JP4115199B2 - Reaction body for rock bolt - Google Patents
Reaction body for rock bolt Download PDFInfo
- Publication number
- JP4115199B2 JP4115199B2 JP2002227307A JP2002227307A JP4115199B2 JP 4115199 B2 JP4115199 B2 JP 4115199B2 JP 2002227307 A JP2002227307 A JP 2002227307A JP 2002227307 A JP2002227307 A JP 2002227307A JP 4115199 B2 JP4115199 B2 JP 4115199B2
- Authority
- JP
- Japan
- Prior art keywords
- reaction force
- slope
- lock bolt
- grout material
- force body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011435 rock Substances 0.000 title claims description 7
- 239000011440 grout Substances 0.000 claims description 45
- 239000000463 material Substances 0.000 claims description 36
- 238000002347 injection Methods 0.000 claims description 12
- 239000007924 injection Substances 0.000 claims description 12
- 229920006167 biodegradable resin Polymers 0.000 claims description 6
- 238000000034 method Methods 0.000 description 6
- 239000004567 concrete Substances 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 244000005700 microbiome Species 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 239000002390 adhesive tape Substances 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000010169 landfilling Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 238000013022 venting Methods 0.000 description 1
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、例えば、法面の安定化工法に使用されるロックボルト用の反力体に係り、傾斜面に反力体を敷設してグラウト材を注入する施工の効率化を図り、法面の植生の連続性にも配慮したロックボルト用の反力体に関する。
【0002】
【従来の技術】
従来、法面の安定化に使用されるロックボルト用の反力体としては、例えば、従来例1として、現場で法面に沿って鉄筋を配筋し、枠体を組み立て、コンクリートを打設する工法と、従来例2として、プレキャストコンクリートブロックを工場で成形して、これを法面に敷設する工法と等が知られている。
【0003】
【発明が解決しようとする課題】
しかしながら、前記従来例1では、法面の凹凸に沿って鉄筋を配筋しなければならないので手間が掛かり、法枠交差部の構築が複雑となり、コンクリート養生期間が長くなって工期を短縮できないという課題がある。更に、法枠は高さ及び幅が、通常、300mm×300mmと大きいため、当該法枠の格子内を緑化しても前記法枠を隠しきれず、美観上の課題となっている。
また、前記従来例2では、法面に敷設する手間は掛からないが、そのブロック体の重量が重いので急斜面では敷設作業が困難となり、これを適用する斜面が限定されており、更に、受圧板部分の緑化ができないという課題がある。
更に、ブロック体では、地山の凹凸(不陸)を処理するために、ブロック体の設置に先立って急斜面においては難しい工程となる、モルタルの敷き均しが必要である。これに代えて比較的高価なマットの敷設やグラウト注入後の袋体の敷設による不陸の調整が知られているが、前者は費用の点で必要な厚さの確保が困難であること、後者では注入口が一箇所であるため凹部全部にグラウトが行き渡らないこと等の課題がある。本発明に係るロックボルト用の反力体は、このような課題を解消するために提案されたものである。
【0004】
【課題を解決するための手段】
本発明に係るロックボルト用の反力体の上記課題を解決するための要旨は、筒体が井桁状に形成されるとともに、当該筒体の交差部である井桁部の上面に設置される定着板に法面から突出したロックボルトの端部を定着ナットで定着させる反力体であって、前記筒体の交差部においては内部空間が互いに連通されてなり、前記筒体の地面接地面にグラウト材排出用の孔が設けられ、前記筒体の長手方向の開口端部において、法面に敷設した場合に上側となる開口部を蓋する閉蓋部材には前記筒体の内部空間に連通させたグラウト材注入用の注入口が穿設されるとともに、下側となる開口部にはこれを蓋する閉蓋部材が設けられていることである。
【0005】
前記筒体の交差部である井桁部の上面に、当該井桁部に設置される定着板の側面に当たってその滑り落下を防止する突起が設けられていること、;
また、前記筒体の地面接地面に、法面の不陸に応じてグラウト材排出用の孔から排出されるグラウトにより膨出して不陸部分を埋める不陸部充填用シートが設けられていること、;
更に、前記不陸部充填用シートは、生分解性樹脂により形成されたものであることを含むものである。
【0006】
本発明に係るロックボルト用の反力体によれば、井桁状に形成された反力体は、例えば、筒体としての角形鋼管によって工場で形成され、その筒体の内部空間にグラウト材が充填されていない状態であるので、コンクリートブロックに比較してはるかに軽量であって現場への運搬,搬入,法面への敷設が容易となる。
【0007】
また、法面にこの反力体を敷設した後に、前記筒体の内部空間へグラウト材を注入して充填することで、外反力体の強度が増大すると共に、グラウト排出用の孔が複数設けられているので、不陸部分を容易に且つ十分に埋めることになり、反力体の設置状態が安定する。
【0008】
また、この反力体における井桁部には、ロックボルトを定着させる定着板用の突起があるので、法面に反力体を敷設した後に、前記井桁部に定着板を載置するのが容易となり、落下の危険もないので安全性が確保される。
【0009】
更に、不陸部充填用シートにより簡単に法面の凹凸に対応することができる様になる。そして、この不陸部充填用シートが、生分解性樹脂により形成されていることで、自然にシートが分解して消滅する。
【0010】
【発明の実施の形態】
次に、本発明に係るロックボルト用の反力体1について図面を参照して説明する。前記反力体1は、例えば、100mm×100mmの口で、長さが1800mmの角形鋼管である筒体2を、図1に示すように、井桁状に溶接手段で組み立てる。前記筒体の形状は、丸形、楕円型、三角型等、必ずしも角形に限られないが、入手容易,接地状態,価格面において、反力体として最も好適なものとして採用するものである。また、前記筒体2は、地山の植生植物によって十分に覆われるように、高さと幅の寸法を、例えば、50mm〜100mm程度とするものである。
【0011】
上記筒体の井桁状の交差部では、一例として、図1に示すように、縦方向の筒体2,2に対して、横方向の筒体2a,2b,2cを突き合わせて溶接することで、組み立てたものである。そして、前記筒体2の交差部においては、内部空間が互いに連通されている。
【0012】
これは、後のグラウト材がこの反力体1の内部空間に充填された際に、当該内部空間に行き渡って、全内部空間に充填される様にするためである。なお、横方向の筒体2a,2cの端部における上部には、比較的小さな(グラウト材の漏れのない)グラウト用の空気抜き孔が設けられている。
【0013】
一般的な従来の法枠であるコンクリート製法枠に較べ、本発明に係る反力体1おいては、強度の高い角形鋼管を用いているため、筒体2の高さを100mmに設定でき、従来のコンクリート製法枠の高さ300mmに対して、1/3とすることができる。
【0014】
また、図8に示すように、筒体2の幅が100mmであって、それを約150mmの間隔で離間させて井桁状に2分割して該筒体2,2を併設しているので、地山を覆う幅(非緑化幅)を、従来の幅300mmに対して本発明において幅200mmにすることができ、非緑化幅が略3割程の低減される。
【0015】
しかも、前記井桁状に配置して離間させた筒体2,2の間の地山には、植物を植生することで緑化が可能となる。そして、筒体2,2間に植生された植物が成長する(通常、300mm程度である)と、背の低い筒体2を覆うようになる。こうして、当該筒体2が、その内外から植生植物で覆われて緑化され、反力体1がほとんど覆い隠されるものである。
【0016】
また、図2に示すように、筒体2の下面(法面においては、地面接地面となる面)2dに、グラウト材排出用の孔2eが長手方向に設けられている。この孔2eは、一例として幅が10mmで長さが150mmの長孔であり、長手方向に20mm程度の間隔を開けて設けられている。筒体2の強度が法面の反力体として十分あれば、前記孔2eを連続させて設けても良い。
【0017】
前記筒体2の長手方向の開口端部には、その開口部を蓋するプレート状の閉蓋部材3が、溶接手段により4箇所に固着されている。なお、4箇所の閉蓋部材3のうち、この反力体1を法面に敷設した場合に、上側となる1箇所の閉蓋部材3aは、図3に示すように、筒体2の内部空間に連通させた、グラウト材注入用の注入口3bが穿設されている。
【0018】
前記筒体2の交差部である井桁部の上面に、図1に示すように、当該井桁部に設置されるロックボルト定着用の、円形平板体である定着板(図13参照)14が載置される。法面に反力体1を敷設した状態において、傾斜状態であることによって前記定着板14が滑り落ちるのをその定着板14の側面に当たって防止する突起4が、例えば、4箇所に設けられている。
【0019】
この突起4の配置は、前記定着板が法面の傾斜状態により、前記上面において設置位置が変化するので、それによる移動を考慮し、余裕を持たせた間隔で配置される。また、前記突起4は、必ずしも4箇所に設ける必要はなく、傾斜した法面に反力体1を敷設した状態での下側になる位置において、2箇所だけに設けることでも良い。
【0020】
前記筒体2の地面接地面2dには、図1及び図4に示すように、法面の不陸に応じて前記孔2eから排出されるグラウトにより膨出して不陸部分を埋める、不陸部充填用シート5が袋体にして設けられている。この不陸部充填用シート5は、例えば、生分解性樹脂により形成されている。
【0021】
前記不陸部充填用シート5は、図5に示すように、上面が開口して、上部縁に、フランジ5aを有している。このシート5を、筒体2の下に取り付けるには、図6に示すように、シート止め具6a,6bを使用する。
【0022】
前記シート止め具6a,6bは、図示した断面形状で、長手方向に一例として500mm〜1000mmと一様に長いものである。図7に示すように、前記シート5のフランジ5aを間に挟んで、止め具6aに止め具6bを嵌合させるものである。
【0023】
そして、前記止め具6aの上面に、例えば、両面接着テープを貼着して、図4に示すように、筒体2の下面2dに張り付けるものである。なお、シート5の袋体の深さの程度は、法面の不陸の程度が規定されているので、その不陸程度を十分にカバーできる深さであればよい。
【0024】
このようにして、形成されて成る本発明の反力体1の使用方法について説明する。図8乃至図9に示すように、工場にて反力体1を形成する。そして、この反力体1を現場に運び込む。図に示すように、法面7にロックボルト用の孔8を削孔する。そして、前記孔8が井桁状の交差部における略中心位置になるように、小型クレーンで反力体1を吊り上げて、図10に示すように、該反力体1を法面7に敷設する。
【0025】
前記反力体1は、グラウト用の注入口3bが設けられている閉蓋部材3aを、傾斜している法面7の上側に位置させて敷設する。次に、図11に示すように、前記注入口3bの片側に注入管9を差込み、グラウト注入装置(図示せず)によりグラウト材を注入する。
【0026】
前記グラウト材が筒体2の下部から充填され、前記注入口の他側の注入口3bから空気が抜け、やがてグラウト材は横方向の筒体2a,2b,2cに至って筒体の内部空間に充填される。この横方向の筒体2a,2cの端部上側には、小さな空気抜き用の孔10が設けられており、前記グラウト材は漏出しないが、空気は抜けるようにされている。前記他側の注入口3bからグラウト材が漏出した段階で、グラウト材の充填作業を停止する。
【0027】
前記グラウト材12は、図12に示すように、筒体2の地面接地面である下面2dと、法面7との間に、ある設定範囲内の隙間11があると、グラウト材排出用の孔2eから、当該グラウト材12が漏出して不陸部充填用シート5を前記隙間11に応じて膨出させる。こうして、法面7の不陸に対して、前記隙間11にグラウト材12が自然に充填されて、反力体1が安定して設置されるものである。
【0028】
また、前記グラウト材12の充填作業とともに、ロックボルト13の定着作業を平行して行うものである。砂割、前記孔8にロックボルト13を挿入してブラウト材を充填する。そのグラウト材が硬化した後に、反力体1の井桁状の交差部において、定着板14(図13参照)を、突起4で滑り落ちないようにして載置する。そして、定着ナット15で締結して定着させる。ロックボルト13の端部にはキャップ16を被せる。
【0029】
このように前記敷設作業,グラウト充填作業,定着作業を繰り返して、法面7に反力体1を、例えば、全体として格子状に敷設するものである。この反力体1の筒体2の長さが、従来のブロック製反力体に比べて長いので、全体に格子状に敷設することで、法面7に対する押さえとしての、中抜けが無いものである。
【0030】
なお、反力体1には、中央部に井桁状の交差部があるので、ロックボルト用の削孔作業をこの反力体1の敷設後においても、行うことができるものである。
【0031】
このように、反力体1が法面7に安定した状態で敷設される。また、前記筒体2間に間隔があるとともにその幅も広くないので、植物に覆われるようになり、植生の連続性を阻害することもない。また、不陸部充填用シート5は、生分解性樹脂で形成されているので、微生物によって自然に分解されて、地球環境にやさしいものとなる。
【0032】
【発明の効果】
以上説明したように、本発明に係るロックボルト用の反力体は、筒体が井桁状に形成されるとともに、当該筒体の交差部である井桁部の上面に設置される定着板に法面から突出したロックボルトの端部を定着ナットで定着させる反力体であって、前記筒体の交差部においては内部空間が互いに連通されてなり、前記筒体の地面接地面にグラウト材排出用の孔が設けられ、前記筒体の長手方向の開口端部において、法面に敷設した場合に上側となる開口部を蓋する閉蓋部材には前記筒体の内部空間に連通させたグラウト材注入用の注入口が穿設されるとともに、下側となる開口部にはこれを蓋する閉蓋部材が設けられているので、法面に敷設する前は筒体で形成され全体として軽量であって取り扱いやすく、運搬・敷設作業にも作業性が向上する。また、筒体である角形鋼管の強度で十分な反力が得られるが、内部空間にグラウト材を充填することで、一層、強度的に向上する。
更に、前記グラウト材が法面の不陸を埋めて、不陸があっても安定して設置することができる。筒体を井桁状にして構成してあるので、植生の連続性が維持される、という種々の優れた効果を奏するものである。
【0033】
前記筒体の交差部である井桁部の上面に、当該井桁部に設置される定着板の滑り落下を防止する突起が設けられているので、ロックボルトの定着作業も容易で効率的に作業することができる。
【0034】
筒体の地面接地面に、法面の不陸に応じてグラウト材排出用の孔から排出されるグラウトにより膨出して不陸部分を埋める不陸部充填用シートが設けられているので、グラウト材を筒体の内部空間に充填するだけで、不陸部分を自然に埋めることができる。
【0035】
前記不陸部充填用シートは、生分解性樹脂により形成されたものであるので、時間の経過と共に自然に微生物により分解され、環境維持に役立つものである。
【図面の簡単な説明】
【図1】本発明に係るロックボルト用の反力体1斜視図である。
【図2】同ロックボルト用の反力体1における下面2dに設けられた孔2eを示す、一部の底面図である。
【図3】同ロックボルト用の反力体1における、閉蓋部材3aの正面図である。
【図4】同ロックボルト用の反力体1における、不陸部充填用シート5が止め具6で取り付けられた状態を示す一部断面図である。
【図5】同ロックボルト用の反力体1における、不陸部充填用シート5の斜視図である。
【図6】同ロックボルト用の反力体1における、止め具6側面図(A),(B)である。
【図7】同ロックボルト用の反力体1における、不陸部充填用シート5に止め具6が取り付けられた状態の斜視図である。
【図8】同ロックボルト用の反力体1の平面図である。
【図9】同ロックボルト用の反力体1の正面図である。
【図10】同ロックボルト用の反力体1を法面7に敷設した状態の断面図である。
【図11】同ロックボルト用の反力体1に、グラウト材を注入する様子を示す説明図である。
【図12】同ロックボルト用の反力体1にグラウト材12を注入した際に、孔2eからグラウト材が漏出して不陸充填用シート5を膨出させ、不陸を埋める様子を示す説明図である。
【図13】ロックボルト13の定着用に使用される定着板14の斜視図である。
【符号の説明】
1 ロックボルト用の反力体、 2 筒体、
2a,2b,2c 横方向の筒体、
2d 下面(地面接地面)、 2e 孔、
3,3a 閉蓋部材、 3b 注入口、
4 突起、 5 不陸部充填用シート、
5a フランジ、
6,6a,6b 止め具、 7 法面、
8 孔、 9 注入管、
10 空気抜き用の孔、 11 隙間、
12 グラウト材、 13 ロックボルト、
14 定着板、 15 定着ナット、
16 キャップ。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to, for example, a reaction force body for a lock bolt used in a method for stabilizing a slope, and lays the reaction force body on an inclined surface to improve the efficiency of construction for injecting a grout material. It is related with the reaction body for the rock bolt in consideration of the continuity of vegetation.
[0002]
[Prior art]
Conventionally, as a reaction body for a rock bolt used for stabilization of a slope, for example, as Conventional Example 1, reinforcing bars are arranged along the slope on the site, a frame is assembled, and concrete is placed. As a
[0003]
[Problems to be solved by the invention]
However, in the conventional example 1, it is necessary to arrange the reinforcing bars along the unevenness of the slope, so that it takes time, the construction of the crossing of the frame becomes complicated, the concrete curing period becomes long and the construction period cannot be shortened. There are challenges. Furthermore, since the height and width of the legal frame is usually as large as 300 mm × 300 mm, even if the inside of the lattice of the legal frame is greened, the legal frame cannot be concealed, which is an aesthetic problem.
In the conventional example 2, it does not take time to lay on the slope, but the weight of the block body is so heavy that laying work is difficult on steep slopes, and the slope to which this is applied is limited. There is a problem that the greening of the part is not possible.
Furthermore, in the block body, in order to process the unevenness (unevenness) of the natural ground, it is necessary to level the mortar, which is a difficult process on a steep slope prior to the installation of the block body. Instead, it is known to adjust the unevenness by laying a relatively expensive mat or laying a bag after injecting grout, but the former is difficult to secure the necessary thickness in terms of cost, In the latter, since there is only one injection port, there are problems such as that the grout does not spread all over the recess. The reaction force body for a lock bolt according to the present invention has been proposed to solve such a problem.
[0004]
[Means for Solving the Problems]
The gist for solving the above-described problems of the reaction force body for a lock bolt according to the present invention is that a cylinder is formed in a cross- girder shape and is fixed on the upper surface of a cross-girder part that is an intersection of the cylinders. It is a reaction body that fixes the end of the lock bolt protruding from the slope to the plate with a fixing nut, and internal spaces are communicated with each other at the intersection of the cylinder, and the ground contact surface of the cylinder Grout material discharge holes are provided, and at the opening end in the longitudinal direction of the cylinder, the lid member that covers the upper opening when laid on the slope is in communication with the internal space of the cylinder. In addition, the injection port for injecting the grout material is formed, and the opening on the lower side is provided with a closing member for covering it .
[0005]
A protrusion is provided on the upper surface of the cross-girder part, which is an intersection of the cylinders, so as to hit the side surface of the fixing plate installed in the cross-girder part and prevent its sliding and dropping;
In addition, on the ground contact surface of the cylindrical body, a non-land portion filling sheet is provided that bulges by the grout discharged from the grout material discharge hole according to the slope of the slope and fills the non-land portion. thing,;
Furthermore, the uneven | corrugated part filling sheet | seat contains that it is formed with biodegradable resin.
[0006]
According to the reaction force body for a lock bolt according to the present invention, the reaction force body formed in a cross beam shape is formed in a factory by, for example, a square steel pipe as a cylindrical body, and a grout material is formed in the internal space of the cylindrical body. Since it is in an unfilled state, it is much lighter than a concrete block, making it easy to transport, carry in, and lay on a slope.
[0007]
In addition, after laying the reaction force body on the slope, injecting and filling the grout material into the inner space of the cylinder, the strength of the reaction force body is increased and a plurality of grout discharge holes are provided. Since it is provided, the non-land portion is easily and sufficiently buried, and the installation state of the reaction body is stabilized.
[0008]
In addition, since there is a fixing plate projection for fixing the lock bolt in the cross beam portion of the reaction force body, it is easy to place the fixing plate on the cross beam portion after laying the reaction force body on the slope. Therefore, there is no danger of falling, so safety is ensured.
[0009]
In addition, the uneven surface filling sheet can easily cope with the irregularities of the slope. And since the sheet | seat for this uneven part filling is formed with biodegradable resin, a sheet | seat decomposes | disassembles and lose | disappears naturally.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Next, the reaction force body 1 for a lock bolt according to the present invention will be described with reference to the drawings. The reaction force body 1 is, for example, a 100 mm × 100 mm mouth, and a
[0011]
As shown in FIG. 1, as shown in FIG. 1, for example, in the crossed portion of the above-described cylindrical cross-beams, the horizontal
[0012]
This is because when the subsequent grout material is filled in the internal space of the reaction force body 1, it reaches the internal space and is filled in the entire internal space. A relatively small grout air vent hole (with no leakage of the grout material) is provided in the upper part of the end portions of the
[0013]
Compared to the concrete manufacturing method frame which is a general conventional method frame, in the reaction force body 1 according to the present invention, since a high-strength square steel pipe is used, the height of the
[0014]
Also, as shown in FIG. 8, the width of the
[0015]
Moreover, greening is possible by planting plants in the natural ground between the
[0016]
Further, as shown in FIG. 2, a grout
[0017]
At the opening end of the
[0018]
As shown in FIG. 1, a fixing plate (see FIG. 13) 14 that is a circular flat plate for fixing a lock bolt installed on the cross beam portion is mounted on the upper surface of the cross beam portion that is an intersecting portion of the
[0019]
The
[0020]
As shown in FIGS. 1 and 4, the
[0021]
As shown in FIG. 5, the non-land
[0022]
The
[0023]
Then, for example, a double-sided adhesive tape is attached to the upper surface of the
[0024]
A method of using the reaction force body 1 of the present invention thus formed will be described. As shown in FIGS. 8 to 9, the reaction body 1 is formed in a factory. And this reaction force body 1 is carried in the spot. As shown in the figure, holes 8 for lock bolts are drilled on the
[0025]
The reaction body 1 is laid such that the
[0026]
The grout material is filled from the lower part of the
[0027]
As shown in FIG. 12, when there is a
[0028]
Further, the fixing operation of the
[0029]
In this way, the laying operation, the grout filling operation, and the fixing operation are repeated to lay the reaction body 1 on the
[0030]
In addition, since the reaction force body 1 has a cross-shaped crossing portion at the center, the drilling operation for the lock bolt can be performed even after the reaction force body 1 is laid.
[0031]
In this way, the reaction force body 1 is laid on the
[0032]
【The invention's effect】
As described above, the reaction force body for a lock bolt according to the present invention is a method in which a cylinder is formed in a cross- girder shape and a fixing plate installed on the upper surface of a cross-girder part that is an intersection of the cylinders. A reaction force body that fixes the end of the lock bolt protruding from the surface with a fixing nut, wherein internal spaces are communicated with each other at the intersection of the cylinder, and grout material is discharged to the ground contact surface of the cylinder A grout is provided in the longitudinal direction of the opening of the cylinder, and the closing member that covers the upper opening when laid on the slope is in communication with the internal space of the cylinder The injection port for material injection is drilled, and the opening on the lower side is provided with a closure member that covers it, so it is formed of a cylindrical body before it is laid on the slope and is lightweight as a whole It is easy to handle and improves workability for transportation and laying work. . Further, a sufficient reaction force can be obtained with the strength of the rectangular steel pipe that is a cylindrical body, but the strength is further improved by filling the inner space with a grout material.
Furthermore, the grout material fills the sloped unevenness and can be stably installed even if there is unevenness. Since the cylindrical body is formed in a cross-beam shape, various excellent effects of maintaining vegetation continuity are exhibited.
[0033]
Since a projection for preventing the fixing plate installed in the cross beam portion from slipping and dropping is provided on the upper surface of the cross beam portion which is an intersection of the cylinders, the fixing work of the lock bolt is also easy and efficient. be able to.
[0034]
Since the ground contact surface of the cylinder is provided with a non-land portion filling sheet that bulges by the grout discharged from the grout material discharge hole according to the slope unevenness and fills the non-land portion. By simply filling the interior space of the cylinder with the material, it is possible to naturally fill in the uneven areas.
[0035]
Since the non-land portion filling sheet is formed of a biodegradable resin, it is naturally decomposed by microorganisms with the passage of time, and is useful for maintaining the environment.
[Brief description of the drawings]
FIG. 1 is a perspective view of a reaction force body 1 for a lock bolt according to the present invention.
FIG. 2 is a partial bottom view showing a
FIG. 3 is a front view of a closing
4 is a partial cross-sectional view showing a state in which a non-land
FIG. 5 is a perspective view of a non-land
6A and 6B are side views (A) and (B) of the
FIG. 7 is a perspective view showing a state in which a
FIG. 8 is a plan view of a reaction force body 1 for the lock bolt.
FIG. 9 is a front view of the reaction force body 1 for the lock bolt.
FIG. 10 is a cross-sectional view showing a state in which the reaction force body 1 for the lock bolt is laid on the
FIG. 11 is an explanatory view showing a state in which a grout material is injected into the reaction force body 1 for the lock bolt.
FIG. 12 shows how the grout material leaks from the
13 is a perspective view of a fixing
[Explanation of symbols]
1 reaction force body for rock bolt, 2 cylinder,
2a, 2b, 2c lateral cylinders,
2d bottom surface (ground contact surface), 2e hole,
3, 3a closing member, 3b inlet,
4 protrusions, 5 sheet for filling the uneven area,
5a flange,
6, 6a, 6b Stopper, 7 Slope,
8 holes, 9 injection tubes,
10 holes for venting, 11 gaps,
12 grout materials, 13 rock bolts,
14 fixing plate, 15 fixing nut,
16 Cap.
Claims (4)
前記筒体の交差部においては内部空間が互いに連通されてなり、
前記筒体の地面接地面にグラウト材排出用の孔が設けられ、
前記筒体の長手方向の開口端部において、法面に敷設した場合に上側となる開口部を蓋する閉蓋部材には前記筒体の内部空間に連通させたグラウト材注入用の注入口が穿設されるとともに、下側となる開口部にはこれを蓋する閉蓋部材が設けられていること、
を特徴とするロックボルト用の反力体。A cylinder that is formed in a cross- beam shape, and a reaction body that fixes the end of the lock bolt protruding from the slope to the fixing plate installed on the upper surface of the cross-beam portion that is the intersection of the cylinders with a fixing nut. There,
At the intersection of the cylinders, the internal spaces are communicated with each other,
Grout material discharge holes are provided in the ground contact surface of the cylinder,
In the opening end in the longitudinal direction of the cylindrical body, the closing member that covers the upper opening when laid on the slope has an injection port for injecting a grout material communicated with the internal space of the cylindrical body. The lower opening is provided with a closing member that covers it,
A reaction force body for rock bolts.
を特徴とする請求項1に記載のロックボルト用の反力体。Protrusions that hit the side surface of the fixing plate installed in the cross girder part and prevent its sliding and dropping are provided on the upper surface of the cross girder part that is the intersection of the cylinders,
The reaction force body for a lock bolt according to claim 1.
を特徴とする請求項1に記載のロックボルト用の反力体。The ground contact surface of the cylindrical body is provided with a non-land portion filling sheet that bulges by the grout discharged from the grout material discharge hole according to the slope unevenness and fills the non-land portion,
The reaction force body for a lock bolt according to claim 1.
を特徴とする請求項3に記載のロックボルト用の反力体。The non-land portion filling sheet is formed of a biodegradable resin,
The reaction force body for a lock bolt according to claim 3.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002227307A JP4115199B2 (en) | 2002-05-15 | 2002-08-05 | Reaction body for rock bolt |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2002139935 | 2002-05-15 | ||
| JP2002227307A JP4115199B2 (en) | 2002-05-15 | 2002-08-05 | Reaction body for rock bolt |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004044331A JP2004044331A (en) | 2004-02-12 |
| JP4115199B2 true JP4115199B2 (en) | 2008-07-09 |
Family
ID=31719369
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2002227307A Expired - Lifetime JP4115199B2 (en) | 2002-05-15 | 2002-08-05 | Reaction body for rock bolt |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4115199B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05697U (en) * | 1991-06-19 | 1993-01-08 | 株式会社マルキン産業 | Beverage supply device |
-
2002
- 2002-08-05 JP JP2002227307A patent/JP4115199B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05697U (en) * | 1991-06-19 | 1993-01-08 | 株式会社マルキン産業 | Beverage supply device |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004044331A (en) | 2004-02-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20140059957A1 (en) | Tower foundation system | |
| KR101223667B1 (en) | Irrigation channel using pre-cast concrete panel and constructing method thereof | |
| US7083364B2 (en) | Retaining wall system with interlocked wall-building units | |
| US7452164B2 (en) | Retaining wall system with interlocked wall-building units | |
| JP6581414B2 (en) | Slope reinforcement structure and slope reinforcement construction method | |
| JP4707838B2 (en) | Retaining wall system including engaging wall construction unit | |
| JP4115199B2 (en) | Reaction body for rock bolt | |
| CN114182745B (en) | High liquid limit soil ecological retaining wall ecological slope protection roadbed and construction method | |
| KR101540063B1 (en) | Construction Method of Tunnel with Self-supporting retaining wall | |
| US10400418B2 (en) | Combined counterfort retaining wall and mechanically stabilized earth wall | |
| US10337164B2 (en) | Threadbar connections for wall systems | |
| JP3440169B2 (en) | Artificial island ground and its construction method | |
| JP2548634B2 (en) | Underwater structure using underwater ground driving member | |
| JP3902036B2 (en) | Structure with retaining walls on both sides | |
| JP2005350884A (en) | Method for widening road and the like, and wall surface panel | |
| US20080170913A1 (en) | Seawall connector for attachment of geogrid material | |
| JP4068689B2 (en) | Connected structure | |
| KR100680246B1 (en) | Greening retaining wall using H-beam and shelf block | |
| JP2005220669A (en) | Slope face protection structure | |
| JP4834649B2 (en) | Construction structure of embankment structure, retaining wall block for construction of embankment structure and construction method of embankment structure | |
| KR200409796Y1 (en) | Greening retaining wall using H-beam and shelf block | |
| JPH0743172Y2 (en) | Slope retaining wall | |
| KR102824085B1 (en) | Retaining wall construction method applied with RC and reinforced earth method | |
| JP4485388B2 (en) | Pressure frame forming plate and method frame method | |
| JPH04134533U (en) | Wave control structure using columnar members |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050715 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070921 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071119 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071225 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080326 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080415 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110425 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4115199 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110425 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110425 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120425 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130425 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130425 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140425 Year of fee payment: 6 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |