JP4133594B2 - Water-retaining pavement structure and construction method - Google Patents
[go: Go Back, main page]

JP4133594B2 - Water-retaining pavement structure and construction method - Google Patents

Water-retaining pavement structure and construction method Download PDF

Info

Publication number
JP4133594B2
JP4133594B2 JP2003154986A JP2003154986A JP4133594B2 JP 4133594 B2 JP4133594 B2 JP 4133594B2 JP 2003154986 A JP2003154986 A JP 2003154986A JP 2003154986 A JP2003154986 A JP 2003154986A JP 4133594 B2 JP4133594 B2 JP 4133594B2
Authority
JP
Japan
Prior art keywords
water
mixture layer
particle size
water supply
water retention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003154986A
Other languages
Japanese (ja)
Other versions
JP2004353399A (en
Inventor
豪 辻井
広志 藤田
秀行 小林
直幸 小栗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Rotec Corp
Original Assignee
Taisei Rotec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Rotec Corp filed Critical Taisei Rotec Corp
Priority to JP2003154986A priority Critical patent/JP4133594B2/en
Publication of JP2004353399A publication Critical patent/JP2004353399A/en
Application granted granted Critical
Publication of JP4133594B2 publication Critical patent/JP4133594B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、保水性舗装構造及びその施工方法に関するものである。
【0002】
真夏の炎天下におけるアスファルト舗装の路面温度は、アスファルトの色調が黒であるため太陽光を吸収しやすく、60℃以上に上昇することもある。特に舗装比率の高い市街地では、このような路面温度の上昇に起因して、市街地全体が高温となるヒートアイランド現象が問題となっている。
【0003】
そこで、降雨時における雨水を保水する保水機能を有し、晴天時に保水された水が蒸発することにより路面温度の上昇を抑制する種々の保水性舗装が提案されている。例えば、本願出願人による「シルト系充填材を充填した路面温度の上昇抑制機能を備える舗装体の有孔表層」(特許文献1参照)が挙げられる。
【0004】
【特許文献1】
特許第3156151号公報(第3−14頁、第1−3図)
【0005】
【発明が解決しようとする課題】
しかしながら、特許文献1に開示された技術は、保水性を有するシルト系充填材(保水性グラウト)が充填された有孔表層の下部に、砕石路盤材料や透水性アスファルト混合物からなる水分貯溜層を設け、さらにこの水分貯留層に水を給水する給水用配管を配設した技術であるが、晴天時等の温度上昇時に、水分貯留層からシルト系充填材に水を好適に供給できにくく保水性を持続できないという問題があった。
【0006】
そこで、本発明は、保水機能を好適に持続可能な保水性舗装構造及びその施工方法を提供することを課題とする。
【0007】
【課題を解決するための手段】
前記課題を解決するための手段として、本発明は、内部に連続空隙を有する開粒度混合物層と、前記連続空隙の上部に層状で充填された保水性を有する保水性グラウトと、当該保水性グラウトの下方に連続した状態で、前記連続空隙の下部の少なくとも一部に充填された保水性及び透水性を有する給水材料と、前記給水材料に水を供給する給水手段を備え、前記給水材料を介して前記保水性グラウトに水が供給可能であることを特徴とする保水性舗装構造である。
【0008】
ここで、開粒度混合物層は、内部に連続空隙を有すれば、混合物の種類、態様は特に限定されず、例えば、開粒度アスファルト混合物層、開粒度コンクリート混合物層、開粒度樹脂混合物層等が挙げられる。
また、開粒度混合物層が、開粒度アスファルト混合物層である場合、骨材、アスファルトバインダ量等の配合比、空隙率、密度等はどのようであってもよい。また、開粒度アスファルト混合物層は、一回で施工されたものであってよいし、複数回で施工されたものであってもよい。さらに、複数回で施工された開粒度アスファルト混合物層の場合、この開粒度アスファルト混合物層を形成する各開粒度アスファルト混合物の種類は異なってもよい。
【0009】
このような保水性舗装構造によれば、給水手段から給水材料に水を適宜供給することにより、水は給水材料に吸水されると共に、給水材料の内部を通水し保水される。給水材料は、保水性グラウトに連続して充填されていることにより、蒸発により保水性グラウトに保水された水が減少した場合には、給水材料に保水された水が、保水性グラウトに移動する。したがって、保水性グラウトには水が連続的に保水され、保水機能は好適に持続可能となり、保水性グラウトに保水された水が蒸発するときに奏する温度上昇抑制効果を持続させることができる。
【0010】
また、本発明は、内部に連続空隙を有する開粒度混合物層の表面から、乾燥状態の給水材料を充填させる給水材料充填工程を備えたことを特徴とする保水性舗装構造の施工方法である。
【0011】
このような保水性舗装構造の施工方法によれば、乾燥状態の給水材料を開粒度混合物層の表面から充填させるため、開粒度混合物層の連続空隙の下部から、給水材料を充填させることができる。
【0012】
【発明の実施の形態】
以下、本発明の一実施形態について、図面を適宜参照して、詳細に説明する。参照する図面において、図1は、本実施形態に係る保水性舗装構造を模式的に示す側断面図である。図2は、本実施形態に係る保水性舗装構造における水の移動状況を模式的に示す側断面図である。図3は、本実施形態に係る保水性舗装構造について、時間と路面温度の関係を示したグラフである。図4は、本実施形態に係る保水性舗装構造を基層と表層に分けて施工する施工方法を示す側断面図である。
【0013】
図1に示すように、保水性舗装構造1は、路盤51の上に積層した密粒度アスファルト混合物からなる遮水層52の上に構築されており、母体となる開粒度アスファルト混合物層5(開粒度混合物層)と、開粒度アスファルト混合物層5の連続空隙6(図4参照)の上部に層状に充填され固化した固化状態の保水性グラウト7と、保水性グラウト7の直下に連続すると共に連続空隙6の下部に層状で充填され固化した固化状態のドライモルタル8(給水材料)と、ドライモルタル8に水を供給する給水パイプ15(給水手段)を備えて構成されており、給水パイプ15が接続された給水池等の給水設備(図示しない)から、ドライモルタル8を介して保水性グラウト7に、水を適宜供給可能となっている。
【0014】
ここで、本実施形態に係る開粒度アスファルト混合物層5は、後記するように、基層と表層の2回に分けて施工されたものであり(図4参照)、基層開粒度アスファルト混合物層5aと表層開粒度アスファルト混合物層5bとが、界面に散布されたアスファルト乳剤により一体化して形成されたものである。したがって、連続空隙6は、基層開粒度アスファルト混合物層5aの連続空隙6aと、表層開粒度アスファルト混合物層5bの連続空隙6bとの和で形成されることとなる。なお、基層開粒度アスファルト混合物層5a及び表層開粒度アスファルト混合物層5bの厚さは、施工箇所に応じて適宜変更してよい。
【0015】
また、ドライモルタル8は、本実施形態では、連続空隙6aの下方より、基層開粒度アスファルト混合物層5aの施工厚さの略中間高さ位置まで充填されている。この層状のドライモルタル8の上面に連続して、すなわち、ドライモルタル8が充填されていない連続空隙6aの部分と連続空隙6bに保水性グラウト7は充填されている。よって、図1に示すように、本実施形態に係る保水性舗装構造1は、見かけ上、保水性グラウト7が充填された保水層とその直下でドライモルタル8が充填された給水層とを備えた二層式構造となっている。なお、保水性グラウト7及びドライモルタル8充填高さは、施工箇所の横断・縦断勾配、開粒度アスファルト混合物層5の施工厚さ、気候などに応じて適宜変更してよい。
以下、各構成要素について詳細に説明する。
【0016】
開粒度アスファルト混合物層5は、骨格となる粗骨材、細骨材及び石粉(以下、「骨材」とする)と、これらを結合したアスファルトバインダを含んで形成されている。骨材の配合及び合成粒度、アスファルトバインダの添加量は、締め固め後の開粒度アスファルト混合物層5が、内部に連続する連続空隙6及び施工箇所に応じた耐流動性等を有すれば、どのような配合であってもよい。
【0017】
骨材の合成粒度は、例えば、使用する骨材の最大粒径が13mm(つまり、使用する最大粒径の骨材が6号砕石)の場合、表1に示す粒度範囲であると設定空隙率が15〜35%となり、保水性グラウト7及びドライモルタル8を十分に充填可能となるので好ましい。
【0018】
【表1】

Figure 0004133594
【0019】
アスファルトバインダは、水に対する剥離抵抗性等を考慮し、アミン等の剥離防止剤が添加された高粘度改質アスファルトバインダであることが好ましい。
【0020】
保水性グラウト7は、透水性及び保水性を有し、前記した本願出願人による特許第3156151号公報(特許文献1)に記載された「シルト系充填材」と同義である。すなわち、保水性グラウト7は、シルト系粉末、セメント系固化材、水、添加剤として減水剤または凝結遅延剤を所定配合で混合し、硬化・乾燥させたものであり、多数の保水可能な微細空隙(図示しない)を有している。
【0021】
ここで、シルト系粉末とは、岩石を集塵したものである。
また、セメント系固化材としては、超速硬性セメント、普通ポルトランドセメント、超早強セメント、早強セメント、高炉セメント等から、施工条件等を考慮し適宜選択して使用してよい。
さらに、添加剤について、減水剤としては、カルボン酸系またはメラニン系等の減水剤が適しており、凝結遅延剤としては、SBR系、アクリル系、酢酸ビニル系のポリマーエマルジョンが好適に使用可能である。
【0022】
固化状態のドライモルタル8は、天然砂、人工砂、珪砂等の砂と、粉末ポリマー、セメント系材料等の粉末状の結合材とが、所定配合で混合され、連続空隙6に充填後、固化、乾燥したものであり、多数の微細空隙及び微細隙間(図示しない)を有し、透水性と吸水性を具えている。したがって、給水パイプ15から供給された水は、ドライモルタル8に吸水され、保水されると共に、ドライモルタル8が充填された給水層内部を移動自在となっている。
また、固化状態のドライモルタル8は、砂が結合材により結合した骨格構造を具えると共に、開粒度アスファルト混合物層5に固着している。結合材の添加量は、砂の質量に対して、2〜10質量%であることが好ましい。このような結合材の添加量であると、固化したドライモルタル8は、開粒度アスファルト混合物層5に対して、十分な固着力を有することになり、給水パイプ15からの給水にともなう水流により、ドライモルタル8が保水性舗装構造1の外部に流出することを防止できる。
【0023】
給水パイプ15は、壁体に所定間隔で給水孔(図示しない)を有しており、開粒度アスファルト混合物層5中の底部に沿って所定位置に埋設されている。また、給水パイプ15は、流量調節バルブ等を介して、外部の給水池等の給水設備(図示しない)に接続しており、ドライモルタル8に水を適宜供給可能となっている。
給水パイプ15としては、有孔塩ビ管、多孔質パイプ、ビニールホース等から適宜選択して使用可能であり、さらにスパイラルドレンパイプ等を使用して、給水パイプ15を保護してもよい。
【0024】
次に、保水性舗装構造1における水の移動状況について、図2を参照して説明する。
外部の給水設備から給水パイプ15に水が供給されると、この水はドライモルタル8を含む給水層に吸水されるとともに、その内部全域に亘って通水する(図2に示す矢印A1)。
そして、給水層の全域に亘った水は、保水性グラウト7内に十分に水が保水されていない場合、毛細管現象により、保水性グラウト7とドライモルタル8との界面を越えて、保水性グラウト7に吸水され(図2に示す矢印A2)、保水層の全域に亘って保水される(図2に示す矢印A3)。
そして、晴天等により外気温が上昇し、保水性舗装構造1が高温になると、表面から保水層に保水された水が蒸発する(図2に示す矢印A4)とともに、水の気化潜熱が保水性舗装構造1及び外気中から奪われるため、保水性舗装構造1の路面温度の上昇は抑制される。
【0025】
したがって、図3に示すように、本実施形態に係る保水性舗装構造1(図3において「給水付保水性(給水・有)」と示す)によれば、外気温等を考慮し適宜な間隔で、ドライモルタル8に給水することにより、保水性を有しない密粒度舗装構造(「密粒度」)、散水しない保水性舗装構造(「保水性(散水・無)」)、適宜な間隔で路面に散水し水を供給する保水性舗装構造(「保水性(散水・有)」)に比して、路面温度の上昇を抑制することが可能である。特に、本実施形態に係る舗装構造1は、舗装構造の内部から水を供給するため、路面から散水する保水性舗装(「保水性(散水・有)」)と比して、路面温度の上昇を抑制可能である。
なお、図3に示すデータは、各舗装構造を0.9m×0.9mのブロックに分割して路面温度の経時変化を測定したものであり、そのうち、給水または散水する舗装構造については、前記ブロックに7、10、13及び16時に、5Lの水を供給してすること条件として得られたデータである。また、図3に示す「気温」は外気温、「土」は土を樹脂等で固化した土系の舗装構造を示す。
【0026】
(保水性舗装構造の施工方法)
続いて、保水性舗装構造1を基層と表層に分けて施工する施工方法について、図4を参照して説明する。
保水性舗装構造の施工方法は、基層開粒度アスファルト混合物層5aを構築する基層開粒度アスファルト混合物層構築工程と、基層開粒度アスファルト混合物層5aの表面から、連続空隙6へ乾燥状態のドライモルタル8(給水材料)を充填するドライモルタル充填工程(給水材料充填工程)と、基層開粒度アスファルト混合物層5aの表面にアスファルト乳剤を散布するアスファルト乳剤散布工程と、基層開粒度アスファルト混合物層5aの上に表層開粒度アスファルト混合物層5bを構築する表層開粒度アスファルト混合物層構築工程と、表層開粒度アスファルト混合物層5bの表面から流動性を有する液状の保水性グラウト7を注入する保水性グラウト注入工程を備えて構成されている。
【0027】
(基層開粒度アスファルト混合物層構築工程)
図4(a)に示すように、遮水層52上に、例えば路肩に沿って給水パイプ15を配置した後、その上からアスファルトフィニッシャ等を使用して、所定配合の基層開粒度アスファルト混合物を敷き均し、ロードローラ、振動ローラ、タイヤローラ、振動プレート、タンパ等(以下、「締め固め機械」と総称する)で締め固め、所定密度、所定厚さ、所定空隙率の基層開粒度アスファルト混合物層5aを構築する。
また、遮水層52及び路肩等の周囲部が十分な遮水性を有さない場合には、基層開粒度アスファルト混合物を敷き均す前に、高濃度のゴム入りアスファルト乳剤を散布する等の止水処理を施すことが好ましい。
【0028】
(ドライモルタル充填工程)
そして、図4(b)に示すように、基層開粒度アスファルト混合物層5aの表面から、ドライモルタル8を適宜な手段(例えば、角型スコップなど)で散布し、レーキ21で敷き均す。その後、振動プレート22、振動ローラ(図示しない)等の振動付与手段により、基層開粒度アスファルト混合物層5aに振動を与え、ドライモルタル8を、基層開粒度アスファルト混合物層5aの連続空隙6aに下部から充填する。
ドライモルタル8の充填量は、施工箇所の横断勾配、縦断勾配等に応じて、適宜変更してよい。ただし、ドライモルタル8の充填量は、連続空隙6aの容積よりやや少なく、充填後に基層の表面に基層開粒度アスファルト混合物層5aが露出し、凹凸が形成され、後記するアスファルト乳剤が基層開粒度アスファルト混合物層5aのみに付着するようにすることが好ましい。
このように基層開粒度アスファルト混合物層5aを構築した後、すなわち、表層開粒度アスファルト混合物層5bを構築する前に、乾燥状態のドライモルタル8を散布・充填することにより、基層開粒度アスファルト混合物層5aの連続空隙6aの下部からドライモルタル8を隙間なく充填しやすくなる。
【0029】
その後、乾燥状態のドライモルタル8が充填された基層開粒度アスファルト混合物層5aの表面に、所定量の水を散水し、この水を乾燥状態のドライモルタル8に吸水させる。乾燥状態のドライモルタル8が吸水すると、ドライモルタル8に含まれた結合材が硬化する。そうすると、ドライモルタル8は、主に砂からなる骨格構造が形成され固化して固化状態になると共に、基層開粒度アスファルト混合物層5aに固着する。したがって、給水パイプ15よりの給水に伴う水流により、基層開粒度アスファルト混合物層5aに固着したドライモルタル8が、流出することを防止することができる。
【0030】
(アスファルト乳剤散布工程)
その後、図4(c)に示すように、基層開粒度アスファルト混合物層5aの表面に乳剤を散布する。アスファルト乳剤を散布するとき、ローラ刷毛23を使用したり、その他ディストリビュータ(図示しない)の散布量を減少させ複数回で散布したり、エンジンスプレーヤ(図示しない)の噴霧ノズルの吐出口を霧状で噴霧可能に変更したりして、基層開粒度アスファルト混合物層5aの上部の連続空隙6aにアスファルト乳剤が侵入せず、基層開粒度アスファルト混合物層5aの表面の骨材のみにアスファルト乳剤が散布され、アスファルト被膜を形成することが好ましい。
このように基層開粒度アスファルト混合物層5aの連続空隙6aにアスファルト乳剤が侵入しないようにすると、先に充填したドライモルタル8の表面にアスファルト乳剤が付着してアスファルト被膜を形成しない。したがって、ドライモルタル8は、この後充填する保水性グラウト7と、アスファルト被膜等の不透水層を介さず連続的に接触可能となる。すなわち、ドライモルタル8と保水性グラウト7が連続的に接触すると、ドライモルタル8と保水性グラウト7の間で、水は移動自在となる。
【0031】
(表層開粒度アスファルト混合物層構築工程)
散布したアスファルト乳剤を所定時間養生した後、アスファルトフィニッシャ等で、所定配合の表層開粒度アスファルト混合物を敷き均し、基層開粒度アスファルト混合物層5aと同様に締め固め機械で、所定密度となるように締め固めて、表層開粒度アスファルト混合物層5bを構築する(図4(d)参照)。
【0032】
(保水性グラウト注入工程)
その後、図4(e)に示すように、表層開粒度アスファルト混合物層5bの表面から、基層開粒度アスファルト混合物層5a及び表層開粒度アスファルト混合物層5bの連続空隙6に、流動性を有する液状の保水性グラウト7を注入する。保水性グラウト7を注入する際には、保水性グラウト7が貯留されたグラウトタンク(図示しない)から保水性グラウト7が逐次供給されると共に、所定量の保水グラウト7を貯留しながら(例えば、注入ホッパ24内の保水性グラウト7の水頭高さを保持する)、下部の吐出孔(図示しない)から保水性グラウト7を吐出し、保水性グラウト7を注入する保水性グラウト注入ホッパ24(以下「注入ホッパ」と略称する)を使用する。このような注入ホッパ24を使用することにより、簡易な構成で、保水性グラウト7の注入速度が一定速度となり、良好に保水性グラウト7を注入可能となる。
また、保水性グラウト7を注入しながら、振動ローラ等で振動を開粒度アスファルト混合物層5に付与すると、連続空隙6に隙間を形成せずに保水性グラウト7は充填されるので好ましい。
【0033】
保水性グラウト7を注入後、所定時間養生した後、保水性グラウト7は固化状態となり、本実施形態に係る保水性舗装構造1が構築される(図4(f)参照)。
【0034】
以上、本発明の好適な実施形態について一例を説明したが、本発明は前記実施形態に限定されず、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。
【0035】
前記した実施形態では、母体となる開粒度アスファルト混合物層5を基層開粒度アスファルト混合物層5aと表層開粒度アスファルト混合物層5bに分けて、別々に敷き均し構築した後、一体化させ形成したが、その他に例えば、施工厚を確保できない現場等の場合には、別々に分けず、開粒度アスファルト混合物層を構築した後、その表面からドライモルタル8、保水性グラウト7の順に充填して、保水性舗装構造1を構築してもよい。
【0036】
前記した実施形態では、新規に開粒度アスファルト混合物層を構築した後、ドライモルタル8を充填するとしたが、既存の開粒度アスファルト混合物層について、連続空隙に堆積した埃・塵などを水、空気で清掃する空隙清掃処理等を適宜行った後に、ドライモルタル8、保水性グラウト7を充填して、保水性舗装構造1を構築してもよい。
【0037】
前記した実施形態では、給水手段として給水パイプ15を埋設したが、その他に例えば、遮水層15の表面に、通水可能な溝部を設けてもよい。
【0038】
前記した実施形態では、図1に示すように、保水性グラウト7の下方に、層状でドライモルタル8(吸水材料)が充填され、保水層と給水層とが二層状で形成された保水性保水性舗装構造1としたが、ドライモルタル8(給水材料)は層状でなく、保水性グラウトの下方で部分的に充填されていてもよい。すなわち、例えば、遮水層に15に溝部が形成されており、その溝部及び遮水層15の上面に、開粒度アスファルト混合物層が一体的に施工・構築されており、溝部にドライモルタルが充填されていてもよい。つまり、本発明における開粒度アスファルト混合物層(開粒度混合物層)は、このように下部に突出した部分を有していてもよい。
【0039】
前記した実施形態では、乾燥状態のドライモルタル8を充填後に散水し固化させるとしたが、散水を行わず、乾燥状態のドライモルタル8が、その後充填する液状の保水性グラウト7に含まれる水を吸収することにより固化するとしてもよい。
【0040】
前記した実施形態では、開粒度混合物層は、開粒度アスファルト混合物が締め固められた開粒度アスファルト混合物層としたが、その他に例えば、開粒度コンクリート混合物層(ポーラスコンクリート)や、エポキシ系樹脂、アクリル系樹脂をバインダとして形成された開粒度樹脂混合物層であってもよい。
【0041】
【発明の効果】
本発明によれば、保水機能を好適に持続可能な保水性舗装構造及びその施工方法を提供することができる。
【図面の簡単な説明】
【図1】本実施形態に係る保水性舗装構造を模式的に示す側断面図である。
【図2】本実施形態に係る保水性舗装構造における水の移動状況を模式的に示す側断面図である。
【図3】本実施形態に係る保水性舗装構造について、時間と路面温度の関係を示すグラフである。
【図4】(a)〜(f)ともに、本実施形態に係る保水性舗装構造を基層と表層に分けて施工する施工方法を模式的に示す側断面図である。
【符号の説明】
1 保水性舗装構造
5 開粒度アスファルト混合物層(開粒度混合物層)
5a 基層開粒度アスファルト混合物層
5b 表層開粒度アスファルト混合物層
6、6a、6b 連続空隙
7 保水性グラウト
8 ドライモルタル(給水材料)
15 給水パイプ(給水手段)
21 レーキ
22 振動プレート
23 ローラ刷毛
24 注入ホッパ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a water-retaining pavement structure and a construction method thereof.
[0002]
The road surface temperature of asphalt pavement under the hot summer heat is easy to absorb sunlight because the color of the asphalt is black, and may rise to 60 ° C. or higher. Particularly in urban areas where the pavement ratio is high, the heat island phenomenon in which the entire urban area becomes high temperature is a problem due to such an increase in road surface temperature.
[0003]
In view of this, various water retention pavements have been proposed that have a water retention function for retaining rainwater during rainfall, and suppress the increase in road surface temperature by evaporating the water retained in fine weather. For example, “a perforated surface layer of a pavement having a function of suppressing an increase in road surface temperature filled with a silt-based filler” by the applicant of the present application (see Patent Document 1).
[0004]
[Patent Document 1]
Japanese Patent No. 3156151 (page 3-14, Fig. 1-3)
[0005]
[Problems to be solved by the invention]
However, in the technique disclosed in Patent Document 1, a water storage layer made of a crushed stone roadbed material or a water-permeable asphalt mixture is formed below a perforated surface layer filled with a silt-based filler having a water retention property (water retention grout). In addition, it is a technology in which a water supply pipe for supplying water to this moisture reservoir is provided, but it is difficult to supply water from the moisture reservoir to the silt-type filler when the temperature rises in fine weather. There was a problem that could not be sustained.
[0006]
Then, this invention makes it a subject to provide the water retention pavement structure which can maintain a water retention function suitably, and its construction method.
[0007]
[Means for Solving the Problems]
As means for solving the above-mentioned problems , the present invention provides an open particle size mixture layer having continuous voids therein, a water retention grout having water retention filled in layers above the continuous voids, and the water retention grout. A water supply material having water retention and water permeability filled in at least a part of the lower portion of the continuous gap, and a water supply means for supplying water to the water supply material, with the water supply material interposed therebetween. The water retention pavement structure is characterized in that water can be supplied to the water retention grout.
[0008]
Here, as long as the open particle size mixture layer has continuous voids therein, the type and aspect of the mixture are not particularly limited. For example, an open particle size asphalt mixture layer, an open particle size concrete mixture layer, an open particle size resin mixture layer, etc. Can be mentioned.
When the open particle size mixture layer is an open particle size asphalt mixture layer, the mixing ratio of the aggregate, the amount of asphalt binder, the porosity, the density, etc. may be any. Moreover, the open-graded asphalt mixture layer may be constructed once or may be constructed multiple times. Furthermore, in the case of an open-graded asphalt mixture layer that has been applied multiple times, the types of each open-graded asphalt mixture that forms this open-graded asphalt mixture layer may be different.
[0009]
According to such a water-retaining pavement structure, by appropriately supplying water from the water supply means to the water supply material, the water is absorbed by the water supply material, and the inside of the water supply material is passed and retained. The water supply material is continuously filled in the water retention grout, so that when the water retained in the water retention grout is reduced by evaporation, the water retained in the water supply material moves to the water retention grout. . Therefore, water is continuously retained in the water retention grout, the water retention function can be suitably maintained, and the temperature rise suppressing effect exhibited when the water retained in the water retention grout evaporates can be maintained.
[0010]
Moreover, this invention is the construction method of the water retention pavement structure provided with the water supply material filling process filled with the dry water supply material from the surface of the open particle-size mixture layer which has a continuous space | gap inside.
[0011]
According to the construction method of such a water-retaining pavement structure, since the dry water supply material is filled from the surface of the open particle size mixture layer, the water supply material can be filled from the lower part of the continuous voids of the open particle size mixture layer. .
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings as appropriate. In the drawings to be referred to, FIG. 1 is a side sectional view schematically showing a water-retaining pavement structure according to this embodiment. FIG. 2 is a side cross-sectional view schematically showing the movement of water in the water-retaining pavement structure according to the present embodiment. FIG. 3 is a graph showing the relationship between time and road surface temperature for the water-retaining pavement structure according to the present embodiment. FIG. 4 is a side sectional view showing a construction method for constructing the water-retaining pavement structure according to the present embodiment by dividing it into a base layer and a surface layer.
[0013]
As shown in FIG. 1, the water-retaining pavement structure 1 is constructed on a water-impervious layer 52 made of a dense-graded asphalt mixture laminated on a roadbed 51, and an open-graded asphalt mixture layer 5 (open A particle size mixture layer), a solidified water retaining grout 7 filled in a layered form on the upper part of the continuous void 6 (see FIG. 4) of the open particle size asphalt mixture layer 5 and a solidified water retaining grout 7 which is continuous and continuous immediately below the water retaining grout 7. A solidified dry mortar 8 (water supply material) that is filled and solidified in layers below the gap 6 and a water supply pipe 15 (water supply means) that supplies water to the dry mortar 8 are configured. Water can be appropriately supplied to the water retention grout 7 via the dry mortar 8 from a water supply facility (not shown) such as a connected water reservoir.
[0014]
Here, as described later, the open-graded asphalt mixture layer 5 according to the present embodiment is constructed in two steps of the base layer and the surface layer (see FIG. 4), and the base-layered asphalt mixture layer 5a and The surface layer open-graded asphalt mixture layer 5b is formed integrally with the asphalt emulsion dispersed on the interface. Therefore, the continuous space | gap 6 will be formed by the sum of the continuous space | gap 6a of the base layer open particle size asphalt mixture layer 5a, and the continuous space | gap 6b of the surface layer open particle size asphalt mixture layer 5b. In addition, you may change suitably the thickness of the base layer open grain size asphalt mixture layer 5a and the surface layer open grain size asphalt mixture layer 5b according to a construction location.
[0015]
Further, in the present embodiment, the dry mortar 8 is filled from the lower side of the continuous gap 6a to a position approximately in the middle of the construction thickness of the base layer open-graded asphalt mixture layer 5a. The water retaining grout 7 is continuously filled on the upper surface of the layered dry mortar 8, that is, the continuous void 6a not filled with the dry mortar 8 and the continuous void 6b. Therefore, as shown in FIG. 1, the water-retaining pavement structure 1 according to the present embodiment apparently includes a water-retaining layer filled with the water-retaining grout 7 and a water-supplying layer filled with the dry mortar 8 immediately below it. It has a two-layer structure. The filling height of the water retention grout 7 and the dry mortar 8 may be appropriately changed according to the crossing / vertical gradient of the construction site, the construction thickness of the open-graded asphalt mixture layer 5, the climate, and the like.
Hereinafter, each component will be described in detail.
[0016]
The open-graded asphalt mixture layer 5 is formed to include coarse aggregate, fine aggregate and stone powder (hereinafter referred to as “aggregate”) serving as a skeleton, and an asphalt binder obtained by combining these. Aggregate composition and composite particle size, asphalt binder addition amount, as long as the open particle size asphalt mixture layer 5 after compaction has continuous continuous voids 6 and flow resistance depending on the construction location, etc. Such a blend may be used.
[0017]
For example, when the aggregate particle size of the aggregate is 13 mm (that is, the aggregate with the maximum particle size to be used is No. 6 crushed stone), the composite porosity of the aggregate is set to the particle size range shown in Table 1 15 to 35%, which is preferable because the water retaining grout 7 and the dry mortar 8 can be sufficiently filled.
[0018]
[Table 1]
Figure 0004133594
[0019]
The asphalt binder is preferably a high-viscosity modified asphalt binder to which a peeling inhibitor such as amine is added in consideration of peeling resistance to water and the like.
[0020]
The water retention grout 7 has water permeability and water retention and is synonymous with the “silt filler” described in Japanese Patent No. 3156151 (Patent Document 1) by the applicant of the present application. That is, the water retention grout 7 is obtained by mixing a silt powder, a cement solidifying material, water, a water reducing agent or a setting retarder as an additive in a predetermined composition, and curing and drying. There is a gap (not shown).
[0021]
Here, the silt powder is a collection of rocks.
The cement-based solidifying material may be appropriately selected from super fast-hardening cement, ordinary Portland cement, ultra-high strength cement, early strength cement, blast furnace cement and the like in consideration of construction conditions.
Further, as for the additive, a water reducing agent such as a carboxylic acid type or a melanin type is suitable as a water reducing agent, and an SBR type, acrylic type or vinyl acetate type polymer emulsion can be suitably used as a setting retarder. is there.
[0022]
The dry mortar 8 in the solidified state is prepared by mixing sand such as natural sand, artificial sand, and silica sand with a powdery binder such as a powder polymer or cement-based material and filling the continuous void 6 to solidify. It is dried, has many fine voids and fine gaps (not shown), and has water permeability and water absorption. Therefore, the water supplied from the water supply pipe 15 is absorbed by the dry mortar 8 and retained, and can move freely inside the water supply layer filled with the dry mortar 8.
Further, the solidified dry mortar 8 has a skeletal structure in which sand is bound by a binder, and is firmly fixed to the open-graded asphalt mixture layer 5. The amount of the binder added is preferably 2 to 10% by mass with respect to the mass of the sand. When the amount of the binder is such an amount, the solidified dry mortar 8 has a sufficient fixing force with respect to the open-graded asphalt mixture layer 5, and the water flow accompanying the water supply from the water supply pipe 15 It is possible to prevent the dry mortar 8 from flowing out of the water-retaining pavement structure 1.
[0023]
The water supply pipe 15 has water supply holes (not shown) at predetermined intervals in the wall body, and is embedded at a predetermined position along the bottom in the open-graded asphalt mixture layer 5. In addition, the water supply pipe 15 is connected to a water supply facility (not shown) such as an external water reservoir through a flow rate adjusting valve or the like, and can appropriately supply water to the dry mortar 8.
The water supply pipe 15 can be appropriately selected from a perforated PVC pipe, a porous pipe, a vinyl hose, and the like, and may further be protected by using a spiral drain pipe or the like.
[0024]
Next, the movement state of water in the water-retaining pavement structure 1 will be described with reference to FIG.
When water is supplied from an external water supply facility to the water supply pipe 15, this water is absorbed into the water supply layer including the dry mortar 8 and passes through the entire interior (arrow A 1 shown in FIG. 2). .
And when the water over the entire water supply layer is not sufficiently retained in the water retention grout 7, the water retention grout exceeds the interface between the water retention grout 7 and the dry mortar 8 due to capillary action. 7 is absorbed (arrow A 2 shown in FIG. 2), and water is retained throughout the water-retaining layer (arrow A 3 shown in FIG. 2).
When the outside air temperature rises due to clear weather or the like and the water-retaining pavement structure 1 becomes high temperature, the water retained in the water retention layer from the surface evaporates (arrow A 4 shown in FIG. 2) and the latent heat of vaporization of the water is retained by the water. Since the pavement structure 1 and the outside air are deprived, an increase in the road surface temperature of the water-retaining pavement structure 1 is suppressed.
[0025]
Therefore, as shown in FIG. 3, according to the water retention pavement structure 1 according to the present embodiment (shown as “water retention with water supply (water supply / presence)” in FIG. 3), an appropriate interval in consideration of the outside air temperature and the like. By supplying water to the dry mortar 8, a dense pavement structure without water retention ("dense particle size"), a water retentive pavement structure without water spraying ("water retention (water spray / no)"), road surface at appropriate intervals Compared to a water-retaining pavement structure ("water retention (watering / with water)") that sprays water and supplies water, it is possible to suppress an increase in road surface temperature. In particular, since the pavement structure 1 according to the present embodiment supplies water from the inside of the pavement structure, the road surface temperature is increased as compared with the water-retaining pavement ("water retention (watering / present)") that sprinkles water from the road surface. Can be suppressed.
In addition, the data shown in FIG. 3 is obtained by dividing each pavement structure into 0.9 m × 0.9 m blocks and measuring a change in road surface temperature with time. This is data obtained as a condition of supplying 5 L of water to the block at 7, 10, 13, and 16. In addition, “temperature” shown in FIG. 3 indicates the outside temperature, and “soil” indicates a soil-based pavement structure in which the soil is solidified with resin or the like.
[0026]
(Construction method of water retentive pavement structure)
Then, the construction method which divides and constructs the water retention pavement structure 1 in a base layer and a surface layer is demonstrated with reference to FIG.
The construction method of the water retentive pavement structure includes a base layer open particle size asphalt mixture layer construction step for constructing the base layer open particle size asphalt mixture layer 5a, and a dry mortar 8 in a dry state from the surface of the base layer open particle size asphalt mixture layer 5a to the continuous void 6 A dry mortar filling step (water supply material filling step) for filling (water supply material), an asphalt emulsion spraying step for spraying an asphalt emulsion on the surface of the base layer open grain size asphalt mixture layer 5a, and a base layer open grain size asphalt mixture layer 5a A surface layer open particle size asphalt mixture layer construction step for constructing the surface layer open particle size asphalt mixture layer 5b, and a water retention grout injection step for injecting a liquid water retention grout 7 having fluidity from the surface of the surface layer open particle size asphalt mixture layer 5b are provided. Configured.
[0027]
(Base layer open particle size asphalt mixture layer construction process)
As shown in FIG. 4A, after the water supply pipe 15 is disposed on the water-impervious layer 52, for example, along the road shoulder, an asphalt finisher or the like is used on the water supply pipe 15 to form a base layer open-graded asphalt mixture having a predetermined composition. Flooring, road roller, tire roller, vibration plate, tamper, etc. (hereinafter collectively referred to as “compacting machine”), and a base layer open-graded asphalt mixture with a predetermined density, a predetermined thickness, and a predetermined porosity Build layer 5a.
Also, if the surrounding area such as the water shielding layer 52 and the shoulder of the road does not have sufficient water shielding properties, stop the application of a high concentration rubber-filled asphalt emulsion before spreading the base layer open-graded asphalt mixture. It is preferable to perform water treatment.
[0028]
(Dry mortar filling process)
Then, as shown in FIG. 4 (b), dry mortar 8 is sprayed from the surface of the base layer open-graded asphalt mixture layer 5 a by an appropriate means (for example, a square scoop) and spread with a rake 21. Thereafter, vibration is applied to the base layer open-graded asphalt mixture layer 5a by vibration imparting means such as a vibration plate 22 and a vibration roller (not shown), and the dry mortar 8 is introduced into the continuous gap 6a of the base layer open-graded asphalt mixture layer 5a from below. Fill.
The filling amount of the dry mortar 8 may be appropriately changed according to the transverse gradient, longitudinal gradient, etc. of the construction site. However, the filling amount of the dry mortar 8 is slightly smaller than the volume of the continuous gap 6a, and after filling, the base layer open-graded asphalt mixture layer 5a is exposed on the surface of the base layer, and irregularities are formed. It is preferable to adhere only to the mixture layer 5a.
After the base layer open particle size asphalt mixture layer 5a is constructed as described above, that is, before the surface layer open particle size asphalt mixture layer 5b is constructed, the dry layer dry mortar 8 is sprayed and filled to thereby form the base layer open particle size asphalt mixture layer 5a. It becomes easy to fill the dry mortar 8 with no gap from the lower part of the continuous gap 6a of 5a.
[0029]
Thereafter, a predetermined amount of water is sprinkled on the surface of the base layer open particle size asphalt mixture layer 5a filled with the dry mortar 8 in the dry state, and the dry mortar 8 in the dry state absorbs this water. When the dry mortar 8 in the dry state absorbs water, the binder contained in the dry mortar 8 is cured. Then, the dry mortar 8 is solidified by forming a skeleton structure mainly composed of sand, and is fixed to the base layer open grain size asphalt mixture layer 5a. Therefore, it is possible to prevent the dry mortar 8 fixed to the base layer open-graded asphalt mixture layer 5a from flowing out due to the water flow accompanying the water supply from the water supply pipe 15.
[0030]
(Asphalt emulsion spraying process)
Then, as shown in FIG.4 (c), an emulsion is spread | dispersed on the surface of the base layer open particle size asphalt mixture layer 5a. When spraying the asphalt emulsion, use the roller brush 23, reduce the spray amount of other distributors (not shown) and spray multiple times, or spray the spray nozzle of the engine sprayer (not shown) By changing to sprayable, the asphalt emulsion does not invade into the continuous void 6a at the top of the base layer open particle size asphalt mixture layer 5a, and the asphalt emulsion is spread only on the aggregate on the surface of the base layer open particle size asphalt mixture layer 5a, It is preferable to form an asphalt film.
As described above, when the asphalt emulsion does not enter the continuous gap 6a of the base layer open-graded asphalt mixture layer 5a, the asphalt emulsion adheres to the surface of the previously filled dry mortar 8 and does not form an asphalt film. Accordingly, the dry mortar 8 can be continuously contacted with the water retaining grout 7 to be filled thereafter without passing through an impermeable layer such as an asphalt coating. That is, when the dry mortar 8 and the water retention grout 7 are continuously in contact with each other, the water can move between the dry mortar 8 and the water retention grout 7.
[0031]
(Surface layer asphalt mixture layer construction process)
After the spread asphalt emulsion is cured for a predetermined time, the asphalt finisher or the like is used to spread the surface-layered asphalt mixture of a predetermined composition and level it with a compacting machine in the same manner as the base layer-opened asphalt mixture layer 5a. It compacts and the surface-layer open-particle-size asphalt mixture layer 5b is constructed | assembled (refer FIG.4 (d)).
[0032]
(Water retention grout injection process)
Thereafter, as shown in FIG. 4 (e), from the surface of the surface layer open particle size asphalt mixture layer 5b to the continuous voids 6 of the base layer open particle size asphalt mixture layer 5a and the surface layer open particle size asphalt mixture layer 5b, a liquid having fluidity is obtained. Inject water retention grout 7. When the water retention grout 7 is injected, the water retention grout 7 is sequentially supplied from a grout tank (not shown) in which the water retention grout 7 is stored, and a predetermined amount of the water retention grout 7 is stored (for example, Water retention grout injection hopper 24 (which maintains the water head height of the water retention grout 7 in the injection hopper 24) and discharges the water retention grout 7 from a lower discharge hole (not shown) and injects the water retention grout 7. Abbreviated "injection hopper"). By using such an injection hopper 24, the injection speed of the water retention grout 7 becomes a constant speed with a simple configuration, and the water retention grout 7 can be injected well.
Further, it is preferable to apply vibration to the open-graded asphalt mixture layer 5 with a vibrating roller or the like while injecting the water retention grout 7 because the water retention grout 7 is filled without forming a gap in the continuous gap 6.
[0033]
After injecting the water retaining grout 7 and curing for a predetermined time, the water retaining grout 7 is in a solidified state, and the water retaining pavement structure 1 according to the present embodiment is constructed (see FIG. 4 (f)).
[0034]
As mentioned above, although an example was described about suitable embodiment of this invention, this invention is not limited to the said embodiment, In the range which does not deviate from the meaning of this invention, it can change suitably.
[0035]
In the above-described embodiment, the base open-graded asphalt mixture layer 5 is divided into a base-layer open-graded asphalt mixture layer 5a and a surface-layer open-graded asphalt mixture layer 5b. In addition, for example, in the case where the construction thickness cannot be secured, after constructing an open-graded asphalt mixture layer, the dry mortar 8 and the water retention grout 7 are filled in that order from the surface, The pavement structure 1 may be constructed.
[0036]
In the above-described embodiment, it is assumed that the dry mortar 8 is filled after a new open-graded asphalt mixture layer is constructed. However, with the existing open-graded asphalt mixture layer, dust, dust, etc. accumulated in the continuous voids are removed with water or air. After performing the clearance cleaning process etc. to clean suitably, you may fill the dry mortar 8 and the water retention grout 7, and may construct the water retention pavement structure 1. FIG.
[0037]
In the above-described embodiment, the water supply pipe 15 is embedded as the water supply means. However, for example, a groove portion capable of passing water may be provided on the surface of the water shielding layer 15.
[0038]
In the above-described embodiment, as shown in FIG. 1, the water retention water retention water in which the dry retention mortar 8 (water absorption material) is filled below the water retention grout 7 and the water retention layer and the water supply layer are formed in two layers. However, the dry mortar 8 (water supply material) is not layered and may be partially filled below the water retention grout. That is, for example, a groove portion is formed in the water shielding layer 15, and an open-graded asphalt mixture layer is integrally constructed and constructed on the groove portion and the upper surface of the water shielding layer 15, and the groove portion is filled with dry mortar. May be. That is, the open particle size asphalt mixture layer (open particle size mixture layer) in the present invention may have a portion protruding downward in this way.
[0039]
In the above-described embodiment, the dry dry mortar 8 is sprinkled and solidified after filling, but the water contained in the liquid water retaining grout 7 to be filled after the dry dry mortar 8 is filled without watering. It may be solidified by absorption.
[0040]
In the embodiment described above, the open particle size mixture layer is an open particle size asphalt mixture layer in which the open particle size asphalt mixture is compacted, but other examples include an open particle size concrete mixture layer (porous concrete), an epoxy resin, an acrylic resin, and the like. An open particle size resin mixture layer formed using a base resin as a binder may be used.
[0041]
【The invention's effect】
According to the present invention, it is possible to provide a water-retaining pavement structure that suitably maintains a water retention function and a construction method thereof.
[Brief description of the drawings]
FIG. 1 is a side sectional view schematically showing a water retention pavement structure according to the present embodiment.
FIG. 2 is a side cross-sectional view schematically showing the state of water movement in the water-retaining pavement structure according to the present embodiment.
FIG. 3 is a graph showing the relationship between time and road surface temperature for the water-retaining pavement structure according to the present embodiment.
4 (a) to 4 (f) are side cross-sectional views schematically showing a construction method for constructing a water-retaining pavement structure according to the present embodiment by dividing it into a base layer and a surface layer.
[Explanation of symbols]
1 Water retention pavement structure 5 Open grain size asphalt mixture layer (open grain size mixture layer)
5a Base layer open particle size asphalt mixture layer 5b Surface layer open particle size asphalt mixture layer 6, 6a, 6b Continuous void 7 Water retention grout 8 Dry mortar (water supply material)
15 Water supply pipe (water supply means)
21 Rake 22 Vibrating plate 23 Roller brush 24 Injection hopper

Claims (3)

内部に連続空隙を有する開粒度混合物層と、
前記連続空隙の上部に層状で充填された保水性を有する保水性グラウトと、
前記保水性グラウトに水を供給するため、前記保水性グラウトの下方に連続した状態で前記連続空隙の下部の少なくとも一部に充填され、結合材により砂が空隙及び隙間を形成しつつ結合することで構成され、保水性及び透水性を有すると共に水が移動自在である給水材料と、
前記給水材料に水を供給する給水手段を備え、
前記給水手段から前記給水材料を介して前記保水性グラウトに水が供給可能であることを特徴とする保水性舗装構造。
An open particle size mixture layer having continuous voids therein;
A water retention grout having water retention filled in layers above the continuous voids;
For supplying water to the water retention grout is filled into at least a portion of the lower portion of the front Symbol continuous void in a state of continuous below the water retention grout, sand the binder binds while forming a gap and the gap A water supply material that has water retention and water permeability and water is movable ,
Water supply means for supplying water to the water supply material,
A water retention pavement structure characterized in that water can be supplied from the water supply means to the water retention grout via the water supply material.
内部に連続空隙を有する開粒度混合物層と、
前記連続空隙の上部に層状で充填された保水性を有する保水性グラウトと、
前記保水性グラウトに水を供給するため、前記保水性グラウトの下方に連続した状態で前記連続空隙の下部の少なくとも一部に充填され、結合材により砂が空隙及び隙間を形成しつつ結合することで構成され、保水性及び透水性を有すると共に水が移動自在である給水材料と、
前記給水材料に水を供給する給水パイプを備え、
前記給水パイプから前記給水材料を介して前記保水性グラウトに水が供給可能である保水性舗装構造の施工方法であって、
所定に配置された給水パイプの上に、前記開粒度混合物層を構築する開粒度混合物層構築工程と、
前記開粒度混合物層の表面から、乾燥状態の給水材料を充填させる給水材料充填工程と、
前記開粒度混合物層の表面から、保水性グラウトを充填する保水性グラウト充填工程と、
を備えたことを特徴とする保水性舗装構造の施工方法。
An open particle size mixture layer having continuous voids therein;
A water retention grout having water retention filled in layers above the continuous voids;
In order to supply water to the water retention grout, at least a part of the lower portion of the continuous void is filled in a state continuous below the water retention grout, and the sand is bonded while forming voids and gaps by a binder. A water supply material that has water retention and water permeability and water is movable,
A water supply pipe for supplying water to the water supply material;
A method for constructing a water retention pavement structure capable of supplying water to the water retention grout from the water supply pipe via the water supply material,
An open particle size mixture layer constructing step for constructing the open particle size mixture layer on a water pipe arranged in a predetermined manner;
From the surface of the open particle size mixture layer, a water supply material filling step of filling a dry water supply material ,
From the surface of the open particle size mixture layer, a water retention grout filling step of filling the water retention grout,
A construction method of a water-retaining pavement structure characterized by comprising:
基層開粒度混合物層及び表層開粒度混合物層を備え、内部に連続空隙を有する開粒度混合物層と、An open particle size mixture layer comprising a base layer open particle size mixture layer and a surface layer open particle size mixture layer, and having continuous voids therein;
前記連続空隙の上部に層状で充填された保水性を有する保水性グラウトと、  A water retention grout having water retention filled in layers above the continuous voids;
前記保水性グラウトに水を供給するため、前記保水性グラウトの下方に連続した状態で前記連続空隙の下部の少なくとも一部に充填され、結合材により砂が空隙及び隙間を形成しつつ結合することで構成され、保水性及び透水性を有すると共に水が移動自在である給水材料と、  In order to supply water to the water retention grout, at least a part of the lower portion of the continuous gap is filled in a state of being continuous below the water retention grout, and the sand is bonded while forming voids and gaps with a binder. A water supply material that has water retention and water permeability and water is movable,
前記給水材料に水を供給する給水パイプを備え、  A water supply pipe for supplying water to the water supply material;
前記給水パイプから前記給水材料を介して前記保水性グラウトに水が供給可能である保水性舗装構造の施工方法であって、  A construction method of a water-retaining pavement structure capable of supplying water to the water-retaining grout via the water supply material from the water supply pipe,
所定に配置された給水パイプの上に、前記基層開粒度混合物層を構築する基層開粒度混合物層構築工程と、  A base layer open particle size mixture layer constructing step of constructing the base layer open particle size mixture layer on a predetermined water supply pipe;
前記基層開粒度混合物層の表面から、乾燥状態の給水材料を充填させる給水材料充填工程と、  From the surface of the base layer open particle size mixture layer, a water supply material filling step of filling a dry water supply material,
前記基層開粒度混合物層の上に、前記表層開粒度混合物層を構築する表層開粒度混合物層構築工程と、  On the base layer open particle size mixture layer, a surface layer open particle size mixture layer building step for building the surface layer open particle size mixture layer;
前記開粒度混合物層の表面から、保水性グラウトを充填する保水性グラウト充填工程と、  From the surface of the open particle size mixture layer, a water retention grout filling step of filling the water retention grout,
を備えたことを特徴とする保水性舗装構造の施工方法。  A construction method of a water-retaining pavement structure characterized by comprising:
JP2003154986A 2003-05-30 2003-05-30 Water-retaining pavement structure and construction method Expired - Lifetime JP4133594B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003154986A JP4133594B2 (en) 2003-05-30 2003-05-30 Water-retaining pavement structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003154986A JP4133594B2 (en) 2003-05-30 2003-05-30 Water-retaining pavement structure and construction method

Publications (2)

Publication Number Publication Date
JP2004353399A JP2004353399A (en) 2004-12-16
JP4133594B2 true JP4133594B2 (en) 2008-08-13

Family

ID=34049490

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003154986A Expired - Lifetime JP4133594B2 (en) 2003-05-30 2003-05-30 Water-retaining pavement structure and construction method

Country Status (1)

Country Link
JP (1) JP4133594B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105755921A (en) * 2016-04-07 2016-07-13 广州市高速公路有限公司 Novel asphalt pavement structure

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4699081B2 (en) * 2005-04-25 2011-06-08 株式会社Nippo Water retentive pavement and its pavement method
JP4681423B2 (en) * 2005-11-02 2011-05-11 大成ロテック株式会社 Water retentive pavement and construction method of water retentive pavement
JP4769139B2 (en) * 2006-07-27 2011-09-07 ヤハギ道路株式会社 Asphalt pavement and asphalt pavement structure with the function to suppress the rise in road surface temperature
JP4709123B2 (en) * 2006-11-17 2011-06-22 株式会社川本製作所 Sprinkler control device
JP2012102530A (en) * 2010-11-10 2012-05-31 Taisei Corp Water retaining block and water retaining structure
JP5748989B2 (en) * 2010-11-30 2015-07-15 株式会社竹中工務店 Water retentive pavement and manufacturing method thereof
CN117049836B (en) * 2023-10-11 2024-01-02 湖南云中再生科技股份有限公司 Permeable construction waste pavement base material, preparation method and application

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3156151B2 (en) * 1996-08-05 2001-04-16 大成ロテック株式会社 Perforated pavement with road surface temperature rise suppression function filled with silt-based filler
JP2001146706A (en) * 1999-11-19 2001-05-29 Nippon Shokubai Co Ltd Civil engineering construction structure body and its manufacturing method
JP4004775B2 (en) * 2001-11-09 2007-11-07 矢作建設工業株式会社 Asphalt pavement and asphalt pavement structure with a function to suppress the rise in road surface temperature
JP2003147716A (en) * 2001-11-13 2003-05-21 Kawasaki Steel Corp Pavement with permeability, drainage and water retention and its construction method
JP2003155703A (en) * 2001-11-22 2003-05-30 Kawasaki Steel Corp Pavement having both permeability, drainage and water retention, and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105755921A (en) * 2016-04-07 2016-07-13 广州市高速公路有限公司 Novel asphalt pavement structure

Also Published As

Publication number Publication date
JP2004353399A (en) 2004-12-16

Similar Documents

Publication Publication Date Title
CN1981090A (en) Water-permeable paving and method for producing a paving
JPH1046513A (en) Perforated surface of paving body furnished with road surface temperature rise restraining function filled with silt filler
JP4746654B2 (en) Surface layer body and surface layer construction method
JP4133594B2 (en) Water-retaining pavement structure and construction method
KR100961967B1 (en) Structure of loess paving layer and construction method using thereof
JP4147154B2 (en) Water-retaining pavement and its construction method
JP4217133B2 (en) Water retention pavement structure
KR101343994B1 (en) Porous polymer block having improved rainwater drain function and manufacturing method thereof
JP4589700B2 (en) Construction method of water retentive pavement structure
CN107447617A (en) A kind of dust-proof curing process of temporary construction road
JP4130596B2 (en) Road surface temperature rise control pavement
JP4246940B2 (en) Paving method
JP5491756B2 (en) Permeable pavement structure
JP4699081B2 (en) Water retentive pavement and its pavement method
JP2003147716A (en) Pavement with permeability, drainage and water retention and its construction method
JP2004068465A (en) Pumping pavement and its paving method
JP4594749B2 (en) Water retention pavement system
JP4517357B2 (en) Water supply type water retaining pavement structure and its construction method
JP4149592B2 (en) Pavement structure
JP2777821B2 (en) Permeable sand pavement made of reinforced sand layer structure plate
JP4681423B2 (en) Water retentive pavement and construction method of water retentive pavement
JP5711781B2 (en) Permeable pavement and its construction method
JPH02123188A (en) Hardenable soil composition and hardening of soil
KR20130102912A (en) Vegetation porous hybrid polymer block having improved rainwater drain and manufacturing method thereof
JPH0136962Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080520

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080602

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110606

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4133594

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110606

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130606

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130606

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140606

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term