Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4210167B2 - Tightening setting device and tensioning setting method using the same - Google Patents
[go: Go Back, main page]

JP4210167B2 - Tightening setting device and tensioning setting method using the same - Google Patents

Tightening setting device and tensioning setting method using the same Download PDF

Info

Publication number
JP4210167B2
JP4210167B2 JP2003193349A JP2003193349A JP4210167B2 JP 4210167 B2 JP4210167 B2 JP 4210167B2 JP 2003193349 A JP2003193349 A JP 2003193349A JP 2003193349 A JP2003193349 A JP 2003193349A JP 4210167 B2 JP4210167 B2 JP 4210167B2
Authority
JP
Japan
Prior art keywords
pile
tension
reference pile
placement
tension setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2003193349A
Other languages
Japanese (ja)
Other versions
JP2005030789A (en
Inventor
文夫 大友
律雄 先村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Topcon Corp
Original Assignee
Topcon Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Topcon Corp filed Critical Topcon Corp
Priority to JP2003193349A priority Critical patent/JP4210167B2/en
Publication of JP2005030789A publication Critical patent/JP2005030789A/en
Application granted granted Critical
Publication of JP4210167B2 publication Critical patent/JP4210167B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、地盤造成時の丁張り作業に用いる丁張り設定装置及びこれを用いた丁張り設定方法に関する。
【0002】
【従来の技術】
従来から、地盤造成時の丁張り設定方法には、図1に示す方法が知られている。丁張り作業は例えば土木工事において切り土、或いは、盛り土する際の勾配や側溝位置の指示の際に行われ、より詳細には、法面41の法肩41a、法尻41bの位置や、勾配1:P、1:Q等を、重機を操作する作業者に指示するための目印として、これらの位置或いは数値を表す丁張り40が所定の位置毎に設置される。
【0003】
丁張りは3次元の目印である。例えば路線の場合、平面線形データ、縦断面データ、横断面データに基づいて丁張りの位置が決定される。
【0004】
このような丁張り40を設置する際には、まず、道路のセンターラインCLX上の基準地点T1に測量機械42を据え付け、この基準地点T1からセンターラインCLXと直交する方向、即ち、矢印M−N方向に示す法線方向を見ながら、法肩41a付近に控え杭43を打つ。
【0005】
そして、控え杭43を測量機械42で視準して、この控え杭43の打設地点T2とセンターラインCLX上の打設地点T1との距離LX1、及び控え杭43の頂端の標高(打設高さ)ZX1を測定する形で、この控え杭43の位置を求めておく。
【0006】
こうしておいてから、控え杭43の打設地点T2とセンターラインCLX上の基準地点T1を結ぶ見通し線上に木杭44A、44Bを打設する。ここで、木杭44Aを基準杭、方向杭44Bを方向杭と言い換えることにする。
【0007】
そして、先に求めた控え杭43の位置に基づいて、横板48を介して基準杭44A、方向杭44Bに掛け渡すように抜き材45を設置することによって、抜き材45を法線方向である矢印M、N方向に向けて配置させ、この際、抜き材45はスラントレール46を用いて、法面41の勾配1:P、1:Qに対応した傾斜を為すように設置する。これによって、抜き材45に法面41の掘削線形状を指示させる。
【0008】
そして、この勾配で掘削を行うべき法長等を、各丁張り40毎に記載しておく。こうして、基準杭44A、方向杭44B、横板48、抜き材45等による丁張り40をセットし、この丁張り40を法肩41aの伸延方向に距離LX4毎に離して設置することにより、法肩方向に2ヶ並ぶ丁張り40、40を見通した距離LX4分の見通し線を介して、法肩41aの掘削位置を指示する。
【0009】
こうした丁張り40を設置するには、1本、1本の基準杭44A、方向杭44Bや横板48、抜き材45を打設する作業と、控え杭43を打設した地点T2の位置に基づいてこれらの基準杭44A、方向杭44B、横板48、抜き材45の取付け位置を求める作業とを、測量及び面倒な計算によって1ステップ毎に積み重ねていかなければならないために、その設置作業が非常に煩雑である。
【0010】
また、控え杭43及び基準杭4A、方向杭4Bは、センターラインCLXに対して、正確に直角な矢印M−Nに示す法線方向に並ぶ形で設置しなければ、抜き材45の向きが曲がって、これが現す法面41の掘削線にずれが生じるが、先に述べたような丁張り設定方法では、控え杭43の打設地点T2からセンターラインCLX上の基準地点T1を目視することによって得る見通し線を利用してこの見通し線上に基準杭44A、方向杭44Bを打設するので、この基準杭44A、方向杭44Bに打ち付けられる横板48や抜き材45が法線方向からずれて設置される危険性を抱えている。
【0011】
従って、正確な丁張り40の設置を行うには、熟練した測量技術をもって、煩雑な作業や計算を根気良く行わなければならず、これに費やされる作業労力は大変なものである(例えば、特許文献1参照。)。
【0012】
こうした丁張り作業では、作業労力が大変なので、測量機械42にあらかじめ丁張り位置を記憶させているものもある。
【0013】
例えば、図2に示すように、道路の長手方向に丁張りの間隔が離散的に設けられ、図2において、符号P1、P2、…は、丁張り位置の横断面データを示している。
【0014】
基準杭44Aの水平方向の打設位置(X1、Y1)は、その設計データに対応して定められており、基準杭44Aをその打設位置(X1、Y1)に立てて基準杭44Aを打ち込み、基準杭44Aの打設高さZX1を測量機械42により求めると、図3に示すように、基準杭44Aに対する取付け位置としての横板48の基準杭44Aの頂点44Cからの垂直方向の距離H1、横板48に対する取付け位置としての抜き材45の基準杭44Aから水平方向の距離H2、抜き材45の水平方向に対する傾斜角度θが演算により得ることができる。
【0015】
従って、測量機械42を基準地点T1に据え付けて、基準杭44Aの打設位置を視準して、横断データの箇所毎に基準杭44Aの打設位置(X1、Y1)、その高さZX1を決めると、垂直方向の距離H1、水平方向の距離H2、傾斜角度θが求まるので、この距離H1、H2、角度θに基づき丁張り作業を行うことができる。
【0016】
なお、方向杭44Bは、単独で測量を行い位置を特定してもよいが、測量機械42を用いてその方向杭44Bを視準したとき、基準杭44Aの背後に隠れる打設位置に打設すれば良い。また、方向杭44Bと基準杭44Aとの間隔H3は例えば1mで、定数として決めて置くことができる。
【0017】
こうして、基準杭44A、方向杭44Bを予め定められた打設位置に打設後、横板48を距離H1の取付け位置に打ち付け、次いで、横板48の距離H2の取付け位置に抜き材45を当て付け、角度θを傾斜角度測定器(図示を略す)を用いて決めて、抜き材45を横板48に打ち付ける。
【0018】
こうした丁張り作業を行うことにより、控え杭43等を打ち付ける作業等を省略でき、丁張り作業の労力を軽減しつつ正確に丁張り作業を行うことができる。
【0019】
【特許文献1】
特開平7−128060号公報(図13)
【0020】
【発明が解決しようとする課題】
ところが、実際に現場で作業を行う場合には、必ずしも設計データに対応する打設位置に丁張り40を設置することができないことが多い。
【0021】
設計データは、必ずしも現場を調査して丁張り作業の位置を決めたものではなく、机上で予め定めたものであり、実際には、予め定めた打設位置に大石があったり、地盤が軟らかかったり、凹んでいたりして、現況は設計上予定した通りにはいかないものである。
【0022】
従って、やむをえず丁張り40の打設位置を変える必要が生じてくるが、基準杭44Aの頂端44Cの打設高さZX1、距離H1、距離H2、傾斜角度θは、設計データに対応する箇所に対応して決定されるものである。
【0023】
丁張り40の打設位置を変更するとそれに応じて、基準杭44Aの打設高さZX1、距離H1、距離H2、傾斜角度θを、丁張り40の打設位置を変更するとこれに応じて変更しなければならなくなる。
【0024】
すると、丁張り作業者は、その打設位置の変更に応じて、基準杭44Aの打設高さX1、距離H1、距離H2、傾斜角度θを計算して求めなければならず、丁張り40の打設位置を変更した場合に再計算が必要であり、迅速に丁張り作業を行うことができないといった問題点が残存する。
【0025】
本発明は、上記の事情に鑑みて為されたもので、丁張り打設位置を現況に合わせて変更した場合でも、丁張り作業を支障なく迅速に行うのに便利な丁張り設定装置及びこれを用いた丁張り設定方法を提供することを目的とする。
【0026】
【課題を解決するための手段】
請求項1に記載の丁張り設定装置は、測量機械の測定により得られた丁張りの位置情報を入力する入力手段と、予め定められた設計データを記憶する記憶手段と、前記設計データと前記丁張りを構成する基準杭の位置情報としての打設位置とその打設高さとから前記丁張りを構成する横板の前記基準杭への取付け位置と前記丁張りを構成する抜き材の前記横板への取付け位置とを演算する演算手段と、前記演算手段の演算結果を表示する表示手段とを備えていることを特徴とする。
【0027】
請求項2に記載の丁張り設定装置は、前記設計データは平面線形データと縦断面線形データと横断面線形データとから構成され、前記演算手段の演算結果は、基準杭に対する取付け位置としての、横板の基準杭の頂点からの垂直方向の距離と、横板に対する取付け位置としての、抜き材の基準杭から水平方向の距離と、抜き材の水平方向に対する傾斜角度として、前記表示手段に表示されることを特徴とする。
【0028】
請求項3に記載の丁張り設定方法は、請求項2に記載の丁張り設定装置を用いた丁張り設定方法であって、前記基準杭の位置情報としての打設位置とその打設高さとを測量機械を用いて測定する測定ステップと、前記測量機械で視準しながら前記基準杭の背後に隠れるように方向杭を打設する打設ステップと、前記基準杭の打設位置とその打設高さとを前記丁張り設定装置に入力する入力ステップと、該丁張り設定装置により求められた各取付け位置に基づいて前記横板と前記抜き材とを打ち付けるステップとからなることを特徴とする。
【0029】
請求項4に記載の丁張り設定方法は、測定ステップとして、丁張りを構成する基準杭の位置と高さと方向杭の方向とを決定する測量装置と、入力ステップとして、各丁張りの位置及び丁張りを構成する部材の位置関係の算出に要する設計データを記憶して前記測量装置の測定する丁張りの基準杭の位置と高さを取得することによりその位置における丁張りを構成する部材の位置関係を特定する丁張り設定装置とを用いることを特徴とする。
【0030】
【発明の実施の形態】
図4(A)は本発明に係わる丁張り設定装置1の一例を示すものである。この丁張り設定装置1は、入力部(入力手段)2としての複数個の操作ボタン、表示部(表示手段)3を正面に有する。また、この丁張り設定装置1はその内部に、図4(B)に示すように、制御演算部(演算手段)4、メモリカード5、記憶部(記憶手段)6を有する。記憶部6には設計データが記憶されている。
その設計データには、平面線形データ(IP座標、半径、クロソイドパラメータ)、縦断データ(標高、勾配、縦断曲線長)、横断データ(標準断面データ)、基準ぐい位置データがある。その平面線形データは、平たく言えば、完成後の道路を真上から見た図に対応するもの、縦断面データはその完成後の道路の延びる方向に沿って縦方向に断面して見た図に対応するもの、横断面データはその完成後の道路の幅方向に沿って断面して見た図に対応するものである。この横断面データは、図2に示すように、道路の法線(M−N)方向に沿って設けられている。基準杭44Aはこの横断面データに沿う方向で法肩に打設されるものであり、その位置(X1、Y1)は予め定められている。
【0031】
メモリカード5には、その各データと操作ボタンからの後述する位置情報とに基づいて距離H1、距離H2を演算すると共に、傾斜角度θを表示する演算用プログラムがメモリされている。
【0032】
その位置情報は、測量機械42を用いての測定による基準杭44Aの打設位置(X、Y)、基準杭44Aの打設高さZXであり、これらの位置情報は測量機械42に基づいて丁張り作業者7に無線等の手段を用いて伝達される。
【0033】
図5に示すように、丁張り作業者7は基準杭44Aの予定された打設位置(X1、Y1)と思われる位置に基準杭44Aを立ててみる。測量作業者は予定された打設位置(X1、Y1)の方向に望遠鏡を向け、基準杭44Aが望遠鏡の視野内に入っているか否かを確認する。測量作業者は、測量機械42の視準望遠鏡の視野に基準杭44Aが入っていない場合には、基準杭44Aが望遠鏡の視野に入るように丁張り作業者7に指示する。
【0034】
丁張り作業者7は、その指示に基づいて予定された打設位置(X1、Y1)に移動して基準杭44Aを再び立ててみる。測量作業者はその基準杭44Aの中心上に置いたターゲットプリズムを視準しつつ、その基準杭44Aの垂直軸44Dが望遠鏡の光軸中心(視準軸)を通るように基準杭44Aを立てるべく丁張り作業者7に指示する。丁張り作業者7はその指示に基づき基準杭44Aを移動させ、基準杭44Aの垂直軸44Dが望遠鏡の光軸中心を通る位置に立てて距離を計ると、その基準杭44Aが立っている角度と距離とからその位置が計算される。それが設計上予定された打設位置(X1、Y1)である。そして、基準杭44Aの頂頭が高さZ1である。
【0035】
このときには、設計データに基づき予め計算により求められた距離H1、距離H2、傾斜角度θを用いて丁張り作業を行うことができる。
【0036】
基準杭44Aを設計上予定された打設位置(X1、Y1)及び高さZ1に立てることに支障があるときには、丁張り作業者7は測量作業者にその旨を伝える。丁張り作業者7は、設計上予定された打設位置(X1、Y1)とは異なる箇所に基準杭44Aを立てる。その基準杭44Aはなるべく設計上予定された打設位置(X1、Y1)の近傍に立てるのが望ましい。
【0037】
基準杭44Aが望遠鏡の光軸中心を通るように視準した後、基準杭44Aの測量を行う。その基準杭44Aの打設位置と高さ(X1’、Y1’、Z1)の測量には三角測量法を用いても良いし、基準杭44Aまでの距離を測定し、基準点T1に基づく演算により求めることもできる。
【0038】
いずれにしても、望遠鏡の回転角は法線(M−N)方向からのずれ量が小さく、ほぼ法線(M−N)方向であるとみなせる程度とする程度の位置に基準杭44Aを立てるのが望ましい。そうしないと、設計上予定した通りの切り土又は盛り土に対する誤差が大きくなる可能性があるからである。
【0039】
まず、その基準杭44Aが立てられている位置を打設位置(X、Y)として、測量作業者は基準杭44Aの打設位置(X、Y)を測定する。その打設位置測定後、丁張り作業者7は図6に示すように基準杭44Aを地盤8に打ち込む。その基準杭44Aの地盤8への打ち込み後、測量作業者は望遠鏡で視準しながら基準杭44Aの頂端44Cが光軸中心に位置するように高低方向に望遠鏡を回動させ、基準杭44Aの打設高さZを測定する。なお、ターゲットプリズムを用いて測定する場合は、打設位置及び高さ(X、Y、Z)を直接測定可能である。例えば、図7に示すように、ターゲットプリズム44Eを基準杭44Aの頂端44Cからオフセット高さZXの高さ位置に設けた場合には、高さZは、
Z=(Z+ZX)−ZXにより求まる。
【0040】
次いで、測量作業者は望遠鏡を視準しながら、丁張り作業者7に方向杭44Bが基準杭44Aの背後に隠れるように立てさせる。例えば、丁張り作業者7は、基準杭44Aから所定間隔H3、例えば1mの間隔のところに立て、測量作業者の指示に基づいて方向杭44Bを位置決めする。そして、この方向杭44Bを地盤8に打設する。
【0041】
その後、測量作業者は基準杭44Aの打設位置(X、Y)、打設高さZを丁張り作業者7に無線により知らせる。丁張り作業者7はその位置情報としての打設位置(X、Y)、打設高さZを丁張り設定装置1に入力する。丁張り設定装置1はその位置情報と設計データとに基づいて、距離H1、距離H2、傾斜角度θを演算する。この距離H1、距離H2、傾斜角度θは表示部3に表示される。
【0042】
丁張り作業者7は、図8に示すようにその距離H1に基づいて横板48を水平にして頂端44Cから距離H1だけ下の部分を取付け位置として基準杭44Aと方向杭44Bとに掛け渡して打ち付ける。
【0043】
次いで、丁張り作業者7は、基準杭44Aの垂直軸44Dに対して水平方向に距離H2だけ離れた横板48の位置を抜き材45の取付け位置とするために、その取付け位置に目印を付ける。
【0044】
次いで、丁張り作業者7は、図9に示すように、その目印に従って抜き材45を横板48の取付け位置に当てつけ、抜き材45が傾斜角度測定器(図示を略す)を用いて傾斜角度θの方向を向くように設定した後、抜き材45を横板48に打ち付ける。これによって、丁張り作業を支障なく迅速に行うことができる。
【0045】
【発明の効果】
本発明は、以上説明したように構成したので、丁張り打設位置を現況に合わせて支障なく迅速に行うのに便利である。
【図面の簡単な説明】
【図1】 従来の丁張り設定方法の説明図である。
【図2】 従来の丁張り設定方法の他の例を示す説明図である。
【図3】 図2に示す丁張り設定方法を横断面方向から見た説明図である。
【図4】 本発明に係わる丁張り設定装置の一例を示す図であって、(A)は
平面図、(B)は(A)に示す丁張り設定装置のブロック回路図である。
【図5】 本発明に係わる丁張り設定方法の手順を示す説明図であって、基準杭を地盤に立てた状態を示す図である。
【図6】 本発明に係わる丁張り設定方法の手順を示す説明図であって、基準杭と方向杭とを地盤に打設した状態を示す図である。
【図7】 基準杭の頂端にターゲットプリズムを設けた場合の変形例を説明するための部分図である。
【図8】 本発明に係わる丁張り設定方法の手順を示す説明図であって、基準杭と方向杭とに横板を打ち付けた状態を示す図である。
【図9】 本発明に係わる丁張り設定方法の手順を示す説明図であって、横板に抜き材を打ち付けた状態を示す図である。
【符号の説明】
1…丁張り設定装置
2…入力部(入力手段)
3…表示部(表示手段)
4…制御演算部(演算手段)
6…記憶部(記憶手段)
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tension setting device used for tensioning work at the time of ground formation and a tension setting method using the same.
[0002]
[Prior art]
Conventionally, a method shown in FIG. 1 is known as a tension setting method at the time of ground formation. Tightening work is performed, for example, when instructing the gradient or side groove position when cutting or embedding in civil engineering work, and more specifically, the position of the slope 41a and slope 41b of the slope 41, the slope As marks for instructing 1: P, 1: Q, etc. to the operator operating the heavy machinery, a stringer 40 representing these positions or numerical values is installed at each predetermined position.
[0003]
Tightening is a three-dimensional landmark. For example, in the case of a route, the position of the tension is determined based on the plane linear data, the longitudinal section data, and the transverse section data.
[0004]
When installing such a stringer 40, first, the surveying machine 42 is installed at the reference point T1 on the center line CLX of the road, and the direction perpendicular to the center line CLX from the reference point T1, that is, the arrow M− While looking at the normal direction shown in the N direction, hit the stake 43 near the shoulder 41a.
[0005]
Then, collimating the reserve pile 43 with the surveying machine 42, the distance LX1 between the placement point T2 of the reserve pile 43 and the placement point T1 on the center line CLX, and the altitude (placement) of the top end of the reserve pile 43 Height) The position of the reserve pile 43 is determined in the form of measuring ZX1.
[0006]
After that, the wooden piles 44A and 44B are placed on the line of sight connecting the placement point T2 of the reserve pile 43 and the reference point T1 on the center line CLX. Here, the wooden pile 44A is referred to as a reference pile, and the direction pile 44B is referred to as a direction pile.
[0007]
And based on the position of the reserve pile 43 calculated | required previously, by installing the cutting material 45 so that it may span over the reference | standard pile 44A and the direction pile 44B via the horizontal board 48, the cutting material 45 is made into a normal line direction. It arrange | positions toward a certain arrow M and N direction, and the punching material 45 is installed so that the inclination corresponding to the gradient 1: P, 1: Q of the slope 41 may be made using the slant rail 46 at this time. As a result, the cutting material 45 is instructed about the shape of the excavation line of the slope 41.
[0008]
Then, the length of law to be excavated with this gradient is described for each string 40. Thus, by setting the stringer 40 by the reference pile 44A, the direction pile 44B, the horizontal plate 48, the cutting material 45, etc., and installing the stringer 40 at a distance LX4 apart in the extending direction of the shoulder 41a, The excavation position of the shoulder 41a is instructed through a line of sight of a distance LX4 looking through the two stringers 40, 40 aligned in the shoulder direction.
[0009]
In order to install such a stringer 40, the operation of placing one, one reference pile 44A, the directional pile 44B, the horizontal plate 48, and the cutting material 45, and the position of the point T2 where the reserve pile 43 is placed are provided. Based on the surveying and cumbersome calculation, it is necessary to stack the work of obtaining the reference pile 44A, the direction pile 44B, the horizontal plate 48, and the cutting material 45 for each step. Is very cumbersome.
[0010]
In addition, if the reserve pile 43, the reference pile 4 4 A, and the direction pile 4 4 B are not installed in a normal line direction indicated by an arrow M-N that is exactly perpendicular to the center line CLX, the punched material The direction of 45 is bent, and the excavation line of the slope 41 where this appears is displaced, but in the tension setting method as described above, the reference point T1 on the center line CLX from the placement point T2 of the holding pile 43 Since the reference pile 44A and the direction pile 44B are driven on the line of sight by using the line of sight obtained by visual observation, the horizontal plate 48 and the cutting material 45 applied to the reference pile 44A and the direction pile 44B are normal. There is a risk of installation out of the direction.
[0011]
Therefore, in order to accurately install the stringer 40, it is necessary to patiently carry out complicated work and calculations with a skilled surveying technique, and the work labor consumed for this is very difficult (for example, patents). Reference 1).
[0012]
In such a tightening work, since the work effort is difficult, there is also a case where the position of the tightening is stored in the surveying machine 42 in advance.
[0013]
For example, as shown in FIG. 2, the intervals between the stringers are provided discretely in the longitudinal direction of the road, and in FIG. 2, symbols P <b> 1, P <b> 2,.
[0014]
The horizontal placement position (X1, Y1) of the reference pile 44A is determined in accordance with the design data, and the reference pile 44A is driven by placing the reference pile 44A at the placement position (X1, Y1). When the placement height ZX1 of the reference pile 44A is obtained by the surveying machine 42, as shown in FIG. 3, a vertical distance H1 from the apex 44C of the reference pile 44A of the reference plate 44A of the horizontal plate 48 as an attachment position with respect to the reference pile 44A. The horizontal distance H2 from the reference pile 44A of the cutting material 45 as the attachment position with respect to the horizontal plate 48 and the inclination angle θ of the cutting material 45 with respect to the horizontal direction can be obtained by calculation.
[0015]
Accordingly, the surveying machine 42 is installed at the reference point T1, the placement position of the reference pile 44A is collimated, the placement position (X1, Y1) of the reference pile 44A for each location of the cross- sectional data, and its height ZX1. Is determined, the vertical distance H1, the horizontal distance H2, and the inclination angle θ are obtained, so that the tensioning operation can be performed based on the distances H1, H2, and the angle θ.
[0016]
In addition, although the direction pile 44B may survey independently and may specify a position, when the direction pile 44B is collimated using the surveying machine 42, it is placed at a placement position hidden behind the reference pile 44A. Just do it. The distance H3 between the direction pile 44B and the reference pile 44A is, for example, 1 m and can be determined and set as a constant.
[0017]
Thus, after placing the reference pile 44A and the direction pile 44B at the predetermined placement positions, the horizontal plate 48 is driven to the attachment position at the distance H1, and then the cutting material 45 is attached to the attachment position at the distance H2 of the horizontal plate 48. The angle θ is determined by using an inclination angle measuring device (not shown), and the punching material 45 is driven against the horizontal plate 48.
[0018]
By performing such a tightening operation, the operation of striking the holding pile 43 and the like can be omitted, and the tightening operation can be performed accurately while reducing the labor of the tightening operation.
[0019]
[Patent Document 1]
JP 7-128060 A (FIG. 13)
[0020]
[Problems to be solved by the invention]
However, when actually performing work on site, it is often not always possible to install the stringer 40 at the placement position corresponding to the design data.
[0021]
The design data is not necessarily determined by surveying the site to determine the position of the tightening work, but is determined in advance on the desk. Actually, there is a large stone at the predetermined placement position or the ground is soft. The situation is not as planned due to the design.
[0022]
Accordingly, it is unavoidable to change the placement position of the stringer 40, but the placement height ZX1, distance H1, distance H2, and inclination angle θ of the top end 44C of the reference pile 44A are locations corresponding to the design data. It is determined corresponding to
[0023]
If the placement position of the stringer 40 is changed, the placement height ZX1, the distance H1, the distance H2, and the inclination angle θ of the reference pile 44A are changed accordingly. Will have to do.
[0024]
Then, according to the change of the placement position, the tensioning operator must calculate and obtain the placement height X1, distance H1, distance H2, and inclination angle θ of the reference pile 44A. When the placement position is changed, recalculation is required, and there remains a problem that it is not possible to quickly perform the tightening work.
[0025]
The present invention has been made in view of the above circumstances, and even when the position of placing the stringer is changed in accordance with the current situation, the stringer setting device convenient for quickly performing the stringing operation without any trouble, and the same An object of the present invention is to provide a tension setting method using the.
[0026]
[Means for Solving the Problems]
Ding tension setting device according to claim 1, wherein the input means for inputting position information of Ding tension obtained by measurement of the surveying machine, storage means for storing design data predetermined, and the design data The mounting position of the horizontal plate constituting the stringer to the reference pile and the lateral side of the punching material constituting the stringer from the placement position and the placement height as position information of the reference pile constituting the stringer Computation means for computing the mounting position on the plate and display means for displaying the computation results of the computation means are provided.
[0027]
The tension setting device according to claim 2, wherein the design data is composed of plane linear data, vertical cross-sectional linear data, and cross-sectional linear data, and the calculation result of the calculating means is an attachment position with respect to a reference pile, Displayed on the display means as a vertical distance from the top of the reference pile of the horizontal plate, a horizontal distance from the reference pile of the punched material as a mounting position for the horizontal plate, and an inclination angle of the punched material with respect to the horizontal direction It is characterized by being.
[0028]
The tightness setting method according to claim 3 is a tightness setting method using the tightness setting device according to claim 2, wherein the placement position and the placement height as positional information of the reference pile A measuring step using a surveying machine , a placing step for placing a directional pile so as to be hidden behind the reference pile while collimating with the surveying machine , a placement position of the reference pile and its placement An input step of inputting an installation height into the tension setting device, and a step of striking the horizontal plate and the punching material on the basis of each attachment position obtained by the tension setting device. .
[0029]
According to the fourth aspect of the present invention, the tension setting method includes a surveying device that determines the position and height of the reference pile that constitutes the tension and the direction of the direction pile as the measurement step, and the position of each tension as the input step. The design data required for calculating the positional relationship of the members constituting the tension is stored and the position and height of the reference pile of the tension measured by the surveying device are acquired to obtain the position of the member constituting the tension. It is characterized by using a tension setting device for specifying the positional relationship.
[0030]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 4A shows an example of the tension setting apparatus 1 according to the present invention. The tension setting apparatus 1 includes a plurality of operation buttons as an input unit (input unit) 2 and a display unit (display unit) 3 on the front. Further, as shown in FIG. 4B, the tension setting apparatus 1 includes a control calculation unit (calculation unit) 4, a memory card 5, and a storage unit (storage unit) 6. The storage unit 6 stores design data.
The design data includes plane linear data (IP coordinates, radius, clothoid parameters), longitudinal data (elevation, gradient, longitudinal curve length), crossing data (standard cross section data), and reference pile position data. The flat linear data corresponds to a view of the completed road as viewed from directly above, and the vertical cross-sectional data is a cross-sectional view of the completed road along the extending direction of the road. The cross-sectional data corresponds to the figure seen in a cross-section along the width direction of the road after completion. This cross-sectional data is provided along the normal (MN) direction of the road as shown in FIG. The reference pile 44A is placed on the shoulder in a direction along the cross-sectional data, and its position (X1, Y1) is determined in advance.
[0031]
The memory card 5 stores a calculation program for calculating the distance H1 and the distance H2 based on each data and position information described later from the operation buttons and displaying the inclination angle θ.
[0032]
The position information is the placement position (X, Y) of the reference pile 44A and the placement height ZX of the reference pile 44A by measurement using the surveying machine 42. These position information is based on the surveying machine 42. It is transmitted to the stringer 7 using wireless means.
[0033]
As shown in FIG. 5, the stringer 7 puts the reference pile 44 </ b> A at a position that is considered to be the planned placement position (X1, Y1) of the reference pile 44 </ b> A. The surveying operator points the telescope in the direction of the planned placement position (X1, Y1), and checks whether or not the reference pile 44A is in the field of view of the telescope. If the reference pile 44A is not in the field of view of the collimating telescope of the surveying machine 42, the surveying operator instructs the stringer operator 7 so that the reference pile 44A is in the field of view of the telescope.
[0034]
The stringer operator 7 moves to the planned placement position (X1, Y1) based on the instruction and stands the reference pile 44A again. The surveyor collimates the target prism placed on the center of the reference pile 44A, and stands the reference pile 44A so that the vertical axis 44D of the reference pile 44A passes through the optical axis center (collimation axis) of the telescope. Instruct the tensioning operator 7 as much as possible. The stringer 7 moves the reference pile 44A based on the instruction, and when the vertical axis 44D of the reference pile 44A is set at a position passing through the optical axis center of the telescope and measures the distance, the angle at which the reference pile 44A stands. And the position is calculated from the distance. This is the placement position (X1, Y1) planned by design. And the top of the reference | standard pile 44A is height Z1.
[0035]
At this time, it is possible to perform the tensioning operation using the distance H1, the distance H2, and the inclination angle θ previously obtained by calculation based on the design data.
[0036]
When there is a hindrance to standing the reference pile 44A at the planned placement position (X1, Y1) and the height Z1, the stringer operator 7 notifies the surveying operator to that effect. The stringer operator 7 stands the reference pile 44A at a place different from the placement position (X1, Y1) scheduled in the design. It is desirable to stand the reference pile 44A as close to the placement position (X1, Y1) as possible in the design.
[0037]
After collimating so that the reference pile 44A passes through the center of the optical axis of the telescope, the reference pile 44A is surveyed. Triangulation method may be used for surveying the placement position and height (X1 ′, Y1 ′, Z1) of the reference pile 44A, and the distance to the reference pile 44A is measured, and the calculation is based on the reference point T1. Can also be obtained.
[0038]
In any case, the reference pile 44A is set at a position where the rotation angle of the telescope is small enough to be regarded as being in the normal (MN) direction with a small deviation from the normal (MN) direction. Is desirable. Otherwise, the error with respect to the cut or fill as planned in the design may increase.
[0039]
First, the surveying operator measures the placement position (X, Y) of the reference pile 44A with the position where the reference pile 44A is set as the placement position (X, Y). After measuring the placement position, the stringer 7 drives the reference pile 44A into the ground 8 as shown in FIG. After driving the reference pile 44A into the ground 8, the surveying operator collimates with the telescope and rotates the telescope in the height direction so that the top end 44C of the reference pile 44A is located at the center of the optical axis. The casting height Z is measured. In addition, when measuring using a target prism, a placement position and height (X, Y, Z) are directly measurable. For example, as shown in FIG. 7, when the target prism 44E is provided at the height position of the offset height ZX from the top end 44C of the reference pile 44A, the height Z is
Z = (Z + ZX) −ZX.
[0040]
Next, the surveying operator collimates the telescope and causes the stringer operator 7 to stand so that the direction pile 44B is hidden behind the reference pile 44A. For example, the stringer operator 7 stands at a predetermined interval H3, for example, 1 m from the reference pile 44A, and positions the direction pile 44B based on an instruction from the surveying operator. And this direction pile 44B is driven in the ground 8. FIG.
[0041]
Thereafter, the surveying operator informs the tensioning operator 7 of the placement position (X, Y) and the placement height Z of the reference pile 44A by radio. The dressing operator 7 inputs the placement position (X, Y) and the placement height Z as the position information to the tension setting device 1. The tightness setting device 1 calculates the distance H1, the distance H2, and the inclination angle θ based on the position information and the design data. The distance H1, the distance H2, and the inclination angle θ are displayed on the display unit 3.
[0042]
As shown in FIG. 8, the tensioner 7 makes the horizontal plate 48 horizontal based on the distance H1, and spans the reference pile 44A and the direction pile 44B with the portion below the top end 44C by the distance H1 as the attachment position. Hit it.
[0043]
Next, the stringer 7 puts a mark on the mounting position in order to set the position of the horizontal plate 48 separated by the distance H2 in the horizontal direction with respect to the vertical axis 44D of the reference pile 44A as the mounting position of the cutting member 45. wear.
[0044]
Next, as shown in FIG. 9, the tensioner 7 applies the cutting material 45 to the mounting position of the horizontal plate 48 according to the mark, and the cutting material 45 is tilted by using a tilt angle measuring device (not shown). After setting so as to face the direction of θ, the cutting material 45 is struck against the horizontal plate 48. As a result, it is possible to quickly perform the tightening work without any trouble.
[0045]
【The invention's effect】
Since the present invention is configured as described above, it is convenient to quickly perform the tight placement position according to the current situation without any trouble.
[Brief description of the drawings]
FIG. 1 is an explanatory diagram of a conventional tension setting method.
FIG. 2 is an explanatory diagram showing another example of a conventional tension setting method.
FIG. 3 is an explanatory view of the tension setting method shown in FIG. 2 as viewed from the cross-sectional direction.
4A and 4B are diagrams showing an example of a tension setting apparatus according to the present invention, in which FIG. 4A is a plan view and FIG. 4B is a block circuit diagram of the tension setting apparatus shown in FIG.
FIG. 5 is an explanatory view showing a procedure of a tension setting method according to the present invention, and is a view showing a state in which a reference pile is set on the ground.
FIG. 6 is an explanatory diagram showing a procedure of a tension setting method according to the present invention, and is a diagram showing a state in which a reference pile and a direction pile are driven on the ground.
FIG. 7 is a partial view for explaining a modification when a target prism is provided at the top end of a reference pile.
FIG. 8 is an explanatory diagram showing a procedure of a tension setting method according to the present invention, and is a diagram showing a state in which a horizontal plate is struck to a reference pile and a direction pile.
FIG. 9 is an explanatory view showing the procedure of the tension setting method according to the present invention, and is a view showing a state in which a cutting material is struck on a horizontal plate.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Tightening setting apparatus 2 ... Input part (input means)
3. Display unit (display means)
4. Control calculation unit (calculation means)
6. Storage unit (storage means)

Claims (4)

測量機械の測定により得られた丁張りの位置情報を入力する入力手段と、
予め定められた設計データを記憶する記憶手段と、
前記設計データと前記丁張りを構成する基準杭の位置情報としての打設位置とその打設高さとから前記丁張りを構成する横板の前記基準杭への取付け位置と前記丁張りを構成する抜き材の前記横板への取付け位置とを演算する演算手段と、
前記演算手段の演算結果を表示する表示手段とを備えていることを特徴とする丁張り設定装置。
Input means for inputting the position information of the tightness obtained by the measurement of the surveying machine;
Storage means for storing predetermined design data;
From the design data and the placement position as the position information of the reference pile constituting the tension, and the placement height, the mounting position of the horizontal plate constituting the tension on the reference pile and the tension are constituted. A calculating means for calculating a mounting position of the cutting material on the horizontal plate ;
A tension setting apparatus comprising: display means for displaying a calculation result of the calculation means.
前記設計データは平面線形データと縦断面線形データと横断面線形データとから構成され、
前記演算手段の演算結果は、基準杭に対する取付け位置としての、横板の基準杭の頂点からの垂直方向の距離と、横板に対する取付け位置としての、抜き材の基準杭から水平方向の距離と、抜き材の水平方向に対する傾斜角度として、前記表示手段に表示されることを特徴とする請求項1に記載の丁張り設定装置。
The design data is composed of plane linear data, vertical cross-sectional linear data, and cross-sectional linear data,
The calculation result of the calculating means is the vertical distance from the top of the reference pile of the horizontal plate as the attachment position to the reference pile, and the horizontal distance from the reference pile of the punched material as the attachment position to the horizontal plate. 2. The tension setting apparatus according to claim 1 , wherein an inclination angle with respect to a horizontal direction of the cutting material is displayed on the display means .
請求項2に記載の丁張り設定装置を用いた丁張り設定方法であって、前記基準杭の位置情報としての打設位置とその打設高さとを測量機械を用いて測定する測定ステップと、前記測量機械で視準しながら前記基準杭の背後に隠れるように方向杭を打設する打設ステップと、前記基準杭の打設位置とその打設高さとを前記丁張り設定装置に入力する入力ステップと、該丁張り設定装置により求められた各取付け位置に基づいて前記横板と前記抜き材とを打ち付けるステップとからなることを特徴とする丁張り設定方法。A tension setting method using the tension setting apparatus according to claim 2, wherein a measurement position is measured using a surveying machine as a placement position and a placement height as position information of the reference pile, A placing step for placing a direction pile so as to be hidden behind the reference pile while collimating with the surveying machine , and a placement position and a placement height of the reference pile are input to the tension setting device. A tension setting method comprising: an input step; and a step of hitting the horizontal plate and the punching material based on each attachment position obtained by the tension setting device. 前記測定ステップとして、丁張りを構成する基準杭の位置と高さと方向杭の方向とを決定する測量装置と、前記入力ステップとして、各丁張りの位置及び丁張りを構成する部材の位置関係の算出に要する設計データを記憶して前記測量装置の測定する丁張りの基準杭の位置と高さを取得することによりその位置における丁張りを構成する部材の位置関係を特定する丁張り設定装置とを用いることを特徴とする請求項3に記載の丁張り設定方法。 As the measurement step, a surveying device that determines the position and height of the reference pile that constitutes the tension and the direction of the direction pile, and as the input step, the position of each tension and the positional relationship of the members that constitute the tension A tension setting device that stores design data required for calculation and acquires the position and height of a reference pile of the tensioner to be measured by the surveying device, thereby identifying the positional relationship of members constituting the tensioner at that position; The tension setting method according to claim 3, wherein:
JP2003193349A 2003-07-08 2003-07-08 Tightening setting device and tensioning setting method using the same Expired - Lifetime JP4210167B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003193349A JP4210167B2 (en) 2003-07-08 2003-07-08 Tightening setting device and tensioning setting method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003193349A JP4210167B2 (en) 2003-07-08 2003-07-08 Tightening setting device and tensioning setting method using the same

Publications (2)

Publication Number Publication Date
JP2005030789A JP2005030789A (en) 2005-02-03
JP4210167B2 true JP4210167B2 (en) 2009-01-14

Family

ID=34204835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003193349A Expired - Lifetime JP4210167B2 (en) 2003-07-08 2003-07-08 Tightening setting device and tensioning setting method using the same

Country Status (1)

Country Link
JP (1) JP4210167B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021187199A1 (en) 2020-03-19 2021-09-23 株式会社トプコン Portable display terminal for survey assistance, survey assistance system, survey assistance method, and survey assistance program

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5796998B2 (en) 2011-04-28 2015-10-21 株式会社トプコン Survey point indicating device and survey system
JP5833335B2 (en) 2011-04-28 2015-12-16 株式会社トプコン Measuring point indicating device
JP7372003B2 (en) * 2019-08-16 2023-10-31 株式会社トプコン Ding method and Ding system
JP7424585B2 (en) * 2020-07-14 2024-01-30 株式会社トプコン How to install the method, how to install the method and the surveying system
JP7424584B2 (en) * 2020-07-14 2024-01-30 株式会社トプコン How to install the method, how to install the method and the surveying system
JP7494429B2 (en) * 2020-07-28 2024-06-04 株式会社トプコン Surveying system, method for supporting installation of stakes, and program for supporting installation of stakes
JP7487863B2 (en) * 2020-08-25 2024-05-21 株式会社トプコン Surveying system, method for supporting installation of stakes, and program for supporting installation of stakes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021187199A1 (en) 2020-03-19 2021-09-23 株式会社トプコン Portable display terminal for survey assistance, survey assistance system, survey assistance method, and survey assistance program

Also Published As

Publication number Publication date
JP2005030789A (en) 2005-02-03

Similar Documents

Publication Publication Date Title
US20080177450A1 (en) Ground Engineering Apparatus and Method
JP5213163B2 (en) Concrete placement management method in tunnel construction
US6844923B2 (en) Method and apparatus for surveying the geometry of tunnels
US20130158789A1 (en) Hydraulic shovel calibration device and hydraulic shovel calibration method
JP7707510B2 (en) Surveying system, method for supporting installation of stakes, and program for supporting installation of stakes
JP4210167B2 (en) Tightening setting device and tensioning setting method using the same
JP7831925B2 (en) Surveying methods, surveying systems, and surveying programs
JP7494429B2 (en) Surveying system, method for supporting installation of stakes, and program for supporting installation of stakes
JP2017115387A (en) Construction machine automatic control system
JP7505957B2 (en) Measurement method for winding space in tunnel construction
JP7372003B2 (en) Ding method and Ding system
JP2004170164A (en) Survey method and program for displaying result thereof
JP2003119784A (en) Pile driving system
JP2005337826A (en) Method and apparatus for laser marking
FI123605B (en) Method and apparatus for forming a structural layer of a traffic lane
US20060225310A1 (en) Work machine alignment system and method of maintaining alignment of a work machine
JPH02112718A (en) Tunnel surveying method
JP4708558B2 (en) Position guidance device
JP4247562B1 (en) Tightening device
JP6878051B2 (en) How to get the position correction amount of the soil removal plate
JP4460123B2 (en) Position guidance device for slope formation
JP2896163B2 (en) How to manage the position of the shoring in the tunnel
JP7577977B2 (en) Drilling system and drilling method
US12221771B2 (en) On-implement indicator
JP2008020427A (en) Finishing stake location setting method for civil engineering construction plan and its device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060426

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080624

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080822

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20081021

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20081024

R150 Certificate of patent or registration of utility model

Ref document number: 4210167

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111031

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121031

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121031

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131031

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term