JP4132532B2 JP2000018293A JP2000018293A JP4132532B2 JP 4132532 B2 JP4132532 B2 JP 4132532B2 JP 2000018293 A JP2000018293 A JP 2000018293A JP 2000018293 A JP2000018293 A JP 2000018293A JP 4132532 B2 JP4132532 B2 JP 4132532B2
Authority
JP
Japan
Prior art keywords
gondola
rail
wire
column
operator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000018293A
Other languages
Japanese (ja)
Other versions
JP2001207638A (en
Inventor
茂夫 樫尾
忠政 大和久
隆 橋田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisso Industries Co Ltd
Original Assignee
Nisso Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisso Industries Co Ltd filed Critical Nisso Industries Co Ltd
Priority to JP2000018293A priority Critical patent/JP4132532B2/en
Publication of JP2001207638A publication Critical patent/JP2001207638A/en
Application granted granted Critical
Publication of JP4132532B2 publication Critical patent/JP4132532B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、ゴンドラ装置に関し、特に、構築物の外壁面に副って縦横に移動し得るゴンドラ装置の改良に関する。
【0002】
【従来技術とその問題点】
たとえば、中高層建築物などの構築物の外壁面に副って縦横に移動し得るゴンドラ装置としては、従来から種々の提案があるが、その多くは、いわゆる一台のゴンドラが移動し得るように構成されている。
【0003】
そこで、一台のゴンドラで、しかも、停止状態で横方向に広範囲に作業範囲をいわゆるカバーしようとする場合には、ゴンドラを横方向に大きく形成する必要がある。
【0004】
しかしながら、ゴンドラは、その搬送などの取り扱いを考慮すれば、自ずと大きさに限度が設けられ、したがって、無闇に横方向に大きく形成する訳にもいかない。
【0005】
この発明は、上記した事情を鑑みて創案されたものであって、その目的とするところは、構築物の外壁面に副って縦横に移動し得るのはもちろんのこと、停止状態で横方向に広範囲に作業範囲をカバーし得るようにして、その汎用性の向上を期待するのに最適となるゴンドラ装置を提供することである。
【0006】
【課題を解決するため手段】
上記した目的を達成するために、この発明によるゴンドラ装置の構成を、基本的には、ゴンドラが構築物の外壁面に適宜の間隔を有して対向する複数本の前方柱体と、この前方柱体の後方にそれぞれ配在されて対をなし前方柱体との間に作業者の臨在を許容する空間を形成する複数本の後方柱体と、前方柱体の下端部と後方柱体の下端部との間に配在されて作業者の立ち入りを許容する足場板とを有してなる一方で、このゴンドラを吊持する吊りワイヤの上端が構築物の天端に配在のレールに副って横方向に移動可能とされてなるゴンドラ装置において、吊りワイヤがゴンドラの上方外部からゴンドラの内部に案内されると共に、後方柱体の上端部に配在のワイヤそらし機構を介することで後方柱体に副って垂下されてなり、かつ、吊りワイヤの下端側を巻装させて吊りワイヤの巻き取りあるいは解き出しでゴンドラを昇降させるワイヤ巻取り機構が足場板の下方に配在されてなるとする。
【0007】
そして、上記した基本的な構成において、より具体的には、ゴンドラの側面部が手摺枠を揺動可能にあるいは分離可能に有すると共に、この手摺枠の揺動時にあるいは撤去時に相隣するゴンドラへの作業者の移動を許容する開口部とされてなるとする。
【0008】
また、前方柱体が直線状に設定される一方で、後方柱体が下端側を直線状に設定すると共に上端側を前方柱体側に折り曲げて上端を前方柱体の上端に連結してなり、かつ、相隣する後方柱体との間で防護シートを分離可能に保持してなるとする。
【0009】
さらに、吊りワイヤの上端を連繋させるレールが構築物の屋上部分に配在の適宜の保持機構に分離可能に保持されてなると共に、保持機構が構築物の屋上に着脱可能に配在されてなる
【0010】
【発明の実施の形態】
以下に、図示した実施の形態に基づいて、この発明を説明するが、この発明によるゴンドラ装置にあっても、図1に示すように、従来から提供されているこの種のゴンドラ装置と同様に、構築物Aの外壁面に適宜の間隔を有して対向するゴンドラGが構築物Aの天端から垂下される吊りワイヤWに吊持される一方で、吊りワイヤWの上端が構築物Aの天端に配在のレールRに副って横方向に移動可能とされている。
【0011】
そして、図1に示すところでは、この発明によるゴンドラGが適宜の連結手段で横方向に複数台(図示するところでは、3台)が連結され、しかも、この連結された複数台のゴンドラGの内部を作業者が自由に移動し得るとしていて、ゴンドラGを移動させずして、作業者が横方向に広範囲にわたる作業範囲をカバーし得るとしている。
【0012】
また、このゴンドラ装置にあっては、図1中に実線矢印で示すように、ゴンドラGが複数台連結された状態のままで、構築物Aの外壁面に沿って縦横に移動し得るように設定されていて、ゴンドラGの移動回数を少なくし得るとしている。
【0013】
ちなみに、図示するところでは、構築物Aは、高層建築物たる高層住宅とされていて、後述するように、ゴンドラGは、高層住宅の外壁面を形成するベランダV(図3参照)の手摺壁V1に適宜の間隔を有していわゆる仮止め状態に固定されるとしている。
【0014】
一方、このゴンドラ装置にお構築物Aの外壁面にけるゴンドラGは、この発明にあって、図2および図3に示すように、前方柱体1と、後方柱体2と、足場板3とを有してなるとしている。
【0015】
前方柱体1は、所定の機械的強度を有しながら必要以上の重量の増大化を回避し得るように、たとえば、アルミなどの金属製型材からなり、構築物Aの外壁面に適宜の間隔を有して対向する複数本に設定されていて、ほぼ等間隔となる適宜の間隔で起立されてなるとしている。
【0016】
このとき、この前方柱体1は、図示するところでは、直線状に設定されていながら複数本とされることでゴンドラGのいわゆる前面を形成するとしており、相隣する前方柱体1間にラーメン構造に設定された手摺枠4を架設していて、この手摺枠4を作業者の墜落防止用の安全柵とする一方で、この前方柱体1群で形成されるゴンドラGにおけるいわゆる前面の強度アップを図っている。
【0017】
ちなみに、複数本の前方柱体1で形成されるゴンドラGの前面にあっては、作業者が構築物Aの外壁面に対する諸作業を滞りなく実行できるように、上記した手摺枠4以外のカーテンなどのいわゆる遮蔽物を有しないとしている。
【0018】
また、この前方柱体1は、図示するところでは、構築物Aの外壁面に対する固定手段、すなわち、固定ブラケット11を有していて、この固定ブラケット11におけるクランプ部11aが構築物Aの外壁面を形成するベランダVの手摺壁V1の上端を把持するとしている。
【0019】
ちなみに、この固定手段は、図示するところでは、前方柱体1に連繋されてなるとして、その連繋位置を設定するにあって、上下方向に自由度を有し得るとしているが、これに代えて、図示しないが、前記した手摺枠4に連繋されるとして、連繋位置の設定に際して横方向に自由度を有し得るようにしても良い。
【0020】
なお、この固定手段は、いわゆる仮止めである限りには、構築物Aの外壁面の状態などによって、異なる構成のものが採用されることになるのはもちろんである。
【0021】
上記した前方柱体1に対して、後方柱体2は、前方柱体1の後方にそれぞれ配在されて対をなす複数本に設定されていて、前方柱体1との間に作業者の臨在を許容する空間を形成するとしている。
【0022】
このとき、この後方柱体2は、前方柱体1と同様に、所定の機械的強度を有しながら必要以上の重量の増大化を回避し得るように、たとえば、アルミなどの金属製型材からなり、図示するところでは、下端側が直線状に設定される一方で、上端側が前方柱体1側に折り曲げた状態に設定され、かつ、上端を前方柱体1の上端に連結してなるとしている。
【0023】
また、このとき、相隣する後方柱体2の上端間には、頭継ぎ材21が配在されると共に、相隣する後方柱体2の中間部間には、前記した手摺枠4が架設されてなるとして、前記した前方柱体1と同様に、複数本の後方柱体2で形成されるゴンドラGにおけるいわゆる背面の強度アップを図っている。
【0024】
そして、前方柱体1の下端および後方柱体2の下端には、それぞれ巾木12,22が連設されていて、前方柱体1および後方柱体2の各下端における脚固めを図る一方で、足場板3の上に置かれることがある工具やその他の物が外部に出ること、すなわち、落下することをあらかじめ阻止するように配慮している。
【0025】
ところで、後方柱体2は、相隣する後方柱体2との間に、すなわち、図示するところでは、前記した手摺枠4をいわゆる外側から覆うように配在される防護シートS(図2参照)を着脱可能に保持してなるとしている。
【0026】
ところで、後方柱体2に防護シートSを着脱可能に保持させるについては、種々の構成を採用し得るが、図示するところでは、図4に示すように、まず、後方柱体2がいわゆる型材からなり、防護シートSの両端、すなわち、左右方向の端部S1を嵌合させる溝2aを有してなるとしている。
【0027】
このとき、防護シートSの端部S1は、その横断面の形状をほぼ円形としており、後方柱体2における溝2aのいわゆる開口が狭められていて、溝2aに嵌装された防護シートSの端部S1が横方向に抜き出ないように配慮している。
【0028】
それゆえ、防護シートSの両端部S1を相隣する後方柱体2の溝2aに嵌装するとき、この防護シートSが相隣する後方柱体2間にいわゆる展張されてゴンドラGの内部を外部から防護することになる。
【0029】
なお、この防護シートSを後方柱体2に保持させる方策については、任意の方策が採用されて良いが、図示するところでは、図3中に破線図で示すように、後方柱体2の縦方向の中間部に用意されたいわゆる入り口(附示せず)から上下端を挿し込むようにするとしている。
【0030】
また、この防護シートSは、いわゆる上下部分をシート状にして雨水の浸透などを阻止する一方で、いわゆる中間部分は、メッシュ状とされていて通風を許容し、ゴンドラG内における作業環境の改善を図るべく換気を可能にしている。
【0031】
足場板3は、前方柱体1の下端部と後方柱体2の下端部との間に配在されて 作業者の立ち入りを許容するように構成されてなるもので、多くの場合に、軽量にして所定の機械的強度を有すべくアルミなどの金属製型材からなるとしている。
【0032】
ところで、このゴンドラGにあっては、前記した前方柱体1と後方柱体2は、前記した巾木12,22を介して足場板3の下方に配在される枠体5に連設されてなるとしている。
【0033】
すなわち、足場板3は、図示するところでは、枠体5の上に配在されるとしているもので、このとき、足場板3は、図示するところでは、たとえば、溶接で枠体5に一体的に連結されるとしているが、後述するワイヤ巻取り機構6などのメンテナンスのことを考慮すれば、分離可能に連結されるとしても良い。
【0034】
ところで、この枠体5に保持されるワイヤ巻取り機構6は、吊りワイヤWの巻取りのためにこれを引っ張り、あるいは、吊りワイヤWの解き出しのためにこれを繰り出す駆動源たるワインダ61と、このワインダ61で引っ張られた吊りワイヤWを巻装させるリール62とを有してなる。
【0035】
このように、ワイヤ巻取り機構6を足場板3の下方となる枠体5に保持させるとすることで、これを足場板3の上に配在させたりする場合に比較して、作業者の居場所を広くする上で有利になる。
【0036】
のみならず、この発明では、ゴンドラGが複数台連結される場合があることを前提にしているから、このことからしても、ワイヤ巻取り機構6がゴンドラGのいわゆる側面部に配在されていない方が良いことになる。
【0037】
一方、ゴンドラGを吊持する吊りワイヤWは、図示するところでは、いわゆる左右となる一対とされていて、吊持の際にゴンドラGが安定するように配慮している。
【0038】
そして、この一対となる吊りワイヤWは、図示するところでは、ゴンドラGの上方外部からゴンドラGの内部に案内されると共に、後方柱体2の上端部に配在のワイヤそらし機構7を介することで後方柱体2に副って垂下され、かつ、下端側を上記したワイヤ巻取り機構6を構成するリール62に巻装させてなるとしている。
【0039】
このように設定することで、ゴンドラGの内部に案内された吊りワイヤWが作業者に占有されるべき空間を、すなわち、前方柱体1と後方柱体2との間に形成されて作業者を臨在させる空間を吊りワイヤWが通過しなくなる。
【0040】
このとき、このワイヤそらし機構7は、ゴンドラGの外部のいわゆる中央上方から案内される吊りワイヤWを後方柱体2に向けてターンさせる一つ目のシーブ71と、このターンした吊りワイヤWを後方柱体2に副って垂下させる二つ目のシーブ72とを有してなるとしている。
【0041】
それゆえ、このワイヤそらし機構7による場合には、二つのシーブ71,72があれば足りるから、構成を簡単にして効果的な吊りワイヤWのそらしを実現できることになる利点がある。
【0042】
ちなみに、吊りワイヤWがゴンドラG内部における作業者用の空間を通過しないようにするために、吊りワイヤWをゴンドラGの背面外部に臨在させることを検討し得るが、この場合には、吊りワイヤWが後方柱体2あるいは防護シートSを貫通することになる不利があり、好ましくないと言い得る。
【0043】
以上のようの構成されたこの発明によるゴンドラGにあっては、以下のような配慮もしている。
【0044】
すなわち、まず、このゴンドラGの側面部には、相隣するゴンドラG同志の連結を可能にする適宜の連結手段を有してなるとしているが、この連結手段を構成するブラケット23が、図示するところでは、枠体5に連設されていて、このブラケット23に分離可能に連繋されるリンク部材24を介して相隣するゴンドラG同志が連結されるとしている。
【0045】
それゆえ、この連結手段による場合には、相隣するゴンドラG同志の連結を実現して、横方向に複数台連結されたゴンドラGの内部を作業者が自由に移動し得るとするのはもちろんのこと、相隣するゴンドラGが昇降するときに、相隣するゴンドラG間における競り合いが未然に阻止されて、それぞれのゴンドラGの円滑な昇降が実現されることになる。
【0046】
つぎに、枠体5の下端には、車輪51を有していて、このゴンドラGが地上などに置かれるときに、人手によって押すなどしてこれを搬送し得るようにすると共に、枠体5の図3中で右端となる前方端には、落下防止板52が枢支されていて、この落下防止板52の揺動可能とされる先端に吊り材13の下端が連結され、この吊り材13の上端が前方柱体1に連結されてなるとしている。
【0047】
この落下防止板52の配在で、たとえば、作業者が作業中に工具を落とすなどしても、これを下方に落下させないようにすることが可能になる。
【0048】
つぎに、以上のように形成されたゴンドラGを吊持する吊りワイヤWの上端が構築物Aの天端に配在のレールRに副って横方向に移動可能とされてなることについて少し説明する。
【0049】
このとき、この発明にあっては、吊りワイヤWの上端を連繋させるレールRが構築物Aの屋上部分に配在の適宜の保持機構8に分離可能に保持されてなると共に、保持機構8が構築物Aの屋上に着脱可能に配在されてなるとしている。
【0050】
その理由としては、ゴンドラGをレールRに副って移動し得るとすることで、ゴンドラGを横方向に移動するについていわゆる盛り替えをしなくて済み、レールRが保持機構8に保持されることで、吊持されるゴンドラGが構築物Aの外壁面との間に適宜の間隔を保持できることが挙げられる。
【0051】
以下に、まず、この保持機構8について説明すると、この保持機構8は、支持金具81と、アーム82とを有してなり、このアーム82にレールRを保持させる、すなわち、スライド構造下に保持させるとしている。
【0052】
このとき、支持金具81は、いわゆるクランプ構造に形成されていて、下方部で構築物Aにおける天端、すなわち、屋上を構成するパラペットを把持する一方で、上方部でアーム82を、図5に示す実施の形態では、固定状態に保持するとしている。
【0053】
そして、アーム82は、図6に示すように、上端に軸線方向に沿うガイド溝82aを有していて、このガイド溝82aにレールRの端部の下端に配設されたガイド輪rを係合させるとしている。
【0054】
それゆえ、この図5に示す実施の形態の場合には、アーム82上でレールRを構築物Aの屋上側に引き寄せた状態にして、このレールRに吊りワイヤWの上端を連繋し得ることになり、連繋後は、レールRをアーム82上でスライドさせていわゆる先方に送り出すようにして、吊りワイヤWの上端を押し出し得ることになる。
【0055】
その結果、この保持機構8による場合には、吊りワイヤWの上端をレールRに連繋したり、この連繋を解除したりする作業の際に、たとえば、作業者が構築物Aの屋上に居るままで諸作業を実行でき、したがって、外壁面から離れた位置にある保持機構8の先端にレールRを連繋したり、保持機構8の先端からレールRを撤去したりする作業をしなくて済むことになる。
【0056】
上記の保持機構8において、アーム82は、支持金具81に固定状態に保持されてなるとしているが、これに代えて、図7に示すように、支持金具81の上端に設けられているブラケット81aに摺動可能に介装されて前後方向に移動可能なように連結されてなるとしても良い。
【0057】
そして、この実施の形態による場合には、アーム82を摺動させることで、上記したようにレールRを直接移動させることなく、結果的にレールRを移動させ得ることになる。
【0058】
また、図8に示す実施の形態の場合には、支持金具81において、いわゆる折り曲げ可能に設定されていて、この支持金具81を折り曲げることで、アーム82を揺動し得ることになり、その結果、上記した図7に示す実施の形態の場合と同様に、レールRを直接移動させることなく、結果的にレールRを移動させ得ることになる。
【0059】
ところで、以上のように構成されたレールRには、吊りワイヤWの上端が走行可能な状態にして連繋してなるとするもので、以下には、その連繋構造について少し説明する。
【0060】
すなわち、まず、この連繋構造は、図9および図10に示すように、図示するところでは、駆動部91と従動部92とを有してなり、この駆動部91と従動部92がその間に配在の連結棒93にピン93a(図10参照)を利用してヒンジ結合されてなるとしている。
【0061】
このように、駆動部91と従動部92が連結棒93を介してヒンジ結合されることで、たとえば、レールRが水平方向に湾曲する場合にも、駆動部91および従動部92のレールRからのいわゆる脱輪を危惧しなくても済むことになる。
【0062】
つぎに、上記した駆動部91および従動部92の構成について説明すると、この両部91,92は、基本的には、同一の構造に形成されてなるとし、ただ、駆動部91にあって、駆動源91a(図9参照)を有することで差異がある。
【0063】
それ以外では、両部91,92は、レールR上でそれそれでいわゆる前後となって転動する一対の車輪94,95を有し、この一対の車輪94,95をそれぞれ枢支するブラケット94a,95aが吊りワイヤWの上端をその下端に結束させるフック94b,95bを連設させてなるとしている。
【0064】
ちなみに、駆動部91における車輪94が駆動源91aに連繋されてなるとしており、したがって、駆動源91aの駆動で車輪94が回転し、駆動部91がレールR上を移動することになる。
【0065】
そして、このときに、従動部92も連結棒93の介在がゆえに駆動部91に同期してレールR上を移動することになる。
【0066】
一方、レールRは、図11および図12に示すように、図示するところでは、縦断面を角C型にするいわゆるチャンネル材を背中合せにした構造に形成されていて、両側面に横方向に延びるガイド溝たる開口R1を有している。
【0067】
そして、上記した両部91,92を形成するブラケット94a,95aにいわゆる対となる状態に保持されたガイド輪96,97が上記の両方の開口R1にそれぞれ臨在される状態にして、レールR上を走行する車輪94,95の脱輪を阻止するとしている。
【0068】
ところで、上記したレールRに形成された開口R1には、図13および図14に示すように、ケーブルホルダー10が繋合されるとしており、このケーブルホルダー10は、前記した駆動部91における駆動源91aに接続されるいわゆる通電用のケーブル(図示せず)を吊持する。
【0069】
ちなみに、上記のケーブルの総長は、上記した連繋構造がレールRを移動するのを妨げない長さに設定されるから、いわゆる長くなり、したがって、ケーブルホルダー10は、複数とされて上記した開口R1に繋合される。
【0070】
また、このケーブルホルダー10をレールRの開口R1に繋合する方策としては、任意の方策を選択し得るが、この実施の形態では、図15に示すように、既設のレールRに先端が接続される補助レール101を利用して繋合されるとしている。
【0071】
すなわち、この補助レール101は、その断面形状をレールRに類似させる、すなわち、レールRにおける開口R1と同様に設定された開口(図示せず)を有していて、必要な個数のケーブルホルダー10を繋合させ得るように構成されている。
【0072】
そして、この補助レール101は、基端が構築物Aの屋上側に位置決められながらいわゆる自由端とされていて、この基端側に繋合される必要な個数のケーブルホルダー10を順次にいわゆる押しやるようにしてレールRの開口R1に繋合させるように構成されている。
【0073】
そしてまた、この補助レール101は、必要な個数のケーブルホルダー10をレールRの開口R1に繋合させた後に撤去される、すなわち、図示するところでは、前記した保持機構8におけるアーム82に沿ってスライド移動されて構築物Aの屋上側に後退されるとしている。
【0074】
以上からすれば、この補助レール101は、その縦断面形状がレールRの縦断面形状と同一もしくはほぼ同一になるように設定される場合には、前記した連繋構造を構成する駆動部91および従動部92を連結棒93で連結した状態のままでレールRに連繋させることをも可能にすることになり、両部91,92を連繋したレールRをアーム82に沿ってスライド移動させることに比較すれば、連繋構造をレールRに連繋させる作業が一層簡単になる点で有利となる。
【0075】
【発明の効果】
以上のように、この発明にあっては、ゴンドラを吊持する吊りワイヤがゴンドラの上方外部からゴンドラの内部に案内されると共に、後方柱体の上端部に配在のワイヤそらし機構を介することで後方柱体に副って垂下されてなるから、吊りワイヤがゴンドラの重心に重なる軸心線に沿ってこのゴンドラを吊持することが可能になり、吊りワイヤで吊持したためにゴンドラが前傾したり後傾したりしなくなる。
【0076】
このとき、ゴンドラの内部に案内された吊りワイヤがワイヤそらし機構を介することで後方柱体に副って垂下され、したがって、ゴンドラの内部に案内された吊りワイヤが作業者に占有されるべき空間、すなわち、前方柱体と後方柱体との間に形成されて作業者を臨在させる空間を吊りワイヤが通過しなくなる。
【0077】
そして、この発明にあっては、吊りワイヤの下端側を巻装させて吊りワイヤの巻き取りあるいは解き出しでゴンドラを昇降させるワイヤ巻取り機構が足場板の下方に配在されてなるから、ワイヤ巻取り機構を足場板の下方となる枠体に保持させるとすることで、これを足場板の上に配在させたりする場合に比較して、作業者の居場所を広くすることになる。
【0078】
のみならず、この発明にあっては、ゴンドラの側面部が相隣するゴンドラとの連結部とされると共に、相隣するゴンドラへの作業者の移動を許容する開口部とされることで、ゴンドラを複数台連結すると共に、この複数台連結されたゴンドラの内部を作業者が自由に移動し得ることになり、ゴンドラを移動させずして、作業者が横方向に広範囲にわたる作業範囲をカバーし得ることになる。
【0079】
また、この発明にあっては、前方柱体が直線状に設定される一方で、後方柱体が下端側を直線状に設定すると共に上端側を前方柱体側に折り曲げて上端を前方柱体の上端に連結してなるから、前方柱体の上端と後方柱体の上端との間に梁材などを配在しなくて済み、部材点数を削減できる点で有利となる
そして、このとき、上記の後方柱体、すなわち、相隣する後方柱体との間で防護シートを分離可能に保持してなるから、この防護シートでゴンドラの内部を外部から防護し得ることになる。
【0080】
さらに、この発明にあっては、吊りワイヤの上端を連繋させるレールが構築物の屋上部分に配在の適宜の保持機構に分離可能に保持されてなると共に、保持機構が構築物の屋上に着脱可能に配在されてなるから、吊りワイヤの上端をレールに連繋したり、この連繋を解除したりする作業を安全にして容易に実行し得ることになる。
【0081】
その結果、この発明によれば、構築物の外壁面に副って縦横に移動し得るのはもちろんのこと、停止状態で横方向に広範囲にわたる作業範囲をカバーし得ることになり、その汎用性の向上を期待するのに最適となる利点がある。
【図面の簡単な説明】
【図1】この発明の一実施の形態によるゴンドラ装置の利用状態を示す概略図である。
【図2】図1のゴンドラを示す背面図である。
【図3】図1のゴンドラを構築物の外壁面に連結させた状態を拡大して示す側面図である。
【図4】防護シートが後方柱体に保持されている状態を示す部分斜視図である。
【図5】レールが保持機構によって構築物の天端に配在されている状態を示す部分斜視図である。
【図6】レールが保持機構を構成するアームに連繋している状態を示す部分断面図である。
【図7】他の実施の形態による保持機構を示す側面図である。
【図8】同じく他の実施の形態による保持機構を示す側面図である。
【図9】吊りワイヤの上端をレールに連繋させる連繋構造を一部破段して示す平面図である。
【図10】図9の連繋構造を構築物の外部側から見た立面図である。
【図11】連繋構造を構成する駆動部を示す側面図である。
【図12】連繋構造を構成する従動部を図12と同様に示す図である。
【図13】ケーブルホルダーがレールに繋合されている状態を示す立面図である。
【図14】図13のケーブルホルダーを示す側面図である。
【図15】ケーブルホルダーをレールに繋合させるための補助レールの配設状態を示す概略平面図である。
【符号の説明】
1 前方柱体
2 後方柱体
2a 溝
3 足場板
4 手摺枠
5 枠体
6 ワイヤ巻取り機構
7 ワイヤそらし機構
8 保持機構
10 ケーブルホルダー
11 固定ブラケット
11a クランプ部
12,22 巾木
13 吊り材
21 頭継ぎ材
23,94a,95a ブラケット
24 リンク部材
51,94,95 車輪
52 落下防止板
61 ワインダ
62 リール
71,72 シーブ
81 支持金具
82,83,84 アーム
82a ガイド溝
91 駆動部
91a 駆動源
92 従動部
93 連結棒
93a ピン
94b,95b フック
96,97 ガイド輪
101 補助レール
A 構築物
G ゴンドラ
R レール
R1 開口
r ガイド輪
S 防護シート
S1 端部
V ベランダ
V1 手摺壁
W 吊りワイヤ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a gondola apparatus, and more particularly to an improvement of a gondola apparatus that can move vertically and horizontally along an outer wall surface of a structure.
[0002]
[Prior art and its problems]
For example, there have been various proposals for a gondola device that can move vertically and horizontally next to the outer wall surface of a structure such as a mid-to-high-rise building, but many of them are configured so that a so-called single gondola can move. Has been.
[0003]
Therefore, when a single gondola is intended to cover a wide working range in the lateral direction in a stopped state, the gondola needs to be formed large in the lateral direction.
[0004]
However, considering the handling of the gondola, the size of the gondola is naturally limited, and therefore it cannot be formed in the horizontal direction without darkness.
[0005]
The present invention has been developed in view of the above-described circumstances, and the object of the present invention is that it can move vertically and horizontally along the outer wall surface of the structure, and in the lateral direction in a stopped state. An object of the present invention is to provide a gondola device that can cover a wide range of work and is optimal for expecting an improvement in its versatility.
[0006]
[Means for solving the problems]
In order to achieve the above-described object, the configuration of the gondola device according to the present invention basically includes a plurality of front pillars in which the gondola faces the outer wall surface of the structure with an appropriate interval, and the front pillars. A plurality of rear pillars which are respectively arranged behind the body and form a pair to allow a worker to be present between the front pillars, a lower end of the front pillars, and a lower end of the rear pillars And a scaffolding plate that is allowed to enter the operator, while the upper end of the suspension wire that holds the gondola is next to the rail that is distributed at the top end of the structure. In the gondola device that is movable in the lateral direction, the suspension wire is guided from the upper outside of the gondola to the inside of the gondola, and the rear column is provided via a wire diverting mechanism arranged at the upper end of the rear column. It hangs down next to the body and hangs Wire winding mechanism for raising and lowering the gondola winding of the lower end is wound around the hanging wire or at unwound in the will be Zaisa distribution below the scaffolding board.
[0007]
In the basic configuration described above, more specifically, the side portion of the gondola has a handrail frame that can swing or be separated, and the gondola adjacent to the handrail frame when it swings or is removed. It is assumed that the opening is allowed to allow the operator to move.
[0008]
In addition, while the front column is set linearly, the rear column sets the lower end side linearly and bends the upper end side to the front column body side to connect the upper end to the upper end of the front column body, In addition, it is assumed that the protective sheet is separably held between adjacent rear pillars.
[0009]
Further, a rail for connecting the upper ends of the suspension wires is separably held by an appropriate holding mechanism disposed on the rooftop portion of the structure, and the holding mechanism is detachably disposed on the rooftop of the structure.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described based on the illustrated embodiment. Even in the gondola apparatus according to the present invention, as shown in FIG. The gondola G facing the outer wall surface of the structure A with an appropriate interval is suspended by the suspension wire W suspended from the top end of the structure A, while the upper end of the suspension wire W is the top end of the structure A. It is possible to move in the lateral direction next to the rail R distributed in the.
[0011]
As shown in FIG. 1, a plurality of gondola G according to the present invention are connected in a lateral direction by appropriate connecting means (three in the figure), and the plurality of gondola G connected to each other are connected. It is said that the worker can move freely inside, and the worker can cover a wide working range in the lateral direction without moving the gondola G.
[0012]
In addition, in this gondola device, as indicated by solid arrows in FIG. 1, it is set so that it can move vertically and horizontally along the outer wall surface of the structure A while a plurality of gondola G is connected. The gondola G can be moved less frequently.
[0013]
Incidentally, in the figure, the structure A is a high-rise house that is a high-rise building. As will be described later, the gondola G is a handrail wall V1 of the veranda V (see FIG. 3) that forms the outer wall surface of the high-rise house. In this case, the fixing is performed in a so-called temporarily fixed state with an appropriate interval.
[0014]
On the other hand, the gondola G on the outer wall surface of the structure A in this gondola device is in the present invention. As shown in FIGS. 2 and 3, the front column 1, the rear column 2, the scaffold plate 3, It is said to have.
[0015]
The front column 1 is made of a metal mold such as aluminum so as to avoid an increase in weight more than necessary while having a predetermined mechanical strength, and an appropriate interval is provided on the outer wall surface of the structure A. It is set to have a plurality of facing and has been set up at appropriate intervals that are substantially equidistant.
[0016]
At this time, as shown in the figure, the front pillars 1 are formed in a straight line to form a so-called front surface of the gondola G, so that the noodles between the adjacent front pillars 1 are formed. While the handrail frame 4 set in the structure is installed and this handrail frame 4 is used as a safety fence for preventing a worker from falling, the strength of the so-called front surface in the gondola G formed by the front column body 1 group is provided. I am trying to improve.
[0017]
By the way, on the front face of the gondola G formed by a plurality of front pillars 1, curtains other than the above-described handrail frame 4 so that the operator can perform various operations on the outer wall surface of the structure A without delay. The so-called shield is not provided.
[0018]
In addition, the front column 1 has a fixing means for the outer wall surface of the structure A, that is, a fixing bracket 11, and the clamp portion 11 a in the fixing bracket 11 forms the outer wall surface of the structure A. It is assumed that the upper end of the handrail wall V1 of the veranda V to be held is gripped.
[0019]
By the way, in the illustrated case, the fixing means is connected to the front column 1 and is supposed to have a degree of freedom in the vertical direction in setting the connection position. Although not shown in the figure, it may be connected to the above-described handrail frame 4 so that it can have a degree of freedom in the lateral direction when setting the connection position.
[0020]
In addition, as long as this fixing means is what is called temporary fix | stop, of course, the thing of a different structure will be employ | adopted according to the state of the outer wall surface of the structure A, etc.
[0021]
With respect to the front column 1 described above, the rear column 2 is set to a plurality of pairs arranged behind the front column 1 and paired with each other. It is supposed to form a space that allows presence.
[0022]
At this time, the rear column body 2 is made of, for example, a metal mold material such as aluminum so as to avoid an increase in weight more than necessary while having a predetermined mechanical strength like the front column body 1. In the figure, the lower end side is set to be linear, while the upper end side is set to be bent toward the front column 1 and the upper end is connected to the upper end of the front column 1. .
[0023]
At this time, the head joint material 21 is disposed between the upper ends of the adjacent rear column bodies 2, and the handrail frame 4 described above is installed between the intermediate portions of the adjacent rear column bodies 2. As described above, the strength of the so-called back surface of the gondola G formed by a plurality of rear column bodies 2 is increased in the same manner as the front column body 1 described above.
[0024]
Baseboards 12 and 22 are connected to the lower end of the front column body 1 and the lower end of the rear column body 2 respectively, and the lower ends of the front column body 1 and the rear column body 2 are stiffened. Consideration is given in advance to prevent any tools or other objects that may be placed on the scaffold plate 3 from going outside, that is, falling.
[0025]
By the way, the rear column body 2 is disposed between the adjacent rear column bodies 2, that is, in the illustrated case, the protective sheet S disposed so as to cover the handrail frame 4 from the outside (see FIG. 2). ) Is detachably held.
[0026]
By the way, various configurations can be adopted for detachably holding the protective sheet S on the rear column 2. However, as shown in FIG. 4, first, the rear column 2 is made of a so-called mold material. Thus, both ends of the protective sheet S, that is, the left and right end portions S1 are provided with grooves 2a.
[0027]
At this time, the end portion S1 of the protective sheet S has a substantially circular cross-sectional shape, the so-called opening of the groove 2a in the rear column 2 is narrowed, and the protective sheet S fitted in the groove 2a is narrowed. Consideration is made so that the end S1 is not pulled out in the lateral direction.
[0028]
Therefore, when the opposite ends S1 of the protective sheet S are fitted into the grooves 2a of the adjacent rear column bodies 2, the protective sheet S is so-called stretched between the adjacent rear column bodies 2 so that the inside of the gondola G is covered. Protect from the outside.
[0029]
As a measure for holding the protective sheet S on the rear column 2, an arbitrary measure may be adopted. However, as shown in FIG. 3, as shown by a broken line in FIG. The upper and lower ends are inserted from a so-called entrance (not shown) prepared in the middle of the direction.
[0030]
Further, the protective sheet S has a so-called upper and lower parts in a sheet shape to prevent the penetration of rainwater, etc., while the so-called intermediate part is meshed to allow ventilation and improve the working environment in the gondola G. Ventilation is possible to achieve this.
[0031]
The scaffolding plate 3 is arranged between the lower end portion of the front column 1 and the lower end portion of the rear column 2 and is configured to allow entry of an operator. Thus, it is made of a metal mold such as aluminum so as to have a predetermined mechanical strength.
[0032]
By the way, in this gondola G, the above-mentioned front column 1 and the back column 2 are connected to the frame 5 arranged below the scaffold plate 3 through the above-mentioned baseboards 12 and 22. It is supposed to become.
[0033]
In other words, the scaffold plate 3 is arranged on the frame 5 in the illustrated case. At this time, the scaffold plate 3 is integrated with the frame 5 by welding, for example, in the illustrated case. However, in consideration of maintenance of the wire winding mechanism 6 and the like which will be described later, it may be detachably connected.
[0034]
By the way, the wire winding mechanism 6 held by the frame 5 has a winder 61 as a driving source that pulls the suspension wire W to wind it up or unwinds the suspension wire W. And a reel 62 around which the suspension wire W pulled by the winder 61 is wound.
[0035]
In this way, the wire winding mechanism 6 is held by the frame body 5 below the scaffold plate 3, so that it is possible for the operator to compare with the case where the wire take-up mechanism 6 is distributed on the scaffold plate 3. It will be advantageous in widening the place of residence.
[0036]
In addition, the present invention presupposes that a plurality of gondola G may be connected. Therefore, even from this, the wire winding mechanism 6 is disposed on the so-called side surface of the gondola G. It is better not to.
[0037]
On the other hand, the suspension wire W for suspending the gondola G is a pair of so-called left and right in the figure, so that the gondola G is stabilized when suspended.
[0038]
The pair of suspension wires W are guided from the upper outside of the gondola G to the inside of the gondola G and through the wire diverting mechanism 7 disposed at the upper end of the rear column 2 as shown in the figure. The lower column is suspended by the rear column 2 and the lower end is wound around the reel 62 constituting the wire winding mechanism 6 described above.
[0039]
By setting in this way, a space in which the suspension wire W guided inside the gondola G is to be occupied by the operator, that is, between the front column 1 and the rear column 2 is formed. The suspension wire W does not pass through the space in which the
[0040]
At this time, the wire diverting mechanism 7 has a first sheave 71 for turning the suspension wire W guided from a so-called upper center outside the gondola G toward the rear column 2 and the turned suspension wire W. It has a second sheave 72 that hangs down from the rear column 2.
[0041]
Therefore, in the case of using the wire diverting mechanism 7, since there are only two sheaves 71 and 72, there is an advantage that the configuration can be simplified and an effective diversion of the hanging wire W can be realized.
[0042]
Incidentally, in order to prevent the suspension wire W from passing through the space for the worker inside the gondola G, it can be considered that the suspension wire W is present outside the back surface of the gondola G. There is a disadvantage that W penetrates the rear column body 2 or the protective sheet S, and it can be said that it is not preferable.
[0043]
In the gondola G according to the present invention configured as described above, the following consideration is given.
[0044]
That is, first, the side surface portion of the gondola G is provided with appropriate connecting means for enabling connection between adjacent gondola G, but a bracket 23 constituting the connecting means is illustrated. By the way, the adjacent gondola G is connected to each other through a link member 24 that is connected to the frame 5 and is connected to the bracket 23 in a separable manner.
[0045]
Therefore, in the case of this connection means, it is possible to realize the connection between the adjacent gondola G so that the worker can freely move inside the gondola G connected in the lateral direction. In other words, when the adjacent gondola G moves up and down, the competition between the adjacent gondola G is prevented in advance, and the smooth raising and lowering of each gondola G is realized.
[0046]
Next, the lower end of the frame 5 has wheels 51, and when the gondola G is placed on the ground or the like, the frame 5 can be conveyed by being manually pushed or the like. 3, a drop prevention plate 52 is pivotally supported at the front end, which is the right end of FIG. 3, and the lower end of the suspension member 13 is connected to the tip of the fall prevention plate 52 that can swing. The upper end of 13 is connected to the front column 1.
[0047]
With the arrangement of the fall prevention plate 52, for example, even if an operator drops a tool during work, it can be prevented from dropping downward.
[0048]
Next, a little explanation will be made about the fact that the upper end of the suspension wire W for suspending the gondola G formed as described above can be moved laterally along the rail R located on the top end of the structure A. To do.
[0049]
At this time, in the present invention, the rail R connecting the upper ends of the suspension wires W is separably held by the appropriate holding mechanism 8 disposed on the roof portion of the structure A, and the holding mechanism 8 is the structure. It is supposed to be detachably distributed on the roof of A.
[0050]
The reason is that the gondola G can be moved along with the rail R, so that the gondola G does not have to be reordered to move in the lateral direction, and the rail R is held by the holding mechanism 8. By this, it can be mentioned that the suspended gondola G can maintain an appropriate interval between the outer wall surface of the structure A and the like.
[0051]
First, the holding mechanism 8 will be described. The holding mechanism 8 includes a support fitting 81 and an arm 82. The arm 82 holds the rail R, that is, it is held under a slide structure. I am going to let you.
[0052]
At this time, the support fitting 81 is formed in a so-called clamp structure, and holds the top end of the structure A in the lower part, that is, the parapet constituting the roof, while the arm 82 is shown in FIG. In the embodiment, the fixed state is maintained.
[0053]
As shown in FIG. 6, the arm 82 has a guide groove 82a along the axial direction at the upper end, and a guide ring r disposed at the lower end of the end of the rail R is engaged with the guide groove 82a. It is going to be combined.
[0054]
Therefore, in the case of the embodiment shown in FIG. 5, the upper end of the suspension wire W can be linked to the rail R by bringing the rail R to the roof side of the structure A on the arm 82. Thus, after the connection, the upper end of the suspension wire W can be pushed out by sliding the rail R on the arm 82 and feeding the rail R forward.
[0055]
As a result, in the case of using the holding mechanism 8, for example, when the upper end of the suspension wire W is connected to the rail R or when the connection is released, the worker remains on the roof of the structure A, for example. Various operations can be performed, and therefore, it is not necessary to link the rail R to the tip of the holding mechanism 8 located away from the outer wall surface or to remove the rail R from the tip of the holding mechanism 8. Become.
[0056]
In the holding mechanism 8 described above, the arm 82 is held in a fixed state by the support fitting 81, but instead of this, a bracket 81a provided at the upper end of the support fitting 81 as shown in FIG. It is good also as being connected so that it may be slidably inserted in and moved in the front-back direction.
[0057]
In this embodiment, by sliding the arm 82, the rail R can be moved as a result without directly moving the rail R as described above.
[0058]
In the case of the embodiment shown in FIG. 8, the support fitting 81 is set to be so-called bendable, and the arm 82 can be swung by bending the support fitting 81, and as a result. As in the case of the embodiment shown in FIG. 7, the rail R can be moved as a result without moving the rail R directly.
[0059]
By the way, it is assumed that the upper end of the suspension wire W is connected to the rail R configured as described above so that the upper end of the suspension wire W can travel, and the connection structure will be described below a little.
[0060]
That is, first, as shown in FIG. 9 and FIG. 10, this linkage structure includes a drive unit 91 and a driven unit 92, and the drive unit 91 and the driven unit 92 are arranged between them. The connecting rod 93 is hinged using a pin 93a (see FIG. 10).
[0061]
As described above, the drive unit 91 and the driven unit 92 are hinge-coupled via the connecting rod 93, so that, for example, even when the rail R is curved in the horizontal direction, the drive unit 91 and the driven unit 92 are separated from the rail R. No need to worry about the so-called derailment.
[0062]
Next, the configuration of the drive unit 91 and the driven unit 92 described above will be described. It is assumed that both the units 91 and 92 are basically formed in the same structure. There is a difference in having a drive source 91a (see FIG. 9).
[0063]
Otherwise, both portions 91 and 92 have a pair of wheels 94 and 95 that roll on the rail R in a so-called front and rear direction, and brackets 94a and pivots that pivotally support the pair of wheels 94 and 95, respectively. 95a is provided with hooks 94b and 95b that bind the upper end of the suspension wire W to the lower end thereof.
[0064]
Incidentally, the wheels 94 in the drive unit 91 are linked to the drive source 91a. Therefore, the wheels 94 are rotated by the drive of the drive source 91a, and the drive unit 91 moves on the rail R.
[0065]
At this time, the driven portion 92 also moves on the rail R in synchronization with the drive portion 91 due to the intervention of the connecting rod 93.
[0066]
On the other hand, as shown in FIGS. 11 and 12, the rail R is formed in a structure in which a so-called channel material having a vertical cross section of a square C shape is back-to-back, and extends laterally on both side surfaces. It has an opening R1 as a guide groove.
[0067]
Then, the guide wheels 96 and 97 held in a so-called paired state with the brackets 94a and 95a forming both the above-described portions 91 and 92 are respectively placed in the above-described openings R1 so as to be on the rail R. The wheels 94 and 95 traveling on the road are prevented from being removed.
[0068]
Incidentally, as shown in FIGS. 13 and 14, the cable holder 10 is connected to the opening R <b> 1 formed in the rail R described above, and this cable holder 10 is a driving source in the driving unit 91 described above. A so-called energization cable (not shown) connected to 91a is suspended.
[0069]
Incidentally, the total length of the cable is set to a length that does not prevent the connecting structure from moving on the rail R, so that it becomes so long. Therefore, the cable holder 10 has a plurality of openings R1 described above. Connected to.
[0070]
Further, as a measure for connecting the cable holder 10 to the opening R1 of the rail R, an arbitrary measure can be selected. In this embodiment, as shown in FIG. 15, the tip is connected to the existing rail R. It is assumed that they are connected using the auxiliary rail 101 to be connected.
[0071]
That is, the auxiliary rail 101 has a cross-sectional shape similar to that of the rail R, that is, has an opening (not shown) set in the same manner as the opening R1 in the rail R, and a necessary number of cable holders 10 are provided. It is comprised so that it can unite.
[0072]
The auxiliary rail 101 is a so-called free end while the base end is positioned on the roof side of the structure A, and the necessary number of cable holders 10 connected to the base end side are sequentially pushed so-called. Thus, it is configured to be coupled to the opening R1 of the rail R.
[0073]
The auxiliary rail 101 is removed after the necessary number of cable holders 10 are connected to the opening R1 of the rail R, that is, along the arm 82 in the holding mechanism 8 described above. It is assumed that it is slid and retracted to the roof side of the structure A.
[0074]
In view of the above, when the auxiliary rail 101 is set so that the vertical cross-sectional shape thereof is the same as or substantially the same as the vertical cross-sectional shape of the rail R, the drive unit 91 and the follower that constitute the above-described linkage structure. It is possible to connect the rail 92 with the rail 92 while the portion 92 is connected with the connecting rod 93, compared to the slide movement of the rail R connecting the portions 91 and 92 along the arm 82. This is advantageous in that the work of connecting the connecting structure to the rail R is further simplified.
[0075]
【The invention's effect】
As described above, in the present invention, the suspension wire for suspending the gondola is guided from the upper outside of the gondola to the inside of the gondola, and via the wire deflecting mechanism disposed at the upper end of the rear column. Since the suspension wire is suspended below the rear column body, it becomes possible to suspend this gondola along the axial center line where the suspension wire overlaps the center of gravity of the gondola. It will not tilt or tilt backwards.
[0076]
At this time, the suspension wire guided to the inside of the gondola is suspended by the rear column by way of the wire deflecting mechanism, and thus the suspension wire guided to the inside of the gondola should be occupied by the operator. That is, the suspension wire does not pass through the space formed between the front columnar body and the rear columnar body so that the worker is present.
[0077]
In the present invention, the wire winding mechanism for winding the lower end side of the suspension wire and lifting and lowering the gondola by winding or unwinding the suspension wire is disposed below the scaffold plate. By holding the winding mechanism on the frame below the scaffolding plate, the operator's location is widened compared to the case where the winding mechanism is distributed on the scaffolding plate.
[0078]
Not only in the present invention, the side part of the gondola is a connecting part with the adjacent gondola, and the opening is allowed to allow the operator to move to the adjacent gondola, Along with connecting multiple gondolas, the worker can move freely inside the multiple connected gondola, and the operator can cover a wide range of work in the horizontal direction without moving the gondola. Will be able to.
[0079]
In the present invention, the front column is set to be linear, while the rear column is set to be linear at the lower end, and the upper end is bent toward the front column and the upper end is set to the front column. Since it is connected to the upper end, there is no need to arrange a beam material between the upper end of the front column and the upper end of the rear column, which is advantageous in that the number of members can be reduced.
And at this time, since the protective sheet is separably held between the rear pillars, that is, the adjacent rear pillars, the inside of the gondola can be protected from the outside by this protective sheet. Become.
[0080]
Furthermore, in the present invention, the rail that connects the upper ends of the suspension wires is separably held by an appropriate holding mechanism disposed on the rooftop portion of the structure, and the holding mechanism is detachable from the rooftop of the structure. Since it is distributed, the work of connecting the upper end of the suspension wire to the rail and releasing the connection can be performed safely and easily.
[0081]
As a result, according to the present invention, it is possible to move vertically and horizontally along the outer wall surface of the structure, and it is possible to cover a wide working range in the lateral direction in a stopped state, and its versatility. There is an advantage that is optimal to expect improvement.
[Brief description of the drawings]
FIG. 1 is a schematic view showing a utilization state of a gondola apparatus according to an embodiment of the present invention.
FIG. 2 is a rear view showing the gondola of FIG. 1;
FIG. 3 is an enlarged side view showing a state where the gondola of FIG. 1 is connected to the outer wall surface of the structure.
FIG. 4 is a partial perspective view showing a state in which the protective sheet is held by the rear column.
FIG. 5 is a partial perspective view showing a state in which a rail is arranged at the top end of the structure by a holding mechanism.
FIG. 6 is a partial cross-sectional view showing a state in which a rail is linked to an arm constituting a holding mechanism.
FIG. 7 is a side view showing a holding mechanism according to another embodiment.
FIG. 8 is a side view showing a holding mechanism according to another embodiment.
FIG. 9 is a plan view showing a partially broken step of a connecting structure for connecting the upper end of a suspension wire to a rail.
10 is an elevational view of the connecting structure of FIG. 9 as viewed from the outside of the structure.
FIG. 11 is a side view showing a drive unit constituting a linkage structure.
FIG. 12 is a view showing a driven portion constituting the linkage structure in the same manner as FIG.
FIG. 13 is an elevational view showing a state where the cable holder is connected to the rail.
14 is a side view showing the cable holder of FIG. 13. FIG.
FIG. 15 is a schematic plan view showing an arrangement state of auxiliary rails for connecting the cable holder to the rails.
[Explanation of symbols]
1 Front column
2 Rear column
2a groove
3 Scaffolding board
4 Handrail frame
5 Frame
6 Wire winding mechanism
7 Wire diversion mechanism
8 Holding mechanism
10 Cable holder
11 Fixing bracket
11a Clamp part
12,22 skirting board
13 Hanging material
21 Head joint
23, 94a, 95a Bracket
24 Link member
51, 94, 95 wheels
52 Fall prevention plate
61 Winder
62 reel
71,72 sheave
81 Support bracket
82, 83, 84 arms
82a Guide groove
91 Drive unit
91a Driving source
92 Follower
93 Connecting rod
93a pin
94b, 95b hook
96, 97 Guide wheel
101 Auxiliary rail
A construction
G Gondola
R rail
R1 opening
r Guide wheel
S protective sheet
S1 end
V Veranda
V1 handrail wall
W Hanging wire

Claims (4)

ゴンドラが構築物の外壁面に適宜の間隔を有して対向する複数本の前方柱体と、この前方柱体の後方にそれぞれ配在されて対をなし前方柱体との間に作業者の臨在を許容する空間を形成する複数本の後方柱体と、前方柱体の下端部と後方柱体の下端部との間に配在されて作業者の立ち入りを許容する足場板とを有してなる一方で、このゴンドラを吊持する吊りワイヤの上端が構築物の天端に配在のレールに副って横方向に移動可能とされてなるゴンドラ装置において、吊りワイヤがゴンドラの上方外部からゴンドラの内部に案内されると共に、後方柱体の上端部に配在のワイヤそらし機構を介することで後方柱体に副って垂下されてなり、かつ、吊りワイヤの下端側を巻装させて吊りワイヤの巻き取りあるいは解き出しでゴンドラを昇降させるワイヤ巻取り機構が足場板の下方に配在されてなることを特徴とするゴンドラ装置An operator is present between a plurality of front columns facing the outer wall surface of the structure with an appropriate interval and a pair of front columns arranged behind the front columns. A plurality of rear pillars that form a space that allows a worker, and a scaffolding plate that is disposed between a lower end portion of the front pillar body and a lower end portion of the rear pillar body and allows an operator to enter. On the other hand, in the gondola device in which the upper end of the suspension wire for suspending the gondola is movable laterally next to the rail located at the top end of the structure, And is suspended from the rear column by way of a wire deflecting mechanism disposed at the upper end of the rear column, and the lower end side of the suspension wire is wound and suspended. Raise and lower the gondola by winding or unwinding the wire Gondola device wire winding mechanism is characterized by comprising been Zaisa distribution below the scaffolding plate ゴンドラの側面部が手摺枠を揺動可能にあるいは分離可能に有すると共に、この手摺枠の揺動時にあるいは撤去時に相隣するゴンドラへの作業者の移動を許容する開口部とされてなる請求項1に記載のゴンドラ装置The side surface of the gondola has a handrail frame swingably or separably, and is an opening that allows an operator to move to an adjacent gondola when the handrail frame swings or is removed. The gondola device according to 1 前方柱体が直線状に設定される一方で、後方柱体が下端側を直線状に設定すると共に上端側を前方柱体側に折り曲げて上端を前方柱体の上端に連結してなり、かつ、相隣する後方柱体との間で防護シートを分離可能に保持してなる請求項1に記載のゴンドラ装置While the front column is set to be linear, the rear column is set to be linear at the lower end and the upper end is bent to the front column and the upper end is connected to the upper end of the front column, and The gondola device according to claim 1, wherein the protective sheet is separably held between adjacent rear columns. 吊りワイヤの上端を連繋させるレールが構築物の屋上部分に配在の適宜の保持機構に分離可能に保持されてなると共に、保持機構が構築物の屋上に着脱可能に配在されてなる請求項1に記載のゴンドラ装置The rail connecting the upper ends of the suspension wires is separably held by an appropriate holding mechanism disposed on the roof portion of the structure, and the holding mechanism is detachably disposed on the roof of the structure. Gondola equipment as described
JP2000018293A 2000-01-27 2000-01-27 Gondola equipment Expired - Lifetime JP4132532B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000018293A JP4132532B2 (en) 2000-01-27 2000-01-27 Gondola equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000018293A JP4132532B2 (en) 2000-01-27 2000-01-27 Gondola equipment

Publications (2)

Publication Number Publication Date
JP2001207638A JP2001207638A (en) 2001-08-03
JP4132532B2 true JP4132532B2 (en) 2008-08-13

Family

ID=18545158

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000018293A Expired - Lifetime JP4132532B2 (en) 2000-01-27 2000-01-27 Gondola equipment

Country Status (1)

Country Link
JP (1) JP4132532B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101836345B1 (en) * 2017-12-12 2018-03-08 주식회사 선진곤도라 Gondola
JP7601611B2 (en) * 2020-11-10 2024-12-17 株式会社スガテック Temporary scaffolding unit

Also Published As

Publication number Publication date
JP2001207638A (en) 2001-08-03

Similar Documents

Publication Publication Date Title
JP6467097B1 (en) Monorail gondola
JP2587684B2 (en) Construction wall construction equipment
EP0515069B1 (en) Suspender arm for machinery
JP2006348691A (en) Construction system for building outer wall
JP4132532B2 (en) Gondola equipment
JP5466783B1 (en) Support member for safety belt
JP2006233486A (en) Traversing work device and work method thereby
JPH0978842A (en) Crane for scaffold
JPH06210074A (en) Stage hanging mechanism
JP5948542B1 (en) Simple crane
JP3124057U (en) Unic arm suspension scaffold
JP2014023431A (en) Curtain device
JP3231930B2 (en) Lifeline routing structure in a horizontally movable gondola device
JPH10203751A (en) Main rope replacement method and apparatus for 2: 1 roping elevator
JPH0885685A (en) Safety lock device of elevating body along guide rail
JPH101296A (en) Cable handling device of high altitude working vehicle
JP3105886U (en) Operation cable fall prevention structure for gondola equipment
JPH0225828Y2 (en)
CN116736461B (en) A fiber optic cable threading device
JPH06210075A (en) Stage set hanging mechanism
JP3790210B2 (en) Worker rescue method and apparatus in gondola device
CN222593327U (en) A hanger for building hoisting equipment
JPH084301A (en) Construction method and equipment for outer wall panel using cableway
JP2003010566A (en) Hanging equipment for stage equipment
JPS6236958B2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070123

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080507

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080602

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110606

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4132532

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120606

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120606

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130606

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term