JP4138514B2 - Material input method and input device - Google Patents
Material input method and input device Download PDFInfo
- Publication number
- JP4138514B2 JP4138514B2 JP2003020164A JP2003020164A JP4138514B2 JP 4138514 B2 JP4138514 B2 JP 4138514B2 JP 2003020164 A JP2003020164 A JP 2003020164A JP 2003020164 A JP2003020164 A JP 2003020164A JP 4138514 B2 JP4138514 B2 JP 4138514B2
- Authority
- JP
- Japan
- Prior art keywords
- crushed stone
- input
- charging
- shaft
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims description 114
- 238000000034 method Methods 0.000 title claims description 29
- 238000005192 partition Methods 0.000 claims description 24
- 238000009825 accumulation Methods 0.000 claims description 11
- 239000004575 stone Substances 0.000 description 62
- 230000000694 effects Effects 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000007599 discharging Methods 0.000 description 4
- 239000002245 particle Substances 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- 238000000151 deposition Methods 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000008021 deposition Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000009191 jumping Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
Images
Landscapes
- Loading Or Unloading Of Vehicles (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、地下の坑道に砕石等の材料を投入する場合などに使用される材料の投入方法及び投入装置に関するものである。
【0002】
【従来の技術】
地下に例えば珪砂などの採取のための古い坑道(小断面トンネル)が縦横に掘削されている区域の地上に高層ビル等を建てる場合、前記坑道を埋め戻す必要があり、坑道内の底面に砕石等の舗装材を敷いた後、坑道内に流動化材(土+セメント等)を充填する工法が採用される。
【0003】
砕石を坑道内へ供給するためには、立坑を構築して砕石を投入し、立坑の底面から適宜の手段を使って四方に延びた多数の坑道内へ砕石を搬送する必要があり、従来の立坑内における砕石投入方法としては、砕石の落下高さが小さい場合は、砕石の空中落下による方法、ホッパーに提灯シュートを吊り下げてシュート内を落下させる方法、あるいはクレーン車で砕石搭載バケットやワイヤーモッコを吊り下げる方法が一般的である。ワイヤーモッコによる方法では、砕石のこぼれ防止用シートを敷いて砕石を積載することが行われている。
【0004】
砕石の落下高さが中程度から大きい場合には、クレーン車でバケットを吊り、バケットに砕石を積載して降下させる方法が一般的である。この方法では、深礎工法で用いたリーダー装置(特許文献1参照)をバケットの昇降に補助工法として用いることも安全性の向上の点と効率化の点で必要である。
【0005】
また、本出願人は、立坑内に上部の材料投入部から下部の材料搬出部まで投入管を下端が材料搬出部の底面より上方に位置するように設置し、投入管の下方と投入管の下部内に材料を堆積させ、材料搬出部の材料堆積山から材料を搬出すると共に投入管内に材料を補充して投入管の下方と投入管の下部内に材料を堆積させておくことを特徴とする材料の投入方法を出願している(特許文献2、3参照)。投入管の下方における地底面上に堆積安息角をもって安定した円錐形状の砕石堆積山が形成され、この堆積山の砕石を例えばミニバックホウを使用して適宜の搬送手段(バケット付き電動フォークリフトやコンベヤ等)に移載し、各坑道内に搬送して坑道底面に砕石を敷いていく。
【0006】
【特許文献1】
特開平10−88959号公報
【特許文献2】
特開2001−132398号公報
【特許文献3】
特開2001−132399号公報
【0007】
【発明が解決しようとする課題】
しかし、前述のような従来の立坑内における砕石投入方法は、次のような問題点がある。
【0008】
(1) 砕石の空中落下では、材料の落下高さが大きくなるほど飛散度が大きくなり、その結果、粒度バランスが不安定になり、不良品質となる。また、砕石の飛び跳ねにより安全性の面で問題がある。
【0009】
(2) ホッパーに提灯シュートを吊り下げて砕石を降下させる方法は、比較的少量で高低差が小さい時には可能であるが、大きい高低差の時は高速の落下が発生するため、飛散の問題があり、また提灯シュート強度に限界があり、安全上不可能となる。
【0010】
(3) バケットによる方法では、時間当りの運搬量に制約がでるため、コストが割高となる。また、坑底における安定した時間当りの消費量と地上の供給側の連絡体制がフル稼働できない場合が多く、安定した作業効率が確保できない。
【0011】
(4) ワイヤーモッコの場合、下方に砕石が落下する危険度が高く、下方での人力による同時作業が安全上できない。バケットによる降下も、上部と坑底で同時作業を行うことができない。
【0012】
(5) クレーン車によるいずれの方法も、昇降作業には誘導員を必要とし、コストがかかると共に、運搬のサイクルタイムが長く必要となり、時間当りの投入量が制限される。
【0013】
(6) いずれの方法も、環境的には飛散による公害や作業の振動騒音が大きいなどの課題が発生する。
【0014】
また、本出願人の投入管による方法では、上記の問題点を解消することができるものの、堆積山の砕石を例えばミニバックホウを用いてフォークリフト等に移載するため、作業に時間がかかり、作業効率が悪い。さらに、運搬車としてフォークリフト等を用いる方法では、狭い場所には適用することができない。
【0015】
本発明は、前記の問題点を解消すべくなされたもので、その目的は、砕石等の投入材料を飛散させることなく安全に投入することができると共に、立坑上部下部での同時作業が可能となり、さらに投入材料を投入材料の搬出消費量に関わらず任意に投入することができると共に、粒度バランスの良い投入材料を材料搬出部に安定して供給することができ、また投入された砕石の搬出作業を迅速に行うことができると共に狭い場所においても容易に行うことができる材料の投入方法及び投入装置を提供することにある。
【0016】
【課題を解決するための手段】
本発明の請求項1は、立坑を用いて地上から地下へ材料(砕石など)を投入する方法であり、立坑内に上部の材料投入部から下部の材料搬出部まで投入管を下端が材料搬出部の底面より上方に位置するように設置すると共に、この投入管の下方にシュート状の材料受けを下り勾配で傾斜配置し、この材料受けの排出側を仕切板で閉塞することにより材料受け内と投入管の下部内に材料を堆積させ、仕切板を上昇させることにより材料を排出することを特徴とする材料の投入方法である。材料は、リヤカー等の小型運搬車に排出する。材料の補充は、下部の材料搬出部で消費された分だけ補充するようにしてもよいし、投入管内のストック高さが所定の位置まで低下したときに補充するようにようにしてもよい。
【0017】
本発明の請求項2は、立坑を用いて地上から地下へ材料を投入する装置であり、立坑内に上部の材料投入部から下部の材料搬出部まで下端が材料搬出部の底面より上方に位置するように設置される投入管と、この投入管の下方に下り勾配で傾斜配置されるシュート状の材料受けと、この材料受けを材料堆積部とシュート部に仕切る仕切板と、この仕切板を昇降させる作動機構を備えていることを特徴とする材料の投入装置である。仕切板の作動機構は、例えば、その基端が投入管の下端側面に軸支されて鉛直方向に回動する左右一対の支持部材の先端に仕切板を固定し、作動レバーで仕切板を鉛直方向に昇降させる構成とする。
【0018】
以上のような構成において、材料は投入管内を降下するため、材料の飛散が防止され、粒度バランスの良い投入材料が立坑下部の材料搬出部に供給される。材料搬出部はシュート状の材料受けからなり、その材料堆積部内に堆積安息角をもって安定した円錐形状の堆積山が形成されると共に、投入管の下部内に所定高さのストックが形成される。仕切板を上昇させてリヤカー等の小型運搬車に砕石を排出して仕切板を下降させて閉じると、消費された分だけ投入管の下端から材料が速やかに下降噴出し、略円錐形状の堆積山が再び形成される。この一連の滑らかな材料降下とストック効果により作業効率が向上し、また投入管内の材料ストック分により地上部での材料投入を自由度の高いものとすることができる。
【0019】
また、従来の立坑の地底面に堆積させた砕石をバックホーでフォークリフトに移載する方法では、作業時間がかかっていたが、シュート状の材料受けを用いて直接小型運搬車に排出することで、作業時間を大幅に短縮することができる。また、リヤカー等の小型運搬車を用いることで、フォークリフトが通れないくらい狭い場所でも砕石の敷設作業を容易に行うことができる。
【0020】
【発明の実施の形態】
以下、本発明を図示する実施の形態に基づいて説明する。この実施形態は、地下50m近くの深さに平面視で略格子状に多数掘削された古い坑道を埋め戻す場合に適用した例である。図1は本発明の砕石材料の投入設備の全体と投入方法の概要を示したものである。図2,図3は本発明の投入方法を実施するための装置の1例を示したものである。
【0021】
図1に示すように、地上から多数の古い坑道Aのある位置まで直径 5m程度の立坑1を構築し、立坑1の下部と多数の坑道Aの端部を横坑Bで連結する。このような立坑1内に、直径50cm程度の鋼管からなる砕石用の投入管2と、生コンクリート用の供給管3と、投入管2および供給管3等の管理用の足場4と、マンエレベーター(図示省略)を設ける。
【0022】
地上部にはホッパー装置5を設置し、このホッパー装置5の下部の投入口に投入管2の上端を接続し、投入管2の下端が立坑1の地底面1aから2 m程度上方に位置するように支持架台6で投入管2の下部を支持する。投入管2の下部は、後述するように支持架台6に固定する。なお、投入管2、供給管3、足場4等は、立坑1の横断面において側壁近くに配置されており、坑道埋め戻しのためのその他の機材や資材等をクレーン等で吊り降ろしできるようにしている。
【0023】
このような投入管2を用いた投入設備において、本発明では、図1(c),(d) に示すように、投入管2の下方にシュート状の材料受け7を下り勾配で傾斜配置して支持架台6に固定し、材料受け7の排出側を仕切板8で閉塞することにより材料受け7内と投入管2の下部内に砕石Cを堆積させ、仕切板8を上昇させることにより砕石Cをリヤカー9に排出し、リヤカー9で各坑道A内に搬送して坑道底面に砕石を敷いていく。リヤカー9は、フォークリフトが通れないような狭い場所でも運搬が可能である。なお、リヤカーに限らず、その他の小型運搬車でもよい。
【0024】
図2,図3の実施形態において、支持架台6は、H形鋼等からなる左右一対の柱材6a,6aと梁材6bとから正面視でH字状とされ、投入管2の下端が柱材6a,6a間に位置するように固定される。投入管2の下部には、左右一対の支持板10,10が突設されており、この支持板10が柱材6aの頭部に溶接等で固定される。
【0025】
材料受け7は、断面コ字状の樋であり、材料堆積部7aと、この材料堆積部7aから一体的に突出するシュート部7bからなる。材料堆積部7aは、平面形状が矩形であり、投入管2の円形断面より十分に大きい面積を有している(図3参照)。材料堆積部7aは、投入管2の下端と梁材6bの間に配置され、梁材6bの上に所定の傾斜角で固定される。梁材6bからは、アングル材等からなる長さの異なる排出方向に一対の固定部材11,11が材料堆積部7aを両側から挟むように突設されており、これら固定部材11,11の上部を材料堆積部7aの側板に溶接等で固定する。
【0026】
シュート部7bは、左右一対の側板の上部同士を連結するアングル材等の補強部材12により幅方向が補強され、また、側板の外面に添設されて上方に突出するアングル材等の補強部材13と、この補強部材13と側板上部を連結する鉄筋棒等の補強部材14とにより長さ方向(排出方向)が補強されている。
【0027】
仕切板8は、材料堆積部7aとシュート部7bとの間に材料受け底板と直角に配置され、後述するように材料堆積部7aに所定の安息角で堆積した砕石Cをせき止めることができるように、樋状の材料受け7の横断面を閉塞すると共に上方に所定長さで突出する大きさとされている。また、堆積した砕石Cを排出できるように、鉛直方向に昇降できるようにされている。
【0028】
仕切板8を昇降させる機構は、例えば左右一対の支持部材15,15とL字状のパイプ等からなる作動レバー16から構成されている。支持部材15は、その基端を投入管2の下端側面に軸支して鉛直方向に回動可能とし、一対の先端部同士をアングル材等の連結部材17で連結する。この連結部材17の投入管側に仕切板8の上部を溶接等で固定し、連結部材17の排出側に作動レバー16の本体16aを添接させて溶接等で固定する。この作動レバー16のレバー部分16bを持って上げ下げすることにより、仕切板8が支持部材15の軸支点を中心として鉛直方向に回動昇降する。
【0029】
なお、投入管2の下部前面に突設された棒状のストッパー18により仕切板8の上限位置を規制し、砕石Cが過大に排出されないようにする。また、作動レバー16の本体16aの端部と支持架台6とをゴムやスプリング等の弾性部材(図示省略)で連結し、その付勢力で仕切板8の閉じ状態が維持されるようにするのが好ましい。
【0030】
以上のような構成において、次のような手順で砕石の投入を行う。
【0031】
(1) 地上において、バックホウ等によりホッパー装置5のホッパー内に砕石を投入する。図1に示すように、投入された砕石Cは投入管2内を飛散することなく落下し、材料受け7の材料堆積部7a上に堆積し、さらに砕石の投入を続けて砕石Cが投入管2の下部において所定高さHにわたって堆積されるようにする。砕石Cは材料受け7上において堆積安息角をもって安定した略円錐形状を保持する。
【0032】
(2) 作動レバー16により仕切板8を徐々に上昇させると共に仕切板8の位置を調整しながら、材料受け7上の前記略円錐形状の砕石堆積山から砕石Cをリヤカー9内に排出する。所定量の排出が終了すると、仕切板8を閉じる。リヤカー9を各坑道A内に搬送して坑道底面に砕石Cを敷いていく。材料受け7上から排出された分だけ、投入管2の下端面から砕石Cが速やかに下降噴出して補充され、安定した略円錐形状の砕石堆積山が形成される。リヤカー9に搬出された分を地上から投入補充し、あるいは投入管2の下部内のストック分が所定量だけ減少すると、地上から投入補充し、投入管2の下部内に常に砕石Cが堆積されるようにする。
【0033】
このような一連の滑らかな地下底部の砕石降下とストック効果が作業効率の向上になる。また、地上部のバックホウ等による砕石投入作業は投入管内の砕石ストック量の適量を計りつつ補充するものであり、投入管内の砕石ストック分により、地下での搬出消費された分量と地上の砕石投入時期に時間的連鎖を余り必要としない投入側の「ゆとり」が生まれ、かつ安全に砕石の降下運搬を連続的に行える効用が得られる。
【0034】
また、従来の立坑の地底面に堆積させた砕石をバックホーでフォークリフトに移載する方法では、作業時間が 5分程度かかっていたが、シュート状の材料受け7を用いることで、作業時間を10秒程度に大幅に短縮することができた。また、リヤカー9を用いることで、フォークリフトが通れないくらい狭い場所でも砕石の敷設作業を容易に行うことができた。
【0035】
リヤカー9で各坑道A内へ搬送された砕石Cは、坑道Aの底面に厚さ15〜30cm程度の厚さで敷き詰められる。砕石の敷き詰めが完了すると、砕石上に土とセメントの流動化材料を適宜の手段により充填して坑道を埋め戻し、セメントの固化により、地山強度が復元される。
【0036】
なお、以上は古い坑道内に砕石を投入・運搬する例について説明したが、これに限らず、材料を上部から下部へと投入し、所定の場所へ運搬する場合にも本発明を適用することができる。
【0037】
【発明の効果】
本発明は、以上のような構成からなるので、次のような効果を奏することができる。
【0038】
(1) 材料が投入管内を降下するため、材料の飛散を防止することができる。
【0039】
(2) 材料が投入管内を降下するため、作業空間が少なくて済み、かつ安全性が高い。
【0040】
(3) マンエレベーターの昇降や下部での材料搬出作業等を材料投入作業と同時に行うことができる。
【0041】
(4) 材料落下と降下時の騒音防止効果がある。
【0042】
(5) 材料の飛散がなく、また投入管内のストック分により小落差となるため、材料の分離が防止され、粒度バランスの良い所要の材料品質を確保することができる。
【0043】
(6) 材料の堆積山への滑らかな降下補充と、ストック効果により作業効率が大幅に向上する。
【0044】
(7) 投入管内に材料が常にストック状態にあり、地上部の材料投入量と下部での材料搬出消費の差が時間的にラフな調整でよいため、地上部での材料投入を自由度の高いものとすることができ、必要な時に材料を投入すればよいため、コストの低減を図ることができる。
【0045】
(8) 設備の使用期間が長期間あるいは作業の容量が大になるに従って作業効率が良くなり、経済性が増す。
【0046】
(9) シュート状の材料受けを用いて直接小型運搬車に排出することで、作業時間を大幅に短縮することができる。
【0047】
(10)リヤカー等の小型運搬車を用いることで、フォークリフトが通れないくらい狭い場所でも砕石の敷設作業を容易に行うことができる。
【図面の簡単な説明】
【図1】本発明の投入方法を実施するための投入設備の1例であり、(a) は全体の縦断面図、(b) は地上投入部の正面図、(c) は地下底部の正面図、(d) は(c) の側面図である。
【図2】本発明の投入方法を実施するための装置の1例を示す側面図である。
【図3】図2の装置の平面図である。
【符号の説明】
A……坑道
B……横坑
C……砕石
H……投入管ストック量の高さ
1……立坑、1a…地底面
2……砕石用の投入管
3……生コン用の供給管
4……管理用の足場
5……ホッパー装置
6……投入管の支持架台
7……材料受け
7a…材料堆積部
7b…シュート部
8……仕切板
9……リヤカー
10……支持板
11……固定部材
12……補強部材
13……補強部材
14……補強部材
15……支持部材
16……作動レバー
17……連結部材
18……ストッパー[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a material charging method and a charging device used when a material such as crushed stone is charged into an underground tunnel.
[0002]
[Prior art]
When building a high-rise building or the like on the ground in an area where old tunnels (small cross-section tunnels) for excavation, such as silica sand, are excavated vertically and horizontally, it is necessary to backfill the tunnels and crushed stones on the bottom of the tunnel After laying pavement material such as, the method of filling the tunnel with fluidizing material (soil + cement etc.) is adopted.
[0003]
In order to supply crushed stone into the shaft, it is necessary to construct a shaft, throw in the crushed stone, and transport the crushed stone into a number of tunnels extending in all directions from the bottom of the shaft using appropriate means. As for the method of throwing crushed stone in the shaft, if the fall height of the crushed stone is small, the method by dropping the crushed stone in the air, the method of hanging the lantern chute on the hopper and dropping the inside of the chute, or the bucket and wire with crushed stone by crane truck A method of hanging the mocco is common. In the method using wire mocco, a crushed stone spill prevention sheet is laid and the crushed stone is loaded.
[0004]
When the fall height of the crushed stone is medium to large, a method of hanging a bucket with a crane truck and loading the crushed stone on the bucket and dropping it is common. In this method, it is necessary to use the leader device used in the deep foundation method (see Patent Document 1) as an auxiliary method for raising and lowering the bucket in terms of safety improvement and efficiency.
[0005]
In addition, the applicant installs the input pipe from the upper material input section to the lower material output section in the shaft so that the lower end is located above the bottom surface of the material output section. The material is deposited in the lower part, the material is carried out from the material pile of the material carrying-out part, and the material is filled in the charging pipe to deposit the material below the charging pipe and in the lower part of the charging pipe. (See
[0006]
[Patent Document 1]
Japanese Patent Laid-Open No. 10-88959 [Patent Document 2]
JP 2001-132398 A [Patent Document 3]
Japanese Patent Laid-Open No. 2001-132399
[Problems to be solved by the invention]
However, the conventional method for putting crushed stone in the shaft as described above has the following problems.
[0008]
(1) In the air fall of crushed stone, the greater the drop height of the material, the greater the scattering degree. As a result, the particle size balance becomes unstable, resulting in poor quality. Moreover, there is a problem in terms of safety due to the jumping of crushed stones.
[0009]
(2) The method of hanging the lantern chute on the hopper and lowering the crushed stone is possible when the height difference is small with a relatively small amount, but when the height difference is large, a high-speed fall occurs, so there is a problem of scattering. Yes, and there is a limit to the strength of the lantern chute, making it impossible for safety reasons.
[0010]
(3) With the bucket method, the amount of transport per hour is limited, which increases the cost. In addition, the stable consumption per hour at the bottom of the pit and the contact system on the supply side on the ground are often not fully operational, and stable work efficiency cannot be ensured.
[0011]
(4) In the case of wire mocco, there is a high risk of crushed stones falling down, and simultaneous work by human power in the downward direction is not safe. A bucket descent cannot be carried out simultaneously at the top and bottom.
[0012]
(5) Both methods using a crane vehicle require a guide for the lifting operation, which is costly, requires a long cycle time for transportation, and limits the amount of input per hour.
[0013]
(6) Both methods cause problems such as environmental pollution caused by scattering and large vibration noise during work.
[0014]
In addition, although the method using the input pipe of the present applicant can solve the above-mentioned problems, it takes time to work because the crushed stone of the pile is transferred to a forklift using a mini backhoe, for example. ineffective. Furthermore, the method using a forklift or the like as a transport vehicle cannot be applied to a narrow place.
[0015]
The present invention has been made to solve the above-mentioned problems, and its purpose is to allow the input material such as crushed stones to be safely input without being scattered and to enable simultaneous operation at the lower part of the vertical shaft. In addition, the input material can be arbitrarily input regardless of the amount of the input material carried out, and the input material with a good particle size balance can be stably supplied to the material carry-out section, and the input crushed stone can be carried out. It is an object of the present invention to provide a material charging method and a charging device that can perform work quickly and can be easily performed even in a narrow place.
[0016]
[Means for Solving the Problems]
Claim 1 of the present invention is a method for introducing a material (crushed stone, etc.) from the ground to the ground using a shaft, and the lower end of the material is discharged from the upper material input portion to the lower material discharge portion in the shaft. The chute-shaped material receiver is disposed at a downward slope below the charging pipe, and the discharge side of the material receiver is closed with a partition plate. The material charging method is characterized by depositing the material in the lower portion of the charging pipe and discharging the material by raising the partition plate. The material is discharged into a small transport vehicle such as a rear car. The material may be replenished by the amount consumed by the lower material carry-out section, or may be replenished when the stock height in the input pipe is lowered to a predetermined position.
[0017]
[0018]
In the configuration as described above, since the material descends in the input pipe, the material is prevented from being scattered, and the input material having a good particle size balance is supplied to the material carry-out section at the lower part of the shaft. The material carry-out portion is formed of a chute-shaped material receiver, and a conical pile having a stable angle of repose is formed in the material accumulation portion, and a stock having a predetermined height is formed in the lower portion of the input pipe. When the partition plate is lifted and crushed stone is discharged to a small transport vehicle such as a rear car and the partition plate is lowered and closed, the material quickly descends from the lower end of the input pipe as much as it is consumed, resulting in a substantially conical deposit. Mountains are formed again. The work efficiency is improved by this series of smooth material lowering and stock effect, and the material input in the input pipe can provide a high degree of freedom for material input on the ground.
[0019]
Also, in the method of transferring crushed stone deposited on the bottom of a conventional shaft to a forklift with a backhoe, it took time to work, but by discharging directly to a small transport vehicle using a chute-shaped material receiver, Work time can be greatly reduced. Moreover, by using a small transport vehicle such as a rear car, it is possible to easily perform crushed stone laying work even in a narrow place where a forklift cannot pass.
[0020]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described based on the illustrated embodiment. This embodiment is an example applied to refilling an old tunnel that has been excavated in a large number of grids in a plan view at a depth near 50 m underground. FIG. 1 shows an overview of the entire input facility for the crushed stone material and the input method of the present invention. 2 and 3 show an example of an apparatus for carrying out the charging method of the present invention.
[0021]
As shown in FIG. 1, a shaft 1 having a diameter of about 5 m is constructed from the ground to a position where a large number of old shafts A are located, and the lower portion of the shaft 1 and the ends of a number of shafts A are connected by a horizontal shaft B. In such a shaft 1, a crushed
[0022]
A
[0023]
In the charging equipment using such a
[0024]
In the embodiment shown in FIGS. 2 and 3, the
[0025]
The
[0026]
The
[0027]
The
[0028]
The mechanism for raising and lowering the
[0029]
In addition, the upper limit position of the
[0030]
In the above configuration, the crushed stone is charged in the following procedure.
[0031]
(1) On the ground, crushed stone is put into the hopper of the
[0032]
(2) The
[0033]
Such a series of smooth underground crushed stone fall and stock effect improve working efficiency. In addition, the crushed stone input work by backhoe etc. on the ground is supplemented while measuring the appropriate amount of crushed stone in the input pipe, and the amount of crushed stone in the input pipe and the amount of ground crushed and consumed crushed stone on the ground. A "clearance" on the input side that does not require much time chain at the time is born, and the utility of continuously transporting crushed stones safely can be obtained.
[0034]
In addition, the conventional method of transferring crushed stone deposited on the bottom of a shaft to a forklift with a backhoe takes about 5 minutes, but using a chute-shaped
[0035]
The crushed stone C transported into each mine A by the rear car 9 is spread on the bottom surface of the mine A with a thickness of about 15 to 30 cm. When the crushed stone has been laid, the soil and cement fluidizing material is filled on the crushed stone by an appropriate means, the tunnel is backfilled, and the ground strength is restored by solidifying the cement.
[0036]
In addition, although the above demonstrated the example which inserts and conveys a crushed stone in an old tunnel, it is not restricted to this, Applying this invention also when throwing a material from the upper part to the lower part and conveying it to a predetermined place. Can do.
[0037]
【The invention's effect】
Since this invention consists of the above structures, there can exist the following effects.
[0038]
(1) Since the material descends in the charging pipe, it is possible to prevent the material from scattering.
[0039]
(2) Since the material descends in the input pipe, less work space is required and safety is high.
[0040]
(3) Man elevator can be moved up and down, and material can be carried out at the bottom.
[0041]
(4) There is a noise prevention effect at the time of material fall and descent.
[0042]
(5) There is no scattering of material, and a small drop is caused by the stock in the input pipe, so that separation of the material is prevented and the required material quality with a good particle size balance can be ensured.
[0043]
(6) Work efficiency is greatly improved by smooth replenishment of materials to piles of piles and stock effect.
[0044]
(7) Since the material is always in stock in the input pipe, the difference between the material input amount in the ground part and the material carry-out consumption in the lower part may be adjusted roughly in time. The cost can be reduced because the material can be expensive and the material only needs to be input when necessary.
[0045]
(8) The work efficiency improves and the economic efficiency increases as the equipment is used for a long time or the work capacity is increased.
[0046]
(9) Working time can be greatly reduced by discharging directly to a small transport vehicle using a chute-shaped material receiver.
[0047]
(10) By using a small transport vehicle such as a rear car, it is possible to easily perform crushed stone laying work even in a narrow space where a forklift cannot pass.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is an example of a charging facility for carrying out the charging method of the present invention, where (a) is a longitudinal sectional view of the whole, (b) is a front view of a ground charging unit, and (c) is a basement bottom. Front view, (d) is a side view of (c).
FIG. 2 is a side view showing an example of an apparatus for carrying out the charging method of the present invention.
FIG. 3 is a plan view of the apparatus of FIG.
[Explanation of symbols]
A ... Tunnel B ... Horizontal pit C ... Crushed stone H ... Height of input pipe stock amount 1 ... Vertical shaft, 1a ...
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003020164A JP4138514B2 (en) | 2003-01-29 | 2003-01-29 | Material input method and input device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003020164A JP4138514B2 (en) | 2003-01-29 | 2003-01-29 | Material input method and input device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004232268A JP2004232268A (en) | 2004-08-19 |
| JP4138514B2 true JP4138514B2 (en) | 2008-08-27 |
Family
ID=32949872
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003020164A Expired - Fee Related JP4138514B2 (en) | 2003-01-29 | 2003-01-29 | Material input method and input device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4138514B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104110269A (en) * | 2014-06-05 | 2014-10-22 | 江苏中矿立兴能源科技有限公司 | Self-balancing buffer device for solid cut and fill |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116480843A (en) * | 2023-03-30 | 2023-07-25 | 云南驰宏锌锗股份有限公司 | A new type of installation method for filling pipelines in ultra-deep open wells |
-
2003
- 2003-01-29 JP JP2003020164A patent/JP4138514B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104110269A (en) * | 2014-06-05 | 2014-10-22 | 江苏中矿立兴能源科技有限公司 | Self-balancing buffer device for solid cut and fill |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004232268A (en) | 2004-08-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4261119A (en) | Method for digging and transporting material | |
| FI65464C (en) | VAEGG BESTAOENDE AV ETT ARMERAT JORDLAGER | |
| US6969226B2 (en) | Front end loader bucket discharge funnel and distributor | |
| CN114109485A (en) | Ore slipping and crushing system next to the unloading station underground | |
| CZ59493A3 (en) | Maintenance mechanized machine | |
| US4782606A (en) | Method and apparatus for backfilling ditches | |
| JP4138514B2 (en) | Material input method and input device | |
| WO1999005396A1 (en) | Haulage system for pit mining and discharge gate therefor | |
| US10731320B2 (en) | Slurry sled for filling trench holes | |
| CN113833518A (en) | Blanking method for mine shaft | |
| JP3194190B2 (en) | Open shield machine | |
| CN216617574U (en) | Ore chute and crushing system of underground adjacent unloading station | |
| JP4138184B2 (en) | Material input method | |
| KR101217354B1 (en) | Loading cargo of dump truck dividing compartment and method loading gradually paving materials on the weak soil layers | |
| JP4138185B2 (en) | Small section tunnel backfilling method | |
| JP2971041B2 (en) | Underwater charging device and method | |
| CN120925506A (en) | Arch base hole slag tapping system and method | |
| JP2010270501A (en) | Soil treatment structure | |
| JPH07127090A (en) | In-vehicle type soil improvement device | |
| RU2156358C2 (en) | Method of tunnel filling | |
| KR102175331B1 (en) | Earthwork treatment device for excavation of road header in NATM TUNNEL | |
| RU12588U1 (en) | DUMPING LOADER FOR DUMPERS | |
| RU2100609C1 (en) | Method of transportation of barren rocks to dump | |
| JP5417036B2 (en) | Soil treatment structure and soil treatment vehicle | |
| RU13666U1 (en) | LOADING AND TRANSPORT COMPLEX FOR OPEN MINING |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060105 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080529 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080603 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080605 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110613 Year of fee payment: 3 |
|
| LAPS | Cancellation because of no payment of annual fees |