Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4114136B2 - Film manufacturing method - Google Patents
[go: Go Back, main page]

JP4114136B2 - Film manufacturing method - Google Patents

Film manufacturing method Download PDF

Info

Publication number
JP4114136B2
JP4114136B2 JP2002269782A JP2002269782A JP4114136B2 JP 4114136 B2 JP4114136 B2 JP 4114136B2 JP 2002269782 A JP2002269782 A JP 2002269782A JP 2002269782 A JP2002269782 A JP 2002269782A JP 4114136 B2 JP4114136 B2 JP 4114136B2
Authority
JP
Japan
Prior art keywords
chamber
winding
film
winding chamber
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002269782A
Other languages
Japanese (ja)
Other versions
JP2004106266A (en
Inventor
政春 寺山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Corp
Original Assignee
Fujifilm Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujifilm Corp filed Critical Fujifilm Corp
Priority to JP2002269782A priority Critical patent/JP4114136B2/en
Publication of JP2004106266A publication Critical patent/JP2004106266A/en
Application granted granted Critical
Publication of JP4114136B2 publication Critical patent/JP4114136B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Moulding By Coating Moulds (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はフィルム製造方法に係り、特にセルロースエステルフィルムの製造方法に関する。
【0002】
【従来の技術】
セルロースエステルフィルム、特にセルロースアセテートフィルムは、電子ディスプレイ用途、写真支持体用途、その他の光学用途として広く用いられている。このようなセルロースエステルフィルムは、一般的に溶液流延法で製造される。
【0003】
溶液流延法によるフィルム製造装置は主として、セルロースエステルの濃厚溶液(以下、ドープと称す)を調製するドープ調製工程と、調製したドープをバンドやドラムなどの無端支持体上に流延し、自己支持性を持ったところで支持体から剥離する流延・剥離工程と、剥離したフィルムを乾燥させる乾燥工程と、乾燥したフィルムを巻き取る巻取工程とから構成される。
【0004】
ところで、セルロースエステルフィルムは、近年の高性能化、高機能化に伴い、異物などの欠点をより少なくするため、清浄な環境で各工程を行うことが求められている。例えば、流延してから剥離するまでの工程のプロセス平均雰囲気をクラス10以上、10000以下とすることが提案されている(特許文献1参照)。
【0005】
このような背景から、従来のフィルム製造装置は、清浄なクリーンルームの内部に設置され、さらに各工程ごとに周囲が仕切られて、その仕切られた室の内部がより清浄な状態に維持されている。すなわち、クリーンルームの内部には、流延・剥離工程を行う流延・剥離室と、乾燥工程を行う乾燥室と、巻取工程を行う巻取室とが設けられ、各室にクリーンルームよりも高い清浄度のエアが供給される。各室はフィルムの製造ラインに沿って連設されており、フィルムが通過する僅かな部分のみが開口されている。また、巻取室には開閉自在な扉が設けられており、この扉を開けることによって、フィルムを巻き取った後の巻き芯を取り出して新たな巻き芯を取り付けられるようになっている。
【0006】
上記の如く構成された清浄な室の内部で各工程を行うことによって、塵埃の付着のない高品質の製品を製造することができる。
【0007】
【特許文献1】
特開2000−246747号公報(第8頁)
【0008】
【発明が解決しようとする課題】
しかしながら、従来のフィルム製造装置は、各室における清浄エアの給排気の条件を変更した際に、原因不明の欠陥がフィルム製品に発生することがあった。このため、各室の給排気条件、特に乾燥室の給排気条件を変更したい場合であっても、容易に変更することができないという欠点があった。
【0009】
そこで、本発明の発明者は、欠陥が生じる原因を調べるため、給排気条件に関する様々な試験を行った。その結果、清浄エアの給排気によって変化した巻取室の内圧が主な原因であることを突き止めることができた。具体的には、巻取室の内圧が変化して乾燥室の内圧よりも大きくなった際に、巻取室と乾燥室との間の小さな開口から巻取室のエアが乾燥室に流れ込み、乾燥室の温度が低下することが明らかになった。その結果、フィルムの乾燥状態が悪化するとともに、乾燥室の内部で結露が発生し、その結露がフィルムに付着して欠陥の主な原因となっていた。
【0010】
このような知見に基づいて判断すると、巻取室の内圧は小さくすることが好ましい。しかし、巻取室の内圧が小さいと、巻取室の扉を開閉した際に、巻取室に外部から塵埃が入り込み、塵埃がフィルムに付着するという不具合が発生する。そして、面状故障や偏光板での輝点欠陥を生じて、フィルムの品質が低下するという問題が発生する。
【0011】
本発明はこのような事情に鑑みて成されたもので、乾燥工程における結露の発生を防止することができるとともに、塵埃の付着による面状故障や偏光板での輝点欠陥を防止することができるフィルム製造方法を提供することを目的とする。
【0012】
【課題を解決するための手段】
請求項1に記載の発明は前記目的を達成するために、高分子材料の溶液を支持体上に流延し、該支持体からフィルムとして剥離させる流延・剥離工程と、剥離したフィルムを乾燥させる乾燥工程と、乾燥させたフィルムを巻き取る巻取工程とを連続して行うことにより、セルロースエステルフィルムを製造するフィルム製造方法において、前記巻取工程の周囲を前記他の工程から仕切って巻取室を形成し、該巻取室の上面と下面に循環ラインを接続し、該循環ラインに設けたファンを駆動することによって前記巻取室のエアを循環させて該巻取室の上面から吹き出すとともに、前記循環ラインに設けたフィルタによって循環エアを除塵し、前記巻取室の上部に設けた整流手段によって、前記巻取室にダウンフローを形成し、前記巻取室内の圧力を前記巻取室外の圧力に対して−5以上+15以下Paの圧力差に制御することを特徴としている。
【0013】
前述したように、本発明の発明者は、フィルムに欠陥が発生する主な原因が巻取室の内圧であるという知見を試験により得た。本発明はこのような知見に基づいて成されたものであり、巻取室の内圧と外圧との圧力差を新たに規定することによって、欠陥の発生を防止し、フィルムの品質を向上させるものである。
【0014】
請求項1に記載の発明によれば、巻取工程の室内の圧力を室外の圧力に対して−5Pa以上の圧力差に制御するので、巻取工程の室を開閉しても、室の外部から内部に入り込む塵埃量が少ない。したがって、フィルムに塵埃が付着してフィルムの品質を低下させることを防止できる。
【0015】
また、請求項1に記載の発明によれば、巻取工程の室内の圧力を室外の圧力に対して+15Pa以下の圧力差に制御するので、巻取工程の室から、隣接する室、すなわち乾燥工程の室に流れ込むエアの流量が減少する。したがって、乾燥工程の室の温度が低下することを防止でき、結露が発生することを防止できる。
【0016】
請求項1に記載の発明によれば、巻取工程の室の上部から給気を行い、下部から排気を行うので、室の内部にはダウンフローが形成される。したがって、室の内部に塵埃が浮遊することを抑制することができる。
【0017】
本発明は、高性能化、高機能化が求められるセルロースエステルフィルムの製造に適している。
【0018】
【発明の実施の形態】
以下添付図面に従って本発明に係るフィルム製造方法の好ましい実施の形態について説明する。
【0019】
図1は本発明が採用されるフィルム製造装置10の構成を模式的に示した図である。
【0020】
同図に示すようにフィルム製造装置10は主として、流延・剥離工程部12、テンター乾燥工程部14、ロール乾燥工程部16、及び巻取工程部18で構成されている。
【0021】
流延・剥離工程部12には、一対の支持ローラ20、20、流延バンド22、流延ダイ24が設けられている。流延バンド22はステンレス板などによって無端状に形成されており、一対の支持ローラ20、20に巻き掛けられている。一対の支持ローラ20は少なくとも一方が不図示の駆動装置に接続されている。この支持ローラ20を回転駆動させることによって、流延バンド22が一対の支持ローラ20、20間で周回走行する。
【0022】
流延ダイ24は流延バンド22の上方に設けられており、この流延ダイ24にセルロースエステルのドープが供給される。ドープは、例えばセルロースエステルを可塑剤、UV吸収剤、滑り剤、その他の添加剤とともに溶媒に溶かして調製され、流延ダイ24から流延バンド22上に一定厚さで流延される。流延されたドープは流延バンド22とともに搬送され、その搬送中に流延バンド22と反対側の面から有機溶媒が蒸発する。そしてドープが自己支持性を持ったところで、フィルム26として流延バンド22から剥離される。
【0023】
剥離後のフィルム26は、剥離ロール28に接触した後、テンター乾燥工程部14に導入される。このテンター乾燥工程部14において、フィルム26は幅方向の端部がクリップやピンなどで保持され、張力が付与された状態で搬送されて乾燥される。なお、剥離ロール28の他にもロールを設置して、テンター乾燥工程部14の前段のフィルム26を安定させるようにしてもよい。
【0024】
テンター乾燥工程部14で乾燥されたフィルム26は、ロール乾燥工程部16に送られる。ロール乾燥工程部16は、50〜150℃の範囲に温度制御されており、このロール乾燥工程部16に送られたフィルム26は、複数のロール30、30…に巻き掛けられて均一に乾燥される。乾燥後のフィルム26は、巻取工程部18に送られ、巻取機32に巻き取られる。
【0025】
なお、上述した実施の形態はドープの支持体として流延バンド22を使用したが、流延ドラムを使用してもよい。すなわち、表面がクロムメッキなどによって円滑になっているドラムを回転させながら、その表面にドープを流延してもよい。
【0026】
ところで、フィルム製造装置10は清浄なクリーンルーム34の内部に設置されている。クリーンルーム34の構成は、特に限定されるものではなく、例えば、天井面にFFU(ファンフィルタユニット)が設置され、床面がグレーチングになっており、不図示の床下空間に連通している。これにより、FFUから吹き出された清浄エアによってダウンフローが形成され、クリーンルーム34の内部が清浄な状態に維持される。
【0027】
このクリーンルーム34の内部において、上述した各工程部12、14、16、18はそれぞれ周囲が仕切られており、これによって室42、44、46、48が形成されている。ここで、流延・剥離工程部12が設置された室42を流延・剥離室42と称し、同様に、テンター乾燥工程部14、ロール乾燥工程部16、巻取工程部18が設置された室をそれぞれ、テンター乾燥室44、ロール乾燥室46、巻取室48と称す。
【0028】
各室42〜48はフィルム26の製造ラインに沿って連設されている。すなわち、流延・剥離室42、テンター乾燥室44、ロール乾燥室46、巻取室48の順で連設されている。また、隣接する室同士は、フィルム26の通過する部分のみが開口されて連通されている。例えば、巻取室48は、隣接するロール乾燥室46と開口を介して連通されている。この開口は、フィルム26の幅よりも若干大きい幅で、且つフィルム26の厚さ方向に数センチの大きさで形成される。
【0029】
巻取室48の上面には、循環ライン36の給気側が接続され、下面には循環ライン36の排気側が接続されている。循環ライン36には、フィルタ部材38とファン40が配設されており、このファン40を駆動することによって巻取室48のエアが循環ライン36を介して循環する。その際、循環エアはフィルタ部材38を通過することによって除塵され、巻取室48に上面から吹き出される。これにより、巻取室48の内部には清浄エアのダウンフローが形成され、塵埃が浮遊することが抑制される。巻取室48の内部の清浄度は、巻取室48の外部で且つクリーンルーム34の内部である空間(以下、巻取室48の外部と称す)よりも高い清浄度に維持される。なお、巻取室48の上部には、パンチングプレートなどの整流手段が取り付けられており、均一なダウンフローが形成されるようになっている。また、ファン40はクリーンルーム34の外部に設置されており、ファン40で発生した塵埃がクリーンルーム34の清浄度に影響しないようになっている。
【0030】
巻取室48の内圧は、ファン40の回転数を変えることによって調節される。その際、巻取室48の内圧は、巻取室48の外部の圧力に対して−5以上+15以下Paの差圧、好ましくは0〜+5Paの差圧になるように設定される。
【0031】
また、巻取室48には、不図示の開閉扉が設けられており、この開閉扉を開くことによって、フィルム26を巻き取った後の巻芯50を新たな巻芯50と交換できるようになっている。
【0032】
巻取室48以外の室42〜46も、巻取室48と同様に、清浄なエアがダウンフローされるようになっている。ただし、ロール乾燥室46は、選択した乾燥方法に応じてエアの給気位置と排気位置とが任意に設定される。また、テンター乾燥室44とロール乾燥室46には、温度調節された高温のエアが供給され、室44、46の内部が所定の温度範囲に制御される。例えば、ロール乾燥室46の内部は、50〜150℃に制御される。なお、各室42〜48の循環ライン36ごとにフィルタ部材38とファン40を設けてもよいし、共通のフィルタ部材38やファン40を利用してもよい。また、除塵手段と送風手段をクリーンルーム34の空調機と兼用してもよい。
【0033】
次に上記の如く構成されたフィルム製造装置10の作用について説明する。
【0034】
フィルム製造装置10が清浄なクリーンルーム34の内部に設置されるとともに、各工程部12〜18がより清浄な室42〜48の内部に設置されている。したがって、フィルム26は塵埃の非常に少ない環境で製造される。
【0035】
しかし、製造したフィルム26を搬送する際、巻取室48の扉を開ける必要がある。巻取室48の外部(クリーンルーム34の内部)は作業領域になっているため、巻取室48の内部よりも清浄度が若干低下している。このため、巻取室48の内圧が外圧に対して小さ過ぎると、外部から塵埃が入り込み、巻取室48の清浄度が低下して、フィルム26の品質が低下するおそれがある。そこで、フィルム26の品質が低下しないような巻取室48の内圧を試験により求めたところ、外圧に対して−5Pa(すなわち、外圧よりも5Pa低い値)以上、好ましくは0Pa(すなわち、外圧と同じ値)以上であれば、フィルム26の品質に影響がなかった。
【0036】
反対に、巻取室48の内圧が高過ぎると、巻取室48からロール乾燥室46に開口を介して流出するエアの流量が大きくなるという問題が発生する。ロール乾燥室46の内部は、50〜150℃の高温に維持されているため、巻取室48からの流出エアの流量が大きくなると、巻取室48の温度が急激に低下して結露が発生するおそれがある。結露が発生しないような巻取室48の内圧を試験により求めたところ、外圧に対して+15Pa(すなわち外圧よりも15Pa高い値)以下、好ましくは+5Pa以下の範囲であった。
【0037】
本実施の形態のフィルム製造装置10では、巻取室48の内圧を外圧に対して−5以上+15以下Paの差圧の範囲に制御しているので、巻取室48の外部から塵埃が入り込んでフィルム26の品質が低下することを防止できるとともに、巻取室48からロール乾燥室46にエアが入り込んで温度が低下することを防止できる。さらに、巻取室48の内圧を外圧に対して−5以上+15以下Paの差圧の範囲に制御することによって、巻取室48の内部に存在する蒸発溶剤が周囲に拡散されることを抑制でき、クリーンルーム34内で作業する作業者の安全性を向上させることができる。
【0038】
また、本実施の形態のフィルム製造装置10は、巻取室48の天井面から給気を行い、下面から排気を行うようにしたので、巻取室48の内部に清浄エアのダウンフローが形成される。これにより、塵埃の飛散を抑制することができる。これにより、高品質のフィルム26を製造することができる。
【0039】
ところで、ドープとして、溶媒よりも高沸点の揮発成分を含むポリマー溶液を用いた場合、巻取室48からロール乾燥室46に流れ込む流量が増えてロール乾燥室46の温度が低下した際に、フィルム26の揮発成分が固まりやすくなる。このため、例えば可塑剤等が固まりやすくなって、フィルム製品の品質が低下するという問題が発生する。しかし、本実施の形態のように、巻取室48の内圧を外圧に対して15Pa以下、好ましくは5Pa以下とすることによって、これを防止することができる。なお、セルロースアセテート系に使用可能な可塑剤としては、例えばトリフェニルホスフェート、ビフェニルジフェニルホスフェート、トリクレジルホスフェート、クレジルジフェニルホスフェート、オクチルジフェニルホスフェート、トリオクチルホスフェート、トリブチルホスフェートなどの燐酸エステル類、ジエチルフタレート、ジメトキシエチルフタレート、ジメチルフタレート、ジオクチルフタレート、ジブチルフタレート、ジ−2−エチルヘキシルフタレートなどのフタル酸エステル類、トリアセチン、トリブチリン、ブチルフタリルブチルグリコレート、エチルフタリルエチルグリコレート、メチルフタリルエチルグリコレート、などのグリコール酸エステル類を挙げることができる。これらの可塑剤は単独で用いることも、必要に応じて複数を混合して用いることも可能である。また、完成したフィルム中の可塑剤の比率は1〜20wt%が好ましく特に偏光板などの液晶表示部材用としては寸法安定性、加工適性、光学特性の面から5〜15wt%がさらに好ましく、8〜12%がもっとも好ましい。
【0040】
なお、上述した実施の形態は、各工程部12〜18の周囲を仕切って室42〜48を形成したが、室42〜48の形状や大きさは特に限定されるものではない。
【0041】
また、フィルム製造装置10の構成は上述した実施の形態に限定されるものではなく、例えば、クリーンルーム34の内部にドープの調整工程部を設けてもよい。
【0042】
【発明の効果】
以上説明したように本発明に係るフィルム製造方法によれば、巻取工程の室の内圧が外圧に対して−5以上+15以下の差圧であるので、巻取工程の外部から内部に入り込む塵埃量を減少させることができるとともに、隣接する乾燥工程の室に結露が発生することを防止できる。これにより、フィルムに塵埃が付着して品質が低下することを防止できる。
【図面の簡単な説明】
【図1】本発明に係るフィルム製造装置を示す構成図
【符号の説明】
10…フィルム製造装置、12…流延・剥離工程部、14…テンター乾燥工程部、16…ロール乾燥工程部、18…巻取工程部、20…支持ローラ、22…流延バンド、24…流延ダイ、26…フィルム、28…剥離ロール、30…ロール、32…巻取機、34…クリーンルーム、36…循環ライン、38…フィルタ部材、40…ファン、42…流延・剥離室、44…テンター乾燥室、46…ロール乾燥室、48…巻取室
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a film manufacturing method, and more particularly to a method for manufacturing a cellulose ester film.
[0002]
[Prior art]
Cellulose ester films, particularly cellulose acetate films, are widely used for electronic display applications, photographic support applications, and other optical applications. Such a cellulose ester film is generally produced by a solution casting method.
[0003]
The film production apparatus by the solution casting method mainly comprises a dope preparation step for preparing a concentrated solution of cellulose ester (hereinafter referred to as a dope), and the prepared dope is cast on an endless support such as a band or a drum. It comprises a casting / peeling process for peeling from a support, a drying process for drying the peeled film, and a winding process for winding the dried film.
[0004]
By the way, the cellulose ester film is required to perform each process in a clean environment in order to reduce defects such as foreign substances with the recent high performance and high functionality. For example, it has been proposed that the process average atmosphere of the process from casting to peeling is set to be 10 or more and 10,000 or less (see Patent Document 1).
[0005]
From such a background, the conventional film manufacturing apparatus is installed in a clean clean room, and the periphery is partitioned for each process, and the interior of the partitioned room is maintained in a cleaner state. . That is, the interior of the clean room is provided with a casting / peeling chamber for performing the casting / peeling process, a drying chamber for performing the drying process, and a winding chamber for performing the winding process, and each room is higher than the clean room. Clean air is supplied. Each chamber is connected along the film production line, and only a small portion through which the film passes is opened. The winding chamber is provided with a door that can be opened and closed. By opening the door, the winding core after winding the film can be taken out and a new winding core can be attached.
[0006]
By performing each process inside the clean chamber configured as described above, it is possible to manufacture a high-quality product free from dust adhesion.
[0007]
[Patent Document 1]
JP 2000-246747 A (page 8)
[0008]
[Problems to be solved by the invention]
However, in the conventional film manufacturing apparatus, when the conditions for supplying and exhausting clean air in each chamber are changed, a defect whose cause is unknown may occur in the film product. For this reason, even if it is desired to change the supply / exhaust conditions of each chamber, particularly the supply / exhaust conditions of the drying chamber, there is a drawback that it cannot be easily changed.
[0009]
Therefore, the inventor of the present invention conducted various tests on the supply and exhaust conditions in order to investigate the cause of the defect. As a result, it was possible to ascertain that the main cause was the internal pressure of the winding chamber that changed due to the supply and exhaust of clean air. Specifically, when the internal pressure of the winding chamber changes and becomes larger than the internal pressure of the drying chamber, the air in the winding chamber flows into the drying chamber from a small opening between the winding chamber and the drying chamber, It became clear that the temperature of the drying chamber decreased. As a result, the dry state of the film deteriorated, and dew condensation occurred inside the drying chamber, and the dew condensation adhered to the film and was the main cause of defects.
[0010]
If it judges based on such knowledge, it is preferable to make the internal pressure of a winding chamber small. However, when the internal pressure of the winding chamber is small, when the door of the winding chamber is opened and closed, dust enters the winding chamber from the outside and the dust adheres to the film. And the problem of a surface defect and the bright spot defect in a polarizing plate arises, and the quality of a film falls generate | occur | produces.
[0011]
The present invention has been made in view of such circumstances, and it is possible to prevent the occurrence of condensation in the drying process, as well as to prevent surface failure due to dust adhesion and bright spot defects on the polarizing plate. It aims at providing the film manufacturing method which can be performed.
[0012]
[Means for Solving the Problems]
In order to achieve the above object, the invention according to claim 1 is a casting / peeling process in which a solution of a polymer material is cast on a support and peeled off as a film from the support, and the peeled film is dried. In the film manufacturing method for producing a cellulose ester film by continuously performing a drying step and a winding step for winding the dried film, the periphery of the winding step is separated from the other steps and wound. A take-up chamber is formed, a circulation line is connected to the upper and lower surfaces of the take-up chamber, and a fan provided in the circulation line is driven to circulate the air in the take-up chamber from the upper surface of the take-up chamber. with blown, and dedusted circulating air by a filter provided in the circulation line, by the rectifying means provided on an upper portion of the winding-up chamber to form a downflow in said winding-up chamber, pressure in the winding chamber It is characterized by controlling the pressure difference -5 to +15 less Pa relative to the pressure of the take-up chamber.
[0013]
As described above, the inventor of the present invention has obtained the knowledge that the main cause of defects in the film is the internal pressure of the winding chamber through tests. The present invention has been made based on such knowledge, and by newly defining the pressure difference between the internal pressure and the external pressure of the winding chamber, the occurrence of defects is prevented and the quality of the film is improved. It is.
[0014]
According to the first aspect of the present invention, the pressure inside the winding process is controlled to a pressure difference of −5 Pa or more with respect to the outdoor pressure. The amount of dust entering the inside from the inside is small. Therefore, it can prevent that dust adheres to a film and the quality of a film falls.
[0015]
According to the first aspect of the present invention, the pressure in the winding process chamber is controlled to a pressure difference of +15 Pa or less with respect to the outdoor pressure. The flow rate of air flowing into the process chamber is reduced. Therefore, it can prevent that the temperature of the chamber of a drying process falls, and can prevent that dew condensation occurs.
[0016]
According to the first aspect of the present invention, since air is supplied from the upper part of the chamber in the winding process and exhausted from the lower part, a downflow is formed inside the chamber. Therefore, it is possible to prevent dust from floating inside the chamber.
[0017]
The present invention, high performance of, and suitable for the production of cellulose ester film high functionality are required.
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Preferred embodiments of a film manufacturing method according to the present invention will be described below with reference to the accompanying drawings.
[0019]
FIG. 1 is a diagram schematically showing the configuration of a film manufacturing apparatus 10 in which the present invention is employed.
[0020]
As shown in the figure, the film manufacturing apparatus 10 mainly comprises a casting / peeling process section 12, a tenter drying process section 14, a roll drying process section 16, and a winding process section 18.
[0021]
The casting / peeling process section 12 is provided with a pair of support rollers 20, 20, a casting band 22, and a casting die 24. The casting band 22 is formed endlessly with a stainless steel plate or the like, and is wound around the pair of support rollers 20 and 20. At least one of the pair of support rollers 20 is connected to a driving device (not shown). By rotating the support roller 20, the casting band 22 circulates between the pair of support rollers 20 and 20.
[0022]
The casting die 24 is provided above the casting band 22, and a cellulose ester dope is supplied to the casting die 24. The dope is prepared by, for example, dissolving cellulose ester in a solvent together with a plasticizer, a UV absorber, a slip agent, and other additives, and is cast from the casting die 24 onto the casting band 22 at a constant thickness. The cast dope is conveyed together with the casting band 22, and the organic solvent evaporates from the surface opposite to the casting band 22 during the conveyance. When the dope has a self-supporting property, it is peeled off from the casting band 22 as a film 26.
[0023]
The peeled film 26 is introduced into the tenter drying process unit 14 after contacting the peeling roll 28. In this tenter drying process section 14, the film 26 is transported and dried in a state where the end in the width direction is held by a clip, a pin, or the like and tension is applied. In addition to the peeling roll 28, a roll may be installed to stabilize the film 26 in the previous stage of the tenter drying process unit 14.
[0024]
The film 26 dried in the tenter drying process unit 14 is sent to the roll drying process unit 16. The temperature of the roll drying process unit 16 is controlled in the range of 50 to 150 ° C., and the film 26 sent to the roll drying process unit 16 is wound around a plurality of rolls 30, 30. The The dried film 26 is sent to the winding process unit 18 and wound up by the winder 32.
[0025]
In the above-described embodiment, the casting band 22 is used as a support for the dope, but a casting drum may be used. That is, the dope may be cast on the surface of the drum while rotating the drum whose surface is smoothed by chrome plating or the like.
[0026]
By the way, the film manufacturing apparatus 10 is installed in a clean clean room 34. The configuration of the clean room 34 is not particularly limited. For example, an FFU (fan filter unit) is installed on the ceiling surface, the floor surface is grating, and communicates with an underfloor space (not shown). Thereby, a downflow is formed by the clean air blown out from the FFU, and the inside of the clean room 34 is maintained in a clean state.
[0027]
Inside the clean room 34, the process units 12, 14, 16, and 18 described above are partitioned around each other, thereby forming chambers 42, 44, 46, and 48. Here, the chamber 42 in which the casting / peeling process unit 12 is installed is referred to as a casting / peeling chamber 42, and similarly, the tenter drying process unit 14, the roll drying process unit 16, and the winding process unit 18 are installed. The chambers are referred to as a tenter drying chamber 44, a roll drying chamber 46, and a winding chamber 48, respectively.
[0028]
The chambers 42 to 48 are connected along the production line of the film 26. That is, the casting / peeling chamber 42, the tenter drying chamber 44, the roll drying chamber 46, and the winding chamber 48 are arranged in this order. Adjacent chambers are communicated with each other by opening only a portion through which the film 26 passes. For example, the winding chamber 48 communicates with the adjacent roll drying chamber 46 through an opening. The opening is formed with a width slightly larger than the width of the film 26 and a size of several centimeters in the thickness direction of the film 26.
[0029]
The air supply side of the circulation line 36 is connected to the upper surface of the winding chamber 48, and the exhaust side of the circulation line 36 is connected to the lower surface. The circulation line 36 is provided with a filter member 38 and a fan 40, and the air in the winding chamber 48 circulates through the circulation line 36 by driving the fan 40. At that time, the circulating air is removed by passing through the filter member 38 and blown out from the upper surface into the winding chamber 48. Thereby, a downflow of clean air is formed inside the winding chamber 48, and dust is prevented from floating. The cleanliness inside the winding chamber 48 is maintained at a higher degree of cleanliness than the space outside the winding chamber 48 and inside the clean room 34 (hereinafter referred to as the outside of the winding chamber 48). Note that a rectifying means such as a punching plate is attached to the upper portion of the winding chamber 48 so that a uniform downflow is formed. The fan 40 is installed outside the clean room 34 so that dust generated in the fan 40 does not affect the cleanliness of the clean room 34.
[0030]
The internal pressure of the winding chamber 48 is adjusted by changing the rotational speed of the fan 40. At this time, the internal pressure of the winding chamber 48 is set to be a differential pressure of −5 to +15 Pa, preferably 0 to +5 Pa, with respect to the pressure outside the winding chamber 48.
[0031]
The winding chamber 48 is provided with a door (not shown) so that the core 50 after winding the film 26 can be replaced with a new core 50 by opening the door. It has become.
[0032]
In the chambers 42 to 46 other than the winding chamber 48, as with the winding chamber 48, clean air is downflowed. However, in the roll drying chamber 46, the air supply position and the exhaust position are arbitrarily set according to the selected drying method. The tenter drying chamber 44 and the roll drying chamber 46 are supplied with high-temperature air whose temperature has been adjusted, and the interiors of the chambers 44 and 46 are controlled within a predetermined temperature range. For example, the inside of the roll drying chamber 46 is controlled to 50 to 150 ° C. A filter member 38 and a fan 40 may be provided for each circulation line 36 of each chamber 42 to 48, or a common filter member 38 and fan 40 may be used. Further, the dust removing means and the air blowing means may be used also as the air conditioner of the clean room 34.
[0033]
Next, the operation of the film manufacturing apparatus 10 configured as described above will be described.
[0034]
While the film manufacturing apparatus 10 is installed in the clean clean room 34, each process part 12-18 is installed in the clean chambers 42-48. Accordingly, the film 26 is manufactured in an environment with very little dust.
[0035]
However, when the manufactured film 26 is conveyed, it is necessary to open the door of the winding chamber 48. Since the outside of the winding chamber 48 (the inside of the clean room 34) is a work area, the cleanliness is slightly lower than the inside of the winding chamber 48. For this reason, when the internal pressure of the winding chamber 48 is too small with respect to the external pressure, dust enters from the outside, the cleanliness of the winding chamber 48 is lowered, and the quality of the film 26 may be lowered. Therefore, when the internal pressure of the winding chamber 48 that does not deteriorate the quality of the film 26 is obtained by a test, it is -5 Pa (that is, a value lower by 5 Pa than the external pressure) or more, preferably 0 Pa (that is, the external pressure If it is equal to or greater than the same value, the quality of the film 26 was not affected.
[0036]
On the other hand, if the internal pressure of the winding chamber 48 is too high, there arises a problem that the flow rate of air flowing from the winding chamber 48 to the roll drying chamber 46 through the opening increases. Since the inside of the roll drying chamber 46 is maintained at a high temperature of 50 to 150 ° C., when the flow rate of the outflow air from the winding chamber 48 increases, the temperature of the winding chamber 48 rapidly decreases and condensation occurs. There is a risk. The internal pressure of the winding chamber 48 that does not cause dew condensation was obtained by a test, and it was +15 Pa (that is, a value higher by 15 Pa than the external pressure) or less, preferably +5 Pa or less with respect to the external pressure.
[0037]
In the film manufacturing apparatus 10 of the present embodiment, the internal pressure of the winding chamber 48 is controlled within a differential pressure range of −5 to +15 Pa with respect to the external pressure, so that dust enters from the outside of the winding chamber 48. Therefore, it is possible to prevent the quality of the film 26 from being deteriorated and to prevent the air from entering the roll drying chamber 46 from the winding chamber 48 and the temperature from being lowered. Furthermore, by controlling the internal pressure of the winding chamber 48 within a differential pressure range of −5 to +15 Pa with respect to the external pressure, it is possible to suppress the evaporation solvent existing inside the winding chamber 48 from diffusing to the surroundings. It is possible to improve the safety of workers working in the clean room 34.
[0038]
In addition, since the film manufacturing apparatus 10 of the present embodiment supplies air from the ceiling surface of the winding chamber 48 and exhausts air from the bottom surface, a clean air downflow is formed inside the winding chamber 48. Is done. Thereby, scattering of dust can be suppressed. Thereby, the high quality film 26 can be manufactured.
[0039]
By the way, when a polymer solution containing a volatile component having a boiling point higher than that of the solvent is used as the dope, when the flow rate flowing from the winding chamber 48 to the roll drying chamber 46 increases and the temperature of the roll drying chamber 46 decreases, the film 26 volatile components tend to harden. For this reason, for example, a plasticizer etc. become easy to harden, and the problem that the quality of a film product falls will generate | occur | produce. However, as in the present embodiment, this can be prevented by setting the internal pressure of the winding chamber 48 to 15 Pa or less, preferably 5 Pa or less with respect to the external pressure. Examples of plasticizers that can be used in cellulose acetate include phosphate esters such as triphenyl phosphate, biphenyl diphenyl phosphate, tricresyl phosphate, cresyl diphenyl phosphate, octyl diphenyl phosphate, trioctyl phosphate, and tributyl phosphate, diethyl Phthalates such as phthalate, dimethoxyethyl phthalate, dimethyl phthalate, dioctyl phthalate, dibutyl phthalate, di-2-ethylhexyl phthalate, triacetin, tributyrin, butyl phthalyl butyl glycolate, ethyl phthalyl ethyl glycolate, methyl phthalyl ethyl Examples include glycolate esters such as glycolate. These plasticizers can be used alone or in combination as necessary. Further, the ratio of the plasticizer in the finished film is preferably 1 to 20 wt%, and more preferably 5 to 15 wt% from the viewpoint of dimensional stability, workability, and optical characteristics, particularly for liquid crystal display members such as polarizing plates. ~ 12% is most preferred.
[0040]
In addition, although embodiment mentioned above partitioned off the circumference | surroundings of each process part 12-18, and formed the chambers 42-48, the shape and magnitude | size of the chambers 42-48 are not specifically limited.
[0041]
Moreover, the structure of the film manufacturing apparatus 10 is not limited to embodiment mentioned above, For example, you may provide the adjustment process part of dope in the inside of the clean room 34. FIG.
[0042]
【The invention's effect】
As described above, according to the film manufacturing method of the present invention, since the internal pressure of the chamber in the winding process is a differential pressure of −5 to +15 with respect to the external pressure, dust entering the inside from the outside of the winding process The amount can be reduced, and condensation can be prevented from occurring in the adjacent drying process chamber. Thereby, it can prevent that dust adheres to a film and quality falls.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a film manufacturing apparatus according to the present invention.
DESCRIPTION OF SYMBOLS 10 ... Film manufacturing apparatus, 12 ... Casting and peeling process part, 14 ... Tenter drying process part, 16 ... Roll drying process part, 18 ... Winding process part, 20 ... Support roller, 22 ... Casting band, 24 ... Flow Rolling die, 26 ... film, 28 ... peeling roll, 30 ... roll, 32 ... winder, 34 ... clean room, 36 ... circulation line, 38 ... filter member, 40 ... fan, 42 ... casting / peeling chamber, 44 ... Tenter drying room, 46 ... roll drying room, 48 ... winding room

Claims (1)

高分子材料の溶液を支持体上に流延し、該支持体からフィルムとして剥離させる流延・剥離工程と、剥離したフィルムを乾燥させる乾燥工程と、乾燥させたフィルムを巻き取る巻取工程とを連続して行うことにより、セルロースエステルフィルムを製造するフィルム製造方法において、
前記巻取工程の周囲を前記他の工程から仕切って巻取室を形成し、
該巻取室の上面と下面に循環ラインを接続し、該循環ラインに設けたファンを駆動することによって前記巻取室のエアを循環させて該巻取室の上面から吹き出すとともに、前記循環ラインに設けたフィルタによって循環エアを除塵し、
前記巻取室の上部に設けた整流手段によって、前記巻取室にダウンフローを形成し、
前記巻取室内の圧力を前記巻取室外の圧力に対して−5以上+15以下Paの圧力差に制御することを特徴とするフィルム製造方法。
A casting / peeling process in which a solution of a polymer material is cast on a support and peeled off as a film from the support; a drying process for drying the peeled film; and a winding process for winding the dried film; In the film production method for producing a cellulose ester film by continuously performing
A winding chamber is formed by partitioning the periphery of the winding process from the other processes,
A circulation line is connected to the upper and lower surfaces of the winding chamber, and a fan provided in the circulation line is driven to circulate the air in the winding chamber and blow out from the upper surface of the winding chamber. Circulating air is removed by the filter provided in the
By the rectifying means provided in the upper part of the winding chamber, a down flow is formed in the winding chamber,
The film manufacturing method characterized by controlling the pressure in the winding chamber to a pressure difference of −5 to +15 Pa with respect to the pressure outside the winding chamber.
JP2002269782A 2002-09-17 2002-09-17 Film manufacturing method Expired - Fee Related JP4114136B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002269782A JP4114136B2 (en) 2002-09-17 2002-09-17 Film manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002269782A JP4114136B2 (en) 2002-09-17 2002-09-17 Film manufacturing method

Publications (2)

Publication Number Publication Date
JP2004106266A JP2004106266A (en) 2004-04-08
JP4114136B2 true JP4114136B2 (en) 2008-07-09

Family

ID=32267612

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002269782A Expired - Fee Related JP4114136B2 (en) 2002-09-17 2002-09-17 Film manufacturing method

Country Status (1)

Country Link
JP (1) JP4114136B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10137608B2 (en) * 2016-09-20 2018-11-27 Sumitomo Chemical Company, Limited Film-stretching apparatus and method of producing film
CN112406067B (en) * 2020-11-05 2022-07-19 华瑞达包装材料股份有限公司 Dust collector of plastic extrusion casting film machine

Also Published As

Publication number Publication date
JP2004106266A (en) 2004-04-08

Similar Documents

Publication Publication Date Title
JP2005047141A (en) Solution casting method and apparatus
JP4867122B2 (en) Method for producing cellulose ester film
KR101858752B1 (en) Drying apparatus, method for drying film and solution film forming method
US20030096093A1 (en) Cellulose acylate film and polarizing plate using the same
US7141189B2 (en) Solution casting process for producing polymer film
JP3918694B2 (en) Film manufacturing method
JP4114136B2 (en) Film manufacturing method
JP2004291448A (en) Solution casting method and film
CN104890171A (en) Casting apparatus, solution film forming facility and method
CN104896102A (en) Labyrinth seal, casting apparatus, solution film forming facility and method
JP2009208296A (en) Casting device, solution film forming method and solution film forming apparatus
JP2001129839A (en) Method for producing cellulose ester film and cellulose ester film
JP2002036266A (en) Method for manufacturing film, film and film for polarizing sheet
JP2003285344A (en) Method for manufacturing film using solution and manufactured product thereof
JP3941860B2 (en) Solution casting method
JP2004184689A (en) Solution casting method, polarizing plate and liquid crystal display device
JP4017139B2 (en) Solution casting method
JP4296867B2 (en) Optical film manufacturing method and optical film
JP2002283371A (en) Method and apparatus for manufacturing cellulose ester film
JP2579250B2 (en) Method for producing cellulose triacetate film
JP2000319412A (en) Preparation of cellulose ester film, apparatus for preparing the same and cellulose ester film for liquid crystal image display device
TWI581934B (en) Solution casting method
JP2015180526A (en) Casting apparatus, solution film forming facility and method
JP2002028943A (en) Method for manufacturing cellulose ester film, method for cleaning infinitely transferring endless metal support surface, cellulose ester film, and protective film for polarizing sheet
WO2011148834A1 (en) Method for manufacturing optical film

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050301

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20061208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070606

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070727

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080321

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080403

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4114136

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120425

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130425

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140425

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees