JP4191322B2 - Steam turbine plant installation method - Google Patents
[go: Go Back, main page]

JP4191322B2 - Steam turbine plant installation method - Google Patents

Steam turbine plant installation method Download PDF

Info

Publication number
JP4191322B2
JP4191322B2 JP16869899A JP16869899A JP4191322B2 JP 4191322 B2 JP4191322 B2 JP 4191322B2 JP 16869899 A JP16869899 A JP 16869899A JP 16869899 A JP16869899 A JP 16869899A JP 4191322 B2 JP4191322 B2 JP 4191322B2
Authority
JP
Japan
Prior art keywords
steel
turbine
pressure turbine
bearing
generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16869899A
Other languages
Japanese (ja)
Other versions
JP2001003708A (en
Inventor
龍太郎 馬越
哲 小西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP16869899A priority Critical patent/JP4191322B2/en
Publication of JP2001003708A publication Critical patent/JP2001003708A/en
Application granted granted Critical
Publication of JP4191322B2 publication Critical patent/JP4191322B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、蒸気タービンプラントにおける復水器の据付構造及び同復水器の熱膨張等を考慮したタービン発電機のアライメント方法に関する。
【0002】
【従来の技術及び発明が解決しようとする課題】
図3は、蒸気タービン及びこれに駆動される発電機(以下タービン発電機という)の1例を示す概略側面図である。
【0003】
図3に示すタービン発電機は、タンデム型低圧4フロー再熱タービンであり、図3において、2は高圧タービン、3は中圧タービン、4は第1低圧タービン、5は第2低圧タービン、6は発電機、10は復水器である。また61は高圧タービン2の回転軸である高圧タービン軸、62は中圧タービン3の回転軸である中圧タービン軸、63a及び63bは第1低圧タービン4及び第2低圧タービン5の回転軸である低圧タービン軸、64は発電機6の回転軸である発電機軸であり、これらの各軸を串状に連結して、タンデム型タービン発電機を構成し、タービン架台511(図17参照)上に取付けている。
【0004】
21及び22は上記高圧タービン軸61を支持する No.1(#1)軸受及び No.2(#2)軸受、23及び24は上記中圧タービン軸62を支持する No.3(#3)軸受及び No.4(#4)軸受、25及び26は上記低圧タービン軸63aを支持する No.5(#5)軸受及び No.6(#6)軸受、27及び28は上記低圧タービン軸63bを支持する No.7(#7)軸受及び No.8(#8)軸受、29a及び29bは上記発電機軸64を支持する No.9(#10)軸受及び No.10(#10)軸受である。
【0005】
そして、上記タービン発電機の各軸受21〜28,29a,29bは、高圧タービン2、中圧タービン3、第1低圧タービン4、第2低圧タービン5及び発電機6の重量が、これら各軸受にその軸受容量に応じて負荷されるように、各軸受の上下方向位置をシム等を介して調整されて、つまりアライメントを施されて上記タービン架台511(図17参照)に固定されている。
【0006】
図17は従来のタービン発電機における低圧タービン及び復水器を軸平行方向に視たる図(図3のA−A矢視図)である。図17に示すように、上記復水器10は第1,第2低圧タービン4,5の下部に伸縮継手71を介して取付けられている。そして上記復水器10はその下面を基礎架台50に固定され、上記のようにタービン架台511に取付けられた第1,第2低圧タービン4,5との熱膨張差は上記伸縮継手71によって吸収するようになっている。
【0007】
また、図7は鋼製の共通架台(鋼製架台1)上に取付けたタービン発電機の1例を示す。図7におけるタービン発電機の構成及び軸受の配置は図3と同様であり、図3と同一の部材は同一の符号にて示す。尚、111はタービン発電機用の計器である。
【0008】
図7に示すように、タービン発電機を共通の鋼製架台1に取付けて据付けるようにした据付装置にあっては、基礎架台50上に弾性支持した鋼製架台1上にタービン発電機を固定していることから、後述する理由により、図17に示すような伸縮継手71を設けていない。
【0009】
しかしながら、図17に示されるような従来の復水器の取付構造及びかかる取付構造に基づく軸受のアライメント方法による場合は次のような問題点がある。
【0010】
上記タービン発電機の運転時において、復水器10内の真空による下向きの真空荷重が第1,第2低圧タービン4,5及び復水器10に作用する。図17に示す従来のものにおいては、低圧タービン4,5と復水器10との間に伸縮継手71が介装されているため、低圧タービン側に掛かる上記真空荷重は低圧タービン4,5が固定されたタービン架台511で受けている。従って、タービン架台511に鋼製架台1を用いる場合には、鋼製架台1の剛性がコンクリート架台等よりも小さく、変形能が大きいことから、鋼製架台1のみで上記真空荷重を受けるのが強度上困難である。このため、上記鋼製架台1を用いる場合には、上記伸縮継手71を設けずに、低圧タービン4,5と復水器10とを直結することにより上記真空荷重は鋼製架台1及び復水器10のいずれにも作用しない。
【0011】
然るに、上記のように、鋼製架台1にタービン発電機を据付け、伸縮継手71を用いない据付構造にあっては、上記タービン発電機の運転中において、上記復水器10は上方に熱膨張するとともに、タービン発電機が固定される鋼製架台1も鋼材からなるため、コンクリート架台に較べて架台1自体の熱変形が大きくなる。このため、従来の方法のように、タービン発電機の冷態時における軸受荷重をベースとしてアライメントを行なう場合は、タービン発電機の運転中においては、上記復水器10の熱膨張や鋼製架台の熱変形及び上記真空荷重による変形によって、架台1の上記各軸受21〜28,29a,29b取付部が上下に変位して、各軸受の軸受荷重が、当初のアライメント時から変化し、軸受荷重の不均一が生じて軸受の摩耗や焼付きを引き起こすこととなる。
【0012】
従って本発明の目的は、鋼製架台によりタービン発電機を支持するようにした蒸気タービンプラントにおいて、復水器の真空荷重を鋼製架台の過大な変形を伴うことなく支持可能とするとともに、復水器の熱膨張や鋼製架台の熱変形による軸受荷重の過大化及びこれに伴う軸受の摩耗焼付き等の不具合の発生を防止することにある。
【0013】
次に、図7に示されるような、鋼製架台1上に蒸気タービンプラントの各機器を固定した型式の蒸気タービンプラントにあっては、鋼製架台1がコンクリート架台等に較べて熱伝導率が格段に大きく、熱によって変形し易い。
【0014】
このため、上記蒸気タービンプラントにおいては、蒸気配管や各軸受部7,89,211等を潤滑して昇温された潤滑油が通流する排油管からの熱が鋼製架台1に伝達され、これによって鋼製架台1が熱変形を起こし易くなる。
【0015】
然るに、上記蒸気タービンプラントにおいては、従来、蒸気配管はタービンの回転中心に関して左、右方向にほぼ対称に配置されている一方で、上記排油管は各軸受部から出された枝管を上記架台1の1側に取付けられ、前後に延設された排油主管を通して油タンクに戻される構造となっている。
【0016】
このため、上記従来の蒸気タービンプラントにあっては、排油主管が鋼製架台1の片側に配設されているため、鋼製架台1は、同排油主管が取付けられた側の熱変形がこれと反対側よりも大きくなって、タービン回転軸心に関して非対称に変形することとなり、軸受のアライメントの変動や軸振動の増大等の不具合を誘発する。
【0017】
従って本発明に係る他の第1検討課題は、鋼製架台上に蒸気タービン及び発電機を取付けてなる蒸気タービンプラントにおいて、鋼製架台周りの配管の不均一による鋼製架台の片寄った熱変形及びこれによって引き起される軸受アライメントの変動や軸振動の増大等の不具合の発生を防止することにある。
【0018】
次に、ガスタービンあるいは蒸気タービン(以下タービンという)で発電機を駆動するタービン発電プラントにおいては、タービンと発電機とを連結した据付状態における全長が長く、かつ大重量であるため、発電所の据付構造は高剛性の据付構造となっている。
【0019】
図18は上記タービン発電プラントの据付構造の1例を示す概略正面図(回転軸心に平行方向に観たる図)であり、図18において110は発電所の建屋、111は同建屋内の機器操作用床部、112はコンクリート架台である。113は上記タービンと発電機とを直結してなるタービン発電機であり、同タービン発電機113は上記コンクリート架台112上に固定されている。
【0020】
上記タービン発電機113を製作工場にて製作し、船舶車両等の輸送機関で発電所まで運搬して、建屋110内の据付場所に据付けるにあたっては、従来は製作工場内でタービン及び発電機を製作し、両者を工場内の運転架台上にて連結して所定の性能及び強度確認試験運転を行った後、上記運転架台からタービン及び発電機を取外し上記輸送機関に搭載して上記据付場所まで運搬し、図18に示すように、タービン及び発電機をコンクリート架台112上においてアライメント調整等の所定の調整を行って連結し、上記架台112上に固定していた。
【0021】
しかしながら、上記従来の方法にあっては、製作工場内の運転架台上でタービンと発電機とをアライメント調整等の所定の調整を行なって連結して各種試験運転を行なった後、両者を切り離して輸送機関に搭載、運搬し、据付場所(発電所の建屋110内)のコンクリート架台112において再度タービン及び発電機を上記所定の調整を行って据付けるため、据付場所での据付工事及び製作工場から据付場所までの輸送に多大な工数を要するとともに、他の関連機器の据付工事と錯綜して据付作業能率が低下するという問題点を有している。
【0022】
また上記従来の方法にあっては、タービン発電機113をコンクリート架台112上に固定するため、地震時の発生荷重が大きくなり、地震の影響を直接受け易い。
【0023】
そこで本発明の発明者らは特願平10−176163号にて上記複数の機器を単一の鋼製架台に取付け、固定して双方が一体化されたモジュール体となし、同モジュール体を据付場所の建屋等の据付用構造物に固定する方法を提案した。
【0024】
しかしながら上記方法は複数の機器を単一の鋼製架台に取付けて、輸送し据付ける方法であるため、低圧4フローの再熱蒸気タービン等の軸方向に連結される機器の数が多く、全長の長いプラントの場合には適用困難なことがある。
【0025】
従って、本発明に係る他の第2検討課題は、軸方向に連結される機器の数が多く、全長の長いプラントであっても、上記機器を鋼製架台に取付けての輸送及び据付工事の工数を従来方法よりも大幅に低減するとともに、他の工事との錯綜等を回避して据付作業能率を向上し、輸送、据付コストを低減することにある。
【0026】
次に、近年、火力プラントにおいては、蒸気タービン及び発電機を1個の鋼製架台上に固定し、同鋼製架台を複数のばね機構及び粘性摩擦ダンパからなる制振ダンパを介して基礎架台上に据付ける据付方法が採用されてきている。
【0027】
かかる鋼製架台を用いた蒸気タービン及び発電機(以下タービン発電機と称する)の一例としては、図7に示すように、多数の鋼板を溶接して構成された鋼製架台1上に、高圧タービン2、中圧タービン3、2組の低圧タービン4,5及び発電機6を直列に配置して、これらを上記架台1に固定してなるものがある。尚、10は上記2組の低圧タービン4,5の下部に連結された復水器である。
【0028】
また、7は中圧タービンと第1段低圧タービン4との間の軸受部、8は第1段低圧タービン4と第2段低圧タービン5との間の軸受部、9は第2段低圧タービン5と発電機6との間の軸受部である。さらに、111は上記タービン発電機の各種計測用の計器で、同計器111は上記鋼製架台1の上記高圧タービン2近傍の位置に固定されている。
【0029】
図19〜図20には上記鋼製架台201の従来の1例が示されており、図19は平面視図(図20のB−B矢視図)、図20は図19のA−A矢視図である。図19〜図20において、211はタービン2〜5を取付けるためのスペースであるタービン取付用空間、221は発電機6を取付けるためのスペースである発電機取付用空間である。
【0030】
71は床板、72は底板、73は前面板、74は後面板、75,76は側面板であり、この鋼製架台20は、上記各板を鋼板で構成し、この鋼板をそのまま直接にあるいは所定の形状に折り曲げて溶接し、内部に強度部材としての複数の鋼板製リブ77を適宜設けて上記各板に溶接することによって箱状に形成されている。
【0031】
しかしながら図19〜図20に示されるような従来の鋼製架台を用いるタービン発電機の据付構造には次のような問題点がある。
【0032】
鋼製架台201は、上記のように多数の鋼板を溶接して成り、コンクリート架台等に較べて軽量でかつ所要の剛性を備えているが、鋼板の溶接構造であるため、同鋼製架台201自体の固有振動数が高くなり、タービン発電機の定格回転数に近い値になる。
【0033】
このため、上記従来の鋼製架台201を用いた据付構造にあっては、鋼製架台201の固有振動数とタービン発電機の軸回転数とが同期することがあり、かかる現象が発生すると、タービン発電機の軸振動と鋼製架台201の固有振動との共振が発生し、軸受の摩耗あるいは焼付きや、回転軸の破損等を引き起す。
【0034】
従って本発明に係る他の第3検討課題は、鋼製架台を用いた機器の据付装置において、鋼製架台の剛性を上げて固有振動数を上昇させ、鋼製架台の固有運動数が軸回転数と同期するのを回避して共振の発生を防止し、軸受の摩耗、焼付きや軸の損傷の発生を防止することにある。
【0035】
【課題を解決するための手段】
本発明は上記のような問題点を解決するものであり、上記の目的を達成する手段は請求項1に記載の通りである。
【0036】
即ち請求項1の手段は、蒸気タービンプラントの据付方法において、下端に復水器が直接固定された低圧タービンを含む蒸気タービン及び発電機を、鋼材を溶接してなる鋼製架台に固定し、同鋼製架台をばね機構及び制振ダンパを介して基礎架台に支持するようにした蒸気タービンプラントの軸受のアライメントを行なうにあたり、上記各軸受の冷態時における上下方向位置を、上記鋼製架台上の各軸受取付部の、蒸気タービンプラント運転中における上記復水器と上記鋼製架台の熱変形による方への変位量に相当する量だけ、基準アライメント位置から運転中の位置とは逆方向の低い位置にずらして設定することを特徴としている。
【0037】
上記手段によれば、各軸受の冷態時における上下方向位置(アライメント)を、復水器と鋼製架台の運転中における熱変形による上方への変位量に相当する量だけ、基準アライメント位置から逆方向の低い位置にずらして設定したので、各軸受は、蒸気タービンプラントの運転中には上記復水器と鋼製架台の上記熱による変位によって上記基準アライメント位置となる。これにより、各軸受は正規の軸受荷重に保持され、特定の軸受の軸受荷重が過大化してその軸受が摩耗や焼付きを引き起こすことは無い。
【0038】
【発明の実施の形態】
以下図面を参照して本発明の実施形態を詳細に説明する。
【0039】
図3は本発明が適用される蒸気タービン発電機の1例を示す概略側面図である。
【0040】
図3において、2は高圧タービン、3は中圧タービン、4は第1低圧タービン、5は第2低圧タービン、6は発電機、10は復水器である。また61は高圧タービン2の回転軸である高圧タービン軸、62は3の回転軸である中圧タービン軸、63a及び63bは第1低圧タービン4及び第2低圧タービン5の回転軸である低圧タービン軸、64は発電機6の回転軸である発電機軸であり、これらの各軸を串状に連結して、タンデム型タービン発電機を構成している。
【0041】
21及び22は上記高圧タービン軸61を支持する No.1(#1)軸受及び No.2(#2)軸受、23及び24は上記中圧タービン軸62を支持する No.3(#3)軸受及び No.4(#4)軸受、25及び26は上記低圧タービン軸63aを支持する No.5(#5)軸受及び No.6(#6)軸受、27及び28は上記低圧タービン軸63bを支持する No.7(#7)軸受及び No.8(#8)軸受、29a及び29bは上記発電機軸64を支持する No.9(#9)軸受及び No.10(#10)軸受である。
【0042】
上記タービン発電機の各軸受21,22,23,24,25,26,27,28,29a,29bは後述するようなアライメント方法によって、鋼製架台1上に取付けられている。
【0043】
図7は上記タービン発電機を鋼製架台1上への取付状態を示す外観斜視図である。図7におけるタービン発電機の構成及び軸受の配置は図3と同様であり、図3と同一の部材は同一の符号にて示す。尚、111はタービン発電機用の計器である。
【0044】
図1〜図2は請求項1の発明に対応する実施形態に係る蒸気タービンプラントの据付構造を示し、図1は図3のA−A線矢視図、図2は図1のZ部及びY部、つまりばね機構及び制振ダンパの構造図である。
【0045】
図1において、第1低圧タービン4及び第2低圧タービン5は、上記のように、鋼製架台1上に固定されている。そして上記第1,第2低圧タービン4,5の下端には上記復水器10が、図6に示すような伸縮継手71を介することなく、直接固定されている。
【0046】
また、上記鋼製架台1は、並列に配置された複数のばね機構40及び複数の制振ダンパ30を介して基礎架台50に弾性及び防振支持されている。さらに、上記復水器10は、その下端と基礎架台50との間に、複数のばね機構40及び制振ダンパ30を並列に配置して、これらばね機構40及び制振ダンパ30により弾性及び防振支持されている。
【0047】
上記ばね機構40及び制振ダンパ30の詳細を示す図2において、上記ばね機構40は、上部ばね受40a、下部ばね受40b、上部ばね受40aと下部ばね受40bとの間に複数個並列に設けられたばね(圧縮ばね)40g、及び同ばね40gの取付荷重を調整するための調整ボルト40eからなる。そして、同ばね機構40は上部ばね受40bと鋼製架台1あるいは復水器10との間に粘着ばね受シート40cを介装するとともに、下部ばね受40aと基礎架台50との間に粘着シート40dを介装して、上記鋼製架台1あるいは復水器10と基礎架台50との間に挿入されている。
【0048】
一方、上記制振ダンパ30は、上部ケース30aと下部ケース30bとの間に形成される密閉空間内にシリコン油等の粘性流体30cを封入してなる。そして、上記上部ケース30aは上記鋼製架台1あるいは復水器10の下面に溶接され(ボルト締めでも可)、下部ケース30bは複数のボルト30eにより上記基礎架台50に固定されている。
【0049】
上記のように構成されたタービン発電機の据付構造において、タービン発電機の運転中、鋼製架台1には、タービン発電機を構成する各機器の重量のみが下向きに作用し、真空荷重を受けることはない。
【0050】
これによって、従来のもののような鋼製架台1に上記真空荷重による過大な荷重が作用するのを防止できる。
【0051】
上記のようにタービン発電機の運転中、復水器10の熱膨張によって、復水器10及びこれが固定された第1低圧タービン4及び第2低圧タービン5に上下方向の変位が生ずるが、鋼製架台1及び復水器10をばね機構40及び制振ダンパ30を介して基礎架台50に支持しているので、上記ばね機構40及び制振ダンパ30からなる弾性、防振支持機構によって上記のような上下方向の変位は吸収され、この上下方向変位により、鋼製架台1に過大荷重が掛かることは無い。
【0052】
次に上記実施形態に係るタービン発電機の軸受のアライメント方法について説明する。上記復水器10は、上記のように、その熱膨張により上方に変位する。また上記鋼製架台1は鋼材を溶接してなるため、同架台1自体が温度上昇によって熱変形を起こすとともに、上記のように真空荷重F等の力による変形も生ずる。従って、上記鋼製架台1は上記復水器10の熱膨張による変形及び同架台1自体の変形によって、全体として上方に変位することとなる。
【0053】
図4は上記鋼製架台1の軸方向における上記変位の状況を示す。図4においてAは変位0(ゼロ)の基準となるアライメント、Bは運転中における架台1の実際の変位量、#1〜#10は No.1軸受21〜 No.10軸受29bの位置を夫々示す。
【0054】
図4に明らかなように、上記鋼製架台1は、運転中全体として上方に変位し、その変位量は、復水器10の熱膨張の影響を受ける第1,第2低圧タービン4,5(LP1,LP2)近傍が最も大きくなる。
【0055】
このため本発明の実施形態においては、タービン発電機の冷態時、つまり据付時における各軸受21〜29bのアライメントつまり、軸受の上下方向位置を図4のA線に示す基準アライメントから、B線に示す変位量Sだけ低い位置に設定し、これにより、各軸受21〜29bのアライメントは図4のB線に対称なC線となる。
【0056】
上記実施形態によれば、タービン発電機の各軸受のアライメントを鋼製架台1の運転中における変位量に相当する量だけ、基準アライメントAに対して低い位置に設定しているので、タービン発電機の運転中には、図4のB線に示すような鋼製架台1の上方への変位によって各軸受21〜29bのアライメントは上記基準アライメントAの位置となる。
【0057】
これにより、タービン発電機の各軸受21〜29bの軸受荷重は上記基準アライメントA線にて設定された正規の軸受荷重に維持され、特定の軸受の軸受荷重が過大化してその軸受の摩耗や焼付きを誘発するのが回避される。
【0058】
次に図5〜図6は本発明に係り本発明者が検討した第1検討例の蒸気タービンプラントの配管構造を示し、図5はその平面図、図6は図5のA矢視図である。また図7は上記配管構造が用いられる蒸気タービンプラントの外観斜視図である。
【0059】
図7において、1は鋼材を溶接してなる鋼製架台、2は高圧タービン、3は中圧タービン、4は第1低圧タービン、5は第2低圧タービン、6は発電機、10は復水器、111は計器である。
【0060】
また211は高圧タービン2の前側の軸受部、7は中圧タービン3と第1低圧タービン4との間の軸受部、8は第1低圧タービン4と第2低圧タービン5との間の軸受部、9は第2低圧タービン5と発電機6との間の軸受部である。上記のような蒸気タービンプラントの各機器が固定された鋼製架台1は、複数のばね機構及び制振ダンパ(何れも図示省略)を介して基礎架台(図示省略)に取付けられている。以上の基本とする構成は従来のものと同様である。
【0061】
この検討例においては図7に示す蒸気タービンプラントの配管構造を改良している。
即ち、図5〜図6において、1は鋼製架台で、同鋼製架台1上には図7と同様に、高圧タービン2、中圧タービン3、第1低圧タービン4、第2低圧タービン5及び発電機6が串状に連結されて固定されている。17は油タンクで、基礎架台53上に固定されている。
【0062】
11及び12は、上記鋼製架台1の左側部及び右側部に夫々取付けられた左列排油管及び右列排油管である。上記左列排油管11及び右列排油管12には、上記高圧タービン2、中圧タービン3、第1低圧タービン4、第2低圧タービン5、及び発電機6の各軸受部21,7,8,9等の潤滑部から排出された潤滑油が左列及び右列の各枝管14及び15を通って流入するようになっている。
【0063】
上記右列排油管12は、連通管13を介して左列排油管11と連通され、同連通管13による合流部の下流には集合管16が設けられ、同集合管16の出口は上記油タンク17に接続されている。
【0064】
そして、上記左列排油管11と右列排油管12とは、図2に示すように、これらの中心線31,32が蒸気タービンプラントの回転軸心301に対して同一距離S(ほぼ同一距離であればよい)になるように、また、好ましくは管径や管長も左、右方向(上記回転軸心301に直角な水平方向)に対称に設置されている。また上記左側の枝管14及び右側の枝管15についても、その数、管長、管径ともに上記回転軸心301に対して対称に設けられている。
【0065】
上記のように構成された蒸気タービンプラントにおいて、上記各タービンの軸受部21,7,8,9(図3参照)等の潤滑部を潤滑して昇温された潤滑油(排油)は、左右の各枝管14,15を通って左列排油管11及び右列排油管12に流入する。そして右列排油管12を流れた潤滑油は連通管13を通り、その下流部で左列排油管11からの潤滑油と合流し、集合管16を経て油タンク17に戻される。
【0066】
上記排油時において、蒸気タービンプラント各部を潤滑した後の潤滑油即ち排油の温度が上昇するため、左列及び右列排油管11及び12、並びに左側及び右側の枝管14及び15の温度が上昇し、これらの配管が取付けられている鋼製架台1の温度も上昇する。
【0067】
然るに本発明の検討例においては、上記のように鋼製架台1の回転軸心301に対称に、左列排油管11及び右列排油管12を設けるとともに、左側の枝管14及び右側の枝管15を設けているので、これらの配管が取付けられている鋼製架台1の温度も、上記回転軸心30に対して左側と右側とで略同一温度となる。
【0068】
これによって上記鋼製架台1の上記排油管系の温度上昇による熱変形も回転軸心30に対して左、右で略同一となり、従来のもののような非対称な熱変形による軸アライメントの変動や軸振動の増大等の不具合の発生が回避される。
【0069】
尚、この検討例では、排油管系を、鋼製架台1の上記回転軸心301に対して対称に設けたが、これに加えて蒸気管や鋼製架台1の加熱源となる他の配管類も上記回転軸心301に対して対称に設けることができる。
【0070】
さらに、本検討例ここに示すようなタンデム型低圧4フロー再熱タービンに限らず、蒸気タービンを鋼製架台に支持するようにしたあらゆる蒸気タービンプラントに適用できる。
【0071】
次に図8〜図13は本発明に係り本発明者が検討した第2検討例の蒸気タービンプラントの据付構造及び輸送手段を示し、図8は蒸気タービンプラントの据付状態を示す要部側面図、図9は上記据付状態を示す外観斜視構成図、図10は鋼製架台の連結部を示す拡大側面図、図11は図10のA−A矢視図、図12はモジュール体の船舶での輸送時を示す概略斜視図、図13は上記輸送時におけるモジュール体の固定手段を示す側面図である。
【0072】
図8〜図9において、2は高圧タービン、3は中圧タービン、4は第1低圧タービン、5は第2低圧タービン、6は発電機、10は復水器である。また61は高圧タービン2の回転軸である高圧タービン軸、62は中圧タービン3の回転軸である中圧タービン軸、63a及び63bは第1低圧タービン4及び第2低圧タービン5の回転軸である低圧タービン軸、64は発電機6の回転軸である発電機軸であり、これらの各軸を串状に連結して、タンデム型蒸気タービン発電機を構成している。
【0073】
21及び22は上記高圧タービン軸61を支持する No.1(#1)軸受及び No.2(#2)軸受、23及び24は上記中圧タービン軸62を支持する No.3(#3)軸受及び No.4(#4)軸受、25及び26は上記低圧タービン軸63aを支持する No.5(#5)軸受及び No.6(#6)軸受、27及び28は上記低圧タービン軸63bを支持する No.7(#7)軸受及び No.8(#8)軸受、29a及び29bは上記発電機軸64を支持する No.9(#9)軸受及び No.10(#10)軸受である。
【0074】
また、図9において、211は上記高圧タービン2の前部の軸受部、7は中圧タービン3と第1低圧タービン4との間の軸受部、8は第1低圧タービン4と第2低圧タービン5との間の軸受部、9は第2低圧タービン5と発電機6との間の軸受部、45は発電機6の後部の軸受部である。
【0075】
1は鋼製架台であり、軸方向において、前部架台101、中央架台102及び後部架台103に3分割され、これらを後述するように、ボルト34によって連結して構成される。そして上記鋼製架台1を構成する前部架台101には、高圧タービン2及び中圧タービン3が No.1軸受21、 No.2軸受22、 No.3軸受23及び No.4軸受24を介して固定され、中央架台102には第1,第2低圧タービン4,5が No.5軸受25、 No.6軸受26、 No.7軸受27及び No.8軸受28を介して固定され、さらに後部架台103には、発電機6が、 No.9軸受、及び No.10軸受を介して固定されている。
【0076】
そして、上記前部架台101には高圧タービン2、中圧タービン3及びこれらに付属する全ての部材、並びに配管及び配線が、中央架台102には第1,第2低圧タービン4,5及びこれらに付属する全ての部材、並びに配管及び配線が、さらに後部架台103には発電機6及びこれに付属する全ての部材並びに配管及び配線が、これら各架台101,102,103を切り離して運搬可能なように取付けられている。104は前部架台101と中央架台102との結合部、105は中央架台102と後部架台103との結合部である。
【0077】
尚、上記鋼製架台1の分割態様は、この検討例の態様に限らず、2分割でも、4分割以上でもよく、また分割された各架台には上記検討例の態様に限らず、所要数の機器を固定できる。
【0078】
上記のようにして3つの架台101,102,103が結合された鋼製架台1は複数のばね機構40及び制振ダンパ30を介して基礎架台50に据付けられる。
【0079】
上記ばね機構40は、図13あるいは図8に示すように、上部ばね受40a(図2参照)、下部ばね受40b(図2参照)、上部ばね受40aと下部ばね受40bとの間に複数個並列に設けられたばね(圧縮ばね)40g、及び同ばね40gの取付荷重を調整するための調整ボルト40e(図2参照)からなる。そして、同ばね機構40は上部ばね受40と鋼製架台1との間に粘着ばね受シート40cを介装するとともに、下部ばね受40と基礎架台50との間に粘着シート40dを介装して、上記鋼製架台1と基礎架台50との間に挿入されている。
【0080】
一方、上記制振ダンパ30は、図13あるいは図8に示すように、上部ケース30aと下部ケース30bとの間に形成される密閉空間内にシリコン油等の粘性流体30c(図2参照)を封入してなる。そして、上記上部ケース30aは上記鋼製架台1の下面に溶接され(ボルト締めでも可)、下部ケース30bは複数のボルト30e(図2参照)により上記基礎架台50に固定されている。
【0081】
上記鋼製架台1における分割された各架台の結合態様の詳細を図10〜図11に示す。図10〜図11は前部架台101と中央架台102との結合部104を示しているが、中央架台102と後部架台103との結合部105もこれと同様な構成である。
【0082】
図10〜図11において、32,33は前部架台101及び中央架台102の連結板でその連結面は平滑に仕上げられている。31は上記中圧タービン軸62と第1低圧タービン軸63aとを連結するカップリングである。上記連結板32,33には、図11に示すように、それらの周に沿って複数の結合用ボルト34がほぼ等間隔で配設され、上記連結板32,33を締め付けている。35は位置決め用のピンで、上記ボルト34のピッチ線上に2個以上設けられて、前部架台101と中央架台102との上下面を同一面になるように合わせている。
【0083】
上記のように構成された蒸気タービンプラントの製作工場での組立て、据付場所への輸送、及び据付場所における据付方法について説明する。
【0084】
先ず製作工場においては、前部架台101、中央架台102、及び後部架台103を別個に製作し、治具等によりその上面及び下面が同一平面になるように合わせ、ピン35にて位置決めしておく。次いで前部架台101には高圧タービン2、中圧タービン3及び配管、配線を含むこれの付属部材を取付けあるいは固定し、中央架台102には第1,第2低圧タービン4,5及び配管、配線を含む付属部材を取付け、あるいは固定し、さらに後部架台103には発電機6及び配管、配線を含む付属部材を固定あるいは取付ける。
【0085】
そして、図12に示されるような、上記前部架台101、中央架台102及び後部架台103に上記のようにして各機器を配管、配線とともに取付けあるいは固定してなるモジュール体501を、図10に示すように、ボルト34及びピン35によって結合して、工場内の運転設備に取付け、所定の試運転を行なう。
【0086】
上記試運転後、ボルト34を取外して各架台101,102,103単位のモジュール501に分割し、各モジュール体501毎に船舶(輸送機関)に搭載する。
【0087】
図12は上記モジュール体501を船舶の船体51に仮固定して据付場所まで輸送する際の斜視図である。図5において、モジュール体501を構成する前部架台101上に、高圧タービン2及び中圧タービン3、並びに配管、配線を含む付属品を固定してなるモジュール体501は、船体51のフレーム53上にスペーサ52を介して次の手法によって仮固定される。
【0088】
即ち、上記モジュール体501を船舶の船体51に仮固定する際には、図13に示すように、モジュール体501を構成する鋼製架台1(つまり図12の場合は前部架台101)の下面と船体のフレーム53との間に少なくとも4個の固定用スペーサ52を挿入し、ボルト52aで鋼製架台及びフレーム53に締め付ける。ばね機構40については、図13に示すように、同ばね機構40に粘着シート40c,40dを挿入した状態で仮固定用ボルト40hを、フレーム53からばね機構40及び鋼製架台まで挿通して3者を一体に締め付ける。
【0089】
この際において、上記固定用ボルト40hは専用ボルトを用いて、あるいは、ばね機構40のばね40gのばね荷重を調節する複数のボルトのうち、適当な数本をフレーム53、ばね機構40及びモジュール体501の鋼製架台1に挿通可能なように長尺にして用いても良い。
【0090】
また制振ダンパ30については、空間30f内の粘性流体30cを抜き出した状態で取付ける。この場合、上記のように同制振ダンパ30の上部ケース30aは鋼製架台1に溶接等によって固定されているので下部ケース30bの下面はフレーム53上に載せるのみでよい。
【0091】
以上のような仮固定状態にて、上記モジュール体501は据付場所まで輸送される。かかる輸送時において、海面の波浪等により船体51が揺動しても、モジュール体501は上記のようにして船体のフレーム53に堅固に固定されているので、支障無く輸送できる。
【0092】
次に据付場所(発電所)に上記タービン発電機を据付けるにあたっては、図12〜図13に示す船舶の船体51への仮固定状態から固定用のスペーサ52を取り外すとともに、ばね機構40を仮固定しているボルト40hを抜き出し、鋼製架台(前部架台101等)上に上記機器を取付けてなる上記各モジュール体501を基礎架台50上に置く。
【0093】
そして、図8に示すように、各モジュール体501の前部架台101と中央架台102との結合部104、中央架台102と後部架台103との結合部105を図10及び図11に示すようにボルト34及びピン35を介して連結する。そして、上記のように連結された鋼製架台1の下面と基礎架台50との間に上記ばね機構40及び制振ダンパ30を挿入する。
【0094】
上記ばね機構40は、ばね荷重調整用のボルト40eの長さを調節することによりばね40gの取付荷重を設定し、上部ばね受40aと鋼製架台1との間に粘着シート40cを挿み込むとともに、下部ばね受40bと基礎架台50との間に粘着シート40dを挿み込むことによって、上記鋼製架台1と基礎架台50との間に所要の取付荷重で以って介装される。
【0095】
また上記制振ダンパ30は、所定の制振性能が得られるようにその量を設定して粘性流体30cを封入し、上記鋼製架台1と基礎架台50との間に介装する。
【0096】
以上のように、この検討例においては、製作工場内で、蒸気タービンプラントを構成する機器を分割された鋼製架台101,102,103の夫々に分けて取付けてモジュール体501とし、このモジュール体501のまま船舶等の輸送機関のフレーム53上に仮固定して据付場所まで輸送する。
【0097】
そして据付場所においては、鋼製架台即ち前部架台101、中央架台102、後部架台103及びこれらの架台に取付けられた機器類からなる上記各モジュール体501を連結してばね機構40及び制振ダンパを介して基礎架台50上に据付けるようにしたので、製作工場内で試運転を行った蒸気タービンプラントの構成機器を取外すことなく、鋼製架台101〜103と一本化したモジュール体501として輸送し、据付場所に据付ることができ、製作工場における、輸送のため蒸気タービンプラント機器類の取外し作業が不要となって、製作工場から据付場所までの輸送に要する工数が低減されるとともに、据付時における蒸気タービンプラントの鋼製架台1への再取付け及びアライメント調整が省略され、据付工数が低減される。
【0098】
また、蒸気タービンプラントを構成する各機器を1台あるいは複数台に分け、軸方向に分割された鋼製架台即ち前部架台101、中央架台102あるいは後部架台103に夫々取付けモジュール体化し、このモジュール体501毎に輸送して、据付場所にて各モジュール体501を連結するので、図の実施形態に示すようなタービンの数が多く全長の長い蒸気タービンプラントであっても、容易に鋼製架台1を用いたモジュール体化による輸送及び据付けを上記のような少ない作業工数で以って行なうことができる。
【0099】
次に図14〜図16は本発明に係り本発明者が検討した第3検討例の蒸気タービンプラントの据付装置を示し、図14は蒸気タービン発電機の据付装置の要部外観斜視図、図15は鋼製架台の斜視図、図16は上記鋼製架台のコンクリート充填部の概略側面図である。
【0100】
図14において、1は多数の鋼板を溶接してなる鋼製架台で詳細な構成は後述する。上記鋼製架台1上には、高圧タービン2、中圧タービン3、2組の低圧タービン4,5及び発電機6が直列に配置、固定され、タービン発電機を構成している。10は上記2組の低圧タービン4,5の下部に連結された復水器である。
【0101】
また、7は中圧タービンと第1段低圧タービン4との間の軸受部、8は第1段低圧タービン4と第2段低圧タービン5との間の軸受部、9は第2段低圧タービン5と発電機6との間の軸受部である。さらに、11は上記タービン発電機の各種計測用の計器で、同計器11は上記鋼製架台1の上記高圧タービン2近傍の位置に固定されている。そして上記タービン発電機が固定された鋼製架台1は複数のばね機構及び制振ダンパ(何れも図示省略)を介して基礎架台(図示省略)に防振・耐震支持されている。
【0102】
上記鋼製架台1の詳細を示す図15〜図16において、1aは上記高圧タービン2及び中圧タービン3を取付けるための高中圧取付用空間、1b及び1cは第1低圧タービン4及び第2低圧タービン5を取付けるための低圧タービン取付用空間、1dは発電機6を取付けるための発電機取付用空間である。
【0103】
上記鋼製架台1は、上記のように、多数の鋼板を溶接して構成されており、上記タービン発電機が取付けられる上部側の床板211、上記ばね機構や制振ダンパが取付けられる底板221の間に、多数の縦板231及び中板241を結合して、全体として箱形に構成される。21aは上記タービン発電機の取付面となる床面、22aは上記ばね機構及び制振ダンパの取付面となる床面である。
【0104】
1eは上記中圧タービン3と第1低圧タービン4との間の軸受部7の取付面となる軸受取付面、1fは上記第1低圧タービン4と第2低圧タービン5との間の軸受部8の取付面となる軸受取付面、1gは上記第2低圧タービン5と発電機6との間の軸受部9の取付面となる軸受取付面である。また、1hは上記計器11を取付けるための計器取付面である。
【0105】
上記鋼製架台1において、上記タービン発電機の重量が集中的に負荷される軸受取付面1e,1f,1gの下側の空間部(タービン発電機の軸線方向の長さが、夫々a,a,a)には、コンクリート24a,24b,24cが充填されている。
【0106】
このコンクリート24a,24b,24cは、図16に示されるように、鋼製架台1の上側の床板211の下面と下側の底板221の上面との間の空間部に、架台の長手方向(軸線方向)には上記のようにa,a,aの長さで、幅方向には架台1の全幅に亘って充填され、各鋼板との間に隙間が形成されないよう、密に充填されている。
【0107】
また上記コンクリート24a〜24cは、上記軸受取付面1e,1f,1gの下側の空間に加えて、夫々の空間から長手方向において前後に所定距離b及びc,b及びc,b及びc延長して(幅は適宜設定する)充填され、軸受部近傍の剛性、特にローリング荷重に対する剛性を上昇させている。
【0108】
さらに、上記鋼製架台1は計器取付面1hの下側空間部にも、その長手方向の一定長さ即ち上記計器111の重量が掛かる部分の長さdと幅eとに亘り、コンクリート24dが上記軸受部と同様な形態で充填されている。
【0109】
上記のように構成された鋼製架台1において、タービン発電機の重量が集中して負荷される軸受取付面1e,1f,1gの下側の空間部にコンクリート24a,24b,24cが充填されているため、上記軸受部7,8,9を支持する部位の剛性が増大する。
【0110】
これにより、鋼製架台1は、苛酷な荷重条件下にある軸受部7,8,9を支持する部位の変形が抑制されるとともに、上記剛性の増大によって固有振動数が上昇する。そして、上記コンクリート24a〜24cの充填量及び充填位置を適宜設定することにより、上記固有振動数をタービン発電機の運転軸回転数(定格回転数)よりも常時上位に保持することができ鋼製架台1の固有振動数と軸回転数との同期による共振の発生を防止できる。
【0111】
また、上記鋼製架台1は、軸受取付面1e,1f,1gの下部空間に連なる長手方向の一定長さ(b及びc,b及びc,b及びc)に亘ってコンクリート24a〜24cを充填しているので、各軸受部7,8,9におけるローリング荷重の支持部の剛性が増大し、ローリング荷重に対する鋼製架台1の強度が向上する。
【0112】
さらに、上記鋼製架台1は計器111の重量が負荷される部位にもコンクリートを充填しているので、この部分の剛性が増大し、計器11の重量による架台1の局部的な変形が回避される。
【0113】
尚、上記鋼製架台は、この検討例の態様のように、ばね機構及び制振ダンパを用いた防振・耐震支持方式の他、同鋼製架台1を、上記防振・耐震支持とせずに直接基礎架台に固定するようにした据付方式にも適用できる。
【0114】
【発明の効果】
本発明は以上のように構成されており、請求項1の発明によれば、以下の効果を奏す
【0115】
即ち請求項1の発明によれば、蒸気タービンプラントの各軸受は、その運転中においては、復水器と鋼製架台の熱変形による上方への変位によって基準アライメント位置に保持されることとなる。これにより、各軸受は正規の軸受荷重に保持され、特定の軸受の軸受荷重が過大化してその軸受が摩耗や焼付きを引き起こすのが防止され、軸受の耐久性、寿命が向上する。
【図面の簡単な説明】
【図1】 本発明の施形態に係る低圧タービン及び復水器の軸心に直角方向に視たる図(図3のA−A線矢視図)。
【図2】 上記実施形態におけるばね機構及び制振ダンパの詳細断面図(図1のZ部及びY部詳細図)。
【図3】 本発明が適用される蒸気タービンプラントの概略側面図。
【図4】 上記実施形態における作用説明用線図。
【図5】 本発明に係り本発明者が検討した第1検討例の蒸気タービンプラントの排油管の配置を示す概略平面図。
【図6】 図5のA矢視図。
【図7】 鋼製架台に取付けられた蒸気タービンプラントの1例を示す外観斜視図。
【図8】 本発明に係り本発明者が検討した第2検討例の蒸気タービンプラントの据付状態を示す要部側面図。
【図9】 上記第2検討例における蒸気タービンプラントの据付状態を示す外観斜視図。
【図10】 上記第2検討例における鋼製架台の連結部を示す側面図。
【図11】 図10のA−A矢視図。
【図12】 上記第2検討例におけるモジュール体の輸送時の仮固定状態を示す要部斜視図。
【図13】 上記輸送時におけるモジュール体の固定状態を示す側面図。
【図14】 本発明に係り本発明者が検討した第3検討例の蒸気タービン発電機の据付装置の要部外観斜視図。
【図15】 上記第3検討例における鋼製架台の外観斜視図。
【図16】 上記第3検討例における鋼製架台の要部側面図。
【図17】 従来の復水器の取付構造を示す図1応当図。
【図18】 従来の蒸気タービンプラントの据付構造を示す正面図。
【図19】 従来の鋼製架台の垂直方向断面図(図5のB−B線断面図)。
【図20】 図19のA−A線断面図。
【符号の説明】
1 鋼製架台
2 高圧タービン
3 中圧タービン
4 第1低圧タービン
5 第2低圧タービン
6 発電機
7,8,9、211 軸受部
10 復水器
11 左列排油管
12 右列排油管
13 連通管
14,15 枝管
16 集合管
17 油タンク
21 No.1軸受
22 No.2軸受
23 No.3軸受
24 No.4軸受
24a〜24d コンクリート
25 No.5軸受
26 No.6軸受
27 No.7軸受
28 No.8軸受
29a No.9軸受
29b No.10軸受
30 制振ダンパ
32,33 連結板
34 ボルト
35 ピン
40 ばね機構
50 基礎架台
51 船体
52 スペーサ
53 フレーム
61 高圧タービン軸
62 中圧タービン軸
63a,63b 低圧タービン軸
64 発電機軸
101 前部架台
102 中央架台
103 後部架台
104,105 結合部
501 モジュール体
[0001]
BACKGROUND OF THE INVENTION
  The present invention relates to a turbine generator alignment method that takes into account the condenser installation structure and the thermal expansion of the condenser in a steam turbine plant.To the lawRelated.
[0002]
[Prior art and problems to be solved by the invention]
  FIG. 3 is a schematic side view showing an example of a steam turbine and a generator driven by the steam turbine (hereinafter referred to as a turbine generator).
[0003]
  The turbine generator shown in FIG. 3 is a tandem low-pressure four-flow reheat turbine. In FIG. 3, 2 is a high-pressure turbine, 3 is a medium-pressure turbine, 4 is a first low-pressure turbine, 5 is a second low-pressure turbine, 6 Is a generator and 10 is a condenser. Reference numeral 61 denotes a high-pressure turbine shaft that is a rotation shaft of the high-pressure turbine 2, 62 denotes a medium-pressure turbine shaft that is a rotation shaft of the intermediate-pressure turbine 3, and 63 a and 63 b denote rotation shafts of the first low-pressure turbine 4 and the second low-pressure turbine 5. A certain low-pressure turbine shaft 64 is a generator shaft that is a rotating shaft of the generator 6, and these shafts are connected in a skewer shape to constitute a tandem turbine generator.511 (see FIG. 17)Installed on top.
[0004]
  Nos. 21 and 22 support the high-pressure turbine shaft 61. 1 (# 1) bearing and No. 2 (# 2) bearings 23 and 24 support the intermediate pressure turbine shaft 62. 3 (# 3) bearing and No. 4 (# 4) bearings 25 and 26 support the low-pressure turbine shaft 63a. No. 5 (# 5) bearing and No. 6 (# 6) bearings 27 and 28 support the low-pressure turbine shaft 63b. 7 (# 7) bearing and No. 8 (# 8) bearings 29a and 29b support the generator shaft 64. 9 (# 10) bearing and 10 (# 10) bearing.
[0005]
  And each bearing 21-28, 29a, 29b of the said turbine generator is the weight of the high pressure turbine 2, the intermediate pressure turbine 3, the 1st low pressure turbine 4, the 2nd low pressure turbine 5, and the generator 6 in these each bearing. The turbine base is adjusted by adjusting the vertical position of each bearing through a shim or the like so as to be loaded according to the bearing capacity.511 (see FIG. 17)It is fixed to.
[0006]
  FIG. 17 shows a low-pressure turbine and a condenser in a conventional turbine generator.parallelFIG. 6 is a view (A-A arrow view of FIG. 3) viewed in a direction. As shown in FIG. 17, the condenser 10 is attached to lower portions of the first and second low-pressure turbines 4 and 5 via expansion joints 71. The condenser 10 has its lower surface fixed to the foundation frame 50, and the expansion joint 71 absorbs the difference in thermal expansion between the first and second low-pressure turbines 4 and 5 attached to the turbine frame 511 as described above. It is supposed to be.
[0007]
  FIG. 7 shows an example of a turbine generator mounted on a common steel stand (steel stand 1). The configuration of the turbine generator and the arrangement of the bearings in FIG. 7 are the same as those in FIG. 3, and the same members as those in FIG. 3 are denoted by the same reference numerals. still,111Is an instrument for turbine generators.
[0008]
  As shown in FIG. 7, in the installation apparatus in which the turbine generator is installed on the common steel gantry 1, the turbine generator is mounted on the steel gantry 1 elastically supported on the foundation gantry 50. Since it is fixed, the expansion joint 71 as shown in FIG. 17 is not provided for the reason described later.
[0009]
  However, the figure17The conventional condenser mounting structure as shown in FIG. 1 and the bearing alignment method based on such a mounting structure have the following problems.
[0010]
  During the operation of the turbine generator, a downward vacuum load due to the vacuum in the condenser 10 acts on the first and second low-pressure turbines 4 and 5 and the condenser 10. Figure17Since the expansion joint 71 is interposed between the low-pressure turbines 4 and 5 and the condenser 10, the above-described vacuum load applied to the low-pressure turbine side is fixed to the low-pressure turbines 4 and 5 shown in FIG. Is received by the turbine mount 511. Therefore, when the steel mount 1 is used for the turbine mount 511, the steel mount 1 is less rigid than the concrete mount and has a large deformability. It is difficult in strength. Therefore, when the steel mount 1 is used, the vacuum load is reduced by connecting the low pressure turbines 4 and 5 and the condenser 10 directly without providing the expansion joint 71. It does not act on any of the vessels 10.
[0011]
  However, as described above, in the installation structure in which the turbine generator is installed on the steel mount 1 and the expansion joint 71 is not used, the condenser 10 is thermally expanded upward during the operation of the turbine generator. At the same time, since the steel gantry 1 to which the turbine generator is fixed is also made of steel, the cradle 1 itself is more thermally deformed than the concrete gantry. For this reason, when the alignment is performed based on the bearing load when the turbine generator is cold as in the conventional method, during the operation of the turbine generator, the thermal expansion of the condenser 10 or the steel frame is performed. The bearings 21 to 28, 29a, and 29b of the gantry 1 are displaced up and down due to the thermal deformation and the deformation due to the vacuum load, and the bearing load of each bearing is changed from the initial alignment time. This causes non-uniformity of the bearing and causes wear and seizure of the bearing.
[0012]
  Therefore, the present inventionEyesSpecifically, in a steam turbine plant in which a turbine generator is supported by a steel mount, the vacuum load of the condenser can be supported without excessive deformation of the steel mount, and the heat of the condenser It is intended to prevent the occurrence of problems such as excessive bearing load due to expansion and thermal deformation of the steel cradle and bearing wear-and-seizure associated therewith.
[0013]
  Next, in a steam turbine plant of a type in which each device of the steam turbine plant is fixed on a steel mount 1, as shown in FIG. 7, the steel mount 1 has a higher thermal conductivity than a concrete mount. Is remarkably large and easily deformed by heat.
[0014]
  For this reason, in the said steam turbine plant, steam piping and each bearing part 7 and 8 are used.,Heat from the oil drain pipe through which the lubricating oil heated by lubricating 9, 211, etc. flows is transmitted to the steel pedestal 1, which makes the steel pedestal 1 susceptible to thermal deformation.
[0015]
  However, in the steam turbine plant, conventionally, the steam pipes are arranged substantially symmetrically in the left and right directions with respect to the rotation center of the turbine, while the oil drain pipes have branch pipes extending from the respective bearing portions. 1 is attached to one side, and is configured to be returned to the oil tank through a drained oil main pipe extending in the front-rear direction.
[0016]
  For this reason, in the conventional steam turbine plant, since the oil drain main pipe is disposed on one side of the steel gantry 1, the steel gantry 1 is thermally deformed on the side where the oil drain main pipe is attached. Becomes larger than the opposite side and deforms asymmetrically with respect to the turbine rotation axis, causing problems such as fluctuations in bearing alignment and increase in shaft vibration.
[0017]
  Therefore, the present inventionOther first considerations related toIn a steam turbine plant in which a steam turbine and a generator are mounted on a steel gantry, the thermal deformation of the steel gantry due to uneven piping around the steel gantry and the variation in bearing alignment caused by this It is to prevent the occurrence of problems such as increased shaft vibration.
[0018]
  Next, in a turbine power plant in which a generator is driven by a gas turbine or a steam turbine (hereinafter referred to as a turbine), the total length in the installed state in which the turbine and the generator are connected is long and heavy. The installation structure is a highly rigid installation structure.
[0019]
  FIG. 18 is a schematic front view showing an example of the installation structure of the turbine power plant (with the rotation axis as the center).parallelFIG. 18 shows a building of a power plant, 111 is an equipment operation floor in the same building, and 112 is a concrete mount. A turbine generator 113 is formed by directly connecting the turbine and the generator. The turbine generator 113 is fixed on the concrete mount 112.
[0020]
  When the turbine generator 113 is manufactured at a manufacturing plant, transported to a power plant by a transportation vehicle such as a marine vehicle, and installed at the installation location in the building 110, conventionally, the turbine and the generator are installed in the manufacturing plant. After manufacturing and connecting the two on the operation platform in the factory and performing the specified performance and strength confirmation test operation, the turbine and the generator are removed from the operation platform and mounted on the transportation system to the installation location. As shown in FIG. 18, the turbine and the generator are connected by performing predetermined adjustment such as alignment adjustment on the concrete mount 112, and fixed on the mount 112.
[0021]
  However, in the above conventional method, the turbine and the generator are connected by performing predetermined adjustments such as alignment adjustment on the operation stand in the production factory, and after performing various test operations, the two are disconnected. Since the turbine and the generator are installed with the above-mentioned predetermined adjustments again on the concrete mount 112 at the installation location (in the power plant building 110), they are installed and transported in the transportation facility. In addition to requiring a great number of man-hours for transportation to the installation site, there is a problem that the installation work efficiency is reduced due to the complicated construction of other related equipment.
[0022]
  Further, in the above conventional method, since the turbine generator 113 is fixed on the concrete mount 112, the generated load at the time of the earthquake becomes large and it is easy to be directly affected by the earthquake.
[0023]
  Therefore, the inventors of the present invention, in Japanese Patent Application No. 10-176163, attach the above-mentioned plurality of devices to a single steel pedestal and fix them to form a module body in which both are integrated, and the module body is installed. A method of fixing to the building structure such as the building of the place was proposed.
[0024]
  However, since the above method is a method in which a plurality of devices are mounted on a single steel pedestal, transported and installed, the number of devices connected in the axial direction such as a low-pressure 4-flow reheat steam turbine is large. In the case of a long plant, it may be difficult to apply.
[0025]
  Therefore, the present inventionOther second study issues related toThe number of devices connected in the axial direction is large, and even in a plant with a long total length, the number of man-hours for transportation and installation work with the above devices mounted on a steel mount is significantly reduced compared to the conventional method, The purpose is to improve the efficiency of installation work by avoiding complications with other works, and to reduce transportation and installation costs.
[0026]
  Next, in recent years, in a thermal power plant, a steam turbine and a generator are fixed on a single steel pedestal, and the steel pedestal is connected to a basic gantry via a vibration damper comprising a plurality of spring mechanisms and viscous friction dampers. The installation method which installs on the top has been adopted.
[0027]
  As an example of a steam turbine and a generator (hereinafter referred to as a turbine generator) using such a steel gantry, as shown in FIG. 7, a high pressure is provided on a steel gantry 1 formed by welding a number of steel plates. There is a turbine 2, an intermediate pressure turbine 3, two sets of low pressure turbines 4, 5 and a generator 6 arranged in series and fixed to the gantry 1. Reference numeral 10 denotes a condenser connected to the lower part of the two sets of low-pressure turbines 4 and 5.
[0028]
  7 is a bearing portion between the intermediate pressure turbine and the first stage low pressure turbine 4, 8 is a bearing portion between the first stage low pressure turbine 4 and the second stage low pressure turbine 5, and 9 is a second stage low pressure turbine. 5 is a bearing portion between 5 and the generator 6. Further, reference numeral 111 denotes an instrument for various measurements of the turbine generator. The instrument 111 is fixed at a position in the vicinity of the high-pressure turbine 2 of the steel mount 1.
[0029]
  19 to 20 show a conventional example of the steel pedestal 201. FIG. 19 is a plan view (viewed along arrow BB in FIG. 20), and FIG. 20 is an AA view in FIG. It is an arrow view. 19 to 20, reference numeral 211 denotes a turbine mounting space that is a space for mounting the turbines 2 to 5, and 221 is a generator mounting space that is a space for mounting the generator 6.
[0030]
  71 is a floor plate, 72 is a bottom plate, 73 is a front plate, 74 is a rear plate, 75 and 76 are side plates, and this steel mount 20 is configured by forming each plate from a steel plate directly or directly. A plurality of steel plate ribs 77 as strength members are appropriately provided inside and welded to the respective plates by being bent into a predetermined shape and welded.
[0031]
  However, the conventional turbine generator installation structure using the steel mount as shown in FIGS. 19 to 20 has the following problems.
[0032]
  The steel cradle 201 is formed by welding a number of steel plates as described above, and is lighter and has a required rigidity as compared with a concrete cradle or the like. The natural frequency of itself becomes high and becomes a value close to the rated rotational speed of the turbine generator.
[0033]
  For this reason, in the installation structure using the conventional steel cradle 201, the natural frequency of the steel cradle 201 and the shaft rotation speed of the turbine generator may be synchronized. Resonance between the shaft vibration of the turbine generator and the natural vibration of the steel pedestal 201 occurs, causing bearing wear or seizure, damage to the rotating shaft, and the like.
[0034]
  Therefore, the present inventionOther third examination issues related toIn equipment installation equipment using steel mounts, the rigidity of the steel mounts is increased to increase the natural frequency, and the natural frequency of the steel mounts is avoided from synchronizing with the shaft rotation speed. This is to prevent the occurrence of bearing wear, seizure and shaft damage.
[0035]
[Means for Solving the Problems]
  The present invention solves the above problems, andOfMeans for achieving the object is as described in claim 1.
[0036]
  That is, the means of claim 1 isSteamedAir turbine plant installation methodThe steam turbine and generator including a low pressure turbine with a condenser fixed directly to the lower end are fixed to a steel frame made by welding steel, and the steel frame is fixed via a spring mechanism and a vibration damper. In aligning the bearings of the steam turbine plant that is supported by the foundation frame,The vertical position of each of the bearings in the cold state is determined by the bearing mounting portion on the steel mount during the steam turbine plant operation.Due to thermal deformation of the condenser and the steel mountUpTowardsThe direction corresponding to the amount of displacement in the direction opposite to the operating position from the reference alignment positionLow positionIt is characterized by being set to be shifted to.
[0037]
  According to the above means, the vertical position (alignment) in the cold state of each bearing,With condenserDuring the operation of the steel mountUpward due to thermal deformationOnly the amount corresponding to the displacement is the reference alignment position.ReversedirectionLow positionSince each of the bearings isWith condenserAbove steel mountTo heatDue to the displacement, the reference alignment position is obtained. As a result, each bearing is held at a normal bearing load, and the bearing load of a specific bearing does not become excessive and the bearing does not cause wear or seizure.
[0038]
DETAILED DESCRIPTION OF THE INVENTION
  Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
[0039]
  FIG. 3 is a schematic side view showing an example of a steam turbine generator to which the present invention is applied.
[0040]
  In FIG. 3, 2 is a high-pressure turbine, 3 is a medium-pressure turbine, 4 is a first low-pressure turbine, 5 is a second low-pressure turbine, 6 is a generator, and 10 is a condenser. Reference numeral 61 denotes a high-pressure turbine shaft that is a rotating shaft of the high-pressure turbine 2, 62 denotes an intermediate-pressure turbine shaft that is a rotating shaft of 3, and 63 a and 63 b denote low-pressure turbines that are rotating shafts of the first low-pressure turbine 4 and the second low-pressure turbine 5. A shaft 64 is a generator shaft which is a rotating shaft of the generator 6, and these shafts are connected in a skewer shape to constitute a tandem turbine generator.
[0041]
  Nos. 21 and 22 support the high-pressure turbine shaft 61. 1 (# 1) bearing and No. 2 (# 2) bearings 23 and 24 support the intermediate pressure turbine shaft 62. 3 (# 3) bearing and No. 4 (# 4) bearings 25 and 26 support the low-pressure turbine shaft 63a. No. 5 (# 5) bearing and No. 6 (# 6) bearings 27 and 28 support the low-pressure turbine shaft 63b. 7 (# 7) bearing and No. 8 (# 8) bearings 29a and 29b support the generator shaft 64. 9 (# 9) bearing and 10 (# 10) bearing.
[0042]
  The bearings 21, 22, 23, 24, 25, 26, 27, 28, 29a and 29b of the turbine generator are mounted on the steel mount 1 by an alignment method as will be described later.
[0043]
  FIG. 7 is an external perspective view showing a state in which the turbine generator is mounted on the steel mount 1. The configuration of the turbine generator and the arrangement of the bearings in FIG. 7 are the same as those in FIG. 3, and the same members as those in FIG. 3 are denoted by the same reference numerals. still,111Is an instrument for turbine generators.
[0044]
  1 to 2 are claims1'sCorresponding to the inventionone1 shows an installation structure of a steam turbine plant according to an embodiment, FIG. 1 is a view taken along line AA in FIG. 3, and FIG. 2 is a structural view of a Z part and a Y part in FIG. 1, that is, a spring mechanism and a damping damper. is there.
[0045]
  In FIG. 1, the first low-pressure turbine 4 and the second low-pressure turbine 5 are fixed on the steel mount 1 as described above. The condenser 10 is directly fixed to the lower ends of the first and second low-pressure turbines 4 and 5 without using an expansion joint 71 as shown in FIG.
[0046]
  Further, the steel pedestal 1 is elastically and vibration-proof supported by the base pedestal 50 through a plurality of spring mechanisms 40 and a plurality of vibration dampers 30 arranged in parallel. Further, the condenser 10 has a plurality of spring mechanisms 40 and damping dampers 30 arranged in parallel between the lower end thereof and the foundation frame 50, and these spring mechanisms 40 and damping dampers 30 provide elasticity and prevention. It is supported by vibration.
[0047]
  In FIG. 2 showing the details of the spring mechanism 40 and the damping damper 30, a plurality of the spring mechanisms 40 are arranged in parallel between the upper spring receiver 40a, the lower spring receiver 40b, and the upper spring receiver 40a and the lower spring receiver 40b. A spring (compression spring) 40g provided, and an adjustment bolt 40e for adjusting the mounting load of the spring 40g. The spring mechanism 40 has an adhesive spring receiving sheet 40c interposed between the upper spring receiver 40b and the steel mount 1 or the condenser 10, and an adhesive sheet between the lower spring receiver 40a and the basic mount 50. The steel frame 1 or the condenser 10 and the foundation frame 50 are inserted via 40d.
[0048]
  On the other hand, the damping damper 30 is formed by sealing a viscous fluid 30c such as silicon oil in a sealed space formed between the upper case 30a and the lower case 30b. The upper case 30a is welded to the lower surface of the steel pedestal 1 or the condenser 10 (it may be bolted), and the lower case 30b is fixed to the basic pedestal 50 by a plurality of bolts 30e.
[0049]
  In the turbine generator installation structure configured as described above, during operation of the turbine generator, only the weight of each device constituting the turbine generator acts downward on the steel mount 1 and receives a vacuum load. There is nothing.
[0050]
  Thereby, it is possible to prevent an excessive load due to the vacuum load from acting on the steel pedestal 1 like the conventional one.
[0051]
  During the operation of the turbine generator as described above, the condenser 10 and the first low-pressure turbine 4 and the second low-pressure turbine 5 to which the condenser 10 is fixed cause vertical displacement due to the thermal expansion of the condenser 10. Since the cradle 1 and the condenser 10 are supported by the base gantry 50 via the spring mechanism 40 and the vibration damper 30, the elastic and vibration-damping support mechanism including the spring mechanism 40 and the vibration damper 30 described above is used. Such vertical displacement is absorbed, and this vertical displacement does not apply an excessive load to the steel mount 1.
[0052]
  Next, a bearing alignment method for the turbine generator according to the above embodiment will be described. As described above, the condenser 10 is displaced upward due to its thermal expansion. Further, since the steel pedestal 1 is formed by welding steel materials, the cradle 1 itself undergoes thermal deformation due to a temperature rise, and also deforms due to a force such as a vacuum load F as described above. Therefore, the steel pedestal 1 is displaced upward as a whole by deformation due to thermal expansion of the condenser 10 and deformation of the gantry 1 itself.
[0053]
  FIG. 4 shows the state of the displacement in the axial direction of the steel mount 1. In FIG. 4, A is the reference alignment for displacement 0 (zero), B is the actual displacement of the gantry 1 during operation, and # 1 to # 10 are No. 1 bearing 21-No. The positions of the 10 bearings 29b are shown.
[0054]
  As apparent from FIG. 4, the steel mount 1 is displaced upward as a whole during operation, and the amount of displacement is affected by the thermal expansion of the condenser 10, the first and second low-pressure turbines 4, 5. The vicinity of (LP1, LP2) is the largest.
[0055]
  For this reason, in the embodiment of the present invention, the alignment of the bearings 21 to 29b at the time of cooling of the turbine generator, that is, the installation, that is, the vertical position of the bearing is changed from the reference alignment shown in the A line of FIG. As a result, the alignment of the bearings 21 to 29b becomes a C line symmetrical to the B line in FIG.
[0056]
  According to the above embodiment, since the alignment of each bearing of the turbine generator is set at a position lower than the reference alignment A by an amount corresponding to the displacement amount during the operation of the steel mount 1, the turbine generator During the operation, the alignment of the bearings 21 to 29b becomes the position of the reference alignment A due to the upward displacement of the steel gantry 1 as shown by line B in FIG.
[0057]
  As a result, the bearing load of each of the bearings 21 to 29b of the turbine generator is maintained at a normal bearing load set by the reference alignment A line, and the bearing load of a specific bearing becomes excessive and wear or burnt of the bearing. Inducing sticking is avoided.
[0058]
  Next, FIGS.The first study example examined by the present inventors in connection with the present inventionThe piping structure of a steam turbine plant is shown, FIG. 5 is the top view, and FIG. 6 is A arrow view of FIG. FIG. 7 is an external perspective view of a steam turbine plant in which the piping structure is used.
[0059]
  In FIG. 7, 1 is a steel mount made by welding steel materials, 2 is a high-pressure turbine, 3 is a medium-pressure turbine, 4 is a first low-pressure turbine, 5 is a second low-pressure turbine, 6 is a generator, and 10 is condensate. Instrument 111 is an instrument.
[0060]
  Reference numeral 211 denotes a bearing portion on the front side of the high-pressure turbine 2, 7 denotes a bearing portion between the intermediate-pressure turbine 3 and the first low-pressure turbine 4, and 8 denotes a bearing portion between the first low-pressure turbine 4 and the second low-pressure turbine 5. , 9 is a bearing portion between the second low-pressure turbine 5 and the generator 6. The steel gantry 1 to which each device of the steam turbine plant as described above is fixed is attached to a base gantry (not shown) via a plurality of spring mechanisms and damping dampers (all not shown). The basic configuration described above is the same as the conventional one.
[0061]
  thisExamination exampleIn FIG. 7, the piping structure of the steam turbine plant shown in FIG. 7 is improved.
That is, in FIGS. 5 to 6, reference numeral 1 denotes a steel mount, and the high pressure turbine 2, the intermediate pressure turbine 3, the first low pressure turbine 4, and the second low pressure turbine 5 are placed on the steel mount 1 as in FIG. 7. And the generator 6 is connected and fixed in the shape of a skewer. Reference numeral 17 denotes an oil tank that is fixed on the foundation frame 53.
[0062]
  Reference numerals 11 and 12 denote a left row oil drain pipe and a right row oil drain pipe respectively attached to the left side and right side of the steel gantry 1. The left row drain pipe 11 and the right row drain pipe 12 include bearings 21, 7, 8 of the high pressure turbine 2, intermediate pressure turbine 3, first low pressure turbine 4, second low pressure turbine 5, and generator 6. , 9 etc., the lubricating oil discharged from the lubricating portions flows through the branch pipes 14 and 15 in the left and right rows.
[0063]
  The right row oil drain pipe 12 communicates with the left row oil drain pipe 11 via a communication pipe 13, and a collecting pipe 16 is provided downstream of the joining portion by the communication pipe 13. It is connected to the tank 17.
[0064]
  As shown in FIG. 2, the left row oil drain pipe 11 and the right row oil drain pipe 12 have their center lines 31 and 32 having the same distance S (substantially the same distance) with respect to the rotation axis 301 of the steam turbine plant. In addition, the pipe diameter and the pipe length are preferably set symmetrically in the left and right directions (horizontal direction perpendicular to the rotation axis 301). The left branch pipe 14 and the right branch pipe 15 are also provided symmetrically with respect to the rotational axis 301 in terms of the number, pipe length, and pipe diameter.
[0065]
  In the steam turbine plant configured as described above, the lubricating oil (waste oil) heated by lubricating the lubricating parts such as the bearing parts 21, 7, 8, 9 (see FIG. 3) of each turbine is The oil flows into the left row drain pipe 11 and the right row drain pipe 12 through the left and right branch pipes 14 and 15. The lubricating oil that has flowed through the right row drain pipe 12 passes through the communication pipe 13, merges with the lubricating oil from the left row drain pipe 11 at a downstream portion thereof, and returns to the oil tank 17 through the collecting pipe 16.
[0066]
  Since the temperature of the lubricating oil, that is, the drained oil after lubricating each part of the steam turbine plant rises at the time of the draining, the temperatures of the left and right row drain pipes 11 and 12 and the left and right branch pipes 14 and 15 are increased. Rises, and the temperature of the steel gantry 1 to which these pipes are attached also rises.
[0067]
  However, the present inventionExamination exampleAs described above, the left row drain pipe 11 and the right row drain pipe 12 are provided symmetrically with the rotation axis 301 of the steel gantry 1, and the left branch pipe 14 and the right branch pipe 15 are provided. Therefore, the temperature of the steel mount 1 to which these pipes are attached is also substantially the same on the left side and the right side with respect to the rotation axis 30.
[0068]
  As a result, the thermal deformation caused by the temperature rise of the oil drain pipe system of the steel pedestal 1 is substantially the same on the left and right with respect to the rotation axis 30. The occurrence of problems such as increased vibration is avoided.
[0069]
  In addition, thisExamination exampleIn this case, the oil draining pipe system is provided symmetrically with respect to the rotation axis 301 of the steel gantry 1, but in addition to this, other pipes serving as a heating source for the steam pipe and the steel gantry 1 are also used for the rotation axis. It can be provided symmetrically with respect to the center 301.
[0070]
  In addition, bookExamination exampleIsShow hereThe present invention is not limited to such a tandem low-pressure four-flow reheat turbine, and can be applied to any steam turbine plant in which the steam turbine is supported on a steel mount.
[0071]
  Next, FIGS.Of the second examination example examined by the inventor in connection with the present invention.FIG. 8 is a side view of the main part showing the installation state of the steam turbine plant, FIG. 9 is an external perspective configuration diagram showing the installation state, and FIG. 10 is a connection part of a steel mount. FIG. 11 is a perspective view taken along the line AA of FIG. 10, FIG. 12 is a schematic perspective view showing the module body during transportation on a ship, and FIG. 13 shows the module body fixing means during the transportation. It is a side view.
[0072]
  8 to 9, 2 is a high-pressure turbine, 3 is an intermediate-pressure turbine, 4 is a first low-pressure turbine, 5 is a second low-pressure turbine, 6 is a generator, and 10 is a condenser. Reference numeral 61 denotes a high-pressure turbine shaft that is a rotating shaft of the high-pressure turbine 2, 62 denotes an intermediate-pressure turbine shaft that is a rotating shaft of the intermediate-pressure turbine 3, and 63 a and 63 b denote rotating shafts of the first low-pressure turbine 4 and the second low-pressure turbine 5. A certain low-pressure turbine shaft 64 is a generator shaft that is a rotating shaft of the generator 6, and these shafts are connected in a skewer shape to constitute a tandem steam turbine generator.
[0073]
  Nos. 21 and 22 support the high-pressure turbine shaft 61. 1 (# 1) bearing and No. 2 (# 2) bearings 23 and 24 support the intermediate pressure turbine shaft 62. 3 (# 3) bearing and No. 4 (# 4) bearings 25 and 26 support the low-pressure turbine shaft 63a. No. 5 (# 5) bearing and No. 6 (# 6) bearings 27 and 28 support the low-pressure turbine shaft 63b. 7 (# 7) bearing and No. 8 (# 8) bearings 29a and 29b support the generator shaft 64. 9 (# 9) bearing and 10 (# 10) bearing.
[0074]
  In FIG. 9, 211 is a bearing portion at the front of the high pressure turbine 2, 7 is a bearing portion between the intermediate pressure turbine 3 and the first low pressure turbine 4, and 8 is a first low pressure turbine 4 and a second low pressure turbine. Reference numeral 5 denotes a bearing portion, reference numeral 9 denotes a bearing portion between the second low-pressure turbine 5 and the generator 6, and reference numeral 45 denotes a rear bearing portion of the generator 6.
[0075]
  Reference numeral 1 denotes a steel gantry, which is divided into three parts in the axial direction: a front gantry 101, a central gantry 102, and a rear gantry 103, which are connected by bolts 34 as will be described later. The front frame 101 constituting the steel frame 1 has the high pressure turbine 2 and the medium pressure turbine 3 as No. 1. 1 bearing 21, no. 2 bearing 22, no. 3 bearing 23 and no. 4 is fixed via a bearing 24, and the first and second low-pressure turbines 4 and 5 are provided on the central frame 102. 5 bearing 25, No. 5 6 bearing 26, no. 7 bearing 27 and no. 8 is fixed via a bearing 28, and the generator 6 is attached to the rear frame 103. 9 bearings and It is fixed via 10 bearings.
[0076]
  The front frame 101 hasHigh pressureThe turbine 2, the intermediate pressure turbine 3 and all the members attached thereto, and the piping and wiring are provided on the central frame 102. The first and second low-pressure turbines 4 and 5 and all the members attached thereto, and the piping and wiring are provided on the central frame 102. However, the generator 6 and all members attached thereto, piping and wiring are attached to the rear frame 103 so that the frames 101, 102 and 103 can be separated and transported. Reference numeral 104 denotes a coupling portion between the front frame 101 and the central frame 102, and reference numeral 105 denotes a coupling portion between the central frame 102 and the rear frame 103.
[0077]
  In addition, the division | segmentation aspect of the said steel mount 1 is thisAspect exampleNot limited to this, it may be divided into two or more than four.Examination exampleNot limited to this aspect, a required number of devices can be fixed.
[0078]
  As described above, the steel frame 1 in which the three frames 101, 102, and 103 are coupled is connected to the foundation frame via the plurality of spring mechanisms 40 and the vibration damper 30.50Installed.
[0079]
  As shown in FIG. 13 or FIG. 8, the spring mechanism 40 includes an upper spring receiver 40a.(See Figure 2)Lower spring support 40b(See Figure 2)A plurality of springs (compression springs) 40g provided in parallel between the upper spring receiver 40a and the lower spring receiver 40b, and an adjustment bolt 40e for adjusting the mounting load of the spring 40g.(See Figure 2)Consists of. The spring mechanism 40 includes an upper spring receiver 40.aAn adhesive spring receiving sheet 40c is interposed between the lower spring receiver 40 and the steel mount 1.bAnd foundation mount50With the adhesive sheet 40d interposed between the steel frame 1 and the foundation frame50Is inserted between.
[0080]
  On the other hand, as shown in FIG. 13 or FIG. 8, the damping damper 30 has a viscous fluid 30c such as silicon oil in a sealed space formed between the upper case 30a and the lower case 30b.(See Figure 2)Is enclosed. The upper case 30a is welded to the lower surface of the steel mount 1 (it can be bolted), and the lower case 30b has a plurality of bolts 30e.(See Figure 2)By the above foundation mount50It is fixed to.
[0081]
  The detail of the coupling | bonding aspect of each divided | segmented mount in the said steel mounts 1 is shown in FIGS. 10 to 11 show the connecting portion 104 between the front frame 101 and the central frame 102, the connecting portion 105 between the central frame 102 and the rear frame 103 has the same configuration.
[0082]
  10 to 11, reference numerals 32 and 33 denote connection plates for the front frame 101 and the center frame 102, and the connection surfaces thereof are finished smoothly. Reference numeral 31 denotes a coupling that connects the intermediate-pressure turbine shaft 62 and the first low-pressure turbine shaft 63a. The connecting plates 32 and 33 have a figure.11As shown in FIG. 3, a plurality of coupling bolts 34 are arranged at substantially equal intervals along the circumference thereof, and the connecting plates 32 and 33 are fastened. Two or more positioning pins 35 are provided on the pitch line of the bolt 34 so that the upper and lower surfaces of the front frame 101 and the central frame 102 are aligned with each other.
[0083]
  The assembly at the manufacturing plant of the steam turbine plant configured as described above, transportation to the installation site, and the installation method at the installation site will be described.
[0084]
  First, in the manufacturing factory, the front frame 101, the central frame 102, and the rear frame 103 are separately manufactured, and the upper surface and the lower surface thereof are aligned with a jig or the like and positioned with the pins 35. . Next, the front frame 101 is attached or fixed to the high pressure turbine 2, the intermediate pressure turbine 3, and the pipes and wiring attachments, and the central frame 102 is attached to the first and second low pressure turbines 4, 5 and the piping and wiring. Attached members including are attached or fixed, and further, attached members including the generator 6 and piping and wiring are fixed or attached to the rear frame 103.
[0085]
  Then, as shown in FIG. 12, a module body 501 in which each device is attached or fixed to the front frame 101, the central frame 102 and the rear frame 103 together with piping and wiring as described above is shown in FIG. As shown, they are connected by bolts 34 and pins 35 and attached to operating equipment in the factory to perform a predetermined test run.
[0086]
  After the above trial run, the bolt 34 is removed and the modules 101, 102, 103 unitsbodyEach module is divided into 501Body 501It is mounted on a ship (transportation system) every time.
[0087]
  FIG. 12 is a perspective view when the module body 501 is temporarily fixed to the hull 51 of the ship and transported to the installation place. In FIG. 5, a module body in which accessories including a high-pressure turbine 2 and an intermediate-pressure turbine 3 and piping and wiring are fixed on a front frame 101 constituting the module body 501.501Is temporarily fixed on the frame 53 of the hull 51 through the spacer 52 by the following method.
[0088]
  That is, when the module body 501 is temporarily fixed to the hull 51 of the ship, as shown in FIG. And at least four fixing spacers 52 are inserted between the frame 53 and the hull frame 53, and the steel frame is secured with bolts 52a.1And tighten to the frame 53. For the spring mechanism 40, see FIG.13As shown in FIG. 4, the temporary fixing bolt 40h is inserted from the frame 53 with the adhesive sheets 40c and 40d inserted into the spring mechanism 40, and the spring mechanism 40 and the steel mount.1Tighten the three together.
[0089]
  At this time, the fixing bolt 40h is an exclusive bolt, or among the plurality of bolts for adjusting the spring load of the spring 40g of the spring mechanism 40, an appropriate number of bolts are used for the frame 53, the spring mechanism 40 and the module body. You may use it elongate so that it can penetrate the steel mount 1 of 501.
[0090]
  The damping damper 30 is attached in a state where the viscous fluid 30c in the space 30f is extracted. In this case, since the upper case 30a of the vibration damper 30 is fixed to the steel mount 1 by welding or the like as described above, the lower surface of the lower case 30b only needs to be placed on the frame 53.
[0091]
  In the temporarily fixed state as described above, the module body 501 is transported to the installation location. During such transportation, even if the hull 51 swings due to sea waves or the like, the module body 501 is firmly fixed to the frame 53 of the hull as described above, so that it can be transported without any trouble.
[0092]
  Next, the turbine power generation at the installation site (power plant)MachineFor installation, the fixing spacer 52 is removed from the temporarily fixed state to the ship hull 51 shown in FIGS. 12 to 13, and the bolt 40 h temporarily fixing the spring mechanism 40 is extracted, and the steel frame (front The above-mentioned module body 501 having the above-mentioned device mounted on the base frame 101 or the like) is the basic frame.50put on top.
[0093]
  As shown in FIG. 8, as shown in FIGS. 10 and 11, the connecting portion 104 of the front frame 101 and the central frame 102 of each module body 501 and the connecting portion 105 of the central frame 102 and the rear frame 103 are shown. They are connected via bolts 34 and pins 35. And the lower surface of the steel gantry 1 and the foundation gantry connected as described above50The spring mechanism 40 and the vibration damper 30 are inserted between them.
[0094]
  The spring mechanism 40 sets the attachment load of the spring 40g by adjusting the length of the bolt 40e for adjusting the spring load, and inserts the adhesive sheet 40c between the upper spring receiver 40a and the steel mount 1. Along with the lower spring support 40b and the foundation stand50By inserting the adhesive sheet 40d between the steel frame 1 and the foundation frame50With a required mounting load.
[0095]
  The damping damper 30 is set so as to obtain a predetermined damping performance and encloses the viscous fluid 30c, and the steel gantry 1 and the foundation gantry.50Intervene between.
[0096]
  As described above, in this study example, in the manufacturing plant, the equipment constituting the steam turbine plant is divided and attached to each of the divided steel bases 101, 102, and 103 to form a module body 501, and this module body.501As it is, it is temporarily fixed on the frame 53 of a transportation facility such as a ship and transported to the installation location.
[0097]
  At the installation location, the steel frame, that is, the front frame 101, the central frame 102, the rear frame 103, and the modules 501 composed of the devices attached to these frames are connected to each other to connect the spring mechanism 40 and the vibration damper. Through foundation mount50Since it was installed above, it was transported as a module body 501 integrated with the steel bases 101 to 103 without removing the components of the steam turbine plant that was trial run in the production factory, and installed at the installation location. This eliminates the need to remove steam turbine plant equipment for transportation at the production plant, reduces the number of man-hours required for transportation from the production plant to the installation site, and reduces the number of steam turbine plant installations during installation. Reattachment to the steel mount 1 and alignment adjustment are omitted, and the number of installation steps is reduced.
[0098]
  Further, each device constituting the steam turbine plant is divided into one or a plurality of units, and each module is attached to a steel frame divided in the axial direction, that is, the front frame 101, the central frame 102, or the rear frame 103. Since each module body 501 is transported for each body 501 and connected to each other at the installation location,8Even in a steam turbine plant with a large number of turbines and a long overall length as shown in the above embodiment, transportation and installation by modularization using the steel mount 1 can be easily performed with a small number of work steps as described above. Can be done.
[0099]
  Next, FIGS.Of the third examination example examined by the inventor in connection with the present invention.FIG. 14 is a perspective view of an external appearance of a main part of a steam turbine generator installation device, FIG. 15 is a perspective view of a steel mount, and FIG. 16 is a schematic side view of a concrete filling portion of the steel mount. FIG.
[0100]
  In FIG. 14, reference numeral 1 denotes a steel mount formed by welding a large number of steel plates, and the detailed configuration will be described later. On the steel pedestal 1, a high-pressure turbine 2, an intermediate-pressure turbine 3, two sets of low-pressure turbines 4, 5 and a generator 6 are arranged and fixed in series to constitute a turbine generator. Reference numeral 10 denotes a condenser connected to the lower part of the two sets of low-pressure turbines 4 and 5.
[0101]
  7 is a bearing portion between the intermediate pressure turbine and the first stage low pressure turbine 4, 8 is a bearing portion between the first stage low pressure turbine 4 and the second stage low pressure turbine 5, and 9 is a second stage low pressure turbine. 5 is a bearing portion between 5 and the generator 6. Furthermore, 11 is an instrument for various measurements of the turbine generator, and the instrument 11 is fixed at a position in the vicinity of the high-pressure turbine 2 of the steel mount 1. The steel gantry 1 to which the turbine generator is fixed is supported on a base gantry (not shown) by a plurality of spring mechanisms and damping dampers (all not shown).
[0102]
  15-16 which show the detail of the said steel mount 1, 1a is the space for high and medium pressure attachment for attaching the said high pressure turbine 2 and the intermediate pressure turbine 3, 1b and 1c are the 1st low pressure turbine 4 and the 2nd low pressure A low-pressure turbine mounting space for mounting the turbine 5, 1 d is a generator mounting space for mounting the generator 6.
[0103]
  As described above, the steel pedestal 1 is formed by welding a number of steel plates, and includes an upper floor plate 211 to which the turbine generator is attached, and a bottom plate 221 to which the spring mechanism and damping damper are attached. A large number of vertical plates 231 and intermediate plates 241 are connected to each other to form a box shape as a whole. 21a is a floor surface that serves as a mounting surface for the turbine generator, and 22a is a floor surface that serves as a mounting surface for the spring mechanism and damping damper.
[0104]
  Reference numeral 1e denotes a bearing mounting surface serving as a mounting surface of the bearing portion 7 between the intermediate pressure turbine 3 and the first low pressure turbine 4, and reference numeral 1f denotes a bearing portion 8 between the first low pressure turbine 4 and the second low pressure turbine 5. A bearing mounting surface 1 g is a bearing mounting surface that is a mounting surface of the bearing portion 9 between the second low-pressure turbine 5 and the generator 6. Reference numeral 1h denotes a meter mounting surface for mounting the meter 11.
[0105]
  In the steel pedestal 1, the space portions below the bearing mounting surfaces 1e, 1f, 1g on which the weight of the turbine generator is intensively loaded (the length in the axial direction of the turbine generator is a.1, A2, A3) Is filled with concrete 24a, 24b, 24c.
[0106]
  As shown in FIG. 16, the concrete 24 a, 24 b, 24 c is placed in the space between the lower surface of the upper floor plate 211 and the upper surface of the lower bottom plate 221 of the steel frame 1 in the longitudinal direction (axis line Direction) as above1, A2, A3In the width direction, the entire width of the gantry 1 is filled in the width direction, and the space is filled tightly so that no gap is formed between each steel plate.
[0107]
  The concrete 24a to 24c has a predetermined distance b in the longitudinal direction from each space in addition to the space below the bearing mounting surfaces 1e, 1f, and 1g.1And c1, B2And c2, B3And c3By extending (filling appropriately), the rigidity in the vicinity of the bearing portion, particularly the rigidity against the rolling load is increased.
[0108]
  Further, the steel pedestal 1 has a constant length in the longitudinal direction, i.e., a length d and a width e of the portion where the weight of the instrument 111 is applied, in the lower space portion of the instrument mounting surface 1h. It is filled in the same form as the bearing.
[0109]
  In the steel mount 1 configured as described above, concrete 24a, 24b, and 24c are filled in the space below the bearing mounting surfaces 1e, 1f, and 1g on which the weight of the turbine generator is concentrated and loaded. Therefore, the rigidity of the part that supports the bearing parts 7, 8, and 9 increases.
[0110]
  As a result, in the steel pedestal 1, deformation of a portion that supports the bearing portions 7, 8, and 9 under severe load conditions is suppressed, and the natural frequency increases due to the increase in rigidity. Then, by appropriately setting the filling amount and filling position of the concrete 24a to 24c, the natural frequency can always be kept higher than the operating shaft rotational speed (rated rotational speed) of the turbine generator. It is possible to prevent the occurrence of resonance due to the synchronization between the natural frequency of the gantry 1 and the shaft rotation speed.
[0111]
  Further, the steel pedestal 1 has a certain length (b) in the longitudinal direction connected to the lower space of the bearing mounting surfaces 1e, 1f, and 1g.1And c1, B2And c2, B3And c3) Is filled with concrete 24a to 24c, the rigidity of the support portion of the rolling load in each of the bearing portions 7, 8, and 9 is increased, and the strength of the steel gantry 1 against the rolling load is improved.
[0112]
  Furthermore, since the steel pedestal 1 is filled with concrete even in the portion where the weight of the instrument 111 is loaded, the rigidity of this part increases, and local deformation of the pedestal 1 due to the weight of the instrument 11 is avoided. The
[0113]
  Note that the steel mount isAspect exampleIn addition to the anti-vibration and anti-seismic support method using a spring mechanism and damping damper, the installation method is such that the steel base 1 is directly fixed to the foundation base without using the anti-vibration and anti-seismic support. Is also applicable.
[0114]
【The invention's effect】
  The present invention is configured as described above. According to the invention of claim 1,Has the following effectsRu.
[0115]
  That is, according to the invention of claim 1, each bearing of the steam turbine plant is in operation.With condenserSteel mountUpward due to thermal deformationThe displacement is held at the reference alignment position. As a result, each bearing is held at a normal bearing load, and the bearing load of a specific bearing is prevented from being excessively caused to cause wear or seizure, thereby improving the durability and life of the bearing.
[Brief description of the drawings]
FIG. 1 of the present inventiononeFruitProcessingThe figure seen from the low-pressure turbine which concerns on a state, and the axial center of a condenser at a right angle direction (AA line arrow view of FIG. 3).
FIG. 2 is a detailed cross-sectional view of the spring mechanism and the vibration damper in the embodiment (detailed view of a Z part and a Y part in FIG. 1).
FIG. 3 is a schematic side view of a steam turbine plant to which the present invention is applied.
[Figure 4]ImplementationThe action explanatory view in a form.
FIG. 5 shows the present invention.Of the first study example studied by the present inventorThe schematic plan view which shows arrangement | positioning of the drain pipe of a steam turbine plant.
6 is a view taken in the direction of arrow A in FIG.
FIG. 7 is an external perspective view showing an example of a steam turbine plant attached to a steel mount.
FIG. 8Of the second example studied by the present inventorThe principal part side view which shows the installation state of a steam turbine plant.
FIG. 9 AboveSecond study exampleThe external appearance perspective view which shows the installation state of the steam turbine plant in FIG.
FIG. 10 AboveSecond study exampleThe side view which shows the connection part of the steel mount frame in.
11 is an AA arrow view of FIG.
FIG. 12Second study exampleThe principal part perspective view which shows the temporarily fixed state at the time of transport of the module body in FIG.
FIG. 13 is a side view showing a fixed state of the module body during the transportation.
FIG. 14 shows the present invention.Of the third study example studied by the present inventorThe principal part external appearance perspective view of the installation apparatus of a steam turbine generator.
FIG. 15 aboveThird study exampleThe external appearance perspective view of the steel mount frame in.
FIG. 16 AboveThird study exampleThe principal part side view of the steel mount frame in FIG.
FIG. 17 is a diagram corresponding to FIG. 1 showing a conventional condenser mounting structure.
FIG. 18 is a front view showing an installation structure of a conventional steam turbine plant.
FIG. 19 is a vertical sectional view of a conventional steel pedestal (cross sectional view taken along line BB in FIG. 5).
20 is a cross-sectional view taken along line AA in FIG.
[Explanation of symbols]
  1 Steel mount
  2 High-pressure turbine
  3 Medium pressure turbine
  4 First low-pressure turbine
  5 Second low pressure turbine
  6 Generator
  7, 8, 9, 211 Bearing part
  10 Condenser
  11 Left drain oil pipe
  12 Right drain oil pipe
  13 Communication pipe
  14,15 Branch pipe
  16 Collecting pipe
  17 Oil tank
  21 No. 1 bearing
  22 No. 2 bearings
  23 No. 3 bearings
  24 No. 4 bearings
  24a-24d concrete
  25 No. 5 bearings
  26 No. 6 bearings
  27 No. 7 bearings
  No. 28 8 bearings
  29a No. 9 bearings
  29b No. 10 bearings
  30 Damping damper
  32, 33 connecting plate
  34 volts
  35 pins
  40 Spring mechanism
  50 foundation stand
  51 hull
  52 Spacer
  53 frames
  61 High-pressure turbine shaft
  62 Medium pressure turbine shaft
  63a, 63b Low pressure turbine shaft
  64 Generator shaft
  101 Front stand
  102 Central stand
  103 Rear stand
  104,105 joint
  501 Module body

Claims (1)

下端に復水器が直接固定された低圧タービンを含む蒸気タービン及び発電機を、鋼材を溶接してなる鋼製架台に固定し、同鋼製架台をばね機構及び制振ダンパを介して基礎架台に支持するようにした蒸気タービンプラントの軸受のアライメントを行なうにあたり、上記各軸受の冷態時における上下方向位置を、上記鋼製架台上の各軸受取付部の、蒸気タービンプラント運転中における上記復水器と上記鋼製架台の熱変形による方への変位量に相当する量だけ、基準アライメント位置から運転中の位置とは逆方向の低い位置にずらして設定することを特徴とする蒸気タービンプラントの据付方法。 A steam turbine including a low-pressure turbine with a condenser fixed directly at the lower end and a generator are fixed to a steel frame made by welding steel, and the steel frame is fixed to a basic frame via a spring mechanism and a damping damper. In the alignment of the bearings of the steam turbine plant that is supported by the above, the vertical position of each of the bearings in the cold state is determined based on the above- mentioned recovery during the operation of the steam turbine plant of each bearing mounting portion on the steel mount. by an amount corresponding to the displacement amount of the upper side by water vessel and thermal deformation of the steel frame, a steam turbine and the position during operation from a reference alignment position and sets shifted to lower reverse position How to install the plant.
JP16869899A 1999-06-15 1999-06-15 Steam turbine plant installation method Expired - Lifetime JP4191322B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16869899A JP4191322B2 (en) 1999-06-15 1999-06-15 Steam turbine plant installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16869899A JP4191322B2 (en) 1999-06-15 1999-06-15 Steam turbine plant installation method

Related Child Applications (3)

Application Number Title Priority Date Filing Date
JP2007272156A Division JP4191776B2 (en) 2007-10-19 2007-10-19 Equipment transportation and installation methods
JP2007272155A Division JP4126328B2 (en) 2007-10-19 2007-10-19 Piping equipment for steam turbine plant
JP2007272157A Division JP4241867B2 (en) 2007-10-19 2007-10-19 Equipment installation equipment

Publications (2)

Publication Number Publication Date
JP2001003708A JP2001003708A (en) 2001-01-09
JP4191322B2 true JP4191322B2 (en) 2008-12-03

Family

ID=15872811

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16869899A Expired - Lifetime JP4191322B2 (en) 1999-06-15 1999-06-15 Steam turbine plant installation method

Country Status (1)

Country Link
JP (1) JP4191322B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105115247A (en) * 2015-07-20 2015-12-02 太仓市友联干燥粉碎设备有限公司 Vertical vacuum vibration flow drying system

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6601392B2 (en) 2001-10-01 2003-08-05 Ingersoll-Rand Energy Systems Corporation Spring mounted recuperator
KR100933971B1 (en) 2008-02-26 2009-12-28 주식회사 무진기연 Dampers for buffering turbine casings in power plants
JP5159702B2 (en) * 2009-05-20 2013-03-13 株式会社東芝 Steam turbine
DE102009039184A1 (en) * 2009-08-28 2011-03-17 Man Diesel & Turbo Se turbomachinery
JP5766447B2 (en) * 2011-01-19 2015-08-19 三菱日立パワーシステムズ株式会社 Turbine exterior compartment
US9157335B2 (en) 2012-03-27 2015-10-13 General Electric Company Side supported turbine shell
US9938958B2 (en) 2012-07-19 2018-04-10 Humberto Antonio RUBIO Vertical axis wind and hydraulic turbine with flow control
JP5883811B2 (en) * 2013-02-21 2016-03-15 株式会社日立製作所 Rotating machine base
CN104633414A (en) * 2014-12-25 2015-05-20 贵州黔程天力智能科技有限公司 Levelness-adjustable damping receiver support
JP6510278B2 (en) 2015-03-10 2019-05-08 三菱日立パワーシステムズ株式会社 Condenser
JP6081544B1 (en) * 2015-08-19 2017-02-15 三菱日立パワーシステムズ株式会社 Steam turbine plant
WO2018154738A1 (en) * 2017-02-24 2018-08-30 三菱重工コンプレッサ株式会社 Steam turbine system and method for producing steam turbine system
CN108104931A (en) * 2017-12-17 2018-06-01 斯凯伦动力设备科技(兴化)有限公司 A kind of diesel power plant rain-proof smoke removing device
CN109204761A (en) * 2018-09-26 2019-01-15 中国船舶重工集团公司第七0三研究所 A kind of marine engine group modularization integrated stand with steam discharge function
JP7183067B2 (en) * 2019-02-13 2022-12-05 三菱重工マリンマシナリ株式会社 Drainage mechanism and ship equipped with it
CN111425268B (en) * 2020-03-31 2021-12-31 江苏核电有限公司 Installation method of double-elastic-base steam turbine with independently supported inner cylinder
CN111927115A (en) * 2020-09-11 2020-11-13 中国电建集团核电工程有限公司 Mounting method and mounting equipment for condenser shell
CN114320501B (en) * 2021-10-11 2024-03-01 中国化学工程第十四建设有限公司 Disassembly and installation process for steam turbine of chemical power station
CN116480633B (en) * 2023-05-25 2025-08-29 中化二建集团有限公司 Installation method of centrifugal ammonia synthesis gas compressor
CN119288639A (en) * 2024-10-17 2025-01-10 泰州丰源管业有限公司 An ORC heat recovery system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105115247A (en) * 2015-07-20 2015-12-02 太仓市友联干燥粉碎设备有限公司 Vertical vacuum vibration flow drying system

Also Published As

Publication number Publication date
JP2001003708A (en) 2001-01-09

Similar Documents

Publication Publication Date Title
JP4191322B2 (en) Steam turbine plant installation method
US7552903B2 (en) Machine mounting system
JP4734112B2 (en) Balancing system and balanced assembly
WO2018092098A1 (en) Generator set integrated gearbox
JP4191776B2 (en) Equipment transportation and installation methods
CA2963854C (en) Multi-point mounting system for rotating machinery
GB2036289A (en) Support arrangements particularly for heat exchangers
CN106907243A (en) A kind of gas turbine supporting construction
JP4241867B2 (en) Equipment installation equipment
EP3093547B1 (en) Base-frame assembly for a combustion engine
US4377025A (en) Method of mounting heat exchanger support system
JP4126328B2 (en) Piping equipment for steam turbine plant
US5495714A (en) Condenser envelope made of concrete for a structurally independent low pressure module
US4206013A (en) Condenser vacuum load compensating system
KR102502368B1 (en) Mounting system for rotating machinery
CN212428963U (en) Device for reducing operation vibration of steam turbine
CN213117787U (en) Comprehensive support system for dense pipelines of data center
JP3793640B2 (en) Frame equipment for steam turbine equipment
US4484447A (en) Turbine generator unit installation
CN112460639A (en) Elastic supporting structure for bidirectional expansion compensation of gas turbine
CN208252960U (en) A kind of fixed bracket of large size cryogenic vibration pipeline
RU2280170C2 (en) Method of condenser mounting
CN213020860U (en) Double shaft dewatering screen
CN102587698A (en) Supporting platform system for steam turbine generator unit arranged at high position
Nawrotzki et al. Static and dynamic analysis of concrete turbine foundations

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060516

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070816

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070821

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080415

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080613

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080902

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080918

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R151 Written notification of patent or utility model registration

Ref document number: 4191322

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130926

Year of fee payment: 5

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term