JP4163827B2 - Construction method of wave-dissipating structure using artificial rock - Google Patents
[go: Go Back, main page]

JP4163827B2 - Construction method of wave-dissipating structure using artificial rock - Google Patents

Construction method of wave-dissipating structure using artificial rock Download PDF

Info

Publication number
JP4163827B2
JP4163827B2 JP27827299A JP27827299A JP4163827B2 JP 4163827 B2 JP4163827 B2 JP 4163827B2 JP 27827299 A JP27827299 A JP 27827299A JP 27827299 A JP27827299 A JP 27827299A JP 4163827 B2 JP4163827 B2 JP 4163827B2
Authority
JP
Japan
Prior art keywords
pseudo
rock
wave
filling material
filled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP27827299A
Other languages
Japanese (ja)
Other versions
JP2001098523A (en
Inventor
輝勝 笹谷
恭一 永瀬
拓 池見
圭一 名執
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP27827299A priority Critical patent/JP4163827B2/en
Publication of JP2001098523A publication Critical patent/JP2001098523A/en
Application granted granted Critical
Publication of JP4163827B2 publication Critical patent/JP4163827B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)
  • Retaining Walls (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、天然の岩石の外観を模して作られる擬岩を用いた消波構造物の構築技術に関する。
【0002】
【従来の技術】
近年、自然環境や景観上の配慮から、消波構造物には天然の岩石の外観を模倣して作られた擬岩を用いる例が増加して来ている。そして、このような擬岩を用いた消波構造物の構築方法の典型的な従来技術としては、図7に示されたようなものが知られている。
【0003】
このうち、図7(A)に示された工法は、ケーソン等、一般的な構造の既設構造物100の外側を取り囲むように、グラスファイバー補強セメント等からなる複数の擬岩パネル101をアンカーや鉄筋等からなる架台102を介して組み立て設置し、前記既設構造物100と擬岩パネル101の間の空間103にモルタルやコンクリート等の中詰材を充填するものである(例えば特許第2516881号公報参照)。
【0004】
また、図7(B)に示された工法は、工場や製作ヤードで、基板201に取着したフレーム202の周囲を複数の擬岩パネル203で包囲してコンクリート204を充填することによって擬岩ブロック200を製作し、これを現場へ搬送して据え付けるものである(例えば特許2518775号公報参照)。
【0005】
【発明が解決しようとする課題】
上記従来技術によれば、次のような問題が指摘される。すなわち、図7(A)に示される技術において、既設構造物100がケーソン等の既存の水中構造物である場合、その外側に擬岩パネル101を固定するには、架台102の水中溶接をはじめとする潜水作業が必要であり、潜水作業は危険なばかりでなく、天候や海象に大きく左右され、しかも工費の増大を来す。また、複数の擬岩パネル101,101間の隙間を塞ぐ目地処理等はモルタルを用いて行われるため、水中では作業が困難であり、品質の低下を来すおそれがある。
【0006】
また、図7(B)のように擬岩ブロック200を用いた工法では、これを現場海域まで運搬する必要から、製作及び設置可能な構造物の大きさに限界があり、波浪等による大きな流体力が作用する場合には、擬岩ブロック200の安定性の確保が困難である。
【0007】
本発明は、上記のような問題に鑑みてなされたもので、その技術的課題とするところは、現場での危険な又は困難な作業を極力少なくし、省力化及び品質の向上を図ることにある。
【0008】
【課題を解決するための手段】
上述した技術的課題を有効に解決するための手段として、本発明に係る擬岩を用いた消波構造物の構築方法は、天然の岩石又は岩盤の外観を模して製作した擬岩パネル又は擬岩ブロックを、消波構造物の構築のための型枠として利用することにより、現場での省力化を実現するもので、支保工を製作すると共にこの支保工に前記擬岩パネル又は擬岩ブロックを含む型枠を取り付けた後、前記支保工を船舶によって現場海域へ運搬し、前記型枠が互いに背向すると共に前記擬岩パネル又は擬岩ブロックが海面付近に位置するように、前記支保工を海底の現地盤上に設置し、前記型枠の内側の領域に中詰材を充填することを特徴とする。したがって、現場作業においては、消波構造物内部と、その外層の擬岩部が、中詰材の充填によって同時に施工される。なお、ここでいう「現地盤」とは、岩盤、砂面、捨石等で、自然物であるか人工のものであるかは問わない。
【0009】
上記本発明の方法において、中詰材は、コンクリート、モルタル、気泡モルタル、軽量モルタル、軽量コンクリート、土砂、砕石、無害廃棄物から一以上選択される。また、この中詰材は一度に又は複数回に分けて充填することができる。
【0010】
上記本発明の方法において、施工箇所によっては消波構造物の表層部全体を擬岩で構成する必要はなく、したがってこの場合は、支保工の型枠取付面の一部にのみ擬岩パネル又は擬岩ブロックを固定し、他部は天然の岩石又は岩盤の外観を有さない型板を固定する。
【0011】
【0012】
上記本発明の方法において、水圧や波力等の外力に対する十分な強度を得られるものであれば、必ずしも型枠の内側の施工領域全体に中詰材を充填する必要はなく、前記施工領域の一部に中詰材が充填されない空間を形成しても良い。
【0013】
上記本発明の方法において、好ましくは型板の内側の領域に充填された中詰材の上面を覆うように、上部支保工を介して上部擬岩パネルを設置し、この上部擬岩パネルと前記中詰材の上面との間に上部中詰材を充填するか、あるいは前記中詰材の上面に、一個以上の擬岩ブロックを据え付けて固定する。
【0014】
【0015】
上記本発明の方法において、擬岩パネル又は擬岩ブロックが施工領域の両側に設置される場合は、施工箇所によっては、前記擬岩パネル又は擬岩ブロックの下端の高さが、前記施工領域の両側で互いに異なるものとすることができる。
【0016】
【発明の実施の形態】
図1は、本発明に係る擬岩を用いた消波構造物の構築方法の一実施形態として、上部が海面から露出する消波構造物1の構築方法を工程順に示すものである。すなわち、この構築方法においては、まず図1(A)に示されるように、製作ヤード等において、山形鋼11等を塔状あるいは直方体状等に組み立て、支保工としての一対の下部フレーム10を製作する。
【0017】
各下部フレーム10の片側の鉛直な取付面には、側面型枠20として、例えばグラスファイバーレインフォースドコンクリート(GRC)からなる擬岩パネル21や、又はGRC、コンクリート、あるいはモルタル等からなる擬岩ブロック22を取着する。この擬岩パネル21及び擬岩ブロック22は、共に天然の岩石又は岩盤を母型として型取りし、既知の方法によって製作されたもので、その表面は、天然の岩肌のざらざらあるいはごつごつした不規則なテクスチャ形状が忠実に再現されたものとなっている。また、複数の擬岩パネル21,21間の目地部は、適当な目地モルタル等によって埋める。
【0018】
擬岩パネル21又は擬岩ブロック22は、潮汐変化や波高等を考慮して、海面付近の一定範囲の高さ及び深さに位置するように、前記下部フレーム10の上部に取着される。そしてこの場合は、図示の例のように、まず各下部フレーム10の片側の鉛直方向全面に、コンクリート、モルタル、GRC、鋼板あるいは木材等からなる平板状の型板23を鉛直に取着し、その上部に、前記擬岩パネル21又は擬岩ブロック22を取着する。なお、参照符号24は前記型板23と擬岩パネル21との間を連結するセパレータである。
【0019】
次に、上述のようにして擬岩パネル21又は擬岩ブロック22及び型板23等からなる側面型枠20が取着された下部フレーム10を、製作ヤードから図示されていないクレーン船等の船舶等によって現場海域に運搬し、図1(B)に示されるように、例えば砂、捨石マウンドあるいは岩盤等からなる海底の現地盤G1上に、前記側面型枠20が互いに背向するように設置し、この側面型枠20,20間に中詰施工領域を画成する。
【0020】
なお、参照符号25は下部フレーム10を前記海底の現地盤G1に固定し、かつ側面型枠20の下端をシールするための袋詰めコンクリートで、セメント等の成分が海水中に拡散しないように袋詰めされたものである。また、下部フレーム10への側面型枠20の取着は、現場の状況等によっては、現場へ搬送した後で行うこともできる。
【0021】
下部フレーム10の固定及び側面型枠20のシール手段としては、現場の条件によっては、例えば図2(A)に示されるように、マットやシート26によるものや、あるいは同図(B)に示されるように、海底の現地盤G1上に、両側面型枠20の下端の外側に沿って打設した袋詰めコンクリート25によるものも好ましい。
【0022】
図1の例では、両側の側面型枠20,20を互いに独立した下部フレーム10の片側に取着しているが、図2(A)又は(B)に示されるように、下部フレーム10を中詰施工領域と同等の幅に組み立ててから、その両側に、予め複数の擬岩パネル21又は擬岩ブロック22及び型板23等により組み立てた側面型枠20を取着しても良い。
【0023】
擬岩パネル21又は擬岩ブロック22は、中詰施工領域の両側で互いに高さを異なるものとしても良い。図3はその一例を示すもので、下部フレーム10の片側には、その高さとほぼ同等の高さを有する擬岩ブロック22が直接取着されており、その下端が海底の現地盤G1に到達している。また、前記下部フレーム10の他側には、図2と同様、型板23の上部にセパレータ24を介して擬岩パネル21を取着している。この場合、下端が海底の現地盤G1に到達する擬岩ブロック22は、外洋側の人口漁礁等、海洋生物の棲息を促し、あるいは保護するものとして有用である。
【0024】
なお、図1乃至図3においては一方の側面型枠20に擬岩パネル21が取着され、他方に擬岩ブロック22が取着されているが、双方に擬岩パネル21を取着するか、あるいは双方に擬岩ブロック22を取着した構成としても良い。
【0025】
次に図1(C)に示されるように、両側面型枠20,20間の中詰施工領域に中詰材30を充填し、擬岩パネル21と型板23の間にはコンクリートあるいはモルタル30aを充填する。なお、前記中詰材30としては、例えばコンクリート、モルタル、気泡モルタル、軽量モルタル、軽量コンクリート等が採用されるが、これに土砂、砕石、無害廃棄物等を混合することによって、土木工事等で発生する残土や、廃棄物等の有効利用を図ることができる。この場合、例えば砕石や廃棄物等を前記中詰施工領域に投入してから、その間隙をコンクリート等の注入によって埋めるといった方法を採用することができる。
【0026】
中詰材30は一度に充填しても良いが、中詰施工領域の深さや容積、あるいは中詰材30の種類によっては、図4(A)に示されるように、複数層31,32,33・・・
に分けて充填する。また中詰材30は、必ずしも中詰施工領域全体に充填する必要はなく、構築しようとする消波構造物の大きさによっては、例えば図4(B)に示されるように、中詰材30の上層33を幅方向に分離して、その中間部分に非充填空間Sを形成し、コストダウンを図ることもできる。
【0027】
上述した工程においては、下部フレーム10及び側面型枠20の組み立てや、目地処理等の作業は、予め工場や製作ヤードで行うことができるため、危険性や困難性を有する潜水作業が、従来工法に比較して著しく減少する。また、中詰材30の充填・硬化によって、構造物本体部分の施工と表層の擬岩部分の施工が同時に行われ、その結合性が向上すると共に、工期が短縮される。
【0028】
次に、中詰材30が硬化して海面付近の一定範囲の高さに達する下側構造部1aが完成したら、図1(D)に示されるように複数の擬岩パネル41を、前記下側構造部1aの上面に、鉄筋やその他の補強材で組み立てた上部フレーム42を介して取着することにより、前記下側構造部1aの上面を覆うように上部型枠40を設置する。前記擬岩パネル41は、側面型枠20の擬岩パネル21と同様、天然の岩石又は岩盤を母型として型取りしてGRC等で製作されたものである。
【0029】
上部型枠40の組み立てにおいて、各擬岩パネル41,41間の目地部や、側面型枠20における擬岩パネル21又は擬岩ブロック22の上端との間は、適当な目地モルタル等によって埋める。なお、参照符号43は作業足場である。
【0030】
上部型枠40の組み立てが終わったら、その内側領域に、図示されていない中詰材を充填する。この中詰材も、側面型枠20,20間に充填した中詰材30と同様のものを採用することができる。そしてこのような一連の工程によって、外観が天然の岩石と近似した擬岩による消波構造物1が構築される。なお、上部型枠40は、擬岩パネル41によるもののほか、コンクリート、モルタル、鋼板、あるいは木材等による型枠を利用することもでき、さまざまな機能を持たせた構造物とすることができる。
【0031】
上述の工程において、施工される消波構造物1の大きさによっては、上部型枠40の組立作業と中詰材の充填作業を複数回繰り返して行っても良い。すなわち、例えば図5に示されるように、まず擬岩パネル41を、側面型枠20,20における擬岩パネル21又は擬岩ブロック22の上端と連続するように、所要の高さまで組み立ててから、その内側の領域に中詰材34を充填し、この中詰材34が硬化した後で、その上に一点鎖線で示されるように再び擬岩パネルを組み立てて、その内側に中詰材を充填する。
【0032】
また、上述のような上部型枠40の組立及び中詰材の充填といった方法を採らず、例えば図6に示されるように、予め既知の方法によって工場あるいは製作ヤードで製作した所要数の擬岩ブロック50を、施工が完了した下側構造部1aの上に据え付け、図示されていない鋼材あるいは繊維ロット等からなる固定手段で固定しても良い。
【0033】
【0034】
【0035】
【0036】
【0037】
【0038】
【0039】
【発明の効果】
本発明に係る擬岩を用いた消波構造物の構築方法によると、擬岩パネルや擬岩ブロックを、構造物構築のための型枠として利用するため、構造物本体部分の施工と表層の擬岩部分の施工が同時に行われ、その結合の信頼性が向上する。しかもこれによって工期が短縮されるので、気象・海象によって施工が左右される海上工事にも適しており、この場合、潜水作業をはじめとする現場での危険又は困難な作業を減少させることができ、かつ目地処理等の作業も陸上で行うことができるので、品質を向上させることができる。
【図面の簡単な説明】
【図1】 本発明に係る擬岩を用いた消波構造物の構築方法の一実施形態として、消波構造物の構築方法を工程順に示す説明図である。
【図2】 上記実施形態における下部フレームの構造及び固定方法の種々の例を示す説明図である。
【図3】 上記実施形態における型枠の組み合わせを示す説明図である。
【図4】 上記実施形態における中詰材の充填方法を示す説明図である。
【図5】 上記実施形態における上部施工の方法を示す説明図である。
【図6】 上記実施形態における上部施工の他の方法を示す説明図である。
【図7】 擬岩を用いた消波構造物の構築方法の従来技術を示す説明図である。
【符号の説明】
1 消波構造物
1a 下側構造部
10 下部フレーム(支保工)
20 側面型枠
21,41 擬岩パネル
22,50 擬岩ブロック
23 型板
30 中詰材
40 上部型枠
42 上部フレーム(上部支保工)
G1 海底の現地盤
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a technique for constructing a wave-dissipating structure using a pseudo-rock made to simulate the appearance of natural rock.
[0002]
[Prior art]
In recent years, examples of using pseudo-rocks made by imitating the appearance of natural rocks for wave-dissipating structures have been increasing due to consideration of the natural environment and landscape. And as a typical prior art of the construction method of the wave-dissipating structure using such a pseudo rock, what was shown in FIG. 7 is known.
[0003]
Among them, the construction method shown in FIG. 7A is a method in which a plurality of pseudo-rock panels 101 made of glass fiber reinforced cement or the like are attached to anchors or reinforcing bars so as to surround the outside of an existing structure 100 having a general structure such as caisson. The space 103 between the existing structure 100 and the pseudo rock panel 101 is filled with a filling material such as mortar or concrete (see, for example, Japanese Patent No. 2516881). .
[0004]
In addition, the method shown in FIG. 7B is a pseudo-rock block 200 in which a periphery of a frame 202 attached to a substrate 201 is surrounded by a plurality of pseudo-rock panels 203 and filled with concrete 204 in a factory or a production yard. Is manufactured and transported to the site for installation (see, for example, Japanese Patent No. 2518775).
[0005]
[Problems to be solved by the invention]
According to the above prior art, the following problems are pointed out. That is, in the technique shown in FIG. 7 (A), when the existing structure 100 is an existing underwater structure such as a caisson, in order to fix the pseudo rock panel 101 to the outside, the underwater welding of the gantry 102 is performed. Diving work is necessary, which is not only dangerous, but also greatly affected by the weather and sea conditions, and increases the construction cost. Further, joint processing for closing gaps between the plurality of pseudo-rock panels 101, 101 is performed using mortar, so that it is difficult to work in water and there is a risk of quality degradation.
[0006]
In addition, in the construction method using the pseudo rock block 200 as shown in FIG. 7B , there is a limit to the size of the structure that can be manufactured and installed because it needs to be transported to the sea area. When this occurs, it is difficult to ensure the stability of the pseudo rock block 200.
[0007]
The present invention has been made in view of the above-mentioned problems, and the technical problem is to minimize dangerous or difficult work in the field as much as possible to save labor and improve quality. is there.
[0008]
[Means for Solving the Problems]
As a means for effectively solving the technical problems described above, a method for constructing a wave-dissipating structure using pseudo rocks according to the present invention is a pseudo rock panel or pseudo rock block manufactured by simulating the appearance of natural rock or rock. Is used as a formwork for constructing a wave-dissipating structure , thereby realizing labor saving in the field. A support work is manufactured and a formwork including the pseudo rock panel or pseudo rock block in the support work. After mounting the support work, the support work is transported to the site sea area by ship, and the support work is placed on the seabed so that the formwork faces each other and the pseudo-rock panel or pseudo-rock block is located near the sea surface. And filling the inside region of the mold with a filling material. Therefore, in the field work, the inside of the wave-dissipating structure and the pseudo-rock portion of the outer layer are simultaneously constructed by filling the filling material. The “local board” mentioned here is a rock, sand surface, rubble, etc., regardless of whether it is natural or artificial.
[0009]
In the method of the present invention, the filling material is selected from one or more of concrete, mortar, foam mortar, lightweight mortar, lightweight concrete, earth and sand, crushed stone, and harmless waste. Further, the filling material can be filled at once or divided into a plurality of times.
[0010]
In the method of the present invention, it is not necessary to configure the entire surface layer portion of the wave-dissipating structure with pseudo rocks depending on the construction site. The other part is fixed with a natural rock or a template not having the appearance of a rock.
[0011]
[0012]
In the method of the present invention, as long as sufficient strength against external force such as water pressure and wave force can be obtained, it is not always necessary to fill the entire construction area inside the mold with the filling material. A space not partially filled with the filling material may be formed.
[0013]
In the method of the present invention, preferably, an upper pseudo-rock panel is installed via an upper support so as to cover the upper surface of the filling material filled in the region inside the template, and the upper pseudo-rock panel and the filling The upper filling material is filled with the upper surface of the material, or one or more pseudo-rock blocks are installed and fixed on the upper surface of the filling material.
[0014]
[0015]
In the method of the present invention, when the pseudo rock panel or pseudo rock block is installed on both sides of the construction area, the height of the lower end of the pseudo rock panel or pseudo rock block is different on both sides of the construction area depending on the construction location. Can be.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 shows a construction method of a wave-dissipating structure 1 having an upper portion exposed from the sea surface as an embodiment of a method for constructing a wave-dissipating structure using pseudo rocks according to the present invention. That is, in this construction method, first, as shown in FIG. 1A, in a production yard or the like, a mountain steel 11 or the like is assembled into a tower shape or a rectangular parallelepiped shape to produce a pair of lower frames 10 as support works. To do.
[0017]
On a vertical mounting surface on one side of each lower frame 10, as a side mold 20, for example, a pseudo rock panel 21 made of glass fiber reinforcement concrete (GRC) or a pseudo rock block 22 made of GRC, concrete, mortar or the like. To attach. The pseudo-rock panel 21 and the pseudo-rock block 22 are both made of a natural rock or bedrock as a matrix and manufactured by a known method. The surface of the pseudo-rock panel 21 and the pseudo-rock block 22 is rough or rough irregular texture of natural rock. The shape has been faithfully reproduced. Further, the joint portion between the plurality of pseudo rock panels 21 and 21 is filled with an appropriate joint mortar or the like.
[0018]
The pseudo-rock panel 21 or the pseudo-rock block 22 is attached to the upper part of the lower frame 10 so as to be positioned at a certain range of height and depth near the sea surface in consideration of tide changes and wave heights. And in this case, as in the example shown in the figure, first, a flat template 23 made of concrete, mortar, GRC, steel plate or wood is vertically attached to the entire vertical direction on one side of each lower frame 10, The pseudo rock panel 21 or the pseudo rock block 22 is attached to the upper part. Reference numeral 24 is a separator for connecting the template 23 and the pseudo rock panel 21.
[0019]
Next, the lower frame 10 to which the side mold 20 comprising the pseudo-rock panel 21 or the pseudo-rock block 22 and the template 23 is attached as described above is attached by a ship such as a crane ship not shown from the production yard. Transported to the site sea area, as shown in FIG. 1 (B), for example, on the seafloor local board G1 made of sand, rubble mound or bedrock, the side formwork 20 is placed so as to face each other, A filling area is defined between the side molds 20,20.
[0020]
Reference numeral 25 denotes a bag-filled concrete for fixing the lower frame 10 to the local board G1 on the seabed and sealing the lower end of the side mold 20 so that the components such as cement do not diffuse into seawater. It is stuffed. Moreover, attachment of the side mold 20 to the lower frame 10 can be performed after being transported to the site depending on the situation at the site.
[0021]
As a means for fixing the lower frame 10 and sealing the side mold 20, depending on on-site conditions, for example, as shown in FIG. 2 (A), a mat or a sheet 26 or shown in FIG. As described above, it is also preferable to use a bag-filled concrete 25 that is placed along the outside of the lower end of the double-sided formwork 20 on the local board G1 on the seabed.
[0022]
In the example of FIG. 1, the side molds 20, 20 on both sides are attached to one side of the independent lower frame 10, but the lower frame 10 is attached as shown in FIG. 2 (A) or (B). After assembling to the width equivalent to the filling construction area, side molds 20 previously assembled with a plurality of pseudo rock panels 21 or pseudo rock blocks 22 and a template 23 may be attached to both sides thereof.
[0023]
The pseudo-rock panel 21 or the pseudo-rock block 22 may have different heights on both sides of the filling operation area. FIG. 3 shows an example of this. A pseudo rock block 22 having a height substantially equal to the height of the lower frame 10 is directly attached to one side of the lower frame 10, and the lower end thereof reaches the local board G1 on the seabed. ing. Further, on the other side of the lower frame 10, the pseudo rock panel 21 is attached to the upper part of the template 23 via the separator 24 as in FIG. 2. In this case, the artificial rock block 22 having the lower end reaching the local board G1 on the seabed is useful for promoting or protecting marine organisms such as artificial fishing reefs on the open ocean side.
[0024]
In FIG. 1 to FIG. 3, a pseudo rock panel 21 is attached to one side mold 20, and a pseudo rock block 22 is attached to the other. However, the pseudo rock panel 21 is attached to both sides or both sides are attached. Alternatively, the pseudo rock block 22 may be attached.
[0025]
Next, as shown in FIG. 1C, the filling material 30 is filled in the filling material region between the two side molds 20, 20, and the concrete or mortar 30a is placed between the pseudo rock panel 21 and the template 23. Fill. As the filling material 30, for example, concrete, mortar, bubble mortar, lightweight mortar, lightweight concrete, etc. are adopted. By mixing earth, sand, crushed stone, harmless waste, etc. with this, civil engineering work etc. Effective utilization of generated residual soil and waste can be achieved. In this case, for example, it is possible to employ a method in which crushed stones, waste, or the like is introduced into the filling work area and the gap is filled by pouring concrete or the like.
[0026]
The filling material 30 may be filled at a time, but depending on the depth and volume of the filling operation region or the type of the filling material 30, as shown in FIG. 33 ...
Fill in portions. Moreover, the filling material 30 does not necessarily need to be filled in the entire filling area, and depending on the size of the wave-dissipating structure to be constructed, for example, as shown in FIG. The upper layer 33 is separated in the width direction, and an unfilled space S can be formed in the middle portion thereof to reduce the cost.
[0027]
In the above-described steps, operations such as assembling the lower frame 10 and the side mold 20 and joint processing can be performed in advance in a factory or production yard. Compared to Further, by filling and curing the filling material 30, the construction of the structure body portion and the surface layer pseudo-rock portion are simultaneously performed, the connectivity is improved, and the construction period is shortened.
[0028]
Next, after the filling material 30 is hardened and the lower structure portion 1a reaching a certain range of height near the sea surface is completed, a plurality of pseudo rock panels 41 are placed on the lower side as shown in FIG. The upper formwork 40 is installed on the upper surface of the structure portion 1a through the upper frame 42 assembled with reinforcing bars and other reinforcing materials so as to cover the upper surface of the lower structure portion 1a. Like the pseudo rock panel 21 of the side mold 20, the pseudo rock panel 41 is made of natural rock or rock as a mother mold and manufactured by GRC or the like.
[0029]
In assembling the upper mold 40, the joint between the pseudo rock panels 41 and 41 and the upper end of the pseudo rock panel 21 or the pseudo rock block 22 in the side mold 20 are filled with an appropriate joint mortar or the like. Reference numeral 43 is a work scaffold.
[0030]
When the assembly of the upper mold 40 is finished, the inner filling material (not shown) is filled in the inner region. As the filling material, the same filling material as the filling material 30 filled between the side molds 20 and 20 can be used. And by such a series of processes, the wave-dissipating structure 1 made of pseudo-rock whose appearance approximates that of natural rock is constructed. The upper mold 40 can be a structure made of concrete, mortar, steel plate, wood, or the like in addition to the pseudo rock panel 41, and can be a structure having various functions.
[0031]
In the above-mentioned process, depending on the size of the wave-dissipating structure 1 to be constructed, the assembly work of the upper mold 40 and the filling work of the filling material may be repeated a plurality of times. That is, for example, as shown in FIG. 5, the pseudo rock panel 41 is first assembled to a required height so as to be continuous with the upper end of the pseudo rock panel 21 or the pseudo rock block 22 in the side molds 20, 20, After filling the region with the filling material 34 and hardening the filling material 34, the pseudo rock panel is assembled again as shown by the one-dot chain line, and the filling material is filled inside.
[0032]
Further, the above-described method of assembling the upper mold 40 and filling the filling material is not adopted, but as shown in FIG. 6, for example, as shown in FIG. 50 may be installed on the lower structure portion 1a for which the construction has been completed, and fixed by a fixing means made of a steel material or a fiber lot (not shown).
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
【The invention's effect】
According to the method for constructing a wave-dissipating structure using pseudo rocks according to the present invention, the pseudo rock panel and pseudo rock block are used as a formwork for constructing the structure. Construction is performed at the same time, and the reliability of the connection is improved. In addition, because the construction period is shortened, it is also suitable for offshore construction where the construction is affected by the weather and sea conditions. In addition, since operations such as joint processing can be performed on land, the quality can be improved.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram showing a construction method of a wave-dissipating structure in order of steps as an embodiment of a construction method of the wave-dissipating structure using pseudo rocks according to the present invention.
FIG. 2 is an explanatory diagram showing various examples of the structure and fixing method of the lower frame in the embodiment.
FIG. 3 is an explanatory view showing a combination of molds in the embodiment.
FIG. 4 is an explanatory view showing a filling method of the filling material in the embodiment.
FIG. 5 is an explanatory view showing a method of upper construction in the embodiment.
FIG. 6 is an explanatory view showing another method of the upper construction in the embodiment.
FIG. 7 is an explanatory view showing a prior art of a method for constructing a wave-dissipating structure using pseudo rocks .
[Explanation of symbols]
1 Wave-absorbing structure
1a Lower structure
10 Lower frame (support work)
20 Side formwork
21, 41 Pseudo- rock panel 22, 50 Pseudo-rock block 23 Template 30 Filling material 40 Upper mold 42 Upper frame (upper support)
G1 Submarine local board

Claims (8)

支保工を製作すると共にこの支保工に天然の岩石又は岩盤の外観を模して製作した擬岩パネル又は擬岩ブロックを含む型枠を取り付けた後、前記支保工を船舶によって現場海域へ運搬し、前記型枠が互いに背向すると共に前記擬岩パネル又は擬岩ブロックが海面付近に位置するように、前記支保工を海底の現地盤上に設置し、前記型枠の内側の領域に中詰材を充填することを特徴とする擬岩を用いた消波構造物の構築方法。 After producing a support work and attaching a formwork including a pseudo-rock panel or a pseudo-rock block made to simulate the appearance of natural rock or rock to the support work, transport the support work to the site sea area by ship, The support work is installed on the local board of the seabed so that the formwork faces each other and the pseudo-rock panel or pseudo-rock block is located near the sea surface, and the inner area of the form is filled with the filling material The construction method of the wave-dissipating structure using the pseudo rock characterized by this. 中詰材は、コンクリート、モルタル、気泡モルタル、軽量モルタル、軽量コンクリート、土砂、砕石、無害廃棄物から一以上選択されることを特徴とする請求項1に記載の擬岩を用いた消波構造物の構築方法。The wave-absorbing structure using pseudo-rock according to claim 1, wherein the filling material is selected from one or more of concrete, mortar, foam mortar, lightweight mortar, lightweight concrete, earth and sand, crushed stone, and harmless waste . How to build. 中詰材は一度に又は複数回に分けて充填することを特徴とする請求項1に記載の擬岩を用いた消波構造物の構築方法。The method for constructing a wave-dissipating structure using pseudo rocks according to claim 1, wherein the filling material is filled at once or divided into a plurality of times. 支保工の型枠取付面の一部にのみ擬岩パネル又は擬岩ブロックを固定し、他部は天然の岩石又は岩盤の外観を有さない型板を固定することを特徴とする請求項1に記載の擬岩を用いた消波構造物の構築方法。The pseudo-rock panel or pseudo-rock block is fixed only to a part of the formwork mounting surface of the support, and the other part is fixed to a template that does not have the appearance of natural rock or rock. Of constructing wave-dissipating structures using artificial rocks. 施工領域の一部に中詰材が充填されない空間が形成されることを特徴とする請求項1に記載の擬岩を用いた消波構造物の構築方法。2. The method for constructing a wave-dissipating structure using pseudo rocks according to claim 1, wherein a space not filled with the filling material is formed in a part of the construction area. 型枠の内側の領域に充填された中詰材の上面を覆うように、上部支保工を介して上部擬岩パネルを設置し、この上部擬岩パネルと前記中詰材の上面との間に上部中詰材を充填することを特徴とする請求項1に記載の擬岩を用いた消波構造物の構築方法。An upper pseudo-rock panel is installed through an upper support so as to cover the upper surface of the filling material filled in the area inside the formwork, and the upper intermediate rock panel is placed between the upper pseudo-rock panel and the upper surface of the filling material. The method for constructing a wave-dissipating structure using pseudo rock according to claim 1, wherein the filler is filled. 型枠の内側の領域に充填した中詰材の上面に、一個以上の擬岩ブロックを据え付けて固定することを特徴とする請求項1に記載の擬岩を用いた消波構造物の構築方法。The method for constructing a wave-dissipating structure using pseudo-rock according to claim 1, wherein one or more pseudo-rock blocks are installed and fixed on the upper surface of the filling material filled in the region inside the mold. 擬岩パネル又は擬岩ブロックが施工領域の両側に設置され、その下端の高さが、前記施工領域の両側で互いに異なることを特徴とする請求項4に記載の擬岩を用いた消波構造物の構築方法。5. Construction of a wave-dissipating structure using pseudo-rock according to claim 4, wherein pseudo-rock panels or pseudo-rock blocks are installed on both sides of the construction area, and the lower ends thereof are different from each other on both sides of the construction area. Method.
JP27827299A 1999-09-30 1999-09-30 Construction method of wave-dissipating structure using artificial rock Expired - Fee Related JP4163827B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27827299A JP4163827B2 (en) 1999-09-30 1999-09-30 Construction method of wave-dissipating structure using artificial rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27827299A JP4163827B2 (en) 1999-09-30 1999-09-30 Construction method of wave-dissipating structure using artificial rock

Publications (2)

Publication Number Publication Date
JP2001098523A JP2001098523A (en) 2001-04-10
JP4163827B2 true JP4163827B2 (en) 2008-10-08

Family

ID=17595047

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27827299A Expired - Fee Related JP4163827B2 (en) 1999-09-30 1999-09-30 Construction method of wave-dissipating structure using artificial rock

Country Status (1)

Country Link
JP (1) JP4163827B2 (en)

Also Published As

Publication number Publication date
JP2001098523A (en) 2001-04-10

Similar Documents

Publication Publication Date Title
JP4060790B2 (en) Modular offshore structure
JPH042734B2 (en)
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN107002376B (en) Floating gate or island and method for manufacturing same
CN109797759B (en) Offshore rock surface bionic casing box cofferdam and construction method thereof
CN102277860A (en) Construction method for fill mortar junction stone dam of mortar stone precast block masonry dam shell
KR101900648B1 (en) Way of installing Precast structure of foundation under water
JP4163827B2 (en) Construction method of wave-dissipating structure using artificial rock
KR100934980B1 (en) Precast concrete forms for the capconcrete of caisson and the construction method using the same
JP2601395B2 (en) Construction method of structure using artificial rock
JP3427066B2 (en) Manufacturing method for civil engineering blocks
KR20080078518A (en) Environment-friendly artificial cancer construct and its construction method
CN207891910U (en) A kind of basement building structure
JP2004137807A (en) Caisson embankment construction method and caisson embankment
JP2513973Y2 (en) Natural stone block
JPS59233025A (en) Construction of wastes-incinerating plant
JPH0323689B2 (en)
JPH06116957A (en) Construction method of underwater foundation in break-water, etc.
RU2816995C1 (en) Method for construction of hydraulic structures on rocky soils
JP7495904B2 (en) Improvement structure and method of existing wharf
JP3530128B2 (en) Composite waterproofing method for underground structures
JP2011226091A (en) Breakwater constructing steel block, and method of constructing breakwater
JP3704613B2 (en) Construction method for underground structures
JPH1171737A (en) Seaweed field at outside of breakwater and formation thereof
JPH0649824A (en) Breakwater

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 19991012

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20021010

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060612

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080319

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080516

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080625

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080725

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110801

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4163827

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110801

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120801

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120801

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130801

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees