JP4124707B2 - How to build a natural stone revetment - Google Patents

How to build a natural stone revetment Download PDF

Info

Publication number
JP4124707B2
JP4124707B2 JP2003207070A JP2003207070A JP4124707B2 JP 4124707 B2 JP4124707 B2 JP 4124707B2 JP 2003207070 A JP2003207070 A JP 2003207070A JP 2003207070 A JP2003207070 A JP 2003207070A JP 4124707 B2 JP4124707 B2 JP 4124707B2
Authority
JP
Japan
Prior art keywords
natural stone
natural
revetment
porous concrete
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003207070A
Other languages
Japanese (ja)
Other versions
JP2005060930A (en
Inventor
健 鶴田
仲 宮川
英之 丸山
Original Assignee
マテラス青梅工業株式会社
株式会社オークサ・マテックス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by マテラス青梅工業株式会社, 株式会社オークサ・マテックス filed Critical マテラス青梅工業株式会社
Priority to JP2003207070A priority Critical patent/JP4124707B2/en
Publication of JP2005060930A publication Critical patent/JP2005060930A/en
Application granted granted Critical
Publication of JP4124707B2 publication Critical patent/JP4124707B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Retaining Walls (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、自然石護岸および自然石護岸の構築方法に関し、より詳細には、河川等の護岸部分に動物が生息すると共に、植物が繁茂することが可能な自然石護岸および自然石護岸の構築方法に関する。
【0002】
【従来の技術】
従来の河川工事においては、治水の目的から、河川や湖沼等の護岸にはコンクリートが用いられており、これによって増水時の洗掘から川岸を保護し、増水した水をいち早く下流へと導くことができ、安全な生活の提供において重要な役割を果たしてきた。
近年、生活水準の向上により、機能面だけでなく、景観面の充実が河川工事においても要求されるようになった。そこで、河川や湖沼等における護岸に、近自然工法として、自然石を石積工または石張工として護岸工とする方法が実際に施工され、特許文献1においては、ポーラスコンクリートを護岸コンクリートに用いた護岸が示されている。
このような近自然工法を採用することにより、自然石の隙間やポーラスコンクリートの空隙部分に魚類が棲んだり植物の繁茂が可能になるため、自然豊かな河川環境にすることができるとされている。
【0003】
【特許文献1】
特開2002−285525公報
【0004】
【発明が解決しようとする課題】
しかしながら、自然石を積み上げて護岸を構築しても、安全上、石と石の隙間および目地にコンクリートを詰め込んで施工することが多く、自然石護岸の特徴点であるところの、動植物の生活環境になるべき石と石の目地が埋められてしまい、実際には小動物が生息したり、思うように植生が進まないという課題があることが判明した。
また、特許文献1に開示されているポーラスコンクリートを使用した護岸は、表面が多孔質のポーラスコンクリートであるため、動植物にとって良好な生育環境を提供することができるが、植生がない状態における外観は従来のコンクリート護岸とほとんど変わらないため、植生が進むまでの間においては良好な外観を得ることができないといった課題がある。
【0005】
そこで、本願発明者は、自然石を安定的に積み上げることができ、また、実際に動植物が繁殖可能で、しかも完成と同時に良好な外観を呈することが可能な自然石護岸の構築方法の提供を目的としている。
【0006】
【課題を解決するための手段】
以上の課題を解決し、目的を達成するために、本発明は以下に示す構成を有している。
すなわち、地山の法面に裏込め材とポーラスコンクリートの胴込め材を介して自然石を配設して構築される自然石護岸の構築方法であって、前記法面に裏込め材を所定高さに投入した後に、前記自然石を配設する工程と、前記自然石の目地部分に前記ポーラスコンクリートからなる胴込め材を打設するための型枠および前記目地部分からの前記ポーラスコンクリートからなる胴込め材の流出防止材として、植生袋を配設する工程と、前記配設された自然石および植生袋と、前記裏込め材との間に、前記ポーラスコンクリートからなる胴込め材を打設する工程と、を繰り返し行うことにより、前記法面に自然石護岸を構築することを特徴とする自然石護岸の構築方法である。
これにより、自然石を安全に積み上げまたは貼り付けて護岸を構築することができると共に、小動物や植物が生育しやすい環境を提供することができるので、真の意味での近自然護岸を実現することができる。また、急流河川において用いても、表面部分が自然石により保護されていると共に、目地部分には植生袋が配設されているので、胴込め材としてのポーラスコンクリートを打設した際に、目地部分から流出してしまうことや、実使用時において水流により洗掘されてしまうおそれがなくなるため、耐久性を向上させることも可能になる。
【0007】
また、前記自然石を配設する際に、当該自然石にアンカーを配設する工程と、当該アンカーを地山側に固着させる工程を含むことを特徴とする。
また、前記自然石を配設する際に、当該自然石に連結具を配設する工程と、当該連結具を連結手段により互いに連結する工程を含むことを特徴とする。
これらにより、さまざまな大きさの自然石をより安定して配設することができるので、安全性を向上させることができる。また、自然石を護岸の延長方向(水平方向)に一体化することができるので、サイズの小さい自然石であっても洪水時などにおいて流失してしまうおそれがなくなり、安定した自然石護岸を構築することができる。
【0008】
さらにまた、前記ポーラスコンクリートは、1m3当たり、350kg〜450kgのポルトランドセメント、0.3〜1.5kgの水溶性増粘剤と、2〜6kgの液状の減水剤もしくは、0.35〜1.50kgの粉体の減水剤を配合したものであることが好ましい。
これによれば、ポーラスコンクリートの流動性が格段に向上するため、自然石のような個々の石の大きさが均一でないものを積み上げた際の胴込めコンクリートのように、締め固めが不可能であるような条件下であっても、従来のような普通コンクリートを胴込めコンクリートに用いた時と同等の仕上がりにすることができる。
【0012】
【発明の実施の形態】
(第1の実施の形態)
以下に、本実施の形態にかかる自然石護岸について説明する。図1は、本実施の形態における自然石護岸の概略構造を示す説明図である。
自然石護岸100は、所定の勾配に掘削された地山10に整形された法面12と、河床Kにコンクリート等により形成される基礎14と、基礎14の上に積み上げられた自然石16と、自然石16の隙間および目地を埋めるポーラスコンクリートからなる胴込め材18と、胴込め材18と法面12の間に投入される礫砕石等による裏込め材20と、自然石16を胴込め材18または胴込め材18および裏込め材20に支持させるためのアンカー30とにより構成されている。
【0013】
従来の自然石護岸100は、胴込め材18にほとんど透水性のない普通コンクリートを用いていたため、雨水および地山10からの地下水は、裏込め材20の隙間を流下すると同時に、地山10の細砂を洗屈することがある。これにより、自然石護岸100と地山10との間に隙間が生じ、自然石護岸100が崩壊してしまうことも考えられる。
本実施の形態においては、地山10と河川構造物との境界面に、裏込め材20を介して透水性を有するポーラスコンクリートを胴込め材18として用いている。これにより、自然石16の目地から裏込め材20を介して地山10に浸透した雨水や地山10からの地下水を、地山10の土砂や裏込め材20の流出を伴わずに河川に流出させることも可能になる。
【0014】
なお、胴込め材18として用いるポーラスコンクリートには、表1に示すような配合のものを用いるのが好適である。
【表1】

Figure 0004124707
表1に示す配合のポーラスコンクリートは、普通コンクリートと同等以上の強度を有しながらも、流動性があり、本実施の形態のような自然石を積み上げた際の胴込め材18として用いれば、締め固めをしなくても、自然石間の隙間に入り込み、確実に胴込め材としてのポーラスコンクリートを打設することができるため好適である。
【0015】
また、図1から明らかなように、自然石護岸100の川表側には、自然石16があらわれており、胴込め材18や裏込め材20が直接流水面にあらわれてこないため、河川の流水による吸出し作用が少なくなるので、河川上流部のような急流区域においても裏込め材20や胴込め材18にポーラスコンクリートのような多孔質の材料を用いることができ、河川全体で統一された自然石護岸を用いた近自然型護岸の施工が可能になる。
【0016】
従来技術においては、護岸用コンクリートにポーラスコンクリートを用いようと試みても、ポーラスコンクリートの空隙率(軽量化)の点から急流部への適用ができなかった。本実施の形態における自然石護岸100のように、流水面部分に侵食に強く、自重の大きい自然石16を配設することにより、深目地となり、水流による胴込め材18や裏込め材20の侵食や流出が抑えられるため、河川上流部のような急流部においてもポーラスコンクリートを用いた自然石護岸100を施工することが可能になるといった効果がある。
【0017】
次に、自然石護岸100の構築手順について説明する。図2は、本実施の形態にかかる自然石護岸の構築手順の概略を示す工程図である。図3は、本実施の形態にかかる自然石護岸の構築状況を示す説明図である。
まず、掘削機械により、河川の流路を変更する(S101)。次に自然石護岸100を構築する現場の地山10を掘削機械により掘削し、法面12を人力等により整形する(S102)。法面12の整形が完了したら、河床Kにコンクリート等により基礎14を構築する(S103)。基礎14が構築された後、図示しない丁張に従って、裏込め材20を所定の高さまで投入する(S104)。続いて、丁張に従って、基礎14の上に自然石16を並べる(S105)。自然石16には、アンカー30が取り付けられているので、アンカー30を介して自然石16を胴込め材18や裏込め材20に固定支持させることができる。これにより、安定した自然石護岸100とすることができる。
【0018】
一段目の自然石16が並べ終わったら、ポーラスコンクリートの胴込め材18を打設するための型枠として、また、自然石16の目地からの流出防止材として、植生袋(土砂袋)22を自然石16の目地部分に配設する(S106)。植生袋(土砂袋)22が配設された後、胴込め材18であるポーラスコンクリートを打設する(S107)。ポーラスコンクリートは表1に示したような配合のものを用いることにより、通常のコンクリートと同等もしくはそれ以上の流動性を持たせることができるので、バイブレータ等を用いなくても、自然石16、16・・・の隙間部分に入り込み隙間部分を埋めるように打設することができる。ポーラスコンクリートが固化した後に、砕石等の裏込め材20を所定量埋め戻し、転圧を行う(S108)。
【0019】
自然石16が所定の高さになるまで自然石16の積み上げ(S105)、植生袋(土砂袋)22の配設(S106)、胴込め材18のポーラスコンクリートの打設(S107)、裏込め材20の埋め戻しおよび転圧(S108)を繰り返し行い、法面の法尻から一段ずつ自然石護岸100を積み上げていく。
自然石16が所定の高さになったら、最後に天端コンクリート17を打設(S109)して、自然石護岸100の構築が完了する(S110)。
【0020】
(第2の実施の形態)
第1の実施の形態においては、地山表面に裏込め材を介して自然石16を単純に積み上げ、自然石16に取り付けたアンカー30を地山側に固定支持させることにより、自然石護岸100が構築されているが、本実施の形態においては、自然石16の背面側(地山側)にとりつけたアンカー30の他に、自然石16の表面側(川表側)に連結具32を取り付け、隣接する連結具32を連結するワイヤー34により連結している。これにより、さらに安定した自然石護岸100を構築することができる。
図4は、本実施の形態における自然石護岸の構築状況を示す説明図である。図5は図4の河床から自然石護岸を見た状態を示す概略図である。
【0021】
本実施の形態においても先の実施の形態と同様に、自然石護岸100を構築する法面の傾斜や自然石16の大きさに応じて、自然石16の背面(地山側)にアンカー30を配設している。自然石16に取り付けられたアンカー30は、地山側に埋設するように設置されているので、胴込め材18または胴込め材18および裏込め材20により固定することができる。これにより、自然石16を安定させることができ、安全な自然石護岸100を提供することが可能になる。
【0022】
また、図5に示すように、施工延長方向に隣り合う自然石16の水路側に取り付けられた連結具32どうしをワイヤー34等により互いに連結させれば、自然石護岸100の施工延長方向に配設した自然石16、16・・・の水平方向の一段をそれぞれ一体にすることができるため、さらに好適に自然石16を安定保持させることができる。このように法面に配設された自然石16を安定保持することにより、大雨による増水があった後においても、自然石16が流失してしまうことがないため、護岸としての機能を十分に果たすことができる。
【0023】
次に本実施の形態における自然石護岸100の構築方法について説明する。図6は本実施の形態における自然石護岸の構築手順の概略を示す工程図である。
まず、バックホゥ等の掘削機械(図示せず)により、河川の流路を変更する(S201)。次に自然石護岸100を構築する現場の地山10を掘削機械により掘削し、整形する(S202)。次に図示しない丁張に従い裏込め材20を所定の高さまで投入する(S203)。次に河床Kにコンクリート等により基礎14を構築する(S204)。
【0024】
次に自然石16にアンカー30および連結具32を取り付けする(S205)。自然石16へのアンカー30および連結具32の取り付けは、積み上げるべき自然石16の全てにあらかじめ取り付けるようにしてもよいし、自然石16を積み上げる前にその都度アンカー30と連結具32を取り付けるようにしてもよい。さらに巨石を積み上げる際においては、自然石16を積み上げた後にアンカーを挿通する挿通孔(図示せず)を削孔して、当該挿通孔にアンカー30を挿通し、挿通孔とアンカー30の隙間に充填物を充填して固定してもよい。
【0025】
アンカー30および連結具32が取り付けられた自然石16を図示しない丁張に従って、基礎14の上に施工延長方向に一列に積み上げる(S206)。一段目の自然石16が積み上げ終わったら、隣り合う連結具32どうしをワイヤー34で結束させる(S207)。さらには、図4に示すように、アンカー30と、アンカー30に交差するようにして自然石護岸100の施工延長方向にかけわたした鉄筋36とを溶接やワイヤー等により連結すれば尚好適である。
【0026】
次に、ポーラスコンクリートの胴込め材18を打設するための型枠として、また、自然石の目地からの流出防止材として植生袋(土砂袋)22を自然石16の目地部分および地山側の部分に配設する(S208)。
次に胴込め材18のポーラスコンクリートを打設する(S209)。ポーラスコンクリートは添加剤により流動性が向上しているため、バイブレータ等を用いなくても、自然石16、16・・・の隙間部分に入り込み隙間部分を埋めることができる。ポーラスコンクリートが固化した後に、砕石等の裏込め材20を投入して、転圧を行う(S210)。
【0027】
自然石16が所定の高さになるまで自然石16を積み上げ(S206)、アンカー30および連結具32の連結(S207)、型枠および流出防止材としての植生袋(土砂袋)22の配設(S208)、胴込め材18のポーラスコンクリートの打設(S209)、裏込め材20を埋め戻し、転圧(S210)作業を繰り返し行う。
自然石16が所定の高さになったら、最後に天端コンクリート17を打設(S211)して、自然石護岸100の構築が完了する(S212)。
【0028】
以上に本発明にかかる自然石護岸の好適な実施の形態を説明してきたが、本発明は以上の実施の形態に限定されるものではなく、発明の要旨を逸脱しない範囲において各種の変更がなされても、本願発明の技術的範囲に属するのは言うまでもない。
例えば、本実施の形態においては、胴込め材18にのみポーラスコンクリートを用い、裏込め材20に礫砕石を用いているが、胴込め材18および裏込め材20の両方に、ポーラスコンクリートを用いることももちろん可能である。
【0029】
また、本実施の形態においては、法面勾配が急(1.0:1.2以上)なものについてのみ説明しているが、法面勾配が緩い(1.0:1.2未満)の場合においては、アンカー30および連結具32を使用せずに自然石護岸100を構築することももちろん可能である。さらには、アンカー30のみや、連結具32およびワイヤー34のみを用いて自然石護岸100を構築することも可能であることは言うまでもない。
【0030】
さらに、本実施の形態における連結具32を連結させるワイヤー34や鉄筋36は自然石護岸100の施工延長方向にかけわたしてあるが、図7に示すように地山10の法面12に沿って自然石16を設置した後に自然石16に挿通孔を形成して、鉄筋36を挿通させることにより、自然石16を串刺し状にして高さ方向にも連結させる形態としてもよいのはもちろんである。
【0031】
さらに、地山10の法面勾配が急な場合においては、アンカー30を法面12に対して垂直に設置するのではなく、水面に対して平行になるように、水平に配設し、アンカー30どうしをアンカー30に交差するようにして配設された鉄筋36に連結し、胴込め材18または胴込め材18および裏込め材20に支持させる形態としてもよいし、以上に例示した形態を適宜組み合わせた形態とすることももちろん可能である。
【0032】
【発明の効果】
本願発明にかかる自然石護岸においては、胴込め材としてポーラスコンクリートを用いているので、自然石の目地部分に吸出しは防止しつつも透水性を持たせることができる。これにより、河川から地山、地山から河川への水のみを出入り可能にすることができるため、安全でありながらもより自然に近い状態の護岸を提供することができる。
【0033】
また、使用するポーラスコンクリートの配合を特定範囲のものにしたことにより、普通コンクリートと同等の強度を有しながらも、流動性を有しているので、自然石のように個々の寸法が異なるものを積み上げた箇所においても、ポーラスコンクリートが自然石の隙間に入り込み、確実に胴込め材としてのポーラスコンクリートを打設することができる。従って、信頼性の高いポーラスコンクリートを用いた自然石護岸とすることができる。
さらに、自然石により表面が覆われているので、水の増減等による護岸の吸出しを防ぐことができ、耐久性のある自然石護岸にすることができる。これにより、胴込め材等にポーラスコンクリートを用いていても急流河川においても施工することが可能になる。
【0034】
また、自然石にアンカーや連結具を取り付けたことにより、安定した石積工または石張工とすることができるので、石職人によって正確に石が積み上げられなくても安全な自然石護岸を提供することができるので、自然石護岸の施工単価を低減させることも可能になる。
さらにまた、連結具どうしをワイヤーや鉄筋等により複数の自然石どうしが一体となるように連結させていることにより、自然石どうしを線方向または面方向に一体化することができるので自然石護岸がさらに安定化し、河川が増水しても自然石が流失してしまうおそれを大幅に減らすことができる等といった著効を奏する。
【図面の簡単な説明】
【図1】 第1の実施の形態における自然石護岸の概略構造を示す説明図である。
【図2】 第1の実施の形態にかかる自然石護岸の構築手順の概略を示す工程図である。
【図3】 第1の実施の形態における自然石護岸の構築状況を示す説明図である。
【図4】 第2の実施の形態における自然石護岸の構築状況を示す説明図である。
【図5】 図4の河床から自然石護岸を見た状態を示す概略図である。
【図6】 第2の実施の形態における自然石護岸の構築手順の概略を示す工程図である。
【図7】 他の実施の形態の一例を示す説明図である。
【符号の説明】
10 地山
12 法面
14 基礎
16 自然石
17 天端コンクリート
18 胴込め材(ポーラスコンクリート)
20 裏込め材
22 植生袋(土砂袋)
30 アンカー
32 連結具
34 ワイヤー
36 鉄筋
100 自然石護岸
K 河床[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a natural stone revetment and a method for constructing a natural stone revetment, and more specifically, a natural stone revetment and a natural stone revetment that allow animals to inhabit and grow plants on a revetment part such as a river. Regarding the method.
[0002]
[Prior art]
In conventional river construction, concrete is used for revetments such as rivers and lakes for the purpose of flood control, which protects the river bank from scouring at the time of flooding and quickly leads the increased water downstream. Has played an important role in providing safe living.
In recent years, the improvement of living standards has required not only functional aspects but also landscape aspects in river construction. Therefore, for the revetment in rivers, lakes, etc., as a near-natural construction method, a method of using a natural stone as a masonry or stonework as a revetment work was actually constructed. In Patent Document 1, porous concrete was used for revetment concrete. The revetment is shown.
By adopting such a near-natural construction method, it is said that it is possible to create a river environment rich in nature, because fish can crawl in the gaps between natural stones and voids in porous concrete and plants can grow. .
[0003]
[Patent Document 1]
Japanese Patent Laid-Open No. 2002-285525
[Problems to be solved by the invention]
However, even when building a revetment by stacking natural stones, for safety reasons, it is often the case that concrete is packed in the gap between stones and joints, and the living environment of animals and plants is a feature of natural stone revetments. It turned out that the stones and stone joints that were supposed to be filled were buried, and in fact, there were problems that small animals inhabited and vegetation did not advance as expected.
Moreover, since the surface of the revetment using porous concrete disclosed in Patent Document 1 is porous concrete, it can provide a good growth environment for animals and plants, but the appearance in the absence of vegetation is Since it is almost the same as a conventional concrete revetment, there is a problem that a good appearance cannot be obtained until vegetation proceeds.
[0005]
Therefore, the inventor of the present application provides a method for constructing a natural stone revetment that can stably pile up natural stones, can actually reproduce animals and plants, and can exhibit a good appearance at the same time as completion. It is aimed.
[0006]
[Means for Solving the Problems]
In order to solve the above problems and achieve the object, the present invention has the following configuration.
That is, a natural stone revetment construction method constructed by placing natural stone on the slope of a natural mountain via a backfill material and a porous concrete trunking material, and the backfill material is predetermined on the slope From the step of disposing the natural stone after being put into a height, a mold for placing the indentation material made of the porous concrete on the joint portion of the natural stone, and the porous concrete from the joint portion As a material for preventing the outflow of the indwelling material, the indwelling material made of the porous concrete is placed between the step of disposing the vegetation bag, the natural stone and the vegetation bag disposed, and the backfilling material. The natural stone revetment construction method is characterized by constructing a natural stone revetment on the slope by repeatedly performing the step of installing.
As a result, it is possible to build a revetment by safely stacking or pasting natural stones, and to provide an environment in which small animals and plants can grow easily. Can do. Even when used in torrent rivers, the surface part is protected by natural stone and the vegetation bag is arranged in the joint part. Durability can be improved because there is no risk of spilling out from the portion or being scoured by water flow during actual use .
[0007]
Moreover, when arrange | positioning the said natural stone, the process of arrange | positioning an anchor to the said natural stone, and the process of adhering the said anchor to the natural ground side are characterized by the above-mentioned.
Moreover, when arrange | positioning the said natural stone, the process of arrange | positioning a connection tool to the said natural stone, and the process of connecting the said connection tool mutually by a connection means, It is characterized by the above-mentioned.
As a result, natural stones of various sizes can be arranged more stably, and safety can be improved. In addition, since natural stones can be integrated in the direction of the revetment (horizontal direction), there is no risk that even small natural stones will be washed away during floods, creating a stable natural stone revetment. can do.
[0008]
Furthermore, the porous concrete is 350 kg to 450 kg of Portland cement, 0.3 to 1.5 kg of a water-soluble thickener and 2 to 6 kg of a liquid water reducing agent per 1 m 3 , or 0.35 to 1. It is preferable to blend a 50 kg powder water reducing agent.
According to this, the fluidity of porous concrete is remarkably improved, so that compaction is impossible as in the case of indented concrete when stacking non-uniform stones such as natural stone. Even under certain conditions, it is possible to achieve the same finish as when ordinary concrete is used as indented concrete.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
(First embodiment)
The natural stone revetment according to this embodiment will be described below. FIG. 1 is an explanatory diagram showing a schematic structure of a natural stone revetment in the present embodiment.
The natural stone revetment 100 includes a slope 12 shaped into a natural ground 10 excavated to a predetermined slope, a foundation 14 formed of concrete or the like on the river bed K, and a natural stone 16 stacked on the foundation 14. Incorporating the natural stone 16, a casing material 18 made of porous concrete that fills the gaps and joints of the natural stone 16, a backpacking material 20 such as gravel crushed stones inserted between the casing material 18 and the slope 12, and the natural stone 16 It is comprised by the material 30 or the anchor 30 for making it support to the backpacking material 20 and the backpacking material 18. FIG.
[0013]
Since the conventional natural stone revetment 100 uses ordinary concrete having almost no water permeability for the trunking material 18, rainwater and groundwater from the natural ground 10 flow down the gap of the backfilling material 20 and at the same time, Fine sand may be washed. As a result, a gap may be formed between the natural stone revetment 100 and the natural ground 10, and the natural stone revetment 100 may collapse.
In the present embodiment, porous concrete having water permeability through the backfilling material 20 is used as the trunking material 18 at the boundary surface between the natural ground 10 and the river structure. As a result, rainwater that has penetrated the natural ground 10 from the joints of the natural stone 16 through the backfilling material 20 and groundwater from the natural ground 10 into the river without the earth and sand of the natural mountain 10 and the backfilling material 20 flowing out. It can also be drained.
[0014]
In addition, it is suitable to use the thing as shown in Table 1 for the porous concrete used as the indwelling material 18.
[Table 1]
Figure 0004124707
Porous concrete of the composition shown in Table 1 has fluidity while having strength equal to or higher than that of ordinary concrete, and if used as a shelling material 18 when stacking natural stones as in this embodiment, Even if it is not compacted, it is suitable because it can enter the gap between natural stones and can reliably place porous concrete as a casing material.
[0015]
In addition, as is clear from FIG. 1, natural stone 16 appears on the river surface side of the natural stone revetment 100, and the trunk material 18 and the backfill material 20 do not appear directly on the water surface. Since the sucking action caused by water is reduced, a porous material such as porous concrete can be used for the backfilling material 20 and the shelling material 18 even in a rapid flow area such as the upstream part of the river. Construction of a near-natural type revetment using a stone revetment becomes possible.
[0016]
In the prior art, even if an attempt was made to use porous concrete for the revetment concrete, it was not possible to apply it to a rapid flow part in terms of porosity (weight reduction) of porous concrete. Like the natural stone revetment 100 in the present embodiment, a natural stone 16 that is resistant to erosion and has a large weight is disposed on the surface of the water flow, so that it becomes deep joints, and the body material 18 and the backfill material 20 due to the water flow. Since erosion and outflow are suppressed, there is an effect that it is possible to construct a natural stone revetment 100 using porous concrete even in a rapid flow portion such as an upstream portion of a river.
[0017]
Next, the construction procedure of the natural stone revetment 100 will be described. FIG. 2 is a process diagram showing an outline of a construction procedure of a natural stone revetment according to the present embodiment. FIG. 3 is an explanatory diagram showing the construction status of the natural stone revetment according to the present embodiment.
First, the channel of the river is changed by the excavating machine (S101). Next, the natural ground 10 where the natural stone revetment 100 is constructed is excavated by a drilling machine, and the slope 12 is shaped by human power or the like (S102). When the shaping of the slope 12 is completed, the foundation 14 is constructed on the riverbed K with concrete or the like (S103). After the foundation 14 is constructed, the backfilling material 20 is thrown up to a predetermined height in accordance with a tension (not shown) (S104). Subsequently, the natural stones 16 are arranged on the foundation 14 in accordance with the tension (S105). Since the anchor 30 is attached to the natural stone 16, the natural stone 16 can be fixedly supported to the trunking material 18 and the backfilling material 20 via the anchor 30. Thereby, it can be set as the stable natural stone revetment 100. FIG.
[0018]
When the first-stage natural stones 16 are arranged, a vegetation bag (sandbag) 22 is used as a formwork for placing the porous concrete loading material 18 and as a material for preventing the natural stone 16 from flowing out of the joints. It arrange | positions to the joint part of the natural stone 16 (S106). After the vegetation bag (earth and sand bag) 22 is disposed, the porous concrete as the indwelling material 18 is placed (S107). Porous concrete can be provided with fluidity equal to or higher than that of ordinary concrete by using the blend shown in Table 1, so that natural stones 16 and 16 can be used without using a vibrator or the like. It can be placed so as to enter the gap portion and fill the gap portion. After the porous concrete is solidified, a predetermined amount of backfill material 20 such as crushed stone is backfilled, and rolling is performed (S108).
[0019]
Stacking of natural stone 16 until natural stone 16 reaches a predetermined height (S105), disposing vegetation bag (sediment bag) 22 (S106), placing concrete material 18 in porous concrete (S107), backfilling The backfilling and rolling (S108) of the material 20 are repeated, and the natural stone revetment 100 is piled up step by step from the slope of the slope.
When the natural stone 16 reaches a predetermined height, the top concrete 17 is finally placed (S109), and the construction of the natural stone revetment 100 is completed (S110).
[0020]
(Second Embodiment)
In the first embodiment, the natural stone 16 is simply piled up on the surface of the natural ground via a backfilling material, and the anchor 30 attached to the natural stone 16 is fixedly supported on the natural ground side, whereby the natural stone revetment 100 is obtained. Although constructed, in this embodiment, in addition to the anchor 30 attached to the back side (natural ground side) of the natural stone 16, a connecting tool 32 is attached to the surface side (river surface side) of the natural stone 16, and adjacent to it. It connects with the wire 34 which connects the connecting tool 32 to perform. Thereby, the more stable natural stone revetment 100 can be constructed | assembled.
FIG. 4 is an explanatory diagram showing the construction status of a natural stone revetment in the present embodiment. FIG. 5 is a schematic view showing a state where the natural stone revetment is seen from the river bed of FIG.
[0021]
Also in this embodiment, the anchor 30 is attached to the back surface (natural ground side) of the natural stone 16 according to the slope of the slope and the size of the natural stone 16 for constructing the natural stone revetment 100 as in the previous embodiment. It is arranged. Since the anchor 30 attached to the natural stone 16 is installed so as to be buried on the natural ground side, it can be fixed by the trunking material 18 or the trunking material 18 and the backfilling material 20. Thereby, the natural stone 16 can be stabilized and the safe natural stone revetment 100 can be provided.
[0022]
In addition, as shown in FIG. 5, if the connecting tools 32 attached to the water channel side of the natural stone 16 adjacent in the construction extension direction are connected to each other by a wire 34 or the like, the natural stone revetment 100 is arranged in the construction extension direction. Since the natural stones 16, 16... In the horizontal direction can be integrated with each other, the natural stone 16 can be more stably held. By stably holding the natural stone 16 arranged on the slope in this way, the natural stone 16 will not be washed away even after a heavy rain has occurred. Can fulfill.
[0023]
Next, the construction method of the natural stone revetment 100 in this Embodiment is demonstrated. FIG. 6 is a process diagram showing an outline of a construction procedure of a natural stone revetment in the present embodiment.
First, the flow path of the river is changed by an excavating machine (not shown) such as a backhoe (S201). Next, the natural ground 10 where the natural stone revetment 100 is constructed is excavated by a drilling machine and shaped (S202). Next, the backfilling material 20 is thrown up to a predetermined height in accordance with a not shown tension (S203). Next, the foundation 14 is constructed of concrete or the like on the river bed K (S204).
[0024]
Next, the anchor 30 and the connecting tool 32 are attached to the natural stone 16 (S205). The anchor 30 and the coupling tool 32 may be attached to the natural stone 16 in advance to all the natural stones 16 to be stacked, or before the natural stone 16 is stacked, the anchor 30 and the coupling tool 32 are attached each time. It may be. Furthermore, when stacking megaliths, after stacking natural stone 16, an insertion hole (not shown) through which the anchor is inserted is drilled, the anchor 30 is inserted into the insertion hole, and the gap between the insertion hole and the anchor 30 is inserted. The filling may be filled and fixed.
[0025]
The natural stones 16 to which the anchors 30 and the coupling tools 32 are attached are piled up in a row in the construction extension direction on the foundation 14 according to a tension (not shown) (S206). When the first-stage natural stones 16 have been stacked, the adjacent couplers 32 are bound together by the wires 34 (S207). Furthermore, as shown in FIG. 4, it is more preferable to connect the anchor 30 and the reinforcing bar 36 that crosses the anchor 30 in the construction extension direction of the natural stone revetment 100 by welding or wire.
[0026]
Next, a vegetation bag (sandbag) 22 is used as a formwork for placing the porous concrete loading material 18 and as a material for preventing outflow from natural stone joints. It arrange | positions to a part (S208).
Next, the porous concrete of the trunking material 18 is laid (S209). Since the porous concrete has improved fluidity due to the additive, it is possible to enter the gap portion of the natural stones 16, 16... Without using a vibrator or the like, and to fill the gap portion. After the porous concrete is solidified, the back-filling material 20 such as crushed stone is put in and rolled (S210).
[0027]
The natural stone 16 is piled up until the natural stone 16 reaches a predetermined height (S206), the anchor 30 and the coupling tool 32 are connected (S207), and the vegetation bag (sandbag) 22 is disposed as a mold and an outflow prevention material. (S208) The placement of the porous concrete of the casing material 18 (S209), the backfilling material 20 is backfilled, and the rolling (S210) operation is repeated.
When the natural stone 16 reaches a predetermined height, the top concrete 17 is finally placed (S211), and the construction of the natural stone revetment 100 is completed (S212).
[0028]
Although the preferred embodiment of the natural stone revetment according to the present invention has been described above, the present invention is not limited to the above embodiment, and various modifications are made without departing from the scope of the invention. However, it goes without saying that it belongs to the technical scope of the present invention.
For example, in this embodiment, porous concrete is used only for the trunking material 18 and gravel crushed stone is used for the backing material 20, but porous concrete is used for both the trunking material 18 and the backing material 20. Of course it is also possible.
[0029]
In the present embodiment, only the case where the slope is steep (1.0: 1.2 or more) has been described, but the slope is gentle (less than 1.0: 1.2). In some cases, it is of course possible to construct the natural stone revetment 100 without using the anchor 30 and the connector 32. Furthermore, it goes without saying that the natural stone revetment 100 can be constructed using only the anchor 30 or only the connector 32 and the wire 34.
[0030]
Furthermore, although the wire 34 and the reinforcing bar 36 for connecting the connector 32 in this embodiment are extended to the construction extension direction of the natural stone revetment 100, as shown in FIG. Of course, the natural stone 16 may be skewered and connected in the height direction by forming an insertion hole in the natural stone 16 after the stone 16 is installed and inserting the rebar 36.
[0031]
Further, when the slope of the natural ground 10 is steep, the anchor 30 is not installed vertically to the slope 12 but is arranged horizontally so as to be parallel to the water surface. 30 may be connected to a reinforcing bar 36 arranged so as to cross the anchor 30 and supported by the body member 18 or the body material 18 and the back material 20, or the forms exemplified above may be used. Needless to say, it is possible to adopt a combination form as appropriate.
[0032]
【The invention's effect】
In the natural stone revetment according to the present invention, since porous concrete is used as a trunking material, it is possible to give water permeability to the joint portion of the natural stone while preventing suction. Thereby, since only the water from the river to the natural mountain and the water from the natural mountain to the river can be made in and out, it is possible to provide a revetment in a safer and more natural state.
[0033]
In addition, because the composition of the porous concrete used is in a specific range, it has fluidity while having the same strength as ordinary concrete, but the individual dimensions are different like natural stone. Even in the place where the piles are piled up, the porous concrete enters the gaps between the natural stones, and the porous concrete as the loading material can be reliably placed. Therefore, it is possible to provide a natural stone revetment using highly reliable porous concrete.
Furthermore, since the surface is covered with natural stone, it is possible to prevent the revetment from being sucked out due to increase or decrease of water, etc., and to make the natural stone revetment durable. As a result, even if porous concrete is used for the trunk material or the like, the construction can be performed even in a rapid river.
[0034]
In addition, by attaching anchors and connecting tools to natural stone, it can be a stable stone masonry or stonework, providing a safe natural stone revetment even if stones are not piled up accurately by stone craftsmen It is possible to reduce the construction cost of natural stone revetment.
Furthermore, the natural stones can be integrated in the linear direction or the surface direction by connecting the connecting tools so that the natural stones are integrated with each other by wires or reinforcing bars. Is more stable, and it can significantly reduce the risk of natural stones being washed away even if the river increases.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing a schematic structure of a natural stone revetment in the first embodiment.
FIG. 2 is a process diagram showing an outline of a construction procedure of a natural stone revetment according to the first embodiment.
FIG. 3 is an explanatory diagram showing the construction status of a natural stone revetment in the first embodiment.
FIG. 4 is an explanatory diagram showing the construction status of a natural stone revetment in the second embodiment.
FIG. 5 is a schematic view showing a state where a natural stone revetment is seen from the river bed of FIG. 4;
FIG. 6 is a process diagram showing an outline of a construction procedure of a natural stone revetment in the second embodiment.
FIG. 7 is an explanatory diagram showing an example of another embodiment.
[Explanation of symbols]
10 Natural Mountain 12 Slope 14 Foundation 16 Natural Stone 17 Top End Concrete 18 Cavity Material (Porous Concrete)
20 Backfill material 22 Vegetation bag (sandbag)
30 Anchor 32 Connecting tool 34 Wire 36 Reinforcement 100 Natural stone revetment K River bed

Claims (3)

地山の法面に裏込め材とポーラスコンクリートの胴込め材を介して自然石を配設して構築される自然石護岸の構築方法であって、
前記法面に裏込め材を所定高さに投入した後に、
前記自然石を配設する工程と、
前記自然石の目地部分に前記ポーラスコンクリートからなる胴込め材を打設するための型枠および前記目地部分からの前記ポーラスコンクリートからなる胴込め材の流出防止材として、植生袋を配設する工程と、
前記配設された自然石および植生袋と、前記裏込め材との間に、前記ポーラスコンクリートからなる胴込め材を打設する工程と、
を繰り返し行うことにより、前記法面に自然石護岸を構築することを特徴とする自然石護岸の構築方法。
A natural stone revetment construction method that is constructed by placing natural stones on the slope of a natural mountain via backfilling material and porous concrete shelling material,
After throwing back-filling material at a predetermined height on the slope,
Arranging the natural stone;
A step of disposing a vegetation bag as a mold for placing the porous material made of porous concrete on the joint portion of the natural stone and an outflow prevention material of the porous material made of porous concrete from the joint portion. When,
Placing a trunking material made of the porous concrete between the arranged natural stone and vegetation bag and the backfilling material;
A natural stone revetment construction method characterized in that a natural stone revetment is constructed on the slope by repeating the above.
前記自然石を配設する際に、当該自然石にアンカーを配設する工程と、
当該アンカーを地山側に固着させる工程を含むことを特徴とする請求項1記載の自然石護岸の構築方法。
When disposing the natural stone , disposing an anchor on the natural stone;
The method for constructing a natural stone revetment according to claim 1, further comprising a step of fixing the anchor to the natural ground side.
前記自然石を配設する際に、当該自然石に連結具を配設する工程と、当該連結具を連結手段により互いに連結する工程を含むことを特徴とする請求項1または2記載の自然石護岸構築方法。 3. The natural stone according to claim 1, comprising a step of disposing a connecting tool on the natural stone and a step of connecting the connecting tool to each other by a connecting means when the natural stone is provided. Revetment construction method.
JP2003207070A 2003-08-11 2003-08-11 How to build a natural stone revetment Expired - Fee Related JP4124707B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003207070A JP4124707B2 (en) 2003-08-11 2003-08-11 How to build a natural stone revetment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003207070A JP4124707B2 (en) 2003-08-11 2003-08-11 How to build a natural stone revetment

Publications (2)

Publication Number Publication Date
JP2005060930A JP2005060930A (en) 2005-03-10
JP4124707B2 true JP4124707B2 (en) 2008-07-23

Family

ID=34363685

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003207070A Expired - Fee Related JP4124707B2 (en) 2003-08-11 2003-08-11 How to build a natural stone revetment

Country Status (1)

Country Link
JP (1) JP4124707B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009228218A (en) * 2008-03-19 2009-10-08 Sokei:Kk Stone masonry structure and stone masonry construction method
KR101282594B1 (en) * 2012-12-05 2013-07-12 주식회사 태하 Artificial riffle construction methods
JP6037490B1 (en) * 2016-06-11 2016-12-07 有限会社福井工業 Civil engineering structure and construction method of civil engineering structure

Also Published As

Publication number Publication date
JP2005060930A (en) 2005-03-10

Similar Documents

Publication Publication Date Title
CN103669399B (en) Concrete slab reinforced soil retaining wall and construction method thereof
CN102966119B (en) Geogrid reinforced wall and construction method thereof
CN103758134A (en) Combined double-row pile supporting system and construction method thereof
CN103410167A (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
CN107142926B (en) The supratectal steel trestle steel-pipe pile antiscour construction method of shallow water riverbed thickness erratic boulder
CN203429660U (en) Stereo stiffened rigid-flexible combined ecological retaining wall
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN106400744B (en) A kind of side slope comprehensive treatment structure and its construction method for preventing river channel erosion
JP5868352B2 (en) How to lay a road on the slope
CN211773854U (en) Soil retaining structure permeates water with soil nail
KR100654936B1 (en) Method for constructing retaining wall
JP4124707B2 (en) How to build a natural stone revetment
CN112227380A (en) Foundation pit support and foundation treatment synergy method, structure and construction method of underground structure
KR20110019674A (en) W. Basic reinforcement method
KR100910884B1 (en) Multi-stage cone base
KR20050110996A (en) Reinforced geotextile mat and reinforcement of earth slopes and embankments using the same
CN112878274A (en) Modular bank slope protective structure
JP5097249B2 (en) Drain structure and construction method of drain structure
CN113430989B (en) Lifting construction method for sea pond
CN215252686U (en) Construction structure of earth-rock dam on deep silt layer
CN110359464B (en) Sprayed concrete structure beneficial to drainage and construction method thereof
CN114075805A (en) Construction method for foundation earthwork of trestle
JPH0369721A (en) Steep gradient banking
JP2004124452A (en) Foundation pile structure and construction method of foundation pile on supporting ground

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050803

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071113

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080325

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080502

R150 Certificate of patent or registration of utility model

Ref document number: 4124707

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110516

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120516

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130516

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees