Installation of the bottom door of the case Download PDF

Info

Publication number
JP4129707B2
JP4129707B2 JP09697999A JP9697999A JP4129707B2 JP 4129707 B2 JP4129707 B2 JP 4129707B2 JP 09697999 A JP09697999 A JP 09697999A JP 9697999 A JP9697999 A JP 9697999A JP 4129707 B2 JP4129707 B2 JP 4129707B2
Authority
JP
Japan
Prior art keywords
shaft
bottom door
work chamber
connection hole
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP09697999A
Other languages
Japanese (ja)
Other versions
JP2000291017A5 (en
JP2000291017A (en
Inventor
留 元 男 持
Original Assignee
丸十工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 丸十工業株式会社 filed Critical 丸十工業株式会社
Priority to JP09697999A priority Critical patent/JP4129707B2/en
Publication of JP2000291017A publication Critical patent/JP2000291017A/en
Publication of JP2000291017A5 publication Critical patent/JP2000291017A5/ja
Application granted granted Critical
Publication of JP4129707B2 publication Critical patent/JP4129707B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、艤装(シャフト継ぎ足し)時に作業室内の圧力を一定に保ちながら、シャフト内の圧縮空気を排気して、大気圧にしなければならないため、ケ−ソンのシャフト接続孔を作業室の天井スラブで塞ぐボトムドアの取付方法に関するものである。
【0002】
【従来の技術】
周知のように、ケ−ソン工事に於いて、沈下の進行に伴い艤装工としてロック、シャフトの継足しが行なわれる。
【0003】
圧気作業中にシャフトの継足しを行う場合、ケ−ソンの作業室内(函内)は断気せずにシャフト内のみ断気して大気圧下で継足しを行うため、ケ−ソンのシャフト接続孔をボトムドアで密封封鎖して作業室とシャフトとを遮断してシャフト内のみ断気する。
【0004】
このボトムドアの取付方法について、従来の方法は、図1の〔a〕に示すように、クローラクレ−ン8で、作業室3内のボトムドア7を吊り込み、作業員が1名作業室内に入り、クローラクレーン8のオペレ−タ−と電話、ブザ−、汽笛、無線機等の連絡手段により、信号合図により取付作業を行っている。
【0005】
すなわち、ボトムドア7を図1の〔b〕に示すように、ボトムドア7を作業室3の天井スラブまでクローラクレ−ン8で吊り上げた後、図1の〔c〕に示すようにスペシャルシャフト4又は縦続シャフト5から吊り下げたレバ−ブロック(登録商標)9で固定する作業が行なわれる。
【0006】
この取付作業は,足場が悪い作業室内の作業員の指示に従ってクローラクレ−ン8のオペレ−タがボトムドア7の吊り上げを行うため、危険を伴うものであるばかりでなく,作業性が悪かった。
【0007】
また、従来のボトムドア閉鎖作業は,熟練した作業員5名(クローラクレーン運転工、マテリアルロック扉開閉係、艤装工2名、ケーソン作業室内作業員)で120分の作業時間を必要とした。
【0008】
【発明が解決しようとする課題】
そこで本発明は、ケーソンの作業室内とシャフト接続孔内の作業員2人でケ−ソンのボトムドアの取付作業を従来の1/4の短時間で安全に行うことが出来る方法を提供しようとするものである。
【0009】
【課題を解決するための手段】
本発明は上記の課題を解決するためになされたもので、請求項1記載の発明は、ケ−ソンにシャフト接続孔と作業室を連通する操作チェーン用挿通孔を設け、その挿通孔の作業室側を密閉閉鎖するメクラ蓋を着脱自在に設け、且つシャフト接続孔に連設したスペシャルシャフト又は縦続シャフト内にチェーンブロックを吊り下げ、そのチェーンブロックの操作チェーンを前記挿通孔に挿通して端部を作業室内に垂下させ、この操作チェーンを操作してボトムドアを作業室内の天井スラブに圧接するまで吊り上げた後、操作チェーンの作業室内に垂下しているものを挿通孔内に入れ、メクラ蓋で作業室側の挿通孔を密閉することを特徴とするケ−ソンのボトムドア取付方法である。
【0010】
請求項2の発明は、ケ−ソンのシャフト接続孔と作業室に両端を配置したスイッチ回路の電線を設け、この電線のシャフト接続孔側の端部にはコンセント又は電線端子を接続し、作業室側にはスイッチを接続すると共に、シャフト接続孔に連設したスペシャルシャフト又は縦続シャフト内にホイストウインチを吊り下げ、その電源コ−ドを前記コンセント又は電線端子に接続し、前記スイッチを操作してボトムドアを作業室の天井スラブに圧接するまで吊り上げることを特徴とするケ−ソンのボトムドア取付方法である。
【0011】
【作用】
本発明によれば、マテリアルシャフトとマンシャフトを設けたニュ−マチックケ−ソン工法の場合、ケーソン作業室内とシャトル接続孔内の作業員2人でボトムドアの固定作業を従来より遥かに短時間で安全に行うことが出来る。
【0012】
【発明の実施の形態】
図2は本発明の請求項1記載の発明に対応する実施例を示すもので、10はケ−ソン1のシャフト接続孔2と作業室3を連通する操作チェーン11aを収納する挿通孔12を形成する直径l00mmの埋込鋼管、11はスペシャルシャフト4に接続した縦続シャフト5から吊り下げた1t吊りチェーンブロックであって、操作チェーン11aを埋込鋼管10に挿通して端部を作業室3内に垂下させ、この操作チェーン11aを操作してボトムドア7を吊り上げる。
【0013】
ボトムドア7の取付作業の手順は、ケ−ソン1の沈下に伴って縦続シャフト5を接続する場合、先ず作業室3内から梯子及びシャフト接続孔2に設けたタラップ(図示せず)を使って昇り、チェーンブロック11を縦続シャフト5に吊り下げ、操作チェーン11aの端部をシャフト接続孔2側から埋込鋼管10内に落し込む。
【0014】
次にチェーンブロック11の吊り上げ索11bのフック11cを吊台付ワイヤー13を介してボトムドア7に連繋させ、操作チェーン11aを操作してボトムドア7を天井スラブに密着するまで吊り上げた後、操作チェーン11aの端部を埋込鋼管10内に押し込み、図3に示すようにメクラ蓋14を埋込鋼管10の端部に螺合して密閉する。
【0015】
この作業により作業室3は密閉され断気されるので、次いで、縦続シャフト5に設けられたマンロック(図示せず)を開けば縦続シャフト内は大気圧となり,縦続シャフトの接続が大気圧下で行うことが出来るようになる。
【0016】
以上説明した実施例では、メクラ蓋14の取付を埋込鋼管10の端部に螺合する構造としたが、図4に示すようにメクラ蓋14をボルト15で埋込鋼管10の端部に設けたフランジ10aに固定する構造としてもよい。
【0017】
図5は請求項2記載の発明に対応する実施例を示すもので、電動式のボトムドア取付装置である。
【0018】
図において、16は埋設電線で、一端はシャフト接続孔2側に設けたコンセント17に接続し、他端は作業室3の壁面に取付けたスイッチ18に接続されている。
【0019】
19はスペシャルシャフト4に吊り下げた0.75t吊り用ホイストウインチで、電源コ−ド19aをコンセント17に接続する。なお、埋設電線は、作業室内の照明又はクレ−ンショベル用電源に接続されているので、スイッチ18を投入するとホイストウインチ19が動作してボトムドア7を天井スラブまで吊り上げ固定させることができる。
【0020】
ボトムドア7の天井スラブへの固定作業は、前記手動の場合と同様の手順で行えばよく、操作は自明であるからその説明は省略する。
【0021】
【発明の効果】
以上の説明からわかるように、本発明によればケーソン作業室内とシャフト接続孔内の作業員2人でボトムドア7の取付(密閉)作業を行うことが可能であるため、従来のクローラクレ−ンを用いる場合のように、ケーソン外の作業員の連絡指示に気を使うことなく従来より短時間で安全に作業を行うことができる。
【図面の簡単な説明】
【図1】 従来のボトムドア取付方法の説明図
【図2】 本発明の第1の実施例におけるボトムドア吊り上げ時の概略図
【図3】 本発明の第1の実施例におけるボトムドア閉鎖時の概略図
【図4】 メクラ蓋の他の実施例の断面図
【図5】 本発明の第2の実施例の概略図
【符号の説明】
1 ケ−ソン
2 シャフト接続孔
3 作業室
4 スペシャルシャフト
5 縦続シャフト
6 マテリアルロック
7 ボトムドア
8 クローラクレ−ン
9 レバ−ブロック(登録商標)
10 埋込鋼管
11 チェーンブロック
12 挿通孔
13 吊り台付ワイヤ−
14 メクラ蓋
15 ボルト
16 埋設電線
17 コンセント
18 スイッチ
19 ホイストウインチ
[0001]
BACKGROUND OF THE INVENTION
According to the present invention, since the compressed air in the shaft must be exhausted to the atmospheric pressure while keeping the pressure in the working chamber constant at the time of fitting (shaft addition), the shaft connection hole of the caisson is formed in the ceiling of the working chamber. The present invention relates to a method for mounting a bottom door that is closed with a slab.
[0002]
[Prior art]
As is well known, in the caisson work, as the subsidence progresses, locks and shafts are added as fitting equipment.
[0003]
When the shaft is extended during pressure work, the work chamber (box) in the caisson is not vented but only the inside of the shaft is vented to perform the transfer at atmospheric pressure. The connection hole is hermetically sealed with a bottom door, and the work chamber and the shaft are shut off to cut off the air only in the shaft.
[0004]
As for the method of attaching the bottom door, as shown in FIG. 1A, the conventional method is to suspend the bottom door 7 in the work room 3 with the crawler crane 8 so that one worker enters the work room. Installation work is performed by signal cues by the operator of the crawler crane 8 and communication means such as a telephone, a buzzer, a whistle, and a radio.
[0005]
That is, after the bottom door 7 is lifted by the crawler crane 8 to the ceiling slab of the working chamber 3 as shown in FIG. 1B, the special shaft 4 or the cascade is connected as shown in FIG. An operation of fixing with a lever block (registered trademark) 9 suspended from the shaft 5 is performed.
[0006]
This attachment work is not only dangerous but also has poor workability because the operator of the crawler crane 8 lifts the bottom door 7 in accordance with the instructions of the workers in the work room with poor scaffolding.
[0007]
In addition, the conventional bottom door closing operation required 120 minutes of work time by five skilled workers (crawler crane operator, material lock door opening / closing staff, two rigging workers, and caisson work room workers).
[0008]
[Problems to be solved by the invention]
Therefore, the present invention seeks to provide a method by which two workers in the caisson work chamber and the shaft connection hole can safely perform the work of attaching the bottom door of the caisson in a quarter of the conventional time. Is.
[0009]
[Means for Solving the Problems]
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and the invention according to claim 1 is provided with an operation chain insertion hole for communicating the shaft connection hole and the working chamber in the case, and the operation of the insertion hole is performed. A mecha lid that seals and closes the chamber side is detachably provided, and the chain block is suspended in a special shaft or cascade shaft that is connected to the shaft connection hole, and the operation chain of the chain block is inserted into the insertion hole to end. After hanging the part in the working chamber and operating this operation chain to lift the bottom door until it presses against the ceiling slab in the working chamber, put the thing hanging down in the working chamber of the operation chain into the insertion hole, In this case, the bottom door mounting method of the caisson is characterized in that the insertion hole on the working chamber side is sealed.
[0010]
The invention according to claim 2 is provided with an electric wire of a switch circuit in which both ends are arranged in the shaft connection hole of the caisson and the working chamber, and an outlet or an electric wire terminal is connected to an end portion of the electric wire on the shaft connection hole side. A switch is connected to the room side, and a hoist winch is hung in a special shaft or cascade shaft connected to the shaft connection hole, and its power cord is connected to the outlet or electric wire terminal, and the switch is operated. The bottom door is attached to the ceiling slab of the work room until the bottom door is lifted up.
[0011]
[Action]
According to the present invention, in the case of a pneumatic caisson method provided with a material shaft and a man shaft, the fixing operation of the bottom door is safer in a much shorter time than before by two workers in the caisson work chamber and the shuttle connection hole. Can be done.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 2 shows an embodiment corresponding to the invention described in claim 1 of the present invention. Reference numeral 10 denotes an insertion hole 12 for accommodating an operation chain 11a communicating with the shaft connection hole 2 of the case 1 and the work chamber 3. FIG. An embedded steel pipe having a diameter of 100 mm to be formed, 11 is a 1t suspension chain block suspended from a cascade shaft 5 connected to a special shaft 4, and an operation chain 11 a is inserted into the embedded steel pipe 10 and an end portion thereof is a working chamber 3. The bottom door 7 is lifted by operating the operation chain 11a.
[0013]
When the cascade shaft 5 is connected as the case 1 sinks, the bottom door 7 is attached by using a ladder (not shown) provided in the ladder and the shaft connection hole 2 from the work chamber 3 first. The chain block 11 is suspended from the cascade shaft 5 and the end of the operation chain 11a is dropped into the embedded steel pipe 10 from the shaft connection hole 2 side.
[0014]
Next, the hook 11c of the lifting rope 11b of the chain block 11 is connected to the bottom door 7 via the wire 13 with the suspension base, the operation chain 11a is operated, and the bottom door 7 is lifted until it comes into close contact with the ceiling slab. Is pushed into the embedded steel pipe 10, and the mecha lid 14 is screwed into the end of the embedded steel pipe 10 and sealed as shown in FIG.
[0015]
As a result of this work, the working chamber 3 is sealed and ventilated. Next, when the manlock (not shown) provided on the cascade shaft 5 is opened, the inside of the cascade shaft becomes atmospheric pressure, and the connection of the cascade shaft is under atmospheric pressure. Will be able to do it.
[0016]
In the embodiment described above, the structure is such that the attachment of the meckle lid 14 is screwed into the end of the embedded steel tube 10, but the mecha lid 14 is attached to the end of the embedded steel tube 10 with a bolt 15 as shown in FIG. It is good also as a structure fixed to the provided flange 10a.
[0017]
FIG. 5 shows an embodiment corresponding to the second aspect of the present invention, which is an electric bottom door mounting device.
[0018]
In the figure, 16 is an embedded electric wire, one end is connected to an outlet 17 provided on the shaft connection hole 2 side, and the other end is connected to a switch 18 attached to the wall surface of the work chamber 3.
[0019]
Reference numeral 19 denotes a 0.75-t hoist winch suspended from the special shaft 4. The power cord 19 a is connected to the outlet 17. Since the buried electric wire is connected to the lighting in the working room or the power source for the crane excavator, when the switch 18 is turned on, the hoist winch 19 operates to lift and fix the bottom door 7 to the ceiling slab.
[0020]
The fixing operation of the bottom door 7 to the ceiling slab may be performed in the same procedure as in the manual operation, and the operation is self-explanatory and will not be described.
[0021]
【The invention's effect】
As can be seen from the above description, according to the present invention, two workers in the caisson working chamber and the shaft connection hole can perform the mounting (sealing) operation of the bottom door 7, so that the conventional crawler crane can be used. As in the case of using it, the work can be performed safely in a shorter time than before without paying attention to the contact instruction of the worker outside the caisson.
[Brief description of the drawings]
FIG. 1 is an explanatory view of a conventional bottom door mounting method. FIG. 2 is a schematic view when the bottom door is lifted in the first embodiment of the invention. FIG. 3 is a schematic view when the bottom door is closed in the first embodiment of the invention. FIG. 4 is a cross-sectional view of another embodiment of a meka lid. FIG. 5 is a schematic view of a second embodiment of the present invention.
DESCRIPTION OF SYMBOLS 1 Case 2 Shaft connection hole 3 Work chamber 4 Special shaft 5 Cascade shaft 6 Material lock 7 Bottom door 8 Crawler crane 9 Lever block (trademark)
10 Embedded steel pipe 11 Chain block 12 Insertion hole 13 Wire with suspension base
14 Mekura lid 15 Bolt 16 Buried wire 17 Outlet 18 Switch 19 Hoist winch

Claims (2)

ケ−ソンにシャフト接続孔と作業室を連通する操作チェーン用挿通孔を設け、その挿通孔の作業室側を密閉閉鎖するメクラ蓋を着脱自在に設け、且つシャフト接続孔に連設したスペシャルシャフト又は縦続シャフト内にチェーンブロックを吊り下げ、そのチェーンブロックの操作チェーンを前記挿通孔に挿通して端部を作業室内に垂下させ、この操作チェーンを操作してボトムドアを作業室の天井スラブに圧接するまで吊り上げた後、操作チェーンの作業室内に垂下しているものを前記挿通孔内に入れ、メクラ蓋で作業室側の挿通孔を密閉することを特徴とするケ−ソンのボトムドア取付方法。A special shaft that has an operation chain insertion hole that connects the shaft connection hole and the work chamber in the case, a removable lid that hermetically closes the work chamber side of the insertion hole, and is connected to the shaft connection hole. Alternatively, the chain block is suspended in the cascade shaft, the operation chain of the chain block is inserted into the insertion hole, the end is suspended in the work chamber, and the operation door is operated to press the bottom door against the ceiling slab of the work chamber. A method of attaching the bottom door of the caisson, wherein the operation chain is suspended in the work chamber, and the operation hole is inserted into the insertion hole, and the insertion hole on the work chamber side is sealed with a cover lid. ケ−ソンのシャフト接続孔と作業室に両端を配置したスイッチ回路の電線を設け、この電線のシャフト接続孔側の端部にはコンセント又は電線端子を接続し、作業室側にはスイッチを接続すると共に、シャフト接続孔に連設したスペシャルシャフト又は継続シャフト内にホイストウインチを吊り下げ、その電源コ−ドを前記コンセット又は電線端子に接続し、前記スイッチを操作してボトムドアを作業室の天井スラブに圧接するまで吊り上げることを特徴とするケ−ソンのボトムドア取付方法。  A switch circuit wire with both ends arranged in the shaft connection hole of the caisson and the work chamber is provided, and an outlet or a wire terminal is connected to the end of the shaft connection hole side of the wire, and a switch is connected to the work chamber side. At the same time, a hoist winch is suspended in a special shaft or a continuation shaft connected to the shaft connection hole, its power cord is connected to the conset or electric wire terminal, and the switch is operated to connect the bottom door to the work room. A method of attaching a bottom door of a caisson, characterized by lifting up to a pressure contact with a ceiling slab.
JP09697999A 1999-04-02 1999-04-02 Installation of the bottom door of the case Expired - Fee Related JP4129707B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09697999A JP4129707B2 (en) 1999-04-02 1999-04-02 Installation of the bottom door of the case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09697999A JP4129707B2 (en) 1999-04-02 1999-04-02 Installation of the bottom door of the case

Publications (3)

Publication Number Publication Date
JP2000291017A JP2000291017A (en) 2000-10-17
JP2000291017A5 JP2000291017A5 (en) 2005-12-08
JP4129707B2 true JP4129707B2 (en) 2008-08-06

Family

ID=14179344

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09697999A Expired - Fee Related JP4129707B2 (en) 1999-04-02 1999-04-02 Installation of the bottom door of the case

Country Status (1)

Country Link
JP (1) JP4129707B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4739151B2 (en) * 2006-09-01 2011-08-03 株式会社大本組 Pneumatic caisson bottom door

Also Published As

Publication number Publication date
JP2000291017A (en) 2000-10-17

Similar Documents

Publication Publication Date Title
EP0893390A3 (en) Reactor internal equipment hoisting apparatus
JP4129707B2 (en) Installation of the bottom door of the case
JP4221635B2 (en) Installation of the bottom door of the case
BRPI0407224A (en) Winch for re-locating at least building material and method for re-locating building material by a crane hoist
CN208700400U (en) A kind of hanging apparatus of cladding glass
CN217417897U (en) Pipeline hoisting auxiliary tool and pipeline hoisting equipment
JP2905339B2 (en) Bottom door opening and closing device in the pneumatic caisson method
JP2005226386A (en) Excavator carrying-in and carrying-out method and excavator recovery system for pneumatic caisson
CN210562244U (en) Sealing device for joint of inspection well and shaft
JPH11246166A (en) Concrete lock slinging equipment
CN210313047U (en) Safety device of elevator for construction
CN210341679U (en) Novel prevent blockking up easy dismouting, can synchronous off-load temporary support sand box device
CN211226123U (en) Hoisting assembly and water collecting well with same
JPH1112632A (en) Block brick forming method and converter brick stacking method
CN212712519U (en) Auxiliary device for installing street lamp post
JP2933110B2 (en) Hanging and sling removal equipment for suspended loads
CN220686791U (en) House lifting construction structure
JPH1112631A (en) Converter brick loading method
JP4739151B2 (en) Pneumatic caisson bottom door
CN216157220U (en) Manual hole digging pile falling object protection device
CN214217979U (en) Tower crane toilet device
CN218344969U (en) Lifting appliance for replacing bridge pipe of coke oven
CN216787392U (en) Integrated sewage treatment rain sewage lifting pump station
JPH0724636Y2 (en) Submersible motor pump device
JP3021002U (en) Sling unit

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051018

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080219

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080507

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080508

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110530

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120530

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120530

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130530

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees