Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4190788B2 - Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program - Google Patents
[go: Go Back, main page]

JP4190788B2 - Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program - Google Patents

Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program Download PDF

Info

Publication number
JP4190788B2
JP4190788B2 JP2002101550A JP2002101550A JP4190788B2 JP 4190788 B2 JP4190788 B2 JP 4190788B2 JP 2002101550 A JP2002101550 A JP 2002101550A JP 2002101550 A JP2002101550 A JP 2002101550A JP 4190788 B2 JP4190788 B2 JP 4190788B2
Authority
JP
Japan
Prior art keywords
river
flow
flood
water
inundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002101550A
Other languages
Japanese (ja)
Other versions
JP2003296516A (en
Inventor
献一 吉田
賢持 奥田
剛史 松下
克己 秋山
克己 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Facilities Inc
Original Assignee
NTT Facilities Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTT Facilities Inc filed Critical NTT Facilities Inc
Priority to JP2002101550A priority Critical patent/JP4190788B2/en
Publication of JP2003296516A publication Critical patent/JP2003296516A/en
Application granted granted Critical
Publication of JP4190788B2 publication Critical patent/JP4190788B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水深予測システム、氾濫水深予測方法、氾濫水深予測プログラムおよび氾濫水深予測プログラムを記録した記録媒体に関する。
【0002】
【従来の技術】
従来の氾濫水深予測方法においては、常に、氾濫水が堤内地に貯留する場合を想定した1種類の予測方法を用いていた。
【0003】
【発明が解決しようとする課題】
ところが、この予測方法は、大河川の場合にしか適合しないので、ほとんどの場合、実態に合わなかった。すなわち、河川氾濫については、氾濫区域の地形状況(面積、勾配等)によって氾濫形態が異なるので、画一的な計算方法で、正確な氾濫水深(氾濫水位)を求めるのは困難であった。従って、氾濫による被害を正確に予測することができなかった。
【0004】
本発明は、上記の問題を解決するためになされたもので、正確な氾濫水深予測が可能な氾濫水深予測システム、氾濫水深予測方法、氾濫水深予測プログラムおよび氾濫水深予測プログラムを記録した記録媒体を提供するものである。
【0005】
【課題を解決するための手段】
請求項1に記載の発明は、 河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水深予測システムにおいて、河川氾濫形態を、氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とに分類し、前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合には、氾濫水量および氾濫面積から氾濫水深を算出する第1の算出手段を用い、河川・堤内地一体流下型である場合には、氾濫水量および合成粗度係数によって決まる流速から氾濫水深を算出する第2の算出手段を用い、河川・堤内地分離流下型である場合には、氾濫水量および粗度係数によって決まる流速から氾濫水深を算出する第3の算出手段を用い、河川・堤内地分離道路越流型である場合には、氾濫水量、診断対象建物近傍の土地と道路との標高差および道路越流幅から氾濫水深を算出する第4の算出手段を用いることを特徴とする氾濫水深予測システムである。
【0006】
請求項2に記載の発明は、 前記第1の算出手段は、洪水流出量および河川の流下能力から河川氾濫流量を算出し、算出した河川氾濫流量から氾濫水量を算出し、算出した氾濫水量、氾濫面積、洪水到達時間および氾濫区域率から氾濫水深を算出し、前記第2の算出手段は、氾濫水深によって決まる合成粗度係数、氾濫水深によって決まる径深および平均河床勾配から流速を算出し、算出した流速および氾濫水深によって決まる流水断面積から流下能力を算出し、算出した流下能力が氾濫水量と一致する場合における前記氾濫水深を求め、前記第3の算出手段は、洪水流出量および河川の流下能力から河川氾濫流量を算出し、算出した河川氾濫流量から氾濫水量を算出し、粗度係数、氾濫水深によって決まる径深および平均河床勾配から流速を算出し、算出した流速および氾濫水深によって決まる流水断面積から流下能力を算出し、算出した流下能力が前記氾濫水量と一致する場合における前記氾濫水深を求め、前記第4の算出手段は、洪水流出量および河川の流下能力から河川氾濫流量を算出し、算出した河川氾濫流量から氾濫水量を算出し、算出した氾濫水量および道路越流幅から道路越流水深を算出し、算出した道路越流水深および診断対象建物近傍の土地と道路との標高差から氾濫水深を算出することを特徴とする請求項1に記載の氾濫水深予測システムである。
【0007】
請求項3に記載の発明は、 河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水深予測方法において、河川氾濫形態を、氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とに分類し、前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合には、氾濫水量および氾濫面積から氾濫水深を算出する第1の算出方法を用い、河川・堤内地一体流下型である場合には、氾濫水量および合成粗度係数によって決まる流速から氾濫水深を算出する第2の算出方法を用い、河川・堤内地分離流下型である場合には、氾濫水量および粗度係数によって決まる流速から氾濫水深を算出する第3の算出方法を用い、河川・堤内地分離道路越流型である場合には、氾濫水量、診断対象建物近傍の土地と道路との標高差および道路越流幅から氾濫水深を算出する第4の算出方法を用いることを特徴とする氾濫水深予測方法である。
【0008】
請求項4に記載の発明は、 河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水深予測プログラムにおいて、河川氾濫形態を、氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とに分類し、前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合には、氾濫水量および氾濫面積から氾濫水深を算出する第1の算出手順を用い、河川・堤内地一体流下型である場合には、氾濫水量および合成粗度係数によって決まる流速から氾濫水深を算出する第2の算出手順を用い、河川・堤内地分離流下型である場合には、氾濫水量および粗度係数によって決まる流速から氾濫水深を算出する第3の算出手順を用い、河川・堤内地分離道路越流型である場合には、氾濫水量、診断対象建物近傍の土地と道路との標高差および道路越流幅から氾濫水深を算出する第4の算出手順を用いることを特徴とする氾濫水深予測プログラムである。
【0009】
請求項5に記載の発明は、 河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水深予測プログラムを記録した記録媒体において、河川氾濫形態を、氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とに分類し、前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合には、氾濫水量および氾濫面積から氾濫水深を算出する第1の算出手順を用い、河川・堤内地一体流下型である場合には、氾濫水量および合成粗度係数によって決まる流速から氾濫水深を算出する第2の算出手順を用い、河川・堤内地分離流下型である場合には、氾濫水量および粗度係数によって決まる流速から氾濫水深を算出する第3の算出手順を用い、河川・堤内地分離道路越流型である場合には、氾濫水量、診断対象建物近傍の土地と道路との標高差および道路越流幅から氾濫水深を算出する第4の算出手順を用いることを特徴とする氾濫水深予測プログラムを記録した記録媒体である。
【0010】
【発明の実施の形態】
図1 は、本発明の一実施形態における氾濫水深予測システムの構成を示すブロック図である。この氾濫水深予測システムは、記録媒体1 、演算処理装置2 、入力装置3 、表示装置4 を有する。
【0011】
記録媒体1は、氾濫水深予測プログラムを記録した媒体であって、具体的には、ハードディスクやCD−ROM等である。演算処理装置2は、記録媒体1に記録された氾濫水深予測プログラムを実行する装置であって、具体的には、CPU(Central Processing Unit)やRAM(Random Access Memory)等によって構成され、記録媒体1からRAMにロードされる氾濫水深予測プログラムに従って、CPUが氾濫水深を算出する。入力装置3は、ユーザーが、氾濫水深予測システムに与える命令やデータを入力するための装置であって、具体的には、キーボードやマウス等によって構成されている。表示装置4は、CPUによって算出された氾濫水深等が表示される装置であって、具体的には、CRT(Cathode Ray Tube;陰極線管)ディスプレイや液晶ディスプレイである。
【0012】
図2 は、診断対象建物に対する1次診断を行う際に、表示装置4に表示される画面を示す図である。診断対象建物における水害の原因としては、河川氾濫、内水氾濫、高潮、津波の4種類が考えられる。内水氾濫とは、堤防等により囲まれた地域における豪雨等により排水が間に合わなくなった場合の氾濫のことである。ユーザーは、これらの各項目について、画面中の入力欄(フィールド)にデータを入力する。
【0013】
河川氾濫については、入力欄5 に建物敷地標高HGを入力し、入力欄6 に近接河川周辺の地盤高HRを入力すると、表示欄7 に計算結果が表示される。同時に、内水氾濫の項目における表示欄8 、9 、10 にも、それぞれ、建物敷地標高HG、近接河川周辺の地盤高HR、計算結果が表示される。高潮については、表示欄11 に建物敷地標高HGが表示されるので、入力欄12 に海岸までの距離Lmを入力する。同時に、津波の項目における表示欄13 、14 にも、それぞれ、建物敷地標高HG、海岸までの距離Lmが表示される。以上の入力を行うと、表示欄15 に、各項目について本格的な2次診断を行う必要があるか否かが表示される。
【0014】
図3 は、河川氾濫に関する2次診断を行う際に、最初に表示装置4に表示される画面を示す図である。ユーザーは、この画面を見て、4種類の河川氾濫形態(CASE)の中から、診断対象建物に適合する形態(CASE)を選択し、選択した形態(CASE)の番号を画面右下の入力欄16 に入力する。すると、選択した氾濫形態(CASE)に対応する画面に移行する。
【0015】
この4種類の河川氾濫形態は、九州北部地区で実施された約100カ所の既往水防調査における採用河川氾濫形態を検討することにより、どの様な河川氾濫形態が想定されるのかを検討した結果、得られたものである。
【0016】
想定河川氾濫形態は、下記のように分類される。
1 堤内地貯留型(CASE.1 以下「堤内地貯留型」と記す)
2 堤内地流下型
2-(1) 河川・堤内地一体型(CASE.2 以下「河川・堤内地一体流下型」と記す)
2-(2) 河川・堤内地分離型
2-(2)-▲1▼ 河道形態型(CASE.3 以下「河川・堤内地分離流下型」と記す)
2-(2)-▲2▼ 道路越流型(CASE.4 以下「河川・堤内地分離道路越流型」と記す)
【0017】
すなわち、想定河川氾濫形態は、大きく、堤内地貯留型と、堤内地流下型とに分類される。堤内地貯留型とは、氾濫水が堤内地(河床以外の土地)に貯留する場合であり、堤内地が比較的緩勾配で広い平野である場合に適用される。
【0018】
堤内地流下型とは、氾濫水が堤内地を流下する場合である。堤内地流下型は、さらに、河川・堤内地一体型(河川・堤内地一体流下型)と、河川・堤内地分離型とに分類される。河川・堤内地一体型(河川・堤内地一体流下型)とは、河川水位と堤内地水位とが同じ場合であって、堤内地が比較的急勾配で狭い谷部である場合に適用される。すなわち、この型は、谷全体が河道となる場合である。
【0019】
河川・堤内地分離型とは、河川水位と堤内地水位とが異なる場合である。河川・堤内地分離型は、さらに、河道形態型(河川・堤内地分離流下型)と、道路越流型(河川・堤内地分離道路越流型)とに分類される。河道形態型(河川・堤内地分離流下型)とは、堤内地が河道形態となる場合であって、河川堤防が診断対象建物の上流で決壊した場合に適用される。
【0020】
道路越流型(河川・堤内地分離道路越流型)とは、道路越流の形態となる場合であって、氾濫水が堤内地を流下する際に、道路等の堰上げによって氾濫水位の上昇が見込まれる場合に適用される。
【0021】
以下、図4〜7を参照し、CASE.1〜4における氾濫水深Hの計算方法を説明する。図4 は、CASE.1の「堤内地貯留型」を示す図である。まず、河川氾濫流量Eを下記の式(1)を用いて計算する。
E=(Q1−F1)/N1+(Q2−F2)/N2+(Q3−F3)/N3 …(1)
ただし、上記の式(1)は、氾濫する河川が3本ある場合の式であり、第1項が1本目の河川の氾濫流量、第2項が2本目の河川の氾濫流量、第3項が3本目の河川の氾濫流量である。Q1,Q2,Q3は、それぞれ、1〜3本目の河川の洪水流出量である。F1,F2,F3は、それぞれ、1〜3本目の河川の流下能力である。N1,N2,N3は、それぞれ、1〜3本目の河川の氾濫側数である。氾濫側数とは、片側氾濫の場合(河川の片側の堤防のみが決壊した場合)には1、両側氾濫の場合(河川の両側の堤防が決壊した場合)には2となる数値である。
【0022】
次に、内水域流出量ΣQNiを下記の式(2)を用いて計算する。
ΣQNi=QN1+QN2+QN3 …(2)
内水域流出量とは、診断対象建物に隣接する各地域から流出する内水の量の合計であり、上記の式(2)は、内水が流出する地域が3つある場合の式である。
【0023】
次に、その他河川からの排水量を下記の式(3)を用いて計算する。
ΣRi=R1+R2+R3 …(3)
その他河川からの排水量とは、氾濫河川とは別の河川からの排水量の合計であり、上記の式(3)は、別の河川が3本ある場合の式である。
【0024】
次に、ポンプによる排水量ΣQPiを下記の式(4)を用いて計算する。
ΣQPi=QP1+QP2+QP3 …(4)
上記の式(4)は、ポンプが3つある場合の式である。
【0025】
次に、道路越流量ΣQRiを下記の式(5)を用いて計算する。
ΣQRi=QR1+QR2+QR3 …(5)
上記の式(5)は、氾濫水が越流する道路が3本ある場合の式である。
【0026】
そして、氾濫水量qを下記の式(6)を用いて計算する。
q=E+ΣQNi−ΣRi−ΣQPi−ΣQRi …(6)
【0027】
最後に、氾濫水深Hを下記の式(7)を用いて計算する。
H=q×t×60/(S×K×106) …(7)
ただし、tは洪水到達時間、Sは氾濫面積、Kは氾濫区域率である。
【0028】
図5 は、CASE.2の「河川・堤内地一体流下型」を示す図である。まず、氾濫水量qを下記の式(8)を用いて計算する。
q=Q1+Q2+Q3−ΣQPi …(8)
ただし、上記の式(8)は、氾濫する河川が3本ある場合の式であり、Q1,Q2,Q3は、それぞれ、1〜3本目の河川の洪水流出量である。また、ΣQPiは、ポンプによる排水量であり、上記の式(4)を用いて計算する。
【0029】
次に、氾濫水深Hをある値に仮定し、以下の計算を行う。
【0030】
まず、合成粗度係数n’を下記の式(9)を用いて計算する。
【数1】

Figure 0004190788
ただし、Piは各部の潤辺長(m)、niは各部の粗度係数、Pは全潤辺長(m)である。潤辺長は氾濫水深Hから定まる。
【0031】
次に、流速V(m/sec)を下記の式(10)すなわちマニングの等流公式を用いて計算する。
V=1/n’×R2/3×I1/2 …(10)
ただし、Rは径深であり、R=A/Pである。ここで、Aは流水断面積(m2)である。流水断面積Aは氾濫水深Hから定まる。また、Iは平均河床勾配である。
【0032】
次に、流下能力q’を下記の式(11)を用いて計算する。
q’=A×V …(11)
【0033】
そして、上記の式(11)を用いて計算した流下能力q’が、式(8)を用いて計算した氾濫水量qと一致するまで、氾濫水深Hの値を変えながら、式(9)〜(11)を用いた計算を繰り返す。流下能力q’と氾濫水量qとが一致した場合における氾濫水深Hが、求める答えである。
【0034】
図6 は、CASE.3 の「河川・堤内地分離流下型」を示す図である。まず、氾濫水量qを下記の式(12)を用いて計算する。
q=E+ΣQNi−ΣQPi …(12)
ただし、河川氾濫流量Eは上記の式(1)を用いて計算し、内水域流出量ΣQNiは上記の式(2)を用いて計算し、ポンプによる排水量ΣQPiは上記の式(4)を用いて計算する。
【0035】
次に、氾濫水深Hをある値に仮定し、以下の計算を行う。まず、流速V(m/sec)を上記の式(10)すなわちマニングの等流公式を用いて計算する。ただし、n’には単一の粗度係数nを代入する。次に、流下能力q’を上記の式(11)を用いて計算する。そして、上記の式(11)を用いて計算した流下能力q’が、式(12)を用いて計算した氾濫水量qと一致するまで、氾濫水深Hの値を変えながら、式(10)〜(11)を用いた計算を繰り返す。流下能力q’と氾濫水量qとが一致した場合における氾濫水深Hが、求める答えである。
【0036】
図7 は、CASE.4 の「河川・堤内地分離道路越流型」を示す図である。まず、河川氾濫流量Eを上記の式(1)を用いて計算する。次に、内水域流出量ΣQNiを上記の式(2)を用いて計算する。次に、ポンプによる排水量ΣQPiを上記の式(4)を用いて計算する。
【0037】
そして、氾濫水量qを下記の式(13)を用いて計算する。
q=E+ΣQNi−ΣQPi …(13)
ただし、河川氾濫流量Eは上記の式(1)を用いて計算し、内水域流出量ΣQNiは上記の式(2)を用いて計算し、ポンプによる排水量ΣQPiは上記の式(4)を用いて計算する。
【0038】
そして、道路越流水深ΔHを下記の式(14)すなわち長頂堰の越流公式を用いて計算する。
q=1.5×B×(ΔH)3/2 …(14)
ただし、Bは道路越流幅、ΔHは道路による堰上げ高である。
【0039】
最後に、氾濫水深Hを下記の式(15)を用いて計算する。
H=HR+ΔH …(15)
ただし、HRは、道路と氾濫想定区域の平均地盤高(HA)との標高差である。
【0040】
次に、図8 を参照し、内水氾濫に関する2次診断における氾濫水深Hの計算方法を説明する。まず、氾濫水量qを下記の式(16)を用いて計算する。
q=ΣQNi−ΣQPi …(16)
ただし、内水域流出量ΣQNiは上記の式(2)を用いて計算し、ポンプによる排水量ΣQPiは上記の式(4)を用いて計算する。そして、氾濫水深Hを上記の式(7)を用いて計算する。
【0041】
次に、高潮に関する2次診断における想定水位HWの計算方法を説明する。想定水位HWは、下記の式(17)を用いて計算する。
W=HM+h−hD …(17)
ただし、HMは最高天体潮位、hは伊勢湾台風と同程度の台風を想定した場合の最大気象潮差、hDは、決壊口(海岸)からの距離Lm(km)による逓減量である。
【0042】
次に、津波に関する2次診断における想定水位HWの計算方法を説明する。想定水位HWは、下記の式(18)を用いて計算する。
W=HM+h …(18)
ただし、HMは最高天体潮位、hは過去の最大津波高である。
【0043】
図9〜13は、河川氾濫に関する2次診断を行う際に、全ての氾濫形態において共通に表示装置4に表示される画面を示す図である。
【0044】
図9 は、流域面積a(km2)を算定するための画面である。流域面積aとは、氾濫を想定した河川の決壊想定地点より上流で、降雨時にその河川に雨水が集まる範囲のことである。図10 は、洪水到達時間t(分)を算定するための画面である。図11 は、流域内の200年確率降雨強度r(mm/hr)を算定するための画面である。図12 は、河道(河川)の流下能力F(m3/s)を算定するための画面である。この画面におけるnは粗度係数、Aは堤防決壊後の流下能力Fにおける流水断面積、PはAにおける潤辺長(水と接触している辺の長さ)である。また、Iは平均河床勾配すなわち決壊想定地点近辺(川幅の3〜5倍程度の区間)の勾配である。図13 は、流出係数fおよび氾濫区域率Kを算定するための画面である。氾濫区域率Kとは、氾濫面積Sが、氾濫想定区域内の建物等によって低減する比率を示す値である。
【0045】
図14 〜図16 は、CASE.1の堤内地貯留型を選択した場合に、表示装置4に表示される画面を示す図である。これらの画面における各入力欄17 〜28 に数値を入力することにより、氾濫水深Hが算出され、表示欄29 に表示される。
【0046】
図17 〜図20 は、CASE.2の河川・堤内地一体流下型を選択した場合に、表示装置4に表示される画面を示す図である。これらの画面における各入力欄30〜39 に数値を入力することにより、氾濫水深Hが算出され、表示欄40 に表示される。
【0047】
図21 〜図23 は、CASE.3の河川・堤内地分離流下型を選択した場合に、表示装置4に表示される画面を示す図である。これらの画面における各入力欄41〜50 に数値を入力することにより、氾濫水深Hが算出され、表示欄51 に表示される。
【0048】
図24 〜図26 は、CASE.4の河川・堤内地分離道路越流型を選択した場合に、表示装置4に表示される画面を示す図である。これらの画面における各入力欄52 〜62 に数値を入力することにより、氾濫水深Hが算出され、表示欄63に表示される。
【0049】
図27〜31は、内水氾濫に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。図27 は、流域面積(内水域流域面積)a(km2)を算定するための画面である。内水域流域面積aとは、内水域に雨水が集まる範囲の面積のことである。図28 は、氾濫面積S(km2)を算定するための画面である。図29 は、内水域の洪水到達時間t(分)を算定するための画面である。図30 は、内水域流域内の200年確率降雨強度r(mm/hr)を算定するための画面である。図31 は、氾濫水深H(m)を算定するための画面である。この画面における各入力欄64 、65 に数値を入力することにより、氾濫水深Hが算出され、表示欄66 に表示される。
【0050】
図32、33は、高潮に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。図32 は、最大気象潮差(偏差)h(m)を算定するための画面である。図33 は、想定水位HWを算定するための画面である。この画面における各入力欄67 、68 に数値を入力することにより、想定水位HWが算出され、表示欄69 に表示される。
【0051】
図34、35は、津波に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。図34 は、過去の最大津波高h(m)を算定するための画面である。図35 は、想定水位HWを算定するための画面である。この画面における入力欄70 に数値を入力することにより、想定水位HWが算出され、表示欄71 に表示される。
【0052】
なお、本システムは、診断対象建物(地点)における、河川氾濫、内水氾濫、高潮、津波による予測水深(水位)を比較し、診断対象建物(地点)における最大予測水深(水位)を算出することができる。
【0053】
【発明の効果】
本発明によれば、河川氾濫形態を、被害事例に基づいて、4種類に分類し、それぞれの氾濫形態において、氾濫水量から氾濫水深(水位)を算出することができるので、河川氾濫の実態に合った氾濫水深(水位)を正確に予測することができるようになった。
【0054】
また、本システムにおいては、画面の入力欄に数値を入力していけばよいので、利用が容易であり、水防の専門家ではないユーザーであっても、氾濫水深(水位)を予測することができるようになった。
【図面の簡単な説明】
【図1】 本発明の一実施形態における氾濫水深予測システムの構成を示すブロック図である。
【図2】 診断対象建物に対する1次診断を行う際に、表示装置4に表示される画面を示す図である。
【図3】 河川氾濫に関する2次診断を行う際に、最初に表示装置4に表示される画面を示す図である。
【図4】 CASE.1の「堤内地貯留型」を示す図である。
【図5】 CASE.2の「河川・堤内地一体流下型」を示す図である。
【図6】 CASE.3 の「河川・堤内地分離流下型」を示す図である。
【図7】 CASE.4 の「河川・堤内地分離道路越流型」を示す図である。
【図8】 内水氾濫を示す図である。
【図9】 河川氾濫に関する2次診断を行う際に、全ての氾濫形態において共通に表示装置4に表示される画面を示す図である。
【図10】 河川氾濫に関する2次診断を行う際に、全ての氾濫形態において共通に表示装置4に表示される画面を示す図である。
【図11】 河川氾濫に関する2次診断を行う際に、全ての氾濫形態において共通に表示装置4に表示される画面を示す図である。
【図12】 河川氾濫に関する2次診断を行う際に、全ての氾濫形態において共通に表示装置4に表示される画面を示す図である。
【図13】 河川氾濫に関する2次診断を行う際に、全ての氾濫形態において共通に表示装置4に表示される画面を示す図である。
【図14】 CASE.1の堤内地貯留型を選択した場合に、表示装置4に表示される画面を示す図である。
【図15】 CASE.1の堤内地貯留型を選択した場合に、表示装置4に表示される画面を示す図である。
【図16】 CASE.1の堤内地貯留型を選択した場合に、表示装置4に表示される画面を示す図である。
【図17】 CASE.2の河川・堤内地一体流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図18】 CASE.2の河川・堤内地一体流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図19】 CASE.2の河川・堤内地一体流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図20】 CASE.2の河川・堤内地一体流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図21】 CASE.3の河川・堤内地分離流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図22】 CASE.3の河川・堤内地分離流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図23】 CASE.3の河川・堤内地分離流下型を選択した場合に、表示装置4に表示される画面を示す図である。
【図24】 CASE.4の河川・堤内地分離道路越流型を選択した場合に、表示装置4に表示される画面を示す図である。
【図25】 CASE.4の河川・堤内地分離道路越流型を選択した場合に、表示装置4に表示される画面を示す図である。
【図26】 CASE.4の河川・堤内地分離道路越流型を選択した場合に、表示装置4に表示される画面を示す図である。
【図27】 内水氾濫に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図28】 内水氾濫に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図29】 内水氾濫に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図30】 内水氾濫に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図31】 内水氾濫に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図32】 高潮に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図33】 高潮に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図34】 津波に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【図35】 津波に関する2次診断を行う際に、表示装置4に表示される画面を示す図である。
【符号の説明】
1 記録媒体
2 演算処理装置(第1の算出手段、第2の算出手段、第3の算出手段、第4の算出手段)
3 入力装置
4 表示装置[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an inundation depth prediction system, an inundation depth prediction method, an inundation depth prediction program, and a recording medium on which an inundation depth prediction program is recorded.
[0002]
[Prior art]
In the conventional flood water depth prediction method, one type of prediction method that always assumes the case where flood water is stored in the embankment is used.
[0003]
[Problems to be solved by the invention]
However, this prediction method is only suitable for large rivers, so in most cases it did not match the actual situation. That is, for river inundation, since the inundation form differs depending on the topographical situation (area, gradient, etc.) of the inundation area, it was difficult to determine the exact inundation depth (inundation water level) with a uniform calculation method. Therefore, damage due to flooding could not be predicted accurately.
[0004]
The present invention has been made in order to solve the above-described problems. An inundation depth prediction system, an inundation depth prediction method, an inundation depth prediction program, and a recording medium on which an inundation depth prediction program is recorded. It is to provide.
[0005]
[Means for Solving the Problems]
The invention according to claim 1 is an inundation depth prediction system for predicting an inundation depth in a building to be diagnosed when a river is inundated. River / cave land where the inundation water flows down the levee land with the same water level and the water level in the levee The separated flow type and the river water level and the ground water level in the levee are different from each other, and the flood water flows down the levee land. If the river inundation form near the building to be diagnosed is a levee-type land storage type, use the first calculation means to calculate the inundation depth from the inundation water volume and the inundation area. , By flood water volume and synthetic roughness coefficient The second calculation means that calculates the inundation depth from the flow velocity determined by the river, and the third calculation that calculates the inundation depth from the flow velocity determined by the inundation water volume and the roughness coefficient if the river and levee land separation flow type 4th calculation means to calculate the flood water depth from the flood water volume, the elevation difference between the land and the road in the vicinity of the building to be diagnosed, and the road overflow width. It is a flood depth prediction system characterized by using.
[0006]
The invention according to claim 2 is characterized in that the first calculation means calculates the river flood flow from the flood runoff amount and the river flow capacity, calculates the flood water flow from the calculated river flood flow, The inundation depth is calculated from the inundation area, the flood arrival time, and the inundation area ratio, and the second calculation means calculates the flow velocity from the composite roughness coefficient determined by the inundation water depth, the diameter depth determined by the inundation water depth, and the average riverbed slope, The flow capacity is calculated from the flow cross-sectional area determined by the calculated flow velocity and flood water depth, and the flood water depth is calculated when the calculated flow capacity matches the flood water volume. Calculate the river inundation flow from the flow capacity, calculate the inundation water from the calculated inundation flow, and calculate the flow velocity from the roughness coefficient, the diameter determined by the inundation water depth, and the average riverbed gradient. The flow capacity is calculated from the flow cross-sectional area determined by the calculated flow velocity and flood water depth, and the flood water depth is calculated when the calculated flow capacity matches the flood water volume. The river overflow flow is calculated from the volume and the river flow capacity, the flood water volume is calculated from the calculated river flood flow, the road overflow depth is calculated from the calculated flood water flow and the road overflow width, and the calculated road overflow depth The flood depth prediction system according to claim 1, wherein the flood depth is calculated from an altitude difference between a land near the diagnosis target building and a road.
[0007]
The invention according to claim 3 is an inundation depth prediction method for predicting an inundation depth in a building to be diagnosed when a river is inundated, a river inundation form, an inland embankment storage type in which inundation water is stored in an embankment, and a river River / cave land where the inundation water flows down the levee land with the same water level and the water level in the levee The separated flow type and the river water level and the ground water level in the levee are different from each other, and the flood water flows down the levee land. If the river inundation form near the building to be diagnosed is a dike storage type, use the first calculation method to calculate the inundation depth from the inundation volume and area. , By flood water volume and synthetic roughness coefficient Use the second calculation method to calculate the inundation depth from the determined flow velocity, and in the case of river and levee segregated flow type, the third calculation method to calculate the inundation depth from the flow velocity determined by the inundation water volume and roughness coefficient If the road / bank diversion road overflow type is used, the fourth calculation method is used to calculate the flood water depth from the flood water volume, the elevation difference between the land near the diagnosis target building and the road, and the road overflow width. This is a flood depth prediction method characterized by this.
[0008]
The invention described in claim 4 is a flood depth prediction program for predicting the flood depth in a building to be diagnosed when a river is flooded. River / cave land where the inundation water flows down the levee land with the same water level and the water level in the levee The separated flow type and the river water level and the ground water level in the levee are different from each other, and the flood water flows down the levee land. If the river inundation form near the building to be diagnosed is a levee-type land storage type, use the first calculation procedure to calculate the inundation depth from the inundation volume and the inundation area. , Flood water volume and synthetic roughness coefficient The third calculation procedure to calculate the flood water depth from the flow rate determined by the flood water volume and roughness coefficient when using the second calculation procedure to calculate the flood water depth from the flow velocity determined by the flow rate, and in the case of river and dam land separation flow type If the river and levee land separation road overflow type is used, the fourth calculation procedure to calculate the flood water depth from the flood water volume, the elevation difference between the land near the diagnosis target building and the road and the road overflow width is It is a flood depth prediction program characterized by using it.
[0009]
The invention according to claim 5 is a recording medium recording a flood depth prediction program for predicting a flood depth in a building to be diagnosed when a river is flooded. Inundation water flows down the levee in a state where the river water level and the levee ground water level are different from the storage type, the river and dam ground flow type where the inundation water flows down the levee ground in the state where the river water level and the ground water level in the levee are equal The river / dyke land separation flow overflow type is different from the river / bank inland segregation flow type, where the river water level and the water level in the dike are different, and the flood water flows down the embankment, and the flood water that has flowed over the road When the river inundation form near the building to be diagnosed is a levee land storage type, the first calculation procedure for calculating the inundation depth from the inundation water amount and the inundation area is used, and the river / dyke inland integrated flow type In case of And the second calculation procedure to calculate the inundation depth from the flow velocity determined by the combined roughness coefficient, and in the case of a river / dyke land separation flow type, the inundation depth is calculated from the inflow water amount and the flow velocity determined by the roughness coefficient If the third calculation procedure is used and the river / dyke land separation road overflow type is used, the flood water depth is calculated from the flood water volume, the elevation difference between the land near the diagnosis target building and the road, and the road overflow width. 4 is a recording medium on which is recorded a flood depth prediction program using the calculation procedure of No. 4.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is a block diagram showing a configuration of a flood depth prediction system according to an embodiment of the present invention. This flood depth prediction system includes a recording medium 1, an arithmetic processing device 2, an input device 3, and a display device 4.
[0011]
The recording medium 1 is a medium on which a flood depth prediction program is recorded. Specifically, the recording medium 1 is a hard disk, a CD-ROM, or the like. The arithmetic processing device 2 is a device that executes the flood depth prediction program recorded in the recording medium 1, and is specifically configured by a CPU (Central Processing Unit), a RAM (Random Access Memory), and the like. According to the flood depth prediction program loaded from 1 to the RAM, the CPU calculates the flood depth. The input device 3 is a device for the user to input commands and data to be given to the inundation depth prediction system, and specifically includes a keyboard, a mouse, and the like. The display device 4 is a device that displays the flood water depth calculated by the CPU, and is specifically a CRT (Cathode Ray Tube) display or a liquid crystal display.
[0012]
FIG. 2 is a diagram illustrating a screen displayed on the display device 4 when performing a primary diagnosis on a building to be diagnosed. There are four possible causes of flood damage in the building being diagnosed: river flooding, inland flooding, storm surge, and tsunami. Inland flooding refers to inundation when drainage is not in time due to heavy rain in an area surrounded by embankments. The user inputs data for each of these items in an input field (field) in the screen.
[0013]
For river flooding, enter the building site elevation H in entry field 5 G In the input field 6 and the ground height H around the adjacent river R When is input, the calculation result is displayed in the display field 7. At the same time, each of the display fields 8, 9, 10 in the item of inland flooding also has a building site elevation H G , Ground height around neighboring rivers H R The calculation result is displayed. For the storm surge, the height of the building site H G Is displayed, so the distance L to the coast in the input field 12 m Enter. At the same time, each of the display fields 13 and 14 in the item of tsunami has an elevation of the building site H. G , Distance L to the coast m Is displayed. When the above input is performed, whether or not it is necessary to perform a full-scale secondary diagnosis for each item is displayed in the display column 15.
[0014]
FIG. 3 is a diagram showing a screen that is first displayed on the display device 4 when performing a secondary diagnosis regarding river flooding. The user looks at this screen, selects the form (CASE) that matches the building to be diagnosed from the four types of river flooding (CASE), and enters the number of the selected form (CASE) at the bottom right of the screen Fill in column 16. Then, it moves to the screen corresponding to the selected flooding form (CASE).
[0015]
These four types of river flooding were examined as a result of studying the river flooding forms adopted in approximately 100 existing flood control surveys conducted in the northern part of Kyushu. It is obtained.
[0016]
Assumed river flooding forms are classified as follows.
1 Reservoir type (CASE.1)
2 Underground flow type
2- (1) River / dyke inland integrated type (CASE.2)
2- (2) River / dyke land separation type
2- (2)-▲ 1 ▼ River channel type (CASE.3)
2- (2)-▲ 2 ▼ Road Overflow Type (CASE.4)
[0017]
In other words, the assumed river inundation forms are broadly classified into a dike ground storage type and a dike ground flow type. The levee land storage type is a case where flood water is stored in the levee land (land other than the river bed), and is applied when the levee land is a relatively plain and wide plain.
[0018]
The dike-down type is a case where flood water flows down the dike. The levee ground flow type is further classified into a river and levee land integrated type (river and dam ground integrated flow type) and a river and dam ground separated type. The river / bank inland integrated type (river / bank inland integrated flow type) is applied when the river water level and the bank water level are the same, and the bank land is a relatively steep and narrow valley. . That is, this type is a case where the whole valley becomes a river channel.
[0019]
The river / bank inland separation type is a case where the river water level is different from the bank water level in the bank. The river / bank land separation type is further classified into a river channel type (river / bank land separation flow type) and a road overflow type (river / bank land separation road overflow type). The river channel form (river / bank inland separation flow type) is applied when the bank land is in a river channel, and the river bank is destroyed upstream of the building to be diagnosed.
[0020]
The road overflow type (river / bank inland separation road overflow type) is a form of road overflow, and when flood water flows down the bank land, Applicable when an increase is expected.
[0021]
Hereinafter, the calculation method of the flood water depth H in CASE.1-4 will be described with reference to FIGS. Fig. 4 is a diagram showing CASE.1 “Reservoir type”. First, the river flood flow E is calculated using the following formula (1).
E = (Q 1 -F 1 ) / N 1 + (Q 2 -F 2 ) / N 2 + (Q Three -F Three ) / N Three ... (1)
However, the above equation (1) is an equation when there are three flooding rivers, the first term is the flooding flow of the first river, the second term is the flooding flow of the second river, the third term Is the overflow of the third river. Q 1 , Q 2 , Q Three Are the flood runoff of the 1st to 3rd rivers, respectively. F 1 , F 2 , F Three Is the flow capacity of the 1st to 3rd rivers, respectively. N 1 , N 2 , N Three Are the flooding numbers of the first to third rivers, respectively. The flooding side number is a numerical value that is 1 in the case of one-side flooding (when only one side of the river bank breaks) and 2 in the case of double-sided flooding (when both sides of the river bank breaks).
[0022]
Next, inland water outflow ΣQ Ni Is calculated using the following equation (2).
ΣQ Ni = Q N1 + Q N2 + Q N3 ... (2)
The amount of inland water outflow is the total amount of inland water flowing out from each area adjacent to the building to be diagnosed, and the above formula (2) is an expression when there are three areas from which inland water flows out. .
[0023]
Next, the amount of drainage from other rivers is calculated using the following formula (3).
ΣR i = R 1 + R 2 + R Three ... (3)
The amount of drainage from other rivers is the sum of the amount of drainage from rivers other than flooded rivers, and the above equation (3) is an equation when there are three other rivers.
[0024]
Next, the amount of water drained by the pump ΣQ Pi Is calculated using the following equation (4).
ΣQ Pi = Q P1 + Q P2 + Q P3 (4)
The above expression (4) is an expression when there are three pumps.
[0025]
Next, road overflow ΣQ Ri Is calculated using the following equation (5).
ΣQ Ri = Q R1 + Q R2 + Q R3 ... (5)
The above equation (5) is an equation when there are three roads where flood water overflows.
[0026]
Then, the flood water amount q is calculated using the following equation (6).
q = E + ΣQ Ni -ΣR i -ΣQ Pi -ΣQ Ri (6)
[0027]
Finally, the flood water depth H is calculated using the following equation (7).
H = q × t × 60 / (S × K × 10 6 (7)
Where t is the flood arrival time, S is the flooded area, and K is the flooded area rate.
[0028]
Fig. 5 is a diagram showing CASE.2 "River and levee integrated flow type". First, the flood water quantity q is calculated using the following equation (8).
q = Q 1 + Q 2 + Q Three -ΣQ Pi (8)
However, the above equation (8) is the equation when there are three flooding rivers. 1 , Q 2 , Q Three Are the flood runoff of the 1st to 3rd rivers, respectively. Also, ΣQ Pi Is the amount of water discharged by the pump, and is calculated using the above equation (4).
[0029]
Next, assuming the flood water depth H to a certain value, the following calculation is performed.
[0030]
First, the synthetic roughness coefficient n ′ is calculated using the following formula (9).
[Expression 1]
Figure 0004190788
However, P i Is the length of each part (m), n i Is the roughness coefficient of each part, and P is the total wetness length (m). The length of Junjun is determined from the flood depth H.
[0031]
Next, the flow velocity V (m / sec) is calculated using the following formula (10), that is, Manning's equiflow formula.
V = 1 / n ′ × R 2/3 × I 1/2 (10)
However, R is a deep diameter, and R = A / P. Where A is the cross-sectional area of flowing water (m 2 ). The running water cross section A is determined from the flood depth H. I is the average riverbed slope.
[0032]
Next, the flow capacity q ′ is calculated using the following formula (11).
q ′ = A × V (11)
[0033]
Then, while changing the value of the flood water depth H until the flow capacity q ′ calculated using the above equation (11) matches the flood water amount q calculated using the equation (8), the equations (9) to (9) to Repeat the calculation using (11). The flood water depth H in the case where the flow capacity q ′ and the flood water quantity q coincide with each other is the desired answer.
[0034]
Fig. 6 is a diagram showing CASE.3 “River / bank land separation flow type”. First, the flood water amount q is calculated using the following equation (12).
q = E + ΣQ Ni -ΣQ Pi (12)
However, the river inundation flow E is calculated using the above equation (1), and the inland water discharge ΣQ Ni Is calculated using the above equation (2), and the amount of water discharged by the pump ΣQ Pi Is calculated using equation (4) above.
[0035]
Next, assuming the flood water depth H to a certain value, the following calculation is performed. First, the flow velocity V (m / sec) is calculated using the above equation (10), that is, Manning's equiflow formula. However, a single roughness coefficient n is substituted for n ′. Next, the flow capacity q ′ is calculated using the above equation (11). Then, while changing the value of the flood water depth H until the flow capacity q ′ calculated using the above equation (11) matches the flood water amount q calculated using the equation (12), the equations (10) to Repeat the calculation using (11). The flood water depth H in the case where the flow capacity q ′ and the flood water quantity q coincide with each other is the desired answer.
[0036]
Fig. 7 is a diagram showing CASE.4 "River / Like Land Separation Road Overflow Type". First, the river flood flow E is calculated using the above equation (1). Next, inland water outflow ΣQ Ni Is calculated using equation (2) above. Next, the amount of water drained by the pump ΣQ Pi Is calculated using equation (4) above.
[0037]
Then, the flood water amount q is calculated using the following equation (13).
q = E + ΣQ Ni -ΣQ Pi ... (13)
However, the river inundation flow E is calculated using the above equation (1), and the inland water discharge ΣQ Ni Is calculated using the above equation (2), and the amount of water discharged by the pump ΣQ Pi Is calculated using equation (4) above.
[0038]
Then, the road overflow depth ΔH is calculated using the following formula (14), that is, the overflow formula of the long-top weir.
q = 1.5 × B × (ΔH) 3/2 ... (14)
However, B is the road overflow width and ΔH is the weir height by the road.
[0039]
Finally, the flood water depth H is calculated using the following equation (15).
H = H R + ΔH (15)
However, H R Is the average ground height (H A ) And altitude difference.
[0040]
Next, with reference to FIG. 8, the calculation method of the flood water depth H in the secondary diagnosis regarding inland water flooding will be described. First, the flood water quantity q is calculated using the following equation (16).
q = ΣQ Ni -ΣQ Pi ... (16)
However, inland water outflow ΣQ Ni Is calculated using the above equation (2), and the amount of water discharged by the pump ΣQ Pi Is calculated using equation (4) above. And flood water depth H is calculated using said Formula (7).
[0041]
Next, the assumed water level H in the secondary diagnosis for storm surge W The calculation method of will be described. Assumed water level H W Is calculated using the following equation (17).
H W = H M + H-h D ... (17)
However, H M Is the highest tide level, h is the maximum meteorological tide difference assuming a typhoon similar to the Isewan typhoon, h D Is the distance L from the breakout (coast) m It is a decreasing amount by (km).
[0042]
Next, the assumed water level H in the secondary diagnosis of tsunami W The calculation method of will be described. Assumed water level H W Is calculated using the following equation (18).
H W = H M + H (18)
However, H M Is the highest tide level, and h is the highest tsunami height in the past.
[0043]
9-13 is a figure which shows the screen displayed on the display apparatus 4 in common in all the flooding forms, when performing the secondary diagnosis regarding river flooding.
[0044]
Figure 9 shows the basin area a (km 2 ) Is a screen for calculating. The basin area a is a range where rainwater gathers in the river at the time of rainfall, upstream from the expected breakage point of the river. FIG. 10 is a screen for calculating the flood arrival time t (minutes). FIG. 11 is a screen for calculating the 200-year probability rainfall intensity r (mm / hr) in the basin. Figure 12 shows the flow capacity F (m Three This is a screen for calculating / s). In this screen, n is the roughness coefficient, A is the cross-sectional area of the flowing water in the flow ability F after the bank break, and P is the wet side length in A (the length of the side in contact with water). I is the average riverbed gradient, that is, the gradient in the vicinity of the expected breakage point (section about 3 to 5 times the river width). FIG. 13 is a screen for calculating the runoff coefficient f and the flooded area rate K. The flooding area rate K is a value indicating the ratio of the flooding area S being reduced by buildings or the like in the flooding assumed area.
[0045]
14 to 16 are diagrams showing screens displayed on the display device 4 when the in-bank storage type of CASE.1 is selected. By entering a numerical value in each of the input fields 17 to 28 on these screens, the flood water depth H is calculated and displayed on the display field 29.
[0046]
17 to 20 are diagrams showing screens displayed on the display device 4 when the river / dyke inland integrated flow type of CASE.2 is selected. By entering a numerical value in each of the input fields 30 to 39 on these screens, the flood water depth H is calculated and displayed on the display field 40.
[0047]
21 to 23 are diagrams showing screens displayed on the display device 4 when the river / dyke land separation flow type of CASE.3 is selected. By entering a numerical value in each of the input fields 41 to 50 on these screens, the flood water depth H is calculated and displayed on the display field 51.
[0048]
FIGS. 24 to 26 are diagrams showing screens displayed on the display device 4 when the river / dyke land separation road overflow type of CASE.4 is selected. By entering a numerical value in each of the input fields 52 to 62 on these screens, the flood water depth H is calculated and displayed in the display field 63.
[0049]
FIGS. 27 to 31 are diagrams illustrating screens displayed on the display device 4 when performing a secondary diagnosis on inland water flooding. Figure 27 shows the catchment area (inner watershed catchment area) a (km 2 ) Is a screen for calculating. The inner water basin area a is an area in a range where rainwater collects in the inner water area. FIG. 28 shows the flood area S (km 2 ) Is a screen for calculating. FIG. 29 is a screen for calculating the flood arrival time t (minutes) in the inner water area. FIG. 30 is a screen for calculating the 200-year probability rainfall intensity r (mm / hr) in the inland watershed. FIG. 31 is a screen for calculating the flood depth H (m). By entering a numerical value into each of the input fields 64 and 65 on this screen, the flood water depth H is calculated and displayed in the display field 66.
[0050]
32 and 33 are diagrams showing screens displayed on the display device 4 when performing a secondary diagnosis regarding storm surge. FIG. 32 is a screen for calculating the maximum weather tide difference (deviation) h (m). Figure 33 shows the assumed water level H W It is a screen for calculating. By entering numerical values in the input fields 67 and 68 on this screen, the assumed water level H W Is calculated and displayed in the display field 69.
[0051]
34 and 35 are diagrams showing screens displayed on the display device 4 when performing a secondary diagnosis regarding a tsunami. FIG. 34 is a screen for calculating the past maximum tsunami height h (m). Figure 35 shows the assumed water level H W It is a screen for calculating. By entering a numerical value in the input field 70 on this screen, the assumed water level H W Is calculated and displayed in the display field 71.
[0052]
In addition, this system compares the predicted water depth (water level) due to river flooding, inland flooding, storm surges, and tsunamis at the diagnosis target building (point), and calculates the maximum predicted water depth (water level) at the diagnosis target building (point). be able to.
[0053]
【The invention's effect】
According to the present invention, the river flooding forms are classified into four types based on the damage cases, and in each flooding form, the flooding depth (water level) can be calculated from the flooding water amount. It is now possible to accurately predict the combined flood depth (water level).
[0054]
In addition, in this system, it is only necessary to enter a numerical value in the input field on the screen, so it is easy to use and even a user who is not a flood control expert can predict the flood depth (water level). I can do it now.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of a flood depth prediction system according to an embodiment of the present invention.
FIG. 2 is a diagram showing a screen displayed on the display device 4 when performing a primary diagnosis for a building to be diagnosed.
FIG. 3 is a diagram showing a screen that is first displayed on the display device 4 when performing a secondary diagnosis on river flooding.
FIG. 4 is a diagram showing a “cave land storage type” of CASE.1.
FIG. 5 is a diagram showing a CASE.2 “river / bank dam integrated flow type”.
6 is a diagram showing the “separated flow type of river and levee” in CASE.3.
FIG. 7 is a diagram showing the “overflow type of river / dyke land separation road” of CASE.4.
FIG. 8 is a diagram showing inland water flooding.
FIG. 9 is a diagram showing a screen displayed on the display device 4 in common in all flooding modes when performing a secondary diagnosis regarding river flooding.
FIG. 10 is a diagram showing a screen displayed on the display device 4 in common in all flooding forms when performing a secondary diagnosis regarding river flooding.
FIG. 11 is a diagram showing a screen displayed on the display device 4 in common in all flooding modes when performing a secondary diagnosis regarding river flooding.
FIG. 12 is a diagram showing a screen displayed on the display device 4 in common in all flooding modes when performing a secondary diagnosis regarding river flooding.
FIG. 13 is a diagram showing a screen displayed on the display device 4 in common in all flooding modes when performing a secondary diagnosis regarding river flooding.
FIG. 14 is a diagram showing a screen displayed on the display device 4 when the bank-in-bank storage type of CASE.1 is selected.
FIG. 15 is a diagram showing a screen displayed on the display device 4 when the in-bank land storage type of CASE.1 is selected.
FIG. 16 is a diagram showing a screen displayed on the display device 4 when the case storage type of CASE.1 is selected.
FIG. 17 is a diagram showing a screen displayed on the display device 4 when the river / dyke inland integrated flow type of CASE.2 is selected.
FIG. 18 is a diagram showing a screen displayed on the display device 4 when the river / dyke inland integrated flow type of CASE.2 is selected.
FIG. 19 is a diagram showing a screen displayed on the display device 4 when the river / dyke land integrated flow type of CASE.2 is selected.
FIG. 20 is a diagram showing a screen displayed on the display device 4 when the river / dyke inland integrated flow type of CASE.2 is selected.
FIG. 21 is a diagram showing a screen displayed on the display device 4 when a river / bank land separation flow type of CASE.3 is selected.
FIG. 22 is a diagram showing a screen displayed on the display device 4 when the CASE.3 river / dyke land separation flow type is selected.
FIG. 23 is a diagram showing a screen displayed on the display device 4 when a river / bank land separation flow type of CASE.3 is selected.
FIG. 24 is a diagram showing a screen displayed on the display device 4 when a river / cave land separation road overflow type of CASE.4 is selected.
FIG. 25 is a diagram showing a screen displayed on the display device 4 when the CASE.4 river / dyke land separation road overflow type is selected.
FIG. 26 is a diagram showing a screen displayed on the display device 4 when the CASE.4 river / dyke land separation road overflow type is selected.
FIG. 27 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis regarding inland water flooding.
FIG. 28 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis on inland water flooding.
FIG. 29 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis on inland water flooding.
FIG. 30 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis regarding inland water flooding.
FIG. 31 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis regarding inland water flooding.
FIG. 32 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis on storm surge.
FIG. 33 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis for storm surge.
FIG. 34 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis relating to a tsunami.
FIG. 35 is a diagram showing a screen displayed on the display device 4 when performing a secondary diagnosis related to a tsunami.
[Explanation of symbols]
1 Recording medium
2 Arithmetic processing devices (first calculation means, second calculation means, third calculation means, fourth calculation means)
3 Input devices
4 display devices

Claims (4)

河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水位予測プログラムを記録した記録媒体と、前記記録媒体からメモリに前記氾濫水位予測プログラムをロードし、ロードした当該氾濫水位予測プログラムに従って前記氾濫水深を計算するCPUとから構成される氾濫水深予測システムであり
前記CPUが、
氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とのいずれの河川氾濫形態を計算するかを選択する選択画面を装置に表示し、ユーザが入力装置から入力する前記河川氾濫形態を選択する番号を受け付け、
前記CPUが、
前記選択画面においてユーザが入力した番号に対応する河川氾濫形態に応じて、前記氾濫水位予測プログラムにおける当該河川氾濫形態に対応した算術式により、ユーザによって選択された河川氾濫形態における前記診断対象建物の氾濫水深を演算し、
前記CPUが、
選択された前記河川氾濫形態に対応した算術式に用いる数値を入力させる入力欄の表示画面を、前記表示装置に表示し、
前記CPUが、
選択された河川氾濫形態が前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合、該堤内地貯留型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力及び氾濫面積を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量を氾濫面積により除算することにより氾濫水深を算出し、
選択された河川氾濫形態が河川・堤内地一体流下型である場合、該河川・堤内地一体流下型に対応する表示画面の前記入力欄に入力される各河川の洪水流出量及び仮の水深を用い、前記河川の洪水流出量を加算し氾濫水量を求め、また前記仮の水深により算術式から合成粗度係数を求め、該合成粗度係数からマニングの等流公式を用いて流速及び流水断面積を算出し、前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致する前記仮の水深を氾濫水深とし、
選択された河川氾濫形態が河川・堤内地分離流下型である場合、該河川・堤内地分離流下型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、氾濫河川流域以外の河川の氾濫区域に流水する内水域流出量、仮の水深、流下断面を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量と内水域流出量とを加算して氾濫水量を求め、前記流下断面から求めた氾濫想定幅及び仮の水深により算術式から合成粗度係数を求め、該合成粗度係数と前記流下断面から求めた氾濫想定幅とを用いてマニングの等流公式から流速及び流水断面積を算出し、入力された前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致するまで、仮の水深を入力して流下能力を求め、該流下能力と前記氾濫水量とが一致した前記仮の水深を、この仮の水深を氾濫水深とし、
選択された河川氾濫形態が河川・堤内地分離道路越流型である場合、該河川・堤内地分離道路越流型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、診断対象建物近傍の土地と道路との標高差および道路越流幅を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、長頂堰の越流公式を用いて道路による堰上げ高を求め、該堰上げ高と前記標高差とを加算し、氾濫水深を算出する
ことを特徴とする氾濫水深予測システム。
A recording medium in which a flood water level prediction program for predicting flood water depth in a building to be diagnosed when a river is flooded is recorded, the flood water level prediction program is loaded from the recording medium into a memory, and the flood water level prediction program is loaded according to the loaded flood water level prediction program a flood depth prediction system composed of a CPU for calculating the flooding water depth,
The CPU is
The levee land storage type in which flood water is stored in the levee land, the river and dam ground flow type in which flood water flows down the dam ground with the river water level equal to the dam ground water level, and the river water level and the dam ground water level River and levee land separation flow type in which inundated water flows down the levee in different states, and inundated water flows down the dam with different river water levels and inland water levels, and the overflowed water overflows the road A selection screen for selecting which river flooding mode to calculate with the river / dyke land separation road overflow type is displayed on the device, and the user selects a number for selecting the river flooding mode input from the input device,
The CPU is
According to the river flooding mode corresponding to the number input by the user on the selection screen , the arithmetic target corresponding to the river flooding mode in the flooding water level prediction program is used to calculate the building to be diagnosed in the river flooding mode selected by the user. Calculate the flood depth ,
The CPU is
A display screen of an input field for inputting a numerical value used in an arithmetic expression corresponding to the selected river flooding form is displayed on the display device;
The CPU is
If the selected river flooding mode is the river flooding type in the vicinity of the building to be diagnosed is an inland bank storage type , the river flooding flow entered in the input field of the display screen corresponding to the bank inundation storage type, By using the number of flooding sides, the river flow capacity and the flood area, dividing the result of subtracting the flow capacity from the flood flow rate by the flood side number to obtain the river flood flow, and dividing the river flood flow by the flood area Calculate the flood depth,
If the selected river inundation type is a river / dyke inland integrated flow type, the flood runoff amount and temporary water depth of each river entered in the input field of the display screen corresponding to the river / dyke inland integrated flow type The amount of flood water is calculated by adding the amount of flood runoff of the river, and the synthetic roughness coefficient is obtained from the arithmetic formula based on the provisional water depth. Calculate the area, the flood water depth and the provisional water depth that matches the flow capacity obtained from the flow velocity and the flow velocity cross-sectional area,
When the selected river flooding form is a river / dyke land separation flow type, the river flood flow rate, the number of river flooding sides entered in the input field of the display screen corresponding to the river / bank land separation flow type , Divide the result of subtracting the flow capacity from the inundation flow, using the flow capacity of the river, the inundation area, the inflow of the inland water flowing into the inundation area of the river other than the inundation river basin, the temporary depth, and the cross section. The river inundation flow is obtained, and the inundation water flow is calculated by adding the river inundation flow and the inflow of the inland water, and the composite roughness coefficient is obtained from the arithmetic formula based on the assumed inundation width and the temporary water depth obtained from the flow cross section. The flow rate and the flow cross-sectional area are calculated from Manning's equal flow formula using the combined roughness coefficient and the estimated inundation width obtained from the flow cross-section, and the flow rate and flow cross-sectional area are obtained from the input flood water amount. Until the flow capacity matches Of Type seek discharge capacity of the water depth, the depth of the temporary and flow under power and the flooding water are matched to the depth of the temporary and flooding water depth,
If the selected river flooding type is a river / dyke land separation road overflow type , the river flood flow rate and the river flow entered in the input field of the display screen corresponding to the river / bank land separation road overflow type Divide the result of subtracting the flow capacity from the inundation flow rate by using the flooding number, the river flow capacity, the flood area, the difference in elevation between the land near the diagnosis target building and the road, and the road overflow width. Inundation depth prediction characterized by calculating the river inundation flow, using the overflow formula of the long top weir to determine the height of the weir by road, and adding the height of the weir and the above elevation difference to calculate the inundation depth system.
河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水位予測プログラムを記録した記録媒体と、前記記録媒体からメモリに前記氾濫水位予測 プログラムをロードし、ロードした当該氾濫水位予測プログラムに従って前記氾濫水深を計算するCPUとから構成される氾濫水深予測システムを用い、河川が氾濫した場合の診断対象建物における氾濫水深を予測する氾濫水深予測方法において、
前記CPUが、
氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とのいずれの河川氾濫形態を計算するかを選択する選択画面を表示装置に表示し、ユーザが入力装置から入力する前記河川氾濫形態を選択する番号を受け付ける過程と、
前記CPUが、
前記選択画面においてユーザが入力した番号に対応する河川氾濫形態に応じて、前記氾濫水位予測プログラムにおける当該河川氾濫形態に対応した算術式により、ユーザによって選択された河川氾濫形態における前記診断対象建物の氾濫水深を演算する過程と
を有し、
前記CPUが、
選択された前記河川氾濫形態に対応した算術式に用いる数値を入力させる入力欄の表示画面を、前記表示装置に表示する過程と、
前記CPUが、
選択された河川氾濫形態が前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合、該堤内地貯留型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力及び氾濫面積を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量を氾濫面積により除算することにより氾濫水深を算出しする過程と、
選択された河川氾濫形態が河川・堤内地一体流下型である場合、該河川・堤内地一体流下型に対応する表示画面の前記入力欄に入力される各河川の洪水流出量及び仮の水深を用い、前記河川の洪水流出量を加算し氾濫水量を求め、また前記仮の水深により算術式から合成粗度係数を求め、該合成粗度係数からマニングの等流公式を用いて流速及び流水断面積を算出し、前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致する前記仮の水深を、この仮の水深を氾濫水深とする過程と、
選択された河川氾濫形態が河川・堤内地分離流下型である場合、該河川・堤内地分離流下型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、氾濫河川流域以外の河川の氾濫区域に流水する内水域流出量、仮の水深、流下断面を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量と内水域流出量とを加算して氾濫水量を求め、前記流下断面から求めた氾濫想定幅及び仮の水深により算術式から合成粗度係数を求め、該合成粗度係数と前記流下断面から求めた氾濫想定幅とを用いてマニングの等流公式から流速及び流水断面積を算出し、入力された前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致するまで、仮の水深を入力して流下能力を求め、該流下能力と前記氾濫水量とが一致した前記仮の水深を氾濫水深とする過程と、
選択された河川氾濫形態が河川・堤内地分離道路越流型である場合、該河川・堤内地分離道路越流型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、診断対象建物近傍の土地と道路との標高差および道路越流幅を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、長頂堰の越流公式を用いて道路による堰上げ高を求め、該堰上げ高と前記標高差とを加算し、氾濫水深を算出する過程と
を有することを特徴とする氾濫水深予測方法。
A recording medium in which a flood water level prediction program for predicting flood water depth in a building to be diagnosed when a river is flooded is recorded, the flood water level prediction program is loaded from the recording medium into a memory, and the flood water level prediction program is loaded according to the loaded flood water level prediction program In the inundation depth prediction method for predicting the inundation depth in the building to be diagnosed when the river is inundated , using the inundation depth prediction system composed of the CPU that calculates the inundation depth,
The CPU is
The levee land storage type in which inundated water is stored in the levee land, the river and dam inland flow type in which the flood water flows down the dam ground with the river water level equal to the inland water level, and the river water level and the inland water level River and levee land separation flow type where inundated water flows down the levee in different states, and inundated water flows down the dam with different river water levels and inland water levels, and the overflowed water overflows the road A process for displaying on the display device a selection screen for selecting which type of river flooding is to be calculated for the river / dyke land separation road overflow type and accepting a number for selecting the river flooding mode input by the user from the input device When,
The CPU is
According to the river flooding mode corresponding to the number input by the user on the selection screen , the arithmetic target corresponding to the river flooding mode in the flooding water level prediction program is used to calculate the building to be diagnosed in the river flooding mode selected by the user. The process of calculating the flood depth ,
Have
The CPU is
A process of displaying an input field display screen for inputting a numerical value used in an arithmetic expression corresponding to the selected river flooding form on the display device;
The CPU is
If the selected river flooding mode is the river flooding type in the vicinity of the building to be diagnosed is an inland bank storage type , the river flooding flow entered in the input field of the display screen corresponding to the bank inundation storage type, By using the flooding number, the river flow capacity and the flood area, subtracting the flow capacity from the flood flow and dividing the result by the flood volume to obtain the river flood flow, and dividing the river flood flow by the flood area The process of calculating the flood depth,
If the selected river inundation type is a river / dyke inland integrated flow type, the flood runoff amount and temporary water depth of each river entered in the input field of the display screen corresponding to the river / dyke inland integrated flow type The amount of flood water is calculated by adding the amount of flood runoff of the river, and the synthetic roughness coefficient is obtained from the arithmetic formula based on the provisional water depth. Calculating the area, the provisional water depth in which the inundation water amount and the flow capacity determined from the flow velocity and the cross-sectional area of the flow velocity coincide with each other,
When the selected river flooding form is a river / dyke land separation flow type, the river flood flow rate, the number of river flooding sides entered in the input field of the display screen corresponding to the river / bank land separation flow type , Dividing the result of subtracting the flow capacity from the inundation flow, using the flow capacity of the river, the inundation area, the outflow of the inland water flowing into the flood area of the river other than the inundation river basin, the temporary water depth, and the cross section The river inundation flow is obtained, and the inundation water flow is calculated by adding the river inundation flow and the inflow of the inland water, and the composite roughness coefficient is obtained from the arithmetic formula based on the assumed inundation width and the temporary water depth obtained from the flow cross section. The flow rate and the flow cross-sectional area are calculated from Manning's equal flow formula using the combined roughness coefficient and the estimated inundation width obtained from the flow cross-section, and the flow rate and flow cross-sectional area are obtained from the input flood water amount. Until the flow capacity matches A process by entering search of discharge capacity of the water depth, and flood water depth of depth of the temporary and flow under power and the flooding water are met for,
If the selected river flooding type is a river / dyke land separation road overflow type , the river flood flow rate and river flow entered in the input field of the display screen corresponding to the river / bank land separation road overflow type Divide the result of subtracting the flow capacity from the inundation flow rate by using the flooding number, the river flow capacity, the flood area, the difference in elevation between the land near the diagnosis target building and the road, and the road overflow width. A process of calculating a flood water depth by obtaining a river inundation flow, obtaining a weir height by a road using the overflow formula of a long top weir, adding the weir height and the above-mentioned elevation difference. How to predict the flood depth.
河川が氾濫した場合の診断対象建物における氾濫水深の予測の演算処理を、記録媒体からロードしたコンピュータに実行させる氾濫水深予測プログラムであり、
前記コンピュータが、河川氾濫形態を、氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とのいずれの河川氾濫形態を計算するかを選択する選択画面を表示装置に表示し、ユーザが入力装置から入力する前記河川氾濫形態を選択する番号を受け付ける処理と、
前記コンピュータが、前記選択画面においてユーザが入力した番号に対応する河川氾濫形態に応じて、当該河川氾濫形態に対応した算術式により、ユーザによって選択された河川氾濫形態における前記診断対象建物の前記氾濫水深を演算する処理と
前記演算処理装置が、選択された前記河川氾濫形態に対応した算術式に用いる数値を入力させる入力欄の表示画面を、前記表示装置に表示する処理と、
前記コンピュータが
選択された河川氾濫形態が前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合、該堤内地貯留型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力及び氾濫面積を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量を氾濫面積により除算することにより氾濫水深を算出しする処理と、
選択された河川氾濫形態が河川・堤内地一体流下型である場合、該河川・堤内地一体流下型に対応する表示画面の前記入力欄に入力される各河川の洪水流出量及び仮の水深を用い、前記河川の洪水流出量を加算し氾濫水量を求め、また前記仮の水深により算術式から合成粗度係数を求め、該合成粗度係数からマニングの等流公式を用いて流速及び流水断面積を算出し、前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致する前記仮の水深を、この仮の水深を氾濫水深とする処理と、
選択された河川氾濫形態が河川・堤内地分離流下型である場合、該河川・堤内地分離流下型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、氾濫河川流域以外の河川の氾濫区域に流水する内水域流出量、仮の水深、流下断面を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量と内水域流出量とを加算して氾濫水量を求め、前記流下断面から求めた氾濫想定幅及び仮の水深により算術式から合成粗度係数を求め、該合成粗度係数と前記流下断面から求めた氾濫想定幅とを用いてマニングの等流公式から流速及び流水断面積を算出し、入力された前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致するまで、仮の水深を入力して流下能力を求め、該流下能力と前記氾濫水量とが一致した前記仮の水深を氾濫水深とする処理と、
選択された河川氾濫形態が河川・堤内地分離道路越流型である場合、該河川・堤内地分離道路越流型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、診断対象建物近傍の土地と道路との標高差および道路越流幅を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、長頂堰の越流公式を用いて道路による堰上げ高を求め、該堰上げ高と前記標高差とを加算し、氾濫水深を算出する処理と
を有する氾濫水深予測プログラム。
An inundation depth prediction program that causes a computer loaded from a recording medium to perform calculation processing of inundation depth prediction in a building to be diagnosed when a river is inundated,
The computer has a river inundation form, an inland embankment type in which inundated water is stored in the embankment, and a river / inland integrated flow type in which inundated water flows down the embankment in a state where the river water level is equal to the inland water level. The river and levee land-separated flow type in which the flood water flows down the levee land in a state where the river water level is different from the levee ground water level, and the flood water flows down and flows down in a state where the river water level and the dam ground water level are different The selection screen for selecting whether to calculate the river flooding type of the river where the flooded water overflows the road or the levee separation road overflow type is calculated on the display device, and the river that the user inputs from the input device A process of accepting a number for selecting a flooding form ;
The flooding of the building to be diagnosed in the river flooding mode selected by the user according to the arithmetic formula corresponding to the river flooding mode according to the river flooding mode corresponding to the number input by the user on the selection screen Processing to calculate water depth ,
A process for displaying on the display device a display screen of an input field for allowing the arithmetic processing device to input a numerical value used for an arithmetic expression corresponding to the selected river flooding mode;
The computer is
If the selected river flooding mode is the river flooding type in the vicinity of the building to be diagnosed is an inland bank storage type , the river flooding flow entered in the input field of the display screen corresponding to the bank inundation storage type, By using the number of flooding sides, the river flow capacity and the flood area, dividing the result of subtracting the flow capacity from the flood flow rate by the flood side number to obtain the river flood flow, and dividing the river flood flow by the flood area Processing to calculate flood water depth,
If the selected river inundation type is a river / dyke inland integrated flow type, the flood runoff amount and temporary water depth of each river entered in the input field of the display screen corresponding to the river / dyke inland integrated flow type The amount of flood water is calculated by adding the amount of flood runoff of the river, and the synthetic roughness coefficient is obtained from the arithmetic formula based on the provisional water depth. An area is calculated, and the temporary water depth at which the inundation water amount and the flow capacity determined from the flow velocity and the cross-sectional area of the flow velocity coincide with each other, the temporary water depth is treated as the flood water depth,
When the selected river flooding form is a river / dyke land separation flow type, the river flood flow rate, the number of river flooding sides entered in the input field of the display screen corresponding to the river / bank land separation flow type , Dividing the result of subtracting the flow capacity from the inundation flow, using the flow capacity of the river, the inundation area, the outflow of the inland water flowing into the flood area of the river other than the inundation river basin, the temporary water depth, and the cross section The river inundation flow is obtained, and the inundation water flow is calculated by adding the river inundation flow and the inflow of the inland water, and the composite roughness coefficient is obtained from the arithmetic formula based on the assumed inundation width and the temporary water depth obtained from the flow cross section. The flow rate and the flow cross-sectional area are calculated from Manning's equal flow formula using the combined roughness coefficient and the estimated inundation width obtained from the flow cross-section, and the flow rate and flow cross-sectional area are obtained from the input flood water amount. Until the flow capacity matches Determined by entering the discharge capacity of the water depth, and processing for the depth of the temporary and flow under power and the flooding water was consistent with the flooding water depth,
If the selected river flooding type is a river / dyke land separation road overflow type , the river flood flow rate and the river flow entered in the input field of the display screen corresponding to the river / bank land separation road overflow type Divide the result of subtracting the flow capacity from the inundation flow rate by using the flooding number, the river flow capacity, the flood area, the difference in elevation between the land near the diagnosis target building and the road, and the road overflow width. A flood depth prediction program that calculates the river flood flow, calculates the height of the dam by the road using the overflow formula of the long crest weir, adds the height of the weir and the elevation difference, and calculates the flood depth .
河川が氾濫した場合の診断対象建物における氾濫水深を予測を行う演算処理を、ロードしたコンピュータに実行させる氾濫水深予測プログラムを記録した記録媒体において、
コンピュータが、河川氾濫形態を、氾濫水が堤内地に貯留する堤内地貯留型と、河川水位と堤内地水位とが等しい状態で氾濫水が堤内地を流下する河川・堤内地一体流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下する河川・堤内地分離流下型と、河川水位と堤内地水位とが異なる状態で氾濫水が堤内地を流下し、流下した氾濫水が道路を越流する河川・堤内地分離道路越流型とのいずれの河川氾濫形態を計算するかを 選択する選択画面を表示装置に表示し、ユーザが入力装置から入力する前記河川氾濫形態を選択する番号を受け付ける処理と、
前記コンピュータが、前記選択画面においてユーザが入力した番号に対応する河川氾濫形態に応じて、当該河川氾濫形態に対応した算術式により、ユーザによって選択された河川氾濫形態における前記診断対象建物の前記氾濫水深を演算する処理と、
前記演算処理装置が、選択された前記河川氾濫形態に対応した算術式に用いる数値を入力させる入力欄の表示画面を、前記表示装置に表示する処理と、
前記コンピュータが、
選択された河川氾濫形態が前記診断対象建物近傍の河川氾濫形態が堤内地貯留型である場合、該堤内地貯留型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力及び氾濫面積を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量を氾濫面積により除算することにより氾濫水深を算出しする処理と、
選択された河川氾濫形態が河川・堤内地一体流下型である場合、該河川・堤内地一体流下型に対応する表示画面の前記入力欄に入力される各河川の洪水流出量及び仮の水深を用い、前記河川の洪水流出量を加算し氾濫水量を求め、また前記仮の水深により算術式から合成粗度係数を求め、該合成粗度係数からマニングの等流公式を用いて流速及び流水断面積を算出し、前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致する前記仮の水深を、この仮の水深を氾濫水深とする処理と、
選択された河川氾濫形態が河川・堤内地分離流下型である場合、該河川・堤内地分離流下型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、氾濫河川流域以外の河川の氾濫区域に流水する内水域流出量、仮の水深、流下断面を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、該河川氾濫流量と内水域流出量とを加算して氾濫水量を求め、前記流下断面から求めた氾濫想定幅及び仮の水深により算術式から合成粗度係数を求め、該合成粗度係数と前記流下断面から求めた氾濫想定幅とを用いてマニングの等流公式から流速及び流水断面積を算出し、入力された前記氾濫水量と該流速及び流速断面積から求めた流下能力とが一致するまで、仮の水深を入力して流下能力を求め、該流下能力と前記氾濫水量とが一致した前記仮の水深を氾濫水深とする処理と、
選択された河川氾濫形態が河川・堤内地分離道路越流型である場合、該河川・堤内地分離道路越流型に対応する表示画面の前記入力欄に入力される河川の氾濫流量、河川の氾濫側数、河川の流下能力、氾濫面積、診断対象建物近傍の土地と道路との標高差および道路越流幅を用い、前記氾濫流量から流下能力を減算した結果を氾濫側数で除算して河川氾濫流量を求め、長頂堰の越流公式を用いて道路による堰上げ高を求め、該堰上げ高と前記標高差とを加算し、氾濫水深を算出する処理と
を有する氾濫水深予測プログラムを記録した記録媒体。
In a recording medium recording a flood depth prediction program that causes a loaded computer to execute a calculation process for predicting the flood depth in a building to be diagnosed when a river is flooded,
A computer has a river inundation form, an inland embankment type in which inundated water is stored in the embankment, and a river and embankment integrated flow type in which inundated water flows down the embankment with the river water level equal to the inland water level, The river and levee land separation flow type in which the flood water flows down the levee land in a state where the river water level and the levee ground water level are different, and the flood water flows down and flows down in the state where the river water level and the dam ground water level are different A selection screen for selecting whether to calculate the river flooding mode of the river or levee land separation road overflow type where flood water overflows the road is displayed on the display device, and the river flooding that the user inputs from the input device A process of accepting a number for selecting a form ;
The flooding of the building to be diagnosed in the river flooding mode selected by the user according to the arithmetic formula corresponding to the river flooding mode according to the river flooding mode corresponding to the number input by the user on the selection screen Processing to calculate water depth,
A process for displaying on the display device a display screen of an input field for allowing the arithmetic processing device to input a numerical value used for an arithmetic expression corresponding to the selected river flooding mode;
The computer is
If the selected river flooding mode is the river flooding type in the vicinity of the building to be diagnosed is an inland bank storage type , the river flooding flow entered in the input field of the display screen corresponding to the bank inundation storage type, By using the number of flooding sides, the river flow capacity and the flood area, dividing the result of subtracting the flow capacity from the flood flow rate by the flood side number to obtain the river flood flow, and dividing the river flood flow by the flood area Processing to calculate flood water depth,
If the selected river inundation type is a river / dyke inland integrated flow type, the flood runoff amount and temporary water depth of each river entered in the input field of the display screen corresponding to the river / dyke inland integrated flow type The amount of flood water is calculated by adding the amount of flood runoff of the river, and the synthetic roughness coefficient is obtained from the arithmetic formula based on the provisional water depth. An area is calculated, and the temporary water depth at which the inundation water amount and the flow capacity determined from the flow velocity and the cross-sectional area of the flow velocity coincide with each other, the temporary water depth is treated as the flood water depth,
When the selected river flooding form is a river / dyke land separation flow type, the river flood flow rate, the number of river flooding sides entered in the input field of the display screen corresponding to the river / bank land separation flow type , Dividing the result of subtracting the flow capacity from the inundation flow, using the flow capacity of the river, the inundation area, the outflow of the inland water flowing into the flood area of the river other than the inundation river basin, the temporary water depth, and the cross section The river inundation flow is obtained, and the inundation water flow is calculated by adding the river inundation flow and the inflow of the inland water, and the composite roughness coefficient is obtained from the arithmetic formula based on the assumed inundation width and the temporary water depth obtained from the flow cross section. The flow rate and the flow cross-sectional area are calculated from Manning's equal flow formula using the combined roughness coefficient and the estimated inundation width obtained from the flow cross-section, and the flow rate and flow cross-sectional area are obtained from the input flood water amount. Until the flow capacity matches Determined by entering the discharge capacity of the water depth, and processing for the depth of the temporary and flow under power and the flooding water was consistent with the flooding water depth,
If the selected river flooding type is a river / dyke land separation road overflow type , the river flood flow rate and the river flow entered in the input field of the display screen corresponding to the river / bank land separation road overflow type Divide the result of subtracting the flow capacity from the inundation flow rate by using the flooding number, the river flow capacity, the flood area, the difference in elevation between the land near the diagnosis target building and the road, and the road overflow width. A flood depth prediction program that calculates the river flood flow, calculates the height of the dam by the road using the overflow formula of the long crest weir, adds the height of the weir and the elevation difference, and calculates the flood depth A recording medium on which is recorded.
JP2002101550A 2002-04-03 2002-04-03 Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program Expired - Lifetime JP4190788B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002101550A JP4190788B2 (en) 2002-04-03 2002-04-03 Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002101550A JP4190788B2 (en) 2002-04-03 2002-04-03 Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program

Publications (2)

Publication Number Publication Date
JP2003296516A JP2003296516A (en) 2003-10-17
JP4190788B2 true JP4190788B2 (en) 2008-12-03

Family

ID=29388703

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002101550A Expired - Lifetime JP4190788B2 (en) 2002-04-03 2002-04-03 Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program

Country Status (1)

Country Link
JP (1) JP4190788B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4431545B2 (en) * 2006-03-24 2010-03-17 株式会社日立エンジニアリング・アンド・サービス Inundation simulation device and program
CN106844973A (en) * 2017-01-25 2017-06-13 云南省水利水电勘测设计研究院 A kind of method for inquiring into mini basin design flood
KR101906858B1 (en) 2017-06-28 2018-10-12 홍익대학교 산학협력단 Flood forecast method using numerical model and perimeter interpolation
CN114970315B (en) * 2022-04-19 2023-08-04 河海大学 A method for urban water accumulation simulation and rapid prediction based on deep learning of spatial dynamic features
CN115345069A (en) * 2022-07-28 2022-11-15 中国科学院南京地理与湖泊研究所 Lake water volume estimation method based on maximum water depth record and machine learning
CN120217488B (en) * 2025-02-28 2025-11-21 广东珠荣工程设计有限公司 A solid bed dam design method and system based on multi-source data

Also Published As

Publication number Publication date
JP2003296516A (en) 2003-10-17

Similar Documents

Publication Publication Date Title
Viero et al. Mathematical modeling of flooding due to river bank failure
Hsu et al. Inundation simulation for urban drainage basin with storm sewer system
Amaguchi et al. Development and testing of a distributed urban storm runoff event model with a vector-based catchment delineation
Alcoverro et al. The Barranco de Arás flood of 7 August 1996 (Biescas, Central Pyrenees, Spain)
JP2008050903A (en) Flood prediction method and flood prediction system
Balogun et al. Study and analysis of Asa River hypothetical dam break using HEC-RAS
Ansori et al. Flood inundation and Dam break analysis for disaster risk mitigation (a case study of way apu dam)
JP4190788B2 (en) Inundation depth prediction system, inundation depth prediction method, inundation depth prediction program and recording medium recording inundation depth prediction program
Kang et al. A sensitivity analysis approach of multi-attribute decision making technique to rank flood mitigation projects
JP5270322B2 (en) Sewerage facility inundation countermeasure system
Chen et al. Numerical simulation of potential inundation in a coastal zone
Chao et al. Extreme bed changes in the Gaoping River under climate change
McMahon Developing dam-break flood zone ordinance
YOSHIDA et al. Numerical Simulation of Runoff Peak Cut Potential through Paddy Field Dams as Green Infrastructure in Toyama Prefecture, Japan
Sarvarian Two-objective Optimization of Location and Geometric Characteristics of Rockfill Dams at the Taleghan Basin by NSGA-II
JP2018178544A (en) Multiple Reservoir 氾濫 Analyzer, Multiple Reservoir 氾濫 Analysis Method
Belikov et al. NUMERICAL STUDY OF ICE AND CHANNEL PROCESSES ON THE BRIDGE SUPPORTS ACROSS THE KUIBYSHEV RESERVOIR (KAZAN)
Udom Evaluation of Flood Risk Reduction Project at Tenggang River, Semarang City, Central Java Province, Indonesia
Prasetyorini et al. Integrated flood risk modeling and nature-based solutions in the Petung Sub-Watershed, Pasuruan, East Java, Indonesia
Guangming et al. Investigation, Evaluation and Countermeasures of Flood Disaster in Rural Grassroots in Plain Area
Lazaridou et al. Integrated environmental and hydraulic design of Xerias river, Corinthos, Greece, training works
Süme et al. Management and Planning Without Overflowing from the Riverbed
Chancel et al. Approach to Estimate the Probability That Internal Erosion Will Initiate a Breach through an Embankment Applied to Levees with an Important Linear and Heterogeneous Facies
Breithaupt et al. Effects of wetland restoration on floodplain hydrodynamics under extreme flooding conditions
Weeks et al. Water management during the Pinto Valley removal action

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050315

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071127

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080128

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080422

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080618

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20080701

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080909

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080917

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4190788

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130926

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term