Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4160773B2 - Method for suppressing warpage deformation of precast concrete plate - Google Patents
[go: Go Back, main page]

JP4160773B2 - Method for suppressing warpage deformation of precast concrete plate - Google Patents

Method for suppressing warpage deformation of precast concrete plate Download PDF

Info

Publication number
JP4160773B2
JP4160773B2 JP2002131869A JP2002131869A JP4160773B2 JP 4160773 B2 JP4160773 B2 JP 4160773B2 JP 2002131869 A JP2002131869 A JP 2002131869A JP 2002131869 A JP2002131869 A JP 2002131869A JP 4160773 B2 JP4160773 B2 JP 4160773B2
Authority
JP
Japan
Prior art keywords
precast concrete
plate
concrete
concrete plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002131869A
Other languages
Japanese (ja)
Other versions
JP2003320519A (en
Inventor
貴史 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa Co Ltd
Original Assignee
Daiwa Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa Co Ltd filed Critical Daiwa Co Ltd
Priority to JP2002131869A priority Critical patent/JP4160773B2/en
Publication of JP2003320519A publication Critical patent/JP2003320519A/en
Application granted granted Critical
Publication of JP4160773B2 publication Critical patent/JP4160773B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、表面化粧材を表面に備えたプレキャストコンクリート版の反り変形抑制方法に関する。
【0002】
【従来の技術】
プレキャストコンクリート版は、表面側にタイル、陶板、石、金属板等の表面化粧材を打ち込み、コンクリートパネルとして一体化させることが多い。
ところで、コンクリートは硬化後に、乾燥によって内部のキャピラリ水が散逸することにより、乾燥収縮を生じる。この時、プレキャストコンクリート版に表面化粧材が打ち込まれていると表面側の乾燥が抑制されるのに対し、裏面側は自由に乾燥が進行する。これにより、表裏で乾燥速度に差が生じ、裏面の収縮が進行して、図1(イ)で示すように、表面側が凸面となるような反り変形を生じる。
【0003】
そこで、従来では、このような反りを矯正するために、次の手段が用いられている。
▲1▼ プレキャストコンクリート版の面外への剛性を高めるために、裏面に補強リブを配置してパネルの変形を拘束したり、平積みなどのストック段階でプレキャストコンクリート版に対する支持点の位置を考慮することで版の自重により、反りの抑制を行う。
▲2▼ (反り変形を見越してあらかじめ型枠を反らす方法)
収縮による反り変形量を実績より予測し、その分型枠を逆方向に反らして製作し、収縮により変形を0に近づける。
▲3▼(特開平5−229862号公報)
水セメント比を25%以下、砂セメント比を重量比で1以上に設定したモルタル材料に、高性能減水剤とシリカヒューム等のポゾラン活性作用を有する超微粉末混和剤とを加える。このようにして調製したモルタル材料を混練してモルタルを作成し、このモルタルを型枠に打設した後に養生してプレキャストコンクリート版を得る。このように、砂セメント比をできる限り大きくして砂の割合を多くすることにより、乾燥収縮を起こすセメント水和物の、モルタル中に占める割合を低減させることができ、乾燥収縮に伴うプレキャストコンクリート版の反りを防止する。
▲4▼(特開平8−175883号公報)
型枠の型面に石、タイル、金属板等の表面化粧材を配置し、その表面化粧材上に、立毛布綿をその起毛部を上側にして一面に敷設した後に型枠内にコンクリートを打設する。しかる後、少なくともブリージング水の消失段階以後に、コンクリート表面にアクリル樹脂エマルジョン(ポリマーエマルジョン)を塗布し、その乾燥硬化によってコンクリート表面をアクリル樹脂フィルムで被覆する。更にそのアクリル樹脂フィルムの上面に塩化ビニリデン樹脂エマルジョン(ポリマーエマルジョン)を塗布し、その乾燥硬化によってアクリル樹脂フィルム上に塩化ビニリデン樹脂フィルムの層を形成する。所要の強度が発現した後に型枠から脱型し、表面化粧材を表面に一体化したプレキャストコンクリート版を得る。これにより、フィルムによる被覆養生効果によって乾燥速度およびこれに伴う収縮率が表裏で同一となって反りを防止する。
▲5▼(特開2001−71318)
型枠内に表面化粧材を配置し、メッシュ筋、金物等を配した後コンクリートを打設し、コンクリート打設2〜3時間後、乾燥防止剤をコンクリート面に噴霧し、蒸気養生を行う。
【0004】
【発明が解決しようとする課題】
上述した各手段▲1▼〜▲5▼にあっては、夫々次の問題がある。
【0005】
手段▲1▼の問題点
実際には温度,湿度などのように季節的環境要因や、表面化粧材の透湿性などの違いや、パネル形状などのいくつかの要因が複合化することによってプレキャストコンクリート版に多かれ少くなかれ反り変形が生ずるため、これを完全に抑制することは困難であった。
【0006】
手段▲2▼の問題点
部材のおかれる条件(天候、気温、湿度、等)の変化やコンクリートのバラツキにより予想した変形量と実際の部材の変形量が一致しない場合があり、そのような場合においては、反り変形が生じたり、逆方向の反りが残留したりする問題がある。
【0007】
手段▲3▼の問題点
W/C25%以下のモルタルに対して、60℃〜90℃という高温養生を行うため、コンクリートひび割れが発生し易い。また、特殊な調合、及び養生条件に限られており、汎用性に欠ける。
【0008】
手段▲4▼の問題点
フィルムを形成してコンクリート中の水分の早期蒸発を防止するようにしているが、剥がれ落ちたり傷が付くなどによって性能が低下する欠点があった。また、アクリル樹脂フィルムの上面に塩化ビニリデン樹脂エマルジョンを塗布して二重のフィルムを形成する場合、2度塗りが必要な上に、ブリージング水が無くなった段階で施工することになるために全体としての作業時間が増大する欠点があった。また、表面化粧材上に、立毛布綿を敷設する工程、パネルの裏面にアクリル樹脂フィルム、さらに塩化ビニリデン樹脂エマルジョンを塗布するという2工程が追加され作業が増え、コストが増大する欠点がある。
【0009】
手段▲5▼の問題点
コンクリート打設後2〜3時間で施工する場合、乾燥防止剤はグリコールエーテル、アミノアルコール、エチレンオキサイト等の有機物であるため、コンクリートの硬化を遅延し、表面が荒れる場合がある。また、乾燥防止剤は収縮量を低減することはできても0にすることはできないため、長尺、及び薄肉パネルにおいて十分な対応が出来ない場合がある。
本発明は、上述の各問題点のない、簡易かつ反り状態に対応した最適な平板化が可能な、プレキャストコンクリート版の反り変形抑制方法を提供することを目的とするものである。
【0010】
【課題を解決するための手段】
参考発明として、 表面化粧材を表面に備えたプレキャストコンクリート版にあって、コンクリート層内で、厚みの中心位置より表面側に偏心した位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、コンクリート層が硬化した後に、線状鋼材の両端に伸張応力を付与して、該両端をプレキャストコンクリート版に固定することにより、その復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するようにしたことを特徴とするプレキャストコンクリート版の反り変形抑制方法が提案される。
【0011】
かかる方法は、部材の中心から、表面化粧材が設けられた表面側に偏心させた位置に挿入した線状鋼材に、緊張力(伸張応力)を付与して、その復元収縮力の作用による、プレキャストコンクリート版の逆方向の反り力により、コンクリートの乾燥収縮により生じた反り変形をキャンセルさせ、プレキャストコンクリート版を平板化するものである。
【0012】
すなわち、コンクリートは硬化後に、乾燥によって内部のキャピラリ水が散逸することにより、乾燥収縮を生じる。この時、プレキャストコンクリート版に表面化粧材が打ち込まれていると表面側の乾燥が抑制されるのに対し、裏面側は自由に乾燥が進行する。これにより、表裏で乾燥速度に差が生じ、裏面の収縮が進行して、図1(イ)で示すように、表面側が凸面となるような反り変形を生じる。そこで、表面化粧材が設けられた表面側に偏心させた位置に挿入した線状鋼材に、緊張力(伸張応力)を付与して、プレキャストコンクリート版の端面などで、線状鋼材を固定して、緊張状態を保持する。これにより、図(ロ)で示すように、表面化粧材が設けられた表面側で、復元収縮力が作用して、該表面側が凹面となる変形力が作用する。そしてこの変形力により、図(イ)の反りが消去され、図1(ハ)の状態となる。ここで、図1(ロ)は緊張力fによる反り変形を示すものであり、実際には、乾燥後に図イの状態となり、矯正により図1(ハ)の状態となる。
【0013】
ここでプレストレスを印加する手段として、かかる構成にあっては、コンクリート硬化後に線状鋼材を緊張し、コンクリートに緊張力を導入する方法(ポストテンション方式)を用いているものである。かかる手段にあっては、版の反り量に応じて緊張力を調整でき、このため反り状態に対応した最適な平板化が可能となる。また、コンクリートパネルを建物外壁等に使用している最中でも調整が可能となる。
【0014】
尚、線状鋼材への緊張力は、5t〜12tの大きなものであるから、許容反り量に収まる程度の矯正(例えば、全長の1/1000以内)を加えれば良く、緊張力と反り量との調和をとりながら平板化され、必ずしも、完全な平面となるまで、矯正することを要しない。
【0015】
ここで、コンクリート打設時にあらかじめシース管を、厚み方向の中心より表面側に偏心した位置に面方向に沿って埋設し、コンクリート層が硬化した後に、該シース管内に、線状鋼材を挿通させ、その両端に伸張応力を付与して、両端をプレキャストコンクリート版に固定するようにした方法(請求項2)が提案される。かかる構成にあっては、緊張力を印加する過程で、その伸びにより周囲のコンクリートに亀裂を生じさせることがない。
【0016】
また、線状鋼材にポリエチレン被覆などの耐摩耗性及び滑り性の良い樹脂被覆を施し、コンクリート打設時に、該線状鋼材を打ち込んでおいてから、コンクリート層が硬化した後に、その両端に伸張応力を付与して、両端をプレキャストコンクリート版に固定する方法(請求項3)が提案される。かかる構成にあっては、線状鋼材を両側から引張して伸びを生じさせた場合にあって、樹脂被覆により、コンクリートに対して滑りを生じ、大きな負荷がかかることなく伸張可能となる。
【0017】
他の手段あっては、表面化粧材を表面に備えたプレキャストコンクリート版にあって、コンクリート層の厚みの中心位置より表面側に偏心した位置に、あらかじめ伸張応力を付与した状態で、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、線状鋼材の復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するようにした反り変形抑制方法が提案される。
【0018】
これはプレストレスを印加する手段として、コンクリート打設前に線状鋼材を緊張させておいて、コンクリート硬化後に緊張力を開放することによりコンクリートに緊張力を導入する方法(プレテンション方式)である。
【0019】
すなわち、図7(イ)で示すように、線状鋼材の両端に、緊張力(伸張応力)を付与して、型枠内で線状鋼材を固定する。そして、コンクリートが硬化した後に、その緊張力を解除する。これにより、図7(ロ)で示すように、表面化粧材が設けられた表面側で、線状鋼材の復元収縮力が作用して、該表面側が凹面となる緊張力fが作用する。そしてこの緊張力fが反り変形と均衡して矯正され、平板状となる。
【0020】
本発明は、表面化粧材を表面に備え、重心が版外に位置する異形プレキャストコンクリート版にあって、重心位置よりも表面側に偏心した版外の位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、コンクリート層が硬化した後、又は乾燥する前に、線状鋼材の両端に伸張応力を付与して、該両端をプレキャストコンクリート版に固定することにより、その復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するようにしたことを特徴とするプレキャストコンクリート版の反り変形抑制方法である。かかる構成の異形プレキャストコンクリート版としては、断面構造がコ字状などの構成が供される。
【0021】
かかる方法にあっても、版外に保持された線状鋼材に、緊張力(伸張応力)を付与することにより、その復元収縮力の作用によってコンクリートの乾燥収縮により生じた反り変形をキャンセルさせ、プレキャストコンクリート版を矯正することができる。
【0022】
【発明の実施の形態】
本発明のプレキャストコンクリート版1の反り変形抑制方法の一実施例について説明する。
図2,3は、本発明のプレキャストコンクリート版1の一例を示し、その 寸法は後述する試験例では、6,000×600×97mmとし、表面に表面化粧材2として、タイルが打ち込まれている。図3は、その縦断面図であり、コンクリート層3内に、線状鋼材であるアンボンドPC鋼棒(C種−φ13mm)6を表面側から30mmの位置に配置し、メッシュ筋(D6@100)5を板厚内に配筋している。ここで、線状鋼材として、鋼棒6を用いているが、鋼撚り線等の線状鋼材も適用され得る。
【0023】
かかる製造手段を説明する。
図3で示すように、次の製造工程イ〜ヘを順次実行することにより、プレキャストコンクリート版1は製造され得る。
製造工程イ
上面開放のケース状鋼製型枠10の底面11に表面化粧材2(タイル)を敷設する。
製造工程ロ
メッシュ筋5及び鋼棒6を、底面に沿って平行に差し渡し、型枠10の側壁12で保持する。この場合に、鋼棒6の差し渡し位置は、厚みの中心位置より表面側に偏心した位置とする。
製造工程ハ
ステンレス繊維補強コンクリート(SFRC)3を混練後、型枠10内に打設し、コンクリート層を締め固める。
製造工程ニ
必要に応じて蒸気養生を行う。
製造工程ホ
翌日、型枠から脱型し、反転後、表面を水洗いする。
製造工程ヘ
所定材齢まで養生(試験では14日間養生)した後、鋼棒6に緊張力fを印加した。ここで、緊張力fの導入時期は、ある程度コンクリート強度が発現してからが良いと考えられるため、材齢7日以上、好ましくは14日以上とする。
【0024】
図4は、鋼棒6に緊張力fを印加するために手段を示す。
ここでプレキャストコンクリート版1の両端面からは鋼棒6が突出している。この鋼棒6の端部には、雄螺子8が形成されている。そして、該鋼棒6の端部には、アンカープレート15が外嵌され、かつ雄螺子8に締付けナット16が螺合される。さらに、鋼棒6を跨ぐようにコ字状架台17が配設される。この架台17の鋼棒6と直交する台部18には、油圧ジャッキ19が配設され、その中心に端部を鋼棒6の雄螺子8に螺合する可動パイプ22が挿通している。そして、該可動パイプ22に螺着したナット23を油圧ジャッキ19の可動面20に当接するようにし、油圧ジョッキ19に、油圧ポンプから加圧流体を供給すると、可動面20がプレキャストコンクリート版1の端面から離間する方向へ移動し、これにより可動面20にナット23により係合している可動パイプ22を介して、鋼棒6が両端で外側へ引張され、緊張力fを付与される。そして、この状態で、締付けナット16を緊締し、その緊張状態を保持する。
【0025】
これにより、鋼棒6は、プレキャストコンクリート版1のコンクリート層3の厚み中心から表面側に偏位した位置に配設されているから、伸張応力(緊張力f)による反作用としての復元収縮力により、プレキャストコンクリート版1は、表面側が凹面となる反り力が付与される(図1(ロ)参照)。このため、コンクリート層3が硬化後に、プレキャストコンクリート版1には、表裏の乾燥速度の差により、図1(イ)で示すように、表面側が凸面となるような反り変形を生じるが、上述の反り力により、かかる反り変形が矯正される。そして、この矯正は、プレキャストコンクリート版1の状態をみながら、油圧ジャッキを駆動させ、平状となったのを確認して、該駆動を停止し、締付けナット16を緊締して、その緊張状態を保持すればよいから、容易にプレキャストコンクリート版1の平板化を達成できる。 またかかる構成はコンクリートパネルを建物外壁等に使用している最中でも調整が可能となる。
【0026】
ここで、鋼棒6の配設位置は、中心からの偏心距離が大きい程、緊張力fが小さくてすむが、コンクリート製品の場合には、図5で示すように、表面化粧材2から20mm以上かぶり厚さを確保できる位置に配置することが望ましい。ここで、かぶり厚さとは表面から鉄筋(鋼材)までの距離をいう。すなわち、表面側に鉄筋が近接していると、表面側からの空気、液分により酸化し易くなり、これにより鉄筋が膨張して、コンクリート層3に亀裂を生じ、強度が低下する。このため、通常、表面化粧材から20mm以上のかぶり厚さを確保することが求められている。そこで、鋼棒6にあっても、同様のかぶり厚さを確保するものである。
【0027】
ところで図2は、シングル配筋の場合の例を示すが、板厚が大きくダブル配筋(図3参照)の場合は、表面側のメッシュ筋または、PC鋼棒のかぶり厚さを20mm以上にすることが望ましい。また、表面に例えばポリエチレン皮膜のあるアンボンド鋼棒6を適用した場合には、かぶり厚さを小さくすることができる。このかぶり厚さを小さくして、中心からの偏心距離を大きくすると、表面を凹面とする反り力が大きくなり、緊張力fを小さくすることができる。
【0028】
ここで、鋼棒6を引張する場合にあって、図4で示すように、コンクリート打設時にあらかじめシース管30を、厚み方向の中心より表面側に偏心した位置に面方向に沿って埋設し、コンクリート層が硬化した後に、該シース管30内に、鋼棒6を挿通し、その両端に図4で示したような手段により伸張応力を付与するようにした手段が提案される。かかる手段にあっては、緊張力fを印加する過程で、その伸びにより周囲のコンクリート層3に亀裂を生じさせることがない。
【0029】
また、図5で示すように、鋼棒6にポリエチレン被覆などの耐摩耗性及び滑り性の良い樹脂被覆35を施し、コンクリート層3の打設時に、該鋼棒6を打ち込んでおいてから、コンクリート層3が硬化した後に、上述と同様の手段(同一符号を付して説明を省略)によりその両端に伸張応力を付与する方法が提案される。かかる構成にあっては、鋼棒6を両側から引張して伸びを生じさせた場合にあって、樹脂被覆35により、コンクリート層3に対して滑りを生じ、大きな負荷がかかることなく伸張可能となる。かかる構成にあっては、部品点数が少なくて済み、構造が簡易となる利点がある。
【0030】
ここで、本発明の作用を確認するために、上述の手段により複数の試験体を作成し、1体は緊張力fを導入せず、他に緊張力fを付与した。この結果、緊張力fを付与しないものにあっては、図1の全長6000mmのものにあって、9mm程度の反りを生じた。尚、この緊張力fは、プレキャストコンクリート版1に大きな負荷を与えるものであるから、必ずしも、完全に平板化せずに、4mm程度の反りを残す程度の平板化であれば実用に供しうるものである。すなわち、鋼棒6への緊張力は、5t〜12tの大きなものであるから、許容反り量に収まる程度の矯正(例えば、全長の1/1000以内)を加えれば良く、緊張力と反り量との調和をとりながら平板化され、必ずしも、完全な平面となるまで、矯正することを要しない。
【0031】
プレキャストコンクリート版1’によっては、図6で示すように表面化粧材2を表面に備え、重心が版外に位置する断面コ字状のものなどがある。このような構成にあっては、プレキャストコンクリート版1’の外側で緊張力fを導入して反りを矯正することも可能である。
【0032】
すなわち、かかる構成の異形プレキャストコンクリート版1’にあっては、重心位置よりも表面側に偏心した版外の位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、軸承け30,30で異形プレキャストコンクリート版1’の裏面に支持する。そして、コンクリート層3が硬化した後に、図4と同様の手段によりその両端に伸張応力を付与して、両端を締め付けナット16,16で保持する。これにより、重心の内側での復元収縮力により、プレキャストコンクリート版1’の表面を凸面とする反り変形が矯正されることとなる。
図7は、本発明の他の手段ある、、コンクリート硬化後に緊張力を開放することによりコンクリートに緊張力を導入する方法(プレテンション方式)を示す。
【0033】
すなわち、図7(イ)で示すように、線状鋼材6の両端に、治具40,40により緊張力(伸張応力)を付与して、該線状鋼材6を、コンクリート層3の成形厚の中心から前面側へ返信した位置関係となるように、型枠10内に保持する。しかる後に、コンクリートを打ち込む。そして、コンクリートが硬化した後に、その緊張力を解除すると、図7(ロ)で示すように、表面化粧材2が設けられた表面側で、線状鋼材6の復元収縮力が作用して、該表面側が凹面となる緊張力fが作用する。そしてこの緊張力fが反り変形と均衡して矯正され、平板状となる。この手段は、図6で示す形プレキャストコンクリート版1’の成形にも用いることができる。
【0034】
【発明の効果】
表面化粧材を表面に備えたプレキャストコンクリート版にあって、厚みの中心位置より表面側に偏心した位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、コンクリート層が硬化した後に、その両端に伸張応力を付与して、両端をプレキャストコンクリート版に固定することにより、その復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するものにあっては、版の反り量に応じて緊張力fを調整でき、その反りの程度を確認しながら線状鋼材を緊張することにより、容易かつ適正に平板化が可能となる。また、コンクリートパネルを建物外壁等に使用している最中でも調整が可能となる。
【0035】
ここで、コンクリート打設時にあらかじめシース管を、厚み方向の中心より表面側に偏心した位置に面方向に沿って埋設し、コンクリート層が硬化した後に、該シース管内に、線状鋼材を挿通させ、その両端に伸張応力を付与して、両端をプレキャストコンクリート版に固定するようにした方法にあっては、緊張力fを印加する過程で、その伸びにより周囲のコンクリートに亀裂を生じさせることがないという利点がある。
【0036】
また、線状鋼材にポリエチレン被覆などの耐摩耗性及び滑り性の良い樹脂被覆を施し、コンクリート打設時に、該線状鋼材を打ち込んでおいてから、コンクリート層が硬化した後に、その両端に伸張応力を付与して、両端をプレキャストコンクリート版に固定する方法にあっては、線状鋼材を両側から引張して伸びを生じさせた場合にあって、樹脂被覆により、コンクリートに対して滑りを生じ、大きな負荷がかかることなく伸張可能となる。かかる構成にあっては、部品点数が少なくて済み、構造が簡易となる利点がある。
さらに、コンクリート層の厚みの中心位置より表面側に偏心した位置に、あらかじめ伸張応力を付与した状態で、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、線状鋼材の復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するようにしたものにあっては、線状鋼材の緊張力fが反り変形と均衡して矯正され、平板状となる。
【0037】
本発明の、表面化粧材を表面に備え、重心が版外に位置する異形プレキャストコンクリート版にあっても、重心位置よりも表面側に偏心した版外の位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、コンクリート層が硬化した後、又は乾燥する前に、その両端に伸張応力を付与して、両端をプレキャストコンクリート版に固定することにより、その復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するようにした方法にあっては、版外に保持された線状鋼材に、緊張力(伸張応力)を付与することにより、その復元収縮力の作用によってコンクリートの乾燥収縮により生じた反り変形をキャンセルさせ、プレキャストコンクリート版を平板化することができる。
【図面の簡単な説明】
【図1】本発明の第1手段の原理を示し、(イ)は、プレキャストコンクリート版1に発生する表面側の反り変形を示し、(ロ)は本発明による緊張力fを示し、(ハ)はプレキャストコンクリート版1の矯正状態を示す。
【図2】本発明のプレキャストコンクリート版1の設計例を示し、(イ)は平面図、(ロ)は縦断側面図である。
【図3】プレキャストコンクリート版1の製造工程を示す説明図である。
【図4】鋼棒6に緊張力fを印加する手段の一例を示す縦断側面図である。
【図5】鋼棒6を樹脂被覆35を施した構成における同上の縦断側面図である。
【図6】断面コ字状の異形プレキャストコンクリート版1’に鋼棒6を適用した構成を示し、(イ)は平面図、(ロ)は縦断側面図、(ハ)は正面図である。
【図7】本発明の第2手段の原理を示し、(イ)は本発明による緊張力fを示し、(ロ)はプレキャストコンクリート版1の矯正状態を示す。
【符号の説明】
1,1’ プレキャストコンクリート版
2 表面化粧材
3 コンクリート層
6 鋼棒
30 シース管
35 樹脂被覆
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for suppressing warpage deformation of a precast concrete plate having a surface decorative material on its surface.
[0002]
[Prior art]
Precast concrete plates are often integrated into a concrete panel by placing surface decorative materials such as tiles, porcelain plates, stones, and metal plates on the surface side.
By the way, after the concrete is hardened, the capillary water inside is dissipated by drying, so that drying shrinkage occurs. At this time, when the surface decorative material is driven into the precast concrete plate, drying on the front surface side is suppressed, whereas drying on the back surface side freely proceeds. As a result, a difference occurs in the drying speed between the front and back surfaces, and the shrinkage of the back surface proceeds, causing warpage deformation such that the front side becomes a convex surface as shown in FIG.
[0003]
Therefore, conventionally, the following means are used to correct such warpage.
(1) In order to increase the out-of-plane rigidity of the precast concrete slab, reinforcing ribs are placed on the back to constrain panel deformation, and the position of the support point relative to the precast concrete slab at the stock stage such as flat stacking is considered. By doing so, warpage is suppressed by the weight of the plate.
(2) (Method to warp the formwork in advance in anticipation of warping deformation)
The amount of warpage deformation due to shrinkage is predicted from the actual results, and the mold is warped in the opposite direction, and the deformation is brought close to 0 by shrinkage.
(3) (JP-A-5-229862)
A high-performance water reducing agent and an ultrafine powder admixture having a pozzolanic activity such as silica fume are added to a mortar material having a water cement ratio of 25% or less and a sand cement ratio of 1 or more by weight. The mortar material thus prepared is kneaded to prepare a mortar. After the mortar is placed on a mold, it is cured to obtain a precast concrete plate. Thus, by increasing the sand cement ratio as much as possible and increasing the proportion of sand, the proportion of cement hydrate causing drying shrinkage in the mortar can be reduced, and precast concrete accompanying dry shrinkage. Prevent warping of the plate.
(4) (JP-A-8-175883)
Surface decorative materials such as stones, tiles, metal plates, etc. are placed on the mold surface of the formwork, and on the surface decorative material, napped cotton is laid on one side with the raised parts facing upward, and then concrete is placed in the formwork. To cast. Thereafter, at least after the disappearing stage of the breathing water, an acrylic resin emulsion (polymer emulsion) is applied to the concrete surface, and the concrete surface is covered with an acrylic resin film by dry curing. Furthermore, a vinylidene chloride resin emulsion (polymer emulsion) is applied to the upper surface of the acrylic resin film, and a layer of the vinylidene chloride resin film is formed on the acrylic resin film by drying and curing. After the required strength is developed, the mold is removed from the mold to obtain a precast concrete plate in which the surface decorative material is integrated on the surface. Thereby, the drying rate and the shrinkage rate associated therewith are the same on the front and back due to the covering curing effect by the film, thereby preventing warpage.
(5) (JP 2001-71318 A)
A surface decorative material is arranged in the mold, and after placing mesh streaks and hardware, the concrete is placed. After 2-3 hours of placing the concrete, a drying inhibitor is sprayed onto the concrete surface and steam curing is performed.
[0004]
[Problems to be solved by the invention]
Each of the above means (1) to (5) has the following problems.
[0005]
Problem of Means (1) Precast concrete due to the combination of several factors such as seasonal environmental factors such as temperature and humidity, difference in moisture permeability of surface cosmetics, and panel shape It was difficult to completely suppress this because the warpage deformation occurred more or less in the plate.
[0006]
Problem of means (2): The deformation amount expected due to changes in the conditions (weather, temperature, humidity, etc.) of the member and the variation in the concrete may not match the deformation amount of the actual member. However, there is a problem that warpage deformation occurs or warpage in the opposite direction remains.
[0007]
Problem of Means (3) Since mortar with W / C of 25% or less is cured at a high temperature of 60 ° C. to 90 ° C., concrete cracks are likely to occur. Moreover, it is limited to special preparation and curing conditions, and lacks versatility.
[0008]
Problem of Means (4) A film is formed to prevent premature evaporation of moisture in the concrete, but there is a drawback that the performance deteriorates due to peeling off or scratching. In addition, when a vinylidene chloride resin emulsion is applied to the upper surface of an acrylic resin film to form a double film, it is necessary to apply twice, and since it will be applied at the stage where the breathing water has disappeared, as a whole There is a disadvantage that the working time of the process increases. In addition, there is a disadvantage that the cost increases due to the addition of two steps of laying napped cotton on the surface decorative material and applying an acrylic resin film and a vinylidene chloride resin emulsion on the back of the panel.
[0009]
Problem of Means (5) When construction is carried out 2 to 3 hours after placing concrete, the drying inhibitor is an organic substance such as glycol ether, amino alcohol, ethylene oxide, etc., so the hardening of concrete is delayed and the surface becomes rough. There is a case. Further, since the drying inhibitor can reduce the shrinkage amount but cannot reduce it to 0, there is a case where sufficient measures cannot be taken for long and thin panels.
An object of the present invention is to provide a method for suppressing warp deformation of a precast concrete plate, which is simple and can be optimally flattened corresponding to a warped state, without the above-described problems.
[0010]
[Means for Solving the Problems]
As a reference invention, In a precast concrete plate with a surface decorative material on the surface, in the concrete layer, a linear steel material such as a steel bar or a steel stranded wire is placed along the surface direction at a position eccentric to the surface side from the center position of the thickness. After the concrete layer is hardened, by applying tensile stress to both ends of the linear steel material and fixing both ends to the precast concrete plate, the surface of the precast concrete plate is made convex by its restoring shrinkage force. A method for suppressing warp deformation of a precast concrete slab characterized by correcting warpage deformation is proposed.
[0011]
Such a method, by applying tension (extension stress) to the linear steel material inserted in a position eccentric from the center of the member to the surface side provided with the surface decorative material, due to the action of its restoring contraction force, The warp deformation caused by drying shrinkage of the concrete is canceled by the warping force in the reverse direction of the precast concrete plate, and the precast concrete plate is flattened.
[0012]
That is, after the concrete is hardened, the capillary water inside is dissipated by drying, and thus shrinkage occurs. At this time, when the surface decorative material is driven into the precast concrete plate, drying on the front surface side is suppressed, whereas drying on the back surface side freely proceeds. As a result, a difference occurs in the drying speed between the front and back surfaces, and the shrinkage of the back surface proceeds, causing warpage deformation such that the front side becomes a convex surface as shown in FIG. Therefore, tension (extension stress) is applied to the linear steel material inserted at a position eccentric to the surface side where the surface decorative material is provided, and the linear steel material is fixed at the end face of the precast concrete plate. , Hold tension. Thereby, as shown in the figure (b), the restoring contraction force acts on the surface side on which the surface decorative material is provided, and the deformation force acts such that the surface side becomes concave. Then, due to this deformation force, the warpage of FIG. 1A is eliminated, and the state of FIG. Here, FIG. 1 (b) shows the warp deformation due to the tension force f. In practice, the state shown in FIG. 1 is obtained after drying, and the state shown in FIG.
[0013]
Here, as a means for applying prestress, in such a configuration, a method (post-tension method) in which a linear steel material is tensioned after the concrete is hardened and a tension force is introduced into the concrete is used. In such means, the tension force can be adjusted according to the amount of warping of the plate, and therefore, an optimal flattening corresponding to the warping state is possible. In addition, the adjustment can be performed even when the concrete panel is used for the outer wall of the building.
[0014]
In addition, since the tension | tensile_strength to a linear steel material is a big thing of 5t-12t, what is necessary is just to add the correction (for example, less than 1/1000 of full length) to the extent of allowable curvature amount, and tension | tensile_strength and curvature amount. It is not necessary to correct until it is flattened while keeping the harmony, and it becomes a completely flat surface.
[0015]
Here, at the time of concrete placement, the sheath tube is embedded in the surface direction in a position eccentric to the surface side from the center in the thickness direction, and after the concrete layer is hardened, the linear steel material is inserted into the sheath tube. A method (Claim 2) is proposed in which tensile stress is applied to both ends and both ends are fixed to a precast concrete plate. In such a configuration, in the process of applying tension, the elongation does not cause cracks in the surrounding concrete.
[0016]
In addition, the linear steel material is coated with a resin coating with good wear resistance and slipperiness such as polyethylene coating, and when the concrete is cast, the linear steel material is driven and then the concrete layer is hardened and then stretched at both ends. A method is proposed in which stress is applied and both ends are fixed to a precast concrete plate (claim 3). In such a configuration, when the linear steel material is pulled from both sides to cause elongation, the resin coating causes slipping with respect to the concrete and can be expanded without applying a large load.
[0017]
Another means is a precast concrete plate provided with a surface decorative material on the surface, in a state in which a tensile stress is applied in advance to a position eccentric to the surface side from the center position of the thickness of the concrete layer, Proposed a warp deformation suppression method in which linear steel materials such as steel stranded wires are arranged along the surface direction, and the warping deformation with the surface of the precast concrete plate being convex is corrected by the restoring shrinkage force of the linear steel material Is done.
[0018]
This is a method (pretension system) for applying prestress as a method of introducing tension to concrete by tensioning the linear steel material before placing the concrete and releasing the tension after the concrete is hardened. .
[0019]
That is, as shown in FIG. 7 (a), tension (extension stress) is applied to both ends of the linear steel material to fix the linear steel material in the mold. Then, after the concrete has hardened, the tension is released. As a result, as shown in FIG. 7 (b), the restoring shrinkage force of the linear steel material acts on the surface side where the surface decorative material is provided, and the tension force f that makes the surface side concave serves. This tension force f is corrected in balance with the warp deformation and becomes flat.
[0020]
The present invention is a deformed precast concrete plate provided with a surface decorative material on the surface and having a center of gravity located outside the plate, such as a steel bar or a steel stranded wire at a position outside the plate eccentric to the surface side of the center of gravity. By arranging the linear steel material along the surface direction and applying a tensile stress to both ends of the linear steel material after the concrete layer has hardened or dried, and fixing the both ends to the precast concrete plate The method of suppressing warp deformation of a precast concrete plate characterized by correcting warp deformation in which the surface of the precast concrete plate has a convex surface by the restoring shrinkage force . As the deformed precast concrete slab having such a configuration, a configuration having a U-shaped cross-sectional structure is provided.
[0021]
Even in such a method, by applying a tension force (extension stress) to the linear steel material held outside the plate, the warp deformation caused by the drying shrinkage of the concrete due to the action of the restoring shrinkage force is canceled, Precast concrete plate can be straightened.
[0022]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the method for suppressing warpage deformation of the precast concrete plate 1 of the present invention will be described.
2 and 3 show an example of the precast concrete slab 1 of the present invention, the dimensions of which are 6,000 × 600 × 97 mm in a test example described later, and a tile is driven as a surface decorative material 2 on the surface. Fig. 3 is a longitudinal cross-sectional view thereof, in which the unbonded PC steel rod (C type-φ13mm) 6 which is a linear steel material is placed in the concrete layer 3 at a position 30mm from the surface side, and the mesh reinforcement (D6 @ 100 ) 5 is placed within the plate thickness. Here, although the steel rod 6 is used as a linear steel material, linear steel materials, such as a steel strand wire, can also be applied.
[0023]
Such manufacturing means will be described.
As shown in FIG. 3, the precast concrete plate 1 can be manufactured by sequentially executing the following manufacturing steps (a) to (f).
Manufacturing process (1) The surface decorative material 2 (tile) is laid on the bottom surface 11 of the case-shaped steel mold 10 with the top surface open.
Manufacturing Process The romesh bars 5 and the steel rod 6 are passed in parallel along the bottom surface and held by the side walls 12 of the mold 10. In this case, the delivery position of the steel rod 6 is a position eccentric to the surface side from the center position of the thickness.
Manufacturing process C After kneading the stainless fiber reinforced concrete (SFRC) 3, it is placed in the mold 10 and the concrete layer is compacted.
Manufacturing process D Steam curing is performed as necessary.
The next day of the manufacturing process, the mold is removed from the mold, and after reversing, the surface is washed with water.
After curing to a predetermined age in the manufacturing process (14 days in the test), a tension force f was applied to the steel bar 6. Here, it is considered that the introduction time of the tension force f may be after the concrete strength has been developed to some extent, so that the age is 7 days or more, preferably 14 days or more.
[0024]
FIG. 4 shows a means for applying a tension force f to the steel bar 6.
Here, steel bars 6 protrude from both end faces of the precast concrete plate 1. A male screw 8 is formed at the end of the steel rod 6. An anchor plate 15 is fitted on the end of the steel rod 6, and a tightening nut 16 is screwed onto the male screw 8. Further, a U-shaped gantry 17 is disposed so as to straddle the steel rod 6. A hydraulic jack 19 is disposed on a base portion 18 orthogonal to the steel rod 6 of the gantry 17, and a movable pipe 22 having an end screwed to the male screw 8 of the steel rod 6 is inserted in the center thereof. When the nut 23 screwed to the movable pipe 22 is brought into contact with the movable surface 20 of the hydraulic jack 19 and a pressurized fluid is supplied to the hydraulic mug 19 from the hydraulic pump, the movable surface 20 is brought into contact with the precast concrete plate 1. The steel bar 6 is pulled outward at both ends via the movable pipe 22 that moves in a direction away from the end face and is engaged with the movable face 20 by the nut 23, and a tension force f is applied. In this state, the tightening nut 16 is tightened to maintain the tensioned state.
[0025]
Thereby, since the steel bar 6 is arrange | positioned in the position which shifted | deviated from the thickness center of the concrete layer 3 of the precast concrete plate 1 to the surface side, by the restoring contractive force as a reaction by extensional stress (tensile force f) The precast concrete slab 1 is given a warping force with a concave surface (see FIG. 1 (b)). For this reason, after the concrete layer 3 is cured, the precast concrete plate 1 is warped and deformed so that the surface side becomes convex as shown in FIG. Such warpage deformation is corrected by the warping force. In this correction, the hydraulic jack is driven while observing the state of the precast concrete plate 1 to confirm that it is flat, the drive is stopped, the tightening nut 16 is tightened, and the tension state is reached. Therefore, flattening of the precast concrete plate 1 can be easily achieved. Further, such a configuration can be adjusted even when the concrete panel is used for the building outer wall or the like.
[0026]
Here, the steel rod 6 is disposed at a position where the tension force f is smaller as the eccentric distance from the center is larger. However, in the case of a concrete product, as shown in FIG. It is desirable to arrange at a position where the cover thickness can be secured. Here, the cover thickness refers to the distance from the surface to the reinforcing bar (steel material). That is, if the reinforcing bar is close to the surface side, it is easily oxidized by air and liquid from the surface side, whereby the reinforcing bar expands, cracks in the concrete layer 3 and the strength decreases. For this reason, it is usually required to secure a cover thickness of 20 mm or more from the surface decorative material. Therefore, even with the steel rod 6, the same cover thickness is ensured.
[0027]
2 shows an example in the case of single reinforcement, but in the case of large reinforcement and double reinforcement (see FIG. 3), the mesh reinforcement on the surface side or the cover thickness of the PC steel bar should be 20 mm or more. It is desirable to do. In addition, when the unbonded steel rod 6 having a polyethylene film on the surface is applied, the cover thickness can be reduced. When the cover thickness is reduced and the eccentric distance from the center is increased, the warping force with the surface being concave is increased, and the tension force f can be reduced.
[0028]
Here, when the steel rod 6 is pulled, as shown in FIG. 4, the sheath tube 30 is embedded in advance along the surface direction at a position eccentric to the surface side from the center in the thickness direction when placing concrete. After the concrete layer is hardened, a means is proposed in which a steel rod 6 is inserted into the sheath tube 30 and tensile stress is applied to both ends thereof by means as shown in FIG. In such a means, in the process of applying the tension force f, the surrounding concrete layer 3 is not cracked due to its elongation.
[0029]
Further, as shown in FIG. 5, the steel rod 6 is coated with a resin coating 35 having good wear resistance and slipperiness such as polyethylene coating, and the steel rod 6 is driven when the concrete layer 3 is placed. After the concrete layer 3 is hardened, a method is proposed in which tensile stress is applied to both ends thereof by means similar to those described above (the same reference numerals are used and description thereof is omitted). In such a configuration, when the steel rod 6 is pulled from both sides to cause elongation, the resin coating 35 causes the concrete layer 3 to slip and can be stretched without applying a large load. Become. Such a configuration has the advantage that the number of parts is small and the structure is simple.
[0030]
Here, in order to confirm the effect | action of this invention, the some test body was created by the above-mentioned means, and one body did not introduce the tension | tensile_strength f, and gave tension | tensile_strength f to others. As a result, in the case where the tension force f was not applied, there was a warpage of about 9 mm in the case of the total length of 6000 mm in FIG. In addition, since this tension | tensile_strength f gives a big load to the precast concrete plate 1, it is not necessarily flattened completely, and if it is flattening of the extent which leaves the curvature of about 4 mm, it can use for practical use. It is. That is, since the tension force to the steel bar 6 is a large one of 5t to 12t, it is only necessary to add correction (e.g., within 1/1000 of the total length) within the allowable warpage amount. It is not necessary to correct until it is flattened while keeping the harmony, and it becomes a completely flat surface.
[0031]
Depending on the precast concrete plate 1 ′, as shown in FIG. 6, there is a U-shaped section having a surface decorative material 2 on the surface and a center of gravity located outside the plate. In such a configuration, it is also possible to correct the warp by introducing a tension force f outside the precast concrete plate 1 ′.
[0032]
That is, in the deformed precast concrete plate 1 ′ having such a configuration, a linear steel material such as a steel bar or a steel stranded wire is disposed along the surface direction at a position outside the plate that is eccentric to the surface side of the center of gravity. The bearings 30 and 30 are supported on the back surface of the deformed precast concrete plate 1 ′. Then, after the concrete layer 3 is cured, tensile stress is applied to both ends thereof by the same means as in FIG. 4, and both ends are held by the fastening nuts 16 and 16. Thereby, the warp deformation in which the surface of the precast concrete plate 1 ′ is convex is corrected by the restoring shrinkage force inside the center of gravity.
FIG. 7 shows another method of the present invention, a method (pretension system) for introducing tension to concrete by releasing the tension after the concrete is hardened.
[0033]
That is, as shown in FIG. 7A, a tensile force (extension stress) is applied to both ends of the linear steel material 6 by jigs 40 and 40, and the linear steel material 6 is formed into a molding thickness of the concrete layer 3. Is held in the mold 10 so that the positional relationship is returned from the center to the front side. After that, the concrete is driven. And after the concrete has hardened, when the tension force is released, as shown in FIG. 7 (b), on the surface side where the surface decorative material 2 is provided, the restoring shrinkage force of the linear steel material 6 acts, A tension force f having a concave surface is applied. This tension force f is corrected in balance with the warp deformation and becomes flat. This means can also be used for forming the precast concrete slab 1 'shown in FIG.
[0034]
【The invention's effect】
In a precast concrete plate provided with a surface decorative material on the surface, a linear steel material such as a steel bar or a steel stranded wire is arranged along the surface direction at a position eccentric to the surface side from the center position of the thickness, and concrete after the layer is cured, by applying a tensile stress to both ends, by fixing the both ends precast concrete panel, by its restoring contraction force, apparatus having to correct warp deformation of the surface of the precast concrete plate and the convex surface Thus, the tension force f can be adjusted according to the amount of warpage of the plate, and flattening can be performed easily and appropriately by tensioning the linear steel material while confirming the degree of warpage. In addition, the adjustment can be performed even when the concrete panel is used for the outer wall of the building.
[0035]
Here, at the time of concrete placement, the sheath tube is embedded in the surface direction in a position eccentric to the surface side from the center in the thickness direction, and after the concrete layer is hardened, the linear steel material is inserted into the sheath tube. , by applying a tensile stress at both ends, in the method so as to secure the two ends to the precast concrete plate, in the process of applying a tensioning force f, it is possible to generate cracks in the concrete around by its elongation There is no advantage.
[0036]
In addition, the linear steel material is coated with a resin coating with good wear resistance and slipperiness such as polyethylene coating, and when the concrete is cast, the linear steel material is driven and then the concrete layer is hardened and then stretched at both ends. stress grant, the both ends in the method for fixing the precast concrete panel, in the case that gave rise to elongation and tensile linear steel material from both sides, a resin coating, slip against the concrete It is possible to expand without applying a large load. Such a configuration has the advantage that the number of parts is small and the structure is simple.
Further, at a position eccentric to the surface side than the central position of the thickness of the concrete layer, in advance in a state where the tensile stress was applied, the linear steel material of the steel rod or steel wire strands or the like along surfaces arranged linear In the case where the warp deformation with the surface of the precast concrete plate being convex is corrected by the restoring shrinkage force of the steel material, the tension force f of the linear steel material is corrected in balance with the warp deformation, Become.
[0037]
Even if it is in a deformed precast concrete plate provided with a surface decorative material on the surface and having a center of gravity located outside the plate, a steel rod or a steel stranded wire, etc. The linear steel material is arranged along the surface direction, and after the concrete layer is hardened or dried, it is applied with tensile stress at both ends, and both ends are fixed to the precast concrete plate to restore it. In the method of correcting the warp deformation with the surface of the precast concrete plate as a convex surface by the shrinkage force, by applying tension (extension stress) to the linear steel material held outside the plate, The warp deformation caused by drying shrinkage of the concrete can be canceled by the action of the restoring shrinkage force, and the precast concrete plate can be flattened.
[Brief description of the drawings]
FIG. 1 shows the principle of the first means of the present invention, (A) shows the warp deformation on the surface side occurring in the precast concrete slab 1, (B) shows the tension force f according to the present invention, ) Shows the straightened state of the precast concrete slab 1.
FIG. 2 shows a design example of the precast concrete slab 1 of the present invention, where (A) is a plan view and (B) is a longitudinal side view.
FIG. 3 is an explanatory view showing a manufacturing process of the precast concrete plate 1;
4 is a longitudinal side view showing an example of means for applying a tension force f to the steel rod 6. FIG.
FIG. 5 is a longitudinal side view of the same in a configuration in which a steel rod 6 is provided with a resin coating 35;
6 shows a configuration in which a steel bar 6 is applied to a deformed precast concrete slab 1 ′ having a U-shaped cross section, (A) is a plan view, (B) is a longitudinal side view, and (C) is a front view.
FIG. 7 shows the principle of the second means of the present invention, (A) shows the tension force f according to the present invention, and (B) shows the straightened state of the precast concrete plate 1.
[Explanation of symbols]
1,1 'Precast concrete plate 2 Surface decorative material 3 Concrete layer 6 Steel rod 30 Sheath tube 35 Resin coating

Claims (2)

表面化粧材を表面に備え、重心が版外に位置する異形プレキャストコンクリート版にあって、重心位置よりも表面側に偏心した版外の位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、コンクリート層が硬化した後、又は乾燥する前に、線状鋼材の両端に伸張応力を付与して、該両端をプレキャストコンクリート版に固定することにより、その復元収縮力により、プレキャストコンクリート版の表面を凸面とする反り変形を矯正するようにしたことを特徴とするプレキャストコンクリート版の反り変形抑制方法。  In a deformed precast concrete slab with a surface decorative material on the surface and the center of gravity located outside the plate, a linear steel material such as a steel bar or steel strand wire is placed on the outside of the plate that is eccentric to the surface side of the center of gravity. After the concrete layer is hardened or dried, it is stretched along the surface direction and applied to both ends of the linear steel material to fix the both ends to the precast concrete plate, thereby restoring its shrinkage. A method for suppressing warp deformation of a precast concrete plate, wherein the warp deformation in which the surface of the precast concrete plate is convex is corrected by force. 表面化粧材を表面に備え、重心が版外に位置する断面コ字状をなす異形プレキャストコンクリート版にあって、断面コ字状内で、重心位置よりも表面側に偏心した版外の位置に、鋼棒または鋼撚り線等の線状鋼材を面方向に沿って配設し、軸承けで版の裏面に支持するようにした請求項1記載のプレキャストコンクリート版の反り変形抑制方法。A deformed precast concrete slab with a surface decorative material on the surface and a center of gravity located outside the plate, and in a deformed precast concrete slab. 2. A method for suppressing warpage deformation of a precast concrete plate according to claim 1, wherein a linear steel material such as a steel bar or a steel stranded wire is disposed along the surface direction and supported on the back surface of the plate by a bearing.
JP2002131869A 2002-05-07 2002-05-07 Method for suppressing warpage deformation of precast concrete plate Expired - Fee Related JP4160773B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002131869A JP4160773B2 (en) 2002-05-07 2002-05-07 Method for suppressing warpage deformation of precast concrete plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002131869A JP4160773B2 (en) 2002-05-07 2002-05-07 Method for suppressing warpage deformation of precast concrete plate

Publications (2)

Publication Number Publication Date
JP2003320519A JP2003320519A (en) 2003-11-11
JP4160773B2 true JP4160773B2 (en) 2008-10-08

Family

ID=29544308

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002131869A Expired - Fee Related JP4160773B2 (en) 2002-05-07 2002-05-07 Method for suppressing warpage deformation of precast concrete plate

Country Status (1)

Country Link
JP (1) JP4160773B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2024002770A (en) * 2022-06-24 2024-01-11 大和ハウス工業株式会社 architectural panels

Also Published As

Publication number Publication date
JP2003320519A (en) 2003-11-11

Similar Documents

Publication Publication Date Title
US6381912B1 (en) Apparatus and method for sealing an intermediate anchor of a post-tension anchor system
US10640977B2 (en) Concrete structure using reinforcing panel including embedded reinforcing grid and method of repairing and reinforcing the same
US5701707A (en) Bonded slab post-tension system
PT706502E (en) METHODAL FIBER BODY COMPOSITION FOR FOLDING AN ELEMENT IN BETA ELEMENTS OBTAINED AND THERMAL HEALING PROCESS
CN106436569A (en) Prestressed bridge surface connection device and prefabrication method and construction method thereof
CA3005009C (en) System and method for embedding substrate in concrete structure
CN102936965B (en) Method for strengthening reinforced concrete beam through distributed external prestressing cables
JP4160773B2 (en) Method for suppressing warpage deformation of precast concrete plate
KR100613592B1 (en) Repair / reinforcement of cracks in concrete structures using stainless steel wire mesh
CN111042437A (en) Semi-prefabricated FRP (fiber reinforced plastic) reinforced concrete ductile simply-supported beam and preparation method thereof
KR20160027360A (en) Construction method for outside insulating concrete structure
KR200285198Y1 (en) Carbon fiber sheet concrete form for improvting earthquake-proof efficiency
JP2005097882A (en) Thickening and peeling prevention combined construction method
JP3878096B2 (en) Reinforced concrete members
EP3719229A1 (en) Concrete floor panel, method of production of such panel and floor made of this panel
JP3845404B2 (en) Cross-section repair and peeling prevention combined construction method
JP3953374B2 (en) Concrete structures
RU2184195C1 (en) Sandwich slab of low vaults and method for its manufacture
CN220167223U (en) Prefabricated bare concrete non-structural filling wall
CN110700618A (en) A construction method for building prestressed reinforcement
CN202925711U (en) Brick masonry wall additionally provided with ring beam
RU2125143C1 (en) Wall panel
JP4085726B2 (en) Reinforcement method for existing structures
JPH0219453Y2 (en)
JPH05192918A (en) Prestressed concrete panel and production thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050404

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080225

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080422

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080627

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080718

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110725

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110725

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140725

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees