Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4191584B2 - Multilayer building structure construction apparatus and construction method - Google Patents
[go: Go Back, main page]

JP4191584B2 - Multilayer building structure construction apparatus and construction method - Google Patents

Multilayer building structure construction apparatus and construction method Download PDF

Info

Publication number
JP4191584B2
JP4191584B2 JP2003411770A JP2003411770A JP4191584B2 JP 4191584 B2 JP4191584 B2 JP 4191584B2 JP 2003411770 A JP2003411770 A JP 2003411770A JP 2003411770 A JP2003411770 A JP 2003411770A JP 4191584 B2 JP4191584 B2 JP 4191584B2
Authority
JP
Japan
Prior art keywords
crane
building
construction
building structure
constructed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003411770A
Other languages
Japanese (ja)
Other versions
JP2005171593A5 (en
JP2005171593A (en
Inventor
輝武 今村
嘉伸 杉本
永芳 宗
敬造 東間
直一 秋山
隆一 平川
真作 徳永
清道 河本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Kitagawa Corp
Original Assignee
Kitagawa Iron Works Co Ltd
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kitagawa Iron Works Co Ltd, Maeda Corp filed Critical Kitagawa Iron Works Co Ltd
Priority to JP2003411770A priority Critical patent/JP4191584B2/en
Publication of JP2005171593A publication Critical patent/JP2005171593A/en
Publication of JP2005171593A5 publication Critical patent/JP2005171593A5/ja
Application granted granted Critical
Publication of JP4191584B2 publication Critical patent/JP4191584B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、建築分野における多層建築構造物の構築装置及び構築方法に関するものである。   The present invention relates to a construction apparatus and construction method for a multilayer building structure in the construction field.

多層建築構造物の上層部の構築を行う際には、建築部材を上層部まで揚重する必要があり、従来、固定式クレーンを建築構造物の内部又は辺部に設置して、建築部材の揚重を行っていた。しかし、前記建築構造物の内部又は辺部に固定式クレーンを設置すると、その設置部分を構築することができないため、固定式クレーンを設置していた部分を後施工しなければならず、建築工期の増大、コストの増大を招いていた。また、このような後施工を避けるために、固定式クレーンを建築構造物の周辺に設置して構築することが考えられる。しかし、固定式クレーンを建築構造物の周辺に設置すると、吊り荷までの距離が大きくなるため、近接して配置した場合と比較して、クレーンの能力を大きくする必要となり、コストの増大を招いてしまう。   When building the upper layer of a multi-layer building structure, it is necessary to lift the building member up to the upper layer. Conventionally, a fixed crane is installed inside or on the side of the building structure. We were lifting up. However, if a fixed crane is installed inside or on the side of the building structure, the installation part cannot be constructed, so the part where the fixed crane was installed must be post-constructed, and the construction period Increase in cost and cost. Moreover, in order to avoid such post-construction, it can be considered that a fixed crane is installed around a building structure. However, if a fixed crane is installed around the building structure, the distance to the suspended load increases, so it is necessary to increase the capacity of the crane compared to the case where it is placed close to each other, resulting in an increase in cost. I will.

また、建築構造物の構築における工期の短縮を図るための手段としてプレキャスト工法があるが、プレキャスト工法におけるプレキャスト化された建築部材は荷重が大きいため、よりクレーンの負担が大きくなり、プレキャスト工法を採用してもコストの低減を図ることができなかった。これらの問題より、都市部で多い狭隘地での建築構造物の構築は、現場において、鉄筋工事、型枠工事、コンクリート工事等を行う在来工法で施工しており、工期短縮を図ることが難しかった。   In addition, there is a precast method as a means for shortening the construction period in the construction of a building structure, but because the precast building material in the precast method is heavy, the load on the crane becomes larger and the precast method is adopted. However, the cost could not be reduced. Because of these problems, construction of building structures in confined areas, which are common in urban areas, is carried out by conventional methods such as rebar construction, formwork construction, concrete construction, etc. on site, which can shorten the construction period. was difficult.

本発明は、このような問題を鑑みてなされたものであり、狭隘地等施工スペースが少ない場所においても、施工効率を向上させて、コストの低減を図ることができる多層建築構造物の構築装置及び構築方法を提供することを技術的課題とする。   The present invention has been made in view of such a problem, and is a construction apparatus for a multi-layered building structure capable of improving the construction efficiency and reducing the cost even in a place with a small construction space such as a narrow space. It is a technical problem to provide a construction method.

本発明は、多層建築構造物の構築装置であり、上記技術的課題を解決するために以下のように構成されている。本発明は、水平方向において移動自在であり、建築部材を組みたてて躯体を構築する第1のクレーンと、この第1のクレーンと建築部材を鉛直方向において搬送する昇降装置と、を備えた多層建築構造物の構築装置であって、前記昇降装置は、建築すべき建築構造物に隣接して立設されたマストと、前記第1のクレーンを載置し、前記マストに沿って昇降する平面台と、前記平面台に設けられ、建築部材を鉛直方向及び平面方向において搬送する第2のクレーンと、を備えていることを特徴とする。   The present invention is a construction apparatus for a multilayer building structure, and is configured as follows in order to solve the above technical problem. The present invention includes a first crane that is movable in the horizontal direction and builds a building body by assembling building members, and a lifting device that conveys the first crane and building members in the vertical direction. A construction apparatus for a multi-layered building structure, wherein the lifting device mounts a mast erected adjacent to a building structure to be built and the first crane, and moves up and down along the mast. It is provided with a 2nd crane provided in a plane stand and the said plane stand, and conveying a building member in a perpendicular direction and a plane direction.

前記構築装置を用いることにより、昇降装置を用いて建築部材と第1のクレーンを鉛直方向において搬送して、この搬送した建築部材を第2のクレーンによって水平方向に搬送し、適宜な箇所において1層又は2層分の躯体を構築することができる。このような構築方法によれば、前記昇降装置は、鉛直方向の移動のみで良いため、その構造が簡易で小さな能力のものを用いることができ、小型化を図ることができる。従って、設置面積を小さくすることができ、建築構造物に隣接して設置することが可能となる。一方、前記第1のクレーンは、昇降装置によって昇降された建築部材を水平方向において搬送し、躯体を組み立てる。すなわち、この第1のクレーンは、水平方向の移動と、1層又は2層分の躯体の構築とを行うことが可能なものであれば良いため、その構造が簡易で小さな能力のものを用いることができ、小型化を図ることができる。また、前記昇降装置のマストは、構築
すべき建築構造物に隣接して配置されているため、施工箇所の近くまで建築部材を搬送して、躯体を構築することができる。そのため、第1のクレーンに過大な能力を必要とせず、好適である。
By using the construction device, the building member and the first crane are transported in the vertical direction using the lifting device, and the transported building member is transported in the horizontal direction by the second crane. Layers or two-layer housings can be constructed. According to such a construction method, since the lifting device only needs to move in the vertical direction, it is possible to use a device having a simple structure and a small capacity, and can be downsized. Therefore, the installation area can be reduced, and it can be installed adjacent to the building structure. On the other hand, the first crane transports the building members raised and lowered by the lifting device in the horizontal direction and assembles the frame. In other words, the first crane only needs to be capable of moving in the horizontal direction and constructing a frame for one layer or two layers, and therefore has a simple structure and a small capacity. And miniaturization can be achieved. Moreover, since the mast of the said raising / lowering apparatus is arrange | positioned adjacent to the building structure to be constructed | assembled, a building member can be conveyed to the vicinity of a construction location, and a housing can be constructed | assembled. Therefore, the first crane does not require an excessive capacity and is suitable.

また、1層又は2層分の躯体を構築した後、その上層を構築する場合には、前記第1のクレーンを昇降装置上に移動させて、昇降装置によって施工すべき上層部分へ揚重することができる。そして再び、第1のクレーンを用いて1層又は2層分の構築する。これを繰り返すことにより、多層建築構造物を効率よく構築することができる。   In addition, after building a frame for one or two layers, when building the upper layer, the first crane is moved onto the lifting device and lifted to the upper layer portion to be constructed by the lifting device. be able to. And again, it builds for one layer or two layers using the 1st crane. By repeating this, a multi-layered building structure can be constructed efficiently.

さらに、前記昇降装置の平面台には第2のクレーンが設けられているため、この第2のクレーンを用いて建築部材を搬送することができる。この第2のクレーンを用いることにより、建築部材を容易に揚重することができるため、施工効率を更に向上させることができる。加えて、前述のように、施工階における水平方向での建築部材の搬送は、第1のクレーン又は台車を用いて搬送する。特に、昇降装置と構築すべき箇所が離れている場合には、水平方向に移動可能な台車を用いると作業の効率を向上させることができる。しかし、昇降装置と構築すべき箇所が近い場合には、昇降装置から台車等を用いて建築部材を搬送すると、台車等に一旦載置する時間を要し、却って作業効率を低下させる恐れがある。このような場合には、第2のクレーンを用いて、建築部材を構築すべき箇所に搬送することにより、更に施工効率を向上させることができる。   Furthermore, since the 2nd crane is provided in the plane stand of the said raising / lowering apparatus, a building member can be conveyed using this 2nd crane. By using this second crane, the building member can be lifted easily, so that the construction efficiency can be further improved. In addition, as described above, the building members are transported in the horizontal direction on the construction floor using the first crane or the carriage. In particular, when the position to be constructed is separated from the lifting device, work efficiency can be improved by using a cart that can move in the horizontal direction. However, when the lifting device and the place to be constructed are close, if a building member is transported from the lifting device using a carriage or the like, it takes time to temporarily place the building member on the carriage or the like, and the work efficiency may be reduced. . In such a case, the construction efficiency can be further improved by transporting the building member to a place to be constructed using the second crane.

加えて、本発明に係る多層建築構造物の構築装置は、前記昇降装置によって搬送された建築部材を水平方向に搬送する台車と、この台車と第1のクレーンの走行路となる走行レールと、を備えていることが望ましい。   In addition, the construction apparatus for a multilayer building structure according to the present invention includes a carriage that horizontally conveys the building members conveyed by the lifting device, a traveling rail that is a traveling path of the carriage and the first crane, It is desirable to have.

本発明は、前記台車を用いることにより、台車によって建築部材を第1のクレーン側まで搬送しつつ、第1のクレーンによって躯体を構築することができ、建築部材の搬送と躯体の構築を併行して行うことができる。そのため、作業効率を向上させることが可能となる。特に、大規模な建築構造物等平面の面積が大きい場合に、好適に用いることができる。   In the present invention, by using the carriage, the building member can be constructed by the first crane while the building member is conveyed to the first crane side by the carriage. Can be done. Therefore, it is possible to improve work efficiency. In particular, it can be suitably used when the area of a plane such as a large-scale building structure is large.

本発明に用いる第1のクレーン及び台車は、種々の装置を用いることができるが、装置によっては、走行レールを要するものもある。このような装置を用いる場合には、前記第1のクレーンを用いて、走行レールを設置、分解することが望ましい。第1のクレーンを用いて、躯体を構築し、その構築した箇所から走行レールを分解し、この分解した走行レールを構築した部分の上部に載置する。次いで、上層部分を構築する際には、分解された走行レールは上層部分に載置されているため、この走行レールを設置するのみで良い。このように、第1のクレーンを用いて走行レールの設置、分解を行うことにより、効率よく作業を行うことができ、工期及びコストの縮減を図ることができる。   Various apparatuses can be used for the first crane and the carriage used in the present invention, but some apparatuses require a traveling rail. When using such an apparatus, it is desirable to install and disassemble the traveling rail using the first crane. The first crane is used to construct a housing, disassemble the travel rail from the constructed location, and place the disassembled travel rail on the constructed portion. Next, when the upper layer portion is constructed, since the disassembled traveling rail is placed on the upper layer portion, it is only necessary to install the traveling rail. Thus, by installing and disassembling the traveling rail using the first crane, it is possible to perform work efficiently and to reduce the work period and cost.

また、本発明は、前述の構築装置を用いた多層建築構造物の構築方法であって、建築すべき構造体に隣接して前記昇降装置を設置する第1工程と、前記昇降装置を用いて、第1のクレーンと建築部材を鉛直方向において搬送する第2工程と、前記第1のクレーンを用いて、1層又は2層の躯体を構築する第3工程と、を行った後、前記第2工程と第3工程を行うことを特徴とする。   Moreover, this invention is the construction method of the multilayer building structure using the above-mentioned construction apparatus, Comprising: The 1st process of installing the said raising / lowering apparatus adjacent to the structure which should be built, and the said raising / lowering apparatus are used. After performing the second step of conveying the first crane and the building member in the vertical direction and the third step of constructing a one-layer or two-layer housing using the first crane, The second step and the third step are performed.

本発明は、前記構築方法によっても、昇降装置を用いて建築部材と第1のクレーンを鉛直方向において搬送して、この搬送した建築部材を第1のクレーンによって水平方向に搬送し、適宜な箇所において1層又は2層分の躯体を構築することができる。そしてこの第2工程と第3工程を繰り返すことにより、多層建築構造物を効率よく構築することができる。   According to the present invention, the building method and the first crane are transported in the vertical direction using the lifting device, and the transported building member is transported in the horizontal direction by the first crane. In 1 layer or 2 layers can be constructed. And a multilayer building structure can be constructed | assembled efficiently by repeating this 2nd process and 3rd process.

さらに、本発明に係る多層建築構造物の構築方法は、第2工程を行った後、前記第1のクレーンを用いて走行レールを設置する工程と、構築すべき箇所まで第1のクレーンを走行させる工程と、前記台車を用いて、建築部材を第1のクレーンの側まで搬送する工程と、を行うことが望ましい。   Furthermore, the construction method of the multi-layer building structure according to the present invention includes the step of installing the traveling rail using the first crane after the second step, and traveling the first crane to the location to be constructed. It is desirable to perform the step of transporting the building member to the first crane side using the carriage.

本発明は、多層に形成される種々の建築構造物の構築に好適に用いることができるが、例えば、鉄筋コンクリート構造におけるプレキャスト工法における建築構造物に好適に用いることができる。前記プレキャスト工法は、工場にて予め、複数のブロック毎に組みたててプレキャスト化部材として、これらのプレキャスト化部材を現場にて組みたてる。そのため、1つあたりの建築部材の重量が重いものが多く、従来の工法においては、特に、揚重する第1のクレーンの負荷が大きく、コスト及び工期の増大化が顕著であった。しかし、本発明に係る構築方法は、昇降装置と第1のクレーンの両方を用いて躯体を構築するため、重量の重い建築部材であっても、昇降装置及び第1のクレーンの負荷を軽減させることが可能となる。従って、本発明に係る多層建築構造物の構築方法は、プレキャスト工法において好適に用いることができる。   The present invention can be suitably used for the construction of various building structures formed in multiple layers. For example, the present invention can be suitably used for a building structure in a precast method in a reinforced concrete structure. In the precast method, these precast members are assembled in the field as precast members that are assembled in advance at a factory for each of a plurality of blocks. Therefore, many building members are heavy in weight, and in the conventional construction method, the load of the first crane to be lifted is particularly large, and the increase in cost and construction period is remarkable. However, since the construction method according to the present invention constructs the housing using both the lifting device and the first crane, the load on the lifting device and the first crane is reduced even for heavy building members. It becomes possible. Therefore, the construction method of the multilayer building structure according to the present invention can be suitably used in the precast method.

以上のように本発明に係る多層建築構造物の構築装置及び構築方法によれば、狭隘地等施工スペースが少ない場所においても、施工効率を向上させて、コストの低減を図ることができる。また、昇降装置で建築部材の揚重を行い、第1のクレーンで躯体を構築するため、吊り荷となる建築部材に近いところで作業を行うことができ、各々のクレーンに係る負荷を低減することが可能となる。さらに、施工スペースの少ない場所においても、重量の重い鉄筋コンクリート造の建築構造物であってもプレキャスト工法にて施工することができるため、品質、安全性を向上させることができるとともに、更なる工期の短縮化を図ることが可能となる。   As described above, according to the construction apparatus and construction method for a multilayer building structure according to the present invention, the construction efficiency can be improved and the cost can be reduced even in a place with a small construction space such as a confined area. In addition, since the building members are lifted by the lifting device and the frame is constructed by the first crane, work can be performed in the vicinity of the building members that are suspended, and the load on each crane can be reduced. Is possible. Furthermore, even in places where construction space is small, even heavy reinforced concrete building structures can be constructed by the precast construction method, so that quality and safety can be improved. It becomes possible to shorten.

以下、図面に基づいて、本発明に係る多層建築構造物の構築の一実施形態を詳細に説明する。本実施の形態は、鉄筋コンクリート製の12階建ての集合住宅のプレキャスト工法による構築である。図1は、本実施の形態に係る集合住宅の構築方法の説明概略図であり、図2は、図1のA矢視図、図3は、図1の平面図である。まず、本実施の形態に用いる装置について説明する。集合住宅の建築部材を施工階に昇降させるための昇降装置1と、この昇降装置1で昇降させた建築部材を施工階において水平方向に搬送する台車2と、この台車2が搬送した建築部材を組みたてる第1のクレーン3と、この第1のクレーン3と台車2を水平方向において移動させるための走行レール4と、を備えている。   Hereinafter, an embodiment of construction of a multilayer building structure according to the present invention will be described in detail based on the drawings. In the present embodiment, a 12-story apartment house made of reinforced concrete is constructed by a precast method. FIG. 1 is an explanatory schematic diagram of a method for constructing an apartment house according to the present embodiment, FIG. 2 is a view as viewed from an arrow A in FIG. 1, and FIG. 3 is a plan view of FIG. First, an apparatus used in this embodiment will be described. A lifting device 1 for raising and lowering the building members of the apartment building to the construction floor, a carriage 2 for conveying the building members raised and lowered by the lifting device 1 in the horizontal direction on the construction floor, and the building members carried by the carriage 2 A first crane 3 to be assembled and a traveling rail 4 for moving the first crane 3 and the carriage 2 in the horizontal direction are provided.

前記昇降装置1は、施工すべき集合住宅に隣接して配置されており、鉛直方向において立設された2本のマスト11と、このマスト11に沿って昇降する平面台12と、仕上げ材を搭載しマスト11に沿って昇降する資材搬入バケット13と、この資材搬入バケット13と平面台12を昇降させるためのリフト(図示せず)と、前記平面台12に設けられ、建築部材を搬送する第2のクレーンとしての荷取りクレーン14と、を備えている。この昇降装置1は、建築部材と第1のクレーン3と台車2とを鉛直方向において移動させるとともに、平面台12に設けられた荷取りクレーン14を用いて建築部材を台車2に載置する。   The lifting device 1 is disposed adjacent to a housing complex to be constructed, and includes two masts 11 erected in the vertical direction, a flat table 12 that moves up and down along the mast 11, and a finishing material. A material carrying bucket 13 that is mounted and raised and lowered along the mast 11, a lift (not shown) for raising and lowering the material carrying bucket 13 and the flat table 12, and provided on the flat table 12, conveys building members. A loading crane 14 as a second crane. The lifting device 1 moves the building member, the first crane 3, and the carriage 2 in the vertical direction, and places the building member on the carriage 2 by using a loading crane 14 provided on the flat table 12.

前記第1のクレーン3は、水平方向に移動可能であり、プレキャスト化された建築部材を組みたてて躯体を構築する。この第1のクレーン3は、水平方向において適宜の場所に移動して躯体を構築することができるため、従来の工法におけるクレーンと比較して、小さなものを採用することができる。また、この第1のクレーン3と台車2を走行させるた
めの走行レール4も、第1のクレーン3を用いて敷設、撤去する。
The first crane 3 is movable in the horizontal direction, and constructs a frame by assembling precast building members. Since the first crane 3 can be moved to an appropriate place in the horizontal direction to construct a frame, a smaller crane can be employed as compared with a crane in a conventional construction method. Further, the traveling rail 4 for traveling the first crane 3 and the carriage 2 is also laid and removed by using the first crane 3.

次いで、図面に基づいて、本実施の形態に係る集合住宅の構築方法を詳細に説明する。まず、第1のクレーン3を載置した状態で平面台12を上昇させて、第1のクレーン3を施工すべき階に搬送する。この第1のクレーン3を用いて、台車2と走行レール4を施工階に搬送する。これらの装置を施工階まで搬送したら、第1のクレーン3を用いて走行レール4を敷設し、第1のクレーン3を施工箇所に移動する。この第1のクレーン3を移動している際に、昇降装置1の荷取りクレーン14を用いて建築部材を揚重し、台車2に載置する。この台車2を用いて、建築部材をクレーン3の側まで搬送する。そして、クレーン3を後退させながら、順次躯体を構築する(図4参照)。   Next, based on the drawings, a method for constructing an apartment house according to the present embodiment will be described in detail. First, the plane table 12 is raised in a state where the first crane 3 is placed, and the first crane 3 is conveyed to the floor to be constructed. Using this first crane 3, the carriage 2 and the traveling rail 4 are conveyed to the construction floor. When these devices are conveyed to the construction floor, the traveling rail 4 is laid using the first crane 3 and the first crane 3 is moved to the construction site. While moving the first crane 3, the building member is lifted using the load crane 14 of the lifting device 1 and placed on the carriage 2. Using this cart 2, the building member is conveyed to the crane 3 side. Then, the frame is sequentially constructed while the crane 3 is moved backward (see FIG. 4).

このようにして躯体の構築を進めて、第1のクレーン3で建築部材を直接荷取りできる距離まで躯体の構築が進んだ時、第1のクレーン3を昇降装置1の平面台12上に移動させるとともに、第1のクレーン3を用いて台車2と走行レール4を上層階へ載置する。そして、施工階における最後のブロックを構築する際には、第1のクレーン3を昇降装置1のマスト11に固定して、反力を受けられるようにする。このようにして、残りの部分を構築する(図5参照)。   In this way, the construction of the chassis is advanced, and when the construction of the chassis has proceeded to a distance at which the building members can be directly loaded by the first crane 3, the first crane 3 is moved onto the plane table 12 of the lifting device 1. At the same time, the carriage 2 and the traveling rail 4 are placed on the upper floor using the first crane 3. And when constructing the last block in a construction floor, the 1st crane 3 is fixed to the mast 11 of the raising / lowering apparatus 1 so that it can receive reaction force. In this way, the remaining part is constructed (see FIG. 5).

このようにして、1階分の構築が完了したら、第1のクレーン3を載置した状態で平面台12を上昇させる。次いで、新たに構築すべき施工階に、第1のクレーン3を用いて走行レール4を敷設する(図6参照)。   In this way, when the construction for the first floor is completed, the plane table 12 is raised with the first crane 3 placed thereon. Next, the traveling rail 4 is laid on the construction floor to be newly constructed using the first crane 3 (see FIG. 6).

次いで、マスト11に固定していた第1のクレーン3の固定を外し、第1のクレーン3を施工すべき箇所に移動させる。さらに、台車2を走行レール4上に移動させる(図7参照)。そして、再び、台車2を用いて建築部材をクレーン3側まで搬送しつつ、第1のクレーン3を用いて躯体を構築する。この工程を繰り返すことにより、12階の集合住宅を構築することができる。   Next, the first crane 3 that has been fixed to the mast 11 is removed, and the first crane 3 is moved to a place to be constructed. Further, the carriage 2 is moved onto the traveling rail 4 (see FIG. 7). And again, a building is constructed using the 1st crane 3, conveying a building member to the crane 3 side using the trolley | bogie 2. FIG. By repeating this process, a 12-story apartment house can be constructed.

本実施の形態では、前記構築方法を用いることにより、鉄筋コンクリート造の集合住宅を効率よく構築することができる。図8は、従来工法と本実施の形態に係る構築方法とを比較した工程表である。この図8からわかるように、本実施の形態に係る構築方法によれば、従来工法と比較して工期を大幅に短縮することが可能となり、本実施の形態においては、従来工法と比べて1.5カ月短縮することができる。   In the present embodiment, a reinforced concrete apartment house can be efficiently constructed by using the construction method. FIG. 8 is a process chart comparing the conventional method and the construction method according to the present embodiment. As can be seen from FIG. 8, according to the construction method according to the present embodiment, the construction period can be significantly shortened compared to the conventional method. In this embodiment, the construction method is 1 compared with the conventional method. It can be shortened by 5 months.

本実施の形態に係る集合住宅の構築の説明概略図である。It is an explanatory schematic diagram of construction of an apartment house concerning this embodiment. 図1のA矢視図である。It is A arrow directional view of FIG. 図1の平面図である。It is a top view of FIG. 実施の形態に係る集合住宅の構築工程の説明図である。It is explanatory drawing of the construction process of the apartment house which concerns on embodiment. 実施の形態に係る集合住宅の構築工程の説明図であるIt is explanatory drawing of the construction process of the apartment house which concerns on embodiment. 実施の形態に係る集合住宅の構築工程の説明図であるIt is explanatory drawing of the construction process of the apartment house which concerns on embodiment. 実施の形態に係る集合住宅の構築工程の説明図であるIt is explanatory drawing of the construction process of the apartment house which concerns on embodiment. 本実施の形態に係る構築方法と従来工法の工程表である。(a)は本実施の形態に係る構築方法であり、(b)は従来工法である。It is a process table of the construction method according to the present embodiment and the conventional method. (A) is a construction method according to the present embodiment, and (b) is a conventional construction method.

符号の説明Explanation of symbols

1 昇降装置
11 マスト
12 平面台
13 資材搬入バケット
14 荷取りクレーン
2 台車
3 第1のクレーン
4 走行レール
DESCRIPTION OF SYMBOLS 1 Lifting device 11 Mast 12 Plane table 13 Material carrying bucket 14 Loading crane 2 Cart 3 First crane 4 Traveling rail

Claims (5)

水平方向において移動自在であり、建築部材を組みたてて躯体を構築する第1のクレーンと、
この第1のクレーンと建築部材を鉛直方向において搬送する昇降装置と、を備えた多層建築構造物の構築装置であって、
前記昇降装置は、建築すべき建築構造物に隣接して立設されたマストと、
前記第1のクレーンを載置し、前記マストに沿って昇降する平面台と、
前記平面台に設けられ、建築部材を鉛直方向及び平面方向において搬送する第2のクレーンと、を備えていることを特徴とする多層建築構造物の構築装置。
A first crane that is movable in the horizontal direction and that constructs a building frame by assembling building members;
A lifting apparatus for conveying the first crane and building members in the vertical direction, and a construction apparatus for a multilayer building structure,
The lifting device includes a mast erected adjacent to a building structure to be constructed,
A flat table on which the first crane is placed and moved up and down along the mast;
A construction apparatus for a multi-layer building structure, comprising: a second crane provided on the flat table and configured to convey a building member in a vertical direction and a flat direction.
前記昇降装置によって搬送された建築部材を水平方向に搬送する台車と、
この台車と第1のクレーンの走行路となる走行レールと、を備えていることを特徴とする請求項1に記載の多層建築構造物の構築装置。
A carriage for horizontally conveying the building members conveyed by the lifting device;
The construction apparatus for a multilayer building structure according to claim 1, further comprising: a carriage and a traveling rail serving as a traveling path of the first crane.
前記建築部材は、プレキャスト化されていることを特徴とする請求項1または請求項2に記載の多層建築構造物の構築装置。 The building element is constructed equipment according to claim 1 or a multi-layer building structure according to claim 2, characterized in that it is precast of. 請求項1から請求項3のいずれかに記載の多層建築構造物の構築装置を用いた多層建築構造物の構築方法であって、
建築すべき構造体に隣接して前記昇降装置を設置する第1工程と、
前記昇降装置を用いて、第1のクレーンと建築部材を鉛直方向において搬送する第2工程と、
前記第1のクレーンを用いて、1層又は2層の躯体を構築する第3工程と、を行った後、前記第2工程と第3工程を行うことを特徴とする多層建築構造物の構築方法。
A multi-layer building structure construction method using the multi-layer building structure construction device according to any one of claims 1 to 3 ,
A first step of installing the lifting device adjacent to the structure to be constructed;
A second step of transporting the first crane and the building member in the vertical direction using the lifting device;
Construction of a multi-layer building structure characterized in that the second step and the third step are performed after the third step of constructing a one-layer or two-layer housing using the first crane. Method.
請求項2に記載の多層建築構造物の構築装置を用いた多層建築構造物の構築方法であって、
前記第2工程を行った後、
前記第1のクレーンを用いて走行レールを設置する工程と、
躯体を構築すべき箇所まで第1のクレーンを走行させる工程と、
前記台車を用いて、建築部材を第1のクレーンの側まで搬送する工程と、を行うことを特徴とする請求項に記載の多層建築構造物の構築方法。

A construction method for a multilayer building structure using the construction device for a multilayer building structure according to claim 2,
After performing the second step,
Installing a travel rail using the first crane;
A step of running the first crane to a place where the housing is to be constructed;
Using said cart, how to build a multi-layer building structure according to claim 4, the step of conveying the building elements to the side of the first crane, and performing.

JP2003411770A 2003-12-10 2003-12-10 Multilayer building structure construction apparatus and construction method Expired - Fee Related JP4191584B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003411770A JP4191584B2 (en) 2003-12-10 2003-12-10 Multilayer building structure construction apparatus and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003411770A JP4191584B2 (en) 2003-12-10 2003-12-10 Multilayer building structure construction apparatus and construction method

Publications (3)

Publication Number Publication Date
JP2005171593A JP2005171593A (en) 2005-06-30
JP2005171593A5 JP2005171593A5 (en) 2006-09-21
JP4191584B2 true JP4191584B2 (en) 2008-12-03

Family

ID=34732414

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003411770A Expired - Fee Related JP4191584B2 (en) 2003-12-10 2003-12-10 Multilayer building structure construction apparatus and construction method

Country Status (1)

Country Link
JP (1) JP4191584B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526949B (en) * 2013-10-23 2016-03-30 广州建筑股份有限公司 A kind of sliding and lifting construction method of attached wall vertical structure
US11193287B2 (en) 2016-09-23 2021-12-07 Sh Technologies Pte Ltd Construction system and method
CN106545172A (en) * 2016-11-10 2017-03-29 中冶建工集团有限公司 A kind of installation method of high-altitude long-span steel truss

Also Published As

Publication number Publication date
JP2005171593A (en) 2005-06-30

Similar Documents

Publication Publication Date Title
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
CN110562856B (en) Lifting device for heavy objects and lifting and carrying method
JP5914203B2 (en) Disassembly method, disassembly assistance device
CN110550544B (en) Crane and method for lifting and transporting heavy objects using the same
JP4191584B2 (en) Multilayer building structure construction apparatus and construction method
JP5473294B2 (en) Overhead crane installation method and installation system
JPH05113026A (en) Temporary scaffold structure
JP4984493B2 (en) Blast furnace demolition method and blast furnace construction method
JP5286823B2 (en) Manufacturing method and system for deck crane
CN111005564A (en) Construction method based on steel structure on waffle floor
JP5365958B2 (en) Module construction method and surface plate for module construction in plant facility construction
JP6285173B2 (en) Multi-layer parking system assembly method
JP2001322115A (en) Site factory equipment
JP5665905B2 (en) Construction method for multi-layer buildings in limited areas
JP2761518B2 (en) Construction method of building
JP2012046316A (en) Carriage system
JP2006232489A (en) Inclined passenger conveyor equipment, installation method thereof, and delivery method thereof
JP2011140806A (en) Construction method of precast floor slab, and carrying device of precast member
JPH10102779A (en) Assembly method of heavy weight elevator and device therefor
JPH08326323A (en) Construction equipment for high-rise buildings
JP2591352B2 (en) How to build a building
JP2005163323A (en) Module conveying apparatus and installation method
CN109056741B (en) Method for dismantling lower steel support in multi-layer steel support
JP2835880B2 (en) High-rise building frame construction method
JP2005171593A5 (en)

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060807

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060807

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080828

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080909

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080918

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4191584

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130926

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees