JP4154487B2 - Foundation pile construction method, foundation pile - Google Patents
Foundation pile construction method, foundation pile Download PDFInfo
- Publication number
- JP4154487B2 JP4154487B2 JP02080898A JP2080898A JP4154487B2 JP 4154487 B2 JP4154487 B2 JP 4154487B2 JP 02080898 A JP02080898 A JP 02080898A JP 2080898 A JP2080898 A JP 2080898A JP 4154487 B2 JP4154487 B2 JP 4154487B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- ready
- concrete
- reinforcing bar
- stirring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims description 8
- 239000004567 concrete Substances 0.000 claims description 68
- 238000003756 stirring Methods 0.000 claims description 43
- 230000003014 reinforcing effect Effects 0.000 claims description 42
- 239000004568 cement Substances 0.000 claims description 20
- 239000008267 milk Substances 0.000 claims description 20
- 210000004080 milk Anatomy 0.000 claims description 20
- 235000013336 milk Nutrition 0.000 claims description 20
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 238000007599 discharging Methods 0.000 claims description 6
- 238000005553 drilling Methods 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims 2
- 238000009412 basement excavation Methods 0.000 description 14
- 238000000034 method Methods 0.000 description 4
- 238000013019 agitation Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 239000007788 liquid Substances 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000004898 kneading Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、建造物の基礎を構成する基礎杭、この基礎杭の構築方法に関する。
【0002】
【従来の技術】
従来、基礎杭は現場で、杭穴を掘削し、杭穴内に鉄筋篭を沈設すると共に杭穴内にコンクリートを充填するいわゆる場所打ち杭工法が取られていた。
【0003】
【発明が解決しようとする課題】
前記場所打ち杭工法では、構築現場での杭穴の掘削・鉄筋篭の埋設作業等の現場作業が大となり、また打設するコンクリートの品質管理等が煩雑となる問題点があった。
【0004】
そこで、鉄筋コンクリート製その他の既製杭を使用した各種工法も提案されているが、杭穴との既製杭との一体性が保てず、耐力は埋設する既製杭の外径分しか考慮されず、杭穴の穴径に応じた大きな耐力が期待できない問題点があった。
【0005】
【課題を解決するための手段】
然るにこの発明は、鉄筋篭を一体に連設した既製中空杭を、杭穴内のコンクリートに埋設して、基礎杭を構成するので、前記問題点を解決した。
【0006】
即ちこの発明は、
(1) 掘削ロッドで拡底球根部を有する杭穴を掘削した後、該掘削ロッドを引き上げ、
(2) 続いて中空部に撹拌ロッドを入れ、下端に鉄筋篭を一体に連設した既製コンクリート杭を、前記杭穴内に下降し、前記既製コンクリート杭の下方に前記撹拌ロッドの撹拌ヘッドを突出させ、該撹拌ヘッドで、前記拡底球根内を撹拌するとともに、前記撹拌ヘッドの吐出口から前記球根部内にセメントミルクを注入して、前記拡底球根部内の泥土をセメントミルクに置換し、
(3) 次ぎに、前記既製コンクリート杭を所定位置に沈設した後、または沈設しながら、前記杭穴の底から地上まで前記撹拌ヘッドの吐出口からコンクリートを吐出しながら、前記既製コンクリート杭の中空部を通って前記撹拌ロッドを引き上げ、前記セメントミルクをコンクリートと置換して前記杭穴内にコンクリートを充填することを特徴とした基礎杭の構築方法である。
【0007】
また、前記において、既製コンクリート杭を、下端に鉄筋篭を一体に連設し、該鉄筋篭の下端に、該鉄筋篭を保護する短鋼管又は円板状のリングを溶着して構成した基礎杭の構築方法である。
【0008】
また、他の発明は、拡底球根部を有する杭穴内に、下端部に鉄筋篭を連設した既製コンクリート杭を沈設し、杭穴の拡底球根部及び既製中空杭の中空部にコンクリートを充填した基礎杭であって、前記既製コンクリート杭は、中空部を有する既製コンクリート杭の下端に鉄筋篭を一体に連設し、該鉄筋篭の下端に、該鉄筋篭を保護する短鋼管又は円板状のリングを溶着して構成し、前記コンクリートは、前記既製コンクリート杭の中空部を通って下方に突出した撹拌ロッドの撹拌ヘッドで、前記拡底球根内の泥土を撹拌して、前記撹拌ヘッドの吐出口から吐出したセメントミルクで前記泥土を置換し、続いて前記撹拌ヘッドの吐出口から吐出したコンクリートで、前記セメントミルクを置換して構成したことを特徴とする基礎杭である。更に、前記において、既製杭の軸鉄筋を下方に突出させて突出部を構成し、該突出部に、らせん鉄筋を連設して鉄筋篭構成した基礎杭である。
【0009】
前記において、既製中空杭は、中掘工法に使用される各種コンクリート杭(鉄筋コンクリート杭、PC杭等)が望ましいが、中空部を有すれば、鋼管とコンクリートとの複合杭などを使用することもできる。
【0010】
【発明の実施の形態】
中空部を有する既製コンクリート杭の軸鉄筋を下方に突出させて突出部を構成し、該突出部に、らせん鉄筋を連設して一体の鉄筋篭を構成して、既製中空杭とする。
【0011】
掘削ロッドで拡底球根部を有する杭穴を掘削した後、掘削ロッドを引き上げる。続いて、中空部に撹拌ロッドを入れた既製中空杭を、杭穴内に下降して杭の先端を拡底球根部付近に位置させ、ここで既製中空杭を保持する。既製杭の下方に撹拌ロッドの撹拌ヘッドを突出させて、拡底球根部内にセメントミルクを注入して球根部内を撹拌し、既製中空杭を所定位置に沈設する。杭穴の底から地上まで撹拌ロッドの撹拌ヘッドの吐出口からコンクリートを吐出しながら、既製中空杭の中空部を通って撹拌ロッドを引き上げる。セメントミルクがコンクリートに置換され、杭穴内にコンクリートが充填される。コンクリート固化後に既製中空杭が杭穴内のコンクリートと一体の基礎杭を構築する。
【0012】
【作用】
既製中空杭の下端部に鉄筋篭を形成したので、既製中空杭の下端部は、杭穴の下端部で充填されたコンクリートと一体となる。また、杭穴軸部では既製中空杭の中空部内にコンクリートが充填される。従って、杭穴内のコンクリートと中空既製杭とで、杭穴の穴径に応じた現場造成杭と同等の強度を有する現場造成杭を構築できる。
【0013】
【実施例1】
図2、3に基づきこの発明の既製中空杭の構成について説明する。
【0014】
既製コンクリート杭本体1の軸鉄筋2、2を下方に突出させて、該軸鉄筋2、2の突出部3、3を螺旋鉄筋4で連結して、この発明の既製中空杭6を構成する。
【0015】
前記において、軸鉄筋2、2の突出部3、3と螺旋鉄筋4とで、鉄筋篭5とする。また前記既製中空杭6で、既製コンクリート杭本体1の下端1aから鉄筋篭5の下端5aまでの距離Lは、地盤条件、杭が負担すべき荷重にもよるが、既製中空杭6の外径をDとすると、通常は1D〜1m程度であり、既製コンクリート杭本体1の下端1aが、鉄筋篭5の下端5aが掘削した杭穴20の底23に位置した際に、掘削した杭穴20の拡底球根部22内に位置するような高さとしてある。
【0016】
前記実施例において、鉄筋篭5の下端5aに、鉄筋篭5を保護する短鋼管8を溶着することもできる(図3(a))。また、短鋼管8に変えて、円板状のリングとすることもできる(図示していない)。
【0017】
また、前記実施例において、既製コンクリート杭本体1の軸鉄筋3を下方に突出させて鉄筋篭5を構成したが、鉄筋篭5と既製コンクリート杭本体1とを別部材で構成することもできる。即ち、端板10の下面に、軸鉄筋11、11を突設させると共に、該軸鉄筋11、11の周囲に螺旋鉄筋4を周設して鉄筋篭12を構成する(図3(b))。鉄筋篭12の端板10を既製コンクリート杭本体1の下端板9に連結して、既製中空杭6を構成する。この場合には、一般の既製コンクリート杭1の下端板10に鉄筋篭12を取付ければ、本発明の既製中空杭を構成することもできる。
【0018】
また、前記実施例において、既製コンクリート杭本体1をストレート杭としたが、下端部あるいは全長に亘って環状リブ13、13を設けた節杭とすることもできる(図3(c))。
【0019】
【実施例2】
図1に基づきこの発明の基礎杭及びその構築方法の実施例を説明する。
【0020】
(1) 下端部に掘削ヘッド16を有する掘削ロッド15を正転させて、杭穴20の軸部21を掘削する(図1(a))。前記掘削ヘッド16は、下端部に掘削刃を有するヘッド本体17に揺動自在で、下端部に掘削刃を有する揺動腕18、18を取付けて構成してある。また、掘削ロッド15には、掘削土を地上に揚げる搬送手段(螺旋はね、スクリュー等)や、杭穴壁を整えて倒壊を防止する為に掘削泥土を練り付けるドラム類を取付けてある(図示していない)。
【0021】
(2) 続いて、掘削ロッド15を反転させて、逆に振れた揺動腕18、18で杭穴20の拡底球根部22を掘削する(図1(b))。杭穴20の掘削が完了したならば、前記掘削ロッド15を、杭周固定液(セメントミルク等)を杭穴22内に吐出しながら、地上に引き上げる。
【0022】
(3) 次に、既製中空杭6の中空部7内に撹拌ロッド24を収納して、杭穴20内に、該既製中空杭6及び撹拌ロッド24を下降させる。前記撹拌ロッド24はその下端部に、揺動する撹拌腕26、26を有すると共に、コンクリートの吐出口27を有する撹拌ヘッド25を取付けてある。また、撹拌ロッド24は吐出口27に対応した搬送用のパイプを内蔵するが、コンクリート用とセメントミルク用の共用のパイプを設け、あるいは夫々専用のパイプを別途設けることもできる。
【0023】
(4) 既製中空杭6の下端(鉄筋篭の下端)5aが杭穴20の拡底球根部22の上部に位置した状態で、既製中空杭6の下降を停止してこの位置に保持する。既製中空杭6から撹拌ロッド24の撹拌ヘッド25を下方に突出させ、杭穴20の拡底球根部22内を撹拌するとともに拡底球根部22内にセメントミルクを注入する(図1(c))。ここで、拡底球根部22内の泥土はセメントミルクに置換される。
【0024】
(5) 次に、既製中空杭6を杭穴20の底23に沈設した後に、撹拌ヘッド25の吐出口27からコンクリート28を吐出しながら、撹拌ロッド24を既製中空杭6の中空部7を通って、地面29上に引き上げる(図1(d))。コンクリート28の注入により、拡底球根部22内のセメントミルクは、コンクリート28に置換される。
【0025】
(6) コンクリート28が固化した後に、杭穴20の拡底球根部22内、既製中空杭6の中空部7内にコンクリート28が充填され、杭穴20の軸部21と既製中空杭6の外周との間には杭周固定液30が充填された基礎杭31が構築される(図1(e))。
【0026】
前記実施例において、既製中空杭6は、前記実施例1の各種既製中空杭(図3他)を使用することもできる(図示していない)。
【0027】
また、前記実施例において、既製中空杭6を杭穴20の底23に沈設した後に、撹拌ヘッド25からコンクリート28を吐出したが、撹拌ヘッド25からコンクリートを吐出しながら既製中空杭6の中空部7内に通って撹拌ヘッド25を引き上げながら、既製中空杭6を沈設することもできる(図示していない)。
【0028】
また、前記実施例で、撹拌ロッド24からセメントミルクを吐出して、一旦泥土をセメントミルクに置換した後に更にセメントミルクをコンクリートに置換したので、コンクリートの質を高めることができる。
【0029】
【発明の効果】
この発明は、杭穴内に下端部に鉄筋篭を有する既製中空杭を沈設すると共に杭穴内にコンクリートを充填するので、杭穴内に構造的に一体となったコンクリート杭を構築できるので、杭穴径に応じた耐力を期待できる効果がある。
【0030】
また、杭穴内に既製中空杭を沈設するので、鉄筋篭の沈設に比して、沈設作業が容易であり、また構築現場でのコンクリート打設量を大幅に削減できるので、基礎杭の構築作業を簡略化・効率化できる効果がある。
【図面の簡単な説明】
【図1】(a)乃至(e)はこの発明の実施例を説明する概略した縦断面図である。
【図2】この発明の実施例の既製中空杭で、(a)は縦断面図、(b)は底面図を夫々表す。
【図3】(a)乃至(c)は、この発明の既製中空杭の他の実施例の縦断面図である。
【符号の説明】
1 既製コンクリート杭本体
2 軸鉄筋
3 軸鉄筋の突出部
4 螺旋鉄筋
5 鉄筋篭
5a 鉄筋篭の下端
6 既製中空杭
7 中空部(既製中空杭)
9 下端板(既製コンクリート杭本体)
10 端板(鉄筋篭)
11 軸鉄筋(鉄筋篭)
12 鉄筋篭
15 掘削ロッド
16 掘削ヘッド
20 杭穴
21 杭穴の軸部
22 杭穴の拡底球根部
23 杭穴の底
24 撹拌ロッド
25 撹拌ヘッド
27 吐出口(撹拌ヘッド)
28 コンクリート
29 地上
31 基礎杭[0001]
BACKGROUND OF THE INVENTION
The present invention, foundation piles constituting the foundation of the building relates to the construction how the foundation pile.
[0002]
[Prior art]
Conventionally, the so-called cast-in-place pile method has been adopted in which foundation piles are excavated at the site, piles are sunk in the hole, and concrete is filled in the pile hole.
[0003]
[Problems to be solved by the invention]
In the cast-in-place pile method, there are problems such as excavation of pile holes at the construction site and embedding work of reinforcing bars, and the quality control of the concrete to be placed becomes complicated.
[0004]
Therefore, various methods using reinforced concrete and other ready-made piles have also been proposed, but the integrity of the pile holes and ready-made piles cannot be maintained, and the proof stress is considered only for the outer diameter of the ready-made piles to be buried, There was a problem that a large yield strength according to the hole diameter of the pile hole could not be expected.
[0005]
[Means for Solving the Problems]
However, the present invention solves the above-mentioned problems because the ready-made hollow pile in which the reinforcing bar is integrally connected is buried in the concrete in the pile hole to constitute the foundation pile.
[0006]
That is, this invention
(1) After excavating a pile hole having an expanded bulb with a drilling rod, the drilling rod is pulled up,
(2) Subsequently, a stirring rod is inserted into the hollow portion, and a ready-made concrete pile integrally connected with a reinforcing bar at the lower end is lowered into the pile hole, and the stirring head of the stirring rod protrudes below the ready-made concrete pile. And stirring the inside of the expanded bulb with the stirring head, injecting cement milk into the bulb portion from the discharge port of the stirring head, replacing the mud soil in the expanded bulb portion with cement milk ,
(3) Next, after the ready-made concrete pile is sunk at a predetermined position or while being laid , the concrete is discharged from the bottom of the pile hole to the ground while discharging the concrete from the discharge port of the stirring head. It is the construction method of the foundation pile characterized by pulling up the stirring rod through the part, replacing the cement milk with concrete, and filling the pile hole with concrete.
[0007]
In addition, in the above, a foundation pile in which a ready-made concrete pile is integrally connected to a lower end of a reinforcing bar and a short steel pipe or a disk-shaped ring is attached to the lower end of the reinforcing bar to protect the reinforcing bar. This is the construction method.
[0008]
In another invention, in a pile hole having a bottomed bulb part, a ready-made concrete pile having a reinforcing bar is continuously provided at the lower end , and the bottomed bulb part of the pile hole and the hollow part of the ready-made hollow pile are filled with concrete. It is a foundation pile, and the ready-made concrete pile is a short steel pipe or a disk shape that continuously connects a reinforcing bar to the lower end of the ready-made concrete pile having a hollow portion, and protects the reinforcing bar at the lower end of the reinforcing bar. The concrete is composed of a ring with a stirring rod protruding downward through the hollow portion of the ready-made concrete pile, and the mud in the bottom expansion bulb is stirred to discharge the stirring head. A foundation pile characterized in that the mud soil is replaced with cement milk discharged from an outlet, and then the cement milk is replaced with concrete discharged from a discharge port of the stirring head . Furthermore, in the above, it is a foundation pile in which the shaft reinforcing bar of the ready-made pile is protruded downward to form a protruding part, and a helical reinforcing bar is connected to the protruding part to constitute a reinforcing bar.
[0009]
In the above, the ready-made hollow piles are preferably various concrete piles (reinforced concrete piles, PC piles, etc.) used in the medium excavation method, but if they have hollow parts, composite piles of steel pipe and concrete may be used. it can.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
A shaft rebar of a ready-made concrete pile having a hollow portion is protruded downward to form a protrusion, and a helical rebar is connected to the protrusion to form an integrated rebar rod to obtain a ready-made hollow pile.
[0011]
After excavating the pile hole having the expanded bulb portion with the excavation rod, the excavation rod is pulled up. Then, the ready-made hollow pile which put the stirring rod in the hollow part descend | falls in a pile hole, the front-end | tip of a pile is located in the vicinity of a bottomed bulb part, and a ready-made hollow pile is hold | maintained here. The stirring head of the stirring rod is projected below the ready-made pile, cement milk is injected into the expanded bulb part, the inside of the bulb part is stirred, and the ready-made hollow pile is set in place. While discharging concrete from the bottom of the pile hole to the ground from the discharge port of the stirring head of the stirring rod, the stirring rod is pulled up through the hollow portion of the ready-made hollow pile. Cement milk is replaced with concrete, and concrete is filled into the pile holes. After the concrete is solidified, the ready-made hollow pile will be built with the concrete in the pile hole.
[0012]
[Action]
Since the reinforcing bar was formed in the lower end part of a ready-made hollow pile, the lower end part of a ready-made hollow pile becomes integral with the concrete with which the lower end part of the pile hole was filled. Moreover, concrete is filled in the hollow part of a ready-made hollow pile in a pile hole axial part. Therefore, it is possible to construct a field-built pile having the same strength as the field-built pile according to the hole diameter of the pile hole with the concrete in the pile hole and the hollow ready-made pile.
[0013]
[Example 1]
The structure of the ready-made hollow pile of this invention is demonstrated based on FIG.
[0014]
The shaft rebars 2 and 2 of the ready-made concrete pile
[0015]
In the above description, the
[0016]
In the said Example, the
[0017]
Moreover, in the said Example, although the
[0018]
Moreover, in the said Example, although the ready-made concrete pile
[0019]
[Example 2]
Based on FIG. 1, the Example of the foundation pile of this invention and its construction method is described.
[0020]
(1) The
[0021]
(2) Subsequently, the
[0022]
(3) Next, the stirring
[0023]
(4) In the state where the
[0024]
(5) Next, after the ready-made
[0025]
(6) After the concrete 28 is solidified, the concrete 28 is filled in the bottomed
[0026]
In the said Example, the various ready-made hollow piles (FIG. 3 others) of the said Example 1 can also be used for the ready-made hollow pile 6 (not shown).
[0027]
Further, in the above embodiment, after sinking the prefabricated
[0028]
Moreover, in the said Example, since cement milk was discharged from the stirring
[0029]
【The invention's effect】
Since this invention sinks a ready-made hollow pile having a reinforcing bar at the lower end in the pile hole and fills the pile hole with concrete, it is possible to construct a concrete pile that is structurally integrated in the pile hole. There is an effect that can be expected to withstand strength according to.
[0030]
In addition, since a ready-made hollow pile is set in the pile hole, the set-up work is easier than the set-up of reinforcing steel rods, and the amount of concrete placed on the construction site can be greatly reduced. Has the effect of simplifying and improving efficiency.
[Brief description of the drawings]
1A to 1E are schematic longitudinal sectional views for explaining an embodiment of the present invention.
FIG. 2 is a ready-made hollow pile according to an embodiment of the present invention, in which (a) represents a longitudinal sectional view and (b) represents a bottom view.
FIGS. 3A to 3C are longitudinal sectional views of another embodiment of the ready-made hollow pile of the present invention.
[Explanation of symbols]
DESCRIPTION OF
9 Bottom plate (Precast concrete pile body)
10 End plate (rebar bar)
11 shaft rebar (rebar rod)
12 Reinforcing
28
Claims (4)
(2) 続いて中空部に撹拌ロッドを入れ、下端に鉄筋篭を一体に連設した既製コンクリート杭を、前記杭穴内に下降し、前記既製コンクリート杭の下方に前記撹拌ロッドの撹拌ヘッドを突出させ、該撹拌ヘッドで、前記拡底球根内を撹拌するとともに、前記撹拌ヘッドの吐出口から前記球根部内にセメントミルクを注入して、前記拡底球根部内の泥土をセメントミルクに置換し、
(3) 次ぎに、前記既製コンクリート杭を所定位置に沈設した後、または沈設しながら、前記杭穴の底から地上まで前記撹拌ヘッドの吐出口からコンクリートを吐出しながら、前記既製コンクリート杭の中空部を通って前記撹拌ロッドを引き上げ、前記セメントミルクをコンクリートと置換して前記杭穴内にコンクリートを充填することを特徴とした基礎杭の構築方法。(1) After excavating a pile hole having an expanded bulb with a drilling rod, the drilling rod is pulled up,
(2) Subsequently, a stirring rod is inserted into the hollow portion, and a ready-made concrete pile integrally connected with a reinforcing bar at the lower end is lowered into the pile hole, and the stirring head of the stirring rod protrudes below the ready-made concrete pile. And stirring the inside of the expanded bulb with the stirring head, injecting cement milk into the bulb portion from the discharge port of the stirring head, replacing the mud in the expanded bulb portion with cement milk ,
(3) Next, after the ready-made concrete pile is sunk at a predetermined position or while being laid , the concrete is discharged from the bottom of the pile hole to the ground while discharging the concrete from the discharge port of the stirring head. A construction method of a foundation pile characterized by pulling up the stirring rod through a section, replacing the cement milk with concrete, and filling the pile hole with concrete.
前記既製コンクリート杭は、中空部を有する既製コンクリート杭の下端に鉄筋篭を一体に連設し、該鉄筋篭の下端に、該鉄筋篭を保護する短鋼管又は円板状のリングを溶着して構成し、
前記コンクリートは、前記既製コンクリート杭の中空部を通って下方に突出した撹拌ロッドの撹拌ヘッドで、前記拡底球根内の泥土を撹拌して、前記撹拌ヘッドの吐出口から吐出したセメントミルクで前記泥土を置換し、続いて前記撹拌ヘッドの吐出口から吐出したコンクリートで、前記セメントミルクを置換して構成したことを特徴とする基礎杭。In a pile hole having an expanded bulb part, a foundation pile in which a ready-made concrete pile with a reinforcing bar is continuously installed at the lower end is filled with concrete in the expanded bulb part of the pile hole and the hollow part of the ready-made hollow pile,
The ready-made concrete pile is formed by continuously connecting a reinforcing bar to the lower end of the ready-made concrete pile having a hollow portion, and welding a short steel pipe or a disk-shaped ring to protect the reinforcing bar to the lower end of the reinforcing bar. Configure
The concrete is agitating head of a stirring rod protruding downward through a hollow portion of the ready-made concrete pile, stirring the mud in the bottomed bulb, and the mud with cement milk discharged from the discharge port of the stirring head A foundation pile characterized in that the cement milk is replaced with concrete discharged from the discharge port of the stirring head.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02080898A JP4154487B2 (en) | 1998-02-02 | 1998-02-02 | Foundation pile construction method, foundation pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP02080898A JP4154487B2 (en) | 1998-02-02 | 1998-02-02 | Foundation pile construction method, foundation pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH11217829A JPH11217829A (en) | 1999-08-10 |
| JP4154487B2 true JP4154487B2 (en) | 2008-09-24 |
Family
ID=12037350
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP02080898A Expired - Lifetime JP4154487B2 (en) | 1998-02-02 | 1998-02-02 | Foundation pile construction method, foundation pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4154487B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7766420B2 (en) | 2005-01-17 | 2010-08-03 | Toyota Jidosha Kabushiki Kaisha | Front structure of vehicle body |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100334304C (en) * | 2004-12-06 | 2007-08-29 | 雷玉华 | Construction method for making hollow pile with large end at bottom by casting concrete in situ |
| JP5546000B2 (en) * | 2010-09-27 | 2014-07-09 | 旭化成建材株式会社 | Ground excavation method |
| JP5545999B2 (en) * | 2010-09-27 | 2014-07-09 | 旭化成建材株式会社 | Ground excavation method |
| CN108266131A (en) * | 2018-03-13 | 2018-07-10 | 刘守进 | Rotate soil compaction bottom expanding drill and method for constructing foundation pile |
| CN108547284A (en) * | 2018-04-16 | 2018-09-18 | 中交第二航务工程勘察设计院有限公司 | A kind of bottom-expanding sinking-pipe pilework and construction method |
| CN109184570A (en) * | 2018-11-14 | 2019-01-11 | 淮海工学院 | The construction method of prefabricated pile is sunk in a kind of expansion bit and its rotation reaming |
| JP2021050569A (en) * | 2019-09-26 | 2021-04-01 | 株式会社熊谷組 | Reinforcement tool, precast pile, and improved ground |
| CN111472692B (en) * | 2020-05-14 | 2024-10-01 | 武汉南方旭域科技工程有限公司 | Construction equipment and construction method for construction pile |
| CN116378019A (en) * | 2023-04-28 | 2023-07-04 | 山西四建集团有限公司 | A pile foundation suitable for high groundwater level and large settlement and its construction method |
-
1998
- 1998-02-02 JP JP02080898A patent/JP4154487B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7766420B2 (en) | 2005-01-17 | 2010-08-03 | Toyota Jidosha Kabushiki Kaisha | Front structure of vehicle body |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH11217829A (en) | 1999-08-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5265500B2 (en) | Pile digging method, foundation pile structure | |
| KR101014796B1 (en) | Top-down construction method using ready-made concrete pillar member | |
| JP4984308B2 (en) | Ready-made pile | |
| JP2010037864A (en) | Cast-in-place pile and construction method | |
| JP4154487B2 (en) | Foundation pile construction method, foundation pile | |
| JP3960372B2 (en) | Foundation pile structure | |
| KR101977791B1 (en) | Construction method of pile with Soil Cement mixing Foundation | |
| JP2002061178A (en) | Method of burying existing pile with protrusion in pile installation by inner excavation and foundation pile structure | |
| JP2005282063A (en) | Composite site construction pile, its construction method, and composite field construction pile construction device | |
| JPH02289718A (en) | Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill | |
| JP2017106187A (en) | Rotary cap, precast pile burying device, and pile foundation structure construction method | |
| JP2885077B2 (en) | Connection pile method of ready-made concrete pile | |
| JP4724873B2 (en) | Ready-made pile | |
| JP4724879B2 (en) | Foundation pile structure | |
| JP4724878B2 (en) | Foundation pile structure | |
| JP4872561B2 (en) | Construction method of ready-made piles | |
| JP2003227133A (en) | Foundation pile and method for constructing the same | |
| JP2001107356A (en) | Diametrally different combination pile and execution work method therefor | |
| JP4178273B2 (en) | Construction method of structural pillars using ready-made piles | |
| JP4054903B2 (en) | Method of burying ready-made piles, foundation pile structure and ready-made piles | |
| JPS6250516A (en) | Formation work of composite pile | |
| JP4475845B2 (en) | Pile construction method | |
| JP4517233B2 (en) | Ready-made concrete pile, manufacturing method of ready-made concrete pile, foundation pile structure | |
| JP2000154540A (en) | Embedded pile, its construction method, construction equipment and existing pile for embedded pile | |
| JP4641369B2 (en) | Partially built soil cement composite pile |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050125 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20061110 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061121 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070119 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070327 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070523 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071023 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071218 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080513 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080613 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110718 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120718 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130718 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |