Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4114899B2 - Injection method - Google Patents
[go: Go Back, main page]

JP4114899B2 - Injection method - Google Patents

Injection method Download PDF

Info

Publication number
JP4114899B2
JP4114899B2 JP11045099A JP11045099A JP4114899B2 JP 4114899 B2 JP4114899 B2 JP 4114899B2 JP 11045099 A JP11045099 A JP 11045099A JP 11045099 A JP11045099 A JP 11045099A JP 4114899 B2 JP4114899 B2 JP 4114899B2
Authority
JP
Japan
Prior art keywords
rod
injection
boring
packer
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP11045099A
Other languages
Japanese (ja)
Other versions
JP2000303444A (en
Inventor
崎 光 弘 柴
政 男 関
村 鉄 雄 中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemical Grouting Co Ltd
Original Assignee
Chemical Grouting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemical Grouting Co Ltd filed Critical Chemical Grouting Co Ltd
Priority to JP11045099A priority Critical patent/JP4114899B2/en
Publication of JP2000303444A publication Critical patent/JP2000303444A/en
Application granted granted Critical
Publication of JP4114899B2 publication Critical patent/JP4114899B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、先端外周に掘削ビットを装着したボーリングロッドによりボーリング孔を掘削し、ボーリング孔内に注入ロッドを挿入し、注入ロッドから改良するべき地盤中に薬液を注入して地盤改良を行う注入工法に関する。より詳細には、薬液注入時に地上側へ薬液が逆流するのを防止する膨張性パッカを使用する注入工法に関し、特に、ボーリングロッドを構成するボーリングロッドから注入ロッドを突き出してからパッカを膨張するように構成された注入工法に関する。
【0002】
【従来の技術】
図15は、地中の軟弱地盤を薬液注入により改良する従来の技術を開示している。図15において、図示しないボーリングロッドによりボーリング孔40を削孔し、ついで、ボーリング孔40内に注入ロッド53を挿入する。ここで、注入ロッド53は削孔装置と注入装置を兼ねた構造となっている。
【0003】
ボーリング孔40内に挿入された注入ロッド53が所定の深度(薬液注入領域)に到達したならば、噴射口34から、符号36で示す薬液を噴射して改良地盤39を造成する。この薬液注入に際してパッカ30を膨張させて、注入ロッド53とボーリング孔40の内壁面(地盤M)との環状の隙間をシールし、薬液36が地上側へ逆流(矢印37で示す)することを防止している。
【0004】
しかし、図15で示す様な従来の技術によれば、注入ロッド53に取り付けられたパッカ30は、注入ロッド53をボーリング孔40内へ挿入する際に、ボーリンク孔40の内壁面と擦過して、損傷する恐れがある。特に、繰り返し使用して、弾性反発力が弱まり、完全に収縮しなくなってしまったパッカであれば、ボーリング孔40の内壁面との擦過により、損傷する可能性が極めて高くなる。
【0005】
【発明が解決しようとする課題】
本発明は上述した従来技術の問題点に鑑みて提案されたもので、地盤(ボーリング孔内壁面)との擦過によるパッカの破損を防止し、注入ロッドの突出しとパッカの膨張とを連続して行うことが出来る注入工法の提供を目的としている。
【0006】
【課題を解決するための手段】
本発明の注入工法によれば、先端にビット2bを有するボーリングロッド2と、そのボーリングロッド2内に収容可能又はボーリングロッド2から突出し可能に構成された注入ロッド5と、その注入ロッド5に設けられたパッカ5pと、そのパッカ5pにパッカ膨張用の作動流体を供給するために流体弁24を有する流体供給機構とを有し、ボーリングロッド2に注入ロッド5を地上側に押圧するロッドばね8と注入ロッド5を突出させる流体室G1とを備え、注入装置を準備し、ボーリングロッド2内に注入ロッド5を収容した状態でボーリングロッド2を旋回させかつ高圧水によりボーリングロッド2の周辺の地盤Mを所定深度下でボーリング孔を掘削し、そのボーリングロッド2および注入ロッド5を前記の収容状態と同じ相対位関係のまま、所定寸法Lだけ引き上げ、そして地上の加圧源からの流体を流体室G1に供給して注入ロッド5をボーリングロッド2から前記所定寸法L突出させて地下方向に降下させ、注入ロッド5が所定寸法Lまで突出したならば、流体弁24を自動的に開弁してパッカ5pにパッカ膨張用流体を供給してパッカ5pを膨張させ、地盤Mとの隙間をシールし、薬液36を注入ロッド5の先端から地盤Mに向けて噴射させ、次いでパッカ膨張用の作動流体を減圧してパッカを収縮させ、前記所定深度までボーリングロッド2と注入ロッド5とを戻して定置させるようになっている。
【0008】
また本発明の注入工法によれば、前記注入ロッド5をパッカ5pを収縮させる際に、所定深度の位置に突出したままの位置に保持し、ボーリングロッド2を回転掘削しつつ降下させて注入ロッド5をボーリングロッド2内に収容するようになっている。
【0009】
さらに本発明の注入工法によれば、前記ボーリングロッド2と注入ロッド5とを定置させる際に注入ロッド5を引き上げてボーリングロッド2内に収容し、注入ロッド5を収容した状態でボーリングロッド2を降下させるようになっている。
【0011】
かかる構成を具備する本発明によれば、先ずは従来技術と同様に、先端外周に掘削ビットを装着したボーリング用のボーリングロッドや、注入ロッドから高圧液体を噴射して該ボーリングロッド前方の地盤を掘削して、地下に向かって地盤を掘削し、所定の深度すなわち薬液注入領域に到達したならば、注入ロッドから地盤中に薬液を注入して地盤改良を行う。そして、薬液注入時に地上方向への薬液の逆流逸出を防止するため、弾性体製のパッカを膨張させてシールする。
【0012】
ここで本発明によれば、薬液注入に際して、地上から供給される加圧流体で前記注入ロッド先端頭部に設けられたピストンを押圧して前記ボーリングロッドから前記注入ロッドを地下方向に突出させ、それからパッカを膨張している。従って、ボーリング孔掘削工程等、地盤を掘削する際にはパッカはボーリングロッドに収容されており、薬液注入に際してのみボーリングロッドから突き出される。そのため、ボーリング孔の内壁面とパッカが擦過して、パッカが破損してしまう恐れは無い。そして、パッカ膨張時には当該パッカはボーリングロッドから突出されているので、必要且つ十分なシールを行って、薬液が地上側へ逆流するのを防止する。
【0013】
本発明において、前記パッカ膨張用流体は圧縮性の面から気体が好ましく且つ装置、潤滑油等の酸化をさける面から不活性な窒素ガスが好ましい。但し、圧縮エアや液体その他の流体の使用を制限する趣旨ではない。
【0014】
また、本発明による薬液注入装置において、前記流体供給機構の一例として、前記注入ロッド先端頭部にピストンを設け、該注入ロッドのチューブ部外周にばね座用肩部を形成し、前記ボーリングロッドの内周にばね座を設け、該ばね座と前記ばね座用肩部との間に軸方向に伸縮するロッドばねを介装し、前記ピストンの内側に内弁座を形成し、該ピストンの内側に前記内弁座に当接する外弁座を有するスロットル形の流体弁を嵌装し、前記注入ロッドの所定移動寸法によって該流体弁が開弁する開弁手段を設けるのが好ましい。
【0015】
上記の様に構成すれば、加圧流体(パッカ膨張用流体)が注入ロッドを所定寸法前進させると自動的に流体弁を開いてパッカにその加圧流体を供給して膨張させるので、注入ロッド突出し、パッカ膨張を連続した作業で行える。
【0016】
本発明において、前記注入ロッドの位置を前記パッカ収縮工程で所定深さ位置に突出したままの位置に保持して、ボーリングロッドを回転掘削しつつ降下させて、注入ロッドをボーリングロッド内に収容して前記所定深さ位置に定置させれば、手順が最短となっている。
【0017】
或いは、前記装置定置工程においては、注入ロッドを引き上げてボーリングロッド内に収容し、注入ロッドを収容した状態でボーリングロッドを降下させて前記所定深度さ位置に定置させれば、改良固着された土壌を掘削する際に粉砕された土壌の逃げ場があって、工事が容易である。
【0018】
【発明の実施の形態】
以下、図面を参照して本発明の実施の形態を説明する。
【0019】
図1は、本発明の実施形態にかかる、或いは、それを実施するための装置の全体的な構成を示している。地上に通じる多重管1(例えば3重管)には、ボーリングロッド2の一端が接続されている。そのボーリングロッド2の他端にはボーリング用のビット2bが装着され、ボーリングロッド2の内部には、軸方向へ突出及び復帰可能に構成された注入ロッド5が挿入されている。後述するように、注入ロッド5は、高圧流体である高圧水によって、軸方向に移動(突出及び復帰)するように構成されている。そして注入ロッド5には、3重管1に連結され且つ高圧水を供給する圧水路26、注入薬液を供給する薬液路29、パッカ5pに加圧流体である窒素ガスを供給するガス通路G0(図2参照)が設けられている。但し、高圧エア、その他流体であっても、パッカ5p膨張用の加圧流体として利用可能である。
【0020】
図3および図4に、流体供給機構の詳細、すなわちボーリングロッド2と注入ロッド5との関係、注入ロッド5の突出伸長及び収縮、パッカ5pの膨張、収縮の機能を有する構成の詳細、を示す。図3はボーリングロッド2内に注入ロッド5が収まっている状態を示し、図4は注入ロッド5による高圧水掘削や、薬液注入のために、注入ロッド5がボーリングロッド2から地下方向(図3、図4では右方)に突出している状態を示している。
【0021】
注入ロッド5は、全体が外側をボーリングロッド2に支持され、内側を3重管1にテーパねじ16sで装着された支持管16を設けている。そして、3重管1側、即ち、地上側(図3、図4では左側)にピストン6が設けられ、ピストン6の地下側(図3、図4では右側)に形成された内ねじ6sに注入ロッド5の基本部材であるチューブ部7の一端(地上側端部)が装着されている。そのチューブ部7の他端(地下側端部)内側に、環状部材28がねじで装着され、その環状部材28の内側には、3重管1の圧水路26と連通する圧水管18が、ねじにより装着されている。従って、圧水管18はチューブ部7に固着されて一体に動くようになっている。また環状部材28には、パッカ5pに(パッカ膨張用流体である)窒素ガスを導くガス路G7が形成されている。
【0022】
ピストン6は、3重管1との間のガス室G1を形成すると共に、外周がボーリングロッド2の内周に軸方向へ摺動自在に装着されている。ピストン6の内側には、大径の大孔6bと、(後述する弁24の径寸法よりも大きいが、大孔6bの径寸法よりは小さい)中程度の径寸法を有する中孔6aと、大孔6bの端部に形成されて内弁座6cを形成するテーパ孔、とが形成されている。そして、孔6a、6bの内側には、パッカ5pに窒素ガスを供給を制御するためのガス弁24が装着されている。
【0023】
ガス弁24は、外径が大孔6bより小さく、大孔6bとガス弁24との間の隙間によりガス路G3が形成されている。そしてガス弁24の半径方向内方は、支持管16の外径に軸方向に摺動自在に、しかし軸方向には気密に、嵌装されている。また、ガス弁24の地下側には、テーパ面として構成された外弁座24aが形成されている。
【0024】
図3で示す状態においては、ガス室G1には窒素ガス圧が作用しておらず、弁ばね11の反発力によりガス弁24は地下側(図3中右方)に付勢されて、その外弁座24aが内弁座6cと密着して、ガス供給を閉鎖するよう構成されている。また、ガス弁24の3重管1側に装着された弁ばね11は、スペーサ10を介してスナップリング9によって、掘削振動やガス圧変動では開弁しない所定の予荷重で、ガス弁24を押圧している。なお、スナップリング9とスペーサ10との密着状態でも、ガス室G1とガス弁24との流通は確保されるように、スペーサ10は構成されている。
【0025】
チューブ部7の外周にばね座部7aが形成され、そのばね座部7aとボーリングロッド2の下方部に装着されたストッパ2aのばね座部2a1との間には、ロッドばね8が装着されている。このロッドばね8は、ガス室G1に圧力が作用しない無圧状態では、図3で示すように、注入ロッド5の基本部材であるチューブ部7を地上側(図3では左側)に押圧し、注入ロッド5がボーリングロッド2内に収まるように、ばね諸元を設定されている。ストッパ2aは、ロッドばね8の一端を支持すると共に、ボーリングロッド2の継ぎ手の役割と、チューブ部7を摺動可能に支持するように構成されている。
【0026】
支持管16は、前記のガス弁24を直線管部で摺動可能に支持すると共に、地下側端部に形成されたストッパ16aによって、注入ロッド5の突出しストロークを制約し、ガス弁24を開閉させるような開弁手段として構成されている。例えば、図示の実施形態では、チューブ部7の移動量すなわち注入ロッド5の突出しするストロークは、1200mmに設定されている。所定のストロークだけ移動すると、ガス弁24の先端部24bがストッパ16aの肩部16bに当接して、注入ロッド5の突出しが停止する。その段階では、スナップリング9、スペーサ10を介した弁ばね11の圧縮量が開弁量となって、ガス弁24の外弁座24aと内弁座6cとは離隔してガス路Gvを形成する。また、ストッパ16aの外径とチューブ部7の内径との隙間がガス路G5を形成し、ストッパ16aの地下側は圧水管18とチューブ部7との隙間でガス路6を形成している。
【0027】
上記の構成によって、窒素ガスの通路は、注入ロッド5が突出(或いは突出しながら掘削)する際には、に座着して、ガス路Gvをシールするので、図示しないガス供給源から供給されたパッカ膨張用窒素ガスは、ガス通路G0から容積の変化するガス室G1、ガス路G2、G3で留まり、パッカには供給されない。
【0028】
注入ロッド5の突出しが所定のストローク制限(例えば1200mm)に到った時には、ピストン6及びチューブ部7にはガス圧が作用しているので地下側 (図3、図4中右側)へ移動し続けるが、ガス弁24はストッパ16aに当接するので、それ以上地下側には移動しない。その結果、内弁座6cがガス弁24よりも地下側へ移動し、内弁座6cと外弁座24aとは密着した状態ではなくなり、ガス弁24が開弁する。そして、ガス室G1、ガス路G2、ガス路G3、G5〜G7へ通じてパッカ5pに至るガス流路が構成されるのである。
【0029】
次に、図示の実施形態の作動状態を説明する。ここで、図1はボーリングロッド2内に注入ロッドが収まって、ビット掘削、高圧水掘削を状態、または、不作動定置状態を示し、図5は注入ロッド5が突出する状態を示し、図6は図5での高圧水掘削が完了しパッカ5pを膨張させて薬液注入可能な状態にあることを示している。
【0030】
以上の構成装置を使用した工法手順を、図7〜図14を主に説明する。
1.ボーリング孔掘削工程。
地上からの回転駆動力を伝達することによって、ボーリングロッド2を旋回させ、ビット2により、そして、地上の高圧液源から供給され圧水路26から導かれた高圧水により、ボーリングロッド2周辺の地盤Mを掘削し、ボーリング孔を地下の所定深さまで掘削する(図7および図1)。この時のボーリングロッド2と、注入ロッド5との位置関係は、図3の状態にある。
【0031】
2.掘削装置引き上げ工程。
ボーリングロッド2および注入ロッド5を、前記ボーリング孔掘削工程の状態と同じ相対位置関係のまま、所定寸法Lだけ引き上げる(図8)。所定寸法Lは、パッカ膨張時の軸方向距離Lpと薬液注入ゾーンLjとによって、設定される(図10)。最初の注入ゾーンLjは第1のステージとなり、以後はこの第1のステージに接して、それより下方の注入ゾーンが第2のステージとなっていく(ステップダウン方式)。この引き上げ工程後のボーリングロッド2と、注入ロッド5との位置関係も、図1および図3の状態にある。
【0032】
3.注入ロッド5突出し工程。
地上の加圧源から供給される高圧の窒素ガスでピストン6(図3、図4)を押圧して、注入ロッド5を突出して、所定寸法L(前記ボーリング孔掘削工程の掘削深さ)まで降下させる(図9)。
【0033】
この時のボーリングロッド2と、注入ロッド5との位置関係は、ほぼ図4及び図5の状態にある。ただし、図4で示すのとは異なり、ガス弁24は未だ閉弁状態にある。
【0034】
4.パッカ5p膨張工程。
注入ロッド5を前進させ、所定の突出し量(例えば1200mm)まで突出すと、ガス弁24が開弁し(図4)、パッカ膨張用流体である高圧窒素ガスがパッカ5pへ供給され、当該パッカを膨張させて、地盤Mとチューブ部7との隙間をシールする。
【0035】
この時のボーリングロッド2と、注入ロッド5との位置関係は図4の状態にあって、ガス弁24は開弁状態となり、ガス路G0、ガス路Gv、パッカ5aに高圧窒素ガスを供給するガス流路が構成されている(図10および図6)。
【0036】
5.薬液注入工程。
薬液36を地盤Mに向けて噴射し注入する(図11)。この時のボーリングロッド2と、注入ロッド5との位置関係は図4および図6の状態にある。
【0037】
6.パッカ5p収縮工程。
薬液注入完了後にパッカ5pを収縮する。窒素ガスの供給源を大気側へ開放すれば、ガス室G1の圧力が低下し、パッカ5p内の高圧窒素ガスはガス路Gvを通って開放される。そしてパッカ5pは、自身の弾性収縮力によって収縮する (図12)。
【0038】
7.装置定置工程。
前記ボーリング孔掘削工程で掘削した深度(所定深さ)まで、ボーリングロッド2と注入ロッド5を戻し、つぎのステージで掘削、薬液注入を行う準備をする。そのために、注入ロッド5は移動させず、注入ロッド5の位置を前記パッカ5p収縮工程のままに保持し、ボーリングロッド2を回転作動して下降せしめ、注入ロッド5をボーリングロッド2内に収容せしめる(図13)。
【0039】
この場合の注入ロッド5は、ボーリングロッド2に対して相対的にボーリングロッド2内へ引き戻すことになる。そのため、ボーリングロッド2の降下掘削寸法に相当する引戻し量だけ、窒素ガス圧を減じてロッドばね8(図3、図4参照)により引戻す。或いは、この様なガス圧制御等によるボーリングロッド2の掘削に関係なく、ガス室G1の圧力を低減してロッドばねの復元力で注入ロッド5をボーリングロッド2内に一気に引戻すことができる。
【0040】
図13を参照して上述した装置定置工程とは別の態様の方法が、図14では示されている。当該別の態様を、図14を参照して説明する。
【0041】
1) 図14において点線で表示する用に、注入ロッド5を、前記掘削装置引き上げ工程(図8)と同位置まで引き上げる。この場合、注入ロッド5の引上げは、パッカ膨張用ガスの減圧によって行う。
【0042】
2) 前記ボーリング孔掘削工程(図7)と同様に、注入ロッド5をボーリングロッド2内に収容した状態で、ボーリングロッド2先端部よりも下方の領域を掘削する。そして装置の元位置への設置工程の初期における注入ロッド5の位置までボーリングロッド2を回転・掘削しつつ、下降する。
【0043】
図14で示す方法では、注入ロッド5を引き上げる分だけ作業工程が増えるが、注入ロッド5がボーリングロッド2内に収容されているので、注入ロッド5の引き上げ量L(図8)の分だけボーリングロッド2を下降せしめる際に、中空となった領域(改良固着した中空土壌を含む)を掘削することとなり、粉砕された土壌が内側に崩れる等の理由により掘削が容易となり、掘削速度が早くなるという利点がある。
【0044】
【発明の効果】
本発明の作用効果を、以下に列挙する。
(1) 掘削に際して、パッカが取り付けられた注入ロッドはボーリングロッドの内側に収容されているので、ボーリング孔内壁面とパッカが擦過して、パッカが破損することが防止される。
(2) 薬液注入に際しては、薬液が地上側に逆流しようとしても、パッカにより完全にシール出来る。
(3) 液体掘削させる注入ロッドの突き出しを、加圧流体よって行うので、ロッドばねの弾性と相俟って掘削衝撃が緩和される。
(4) 突き出し所定最大寸法で流体弁(実施例ではガス弁)が自動的に開弁し、パッカを膨張させるので、同一流体の圧力で作業を連続して行うことが出来て、工事の滞りがない。
(5) ガス弁をスロットル形とし、弁ばねで予荷重を与えているので、振動、衝撃に対して弁機能が損なわれない。また、ガス弁の開弁を、ストッパへの当接によっているので開弁量が機械的に保証され、誤作動を生じ難い。
(6) ボーリング孔掘削工程から装置定置工程に至るまで、特にパッカ膨張工程、薬液注入工程、パッカ収縮工程が一貫した工程として実施されるので、工事全体の流れが良い。
(7) 装置定置工程では、パッカ収縮工程の注入ロッドが突き出したままの状態からボーリングロッドを降下させビット掘削して定位置に定置させれば、手順が最短にできる。
(8) 装置定置工程では、パッカ収縮工程の注入ロッドが突き出したままの状態から、注入ロッドを一旦ボーリングロッド内に収容し、その後に掘削を行えば、改良固着した土壌の掘削粉砕に逃げ場(薬液注入時に注入ロッドが位置していた空間)が存在し、掘削が容易となる。
【図面の簡単な説明】
【図1】本発明の実施形態を示す装置の概要構成図であり、ビット掘削と高圧水掘削を同時に行っている状態を示す断面図。
【図2】図1のX−X断面図。
【図3】図1の注入ロッドの詳細構成を示す側断面図。
【図4】図3における注入ロッドの移動状態を示す側断面図。
【図5】注入ロッドが高圧水掘削のためにボーリングロッドから突出した状態を示す側断面図。
【図6】高圧水掘削を完了後に、図5の注入ロッド位置でパッカが膨張した状態を示す側断面図。
【図7】所定深さまでボーリングした状態を示す側面図。
【図8】地盤に薬液注入のため装置を一旦引き上げた状態を示す側面図。
【図9】注入ロッドだけをボーリングロッドから突き出した状態を示す側面図。
【図10】パッカを膨張させた状態を示す側面図。
【図11】薬液を噴射注入している状態を示す側面図。
【図12】薬液注入完了後にパッカを収縮した状態を示す側面図。
【図13】地盤改良を次に進めるため、ボーリングロッドを当初のボーリング深さに定置させた状態を示す側面図。
【図14】図13で示すのとは別の態様により、地盤固着部の1部を掘削開始する状態を示す側面図。
【図15】従来の薬液注入装置を示す側断面図。
【符号の説明】
G0・・ガス通路
G1・・ガス室
G2、G3、G4、G5、G6、G7、Gv・・ガス路
1・・・3重管
2・・・ボーリングロッド
2a・・ストッパ
2b・・ビット
2s1、2s2・・ねじ
5・・・注入ロッド
5p・・パッカ
6・・・ピストン
6a・・中孔
6b・・大孔
6c・・内弁座
7・・・チューブ部
7a・・ばね座
8・・・ロッドばね
9・・・スナップリング
10・・スペーサ
11・・弁ばね
16・・支持管
16a・ストッパ
16b・ストッパー肩部
16s・ねじ
18・・圧水管
24・・ガス弁
24a・外弁座
26・・圧水路
28・・環状部材
29・・薬液路
[0001]
BACKGROUND OF THE INVENTION
The present invention excavates a boring hole with a boring rod fitted with a drilling bit on the outer periphery of the tip, inserts an injection rod into the boring hole, and injects a chemical solution into the ground to be improved from the injection rod to improve the ground. Concerning construction method. More specifically, the present invention relates to an infusion method that uses an inflatable packer that prevents the chemical liquid from flowing back to the ground side when injecting the chemical liquid, and in particular, to inflate the packer after protruding the injection rod from the boring rod constituting the boring rod. It relates to the injection method constructed.
[0002]
[Prior art]
FIG. 15 discloses a conventional technique for improving a soft ground in the ground by injecting a chemical solution. In FIG. 15, the boring hole 40 is drilled with a boring rod (not shown), and then the injection rod 53 is inserted into the boring hole 40. Here, the injection rod 53 has a structure that doubles as a hole drilling device and an injection device.
[0003]
When the injection rod 53 inserted into the borehole 40 reaches a predetermined depth (chemical solution injection region), a chemical solution indicated by reference numeral 36 is injected from the injection port 34 to create the improved ground 39. When the chemical solution is injected, the packer 30 is expanded to seal the annular gap between the injection rod 53 and the inner wall surface (ground M) of the boring hole 40, and the chemical solution 36 flows back to the ground side (indicated by an arrow 37). It is preventing.
[0004]
However, according to the prior art as shown in FIG. 15, the packer 30 attached to the injection rod 53 rubs against the inner wall surface of the bore link hole 40 when the injection rod 53 is inserted into the bore hole 40. May be damaged. In particular, if the packer has been used repeatedly and the elastic repulsion has weakened and has not completely shrunk, the possibility of damage due to rubbing with the inner wall surface of the boring hole 40 becomes extremely high.
[0005]
[Problems to be solved by the invention]
The present invention has been proposed in view of the above-described problems of the prior art, and prevents damage to the packer due to rubbing with the ground (the inner wall surface of the borehole), and the protrusion of the injection rod and the expansion of the packer are continuously performed. The purpose is to provide an injection method that can be performed.
[0006]
[Means for Solving the Problems]
According to the injection method of the present invention, a boring rod 2 having a bit 2b at the tip, an injection rod 5 configured to be housed in or projectable from the boring rod 2, and the injection rod 5 are provided. A rod spring 8 having a fluid supply mechanism having a fluid valve 24 for supplying a working fluid for expanding the packer to the packer 5p, and pressing the injection rod 5 to the boring rod 2 to the ground side. And a fluid chamber G1 for projecting the injection rod 5, preparing an injection device, turning the boring rod 2 in a state where the injection rod 5 is accommodated in the boring rod 2, and ground around the boring rod 2 with high-pressure water M is drilled in a borehole at a predetermined depth, and the boring rod 2 and the injection rod 5 are in the same relative relationship as in the above-mentioned accommodation state. The predetermined length L is raised, and the fluid from the ground pressure source is supplied to the fluid chamber G1 so that the injection rod 5 protrudes from the boring rod 2 to the predetermined dimension L and descends in the underground direction. If it protrudes to the predetermined dimension L, the fluid valve 24 is automatically opened to supply the packer 5p with the fluid for expanding the packer, the packer 5p is expanded, the gap with the ground M is sealed, and the chemical solution 36 is injected. The rod 5 is sprayed from the tip toward the ground M, then the packer expansion working fluid is decompressed to contract the packer, and the boring rod 2 and the injection rod 5 are returned to the predetermined depth and placed. Yes.
[0008]
Further, according to the injection method of the present invention, when the packer 5p is contracted, the injection rod 5 is held at a position that protrudes to a predetermined depth, and the boring rod 2 is lowered while rotating and excavating the injection rod. 5 is accommodated in the boring rod 2.
[0009]
Further, according to the pouring method of the present invention, when the boring rod 2 and the pouring rod 5 are placed, the pouring rod 5 is pulled up and accommodated in the boring rod 2, and the boring rod 2 is accommodated while the pouring rod 5 is accommodated. It is designed to descend.
[0011]
According to the present invention having such a configuration, first, as in the prior art, a boring rod for boring with a drilling bit attached to the outer periphery of the tip, and a ground in front of the boring rod by injecting high-pressure liquid from an injection rod. After excavation and excavating the ground toward the basement and reaching the predetermined depth, that is, the chemical solution injection region, the chemical solution is injected into the ground from the injection rod to improve the ground. Then, in order to prevent the backflow of the chemical solution in the ground direction when the chemical solution is injected, the elastic packer is expanded and sealed.
[0012]
Here, according to the present invention, when injecting the chemical solution, the piston provided at the tip of the injection rod is pressed with a pressurized fluid supplied from the ground to protrude the injection rod from the boring rod in the underground direction, Then the packer is inflated. Therefore, when excavating the ground, such as in a boring hole excavation process, the packer is accommodated in the boring rod and protrudes from the boring rod only when the chemical solution is injected. Therefore, there is no possibility that the inner wall surface of the boring hole and the packer will rub and the packer may be damaged. And since the said packer is protruded from the boring rod at the time of packer expansion | swelling, a necessary and sufficient seal | sticker is performed and it prevents that a chemical | medical solution flows backward to the ground side.
[0013]
In the present invention, the packer expansion fluid is preferably a gas from the viewpoint of compressibility, and is preferably an inert nitrogen gas from the viewpoint of avoiding oxidation of the device, lubricating oil and the like. However, it is not intended to limit the use of compressed air, liquid, or other fluids.
[0014]
Further, in the chemical injection device according to the present invention, as an example of the fluid supply mechanism, a piston is provided at the tip of the injection rod, a shoulder for the spring seat is formed on the outer periphery of the tube portion of the injection rod, A spring seat is provided on the inner periphery, a rod spring extending and contracting in the axial direction is interposed between the spring seat and the shoulder for the spring seat, an inner valve seat is formed inside the piston, and the inner side of the piston It is preferable that a throttle-type fluid valve having an outer valve seat abutting on the inner valve seat is fitted to a valve opening means for opening the fluid valve according to a predetermined movement dimension of the injection rod.
[0015]
According to the above configuration, when the pressurized fluid (packer expansion fluid) advances the injection rod by a predetermined dimension, the fluid valve is automatically opened to supply the pressurized fluid to the packer for expansion, so that the injection rod Protrusions and packer expansion can be performed in a continuous operation.
[0016]
In the present invention, the position of the injection rod is held at a position where it protrudes to a predetermined depth position in the packer contraction step, the boring rod is lowered while being rotated and excavated, and the injection rod is accommodated in the boring rod. If it is placed at the predetermined depth position, the procedure becomes the shortest.
[0017]
Alternatively, in the device placing step, the fixed and fixed soil can be obtained by pulling up the pouring rod and accommodating it in the boring rod, and lowering the boring rod in a state where the pouring rod is accommodated and placing it at the predetermined depth position. There is a place for pulverized soil when excavating, making the construction easy.
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
[0019]
FIG. 1 shows an overall configuration of an apparatus according to an embodiment of the present invention or for implementing the same. One end of a boring rod 2 is connected to a multiple tube 1 (for example, a triple tube) that communicates with the ground. A boring bit 2 b is mounted on the other end of the boring rod 2, and an injection rod 5 configured to protrude and return in the axial direction is inserted into the boring rod 2. As will be described later, the injection rod 5 is configured to move (project and return) in the axial direction by high-pressure water that is a high-pressure fluid. The injection rod 5 is connected to the triple pipe 1 and is connected to the pressure water passage 26 for supplying high-pressure water, the chemical passage 29 for supplying the injection chemical, and the gas passage G0 for supplying nitrogen gas as a pressurized fluid to the packer 5p ( 2). However, even high-pressure air or other fluids can be used as the pressurized fluid for expanding the packer 5p.
[0020]
3 and 4 show the details of the fluid supply mechanism, that is, the relationship between the boring rod 2 and the injection rod 5, the details of the structure having functions of projecting extension and contraction of the injection rod 5, expansion and contraction of the packer 5p. . FIG. 3 shows a state in which the injection rod 5 is housed in the boring rod 2, and FIG. 4 shows the injection rod 5 in the underground direction from the boring rod 2 (FIG. 3) for high-pressure water excavation and chemical injection by the injection rod 5. FIG. 4 shows a state of protruding to the right).
[0021]
The injection rod 5 is provided with a support tube 16 that is entirely supported by the boring rod 2 on the outside and mounted on the triple tube 1 with a taper screw 16s on the inside. A piston 6 is provided on the triple pipe 1 side, that is, on the ground side (left side in FIGS. 3 and 4), and an internal screw 6s formed on the underground side of the piston 6 (right side in FIGS. 3 and 4). One end (ground side end) of the tube portion 7 which is a basic member of the injection rod 5 is attached. An annular member 28 is attached to the inside of the other end (basement side end) of the tube portion 7 with a screw, and a pressure water pipe 18 communicating with the pressure water passage 26 of the triple pipe 1 is provided inside the annular member 28. It is attached with a screw. Therefore, the pressure water pipe 18 is fixed to the tube portion 7 and moves integrally. The annular member 28 is formed with a gas path G7 for introducing nitrogen gas (which is a packer expansion fluid) to the packer 5p.
[0022]
The piston 6 forms a gas chamber G <b> 1 with the triple pipe 1, and the outer periphery is mounted on the inner periphery of the boring rod 2 so as to be slidable in the axial direction. Inside the piston 6, a large-diameter large hole 6b, and a medium-diameter 6a having a medium diameter (larger than the diameter of the valve 24 described later, but smaller than the diameter of the large hole 6b), A tapered hole is formed at the end of the large hole 6b to form the inner valve seat 6c. A gas valve 24 for controlling supply of nitrogen gas to the packer 5p is mounted inside the holes 6a and 6b.
[0023]
The gas valve 24 has an outer diameter smaller than that of the large hole 6b, and a gas path G3 is formed by a gap between the large hole 6b and the gas valve 24. The radially inner side of the gas valve 24 is fitted to the outer diameter of the support tube 16 so as to be slidable in the axial direction but airtight in the axial direction. Further, an outer valve seat 24 a configured as a tapered surface is formed on the underground side of the gas valve 24.
[0024]
In the state shown in FIG. 3, nitrogen gas pressure is not applied to the gas chamber G1, and the gas valve 24 is urged to the underground side (right side in FIG. 3) by the repulsive force of the valve spring 11, The outer valve seat 24a is in close contact with the inner valve seat 6c to close the gas supply. Further, the valve spring 11 mounted on the triple pipe 1 side of the gas valve 24 is operated by the snap ring 9 through the spacer 10 with a predetermined preload that is not opened by excavation vibration or gas pressure fluctuation. Pressing. Note that the spacer 10 is configured such that the gas chamber G1 and the gas valve 24 are ensured to flow even when the snap ring 9 and the spacer 10 are in close contact with each other.
[0025]
A spring seat portion 7a is formed on the outer periphery of the tube portion 7, and a rod spring 8 is attached between the spring seat portion 7a and the spring seat portion 2a1 of the stopper 2a attached to the lower portion of the boring rod 2. Yes. In the non-pressure state in which no pressure acts on the gas chamber G1, the rod spring 8 presses the tube portion 7 which is a basic member of the injection rod 5 to the ground side (left side in FIG. 3), as shown in FIG. The spring specifications are set so that the injection rod 5 fits in the boring rod 2. The stopper 2a is configured to support one end of the rod spring 8, and to support the role of the joint of the boring rod 2 and the tube portion 7 so as to be slidable.
[0026]
The support tube 16 slidably supports the gas valve 24 with a straight tube portion, and restricts the protruding stroke of the injection rod 5 by a stopper 16a formed at an underground side end portion, thereby opening and closing the gas valve 24. It is comprised as a valve opening means to make it. For example, in the illustrated embodiment, the moving amount of the tube portion 7, that is, the stroke of the injection rod 5 protruding is set to 1200 mm. If it moves only a predetermined stroke, the front-end | tip part 24b of the gas valve 24 will contact | abut to the shoulder part 16b of the stopper 16a, and the protrusion of the injection rod 5 will stop. At that stage, the compression amount of the valve spring 11 via the snap ring 9 and the spacer 10 becomes the opening amount, and the outer valve seat 24a and the inner valve seat 6c of the gas valve 24 are separated to form the gas passage Gv. To do. Further, the gap between the outer diameter of the stopper 16a and the inner diameter of the tube portion 7 forms a gas path G5, and the underground side of the stopper 16a forms the gas path 6 by the gap between the pressurized water pipe 18 and the tube portion 7.
[0027]
With the above configuration, when the injection rod 5 protrudes (or is excavated while protruding), the nitrogen gas passage is seated on and seals the gas passage Gv, so that it is supplied from a gas supply source (not shown). The nitrogen gas for expanding the packer stays in the gas chamber G1 and the gas paths G2 and G3 whose volumes change from the gas passage G0, and is not supplied to the packer.
[0028]
When the protrusion of the injection rod 5 reaches a predetermined stroke limit (for example, 1200 mm), gas pressure is acting on the piston 6 and the tube portion 7, so that it moves to the underground side (right side in FIGS. 3 and 4). However, since the gas valve 24 abuts against the stopper 16a, it does not move further underground. As a result, the inner valve seat 6c moves to the basement side from the gas valve 24, the inner valve seat 6c and the outer valve seat 24a are not in close contact with each other, and the gas valve 24 is opened. And the gas flow path which leads to the packer 5p through the gas chamber G1, the gas path G2, the gas paths G3, G5 to G7 is configured.
[0029]
Next, the operating state of the illustrated embodiment will be described. Here, FIG. 1 shows a state where the injection rod is housed in the boring rod 2 and a bit excavation and high-pressure water excavation state or a non-operational stationary state, FIG. 5 shows a state where the injection rod 5 protrudes, FIG. FIG. 5 shows that the high-pressure water excavation in FIG. 5 is completed and the packer 5p is inflated so that the chemical solution can be injected.
[0030]
The construction procedure using the above-described configuration apparatus will be mainly described with reference to FIGS.
1. Boring hole drilling process.
By transmitting the rotational driving force from the ground, the boring rod 2 is turned, and the ground around the boring rod 2 is supplied by the bit 2 and by the high-pressure water supplied from the high-pressure liquid source on the ground and guided from the pressure water channel 26. M is excavated and a borehole is excavated to a predetermined depth underground (FIGS. 7 and 1). The positional relationship between the boring rod 2 and the injection rod 5 at this time is in the state shown in FIG.
[0031]
2. Drilling device lifting process.
The boring rod 2 and the injection rod 5 are pulled up by a predetermined dimension L while maintaining the same relative positional relationship as in the boring hole excavation process (FIG. 8). The predetermined dimension L is set by the axial distance Lp and the chemical solution injection zone Lj when the packer is expanded (FIG. 10). The first injection zone Lj becomes the first stage, and thereafter, the first injection zone Lj comes into contact with the first stage, and the injection zone below it becomes the second stage (step-down method). The positional relationship between the boring rod 2 and the injection rod 5 after the pulling process is also in the state shown in FIGS.
[0032]
3. Injection rod 5 protruding process.
The piston 6 (FIGS. 3 and 4) is pressed with high-pressure nitrogen gas supplied from a ground pressure source, and the injection rod 5 is projected to a predetermined dimension L (excavation depth in the boring hole excavation step). Lower (Fig. 9).
[0033]
The positional relationship between the boring rod 2 and the injection rod 5 at this time is substantially in the state shown in FIGS. However, unlike the case shown in FIG. 4, the gas valve 24 is still in a closed state.
[0034]
4). Packer 5p expansion step.
When the injection rod 5 is advanced and protruded to a predetermined protruding amount (for example, 1200 mm), the gas valve 24 is opened (FIG. 4), and high-pressure nitrogen gas that is a packer expansion fluid is supplied to the packer 5p. Is expanded to seal the gap between the ground M and the tube portion 7.
[0035]
The positional relationship between the boring rod 2 and the injection rod 5 at this time is in the state shown in FIG. 4, the gas valve 24 is opened, and high-pressure nitrogen gas is supplied to the gas passage G0, the gas passage Gv, and the packer 5a. A gas flow path is configured (FIGS. 10 and 6).
[0036]
5. Chemical solution injection process.
The chemical liquid 36 is injected and injected toward the ground M (FIG. 11). The positional relationship between the boring rod 2 and the injection rod 5 at this time is in the state shown in FIGS.
[0037]
6). Packer 5p contraction process.
The packer 5p is contracted after the chemical injection is completed. If the supply source of nitrogen gas is opened to the atmosphere side, the pressure in the gas chamber G1 decreases, and the high-pressure nitrogen gas in the packer 5p is released through the gas path Gv. The packer 5p contracts by its own elastic contraction force (FIG. 12).
[0038]
7). Device placement process.
The boring rod 2 and the injection rod 5 are returned to the depth (predetermined depth) excavated in the boring hole excavation step, and preparations for excavating and injecting a chemical solution are performed on the next stage. Therefore, the injection rod 5 is not moved, the position of the injection rod 5 is maintained as it is in the packer 5p contraction step, the boring rod 2 is rotated and lowered, and the injection rod 5 is accommodated in the boring rod 2. (FIG. 13).
[0039]
The injection rod 5 in this case is pulled back into the boring rod 2 relative to the boring rod 2. Therefore, the nitrogen gas pressure is reduced by the pullback amount corresponding to the lowered excavation dimension of the boring rod 2 and pulled back by the rod spring 8 (see FIGS. 3 and 4). Alternatively, regardless of the excavation of the boring rod 2 by such gas pressure control or the like, the pressure in the gas chamber G1 can be reduced and the injection rod 5 can be pulled back into the boring rod 2 by the restoring force of the rod spring.
[0040]
FIG. 14 shows a method in another mode different from the apparatus placing step described above with reference to FIG. The other aspect will be described with reference to FIG.
[0041]
1) In order to display it with a dotted line in FIG. 14, the injection rod 5 is pulled up to the same position as in the excavator lifting process (FIG. 8). In this case, the injection rod 5 is pulled up by depressurizing the packer expansion gas.
[0042]
2) Similarly to the boring hole excavation step (FIG. 7), the region below the tip of the boring rod 2 is excavated with the injection rod 5 housed in the boring rod 2. Then, the boring rod 2 is lowered and rotated to the position of the injection rod 5 at the initial stage of the installation process at the original position of the apparatus.
[0043]
In the method shown in FIG. 14, the number of work steps increases as the injection rod 5 is pulled up. However, since the injection rod 5 is accommodated in the boring rod 2, boring is performed by the amount L of the injection rod 5 pulled up (FIG. 8). When the rod 2 is lowered, a hollow area (including improved fixed hollow soil) is excavated, and excavation is facilitated due to the fact that the crushed soil collapses inward, and the excavation speed increases. There is an advantage.
[0044]
【The invention's effect】
The effects of the present invention are listed below.
(1) At the time of excavation, since the injection rod to which the packer is attached is accommodated inside the boring rod, the inner wall surface of the boring hole and the packer are prevented from rubbing and the packer is prevented from being damaged.
(2) When the chemical solution is injected, even if the chemical solution flows backward to the ground side, it can be completely sealed by the packer.
(3) Since the injection rod for excavating the liquid is ejected by the pressurized fluid, the excavation impact is mitigated in combination with the elasticity of the rod spring.
(4) Since the fluid valve (in this example, the gas valve) automatically opens and expands the packer with a predetermined maximum dimension, the work can be performed continuously with the same fluid pressure, resulting in construction delays. There is no.
(5) Since the gas valve is a throttle type and a preload is applied by a valve spring, the valve function is not impaired against vibration and impact. Further, since the gas valve is opened by contact with the stopper, the valve opening amount is mechanically guaranteed, and malfunction is unlikely to occur.
(6) From the boring hole excavation process to the device placement process, the packer expansion process, the chemical solution injection process, and the packer contraction process are performed as a consistent process, so the overall construction flow is good.
(7) In the device placement step, the procedure can be shortened by lowering the boring rod from the state where the injection rod in the packer shrinkage step is protruding and excavating the bit and placing it in place.
(8) In the device placement process, once the injection rod in the packer contraction process is protruding, the injection rod is once accommodated in the boring rod and then excavated. Excavation is easy because there is a space where the injection rod was located at the time of the chemical injection.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of an apparatus showing an embodiment of the present invention, and is a cross-sectional view showing a state in which bit excavation and high-pressure water excavation are performed simultaneously.
FIG. 2 is a cross-sectional view taken along line XX in FIG.
3 is a side sectional view showing a detailed configuration of the injection rod of FIG. 1. FIG.
4 is a side sectional view showing a movement state of the injection rod in FIG. 3. FIG.
FIG. 5 is a side sectional view showing a state in which an injection rod protrudes from a boring rod for high-pressure water excavation.
6 is a side cross-sectional view showing a state where the packer has expanded at the pouring rod position of FIG. 5 after completion of high-pressure water excavation.
FIG. 7 is a side view showing a state where the drilling is performed to a predetermined depth.
FIG. 8 is a side view showing a state where the apparatus is once pulled up for injecting a chemical into the ground.
FIG. 9 is a side view showing a state in which only the injection rod is protruded from the boring rod.
FIG. 10 is a side view showing a state where the packer is expanded.
FIG. 11 is a side view showing a state in which a chemical solution is injected and injected.
FIG. 12 is a side view showing a state in which the packer is contracted after the chemical liquid injection is completed.
FIG. 13 is a side view showing a state in which a boring rod is placed at an initial boring depth in order to proceed with ground improvement.
FIG. 14 is a side view showing a state in which excavation of one part of the ground fixed portion is started according to a mode different from that shown in FIG. 13;
FIG. 15 is a side sectional view showing a conventional chemical liquid injector.
[Explanation of symbols]
G0 .. Gas passage G1 .. Gas chambers G2, G3, G4, G5, G6, G7, Gv. 2s2 ... Screw 5 ... Injection rod 5p ... Packer 6 ... Piston 6a ... Middle hole 6b ... Large hole 6c ... Inner valve seat 7 ... Tube 7a ... Spring seat 8 ... Rod spring 9 ... Snap ring 10 ·· Spacer 11 · · Valve spring 16 · · Support pipe 16a · Stopper 16b · Stopper shoulder 16s · Screw 18 · · Pressure water pipe 24 · · Gas valve 24a · Outer valve seat 26・ Pressure channel 28 ・ ・ annular member 29 ・ ・ chemical channel

Claims (3)

先端にビット(2b)を有するボーリングロッド(2)と、そのボーリングロッド(2)内に収容可能又はボーリングロッド(2)から突出し可能に構成された注入ロッド(5)と、その注入ロッド(5)に設けられたパッカ(5p)と、そのパッカ(5p)にパッカ膨張用の作動流体を供給するために流体弁(24)を有する流体供給機構とを有し、ボーリングロッド(2)に注入ロッド(5)を地上側に押圧するロッドばね(8)と注入ロッド(5)を突出させる流体室(G1)とを備え、注入装置を準備し、ボーリングロッド(2)内に注入ロッド(5)を収容した状態でボーリングロッド(2)を旋回させかつ高圧水によりボーリングロッド(2)の周辺の地盤(M)を所定深度下でボーリング孔を掘削し、そのボーリングロッド(2)および注入ロッド(5)を前記の収容状態と同じ相対位関係のまま、所定寸法(L)だけ引き上げ、そして地上の加圧源からの流体を流体室(G1)に供給して注入ロッド(5)をボーリングロッド(2)から前記所定寸法(L)突出させて地下方向に降下させ、注入ロッド(5)が所定寸法(L)まで突出したならば、流体弁(24)を自動的に開弁してパッカ(5p)にパッカ膨張用流体を供給してパッカ(5p)を膨張させ、地盤(M)との隙間をシールし、薬液(36)を注入ロッド(5)の先端から地盤(M)に向けて噴射させ、次いでパッカ膨張用の作動流体を減圧してパッカを収縮させ、前記所定深度までボーリングロッド(2)と注入ロッド(5)とを戻して定置させることを特徴とする注入工法。  A boring rod (2) having a bit (2b) at the tip, an injection rod (5) configured to be housed in or projectable from the boring rod (2), and the injection rod (5 ) And a fluid supply mechanism having a fluid valve (24) for supplying a working fluid for expanding the packer to the packer (5p), and injected into the boring rod (2). A rod spring (8) for pressing the rod (5) to the ground side and a fluid chamber (G1) for projecting the injection rod (5) are prepared. An injection device is prepared, and the injection rod (5 ), The boring rod (2) is turned, and the ground (M) around the boring rod (2) is excavated at a predetermined depth with high-pressure water, and the boring rod ( ) And the injection rod (5) with the same relative relationship as in the above-described housing state, the injection rod (5) is pulled up by a predetermined dimension (L), and the fluid from the ground pressure source is supplied to the fluid chamber (G1). 5) is protruded from the boring rod (2) by the predetermined dimension (L) and lowered in the underground direction, and when the injection rod (5) protrudes to the predetermined dimension (L), the fluid valve (24) is automatically turned on. Open the valve and supply the packer expansion fluid to the packer (5p) to expand the packer (5p), seal the gap with the ground (M), and feed the chemical (36) from the tip of the injection rod (5) to the ground (M), the pressure is reduced to reduce the working fluid for expanding the packer, the packer is contracted, and the boring rod (2) and the injection rod (5) are returned and fixed to the predetermined depth. Injection method to be used. 前記注入ロッド(5)をパッカ(5p)を収縮させる際に、所定深度の位置に突出したままの位置に保持し、ボーリングロッド(2)を回転掘削しつつ降下させて注入ロッド(5)をボーリングロッド(2)内に収容する請求項1記載の注入工法。  When contracting the packer (5p), the injection rod (5) is held at a position that protrudes to a predetermined depth, and the injection rod (5) is lowered by rotating and drilling the boring rod (2). The injection method according to claim 1, which is accommodated in the boring rod (2). 前記ボーリングロッド(2)と注入ロッド(5)とを定置させる際に注入ロッド(5)を引き上げてボーリングロッド(2)内に収容し、注入ロッド(5)を収容した状態でボーリングロッド(2)を降下させる請求項1記載の注入工法。  When the boring rod (2) and the pouring rod (5) are placed, the pouring rod (5) is pulled up and accommodated in the boring rod (2), and the boring rod (2 ) Is lowered.
JP11045099A 1999-04-19 1999-04-19 Injection method Expired - Fee Related JP4114899B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11045099A JP4114899B2 (en) 1999-04-19 1999-04-19 Injection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11045099A JP4114899B2 (en) 1999-04-19 1999-04-19 Injection method

Publications (2)

Publication Number Publication Date
JP2000303444A JP2000303444A (en) 2000-10-31
JP4114899B2 true JP4114899B2 (en) 2008-07-09

Family

ID=14536036

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11045099A Expired - Fee Related JP4114899B2 (en) 1999-04-19 1999-04-19 Injection method

Country Status (1)

Country Link
JP (1) JP4114899B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101281111B1 (en) * 2011-04-25 2013-07-02 양형칠 Tube device for grouting and terminal device used to the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364441B (en) * 2020-03-27 2021-06-08 哈尔滨工业大学 Intelligent informationized vibration grouting machine with adjustable vibration and controllable direction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101281111B1 (en) * 2011-04-25 2013-07-02 양형칠 Tube device for grouting and terminal device used to the same

Also Published As

Publication number Publication date
JP2000303444A (en) 2000-10-31

Similar Documents

Publication Publication Date Title
US7549480B2 (en) Device for performing a downhole operation
AU2002242652B2 (en) Device for anchoring a drill string in a borehole
CA2700640C (en) Gas lift valve
CN113305141B (en) High-pressure jet grouting injection in-situ repair system and method
CA2560333A1 (en) Spear type blow out preventer
RU2005113714A (en) FINISHING A WELL FOR ONE DOWN OF A PUMP AND COMPRESSOR COLUMN
US7387157B2 (en) Dynamic inflatable sealing device
GB2334985A (en) Shifting tool with inflatable element
EP3803032B1 (en) Pneumatic drilling with packer slideable along stem drill rod
JP4114899B2 (en) Injection method
CN111255410A (en) Packer
CN111472711B (en) Packer
JPS6142077B2 (en)
CN117780299B (en) Claw sleeve type stage cementing device
WO2017124979A1 (en) Device for jet packing and fracturing and tubular column comprising same
CN112761568B (en) Packer
JP4056031B2 (en) Chemical injection method and equipment
CN115263237B (en) Leakage-control well completion string
CN115405252B (en) External packer
JPS6315422Y2 (en)
JP2006028946A (en) Chemical solution injecting device for soil improvement
JP5384240B2 (en) Hole lifting device
JP3770508B2 (en) Chemical injection device
CN207686663U (en) expandable packer
WO2001012949A3 (en) Downhole flapper valve assembly

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060405

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071207

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080121

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080414

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080414

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110425

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140425

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees