Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4099708B2 - Communication path failure detection apparatus and method - Google Patents
[go: Go Back, main page]

JP4099708B2 - Communication path failure detection apparatus and method - Google Patents

Communication path failure detection apparatus and method Download PDF

Info

Publication number
JP4099708B2
JP4099708B2 JP2002296401A JP2002296401A JP4099708B2 JP 4099708 B2 JP4099708 B2 JP 4099708B2 JP 2002296401 A JP2002296401 A JP 2002296401A JP 2002296401 A JP2002296401 A JP 2002296401A JP 4099708 B2 JP4099708 B2 JP 4099708B2
Authority
JP
Japan
Prior art keywords
monitoring
path
signal
communication
communication path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002296401A
Other languages
Japanese (ja)
Other versions
JP2004134966A (en
Inventor
恵子 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2002296401A priority Critical patent/JP4099708B2/en
Publication of JP2004134966A publication Critical patent/JP2004134966A/en
Application granted granted Critical
Publication of JP4099708B2 publication Critical patent/JP4099708B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、通信経路の障害検出装置および方法、通信経路の選択装置に関する。
【0002】
【従来の技術】
パケット交換ノード間のパケット送受信においてIP(Internet Protocol)ルーティングを用いるIPパケット網では、さまざまな負荷条件を想定し、複数のルートを設ける(冗長構成)ことが一般的である。このような構成では、隣接ノードの障害により別のルートに即座に切り替えるための自動検出を目的とした通信経路常時監視機能が必要である。
【0003】
この常時監視機能は、即時性を求めると監視のためのパケットがプロセッサやネットワークへ高負荷を与えかねない。
そのため、負荷を抑えたパケット通信サービスを提供する必要が生じている。
【0004】
特開2001−111550号公報には、ネットワークを介して複数の通信装置と該ネットワークを管理する管理装置とからなるネットワーク管理システムにおいて、前記管理装置は、前記通信装置からの状態情報の報告に基づいて該通信装置からの報告間隔を抑制するように制御することを特徴とするネットワーク管理システムが開示されている。
【0005】
特開平3−23750号公報には、次の障害検出方式が開示されている。その障害検出方式は、障害情報を含む情報を受け、該受けた情報の中から障害情報を検出・認識する障害検出方式において、該方式は、前記情報を受け、該情報の中から障害情報を検出する障害検出手段と、該障害検出手段を監視することにより、該障害検出手段で検出された障害を認識する制御手段とを有し、前記制御手段は、該障害検出方式が適用された装置が行う制御処理過程に対応して、前記障害検出手段を監視する監視周期を複数有することを特徴とするものである。
【0006】
特開平7−183891号公報には、次の計算機システムが開示されている。その計算機システムは、(a)所定の処理を実行するとともに、その処理の実行中に障害の発生の有無を検出し検出信号として送信する被検ソフトウェア、(b)上記被検ソフトウェアからの検出信号を受信して、被検ソフトウェアの障害を検出する障害検出ソフトウェアを有する計算機システムにおいて、上記被検ソフトウェア及び障害検出ソフトウェアは、それぞれシステムの負荷を検出する負荷検出部を備え、負荷検出部により検出したシステムの負荷に応じて検出信号の送受信間隔を調整することを特徴とする。
【0007】
特開平8−307418号公報には、次の分散処理システムの監視方法が開示されている。その分散処理システムの監視方法は、ネットワークを介して結合された複数の装置から構成される分散処理システム内の一の監視装置から複数の被監視装置に対する状態監視行動を全ての被監視装置に対する監視行動の実行間隔時間により制御する分散処理システムの監視方法において、通常の監視実行間隔以外にその長さが異なる異常時の監視実行間隔を有し、全ての被監視装置に対する監視行動をこれら2種類の監視実行間隔で実行する群に分類し、ある被監視装置に対する監視行動を、前回実行された監視行動の結果が正常である場合には前記通常の監視実行間隔で監視する群に変化させ、前回実行された監視行動の結果が異常である場合には前記異常時の監視実行間隔で監視する群に変化させることを特徴とする。
【0008】
【特許文献1】
特開平7−183891号公報(図1)
【特許文献2】
特開2001−111550号公報(図1)
【特許文献3】
特開平3−23750号公報(図1)
【特許文献4】
特開平8−307418号公報(図1)
【0009】
【発明が解決しようとする課題】
本発明の目的は、通信経路の障害を検出するに際して、プロセッサ又はネットワークに高負荷を与えることを防止でき、負荷を抑えたパケット通信サービスを提供できる通信経路の障害検出装置及び方法を提供することである。
本発明の他の目的は、最適な通信経路の選択に際して、プロセッサ又はネットワークに高負荷を与えることを防止でき、負荷を抑えたパケット通信サービスを提供できる通信経路の選択装置を提供することである。
【0010】
【課題を解決するための手段】
以下に、[発明の実施の形態]で使用する番号・符号を用いて、[課題を解決するための手段]を説明する。これらの番号・符号は、[特許請求の範囲]の記載と[発明の実施の形態]の記載との対応関係を明らかにするために付加されたものであるが、[特許請求の範囲]に記載されている発明の技術的範囲の解釈に用いてはならない。
【0011】
本発明の通信経路の障害検出装置は、通信データを送受信する第1及び第2のノード(30、40)間の複数の通信経路(10、20)のうちの監視対象経路(10、20)の障害を検出する通信経路の障害検出装置(30)であって、前記監視対象経路(10、20)に監視信号(12)を送信し、前記監視対象経路(10、20)を介して受信した前記監視信号(12)に対する応答信号(13)に基づいて、前記監視対象経路(10、20)の障害を検出する障害検出部(2)と、前記監視対象経路(10、20)の負荷に応じて、前記監視信号(12)の送信周期を決定する送信周期決定部(2)とを備えている。
【0012】
本発明の障害検出装置(30)において、更に、前記監視対象経路(10、20)の負荷に応じて、前記応答信号(13)の受信を待つ待ち時間を決定する時間決定部(2)を備えている。
【0013】
本発明の通信経路の障害検出装置(30)において、前記通信経路の障害検出装置(30)は、前記第1のノード(30)に設けられ、前記送信周期決定部(2)または前記時間決定部(2)は、それぞれ、前記第1のノード(30)の負荷に応じて、前記送信周期または前記待ち時間を決定する。
【0014】
本発明の通信経路の障害検出装置(30)において、更に、外部の端末(B)から前記送信周期を示す指示信号(11)を入力する入力部(1)を備え、前記送信周期決定部(2)は、前記監視対象経路(10、20)の負荷に応じて、前記指示信号(11)にて示される前記送信周期を再設定する。
【0015】
本発明の通信経路の障害検出装置(30)において、更に、外部の端末(B)から前記待ち時間を示す指示信号(11)を入力する入力部(1)を備え、前記時間決定部(2)は、前記監視対象経路(10、20)の負荷に応じて、前記指示信号(11)にて示される前記待ち時間を再設定する。
【0016】
本発明の通信経路の障害検出装置(30)において、前記通信経路の障害検出装置(30)は、前記第1のノード(30)に設けられ、前記送信周期決定部(2)または前記時間決定部(2)は、それぞれ、前記第1のノード(30)の負荷に応じて、前記指示信号(11)にて示される前記送信周期または前記待ち時間を再設定する。
【0017】
本発明の通信経路の障害検出装置(30)において、前記通信データは、パケットデータであり、前記通信経路(10、20)は、IP(Internet Protocal)ルーティングを用いるIPパケット網の一部である。
【0018】
本発明の通信経路の選択装置は、通信データを送受信する第1及び第2のノード(30、40)間の第1及び第2の通信経路(10、20)の中から最適な通信経路(10、20)を選択する通信経路の選択装置(30)であって、前記第1及び第2の通信経路(10、20)のそれぞれに監視信号(12)を送信し、前記第1及び第2の通信経路(10、20)のそれぞれを介して前記監視信号(12)に対する応答信号(13)を受信するまでの時間を検出する時間検出部(2)と、前記第1及び第2の通信経路(10、20)のそれぞれについての前記時間に基づいて、前記最適な通信経路(10、20)を選択する経路選択部とを備えている。
【0019】
本発明の通信経路の選択装置(30)において、前記経路選択部は、更に、前記第1及び第2の通信経路(10、20)のそれぞれの負荷状況に基づいて、前記最適な通信経路(10、20)を選択する。
【0020】
本発明の通信経路の選択装置(30)において、前記通信データは、パケットデータであり、前記通信経路(10、20)は、IP(Internet Protocal)ルーティングを用いるIPパケット網の一部である。
【0021】
本発明の通信経路の障害検出方法は、通信データを送受信する第1及び第2のノード(30、40)間の複数の通信経路(10、20)のうちの監視対象経路(10、20)の障害を検出する通信経路の障害検出方法であって、(a) 前記監視対象経路(10、20)に監視信号(12)を送信するときの送信周期を指示する指示信号(11)を入力するステップ(S1)と、(b) 前記監視対象経路(10、20)の負荷に応じて、前記指示信号(11)にて示される前記送信周期を再設定するステップと、(c) 前記監視対象経路(10、20)に前記監視信号(12)を送信するステップ(S4)と、(d) 前記(c)が実行されてから待ち時間が経過する以前に前記監視信号(12)に対する応答信号(13)を前記監視対象経路(10、20)を介して受信するか否かを判定するステップ(S5)と、(e) 前記(d)の結果、前記応答信号(13)を受信したときに、前記応答信号(13)を受信する前に前記監視対象経路(10、20)に障害が検出されていれば前記監視対象経路(10、20)の障害の復旧を検出するステップと、(f) 前記(d)の結果、前記応答信号(13)を受信したときに、不良回数を初期化するステップ(S9)と、(g) 前記(d)の結果、前記応答信号(13)を受信しないときに、前記不良回数をインクリメントするステップ(S6)と、(h) 前記不良回数が設定回数を超えているか否かを判断するステップ(S2)と、(i) 前記(h)の結果、前記不良回数が前記設定回数を超えていれば、前記監視対象経路(10、20)に前記障害があると検出するステップ(S3)と、(j) 前記再設定された送信周期が経過したときに、前記(c)を実行するステップとを備えている。
【0022】
本発明の通信経路の障害検出方法において、前記(a)にて入力される前記指示信号(11)では、前記待ち時間が指示され(S1)、前記(b)では、前記監視対象経路(10、20)の負荷に応じて、前記指示信号(11)にて示される前記待ち時間が再設定され、前記(d)では、前記待ち時間として前記再設定された待ち時間が使用される。
【0023】
本発明の通信経路の障害検出方法において、前記(b)では、前記第1のノード(30)の負荷に応じて、前記指示信号(11)にて示される前記送信周期または前記待ち時間が再設定される。
【0024】
【発明の実施の形態】
以下、添付図面を参照して、本発明の通信経路の障害検出装置の一の実施形態について説明する。
【0025】
本実施形態は、パケット交換網において、パケット交換ノードやパケット交換網に負荷を与えずに、隣接するノードへの通信経路の障害を検出するための周期監視機能を提供する。
【0026】
周期監視機能は、一般的に交換ノードやネットワークへの負荷を上げてしまうことによる処理能力の低下が危惧される。この点、本実施形態では、トラフィックデータ(ノードの負荷状況や対象経路へのパケット送出量)に応じて負荷が高い状態と判断される時は、周期処理(監視信号(パケット到達確認信号)の送信周期)の間隔、応答信号の待ち時間を延ばす監視条件の自動再設定を行い、パケット通信サービスへの影響を低減(パケット呼の呼損低減)した経路監視を実施する。
【0027】
図1(a)、(b)に示すように、交換ノードA30及び交換ノードC40のそれぞれは、IP(Internet Protocol)ルーティングを用いたIPパケット網におけるパケット交換ノードであり、パケット通信サービスを提供する。
【0028】
交換ノードA30と交換ノードC40との間には、複数の通信経路10、20が設けられている(冗長構成)。通信経路10は、ノードA30から対向ノードC40への通信において、中継ノードA1を使用する経路である。通信経路20は、ノードA30から対向ノードC40への通信において、中継ノードA2を使用する経路である。
【0029】
保守端末Bは、ノードA30に対して、保守コマンドの入力が可能である。保守端末BからノードA30に対して送られる保守コマンドには、障害監視データ11(図2のステップS1参照)が含まれる。
【0030】
ノードA30は、経路監視制御部1と、経路監視実行部2と、パケット通信サービス制御部3と、信号送受信制御部4とを備えている。経路監視制御部1は、保守端末Bと接続している。信号送受信制御部4は、通信経路10及び通信経路20と接続している。
【0031】
経路監視制御部1は、保守端末Bから障害監視データ11を入力する。経路監視制御部1は、障害監視データ11の入力内容の正当性をチェックし、正当であれば障害監視データ11に基づいて、経路監視制御部2に経路監視の実行を要求する。また、経路監視制御部1は、通信経路に障害が発生した旨又は障害が復旧した旨を受信した時に、パケット通信サービス制御部3にその旨の報告を行うとともに、保守端末Bにその旨を示す警告を出力する。
【0032】
障害監視データ11には、監視対象通信経路10または20を示すデータと、パケット到達確認信号12(図2のステップS4参照)の送信周期を示すデータと、パケット到達確認信号12に対する応答信号13(図2のステップS5参照)の受信待ち時間を示すデータと、経路障害判定回数(応答信号13の待ち時間のタイムアウト許容数)を示すデータとが含まれる。
【0033】
経路監視実行部2は、上記のように経路監視制御部1から経路監視が要求されると、通信経路監視機能を実行し、通信経路の障害または障害復旧を検出し、その検出結果を経路監視制御部1に報告する。
【0034】
また、経路監視実行部2は、経路監視制御部1から経路監視要求を受けたときに入力した障害監視データ11に示される各監視条件が妥当であるか否かを検討する。すなわち、経路監視実行部2は、トラフィックデータ(ノードA30の負荷状況や、対象経路10または20へのパケット送出量)に応じて、保守端末Bから入力された障害監視データ11の各監視条件を再設定する。具体的には、経路監視実行部2は、ノードA30または監視対象経路10もしくは20の負荷が高いと判断した場合には、パケット到達確認信号12の送信周期及び/又は応答信号13の受信待ち時間を延ばすように、監視条件を再設定する。
【0035】
信号送受信制御部4は、経路監視実行部2からパケット到達確認信号12の送信要求を受けて、パケット到達確認信号12を監視対象の通信経路10または20に送信し、その通信経路10または20からのパケット到達確認信号12に対する応答信号13を受信した時に経路監視実行部2にその受信した旨を報告する。
【0036】
パケット通信サービス制御部3は、経路監視実行部2により検出された通信経路10または20の障害発生または障害復旧を示す情報を経路監視制御部1を通して受信し、パケット通信サービスにおける経路選択処理へ反映させる。
【0037】
図1および図2を参照して、本実施形態の動作について説明する。
【0038】
ノードA30は、保守端末Bから保守コマンドを入力する。これにより、ノードA30には、保守端末Bから障害監視データ11が入力される(図2のステップS1)。
【0039】
ステップS1が行われると、経路監視制御部1は、障害監視データ11に基づいて、経路監視実行部2に対して、対向ノードCへの通信経路10、20における障害の有無及び障害復旧の有無の監視の実行を要求する。
【0040】
その実行要求に応答して、経路監視実行部2は、IP(Internet Protocol)のネットワーク通信経路到達確認用のパケット(パケット到達確認信号12)を作成し、障害監視データ11によって指定された上記監視対象通信経路(通信経路10または通信経路20)へ、信号送受信制御部4を通して送信を行う(ステップS4)。
【0041】
この場合、経路監視実行部2は、障害監視データ11により指定されたパケット到達確認信号12の送信周期および応答信号13の受信待ち時間をベースとして、運用時のトラフィックデータ(ノードA30の負荷状況や、対象経路10または20へのパケット送出量)に基づくノードA30や通信経路10または20の負荷状況に応じた柔軟な監視条件を再設定する。すなわち、経路監視実行部2は、トラフィックデータに基づいて、ノードA30または監視対象経路10もしくは20の負荷が高いと判断した場合には、パケット到達確認信号12の送信周期及び/又は応答信号13の受信待ち時間を延ばすように、監視条件を再設定する。そして、以下のステップS4、S10のパケット到達確認信号12の送信周期及びステップS5での応答信号13の受信待ち時間は、その再設定された内容で実行する。
【0042】
パケット到達確認信号12が監視対象通信経路10または20に送信されると、そのパケット到達確認信号12に対する応答信号13の受信待ち時間を計測するタイマーと、パケット到達確認信号12の送信周期を計測する周期起動タイマーがスタートされる(ステップS4)。
【0043】
経路監視実行部2は、障害監視データ11で指定された又は再設定された応答信号13の受信待ち時間内に、パケット到達確認を示す応答パケット(応答信号13)を信号送受信制御部4を通して受信できた場合(ステップS5−Y)は、監視対象の経路10または20が有効とみなす。
【0044】
この時、その監視対象の経路10または20に既に障害が発生中であった場合(ステップS7−Y)には、その経路の障害が復旧したことを検出し(ステップS8)、これまでの監視情報NG回数14を初期化する(ステップS9)。
【0045】
その後、次のパケット到達確認信号12の送信の為の周期起動タイマーのタイムアウト(ステップS10)時に、次の監視処理を実行する。
【0046】
一方、応答信号13の受信待ち時間内に応答パケット13を受信できなかった場合(ステップS5−N)は、その監視経路10または20にNG(不良)が発生とし、該当監視経路の監視情報NG回数14をインクリメントする(ステップS6)。
【0047】
この監視情報NG回数14の値が障害監視データ11で指定された上記経路障害判定回数を上回った場合(ステップS2−Y)には、その監視経路は通信不可状態(障害検出)とし(ステップS3)、経路監視実行部2は、その旨を経路監視制御部1に通知する。
【0048】
経路監視制御部1は、その監視経路に障害が検出されパケット通信サービスにおいてその監視経路が利用不可である旨を、パケット通信サービス制御部3に通知する。
【0049】
さらに、経路障害の検出(ステップS3)後も経路監視実行部2は、パケット到達確認信号12の送信周期に従い、信号送受信制御部4を通して継続してその監視対象経路へパケット到達確認信号12を送信し続け(ステップS4)、その後、該当経路の障害が復旧した際は、信号送受信制御部4を通して応答パケット13を受信する(ステップS5−Y)ことで、監視経路のパケット到達確認(障害復旧)を検出し(ステップS8)、その旨を経路監視制御部1に通知する。
【0050】
経路監視制御部1は、その監視経路の障害復旧が検出されパケット通信サービスにおいてその監視経路を使用したパケット通信が可能になった旨を、パケット通信サービス制御部3に通知する。パケット通信サービス制御部3は、その通知を受けて、その監視経路をパケット通信サービスにおける経路選択対象に再組み込みする。
【0051】
次に、本実施形態の効果について説明する。
【0052】
周期監視処理は、従来より、交換ノードやネットワークへの負荷が高いことより、処理能力の低下が危惧されていたが、本実施形態では、トラフィックデータ(ノードの負荷状況や対象経路のパケット送出量)に応じて、負荷が高い状態と判断される時は、周期処理(監視信号12の送信周期)の間隔、応答信号13の待ち時間を延ばす監視条件の自動再設定を行い、パケット通信サービスへの影響を低減した経路監視を実現できる。
本機能を用いた通信経路障害時の障害検知を行うことにより、パケット通信サービスのサービス低下の低減を図れる。
【0053】
次に、図3を参照して、本発明の通信経路の選択装置の一実施形態について説明する。
図3において、上述した実施形態と同じ構成要素については同じ符号を付してその詳細な説明を省略する。
【0054】
図3に示すように、隣接ノードCへの通信経路(通信経路10、通信経路20)が複数存在する場合、経路監視実行部2は、周期的に信号送受信制御部4を通してそれら通信経路10、通信経路20を使用し、対向ノードCへの監視信号12を送信し、各ノードからの応答信号13を受信した時に信号送受信制御部4より応答受信の報告を受ける。
【0055】
経路監視実行部2は、上記において、監視信号12の送信から応答信号13の受信までの時間を経路選択処理部5へ通知する。
【0056】
経路選択処理部5は、監視信号12の送信から応答信号13の受信までの計測時間およびパケット通信サービス制御部3からのパケット通信サービスにおける各経路10、20の使用状況に基づいて各経路10、20の情報転送能力および負荷状況を周期的に計測する。経路選択処理部5は、その計測結果を経路選択処理に反映することで、レスポンスの悪い経路へのパケット通信サービスの割り当て数の調整および迂回を行う。これにより、最適なパケット通信経路を選択する効率的なサービスが提供できる。
【0057】
なお、経路選択処理部5は、監視信号12の送信から応答信号13の受信までの計測時間に基づいて各経路10、20の情報転送能力を周期的に計測し、その計測結果を経路選択処理に反映することができる。
【0058】
【発明の効果】
本発明によれば、通信経路の障害を検出するに際して、ネットワークに高負荷を与えることを防止できる。
【図面の簡単な説明】
【図1】 図1(a)は、本発明である通信経路の障害検出装置の一の実施の形態の構成を示すブロック図であり、図1(b)は、本実施形態が適用される通信経路を示すブロック図である。
【図2】 本発明である通信経路の障害検出装置の一の実施の形態の動作を示すフローチャートである。
【図3】 本発明である通信経路の選択装置の実施の形態の構成を示すブロック図である。
【符号の説明】
1 経路監視制御部
2 経路監視実行部
3 パケット通信サービス制御部
4 信号送受信制御部
10 通信経路
11 障害監視データ
12 パケット到達確認信号
13 応答信号
14 監視情報NG回数
20 通信経路
30 交換ノードA
40 交換ノードC
B 保守端末
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a communication path failure detection apparatus and method, and a communication path selection apparatus.
[0002]
[Prior art]
In an IP packet network using IP (Internet Protocol) routing in packet transmission / reception between packet switching nodes, it is common to provide a plurality of routes (redundant configuration) assuming various load conditions. In such a configuration, a communication path constant monitoring function for the purpose of automatic detection for immediately switching to another route due to a failure of an adjacent node is necessary.
[0003]
This constant monitoring function may impose a high load on the processor and the network when monitoring is required.
Therefore, it is necessary to provide a packet communication service with a reduced load.
[0004]
Japanese Patent Laid-Open No. 2001-111550 discloses a network management system including a plurality of communication devices and a management device that manages the network via a network. The management device is based on a report of status information from the communication device. Thus, there is disclosed a network management system that performs control so as to suppress a reporting interval from the communication device.
[0005]
Japanese Patent Laid-Open No. 3-23750 discloses the following failure detection method. The failure detection method is a failure detection method that receives information including failure information and detects and recognizes failure information from the received information. The method receives the information and receives failure information from the information. A fault detection unit for detecting the fault detection unit, and a control unit for recognizing the fault detected by the fault detection unit by monitoring the fault detection unit, wherein the control unit is an apparatus to which the fault detection method is applied. Corresponding to the control processing steps performed by the above, the apparatus has a plurality of monitoring cycles for monitoring the failure detecting means.
[0006]
Japanese Patent Laid-Open No. 7-183891 discloses the following computer system. The computer system (a) performs a predetermined process, detects whether a failure has occurred during the execution of the process, and transmits it as a detection signal; (b) a detection signal from the test software; In the computer system having the fault detection software for detecting the fault of the test software, each of the test software and the fault detection software includes a load detection unit for detecting the system load, and is detected by the load detection unit. The transmission / reception interval of the detection signal is adjusted according to the system load.
[0007]
Japanese Patent Laid-Open No. 8-307418 discloses the following distributed processing system monitoring method. The distributed processing system monitoring method monitors a state monitoring action for a plurality of monitored devices from one monitoring device in a distributed processing system including a plurality of devices coupled via a network. In the monitoring method of the distributed processing system that is controlled by the action execution interval time, in addition to the normal monitoring execution interval, the monitoring execution interval at the time of abnormality having different lengths is provided, and these two kinds of monitoring actions for all monitored devices The monitoring action for a certain monitored device is changed to the group to be monitored at the normal monitoring execution interval when the result of the monitoring action executed last time is normal, When the result of the monitoring action executed last time is abnormal, the monitoring action is changed to a group to be monitored at the monitoring execution interval at the time of the abnormality.
[0008]
[Patent Document 1]
Japanese Patent Laid-Open No. 7-183891 (FIG. 1)
[Patent Document 2]
JP 2001-111550 A (FIG. 1)
[Patent Document 3]
JP-A-3-23750 (FIG. 1)
[Patent Document 4]
JP-A-8-307418 (FIG. 1)
[0009]
[Problems to be solved by the invention]
An object of the present invention is to provide a communication path failure detection apparatus and method capable of preventing a processor or network from being subjected to a high load when detecting a communication path failure and providing a packet communication service with a reduced load. It is.
Another object of the present invention is to provide a communication path selection device capable of preventing a processor or network from being subjected to a high load when selecting an optimal communication path and providing a packet communication service with a reduced load. .
[0010]
[Means for Solving the Problems]
[Means for Solving the Problems] will be described below using the numbers and symbols used in [Embodiments of the Invention]. These numbers and symbols are added to clarify the correspondence between the description of [Claims] and the description of [Mode for carrying out the invention]. It should not be used to interpret the technical scope of the described invention.
[0011]
The communication path failure detection apparatus of the present invention is a monitoring target path (10, 20) among a plurality of communication paths (10, 20) between first and second nodes (30, 40) that transmit and receive communication data. A failure detection device (30) for a communication path for detecting a failure in a communication path, wherein a monitoring signal (12) is transmitted to the monitored path (10, 20) and received via the monitored path (10, 20) Based on the response signal (13) to the monitored signal (12), the failure detection unit (2) that detects a failure in the monitored path (10, 20) and the load on the monitored path (10, 20) And a transmission cycle determining unit (2) for determining the transmission cycle of the monitoring signal (12).
[0012]
In the failure detection device (30) of the present invention, a time determination unit (2) that further determines a waiting time for waiting for reception of the response signal (13) according to a load on the monitoring target route (10, 20). I have.
[0013]
In the communication path failure detection apparatus (30) according to the present invention, the communication path failure detection apparatus (30) is provided in the first node (30), and the transmission cycle determination unit (2) or the time determination is performed. The unit (2) determines the transmission cycle or the waiting time according to the load on the first node (30), respectively.
[0014]
The communication path failure detection device (30) of the present invention further includes an input unit (1) for inputting an instruction signal (11) indicating the transmission cycle from an external terminal (B), and the transmission cycle determination unit ( 2) resets the transmission cycle indicated by the instruction signal (11) according to the load of the monitoring target route (10, 20).
[0015]
The communication path failure detection device (30) of the present invention further includes an input unit (1) for inputting an instruction signal (11) indicating the waiting time from an external terminal (B), and the time determination unit (2). ) Resets the waiting time indicated by the instruction signal (11) according to the load of the monitoring target route (10, 20).
[0016]
In the communication path failure detection apparatus (30) according to the present invention, the communication path failure detection apparatus (30) is provided in the first node (30), and the transmission cycle determination unit (2) or the time determination is performed. The unit (2) resets the transmission cycle or the waiting time indicated by the instruction signal (11) according to the load of the first node (30).
[0017]
In the communication path failure detection apparatus (30) according to the present invention, the communication data is packet data, and the communication paths (10, 20) are part of an IP packet network using IP (Internet Protocol) routing. .
[0018]
The communication path selection apparatus according to the present invention includes an optimum communication path (first and second communication paths (10, 20) between the first and second nodes (30, 40) that transmit and receive communication data. 10 and 20), a communication path selection device (30) for transmitting a monitoring signal (12) to each of the first and second communication paths (10, 20), and A time detection unit (2) for detecting a time until a response signal (13) to the monitoring signal (12) is received via each of the two communication paths (10, 20), and the first and second A route selection unit that selects the optimum communication route (10, 20) based on the time for each of the communication routes (10, 20).
[0019]
In the communication route selection device (30) according to the present invention, the route selection unit further includes the optimum communication route (10, 20) based on the load status of each of the first and second communication routes (10, 20). 10, 20).
[0020]
In the communication path selection device (30) of the present invention, the communication data is packet data, and the communication paths (10, 20) are a part of an IP packet network using IP (Internet Protocol) routing.
[0021]
According to the communication path failure detection method of the present invention, the monitoring target path (10, 20) among the plurality of communication paths (10, 20) between the first and second nodes (30, 40) that transmit and receive communication data. (A) An instruction signal (11) for instructing a transmission cycle when a monitoring signal (12) is transmitted to the monitoring target path (10, 20) is input. (B) resetting the transmission cycle indicated by the instruction signal (11) according to the load on the monitoring target path (10, 20), and (c) the monitoring A step (S4) of transmitting the monitoring signal (12) to the target route (10, 20); and (d) a response to the monitoring signal (12) before the waiting time elapses after the execution of (c). The signal (13) is sent to the monitored route (S5) for determining whether or not to receive via (10, 20), (e) When the response signal (13) is received as a result of (d), the response signal (13) Detecting a failure recovery of the monitored route (10, 20) if a failure is detected in the monitored route (10, 20) before receiving (f), the result of (d) A step (S9) of initializing the number of failures when the response signal (13) is received; and (g) the number of failures when the response signal (13) is not received as a result of (d). (S6), (h) a step (S2) for determining whether or not the number of failures exceeds a set number, and (i) as a result of (h), the number of failures is set to the set number. Is exceeded, the monitoring target route (10 A step (S3) of detecting that there is a failure in 20), and a step of performing (j) when the re-set transmission period has elapsed, the (c).
[0022]
In the communication path failure detection method of the present invention, the waiting time is instructed in the instruction signal (11) input in (a) (S1), and the monitored path (10) in (b). 20), the waiting time indicated by the instruction signal (11) is reset. In (d), the reset waiting time is used as the waiting time.
[0023]
In the communication path failure detection method according to the present invention, in (b), the transmission cycle or the waiting time indicated by the instruction signal (11) is retransmitted according to the load on the first node (30). Is set.
[0024]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of a communication path failure detection apparatus according to the present invention will be described with reference to the accompanying drawings.
[0025]
The present embodiment provides a periodic monitoring function for detecting a failure in a communication path to an adjacent node without applying a load to the packet switching node or the packet switching network in the packet switching network.
[0026]
The periodic monitoring function is generally concerned about a decrease in processing capacity due to an increase in load on the exchange node or network. In this regard, in this embodiment, when it is determined that the load is high according to the traffic data (the load status of the node and the amount of packets sent to the target route), the periodic processing (monitoring signal (packet arrival confirmation signal) The monitoring condition is automatically reset to extend the interval of the transmission cycle) and the response signal waiting time, and the route monitoring is performed to reduce the influence on the packet communication service (reduce the call loss of the packet call).
[0027]
As shown in FIGS. 1A and 1B, each of switching node A30 and switching node C40 is a packet switching node in an IP packet network using IP (Internet Protocol) routing, and provides a packet communication service. .
[0028]
A plurality of communication paths 10 and 20 are provided between the exchange node A30 and the exchange node C40 (redundant configuration). The communication path 10 is a path that uses the relay node A1 in communication from the node A30 to the opposite node C40. The communication path 20 is a path that uses the relay node A2 in communication from the node A30 to the opposite node C40.
[0029]
The maintenance terminal B can input a maintenance command to the node A30. The maintenance command sent from the maintenance terminal B to the node A30 includes the failure monitoring data 11 (see step S1 in FIG. 2).
[0030]
The node A 30 includes a route monitoring control unit 1, a route monitoring execution unit 2, a packet communication service control unit 3, and a signal transmission / reception control unit 4. The route monitoring control unit 1 is connected to the maintenance terminal B. The signal transmission / reception control unit 4 is connected to the communication path 10 and the communication path 20.
[0031]
The route monitoring control unit 1 inputs failure monitoring data 11 from the maintenance terminal B. The route monitoring control unit 1 checks the validity of the input contents of the failure monitoring data 11, and if it is valid, requests the route monitoring control unit 2 to execute route monitoring based on the failure monitoring data 11. When the route monitoring control unit 1 receives a notification that a failure has occurred in the communication route or that the failure has been recovered, the route monitoring control unit 1 reports the fact to the packet communication service control unit 3 and notifies the maintenance terminal B of the fact. A warning is output.
[0032]
The failure monitoring data 11 includes data indicating the monitoring target communication path 10 or 20, data indicating the transmission period of the packet arrival confirmation signal 12 (see step S4 in FIG. 2), and a response signal 13 ( The data indicating the reception waiting time in step S5 in FIG. 2 and the data indicating the number of times of path failure determination (the allowable number of timeouts of the waiting time of the response signal 13) are included.
[0033]
When the route monitoring control unit 1 requests route monitoring as described above, the route monitoring execution unit 2 executes a communication route monitoring function, detects a failure or recovery of the communication route, and monitors the detection result. Report to the control unit 1.
[0034]
Further, the route monitoring execution unit 2 examines whether or not each monitoring condition indicated in the failure monitoring data 11 input when the route monitoring request is received from the route monitoring control unit 1 is appropriate. That is, the route monitoring execution unit 2 sets each monitoring condition of the failure monitoring data 11 input from the maintenance terminal B according to the traffic data (the load state of the node A30 and the amount of packets sent to the target route 10 or 20). Reset it. Specifically, when the path monitoring execution unit 2 determines that the load on the node A 30 or the monitoring target path 10 or 20 is high, the transmission period of the packet arrival confirmation signal 12 and / or the reception waiting time of the response signal 13 The monitoring conditions are reset so that
[0035]
The signal transmission / reception control unit 4 receives a transmission request for the packet arrival confirmation signal 12 from the route monitoring execution unit 2, transmits the packet arrival confirmation signal 12 to the communication path 10 or 20 to be monitored, and from the communication path 10 or 20 When the response signal 13 to the packet arrival confirmation signal 12 is received, the route monitoring execution unit 2 is notified of the reception.
[0036]
The packet communication service control unit 3 receives information indicating the occurrence or failure of the communication path 10 or 20 detected by the path monitoring execution unit 2 through the path monitoring control unit 1 and reflects it in the route selection process in the packet communication service. Let
[0037]
The operation of this embodiment will be described with reference to FIGS.
[0038]
The node A30 inputs a maintenance command from the maintenance terminal B. Thereby, the failure monitoring data 11 is input from the maintenance terminal B to the node A30 (step S1 in FIG. 2).
[0039]
When step S <b> 1 is performed, the route monitoring control unit 1 determines whether there is a failure in the communication routes 10, 20 to the opposite node C and whether there is a failure recovery based on the failure monitoring data 11. Request execution of monitoring.
[0040]
In response to the execution request, the route monitoring execution unit 2 creates an IP (Internet Protocol) network communication route arrival confirmation packet (packet arrival confirmation signal 12), and performs the above monitoring specified by the failure monitoring data 11 Transmission to the target communication path (communication path 10 or communication path 20) is performed through the signal transmission / reception control unit 4 (step S4).
[0041]
In this case, the route monitoring execution unit 2 uses the transmission period of the packet arrival confirmation signal 12 specified by the failure monitoring data 11 and the reception waiting time of the response signal 13 as a basis for the traffic data during operation (the load status of the node A30, Flexible monitoring conditions according to the load status of the node A30 and the communication path 10 or 20 based on the packet transmission amount to the target path 10 or 20). That is, when the route monitoring execution unit 2 determines that the load on the node A 30 or the monitoring target route 10 or 20 is high based on the traffic data, the transmission cycle of the packet arrival confirmation signal 12 and / or the response signal 13 Reset the monitoring conditions to increase the reception waiting time. Then, the transmission period of the packet arrival confirmation signal 12 in the following steps S4 and S10 and the reception waiting time of the response signal 13 in step S5 are executed with the reset contents.
[0042]
When the packet arrival confirmation signal 12 is transmitted to the monitoring target communication path 10 or 20, a timer for measuring the reception waiting time of the response signal 13 for the packet arrival confirmation signal 12 and the transmission period of the packet arrival confirmation signal 12 are measured. A periodic start timer is started (step S4).
[0043]
The route monitoring execution unit 2 receives a response packet (response signal 13) indicating packet arrival confirmation through the signal transmission / reception control unit 4 within the reception waiting time of the response signal 13 designated or reset by the failure monitoring data 11. If it is possible (step S5-Y), it is considered that the route 10 or 20 to be monitored is valid.
[0044]
At this time, if a failure has already occurred in the monitoring target route 10 or 20 (step S7-Y), it is detected that the failure of the route has been recovered (step S8), and the previous monitoring is performed. Information NG count 14 is initialized (step S9).
[0045]
Thereafter, the next monitoring process is executed at the time-out (step S10) of the periodic start timer for transmitting the next packet arrival confirmation signal 12.
[0046]
On the other hand, when the response packet 13 cannot be received within the reception waiting time of the response signal 13 (step S5-N), NG (defective) occurs in the monitoring path 10 or 20, and the monitoring information NG of the corresponding monitoring path The number of times 14 is incremented (step S6).
[0047]
When the value of the monitoring information NG count 14 exceeds the route failure determination count specified in the failure monitoring data 11 (step S2-Y), the monitoring route is in a communication disabled state (failure detection) (step S3). ), The route monitoring execution unit 2 notifies the route monitoring control unit 1 to that effect.
[0048]
The route monitoring control unit 1 notifies the packet communication service control unit 3 that a failure has been detected in the monitoring route and the monitoring route cannot be used in the packet communication service.
[0049]
Further, even after the path failure is detected (step S3), the path monitoring execution unit 2 continuously transmits the packet arrival confirmation signal 12 to the monitoring target path through the signal transmission / reception control unit 4 according to the transmission cycle of the packet arrival confirmation signal 12. Continue (step S4), and thereafter, when the failure of the corresponding route is recovered, the response packet 13 is received through the signal transmission / reception control unit 4 (step S5-Y), thereby confirming the arrival of the packet on the monitoring route (failure recovery). Is detected (step S8), and the fact is notified to the route monitoring control unit 1.
[0050]
The route monitoring control unit 1 notifies the packet communication service control unit 3 that failure recovery of the monitoring route has been detected and packet communication using the monitoring route is possible in the packet communication service. Upon receiving the notification, the packet communication service control unit 3 re-embeds the monitored route into the route selection target in the packet communication service.
[0051]
Next, the effect of this embodiment will be described.
[0052]
Conventionally, in the periodic monitoring process, there has been a concern about a decrease in processing capacity due to a high load on the exchange node and the network. However, in this embodiment, traffic data (node load status and packet transmission amount of the target route) ), When it is determined that the load is high, the monitoring condition is automatically reset to extend the interval of the periodic processing (transmission cycle of the monitoring signal 12) and the waiting time of the response signal 13 to the packet communication service. It is possible to realize route monitoring with reduced influence.
By detecting a failure at the time of communication path failure using this function, it is possible to reduce the service degradation of the packet communication service.
[0053]
Next, an embodiment of a communication path selection device of the present invention will be described with reference to FIG.
In FIG. 3, the same components as those of the above-described embodiment are denoted by the same reference numerals, and detailed description thereof is omitted.
[0054]
As shown in FIG. 3, when there are a plurality of communication paths (communication path 10, communication path 20) to the adjacent node C, the path monitoring execution unit 2 periodically transmits these communication paths 10 through the signal transmission / reception control unit 4. The monitoring signal 12 is transmitted to the opposite node C using the communication path 20, and a response reception report is received from the signal transmission / reception control unit 4 when the response signal 13 from each node is received.
[0055]
In the above, the route monitoring execution unit 2 notifies the route selection processing unit 5 of the time from the transmission of the monitoring signal 12 to the reception of the response signal 13.
[0056]
The route selection processing unit 5 determines each route 10, 20 based on the measurement time from the transmission of the monitoring signal 12 to the reception of the response signal 13 and the usage status of each route 10, 20 in the packet communication service from the packet communication service control unit 3. Twenty information transfer capabilities and load conditions are measured periodically. The route selection processing unit 5 adjusts and detours the number of packet communication services assigned to the route with poor response by reflecting the measurement result in the route selection processing. Thereby, an efficient service for selecting an optimum packet communication path can be provided.
[0057]
The route selection processing unit 5 periodically measures the information transfer capability of each of the routes 10 and 20 based on the measurement time from the transmission of the monitoring signal 12 to the reception of the response signal 13, and the measurement result is route selection processing. Can be reflected.
[0058]
【The invention's effect】
ADVANTAGE OF THE INVENTION According to this invention, when detecting the failure of a communication path | route, it can prevent giving a high load to a network.
[Brief description of the drawings]
FIG. 1A is a block diagram showing a configuration of an embodiment of a communication path failure detection apparatus according to the present invention, and FIG. 1B is applied to this embodiment. It is a block diagram which shows a communication path.
FIG. 2 is a flowchart showing the operation of an embodiment of a communication path failure detection apparatus according to the present invention.
FIG. 3 is a block diagram showing a configuration of an embodiment of a communication path selection device according to the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Path | route monitoring control part 2 Path | route monitoring execution part 3 Packet communication service control part 4 Signal transmission / reception control part 10 Communication path 11 Fault monitoring data 12 Packet arrival confirmation signal 13 Response signal 14 Monitoring information NG frequency 20 Communication path 30 Exchange node A
40 Switching node C
B Maintenance terminal

Claims (12)

通信データを送受信する第1のノード装置と前記第1のノード装置に対向する第2のノード装置との間に設けられる複数の通信経路のうちの監視対象経路に監視信号を送信し、前記監視対象経路を介して前記監視信号に対する応答信号を受信する信号送受信制御部と、
前記監視対象経路の経路負荷と前記第1のノード装置のノード負荷とに応じて、前記監視信号を送信する送信周期と、前記応答信号の受信を待つ待ち時間とを設定する経路監視実行部と
を具備して前記第1のノード装置に設けられ
前記信号送受信制御部は、前記監視信号を送信してから前記待ち時間が経過するまでに前記応答信号を受信するか否かを判定する
通信経路の障害検出装置。
A monitoring signal is transmitted to a monitoring target path among a plurality of communication paths provided between a first node apparatus that transmits and receives communication data and a second node apparatus that faces the first node apparatus, and the monitoring A signal transmission / reception control unit that receives a response signal to the monitoring signal via a target path;
A path monitoring execution unit for setting a transmission cycle for transmitting the monitoring signal and a waiting time for waiting for reception of the response signal according to the path load of the monitoring target path and the node load of the first node device; Provided in the first node device ,
The signal transmission / reception control unit determines whether or not to receive the response signal before the waiting time elapses after transmitting the monitoring signal.
請求項1に記載の通信経路の障害検出装置において、
更に、
外部の端末から前記送信周期と前記待ち時間とを示す指示信号を入力する入力部を備え、
前記経路監視実行部は、前記経路負荷と前記ノード負荷とに応じて、前記指示信号にて示される前記送信周期と前記待ち時間とを再設定する
通信経路の障害検出装置。
In the communication path failure detection device according to claim 1,
Furthermore,
An input unit for inputting an instruction signal indicating the transmission cycle and the waiting time from an external terminal;
The path monitoring execution unit is a communication path failure detection apparatus that resets the transmission cycle and the waiting time indicated by the instruction signal according to the path load and the node load.
請求項1または請求項2に記載の通信経路の障害検出装置において、
前記信号送受信制御部は、
前記前記応答信号を受信したときに、前記応答信号を受信する前に前記監視対象経路に障害が検出されていれば前記監視対象経路の障害の回復を検出し、
前記監視信号を送信してから前記待ち時間が経過する前に前記応答信号を受信したとき、前記監視対象経路に対する不良回数を初期化し、
前記監視信号を送信してから前記待ち時間が経過するまでに前記応答信号を受信しなかったとき、前記不良回数をインクリメントして設定回数を超えると前記監視対象経路の障害を検出する
通信経路の障害検出装置。
In the communication path failure detection device according to claim 1 or 2,
The signal transmission / reception control unit includes:
When the response signal is received, if a failure is detected in the monitored route before receiving the response signal, the recovery of the monitored route failure is detected,
When the response signal is received before the waiting time has elapsed since the monitoring signal was transmitted, the number of failures for the monitoring target path is initialized,
When the response signal is not received before the waiting time elapses after the monitoring signal is transmitted, the failure count of the monitoring target path is detected when the number of failures is incremented and the set count is exceeded. Fault detection device.
請求項1から請求項3のいずれかに記載の通信経路の障害検出装置において、
前記複数の通信経路のそれぞれに監視信号を送信し、前記複数の通信経路のそれぞれを介して前記監視信号に対する応答信号を受信するまでの応答時間を検出する時間検出部と、
前記複数の通信経路のそれぞれについての前記応答時間に基づいて、前記複数の通信経路のうちの最適な通信経路を選択する経路選択部と
を更に備えた通信経路の障害検出装置。
In the communication path failure detection device according to any one of claims 1 to 3,
Transmitting a monitoring signal to each of the plurality of communication paths and detecting a response time until receiving a response signal to the monitoring signal via each of the plurality of communication paths;
A communication path failure detection apparatus, further comprising: a path selection unit that selects an optimal communication path among the plurality of communication paths based on the response time for each of the plurality of communication paths.
請求項4記載の通信経路の障害検出装置において、
前記経路選択部は、更に、前記複数の通信経路のそれぞれの負荷状況に基づいて、前記最適な通信経路を選択する
通信経路の障害検出装置。
The communication path failure detection device according to claim 4,
The path selection unit is a communication path failure detection apparatus that further selects the optimum communication path based on the load status of each of the plurality of communication paths.
請求項1から5のいずれか1項に記載の通信経路の障害検出装置において、
前記通信データは、パケットデータであり、
前記通信経路は、IP(Internet Protocal)ルーティングを用いるIPパケット網の一部である
通信経路の障害検出装置。
In the communication path failure detection device according to any one of claims 1 to 5,
The communication data is packet data,
The communication path is a part of an IP packet network using IP (Internet Protocol) routing.
通信データを送受信する第1のノード装置と前記第1ノード装置に対向する第2のノード装置との間に設けられる複数の通信経路のうちの監視対象経路に監視信号を送信する送信ステップと、
前記監視対象経路を介して前記監視信号に対する応答信号を受信する受信ステップと、
前記監視対象経路の経路負荷と前記第1のノード装置のノード負荷とに基づいて、前記監視信号を送信する送信周期と、前記応答信号の受信を待つ待ち時間とを設定する監視条件設定ステップと
を具備し、
前記受信ステップは、前記監視信号が送信されてから前記待ち時間が経過する以前に前記応答信号を受信するか否かを判定する判定ステップを備え
前記第1のノード装置によって前記監視対象経路の障害を検出する
通信経路の障害検出方法。
A transmission step of transmitting a monitoring signal to a monitoring target path among a plurality of communication paths provided between a first node apparatus that transmits and receives communication data and a second node apparatus that faces the first node apparatus;
A receiving step of receiving a response signal to the monitoring signal via the monitoring target path;
A monitoring condition setting step for setting a transmission cycle for transmitting the monitoring signal and a waiting time for waiting for reception of the response signal based on the path load of the monitoring target path and the node load of the first node device; Comprising
The reception step includes a determination step of determining whether to receive the response signal before the waiting time elapses after the monitoring signal is transmitted ,
A communication path failure detection method for detecting a failure in the monitoring target path by the first node device .
請求項7記載の通信経路の障害検出方法において、
外部の端末から前記送信周期と前記待ち時間とを示す指示信号を入力する入力ステップを更に具備し、
前記監視条件設定ステップは、前記経路負荷と前記ノード負荷とに応じて、前記指示信号にて示される前記送信周期と前記待ち時間とを再設定するステップを備える
通信経路の障害検出方法。
The communication path failure detection method according to claim 7,
An input step of inputting an instruction signal indicating the transmission period and the waiting time from an external terminal;
The monitoring condition setting step includes a step of resetting the transmission cycle and the waiting time indicated by the instruction signal according to the path load and the node load.
請求項7または請求項8に記載の通信経路の障害検出方法において、
前記受信ステップは、
前記前記応答信号を受信したときに、前記応答信号を受信する前に前記監視対象経路に障害が検出されていれば前記監視対象経路の障害の回復を検出する回復検出ステップと、
前記監視信号を送信してから前記待ち時間が経過する前に前記応答信号を受信したとき、前記監視対象経路に対する不良回数を初期化する初期化ステップと、
前記監視信号を送信してから前記待ち時間が経過するまでに前記応答信号を受信しなかったとき、前記不良回数をインクリメントする不良検出ステップと、
前記不良回数が設定回数を超えると前記監視対象経路の障害を検出する障害検出ステップと
を更に備える通信経路の障害検出方法。
In the communication path failure detection method according to claim 7 or 8,
The receiving step includes
A recovery detection step of detecting recovery of a failure in the monitoring target path if a failure is detected in the monitoring target path before receiving the response signal when the response signal is received;
An initialization step of initializing the number of failures for the monitoring target path when the response signal is received before the waiting time elapses after transmitting the monitoring signal;
A defect detection step of incrementing the number of defects when the response signal is not received before the waiting time elapses after transmitting the monitoring signal;
A failure detection method for a communication path, further comprising: a failure detection step for detecting a failure in the monitoring target path when the number of failures exceeds a set number.
請求項7から請求項9のいずれかに記載の通信経路の障害検出方法において、
前記複数の通信経路のそれぞれに前記監視信号を送信し、前記複数の通信経路のそれぞれを介して前記監視信号に対する前記応答信号を受信するまでの応答時間を検出する時間検出ステップと、
前記複数の通信経路のそれぞれについての前記応答時間に基づいて、前記複数の通信経路のうちの最適な通信経路を選択する経路選択ステップと
を更に具備する通信経路の障害検出方法。
The communication path failure detection method according to any one of claims 7 to 9,
A time detection step of detecting the response time until the monitoring signal is transmitted to each of the plurality of communication paths and the response signal to the monitoring signal is received via each of the plurality of communication paths;
A communication path failure detection method, further comprising: a path selection step of selecting an optimal communication path among the plurality of communication paths based on the response time for each of the plurality of communication paths.
請求項10記載の通信経路の障害検出方法において、
前記経路選択ステップは、更に前記複数の通信経路のそれぞれの負荷状態に基づいて前記最適な通信経路を選択するステップを備える
通信経路の障害検出方法。
The communication path failure detection method according to claim 10,
The route selection step further comprises a step of selecting the optimum communication route based on a load state of each of the plurality of communication routes.
前記通信経路は、IPルーティングを用いるIPパケット網の一部である
請求項7から請求項11のいずれかに記載の通信経路の障害検出方法。
12. The communication path failure detection method according to claim 7, wherein the communication path is a part of an IP packet network using IP routing.
JP2002296401A 2002-10-09 2002-10-09 Communication path failure detection apparatus and method Expired - Fee Related JP4099708B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002296401A JP4099708B2 (en) 2002-10-09 2002-10-09 Communication path failure detection apparatus and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002296401A JP4099708B2 (en) 2002-10-09 2002-10-09 Communication path failure detection apparatus and method

Publications (2)

Publication Number Publication Date
JP2004134966A JP2004134966A (en) 2004-04-30
JP4099708B2 true JP4099708B2 (en) 2008-06-11

Family

ID=32286403

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002296401A Expired - Fee Related JP4099708B2 (en) 2002-10-09 2002-10-09 Communication path failure detection apparatus and method

Country Status (1)

Country Link
JP (1) JP4099708B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1701474A1 (en) * 2005-03-09 2006-09-13 Siemens Aktiengesellschaft Monitoring system for a communication network for unambiguous detection of the destruction of a network element
US8352594B2 (en) * 2008-06-12 2013-01-08 Panasonic Corporation Network monitoring device, bus system monitoring device, method and program
US8427957B2 (en) * 2008-10-15 2013-04-23 Panasonic Corporation Communication terminal and communication method

Also Published As

Publication number Publication date
JP2004134966A (en) 2004-04-30

Similar Documents

Publication Publication Date Title
FI115271B (en) Procedure and system for implementing a rapid rescue process in a local area network
TWI384805B (en) Access point device for wireless lan and method of securing communication path
JPH07297854A (en) Fixed remote connection management method, node management method, and node in switching network
JP5170001B2 (en) Node device, processing unit, and control frame processing method
CN110138657B (en) Aggregation link switching method, device, equipment and storage medium between switches
WO2007056929A1 (en) A method and apparatus for implementing the groups protection in mpls network
JP4099708B2 (en) Communication path failure detection apparatus and method
JP5558436B2 (en) Network system and network failure avoidance method
JP4102060B2 (en) Data receiver
JP2002026947A (en) Network transmission method and system
JP2011044776A (en) Network maintenance management system, endpoint node, network maintenance control method, and program
CN116155774B (en) Link detection method, device and storage medium
JP4466245B2 (en) Redundant packet network standby system switching system and method
JP4692419B2 (en) Network device, redundant switching method used therefor, and program thereof
JP3666412B2 (en) Communications system
US8111625B2 (en) Method for detecting a message interface fault in a communication device
JP2501335B2 (en) Gateway backup method
JP2003258902A (en) Line state detection method and IP communication device in IP network
JP3875509B2 (en) Anomaly detection method and anomaly detection system
JP3111543B2 (en) MAC bridge buffer release method
JP2000244520A (en) Diagnosis method for redundant network
JP2865047B2 (en) Bus monitoring method
JP2000295142A (en) Self-diagnostic device
JP2025115103A (en) Monitoring system, monitored device, monitoring method, and monitoring program
JP4024941B2 (en) LAN device monitoring device for computers

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050913

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070625

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070627

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070827

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071003

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080221

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080305

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110328

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120328

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130328

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees