイド手段2,2’を引き抜く。その後、各フトン籠3,3’,3’’の密着した側面同士をコネクタ、コイル又は鉄線などの連結手段で連結することにより、一体化することができる。これまでの工程を1つのサイクルとして、繰り返し行うことにより、フトン籠の敷設工事を進行する。
【0030】
【発明の効果】
本発明によれば、複数のフトン籠を規則正しく、隙間を設けることなく並べることができ、更に各フトン籠同士を容易に連結することができる。それによって、複数のフトン籠を一体の軟構造体にすることができるので、地形の変動に応じて柔軟に適合することができ、フトン籠の機能を十分に発揮することができる。
【図面の簡単な説明】
【図1】本発明のフトン籠敷設方法の工程を示す説明図である。
【図2】線状部材を示す説明図である。
【図3】図1に続く工程を示す説明図である。
【図4】ガイド手段を示す斜視図である。
【図5】図3に対応する斜視図である。
【図6】図3に対応する斜視図である。
【図7】図3に対応する斜視図である。
【図8】図3に続く工程を示す説明図である。
【符号の説明】
1 線状部材
2,2’ ガイド手段
3,3’,3’’ フトン籠
8 空間部
10 線状部材の一端部
11 線状部材の他端部
20 垂直プレート部
21 傾斜プレート部
22 水平プレート部
[0001]
[Industrial application fields]
The present invention relates to a method for laying Futon ridges used in rivers and road construction.
[0002]
[Prior art]
In conventional river and road construction, Futon Pass was manufactured and laid by human power. That is, after the container for the futon basket made of wire mesh is transported to the laying site or assembled at the laying site, the futon kite is formed by filling the inside of the container for the futon kite and covering it with a stone. By repeatedly performing the above, a plurality of Futon ridges were laid.
[0003]
However, since most of the above methods are performed manually, the stone in the container for futon can not be made sufficiently dense, and in the case of bad weather such as rainy weather, Performing operations such as assembling and filling stones is extremely dangerous for workers, and has been a factor in delaying the construction period and increasing labor costs.
[0004]
Therefore, the present inventor can fill the inside of the Futon ridge with a sufficiently dense stone material, and further manufactures a plurality of Futon ridges in advance in a factory or the like, and lays these Futon ridges at the construction site. (See Patent Document 1). By this invention, the delay in construction period and increase in labor costs were sufficiently solved.
[0005]
However, according to the above invention, after producing a plurality of futon scissors at a place different from the installation location, the futon scissors are laid by lifting them with a crane or an excavator and lowering them sequentially to a predetermined location. However, it is difficult to arrange them regularly, and there is a problem that gaps are formed between the futon ridges and it is difficult to connect the futon ridges.
[0006]
[Patent Document 1]
Japanese Patent Laid-Open No. 2002-97616
[Problems to be solved by the invention]
Therefore, in view of the above-described problems, the present invention provides a method for laying futon ridges, in which a plurality of fulton ridges can be regularly arranged, thereby easily connecting the futon ridges to each other. Therefore, since each Futon ridge can be formed as a whole in a soft structure, it can be flexibly adapted to changes in topography, and the function of the Futon ridge can be fully exhibited.
[0008]
[Means for Solving the Problems]
The method for laying futon ridges according to the present invention is a method for laying substantially cuboid futon ridges, preparing a linear member having a length substantially the same as the long side or short side of the futon ridges. By connecting at least one linear member to the bottom side of the opposing side surfaces and laying each futon rod in parallel with the linear member being in tension, it corresponds to the area of the futon rod between the futon rods. A space means is formed, and then guide means for guiding the futon ridges are installed on opposite sides of each futon ridge, and the other futon ridges are accommodated in the space along the guide means.
[0009]
Preferably, the linear member is provided with a ring-shaped portion that can be opened and closed at both ends, and is detachable from the Futon bag by opening and closing the ring-shaped portion.
[0010]
The guide means includes a vertical plate portion and an inclined plate portion that is inclined so as to protrude from one side of the vertical plate portion, the vertical plate portion is along the side surface of the Futon ridge, and the inclined plate portion is It is good also as having the means to attach or detach so that it may be located above the futon bowl and to face the inside of the futon bowl.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.
[0012]
FIG. 1 is an explanatory diagram showing the steps of the method for laying futon ridges according to the present invention. As shown in FIG. 1A, first, the lifter means 4 is attached to a first futon basket 3 made of a substantially rectangular parallelepiped manufactured in advance in a factory or the like. Then, the lifter means 4 is connected to the bucket hook of the excavator 5 via a wire, and the futon rod 3 is placed on a desired installation location by the excavator 5. At this time, one end 10 of at least one linear member 1 is attached to the bottom 30 of one side surface of the futon cage 3 with the futon cage 3 slightly lifted from the ground. In this embodiment, four linear members 1 are arranged side by side.
[0013]
As shown in FIG. 1B, after the first futon rod 3 is placed on the ground, a second futon rod 3 ′ is prepared by the lifter means 4 and the hydraulic excavator 5, and the bottom 31 of the other side surface of the futon rod 3 ′ is prepared. The other end portion 11 of the linear member 1 is attached to '. The bottom 30 on one side of the first futon collar 3 and the bottom 31 'on the other side of the second futon collar 3' face each other. And the tension | tensile_strength of the linear member 1 is laid in the state parallel to the 1st futon reed 3 and 2nd futon reed 3 '.
[0014]
In this way, a space 8 for accommodating the third futon rod 3 ″ is formed by securing a required distance between the futon rods 3 and 3 ′. As will be described later, the linear member 1 has substantially the same length as the long side or the short side of the third futon rod 3 ″ inserted between the futon rods 3 and 3 ′. Corresponds to the area of the third futon ridge 3 ″. Then, one end portion 10 ′ of another linear member 1 ′ is attached to the bottom 30 ′ of one side surface of the futon rod 3 ′ in a state where the second futon rod 3 ′ is slightly lifted from the ground.
[0015]
FIG. 2 is an explanatory view showing a linear member. 2A and 2B show a first embodiment. The linear member 1 according to this example is made of iron wire, and both end portions 10 and 11 thereof are formed in a ring shape. The length L of the linear member 1 is a length corresponding to the long side or the short side of the futon ridge 3, and when the futon ridge 3 '' is laid in the vertical direction, the length L is about 2.05 m. When the linear member 1 is used and laid in the lateral direction, the linear member 1 having a length L of about 1.05 m is used. The futon bowl 3 generally has a long side of 2.0 m and a short side of 1.0 m. Therefore, by selecting and using the linear member 1 as appropriate, a required distance between the futon bowls 3 and 3 ′ is obtained. Can be provided.
[0016]
FIG. 2A shows a state in which the ring-shaped portions at both ends 10 and 11 are closed, and FIG. 2B shows a state in which the ring-shaped portions at both ends 10 and 11 are opened. As shown in each figure, the ring-shaped portions of both end portions 10 and 11 are opened and closed by engaging and disengaging the hook portions 10a and 11a and the latching portions 10b and 11b. Then, by opening the ring-shaped portions of the both end portions 10 and 11, the both end portions 10 and 11 of the linear member 1 can be hooked on the outer metal mesh of the futon rod 3, and then the ring-shaped portion is closed to close the futon rod 3 can be fixed.
[0017]
2C and 2D show a second embodiment of the linear member 1. The difference from the first embodiment is that the ring-shaped portions of both end portions 10 and 11 are opened and closed by the latching portions 10c and 11c and the annular bodies 10d and 11d. As shown in FIG. 2D, the annular bodies 10d and 11d are detached from the latching portions 10c and 11c, so that the ring-shaped portions of both end portions 10 and 11 can be opened. As shown in FIG. , 11d can be engaged with the latching portions 10c, 11c to close the ring-shaped portion.
[0018]
The linear member 1 is not limited to a reinforcing bar, and may be formed of a strong wire, chain, steel bar, or the like. In short, a space portion 8 corresponding to the area of the futon rod between the futon rods 3 and 3 ′. What is necessary is that it can be provided.
[0019]
FIG. 3 is an explanatory diagram showing a process following FIG. As shown in FIG. 3, the distance between the first futon rod 3 and the second futon rod 3 ′ is the length L of the linear member 1, and this length L is the long side or short side of the futon rod 3. Since it is substantially the same as the side, the area of the space portion 8 formed between the futon ridges 3 and 3 'corresponds to the area of the futon ridges. Can be accommodated. At that time, guide means 2 and 2 'are installed on the mutually opposing side surfaces of the first futon rod 3 and the second futon rod 3', respectively, and the third futon between the futon rods 3 and 3 '. The hook 3 '' can be inserted so as to slip without being caught.
[0020]
Since this example is an example in which the futon ridges 3, 3 ′, 3 ″ are laid in the vertical direction, the linear member 1 having substantially the same length as the long side of the futon ridge 3 ″ is used. When laying futon rods 3, 3 ′, 3 ″ to the space portion 8, the third futon rod 3 is formed by using the linear member 1 having substantially the same length as the short side of the futon rod 3 ″. 3 ″ can be accommodated, and each futon cage 3, 3 ′, 3 ″ is appropriately aligned.
[0021]
FIG. 4 is a perspective view showing the guide means. The guide means 2 includes a vertical plate portion 20, an inclined plate portion 21, and a horizontal plate portion 22. The width W of the vertical plate portion 20 and the inclined plate portion 21 is about 1.0 m corresponding to the short side of the futon bowl 3, and the angle θ of the inclined plate portion 21 provided on one side of the vertical plate portion 20 is The vertical plate portion 20 is about 20 degrees.
[0022]
A horizontal plate portion 22 that stands upright on the vertical plate portion 20 is provided at a bent portion between the inclined plate portion 21 and the vertical plate portion 20. The height H1 of the vertical plate portion 20 is about 0.5 m, and the height H2 of the inclined plate portion 21 is about 0.25 m.
[0023]
A state in which the vertical plate portion 20 is placed along the side surface of the futon cage 3 by placing the horizontal plate portion 22 on the upper surface of the futon cage 3 in the state where the vertical plate portion 20 is placed along the side surface of the futon cage 3. Thus, the guide means 2 can be installed on the futon cages 3 and 3 ′. Further, since the horizontal plate portion 22 is provided in the direction in which the inclined plate portion 21 is inclined, when the guide means 2 and 2 ′ are installed on the futon rods 3 and 3 ′, the inclined plate portions 21 and 21 ′ are , Located above the upper surface of each of the futon ridges 3, 3 ', and arranged in a reverse C shape.
[0024]
Accordingly, by inserting the third futon ridge 3 ″ along the inclined plate portions 21, 21 ′, the inclined plate disposed in an inverted C shape even if the futon ridge 3 ″ is slightly expanded. By means of the part 21, the futon ridges 3 '' can be smoothly accommodated between the futon ridges 3, 3 '.
[0025]
The guide means 2 and 2 'need only be able to be inserted smoothly so as to reduce friction between the futon cages 3 and 3' and 3 '', and it is naturally not limited to the above-described configuration. is there. For example, the horizontal plate portion 22 is a means for positioning the vertical plate portion 20 along the side surface of the futon bowl and the inclined plate portion 21 above the upper surface of the futon bowl. The guide means 2 may be installed on the futon cage 3 by providing the vertical plate portion 20 on the vertical plate portion 20.
[0026]
5 to 7 are perspective views corresponding to FIG. As shown in FIG. 5, when the futon scissors 3 '' are inserted in the vertical direction, the guide means 2 and 2 'are installed on the side surfaces on the short side facing each of the futon scissors 3 and 3'. As shown in FIG. 6, when the futon scissors 3 ″ are inserted in the lateral direction, the guide means 2 is a set of two on each of the opposing long side surfaces of the futon scissors 3, 3 ′. , 2 '.
[0027]
FIG. 7 shows a perspective view when the futon scissors 3 ″ are accommodated in the space 8 formed in the center of the surrounding futon scissors 3, 3 ′,... , Guide means 2, 2 ′,... Are installed on the opposite side surfaces of the futon rods 3, 3 ′,.
[0028]
FIG. 8 is an explanatory diagram showing a process following FIG. As shown in FIG. 8A, when the futon scissors 3 ″ are inserted, the portions adjacent to the guide means 2 and 2 ′ may not be completely inserted and may rise, so that Place the 15cm square wood 6,6 'and lightly hold it with the bucket of the excavator 5 to align the top surfaces of the futon bowls 3, 3', 3 ''. By restraining through the wood 6 and 6 ', peeling of the metal mesh plating of the futon baskets 3 and 3' can be prevented.
[0029]
After that, as shown in FIG. 8B, the wire provided on the guide means 2 and 2 ′ is attached to the lift means 4 and the lift means 4 is pulled up by the shovel 5 so that it is sandwiched between the futon rods 3 and 3 ′ and 3 ″. Pull out the guide means 2, 2 '. Then, it can integrate, by connecting the contact | adhered side surfaces of each futon cage | basket 3, 3 ', 3''with connection means, such as a connector, a coil, or an iron wire. By repeating the above steps as one cycle, the construction work for Futon ridges will proceed.
[0030]
【The invention's effect】
According to the present invention, a plurality of futon ridges can be regularly arranged without providing a gap, and the futon ridges can be easily connected to each other. As a result, a plurality of futon ridges can be made into an integral soft structure, so that it can be flexibly adapted according to changes in topography, and the function of the futon ridge can be fully exhibited.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is an explanatory diagram showing the steps of a futon wall laying method according to the present invention.
FIG. 2 is an explanatory view showing a linear member.
FIG. 3 is an explanatory view showing a step that follows FIG. 1;
FIG. 4 is a perspective view showing guide means.
FIG. 5 is a perspective view corresponding to FIG. 3;
6 is a perspective view corresponding to FIG. 3; FIG.
7 is a perspective view corresponding to FIG. 3. FIG.
8 is an explanatory diagram showing a step that follows FIG. 3. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Linear member 2, 2 'Guide means 3, 3', 3 '' Futon trough 8 Space part 10 One end part of a linear member 11 The other end part 20 of a linear member Vertical plate part 21 Inclined plate part 22 Horizontal plate part

Claims (3)

実質的に直方体のフトン籠を敷設する方法において、当該フトン籠の長辺又は短辺と略同一の長さの線状部材を準備し、2つのフトン籠の対向する側面の底辺を、少なくとも1つの前記線状部材で連結し、該線状部材を緊張した状態で前記各フトン籠を平行に敷設することにより、前記各フトン籠間にフトン籠の面積に相当する空間部を形成し、その後、前記各フトン籠の対向する側面にフトン籠を導くためのガイド手段を設置し、他のフトン籠を前記ガイド手段に沿って前記空間部に収容することを特徴とするフトン籠の敷設方法。In a method of laying a substantially rectangular parallelepiped futon ridge, a linear member having a length substantially the same as the long side or the short side of the futon ridge is prepared, and at least one bottom side of opposing sides of the two futon ridges is provided. By connecting the two linear members and laying each of the futon rods in parallel in a state where the linear members are tensioned, thereby forming a space portion corresponding to the area of the futon rod between the futon rods, A laying method for a futon scissors, characterized in that guide means for guiding the futon scissors are installed on opposite sides of each of the futon scissors, and the other futon scissors are accommodated in the space along the guide means. 前記線状部材は、開閉可能なリング状部を両端部に設けており、当該リング状部の開閉によって前記フトン籠に着脱自在であることを特徴とする請求項1に記載のフトン籠の敷設方法。The said linear member is provided with the ring-shaped part which can be opened and closed in both ends, and can be attached or detached to the said futon bowl by opening and closing of the said ring-shaped part, Laying of the futon bowl of Claim 1 characterized by the above-mentioned. Method. 前記ガイド手段は、垂直プレート部と、当該垂直プレート部の一辺側より突出するように傾斜する傾斜プレート部とを備えており、前記垂直プレート部がフトン籠の側面に沿い、且つ前記傾斜プレート部がフトン籠の上方に位置してフトン籠の内側に向くように着脱する手段を有することを特徴とする請求項1に記載のフトン籠の敷設方法。The guide means includes a vertical plate portion and an inclined plate portion that is inclined so as to protrude from one side of the vertical plate portion, the vertical plate portion being along a side surface of the Futon ridge, and the inclined plate portion. 2. The method for laying a futon scissors according to claim 1, further comprising means for attaching and detaching so as to face the inside of the futon scissors.
JP2003172981A 2003-06-18 2003-06-18 How to lay Futon Pass Expired - Fee Related JP4097075B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003172981A JP4097075B2 (en) 2003-06-18 2003-06-18 How to lay Futon Pass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003172981A JP4097075B2 (en) 2003-06-18 2003-06-18 How to lay Futon Pass

Publications (2)

Publication Number Publication Date
JP2005009132A JP2005009132A (en) 2005-01-13
JP4097075B2 true JP4097075B2 (en) 2008-06-04

Family

ID=34096934

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003172981A Expired - Fee Related JP4097075B2 (en) 2003-06-18 2003-06-18 How to lay Futon Pass

Country Status (1)

Country Link
JP (1) JP4097075B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0644796U (en) * 1992-11-30 1994-06-14 丹治 徹 Packing mechanism
JPH07165266A (en) * 1993-12-10 1995-06-27 Hitachi Electron Service Co Ltd Gas injected inflating type paper-made package cushioning material and production thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0644796U (en) * 1992-11-30 1994-06-14 丹治 徹 Packing mechanism
JPH07165266A (en) * 1993-12-10 1995-06-27 Hitachi Electron Service Co Ltd Gas injected inflating type paper-made package cushioning material and production thereof

Also Published As

Publication number Publication date
JP2005009132A (en) 2005-01-13

Similar Documents

Publication Publication Date Title
KR101311946B1 (en) Shape-retention-type hoisting rectangular parallelepiped bag
US8632282B2 (en) Mechanically stabilized earth system and method
JP4938543B2 (en) Manufacturing frame for bag and manufacturing method of bag
KR20140087834A (en) prefabricated concrete arch rib and it's construction method
JP4097075B2 (en) How to lay Futon Pass
JP2627050B2 (en) How to set up a stone gabion
JP3479974B2 (en) Building blocks, their construction methods and retaining walls
EP0048307A1 (en) Method and device for laying piping and piping laid by said method
JP3171588U (en) Jacquard, end junk and junk tie trunk
JPH03180617A (en) Bank of sharp gradient
KR200440989Y1 (en) Block, coupler, and reinforced earth retaining wall structure using the same
CN117005407B (en) Prestressed pipe pile unhooking and traction installation construction method
JP4077828B2 (en) Building concrete
JP2002317425A (en) Porous concrete cobble aggregate and method of manufacturing the aggregate
KR200410540Y1 (en) Gabion and its manufacturing apparatus
JP3654852B2 (en) Stone packed bowl
JP5537332B2 (en) Futon straw lifting base material and method for laying futon straw using the lifting base material
JP2583830B2 (en) Construction method of concrete deep foundation pile
JP3622385B2 (en) Pile structure
JPH081068B2 (en) Box for simple retaining wall
JP4407886B2 (en) Slope block unit
JP4255430B2 (en) Method for forming stone-packed net fence and method for forming stone-packed net fence in parallel
JP2019214891A (en) Gabion and installation method of gabion
JPH06227786A (en) How to install heavy objects
KR20190113734A (en) Stone net and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060614

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20060614

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20060614

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060614

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080220

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080305

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees