Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4161303B2 - Image management server - Google Patents
[go: Go Back, main page]

JP4161303B2 - Image management server - Google Patents

Image management server Download PDF

Info

Publication number
JP4161303B2
JP4161303B2 JP2003004415A JP2003004415A JP4161303B2 JP 4161303 B2 JP4161303 B2 JP 4161303B2 JP 2003004415 A JP2003004415 A JP 2003004415A JP 2003004415 A JP2003004415 A JP 2003004415A JP 4161303 B2 JP4161303 B2 JP 4161303B2
Authority
JP
Japan
Prior art keywords
image
construction
user
images
management server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003004415A
Other languages
Japanese (ja)
Other versions
JP2004220166A (en
Inventor
紘一 笠井
泰 西山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Corp
Original Assignee
Fujifilm Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujifilm Corp filed Critical Fujifilm Corp
Priority to JP2003004415A priority Critical patent/JP4161303B2/en
Publication of JP2004220166A publication Critical patent/JP2004220166A/en
Application granted granted Critical
Publication of JP4161303B2 publication Critical patent/JP4161303B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Television Signal Processing For Recording (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Processing Or Creating Images (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は画像管理サーバに係り、特に工事写真画像の保管に好適な画像管理サーバに関する。
【0002】
【従来の技術】
この種の画像管理サーバとしては、ユーザ1人当たりに割り当てる記憶容量に容量制限(例えば、10MB)を設け、アップロードされたユーザの画像を無償又は有償で保管し、各ユーザに対してはユーザIDとパスワードによって画像管理サーバにログインできるようにし、いつでもアップロードされた画像の閲覧が可能なサービスを提供するものがある。
【0003】
また、特許文献1に記載の個人画像保管方法は、ラボ等でフイルム現像及び電子画像化したユーザの画像を一時保管サーバに保管し、ここで一定期間(例えば30日間)保管し、一方、一時保管サーバに保管中の画像から恒久保管する画像をユーザに選択させ、その選択した画像を恒久保管サーバに移動させ、ここで長期間にわたって安全かつ確実に保管するとともに、ユーザに自己の画像を閲覧させるようにしている。
【0004】
また、画像保管の料金体系としては、恒久保管サーバに保管された画像数に応じて課金する例が挙げられている。
【0005】
【特許文献1】
特開2002−183035
【0006】
【発明が解決しようとする課題】
ところで、保管サーバを利用する際に、保管容量に容量制限が課せられていると、一時期に多数の画像を保管することができないという問題がある。
【0007】
一方、特許文献1に記載のように恒久保管サーバに保管された画像数に応じて課金して保管する場合には、保管する画像の枚数に制限が課せられないが、多数枚の画像を恒久保管サーバに移転させると、画像保管料が過大となり、ユーザの負担が大きくなるという問題がある。
【0008】
本発明はこのような事情に鑑みてなされたもので、ユーザ1人当たりの保管容量に容量制限を課さないことで多数の画像を保管することができ、また、一時期に多数の画像を保管してもユーザの画像保管料の増大を低減することができるとともに、サーバ運営事業者の運営設備コストの大幅な増大を招かないようにすることができる画像管理サーバを提供することを目的とする。
【0009】
【課題を解決するための手段】
前記目的を達成するために請求項1に係る発明は、ユーザ又は仲介者の端末機からアップロードされたユーザの画像を画像データベースでユーザ1人当たりの保管容量に容量制限を課さずに保管し、画像保管料をユーザに請求するための画像管理サーバにおいて、前記アップロードされた画像1枚ごとに登録日時及び削除日時を管理する登録情報データベースと、前記端末機からユーザの画像がアップロードされると、該アップロードされた画像の登録日時を前記登録情報データベースに登録し、前記端末機からユーザの画像を削除する指示を受入すると、前記画像データベースから対応する画像を削除するとともに、該画像の削除日時を前記登録情報データベースに登録する制御手段と、前記登録情報データベースに登録された各ユーザの画像の登録日時及び削除日時に基づいて各ユーザの画像の日単位の保管枚数を求めるとともに該日単位の保管枚数の保管期間中の累積枚数を求め、この累積枚数に1日1枚当たりの保管料を乗算することによってユーザに請求する画像保管料を算出する課金処理手段と、前記端末機からのサーバ利用状況の確認要求を受入すると、前記課金処理手段によって算出される画像保管料の日々の推移を含む利用状況を示す利用状況確認画面を作成し、該利用状況確認画面を送信する手段と、を備えたことを特徴としている。
【0010】
即ち、請求項1に係る発明は、保管する画像数に応じて課金するが、保管している又は保管していた各画像の日単位の保管期間(日単位)を考慮し、ユーザの画像の日単位の保管枚数を求めるとともに、この日単位の保管枚数の保管期間中の累積枚数を求め、この累積枚数に1日1枚当たりの保管料を乗算することによって画像保管料を算出し、ユーザに課金するようにしている。
【0011】
従って、ユーザは、保管枚数(ユーザ1人当たりの容量)の制限を受けずに所望の枚数の画像保管ができ、また、一時期に多数の画像を保管しても保管期間を短くすることで、画像保管料の増大を低減することができる。特に、各ユーザは、画像保管料の日々の推移を含む利用状況を確認することができ、これにより画像保管料が過大にならないように画像の登録、削除等を適正に行うことができる。一方、個々のユーザの保管枚数には変動があっても、各ユーザの保管枚数の総量は平均化され、サーバで保管する画像数が累積的に多くなることがなく、サーバ運営事業者の運営設備コストが大幅に増大することがない。
【0012】
請求項2に示すように前記課金処理手段は、前記画像保管料を月単位で集計することを特徴としている。
【0014】
請求項に示すように前記ユーザは建設工事を受注した受注者であり、前記アップロードされる画像は受注した建設工事の進捗状況等を示す工事写真画像であることを特徴としている。この種の工事写真画像は、工事が終了して工事写真台帳を含む工事の完成報告書の作成が終了すると不要になるため、もともとサーバに恒久的に保存する必要がなく、一方、工事中には多くの工事写真画像を撮影しなければならない場合があり、本発明に係る画像管理サーバで管理する画像としては好適な画像である。
また、請求項4に示すように前記課金処理手段は、前記登録情報データベースに登録された各ユーザの画像の日単位の登録枚数及び削除枚数をカウントし、その際、前記登録枚数のカウントは、前記登録情報データベースに登録された各ユーザの画像の登録日時の日付でカウントするとともに、前記削除枚数のカウントは、登録情報データベースに登録された各ユーザの画像の削除日時の日付の翌日でカウントし、更に、前記登録枚数の累計から前記削除枚数の累計を日単位で減算することによって、各ユーザの画像の日単位の保管枚数を求めることを特徴とする。
【0015】
【発明の実施の形態】
以下、添付図面に従って本発明に係る画像管理サーバの好ましい実施の形態について詳説する。
【0016】
図1は本発明に係る画像管理サーバを含む画像管理システムの実施の形態を示す全体構成図である。同図に示す画像管理システムは、国や地方公共団体から建設工事を受注した建設業者が、建設CALSに適用した電子化された完成報告書に添付する、工事の進捗状況を示す工事写真画像の電子アルバムの作成を支援するためのシステムであり、公共工事を受注した建設業者10A,10B,10Cの端末機(受注者端末機)10と、各建設業者10A,10B,10Cの取引先のカメラ店20A,20B,20Cと、各カメラ店20A,20B,20C、図示しないコンビニエンスストアなどの取次店から写真フイルムや画像が記録されたメモリカード等の電子記録媒体を集荷し、写真プリントやCD等の製品を配送する総合ラボ30と、サーバ運営事業者が運営している画像管理サーバ40と、建設工事を発注した発注者50Aの端末機(発注者端末機)50とから構成されている。
【0017】
各建設業者10A,10B,10Cの受注者端末機10は、ネットワークに接続可能な汎用のパーソナルコンピュータであり、本システム用の特別なソフトを必要としない。尚、工事写真画像を使用して国土交通省等の発注者によって決まっているフォーマットに沿った工事写真台帳を作成するための編集ソフトは市販されているため、建設業者は必要に応じて受注者端末機10にインストールし、これを活用することができる。
【0018】
カメラ店20A,20B,20Cは、それぞれパターンA,B,Cのサービスを行う店である。パターンAのサービスを行うカメラ店20Aは、アナログ・ミニラボ機が設置されている店であり、自店ではフイルム現像及びアナログプリントを行う。一方、建設業者10Aから工事写真画像が記録されたCD業務用の作成の注文を受けた場合には、銀塩カメラ又はデジタルカメラで工事現場が撮影されたフイルム又はメモリカード等の電子記録媒体を預かり、CD作成とそのCDに記録された工事写真画像の画像管理サーバ40へのアップロードを総合ラボ30に委託する。
【0019】
総合ラボ30は、各地のこの種のカメラ店20A、コンビニエンスストア等の取次店からフイルムや電子記録媒体を集荷し、フイルム現像、写真プリント等を行うとともに、CD作成及び工事写真画像の画像管理サーバ40へのアップロードを行い、作成したCD等の製品を取次店に配送する。
【0020】
ここで、CD業務用は、工事写真画像がCD−Rに記録されるとともに、その工事写真画像をパソコンで閲覧するためのビューアソフトが記録されており、このビューアソフトは、工事写真画像のサムネイル画像と、その工事写真画像中から黒板(矩形の緑色の領域)を自動抽出し、これを拡大した黒板画像とを合わせて表示する黒板抽出機能を有している。また、CD業務用には、CD固有の識別情報(CD−ID)が付されており、このCD−IDは、画像管理サーバ40での工事写真画像の管理に利用される。更に、CD−IDが付されたCD業務用は、工事写真画像の原本としての機能をもつとともに、不用意に工事写真画像を消去してしまった場合のバックアップとなり、建設業者は、原本保全のバックアップ作業から開放されるとともに、漏れがなく信頼性の高い成果品が得られる。
【0021】
パターンBのサービスを行うカメラ店20Bは、デジタル・ミニラボ機及びCD−Rへの書込みが可能なパソコン等のCD作成装置が設置されている店であり、自店ではフイルム現像及びデジタルプリントを行うとともに、建設業者10Bから工事写真画像が記録されたCD業務用の作成の注文を受けた場合には、銀塩カメラ又はデジタルカメラで工事現場が撮影されたフイルム又はメモリカード等の電子記録媒体からCD業務用をCD作成装置によって作成する。そして、CD業務用を総合ラボ30に集配して貰うことで、CD業務用に記録された工事写真画像の画像管理サーバ40へのアップロードのみを総合ラボ30に委託する。尚、CD業務用は、総合ラボ30等から購入したCD盤に画像データ等を書き込むことで作成される。
【0022】
パターンCのサービスを行うカメラ店20Cは、デジタル・ミニラボ機、画像管理サーバ40へのアップロードソフトを備えた端末機20、及びCD作成装置が設置されている店であり、自店でフイルム現像及びデジタルプリントを行うとともに、建設業者10Cから工事写真画像が記録されたCD業務用の作成の注文を受けた場合には、銀塩カメラ又はデジタルカメラで工事現場が撮影されたフイルム又はメモリカード等の電子記録媒体からCD業務用をCD作成装置によって作成し、また、そのCD業務用に記録された工事写真画像を端末機20から画像管理サーバ40にアップロードする。
【0023】
ここで、建設業者が本システムを利用するために負担する価格の一例としては、CD業務用として500円/CD1枚・フイルム本又はメディア個毎(希望小売価格)、工事写真画像のアップロード料として300円/CD1枚、画像管理サーバ40での保管料として1円/日・枚が考えられるが、本発明はこれに限定されない。尚、画像管理サーバ40での画像保管料の詳細については、後述する。
【0024】
次に、画像管理サーバ40について説明する。
【0025】
画像管理サーバ40は、総合ラボ30又はカメラ店20Cの端末機20を介してアップロードされた建設業者の工事写真画像を保管するとともに、建設業者10A、10B、10Cの受注者端末機10を通じて建設業者が自分の工事写真画像の整理、活用を可能にし、また、建設業者から画像保管料を徴収するための課金処理等を行うもので、図2に示すように主としてHTTP(Hypertext Transfer Protocol) 通信部41と、制御部42と、課金処理部43と、工事写真画像を保存管理する画像データベース44と、建設業者等の各種のユーザの識別情報(ユーザID)、パスワード、及び住所、氏名(名称)等のユーザ情報を管理するユーザ情報データベース45と、アップロードされた工事写真画像の登録日時、削除日時等を管理する登録情報データベース46とから構成されている。
【0026】
制御部42は、画像管理サーバ40内の各部を統括、制御するもので、ブラウザを用いる閲覧ソフト、管理ソフト等を含み、HTTP通信部41を介してCD業務用の工事写真画像がアップロードされると、これをCD−IDに関連付けて画像データベース44に保存したり、受注者端末機10からの指示により登録した工事写真画像の整理、削除、ダウンロード、ユーザによる工事写真画像の閲覧、サーバの利用状況の確認を可能にしたり、工事写真画像の登録日時、削除日時の履歴を登録情報データベース46に残し、ユーザごとの登録枚数の管理等を行う。
【0027】
課金処理部43は、画像データベース44で保管している工事写真画像の保管料を、各建設業者ごとに月単位で集計するもので、建設業者の工事写真画像の日単位の保管枚数を求めるとともに、各日単位の保管枚数の1カ月間の累積枚数を求め、この累積枚数に1日1枚当たりの保管料(この実施の形態では、1円/日・枚)を乗算することによって各建設業者に請求する画像保管料を算出する。
【0028】
また、制御部42は、受注者端末機10からHTTP通信部41を介してサーバ利用状況の確認要求を受入すると、課金処理部43によって算出される画像保管料の日々の推移を含む利用状況を示す利用状況確認画面を作成し、この利用状況確認画面をHTTP通信部41から受注者端末機10に送信する。
【0029】
一方、各建設業者10A、10B、10Cは、自己の工事写真画像を画像管理サーバ40にアップロードした総合ラボ30やカメラ店20Cから建設業者を特定するための識別情報(受注者ID)やパスワードが通知される。
【0030】
また、建設工事を発注した発注者50Aは、発注者を特定する固有の識別情報(発注者ID)を貰うことで、発注者端末機50から画像管理サーバ40にログインすることができ、自己が発注した工事の工事写真画像を閲覧することができるようになっている。
【0031】
次に、図3乃至図6を用いて建設業者等による画像管理サーバ40の活用方法について説明する。
【0032】
図3において、建設業者は、受注者端末機10のインターネット上のホームページ閲覧機能を使用し、画像管理サーバ40のホームページにアクセスする。そして、予め付与されている受注者ID及びパスワードを入力することによりログインする(ステップS10)。画像管理サーバ40は、受注者ID及びパスワードの確認が済むと、受注者端末機10にメニュー画面を表示させ、本サービスの利用が可能な状態にする(ステップS12)。
【0033】
メニュー画面中には、画像閲覧、画像一括削除、閲覧権限設定、及び利用状況確認の4つのメニューがあり、受注者端末機10により所望のメニューの選択を行うことができる。画像閲覧メニューが選択されると、受注者端末機10のモニタ画面上には画像閲覧画面が表示され、この画面上でアップロードした工事写真画像の閲覧、整理、ダウンロード等を行うことができ(ステップS14)、画像一括削除メニューが選択されると、画像一括削除画面が表示され、この画面上で後述するフォルダ単位で画像を削除することができる(ステップS16)。
【0034】
また、閲覧権限設定メニューが選択されると、閲覧権限設定画面が表示され、この画面上で自己の工事写真画像を工事発注者等に閲覧させる権限の付与(発注者ID等の発行)を行うことができ(ステップS18)、利用状況確認メニューが選択されると、利用状況確認画面が表示され、この画面上で画像管理サーバ40で管理されている自己の工事写真画像の利用状況(サーバ保管料)等を確認することができる(ステップS20)。
【0035】
次に、画像管理サーバ40にアップロードされた工事写真画像の閲覧、整理、ダウンロード等の作業や処理内容について説明する。
【0036】
図4は画像閲覧画面の一例を示しており、画面左側にフォルダツリーが表示され、画面右側にフォルダツリーから選択したフォルダ内の工事写真画像の一覧(インデックス画像)が表示されている。同図に示すように、このシステムの論理フォルダは、フォルダツリーに示すように未整理フォルダ60、不要フォルダ61、及び工事フォルダ62の3タイプが存在し、アップロードされた工事写真画像は、それぞれ以下の階層に存在する。
【0037】
まず、画像管理サーバ40にCD作業用の1枚ごとにアップロードされた工事写真画像は、未整理フォルダ60に格納される。未整理フォルダ60は、CD作業用のCD−IDをフォルダ名とするフォルダと、CD作業用に記録された写真フイルムのフイルムIDをフォルダ名とするフォルダとの2階層のフォルダ構造を有しており、登録時にCD単位+フイルム単位で自動的に作成される。尚、図4に示す実施の形態では、フイルムの工事写真画像をCD作業用に記録した場合に関して示しているが、メモリカード等の電子記録媒体の工事写真画像をCD作業用に記録した場合には、フイルムIDをフォルダ名とするフォルダの階層は存在しない。
【0038】
不要フォルダ61は階層がなく、この不要フォルダ61には、未整理フォルダ60や工事フォルダ62内の工事写真画像のうちの不要な工事写真画像が移動させられる。
【0039】
工事フォルダ62は、受注者が任意の工事名等のフォルダ名を付けて作成されるもので、1工事1フォルダで作成される。工事フォルダ62を新規に作成する場合には、新規フォルダを選択するとともに工事名を入力し、追加ボタンをクリックすることにより、工事名をフォルダ名とする新規の工事フォルダ62が作成される。この工事フォルダ62は階層がなく、例えば、1工事内で工程ごとにフォルダを作成したい場合には、工事名+工程名でフォルダを作成する必要がある。
【0040】
尚、図4に示すように画像一覧画面で操作可能な論理フォルダは、受注者ID及びパスワードの入力によってログインした受注者に関連するフォルダだけであることは言うまでもない。
【0041】
次に、未整理フォルダ60内の工事写真画像を不要フォルダ61や工事フォルダ62に移動させて整理する方法について説明する。
【0042】
図4に示す画像一覧画面には、未整理フォルダ60中のCD−ID(902314608)をフォルダ名とする未整理フォルダ内の工事写真画像のインデックス画像が表示されている。尚、インデックス画像中の各画像には、「移動する」、「ダウンロード」のチェックボックスが同時に表示されている。ここで、インデックス画像のうちの適宜の工事写真画像を不要フォルダ61や工事フォルダ62に移動させる場合には、インデックス画像とともに表示されている「移動する」のチェックボックスにチェックを入れ、移動を希望する工事写真画像を選択し、続いて、移動先フォルダを選択する。
【0043】
移動先フォルダの選択は、移動先フォルダ選択部63の「▼」ボタン63Aを押してプルダウンメニューを表示させ、このプルダウンメニューに表示された移動先フォルダ(不要フォルダ61や予め作成した工事フォルダ62)から所望の移動先フォルダをクリックすることによって行う。尚、図4に示す実施の形態では、移動フォルダとして、「○○○地区支線12号道路改良工事」の工事名が付された工事フォルダが選択されている場合に関して示している。
【0044】
上記のようにして移動先フォルダを選択した後、移動先フォルダ選択部63の「移動」ボタン63Bをクリックすることにより、インデックス画像中の移動を希望する画像を前記選択した移動先フォルダに移動させることができる。
【0045】
次に、未整理フォルダ60や工事フォルダ62に格納された工事写真画像を削除する場合について説明する。
【0046】
この場合には、前述した方法により未整理フォルダ60や工事フォルダ62に格納された工事写真画像から不要な工事写真画像を不要フォルダ61に移動させる。続いて、不要フォルダ61をクリックして不要フォルダ一覧画面を表示させる。この不要フォルダ一覧画面には、不要フォルダ61内に移動させられた工事写真画像のインデックス画像等が表示される。この不要フォルダ一覧画面上で削除する画像を個別に指定し、削除を実行させることにより工事写真画像を削除することができる。
【0047】
また、フォルダ単位で工事写真画像を削除することもできる。この場合、メニュー画面上で画像一括削除メニューを選択し、画像一括削除画面を表示させる。この画像一括削除画面には、図4に示したフォルダツリー等が表示されており、ここで削除を希望するフォルダを選択する。そして、「削除」ボタンを押して削除動作を実行させることにより、フォルダ単位で工事写真画像を削除することができる。
【0048】
尚、画像管理サーバ40は、画像一覧のインデックス画像の表示機能の他に、個別画像の詳細表示(大画像+黒板抽出画像)等の表示機能を有しており、建設業者は、自己の工事写真画像の移動や削除時に上記表示機能を適宜利用することができる。
【0049】
次に、整理済の工事フォルダ62内の工事写真画像を受注者端末機10にダウンロードする場合について説明する。
【0050】
この場合、図4に示す画像一覧画面上で、例えば工事写真画像の整理済の工事フォルダ62を選択し、その工事フォルダ62内の工事写真画像のインデックス画像を表示させる。続いて、インデックス画像とともに表示されている「ダウンロード」のチェックボックスにチェックを入れ、ダウンロードを希望する画像を選択する。次に、「ダウンロード」ボタン64をクリックし、ダウンロード候補一覧画面を表示させ、このダウンロード候補一覧画面でダウンロードする工事写真画像を再度確認した後、ダウンロードの実行ボタンを押すことにより、受注者端末機10の所定のフォルダに工事写真画像をダウンロードすることができる。
【0051】
図5は画像管理サーバ40にアップロード(登録)された工事写真画像の整理、削除等の流れを示す図である。
【0052】
同図に示すように登録が完了した工事写真画像は、一旦、未整理フォルダに格納される。未整理フォルダ内の工事写真画像は、工事名が付された工事フォルダや不要フォルダに移動させられる。尚、未整理フォルダ、工事フォルダ、及び不要フォルダの3タイプのフォルダ内の工事写真画像は、各フォルダ間で相互に移動させることができる。
【0053】
そして、工事フォルダ内の工事写真画像は、ダウンロード指定を行うことによって受注者端末機10にダウンロードさせることができ、また、不要フォルダ内の工事写真画像は、個々の工事写真画像別に削除することができる。
【0054】
次に、建設工事を発注した発注者50Aに、その建設工事の工事写真画像を閲覧するための発注者IDを発行する手順について説明する。
【0055】
受注者端末機10を使用して画像管理サーバ40にログインした建設業者は、メニュー画面上で閲覧権限設定メニューを選択し、受注者端末機10の画面上に閲覧権限設定画面を表示させる。そして、閲覧権限設定画面上で、閲覧権限を設定するユーザ(発注者)の発注者名、発注者ID、パスワード等の情報を入力し、これを画像管理サーバ40に通知する。この通知を受信した画像管理サーバ40側では、図6に示すように建設業者が画像管理サーバ40を活用して作成した工事フォルダの一覧を表示させる。
【0056】
建設業者はこの工事フォルダ一覧の画面上で、閲覧を許可する工事フォルダにチェックを入れることで、前記閲覧権限を設定した発注者が閲覧可能な工事フォルダを選択し、その後、閲覧権限設定画面上の「決定」ボタン64を押す。これにより、前記閲覧権限が設定された発注者が閲覧できる工事フォルダの情報が画像管理サーバ40に通知され、画像管理サーバ40は、前記閲覧権限を設定した発注者の発注者ID、パスワード等を含む発注者情報と、その発注者が閲覧可能な工事フォルダとを関連付けてユーザ情報データベース45で管理する。
【0057】
一方、建設業者は、上記のようにして閲覧権限を設定した発注者の発注者ID、パスワードを発注者に通知する。この通知を受けた発注者は、発注者ID、パスワードを使用して発注者端末機50から画像管理サーバ40にログインすることができ、自己が発注した建設工事の工事写真画像を閲覧することができる。
【0058】
尚、この実施の形態では、建設業者(受注者)が発注者に対して発注者IDを発行し、該発注者が発注した建設工事の工事写真画像が格納された工事フォルダ内の工事写真画像を閲覧する権限を付与するようにしたが、これに限らず、建設工事の下請け業者、設計事務所、オンブズマン等の建設工事に関わる他の第三者に対してユーザIDを発行させるようにしてもよい。また、下請け業者等のユーザに対しては閲覧する権限以外に、工事写真画像の整理やダウンロードする権限を付与することもできる。
【0059】
次に、画像管理サーバ40の利用状況の確認方法及び利用状況に応じた画像保管料の算出方法について説明する。
【0060】
図2に示す画像管理サーバ40の制御部42は、各建設業者の工事写真画像がアップロードされると、アップロードされた各工事写真画像ごとに登録日時を登録情報データベース46に格納し、また、画像単位又はフォルダ単位で工事写真画像が削除されると、各工事写真画像ごとに削除日時を登録情報データベース46に格納する。
【0061】
また、制御部42は、画像データベース44に保存され又は削除される建設業者ごとの工事写真画像の登録枚数又は削除枚数をカウントする。ここで、登録枚数のカウントは、前記登録情報データベース46で管理されている登録日時の日付でカウントし、削除枚数のカウントは、前記登録情報データベース46で管理されている削除日時の翌日の日付でカウントする。従って、一度登録された工事写真画像は、直ちに削除しても最低1日分カウントされることになる。
【0062】
そして、上記のようにして工事写真画像が登録される毎にカウントされる登録枚数の累計から、工事写真画像を削除する毎にカウントされる削除枚数の累計を減算することにより日々の蓄積数を算出する。このようにして算出された登録枚数、削除枚数、及び積数は、登録情報データベース46に格納されて管理される。
【0063】
ここで、建設業者が受注者端末機10により画像管理サーバ40の利用状況を確認する場合には、メニュー画面から利用状況確認メニューを選択し、利用状況確認画面を表示させる。この利用状況確認画面は、画像管理サーバ40が作成し、これを受注者端末機10に配信することによって表示される。
【0064】
図7は受注者端末機10に表示される利用状況確認画面の一例を示す図であり、この利用状況確認画面は、任意の年月(この実施の形態では、2002年9月)の月単位の詳細な利用状況を示している。
【0065】
即ち、図7に示すように利用状況確認画面には、その月1日〜末日までの間にカウントされた登録枚数、削除枚数、日々の蓄積数、及び蓄積数グラフ、及び日々の蓄積累計が表示される。また、その月末日の蓄積累計に1日1枚当たりの保管料(この実施の形態では、1円/日・枚)を乗算することによって建設業者に請求する月単位の画像保管料が算出され、これも同時に表示される。
【0066】
また、利用状況の表示は、任意の年月の月単位の詳細な利用状況の表示の他に、現在の登録枚数、当月の累計登録枚数、画像保管料等の表示も行うことができる。尚、画像保管料は、上記のようにして算出される画像保管料に対して更に月又は年単位の基本料金を加算するようにしてもよい。
【0067】
この実施の形態では、工事写真画像の画像管理等について説明したが、本発明は工事写真画像に限らず、例えば報道写真画像の画像管理等にも適用できる。
【0068】
【発明の効果】
以上説明したように本発明によれば、ユーザ1人当たりの保管容量に容量制限を課さないため、ユーザが希望すれば多くの枚数を保管することができ、また、一時期に多数の画像を保管しても、不要な画像を早めに整理して削除するようにすれば、画像保管料の大幅な増大を招くことがなく、ユーザの負担を軽減することができる。特に、各ユーザは、画像保管料の日々の推移を含む利用状況を確認することができ、これにより画像保管料が過大にならないように画像の登録、削除等を適正に行うことができる。更に、個々のユーザの保管枚数に変動があっても、各ユーザの保管枚数の総量は平均化されるため、サーバで保管する画像数が累積的に多くなることがなく、サーバ運営事業者の運営設備コストが大幅に増大することがない。
【図面の簡単な説明】
【図1】本発明に係る画像管理サーバを含む画像管理システムの実施の形態を示す全体構成図
【図2】画像管理サーバの概略構成を示すブロック図
【図3】建設業者が画像管理サーバを活用する際の流れを示す図
【図4】受注者端末機に表示される画像閲覧画面の一例を示す図
【図5】画像管理サーバにアップロードされた工事写真画像の整理、削除等の流れを示す図
【図6】受注者端末機に表示される閲覧権限設定画面の一例を示す図
【図7】受注者端末機に表示される利用状況確認画面の一例を示す図
【符号の説明】
10…受注者端末機、10A、10B、10C…建設業者、20…端末機、20A、20B、20C…カメラ店、30…総合ラボ、40…画像管理サーバ、41…HTTP通信部、42…制御部、43…課金処理部、44…画像データベース、45…ユーザ情報データベース、46…登録情報データベース、50…発注者端末機、60…未整理フォルダ、61…不要フォルダ、62…工事フォルダ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an image management server, and more particularly to an image management server suitable for storing construction photograph images.
[0002]
[Prior art]
As this type of image management server, the storage capacity allocated per user is limited (for example, 10 MB), and uploaded user images are stored for free or for a fee. There is a service that allows a user to log in to an image management server with a password and can view an uploaded image at any time.
[0003]
The personal image storage method described in Patent Document 1 stores a user image that has been film-developed and converted into an electronic image in a laboratory or the like in a temporary storage server, where it is stored for a certain period (for example, 30 days). Let the user select an image to be permanently stored from the images stored in the storage server, move the selected image to the permanent storage server, and store it safely and securely over a long period of time, and view the user's own image I try to let them.
[0004]
In addition, as an image storage fee system, an example of charging according to the number of images stored in the permanent storage server is given.
[0005]
[Patent Document 1]
JP2002-183035
[0006]
[Problems to be solved by the invention]
By the way, when a storage server is used, if the storage capacity is limited, there is a problem that a large number of images cannot be stored at one time.
[0007]
On the other hand, as described in Patent Document 1, when charging and storing according to the number of images stored in the permanent storage server, there is no restriction on the number of images stored, but a large number of images are permanently stored. If it is transferred to the storage server, there is a problem that the image storage fee becomes excessive and the burden on the user increases.
[0008]
The present invention has been made in view of such circumstances, and can store a large number of images without imposing a capacity limit on the storage capacity per user, and can store a large number of images at a time. Another object of the present invention is to provide an image management server that can reduce an increase in the image storage fee of the user and can prevent a significant increase in the operating equipment cost of the server operator.
[0009]
[Means for Solving the Problems]
  In order to achieve the above object, the invention according to claim 1 stores an image of a user uploaded from a terminal of a user or an intermediary in an image database without imposing a capacity limit on the storage capacity per user, In the image management server for charging the storage fee to the user, a registration information database for managing a registration date / time and a deletion date / time for each uploaded image, and when a user's image is uploaded from the terminal, When the registration date and time of an uploaded image is registered in the registration information database and an instruction to delete a user image is received from the terminal, the corresponding image is deleted from the image database, and the deletion date and time of the image is Control means for registering in the registration information database, and each user registered in the registration information database Based on the registration date and deletion date and time of the image, the number of images stored for each user in a day is obtained, and the cumulative number of the daily number of images stored during the storage period is obtained, and this accumulated number is stored per day. Billing processing means for calculating an image storage fee charged to the user by multiplying the fee;Upon receipt of the server usage status confirmation request from the terminal, a usage status confirmation screen is created that indicates the usage status including daily transitions of the image storage fee calculated by the billing processing means. Means for transmitting;It is characterized by having.
[0010]
That is, the invention according to claim 1 charges according to the number of images to be stored, but takes into account the storage period (daily unit) of each image stored or stored, and the user's image. The user obtains the number of daily storages, calculates the cumulative number of storages per day during the storage period, calculates the image storage fee by multiplying this cumulative number by the daily storage fee, and the user To be charged.
[0011]
  Therefore, the user can store a desired number of images without being limited by the number of stored images (capacity per user), and even if a large number of images are stored at a time, the storage period is shortened, An increase in storage fees can be reduced.In particular, each user can confirm the usage status including daily transition of the image storage fee, and thus can appropriately register and delete images so that the image storage fee does not become excessive.On the other hand, even if there are fluctuations in the number of stored individual users, the total number of stored individual users is averaged, and the number of images stored in the server does not increase cumulatively. Equipment costs do not increase significantly.
[0012]
According to a second aspect of the present invention, the billing processing means totals the image storage fee on a monthly basis.
[0014]
  Claim3As shown in FIG. 4, the user is a contractor who has received an order for construction work, and the uploaded image is a construction photograph image showing the progress of the ordered construction work. This kind of construction photo image becomes unnecessary when the construction is completed and the completion report of the construction including the construction photo ledger is finished. In many cases, it is necessary to take a lot of construction photograph images, which is a suitable image as an image managed by the image management server according to the present invention.
  Further, as described in claim 4, the billing processing means counts the number of registered images per day and the number of deleted images of each user registered in the registration information database. While counting the date of registration date of each user's image registered in the registration information database, the number of deleted images is counted on the day following the date of deletion date of each user's image registered in the registration information database. Further, it is characterized in that the daily number of stored images of each user is obtained by subtracting the total number of deleted sheets from the total number of registered sheets.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, a preferred embodiment of an image management server according to the present invention will be described in detail with reference to the accompanying drawings.
[0016]
FIG. 1 is an overall configuration diagram showing an embodiment of an image management system including an image management server according to the present invention. The image management system shown in the figure is a construction photo image showing the progress of construction, which is attached to an electronic completion report applied to construction CALS by a contractor who has received construction work from a national or local government. This is a system for supporting the creation of an electronic album. The terminals (ordering party terminals) 10 of the contractors 10A, 10B, 10C that have received an order for public works, and the cameras of the suppliers of the respective contractors 10A, 10B, 10C Collect electronic recording media such as memory cards with photographic films and images from stores 20A, 20B, and 20C, and camera stores 20A, 20B, and 20C, and convenience stores such as convenience stores (not shown). Terminal 30 of the orderer 50A who ordered the construction work, the general laboratory 30 that delivers the products of the company, the image management server 40 that is operated by the server operator, and the construction work And it is configured from the orderer terminal) 50..
[0017]
The contractor terminal 10 of each of the contractors 10A, 10B, and 10C is a general-purpose personal computer that can be connected to a network, and does not require special software for this system. In addition, since the editing software for creating the construction photo ledger according to the format decided by the orderer such as the Ministry of Land, Infrastructure, Transport and Tourism using the construction photo image is commercially available, the contractor is the contractor as needed. It can be installed in the terminal 10 and utilized.
[0018]
The camera stores 20A, 20B, and 20C are stores that provide services of patterns A, B, and C, respectively. The camera store 20A that provides the pattern A service is a store in which an analog minilab machine is installed, and performs film development and analog printing in its own store. On the other hand, when an order for creation of a CD business in which a construction photo image is recorded is received from the construction company 10A, an electronic recording medium such as a film or a memory card in which the construction site is photographed by a silver salt camera or a digital camera is used. The general laboratory 30 is entrusted to deposit, create a CD, and upload the construction photo image recorded on the CD to the image management server 40.
[0019]
The general lab 30 collects films and electronic recording media from agency stores such as camera stores 20A and convenience stores in various places, performs film development, photo prints, etc., and also creates an image management server for CD creation and construction photo images. Upload to 40 and deliver the created product such as CD to the next store.
[0020]
Here, for commercial use, a construction photo image is recorded on a CD-R, and viewer software for viewing the construction photo image on a personal computer is recorded. This viewer software is a thumbnail of the construction photo image. It has a blackboard extraction function for automatically extracting an image and a blackboard (rectangular green area) from the construction photograph image and displaying the image together with an enlarged blackboard image. Further, identification information (CD-ID) unique to the CD is attached to the CD business, and this CD-ID is used for management of construction photo images in the image management server 40. In addition, the CD business with a CD-ID has a function as an original construction photo image, and also serves as a backup when the construction photo image is inadvertently erased. This frees you from backup work and gives you a reliable product with no leaks.
[0021]
The camera store 20B that provides the pattern B service is a store in which a digital minilab machine and a CD creation device such as a personal computer capable of writing on a CD-R are installed. Film development and digital printing are performed at the store. At the same time, when an order for creation of a CD business in which a construction photograph image is recorded is received from the construction company 10B, it is from an electronic recording medium such as a film or a memory card in which the construction site is photographed with a silver salt camera or a digital camera. CD business use is created by a CD creation device. Then, by collecting and distributing the CD business use to the general laboratory 30, only the upload of the construction photo image recorded for the CD business to the image management server 40 is entrusted to the general laboratory 30. The CD business use is created by writing image data or the like on a CD board purchased from the general laboratory 30 or the like.
[0022]
The camera store 20C that provides the pattern C service is a store in which a digital minilab machine, a terminal device 20 having software for uploading to the image management server 40, and a CD creation device are installed. In addition to performing digital printing and receiving an order from a contractor 10C for creation of a CD job with a construction photo image recorded, such as a film or a memory card in which the construction site is photographed with a silver salt camera or a digital camera CD business use is created from the electronic recording medium by the CD creation device, and the construction photograph image recorded for the CD business is uploaded from the terminal 20 to the image management server 40.
[0023]
Here, as an example of the price that the contractor bears for using this system, it is 500 yen for CD business / 1 CD / film book or media piece (desired retail price), as an uploading fee for construction photo images Although 300 yen / CD and 1 yen / day / sheet as the storage fee in the image management server 40 can be considered, the present invention is not limited to this. Details of the image storage fee in the image management server 40 will be described later.
[0024]
Next, the image management server 40 will be described.
[0025]
The image management server 40 stores the construction photograph image of the construction company uploaded via the terminal 20 of the general lab 30 or the camera shop 20C, and the construction company through the contractor terminals 10 of the construction companies 10A, 10B, and 10C. This system allows users to organize and utilize their own construction photo images, and performs billing processing to collect image storage fees from construction companies. As shown in FIG. 2, the HTTP (Hypertext Transfer Protocol) communication unit 41, control unit 42, billing processing unit 43, image database 44 for storing and managing construction photo images, identification information (user ID) of various users such as construction companies, passwords, addresses, names (names) A user information database 45 that manages user information such as a registration information database that manages the registration date and time and deletion date and time of uploaded construction photo images. 46.
[0026]
The control unit 42 controls and controls each unit in the image management server 40. The control unit 42 includes browsing software using a browser, management software, and the like, and a construction photo image for CD business is uploaded via the HTTP communication unit 41. This is stored in the image database 44 in association with the CD-ID, and the construction photo images registered according to instructions from the contractor terminal 10 are arranged, deleted, downloaded, the construction photo images viewed by the user, and the server is used. The status can be confirmed, and the registration date / deletion date / time history of the construction photo image is left in the registration information database 46 to manage the number of registrations for each user.
[0027]
The billing processing unit 43 aggregates the storage fee of the construction photo images stored in the image database 44 for each construction contractor for each month, and obtains the number of construction photo images stored by the construction contractor on a daily basis. Each construction is obtained by obtaining the cumulative number of storages per day for each day and multiplying this cumulative number by the storage fee per day (in this embodiment, 1 yen / day / sheet). Calculate the image storage fee to be charged to the supplier.
[0028]
Further, when the control unit 42 receives a request for confirming the server usage status from the contractor terminal 10 via the HTTP communication unit 41, the control unit 42 displays the usage status including the daily transition of the image storage fee calculated by the billing processing unit 43. The usage status confirmation screen shown is created, and this usage status confirmation screen is transmitted from the HTTP communication unit 41 to the contractor terminal 10.
[0029]
On the other hand, each of the contractors 10A, 10B, and 10C has identification information (ordering party ID) and password for specifying the contractor from the general laboratory 30 or the camera store 20C that has uploaded its construction photo image to the image management server 40. Be notified.
[0030]
Further, the orderer 50A who ordered the construction work can log in to the image management server 40 from the orderer terminal 50 by receiving unique identification information (orderer ID) for identifying the orderer. It is possible to view the construction photo image of the ordered work.
[0031]
Next, a method for utilizing the image management server 40 by a construction company or the like will be described with reference to FIGS.
[0032]
In FIG. 3, the contractor uses the homepage browsing function on the Internet of the contractor terminal 10 to access the homepage of the image management server 40. Then, the user logs in by inputting a pre-assigned contractor ID and password (step S10). After confirming the contractor ID and password, the image management server 40 displays a menu screen on the contractor terminal 10 so that the service can be used (step S12).
[0033]
In the menu screen, there are four menus of image browsing, image batch deletion, browsing authority setting, and usage status confirmation, and a desired menu can be selected by the contractor terminal 10. When the image browsing menu is selected, an image browsing screen is displayed on the monitor screen of the contractor terminal 10, and the uploaded construction photo images can be viewed, organized, downloaded, etc. on this screen (steps). S14) When the image batch deletion menu is selected, an image batch deletion screen is displayed, and images can be deleted in units of folders to be described later on this screen (step S16).
[0034]
In addition, when the browsing authority setting menu is selected, a browsing authority setting screen is displayed, and on this screen, an authority for allowing the construction orderer to browse his / her construction photo image (granting the orderer ID, etc.) is given. When the usage status confirmation menu is selected, a usage status confirmation screen is displayed. On this screen, the usage status of the own construction photo image managed by the image management server 40 (server storage) is displayed. Fee) etc. can be confirmed (step S20).
[0035]
Next, operations and processing contents such as browsing, organizing, and downloading of construction photo images uploaded to the image management server 40 will be described.
[0036]
FIG. 4 shows an example of an image browsing screen. A folder tree is displayed on the left side of the screen, and a list of construction photo images (index images) in the folder selected from the folder tree is displayed on the right side of the screen. As shown in the figure, there are three types of logical folders in this system, an unorganized folder 60, an unnecessary folder 61, and a construction folder 62, as shown in the folder tree. Exists in the hierarchy.
[0037]
First, the construction photo images uploaded to the image management server 40 for each CD work are stored in the unorganized folder 60. The unorganized folder 60 has a two-level folder structure of a folder whose name is a CD-ID for CD work and a folder whose name is a film ID of a photo film recorded for CD work. And automatically created in units of CD + film at the time of registration. The embodiment shown in FIG. 4 shows the case where a construction photo image of a film is recorded for CD work, but when the construction photo image of an electronic recording medium such as a memory card is recorded for CD work. Does not have a folder hierarchy whose folder name is the film ID.
[0038]
The unnecessary folder 61 has no hierarchy, and unnecessary construction photo images of the construction photo images in the unorganized folder 60 and the construction folder 62 are moved to the unnecessary folder 61.
[0039]
The construction folder 62 is created by the contractor with a folder name such as an arbitrary construction name, and is created in one construction and one folder. When a new construction folder 62 is created, a new construction folder 62 having the construction name as the folder name is created by selecting the new folder, inputting the construction name, and clicking the add button. This construction folder 62 has no hierarchy. For example, when it is desired to create a folder for each process within one construction, it is necessary to create a folder with construction name + process name.
[0040]
Needless to say, as shown in FIG. 4, the logical folder that can be operated on the image list screen is only a folder related to the contractor who has logged in by inputting the contractor ID and password.
[0041]
Next, a method for organizing the construction photo images in the unorganized folder 60 by moving them to the unnecessary folder 61 and the construction folder 62 will be described.
[0042]
In the image list screen shown in FIG. 4, index images of construction photo images in the unorganized folder having the CD-ID (902314608) in the unorganized folder 60 as the folder name are displayed. Note that “moving” and “downloading” check boxes are simultaneously displayed for each image in the index image. Here, when moving an appropriate construction photo image of the index image to the unnecessary folder 61 or the construction folder 62, check the “Move” check box displayed together with the index image, and move it. Select the construction photo image to be selected, and then select the destination folder.
[0043]
The destination folder is selected by pressing the “▼” button 63A of the destination folder selection unit 63 to display a pull-down menu, and from the destination folder (unnecessary folder 61 or construction folder 62 created in advance) displayed in this pull-down menu. This is done by clicking on the desired destination folder. In the embodiment shown in FIG. 4, the case where a construction folder with the construction name “XXX district branch line No. 12 road improvement construction” is selected as the movement folder is shown.
[0044]
  After selecting the destination folder as described above, clicking the “Move” button 63B of the destination folder selection unit 63 makes it desired to move the index image.PaintingThe image can be moved to the selected destination folder.
[0045]
Next, the case where the construction photo image stored in the unorganized folder 60 or the construction folder 62 is deleted will be described.
[0046]
In this case, unnecessary construction photo images are moved from the construction photo images stored in the unorganized folder 60 and the construction folder 62 to the unnecessary folder 61 by the method described above. Subsequently, the unnecessary folder 61 is clicked to display an unnecessary folder list screen. On this unnecessary folder list screen, an index image of the construction photo image moved into the unnecessary folder 61 is displayed. The construction photo image can be deleted by individually specifying the image to be deleted on the unnecessary folder list screen and executing the deletion.
[0047]
It is also possible to delete construction photo images in folder units. In this case, the image batch deletion menu is selected on the menu screen to display the image batch deletion screen. On the image batch deletion screen, the folder tree shown in FIG. 4 is displayed, and a folder desired to be deleted is selected here. Then, by pressing the “delete” button to execute the delete operation, the construction photo image can be deleted in units of folders.
[0048]
The image management server 40 has a display function for displaying individual images in detail (large image + blackboard extracted image) in addition to the display function of the index image of the image list. The above display function can be used as appropriate when moving or deleting a photographic image.
[0049]
Next, the case where the construction photo image in the organized construction folder 62 is downloaded to the contractor terminal 10 will be described.
[0050]
In this case, on the image list screen shown in FIG. 4, for example, a construction folder 62 in which construction photo images are arranged is selected, and an index image of the construction photo images in the construction folder 62 is displayed. Subsequently, the “download” check box displayed together with the index image is checked, and an image desired to be downloaded is selected. Next, the “Download” button 64 is clicked to display a download candidate list screen. After confirming the construction photo image to be downloaded again on this download candidate list screen, the download execution button is pressed, so that the contractor terminal Construction photo images can be downloaded to ten predetermined folders.
[0051]
FIG. 5 is a diagram showing a flow of arrangement, deletion, and the like of construction photo images uploaded (registered) to the image management server 40.
[0052]
As shown in the figure, the completed construction photo image is temporarily stored in an unorganized folder. The construction photo image in the unorganized folder is moved to a construction folder or an unnecessary folder with a construction name. Note that the construction photo images in the three types of folders, the unorganized folder, the construction folder, and the unnecessary folder, can be moved between each folder.
[0053]
The construction photo image in the construction folder can be downloaded to the contractor terminal 10 by performing download designation, and the construction photo image in the unnecessary folder can be deleted for each construction photo image. it can.
[0054]
Next, a procedure for issuing an orderer ID for viewing a construction photo image of the construction work to the orderer 50A who ordered the construction work will be described.
[0055]
The contractor who has logged in to the image management server 40 using the contractor terminal 10 selects the browse authority setting menu on the menu screen and displays the browse authority setting screen on the screen of the contractor terminal 10. Then, information such as the orderer name, orderer ID, password, etc. of the user (orderer) who sets the viewing authority is input on the browsing authority setting screen, and this is notified to the image management server 40. Upon receiving this notification, the image management server 40 displays a list of construction folders created by the construction company using the image management server 40 as shown in FIG.
[0056]
The construction contractor selects a construction folder that can be viewed by the orderer who has set the viewing authority by checking the construction folder permitted to be viewed on the construction folder list screen, and then on the viewing authority setting screen. The “OK” button 64 is pressed. Thereby, the image management server 40 is notified of information on the construction folder that can be browsed by the orderer who is set with the viewing authority, and the image management server 40 obtains the orderer ID, password, etc. of the orderer who has set the viewing authority. The user information database 45 manages the included orderer information and the construction folder viewable by the orderer in association with each other.
[0057]
On the other hand, the construction company notifies the orderer of the orderer ID and password of the orderer who has set the viewing authority as described above. Upon receiving this notification, the orderer can log in to the image management server 40 from the orderer terminal 50 using the orderer ID and password, and can view the construction photo image of the construction work he ordered. it can.
[0058]
In this embodiment, the construction contractor (order receiver) issues an orderer ID to the orderer, and the construction photo image in the construction folder storing the construction photo image of the construction work ordered by the orderer. However, the user ID is issued to other third parties involved in construction work such as subcontractors of construction work, design offices, ombudsmen, etc. Also good. In addition to the authority to browse, users such as subcontractors can be given authority to organize and download construction photo images.
[0059]
Next, a method for confirming the usage status of the image management server 40 and a method for calculating an image storage fee according to the usage status will be described.
[0060]
When the construction photo image of each construction company is uploaded, the control unit 42 of the image management server 40 shown in FIG. 2 stores the registration date and time in the registration information database 46 for each uploaded construction photo image. When the construction photo image is deleted in units or folders, the deletion date and time is stored in the registration information database 46 for each construction photo image.
[0061]
Further, the control unit 42 counts the number of registered or deleted construction photo images for each construction company stored or deleted in the image database 44. Here, the registration number is counted on the date of registration date and time managed in the registration information database 46, and the deletion number is counted on the date following the deletion date and time managed in the registration information database 46. Count. Accordingly, once registered construction photo images are counted for at least one day even if they are immediately deleted.
[0062]
  Then, by subtracting the cumulative number of deletions counted each time the construction photo image is deleted from the total number of registrations counted every time the construction photo image is registered as described above, the daily accumulation number is obtained. calculate. The registration number, deletion number, andAccumulationThe product number is stored and managed in the registration information database 46.
[0063]
Here, when the contractor confirms the usage status of the image management server 40 by the contractor terminal 10, the usage status confirmation menu is selected from the menu screen, and the usage status confirmation screen is displayed. This usage status confirmation screen is created by the image management server 40 and is displayed by distributing it to the contractor terminal 10.
[0064]
FIG. 7 is a diagram showing an example of a usage status confirmation screen displayed on the contractor terminal 10, and this usage status confirmation screen is a monthly unit of an arbitrary year and month (September 2002 in this embodiment). The detailed usage status is shown.
[0065]
That is, as shown in FIG. 7, the usage status confirmation screen includes the registered number, deleted number, daily accumulation number, accumulation number graph, and daily accumulation total counted from the first day to the last day of the month. Is displayed. Also, the monthly image storage fee to be charged to the construction company is calculated by multiplying the accumulated total at the end of the month by the storage fee per day (in this embodiment, 1 yen / day / sheet). This is also displayed at the same time.
[0066]
Further, the usage status can be displayed in addition to the display of the detailed usage status on a monthly basis for any year and month, the current registration number, the cumulative total number of registrations for the current month, the image storage fee, and the like. Note that the image storage fee may be a monthly or yearly basic fee added to the image storage fee calculated as described above.
[0067]
In this embodiment, image management of construction photograph images has been described, but the present invention is not limited to construction photograph images, and can be applied to image management of news photograph images, for example.
[0068]
【The invention's effect】
  As described above, according to the present invention, since there is no limit on the storage capacity per user, a large number of sheets can be stored if the user desires, and a large number of images can be stored at one time. However, if unnecessary images are arranged and deleted early, the image storage fee is not increased significantly, and the burden on the user can be reduced.In particular, each user can confirm the usage status including daily transition of the image storage fee, and thus can appropriately register and delete images so that the image storage fee does not become excessive.Furthermore, even if there is a change in the number of stored individual users, the total number of stored numbers for each user is averaged, so the number of images stored in the server does not increase cumulatively. There is no significant increase in operating equipment costs.
[Brief description of the drawings]
FIG. 1 is an overall configuration diagram showing an embodiment of an image management system including an image management server according to the present invention.
FIG. 2 is a block diagram showing a schematic configuration of an image management server.
FIG. 3 is a diagram showing a flow when a contractor uses an image management server.
FIG. 4 is a view showing an example of an image browsing screen displayed on the contractor terminal.
FIG. 5 is a diagram showing the flow of organizing and deleting construction photo images uploaded to the image management server.
FIG. 6 is a view showing an example of a browsing authority setting screen displayed on the contractor terminal.
FIG. 7 is a diagram showing an example of a usage status confirmation screen displayed on the contractor terminal.
[Explanation of symbols]
10 ... Contractor terminal, 10A, 10B, 10C ... Contractor, 20 ... Terminal, 20A, 20B, 20C ... Camera shop, 30 ... General laboratory, 40 ... Image management server, 41 ... HTTP communication unit, 42 ... Control , 43 ... billing processing unit, 44 ... image database, 45 ... user information database, 46 ... registration information database, 50 ... orderer terminal, 60 ... unorganized folder, 61 ... unnecessary folder, 62 ... construction folder

Claims (4)

ユーザ又は仲介者の端末機からアップロードされたユーザの画像を画像データベースでユーザ1人当たりの保管容量に容量制限を課さずに保管し、画像保管料をユーザに請求するための画像管理サーバにおいて、
前記アップロードされた画像1枚ごとに登録日時及び削除日時を管理する登録情報データベースと、
前記端末機からユーザの画像がアップロードされると、該アップロードされた画像の登録日時を前記登録情報データベースに登録し、前記端末機からユーザの画像を削除する指示を受入すると、前記画像データベースから対応する画像を削除するとともに、該画像の削除日時を前記登録情報データベースに登録する制御手段と、
前記登録情報データベースに登録された各ユーザの画像の登録日時及び削除日時に基づいて各ユーザの画像の日単位の保管枚数を求めるとともに該日単位の保管枚数の保管期間中の累積枚数を求め、この累積枚数に1日1枚当たりの保管料を乗算することによってユーザに請求する画像保管料を算出する課金処理手段と、
前記端末機からのサーバ利用状況の確認要求を受入すると、前記課金処理手段によって算出される画像保管料の日々の推移を含む利用状況を示す利用状況確認画面を作成し、該利用状況確認画面を送信する手段と、
を備えたことを特徴とする画像管理サーバ。
In an image management server for storing an image of a user uploaded from a terminal of a user or a mediator without imposing a capacity limit on a storage capacity per user in an image database, and charging the image storage fee to the user,
A registration information database for managing the registration date and deletion date for each uploaded image;
When a user image is uploaded from the terminal, the registration date and time of the uploaded image is registered in the registration information database, and when an instruction to delete the user image is received from the terminal, the image database supports Control means for deleting the image to be registered and registering the deletion date and time of the image in the registration information database;
Obtaining the daily storage number of each user's image based on the registration date and deletion date and time of each user's image registered in the registration information database and determining the cumulative number of the daily storage number during the storage period; Billing processing means for calculating an image storage fee charged to the user by multiplying the cumulative number by a storage fee per day,
Upon receipt of the server usage status confirmation request from the terminal, a usage status confirmation screen is created that indicates the usage status including daily transitions of the image storage fee calculated by the billing processing means. Means for transmitting;
An image management server comprising:
前記課金処理手段は、前記画像保管料を月単位で集計することを特徴とする請求項1の画像管理サーバ。  2. The image management server according to claim 1, wherein the billing processing unit totals the image storage fee on a monthly basis. 前記ユーザは建設工事を受注した受注者であり、前記アップロードされる画像は受注した建設工事の進捗状況等を示す工事写真画像であることを特徴とする請求項1又は請求項の画像管理サーバ。Wherein the user is a contractor who orders the construction, the uploaded images is claimed in claim 1 or the image management server according to claim 2, characterized in that a construction photographic image showing the progress status of construction that order . 前記課金処理手段は、前記登録情報データベースに登録された各ユーザの画像の日単位の登録枚数及び削除枚数をカウントし、その際、前記登録枚数のカウントは、前記登録情報データベースに登録された各ユーザの画像の登録日時の日付でカウントするとともに、前記削除枚数のカウントは、登録情報データベースに登録された各ユーザの画像の削除日時の日付の翌日でカウントし、更に、前記登録枚数の累計から前記削除枚数の累計を日単位で減算することによって、各ユーザの画像の日単位の保管枚数を求めることを特徴とする請求項1乃至請求項のいずれか1項の画像管理サーバ。The accounting processing unit counts the number of registered images and the number of deleted images of each user registered in the registration information database, and the registration number count is calculated based on each registration number registered in the registration information database. The number of deleted images is counted on the day following the date of deletion of each user's image registered in the registration information database, and the number of deleted images is counted from the cumulative number of registered images. by subtracting the total of the removed sheets on a daily basis, any one image management server of claim 1 to claim 3, characterized in that obtaining the storage number of daily images of each user.
JP2003004415A 2003-01-10 2003-01-10 Image management server Expired - Fee Related JP4161303B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003004415A JP4161303B2 (en) 2003-01-10 2003-01-10 Image management server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003004415A JP4161303B2 (en) 2003-01-10 2003-01-10 Image management server

Publications (2)

Publication Number Publication Date
JP2004220166A JP2004220166A (en) 2004-08-05
JP4161303B2 true JP4161303B2 (en) 2008-10-08

Family

ID=32895398

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003004415A Expired - Fee Related JP4161303B2 (en) 2003-01-10 2003-01-10 Image management server

Country Status (1)

Country Link
JP (1) JP4161303B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4677295B2 (en) * 2005-06-22 2011-04-27 株式会社T.D.S Field survey report creation support system
JP2008009911A (en) * 2006-06-30 2008-01-17 Daiwa Securities Group Inc Order management system and program

Also Published As

Publication number Publication date
JP2004220166A (en) 2004-08-05

Similar Documents

Publication Publication Date Title
US7444354B2 (en) Method and apparatus for storing images, method and apparatus for instructing image filing, image storing system, method and apparatus for image evaluation, and programs therefor
US7043527B2 (en) System and method for offering information service, method of assisting information release service, and information sharing server
EP0930774A2 (en) Network photograph service system
US7068190B2 (en) Information providing apparatus for performing data processing in accordance with order from user
US7590560B2 (en) Information providing apparatus which performs data processing in accordance with order from user
US7617126B2 (en) Information presenting system for performing data processing in accordance with order from user
US7552194B2 (en) Content delivery system and content delivery apparatus
US7409431B2 (en) Server apparatus, communications method, program for making computer execute the communications method, and computer-readable storage medium containing the program
JP2004206345A (en) Image management system, image management server, terminal device, program, recording medium
US7272574B2 (en) Method and system for organizing images
CN112801765A (en) Generating method, device and system of reimbursement file, electronic equipment and storage medium
US7974884B2 (en) Network order system and network server
JP2003091544A (en) Image storage method and device, and image storage system and program
JP4161303B2 (en) Image management server
JP2007128139A (en) Data file transmission system, image management server, and data file replication program
JP5134231B2 (en) Photo ordering system, photo ordering method and photo order receiving server device
JP2003333486A (en) Method, device and program for image management
JP2004220165A (en) Image management system and method
WO2001037260A1 (en) System for processing digital images and distributing the same via the internet
JP5010325B2 (en) Network order system and network server
JP4380230B2 (en) Image information provision system
JP2001266007A (en) Print service billing system
JP5282925B2 (en) Construction cost display system
JP2007041662A (en) Insurance related task support system
JP4466235B2 (en) Image forming order system, server system and image forming processing system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050519

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20061211

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071119

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071221

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080304

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080422

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20080610

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080627

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080710

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110801

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110801

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120801

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120801

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130801

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees