JP4097863B2 - Molded resin mold - Google Patents
Molded resin mold Download PDFInfo
- Publication number
- JP4097863B2 JP4097863B2 JP31529799A JP31529799A JP4097863B2 JP 4097863 B2 JP4097863 B2 JP 4097863B2 JP 31529799 A JP31529799 A JP 31529799A JP 31529799 A JP31529799 A JP 31529799A JP 4097863 B2 JP4097863 B2 JP 4097863B2
- Authority
- JP
- Japan
- Prior art keywords
- layer
- resin mold
- diameter
- mold
- molded resin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Moulds For Moulding Plastics Or The Like (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、例えば車両用のパネル或いはシートを製造するときに使用する成形樹脂型に関する。
【0002】
【従来の技術】
車両等のパネルやシートを真空成形或いはプレス成形する型として、例えば特公平7−106576号公報「表面メッキ樹脂製型及び製造方法」が提案されている。
この公報の表面メッキ樹脂製型は、熱硬化性樹脂製型(バックアップ型)にポリマー型導電性中間層を形成し、ポリマー型導電性中間層の表面に例えばニッケルメッキを施して金属メッキ層とし、金属メッキ層でパネルやシートを真空成形或いはプレス成形するものである。
【0003】
しかし、同公報の金属メッキ層は耐久性を考慮して、規定厚さ(例えば、50〜300μm)になるようにメッキを施す必要がある。このため、メッキ処理に時間がかかり生産性を高める上で問題がある。
【0004】
一方、成形樹脂型のなかにはメッキ処理を施さないものもある。すなわち、金属メッキを施す代りに、例えばバックアップ型に熱硬化性樹脂を塗布して、塗布した熱硬化性樹脂でキャビティに対向する成形面を形成するものである。この成形樹脂型によれば、金属メッキを施す必要がないので、比較的短い時間で成形樹脂型を得ることができる。この成形樹脂型について次図で説明する。
【0005】
図11は従来の成形樹脂型の要部拡大図であり、型表層100の第1層101をアルミニウム片102・・・(・・・は複数を示す。以下同様。)を含む熱硬化性樹脂(エポキシ樹脂)103で構成し、この第1層101をバックアップする第2層105を、アルミニウム粒106・・・を熱硬化性樹脂(エポキシ樹脂)107で接合したもので構成した状態を示す。
なお、第1層101の成形面108に凹部108a及び凸部108bを形成することで、シート110の表面110aに「しぼ(凹凸面)」を形成することができる。
【0006】
次に、成形樹脂型でシート110をプレス成形する工程を説明する。
先ず成形樹脂型を50℃に冷却すると共にシート110を180℃まで加熱し、次に成形樹脂型の第1層101をシート110に押し付けてシート110を所望の形状にプレス成形する。
このとき、シート110の温度が第1層101及び第2層105に伝わり、成形樹脂型の温度が120℃まで上昇する。
次いで、成形樹脂型を型開きして、成形樹脂型の温度を50℃まで冷却した後、上記工程を順次繰返す。
このため、プレス成形の生産性を高めるためには、120℃まで上昇した成形樹脂型を50℃まで短い時間で冷却して、冷却時の待機時間を短くすることが重要である。
【0007】
【発明が解決しようとする課題】
しかし、第2層105のアルミニウム粒106・・・は、各々の形状が一定でなく比較的大径のものや比較的小径のものが混合している。アルミニウム粒106・・・を一定の間隔で接合することができないので、例えば小径のアルミニウム粒106aがアルミニウム粒106b,106cに接触しない、即ち、アルミニウム粒106aとアルミニウム粒106bとの間及びアルミニウム粒106aとアルミニウム粒106cとの間が非接触状態となる。このため、第2層105の熱伝導率を高め難い。
【0008】
従って、プレス成形のときに120℃まで上昇した成形樹脂型を、50℃まで冷却するためには、比較的時間をかける必要がある。この結果、成形樹脂型の待機時間が長くなり、生産性を高めことが難しい。
また、小径のアルミニウム粒106aをアルミニウム粒106b,106cで拘束することができないので、第2層105の強度を高めることが難しい。
【0009】
そこで、本発明の目的は、成形樹脂型の熱伝導率を高めることができ、さらに成形樹脂型の強度を高めることができる技術を提供することにある。
【0010】
【課題を解決するための手段】
上記課題を解決するために本発明の請求項1は、型表層の第1層を熱硬化性樹脂で構成し、この第1層をバックアップする第2層を、金属粒を熱硬化性樹脂で接合したもので構成する成形樹脂型において、前記金属粒を略同径の金属球とし、かつ、前記熱硬化性樹脂が熱硬化する前に、前記第2層に所定荷重をかけることにより、前記金属球間から前記熱硬化性樹脂を除去することで、隣り合う金属粒同士を互いに直接接触させ、前記第2層の熱伝導率を高めたことを特徴とする。
【0011】
熱硬化性樹脂が熱硬化する前に、第2層に所定荷重をかけることにより、金属球間から熱硬化性樹脂を除去することで、隣り合う金属粒同士を互いに直接接触させた。
隣り合う金属粒同士を互いに直接接触させて第2層の熱伝導率を高めることで、シートから伝わった熱を効率よく逃がすことができる。このため、比較的短い時間で成形樹脂型を冷却することができるので、成形樹脂型の待機時間を短くすることができる。
また、隣り合う金属粒同士を互いに接触させることで、金属粒を互いに拘束することができるので、成形樹脂型の強度を高めることができる。
【0012】
請求項2は、金属球の直径を0.3〜3mmの範囲に設定したことを特徴とする。
金属球の直径が0.3mm未満になると、金属球間の空間が小さくなりすぎて、空間を真空引き用の孔として利用することができない。そこで、金属球の直径を0.3mm以上に設定することで、金属球間の空間を真空引き可能な空間とした。
また、金属球の直径が3mmを越えると、金属球間の空間が大きくなりすぎて熱伝導率が低くなる虞がある。そこで、金属球の直径を3mm以下に設定することで、金属球間の空間を比較的小さくして熱伝導率を高くした。
請求項3は、前記第1層と前記第2層との間に、熱硬化性樹脂にステンレス性の不織布を含有させた中間層が積層され、前記中間層の熱膨張率が、前記第1層の熱膨張率より高く、前記第2層の熱膨張率より低くなるように、前記不織布の含有量を設定したことを特徴とする。
このように、中間層を第1層と第2層との間に積層することで熱膨張差を緩和することができる。この結果、例えば第1層に発生する熱膨張差による応力を抑えることができるので、第1層に熱膨張差による亀裂が発生する心配はない。
さらに、型表層を第1層、中間層及び第2層の3層構造としたので型表層の強度を高めることもできる。
【0013】
【発明の実施の形態】
本発明の実施の形態を添付図に基づいて以下に説明する。
図1は本発明に係る成形樹脂型(第1実施の形態)の断面図である。
成形樹脂型1は、型表層2の第1層5を炭化けい素(シリコンカーバイド「SiC」)の細粒を含む熱硬化性樹脂で構成し、第1層5をバックアップする第2層10を、金属粒を熱硬化性樹脂で接合したもので構成し、第1層5に真空引き用の真空孔20・・・を複数個開け、第1層5の裏面5aに沿って複数の冷却用の配管24・・・を配置し、第2層10の裏面10a側に枠体26を取付けたものである。
第1層5及び第2層10については以下に詳しく説明する。
【0014】
図2は図1のA部拡大図である。
第1層5は、細粒の炭化けい素6・・・を50〜80重量%含めた熱硬化性樹脂(以下、「エポキシ樹脂」という)7で厚さt1(一例として、t1=1〜5mm)に形成し、キャビティ(図示せず)に対向する成形面8に「しぼ」用の凹部8a・・・及び凸部8b・・・を形成したものである。
炭化けい素6は、細粒(例えば、粒径は約10μmである。)に形成したものである。
【0015】
細粒の炭化けい素6・・・の含有量を50重量%以上に設定することで、炭化けい素6・・・を第1層5の凹部8a・・・や凸部8b・・・に隙間なく含ませて、第1層5を耐摩耗性に優れた層にした。
また、炭化けい素6・・・の含有量を80重量%以下に設定することで、エポキシ樹脂7を所定量確保することができ、炭化けい素・・・をエポキシ樹脂で接着して第1層5の強度を充分に確保した。
さらに、炭化けい素6・・・の含有量を80重量%以下に設定することで、熱硬化前の流動性を良好に保つことができる。このため、第1層5の形成作業が容易になり、短い時間で第1層5を形成することができる。
【0016】
第2層10は、金属粒(鋼球)12・・・の球面に熱硬化樹脂(以下、「エポキシ樹脂」という)14を付着させ、エポキシ樹脂14で鋼球12・・・を接着して厚さt2(一例として、t2=5mm以上)に形成したものであって、鋼球12・・・間に空間15・・・を形成することで多孔質の層としたものである。
第2層10の空間15・・・を形成することで第1層5の真空孔20・・・から真空引きを行うことができる。
【0017】
鋼球12・・・は、同径の金属球であり、直径Dを0.3〜3mm(3000μm)の範囲に設定したものである。
鋼球12・・・を同径とすることで一定の間隔で接合することができるので、隣り合う鋼球12・・・同士を互いに接触させることができる。このため、第2層10の熱伝導率を高めることができる。
さらに、隣り合う鋼球12・・・同士を互いに接触させることで、鋼球12・・・を互いに拘束することができるので第2層10の強度を高めることができる。
【0018】
また、鋼球12・・・の直径Dが0.3mm未満になると、鋼球12・・・間の空間15・・・が小さくなりすぎて、空間15・・・を真空引き用の孔として利用することができないので真空引き度が劣る。そこで、鋼球12・・・の直径Dを0.3mm以上に設定することで、鋼球12・・・間の空間15・・・を真空引き可能な空間とした。
さらに、鋼球12・・・の直径Dが3mmを越えると、鋼球12・・・の間の空間15・・・が大きくなり過ぎて熱伝導率が低くなる虞がある。そこで、鋼球12・・・の直径を3mm以下に設定することで、空間15・・・を比較的小さくして熱伝導率を高くした。
【0019】
以上に述べた成形樹脂型の製造工程を説明する。
図3(a)〜(d)は本発明に係る成形樹脂型(第1実施の形態)の製造工程の説明図である。
(a)において、マスタモデル30の表面30aに炭化けい素を含めたエポキシ樹脂を塗り、熱硬化させて第1層5を形成する。
(b)において、第1層5の裏面5aに鋼球等を含むエポキシ樹脂を塗布して第2層10(図1に示す)の一部(厚さ数mm)10bを構成する。次に、第2層10の一部10bに沿って複数の冷却用の配管24・・・を配置し、次いで枠体26の支柱27・・・,28・・・を取付ける。
【0020】
(c)において、複数の冷却用の配管24・・・を含み且つ第1層5をバックアップする第2層10を鋼球等を含むエポキシ樹脂(或いはポリウレタン樹脂又はポリウレア樹脂)で構成して、矢印▲1▼,▲1▼の如くマスタモデル30から離す。
(d)において、支柱27・・・の頂部にプレート29をボルト32(図1に示す)で固定し、次に第1層5に真空引き用の真空孔20・・・を複数個開けて成形樹脂型1の成形を完了する。
【0021】
次に、以上に述べた成形樹脂型1の作用を説明する。
図4(a),(b)は本発明に係る成形樹脂型(第1実施の形態)の熱伝導を説明する第2層の拡大図であり、(a)は従来技術の項で説明した従来の成形樹脂型を「比較例」として示し、(b)は図1〜図3で説明した第1実施の形態の成形樹脂型1を「実施例」として示した。なお、図中エポキシ樹脂は省略した。
【0022】
(a)において、第2層105のアルミニウム粒(106a〜106g)は、各々の形状が一定でなく比較的大径のものや比較的小径のものが混合している。このため、各々のアルミニウム粒(106a〜106g)を一定の間隔で接合することができない。従って、例えば小径のアルミニウム粒106aをアルミニウム粒106d,106f,106gに接触させることはできるが、アルミニウム粒106b、106c,106eに接触させることはできない。
【0023】
従って、小径のアルミニウム粒106aの熱は、矢印の如くアルミニウム粒106d,106f,106gの3個に伝わるだけなので、第2層105の熱伝導率を高め難い。
このため、シートから伝わった熱を効率よく逃がすことができないので、比較的長い時間をかけて成形樹脂型を冷却する必要がある。この結果、成形樹脂型の待機時間が長くなり生産性を高めることが難しい。
また、小径のアルミニウム粒106aをアルミニウム粒106b,106c,106eで拘束することができないので、第2層105の強度を高めることは難しい。
【0024】
(b)において、第2層10の鋼球(12a〜12g)を直径Dとして同径の金属球とすることで、隣り合う鋼球(12a〜12g)同士を互いに接触させることができる。
従って、例えば鋼球12aの熱を、矢印の如く鋼球12b〜12gの6個に伝えることができるので、第2層10の熱伝導率を高めることができる。
このため、シートから伝わった熱を効率よく逃がして、比較的短い時間で成形樹脂型を冷却することができる。この結果、成形樹脂型の待機時間を短くして生産性を高めることができる。
また、第2層10の鋼球(12a〜12g)を同径の金属球とすることで、隣り合う鋼球同士を互いに拘束することができる。この結果、第2層10の強度を高めることができる。
【0025】
次に、第2〜4実施の形態について説明する。なお、第1実施の形態と同一部材については同一符号を付して説明を省略する。
図5は本発明に係る成形樹脂型(第2実施の形態)の断面図である。
成形樹脂型40は、成形樹脂型1と同様に第1層5及び第2層10を有し、さらに第1層5と第2層10との間に中間層42を積層した型表層41を有するものである。
【0026】
図6は図5のB部拡大図である。
中間層42は、熱硬化性樹脂(以下、「エポキシ樹脂」という)44にステンレス性の不織布46を含めたもので、厚さt3(一例として、t3=1〜5mm)に形成したものである。
【0027】
ここで、第1層5のエポキシ樹脂7は、第2層10のエポキシ樹脂14と比較して含有量が多いので、第1層5の熱膨張率は第2層10の熱膨張率より高い。このため、中間層42の熱膨張率が、第1層5の熱膨張率より高く、第2層10の熱膨張率より低くなるように不織布46の含有量を設定する。
従って、中間層42を第1層5と第2層10との間に積層することで熱膨張差を緩和することができる。この結果、例えば第1層5に発生する熱膨張差による応力を抑えることができるので、第1層5に熱膨張差による亀裂が発生する心配はない。
【0028】
また、型表層41を第1層5、中間層42及び第2層10の3層構造としたので、第1実施例の成形樹脂型1の型表層2と比較して型表層41の強度を高めることもできる。
【0029】
図7は本発明に係る成形樹脂型(第3実施の形態)の要部拡大図である。
成形樹脂型50の型表層51は、第2層52の鋼球12・・・同士をエポキシ樹脂14を介在させないで直接接触させたもので、その他は第1実施の形態と同じである。
すなわち、鋼球12・・・の表面にはエポキシ樹脂14の薄膜が形成されやすく、この状態でエポキシ樹脂14を熱硬化すると、鋼球12,12間にエポキシ樹脂の薄膜が介在することになる。
【0030】
鋼球12,12間に介在するエポキシ樹脂14は薄膜なので、熱伝導率に大きな影響はないが、エポキシ樹脂を介在させなければ、熱伝導率をさらに高めることが可能になる。
そこで、例えば、エポキシ樹脂14が熱硬化する前に、第2層52に所定の荷重をかけることにより、鋼球12,12間からエポキシ樹脂14を除去するようにした。これにより、第2層52の鋼球12・・・同士を直接接触させた成形樹脂型50を得ることができる。
【0031】
加えて、成形樹脂型50によれば、隣り合う鋼球12同士を直接接触させたことで、第1実施の形態と比べて空間15をより均一に形成することができる。従って、成形の際に、より均一な真空引きが可能になり製品の品質をより高めることができる。
【0032】
図8は本発明に係る成形樹脂型(第4実施の形態)の要部拡大図である。
成形樹脂型60の型表層61は、第2層62の鋼球12・・・同士をエポキシ樹脂14を介在させないで直接接触させたもので、その他は第2実施の形態と同じである。
従って、第3実施の形態と同様に、第2層62の熱伝導率をより高めることができ、かつ真空引きをより均一に行うことができる。
【0033】
次に、第1実施の形態の成形樹脂型1を例に、鋼球の直径Dと熱伝導率との関係、及び鋼球の直径Dと真空引き通気率との関係を説明する。
図9は本発明に係る成形樹脂型による鋼球の直径Dと熱伝導率との関係を示すグラフであり、横軸は鋼球の直径D(mm)を示し、縦軸は熱伝導率(kcal/mh℃)を示す。
ここで、プレス成形中に、成形樹脂型の冷却時間を所望時間まで短くするためには熱伝導率を1kcal/mh℃(以下、「規定値」という)以上に設定する必要がある。
【0034】
熱伝導率は、鋼球の直径Dが3mmのとき規定値(1kcal/mh℃)になり、鋼球の直径Dが3mm未満になると規定値より大きくなる。
一方、鋼球の直径Dが3mmを超えると熱伝導率は規定値より小さくなる。
従って、鋼球の直径Dを3mm以下に設定することにより、熱伝導率を規定値より大きくすることができる。
【0035】
図10は本発明に係る成形樹脂型において鋼球の直径Dと真空引き通気率との関係を示すグラフであり、横軸は鋼球の直径D(mm)を示し、縦軸は真空引き通気率(%)を示す。
ここで、プレス成形中に、パネルやシートの成形体を十分に真空吸着するためには、真空引き通気率を50〜100%に設定する必要がある。
【0036】
真空引き通気率は、鋼球の直径Dが0.3mm未満のとき50%より小さく、鋼球の直径Dが0.3mmのとき50%になる。
また、真空引き通気率は、鋼球の直径Dが0.3mmを超えると50%より大きくなり、鋼球の直径Dが3.0mm以上になると100%を維持する。
従って、鋼球の直径Dを0.3mm以上に設定することにより、真空引き通気率を50〜100%にすることができる。
【0037】
以上述べたように、図9及び図10のグラフから、鋼球の直径Dを0.3〜3mmに設定することで、十分な熱伝導率を確保することができ、かつ十分な真空引き通気率を確保することができることが判る。
【0038】
なお、前記実施の形態では、第1層の厚さt1を1〜5mm、第2層10の厚さt2を5mm以上、中間層42の厚さt3を1〜5mmに設定した例を説明したが、各々の厚さt1、t2,t3はこれらの値に限らないで任意に設定することができる。
また、第1層5、第2層10及び中間層42をエポキシ樹脂7,14,44とした例を説明したが、その他の熱硬化性樹脂として例えばポリウレタン樹脂やポリウレア樹脂等を使用してもよい。
【0039】
さらに、炭化けい素6の粒径を約10μmとしたが、粒径は第1層5の耐摩耗性を確保できる範囲で任意に設定することができる。
また、金属粒12を鋼球としたが、その他に銅球やアルミニウム球のように熱伝導率の高い金属球を使用してもよい。
【0040】
前記実施の形態では成形樹脂型1でシートを真空成形又はプレス成形する例を説明したが、成形樹脂型1はシートの他に、例えばパネルの成形に適用することも可能である。なお、シートやパネルは車両用のものに限らないで、その他の製品に適用することも可能である。
【0041】
【発明の効果】
本発明は上記構成により次の効果を発揮する。
請求項1は、金属粒を略同径の金属球とし、かつ、熱硬化性樹脂が熱硬化する前に、第2層に所定荷重をかけることにより、金属球間から熱硬化性樹脂を除去することで、隣り合う金属粒同士を互いに直接接触さて第2層の熱伝導率を高めた。
このため、シートから伝わった熱を効率よく逃がすことができるので、比較的短い時間で成形樹脂型を冷却することができる。この結果、成形樹脂型の待機時間を短くして生産性を高めることができる。
また、隣り合う鋼球同士を互いに接触させることで、金属粒を互いに拘束することができる。この結果、成形樹脂型の強度を高めることができる。
【0042】
請求項2は、金属球の直径を0.3〜3mmの範囲に設定した。
金属球の直径を0.3mm以上に設定することで、金属球間の空間を比較的大きくすることができるので、金属球間の空間を真空引き可能な空間として利用することができる。
また、金属球の直径を3mm以下に設定することで、金属球間の空間が大きくなり過ぎることを防ぐことができるので、成形樹脂型の熱伝導率を高めることができる。
請求項3は、第1層と第2層との間に、熱硬化性樹脂にステンレス性の不織布を含有させた中間層を積層した。そして、中間層の熱膨張率が、第1層の熱膨張率より高く、第2層の熱膨張率より低くなるように、不織布の含有量を設定した。
このように、中間層を第1層と第2層との間に積層することで熱膨張差を緩和することができる。この結果、例えば第1層に発生する熱膨張差による応力を抑えることができるので、第1層に熱膨張差による亀裂が発生する心配はない。
さらに、型表層を第1層、中間層及び第2層の3層構造としたので型表層の強度を高めることもできる。
【図面の簡単な説明】
【図1】本発明に係る成形樹脂型(第1実施の形態)の断面図
【図2】図1のA部拡大図
【図3】本発明に係る成形樹脂型(第1実施の形態)の製造工程の説明図
【図4】本発明に係る成形樹脂型(第1実施の形態)の熱伝導を説明する第2層の拡大図
【図5】本発明に係る成形樹脂型(第2実施の形態)の断面図
【図6】図5のB部拡大図
【図7】本発明に係る成形樹脂型(第3実施の形態)の要部拡大図である。
【図8】本発明に係る成形樹脂型(第4実施の形態)の要部拡大図である。
【図9】本発明に係る成形樹脂型において鋼球の直径Dと熱伝導率との関係を示すグラフ
【図10】本発明に係る成形樹脂型において鋼球の直径Dと真空引き通気率との関係を示すグラフ
【図11】従来の成形樹脂型の要部拡大図
【符号の説明】
1,40,50,60…成形樹脂型、2,41,51,61…型表層、5…第1層、7,14…熱硬化製樹脂(エポキシ樹脂)、10,52,62…第2層、12…金属粒(鋼球)、42…中間層、46…不織布、D…鋼球の直径。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a molded resin mold used, for example, when manufacturing a panel or sheet for a vehicle.
[0002]
[Prior art]
For example, Japanese Patent Publication No. 7-106576 “Surface plating resin mold and manufacturing method” has been proposed as a mold for vacuum forming or press forming a panel or sheet of a vehicle or the like.
In the surface plating resin mold of this publication, a polymer type conductive intermediate layer is formed on a thermosetting resin mold (backup type), and the surface of the polymer type conductive intermediate layer is subjected to, for example, nickel plating to form a metal plating layer. The panel or sheet is vacuum formed or press formed with a metal plating layer.
[0003]
However, the metal plating layer of the publication needs to be plated so as to have a specified thickness (for example, 50 to 300 μm) in consideration of durability. For this reason, the plating process takes time, and there is a problem in improving productivity.
[0004]
On the other hand, some molded resin molds are not plated. That is, instead of performing metal plating, for example, a thermosetting resin is applied to a backup mold, and a molding surface facing the cavity is formed by the applied thermosetting resin. According to this molded resin mold, since it is not necessary to perform metal plating, the molded resin mold can be obtained in a relatively short time. This molded resin mold will be described with reference to the next figure.
[0005]
FIG. 11 is an enlarged view of a main part of a conventional molded resin mold, in which the
In addition, by forming the
[0006]
Next, the process of press-molding the
First, the molded resin mold is cooled to 50 ° C. and the
At this time, the temperature of the
Next, after opening the molding resin mold and cooling the temperature of the molding resin mold to 50 ° C., the above steps are sequentially repeated.
For this reason, in order to increase the productivity of press molding, it is important to cool the molding resin mold that has been raised to 120 ° C. to 50 ° C. in a short time, thereby shortening the standby time during cooling.
[0007]
[Problems to be solved by the invention]
However, the
[0008]
Therefore, it takes a relatively long time to cool the molded resin mold that has risen to 120 ° C. during press molding to 50 ° C. As a result, the waiting time of the molded resin mold becomes long, and it is difficult to increase productivity.
Further, since the small-
[0009]
Accordingly, an object of the present invention is to provide a technique capable of increasing the thermal conductivity of the molded resin mold and further increasing the strength of the molded resin mold.
[0010]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, claim 1 of the present invention is configured such that the first layer of the mold surface layer is made of a thermosetting resin, and the second layer that backs up the first layer is made of metal particles with a thermosetting resin. In the molded resin mold constituted by what is joined, by applying a predetermined load to the second layer before the metal particles and the metal spheres of substantially the same diameter , and before the thermosetting resin is thermally cured, By removing the thermosetting resin from between the metal spheres , adjacent metal particles are brought into direct contact with each other to increase the thermal conductivity of the second layer.
[0011]
Prior to thermosetting the thermosetting resin, by applying a predetermined load to the second layer, the thermosetting resin was removed from between the metal balls, thereby bringing adjacent metal particles into direct contact with each other.
By bringing the adjacent metal particles into direct contact with each other and increasing the thermal conductivity of the second layer, the heat transferred from the sheet can be efficiently released. For this reason, since the molded resin mold can be cooled in a relatively short time, the standby time of the molded resin mold can be shortened.
In addition, since the metal particles can be restrained by bringing adjacent metal particles into contact with each other, the strength of the molded resin mold can be increased.
[0012]
According to a second aspect of the present invention, the diameter of the metal sphere is set in a range of 0.3 to 3 mm.
If the diameter of the metal sphere is less than 0.3 mm, the space between the metal spheres becomes too small and the space cannot be used as a vacuuming hole. Therefore, by setting the diameter of the metal spheres to 0.3 mm or more, the space between the metal spheres was made a space that can be evacuated.
On the other hand, if the diameter of the metal spheres exceeds 3 mm, the space between the metal spheres becomes too large and the thermal conductivity may be lowered. Therefore, by setting the diameter of the metal spheres to 3 mm or less, the space between the metal spheres was made relatively small to increase the thermal conductivity.
According to a third aspect of the present invention, an intermediate layer in which a stainless nonwoven fabric is contained in a thermosetting resin is laminated between the first layer and the second layer, and the thermal expansion coefficient of the intermediate layer is the first layer. The nonwoven fabric content is set so as to be higher than the thermal expansion coefficient of the layer and lower than the thermal expansion coefficient of the second layer.
Thus, the thermal expansion difference can be reduced by stacking the intermediate layer between the first layer and the second layer. As a result, for example, stress due to the difference in thermal expansion occurring in the first layer can be suppressed, so that there is no fear that cracks due to the difference in thermal expansion occur in the first layer.
Furthermore, since the mold surface layer has a three-layer structure of the first layer, the intermediate layer, and the second layer, the strength of the mold surface layer can be increased.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the accompanying drawings.
FIG. 1 is a sectional view of a molded resin mold (first embodiment) according to the present invention.
The molded
The
[0014]
FIG. 2 is an enlarged view of part A in FIG.
The
The
[0015]
By setting the content of
Moreover, by setting the content of
Furthermore, by setting the content of
[0016]
The
By forming the
[0017]
The
Since the
Furthermore, since the
[0018]
Further, when the diameter D of the
Furthermore, when the diameter D of the
[0019]
The manufacturing process of the molding resin mold described above will be described.
3A to 3D are explanatory views of the manufacturing process of the molded resin mold according to the present invention (first embodiment).
In (a), an epoxy resin containing silicon carbide is applied to the
In (b), an epoxy resin containing a steel ball or the like is applied to the
[0020]
In (c), the
In (d), the
[0021]
Next, the operation of the molded
4 (a) and 4 (b) are enlarged views of the second layer for explaining the heat conduction of the molded resin mold (first embodiment) according to the present invention, and (a) is explained in the section of the prior art. A conventional molding resin mold is shown as a “comparative example”, and (b) shows the
[0022]
In (a), the aluminum particles (106a to 106g) of the
[0023]
Accordingly, the heat of the small-
For this reason, since the heat transmitted from the sheet cannot be efficiently released, it is necessary to cool the molded resin mold over a relatively long time. As a result, the waiting time of the molded resin mold becomes long and it is difficult to improve productivity.
Further, since the small-
[0024]
In (b), the steel balls (12a-12g) of the
Therefore, for example, the heat of the
For this reason, the heat transmitted from the sheet can be efficiently released, and the molded resin mold can be cooled in a relatively short time. As a result, the waiting time of the molded resin mold can be shortened to increase productivity.
Moreover, adjacent steel balls can be mutually restrained by making the steel ball (12a-12g) of the
[0025]
Next, second to fourth embodiments will be described. In addition, about the same member as 1st Embodiment, the same code | symbol is attached | subjected and description is abbreviate | omitted.
FIG. 5 is a sectional view of a molded resin mold (second embodiment) according to the present invention.
The molded
[0026]
FIG. 6 is an enlarged view of part B of FIG.
The
[0027]
Here, since the
Therefore, the thermal expansion difference can be reduced by laminating the
[0028]
In addition, since the
[0029]
FIG. 7 is an enlarged view of a main part of a molded resin mold (third embodiment) according to the present invention.
The
That is, a thin film of the
[0030]
Since the
Therefore, for example, the
[0031]
In addition, according to the molded
[0032]
FIG. 8 is an enlarged view of a main part of a molded resin mold (fourth embodiment) according to the present invention.
The
Therefore, similarly to the third embodiment, the thermal conductivity of the
[0033]
Next, taking the
FIG. 9 is a graph showing the relationship between the diameter D of the steel ball and the thermal conductivity of the molded resin mold according to the present invention, the horizontal axis shows the diameter D (mm) of the steel ball, and the vertical axis shows the thermal conductivity ( kcal / mh ° C.).
Here, during press molding, in order to shorten the cooling time of the molding resin mold to a desired time, it is necessary to set the thermal conductivity to 1 kcal / mh ° C. (hereinafter referred to as “specified value”) or more.
[0034]
The thermal conductivity becomes a specified value (1 kcal / mh ° C.) when the diameter D of the steel ball is 3 mm, and becomes larger than the specified value when the diameter D of the steel ball is less than 3 mm.
On the other hand, when the diameter D of the steel ball exceeds 3 mm, the thermal conductivity becomes smaller than the specified value.
Accordingly, by setting the diameter D of the steel ball to 3 mm or less, the thermal conductivity can be made larger than the specified value.
[0035]
FIG. 10 is a graph showing the relationship between the diameter D of the steel ball and the vacuum suction rate in the molded resin mold according to the present invention, the horizontal axis indicates the diameter D (mm) of the steel ball, and the vertical axis indicates the vacuum suction rate. The rate (%) is shown.
Here, in order to sufficiently vacuum-suck the panel or sheet compact during press molding, it is necessary to set the vacuum suction air permeability to 50 to 100%.
[0036]
The vacuuming air permeability is less than 50% when the diameter D of the steel ball is less than 0.3 mm, and 50% when the diameter D of the steel ball is 0.3 mm.
Further, the vacuum suction air permeability becomes larger than 50% when the diameter D of the steel ball exceeds 0.3 mm, and maintains 100% when the diameter D of the steel ball becomes 3.0 mm or more.
Therefore, by setting the diameter D of the steel ball to 0.3 mm or more, the vacuum suction air permeability can be set to 50 to 100%.
[0037]
As described above, from the graphs of FIGS. 9 and 10, by setting the diameter D of the steel ball to 0.3 to 3 mm, sufficient thermal conductivity can be ensured and sufficient evacuation can be performed. It can be seen that the rate can be secured.
[0038]
In the above embodiment, the example in which the thickness t1 of the first layer is set to 1 to 5 mm, the thickness t2 of the
Moreover, although the example which used the
[0039]
Furthermore, although the particle size of the
In addition, although the
[0040]
In the above-described embodiment, the example in which the sheet is vacuum-formed or press-molded with the molded
[0041]
【The invention's effect】
The present invention exhibits the following effects by the above configuration.
In
For this reason, since the heat transmitted from the sheet can be efficiently released, the molded resin mold can be cooled in a relatively short time. As a result, the waiting time of the molded resin mold can be shortened to increase productivity.
Moreover, a metal grain can be mutually restrained by making adjacent steel balls contact each other. As a result, the strength of the molded resin mold can be increased.
[0042]
In the second aspect, the diameter of the metal sphere is set in a range of 0.3 to 3 mm.
By setting the diameter of the metal spheres to 0.3 mm or more, the space between the metal spheres can be made relatively large, so that the space between the metal spheres can be used as a space that can be evacuated.
Moreover, since the space between metal spheres can be prevented from becoming too large by setting the diameter of the metal spheres to 3 mm or less, the thermal conductivity of the molded resin mold can be increased.
According to a third aspect of the present invention, an intermediate layer containing a thermosetting resin containing a stainless nonwoven fabric is laminated between the first layer and the second layer. And the content of the nonwoven fabric was set so that the thermal expansion coefficient of the intermediate layer was higher than that of the first layer and lower than that of the second layer.
Thus, the thermal expansion difference can be reduced by laminating the intermediate layer between the first layer and the second layer. As a result, for example, stress due to the difference in thermal expansion occurring in the first layer can be suppressed, so that there is no concern that cracks due to the difference in thermal expansion occur in the first layer.
Furthermore, since the mold surface layer has a three-layer structure of the first layer, the intermediate layer, and the second layer, the strength of the mold surface layer can be increased.
[Brief description of the drawings]
1 is a cross-sectional view of a molded resin mold according to the present invention (first embodiment). FIG. 2 is an enlarged view of a portion A in FIG. 1. FIG. 3 is a molded resin mold according to the present invention (first embodiment). FIG. 4 is an enlarged view of the second layer illustrating the heat conduction of the molded resin mold according to the present invention (first embodiment). FIG. 5 is a molded resin mold according to the present invention (second embodiment). FIG. 6 is an enlarged view of a portion B in FIG. 5. FIG. 7 is an enlarged view of a main part of a molded resin mold (third embodiment) according to the present invention.
FIG. 8 is an enlarged view of a main part of a molded resin mold (fourth embodiment) according to the present invention.
FIG. 9 is a graph showing the relationship between the diameter D of the steel ball and the thermal conductivity in the molded resin mold according to the present invention. FIG. 10 shows the relationship between the diameter D of the steel ball and the vacuum suction air permeability in the molded resin mold according to the present invention. [Fig. 11] Enlarged view of the main part of a conventional molded resin mold [Explanation of symbols]
1, 40, 50, 60 ... Molded resin mold, 2, 41, 51, 61 ... Mold surface layer, 5 ... First layer, 7, 14 ... Thermosetting resin (epoxy resin), 10, 52, 62 ... Second Layer, 12 ... metal grains (steel balls) , 42 ... intermediate layer, 46 ... nonwoven fabric , D ... diameter of steel balls.
Claims (3)
前記金属粒を略同径の金属球とし、かつ、前記熱硬化性樹脂が熱硬化する前に、前記第2層に所定荷重をかけることにより、前記金属球間から前記熱硬化性樹脂を除去することで、隣り合う金属粒同士を互いに直接接触させ、前記第2層の熱伝導率を高めたことを特徴とする成形樹脂型。In the molding resin mold which comprises the first layer of the mold surface layer with a thermosetting resin, and the second layer which backs up the first layer comprises metal particles joined with a thermosetting resin.
The metal particles are made into metal spheres having substantially the same diameter , and the thermosetting resin is applied between the metal spheres by applying a predetermined load to the second layer before the thermosetting resin is thermoset. A molded resin mold characterized in that, by removing , adjacent metal particles are brought into direct contact with each other to increase the thermal conductivity of the second layer.
前記中間層の熱膨張率が、前記第1層の熱膨張率より高く、前記第2層の熱膨張率より低くなるように、前記不織布の含有量を設定したことを特徴とする請求項1または請求項2記載の成形樹脂型。The content of the nonwoven fabric is set so that the thermal expansion coefficient of the intermediate layer is higher than the thermal expansion coefficient of the first layer and lower than the thermal expansion coefficient of the second layer. Or the molding resin mold of Claim 2.
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP31529799A JP4097863B2 (en) | 1999-04-05 | 1999-11-05 | Molded resin mold |
| GB9929550A GB2346107B (en) | 1998-12-14 | 1999-12-14 | Resin mold |
| US09/461,104 US6499715B1 (en) | 1998-12-14 | 1999-12-14 | Resin mold |
| TW088121919A TW452535B (en) | 1998-12-14 | 1999-12-18 | Resin mold |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP11-98174 | 1999-04-05 | ||
| JP9817499 | 1999-04-05 | ||
| JP31529799A JP4097863B2 (en) | 1999-04-05 | 1999-11-05 | Molded resin mold |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000351124A JP2000351124A (en) | 2000-12-19 |
| JP4097863B2 true JP4097863B2 (en) | 2008-06-11 |
Family
ID=26439372
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP31529799A Expired - Lifetime JP4097863B2 (en) | 1998-12-14 | 1999-11-05 | Molded resin mold |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4097863B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4635799B2 (en) * | 2005-09-22 | 2011-02-23 | トヨタ紡織株式会社 | Skin material mold |
| JP4619301B2 (en) * | 2006-02-20 | 2011-01-26 | トヨタ紡織株式会社 | Skin material mold and manufacturing method thereof |
| JP2012196876A (en) * | 2011-03-22 | 2012-10-18 | Sekisui Plastics Co Ltd | Mold for continuous heat molding of resin sheet and its recipe, and resin molding and its production process |
-
1999
- 1999-11-05 JP JP31529799A patent/JP4097863B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000351124A (en) | 2000-12-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| TW201830513A (en) | Member for semiconductor manufacturing apparatus and method for producing the same | |
| US6499715B1 (en) | Resin mold | |
| CN106499741A (en) | Foamed ceramics strengthens light metal composite friction clutch disc, brake disc | |
| JP7116690B2 (en) | Heat dissipation member and manufacturing method thereof | |
| CN113787734A (en) | Carbon fiber reinforced aluminum alloy laminate member forming process and forming die | |
| CN101549566B (en) | Friction lining | |
| JP4097863B2 (en) | Molded resin mold | |
| CN106499754A (en) | Periodic truss structure ceramics framework strengthens light metal composite brake disk | |
| CN104228310A (en) | Method for preparing Ti2AlNb alloy light three-layer hollow structure | |
| CN110103489B (en) | Fusion bonding forming method for high-performance thermoplastic composite material I-beam | |
| JP3701499B2 (en) | Resin mold | |
| JP4371289B2 (en) | Manufacturing method of vacuum mold | |
| CN107042313A (en) | A polymer/foam aluminum sandwich panel with gradient interface and its preparation method | |
| JP3989109B2 (en) | Vacuum-drawing resin mold | |
| CN110948905A (en) | Net size forming method of honeycomb sandwich structure grid | |
| CN115638199B (en) | Composite material brake pad for railway vehicle and forming method thereof | |
| CN212643386U (en) | Steel backing structure for preventing brake pad from falling off and steel backing manufacturing die | |
| JP4081962B2 (en) | Insulating mold manufacturing method and apparatus and insulating mold | |
| CN118976883B (en) | Preparation method of automobile brake disc | |
| JP6591114B1 (en) | Heat dissipation member and manufacturing method thereof | |
| CN223545844U (en) | Porous truss type car seat die | |
| CN114055807A (en) | Method for forming part made of composite material, formed part and aircraft | |
| JPH1167990A (en) | Heat sink manufacturing method | |
| CN217124074U (en) | Hot-pressing forming die | |
| CN223097992U (en) | Automobile brake disc preparation device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051205 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070921 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071002 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071129 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080311 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080312 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110321 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110321 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120321 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130321 Year of fee payment: 5 |