JP4226738B2 - Packaging method for goods - Google Patents
Packaging method for goods Download PDFInfo
- Publication number
- JP4226738B2 JP4226738B2 JP25464899A JP25464899A JP4226738B2 JP 4226738 B2 JP4226738 B2 JP 4226738B2 JP 25464899 A JP25464899 A JP 25464899A JP 25464899 A JP25464899 A JP 25464899A JP 4226738 B2 JP4226738 B2 JP 4226738B2
- Authority
- JP
- Japan
- Prior art keywords
- bucket
- receiving
- relay
- conveyor
- articles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004806 packaging method and process Methods 0.000 title claims description 33
- 238000000034 method Methods 0.000 title claims description 24
- 238000012856 packing Methods 0.000 claims description 72
- 238000011144 upstream manufacturing Methods 0.000 claims description 43
- 238000012546 transfer Methods 0.000 claims description 28
- 230000033001 locomotion Effects 0.000 claims description 12
- 210000000078 claw Anatomy 0.000 description 27
- 239000011295 pitch Substances 0.000 description 21
- 238000001125 extrusion Methods 0.000 description 12
- 238000005192 partition Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 230000005540 biological transmission Effects 0.000 description 5
- 230000003028 elevating effect Effects 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
Images
Landscapes
- Container Filling Or Packaging Operations (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、上流側から順次搬送されて来る物品を箱詰めする箱詰め方法に関するものである。
【0002】
【従来の技術】
図11,図12は、この種箱詰め方法を実施する装置の概略平面図である。
【0003】
この箱積め装置に包装対象たる物品を上流側から順次供給する上流側コンベヤ(1)に載置された物品(a)(a)は搬送爪(11)(11)で押されて移送されると共に、該上流側コンベヤ(1)の下流端まで搬送された物品(a)(a)は該上流側コンベヤ(1)に対して垂直方向に間欠走行する間欠バケットコンベヤ(2)で下流側に移送されるようになっている。この間欠バケットコンベヤ(2)の外周には区画板(21)(21)が所定ピッチで配設されていると共に、該区画板(21)(21)間の供給バケット部(23)(23)に上記物品(a)(a)が収容された状態で下流側に搬送されるようになっている。
【0004】
間欠バケットコンベヤ(2)の側方には、これと平行に往復移動する中継装置(3)が設けられていると共に、該中継装置(3)の上面には上記間欠バケットコンベヤ(2)の供給バケット部(23)(23)と同一ピッチで物品(a)(a)を保持する中継バケット部(33)(33)が配設されている。
【0005】
又、上記中継装置(3)を隔てて前記間欠バケットコンベヤ(2)の反対側に位置する部位は、これらと平行に走行する受け取りコンベヤ(4)が配設されていると共に、該受け取りコンベヤ(4)の外周には、バケット壁(41)(41)間に形成された受け取りバケット部(43)(43)が所定ピッチで配設されている。そして、各受け取りバケット部(43)内は区画板(42)(42)で2つの受取側区画室(430)(430)に区画されており、該受取側区画室(430)(430)に物品(a)(a)が載置収容されるようになっている。
【0006】
次に、上記箱詰め装置を用いて包装箱に物品(a)(a)を大箱詰め作業の例示たる二個詰め作業と、小箱詰め作業の例示たる一個詰め作業を場合に分けて説明する。
【0007】
先ず、二個詰め用の包装箱に物品(a)(a)を充填する二個詰め作業を図11を用いて説明する。
【0008】
この場合、上流側コンベヤ(1)と受け取りコンベヤ(4)の夫々はV1 ,V4 の一定速度で連続的に走行し、間欠バケットコンベヤ(2)は走行速度V2 の走行と停止を繰り返す間欠走行を行うと共に、中継装置(3)は上記受け取りコンベヤ(4)の走行速度V4 まで加速された後に初期位置まで後退する往復動作を行う。
【0009】
図11の(イ)に示すように、V1 で連続走行する上流側コンベヤ(1)の搬送爪(11)で特定の物品(a)が間欠バケットコンベヤ(2)の供給バケット部(23)の一端開放部からその内部に押し込まれる。すると、間欠バケットコンベヤ(2)が1ピッチ分だけ速度V2 で走行して停止し、新たな供給バケット部(23)が上流側コンベヤ(1)の下流端に一致して次の物品(a)が押し込まれるのを待つ。この動作が繰り返されることによって、上流側コンベヤ(1)から間欠バケットコンベヤ(2)の各供給バケット部(23)(23)に物品(a)(a)が充填される。
【0010】
間欠バケットコンベヤ(2)上の四個の物品(a)(a)が中継装置(3)の四個の中継バケット部(33)(33)の一端開放部に各別に対向した状態でこれら間欠バケットコンベヤ(2) と中継装置(3)が停止すると共に、プッシャ(19)(19)が作動して前記四個の物品(a)(a)が同時に中継装置(3)の中継バケット部(33)(33)に押し込まれる(図11の(イ)の想像線参照)。
【0011】
次に、中継装置(3)が所定のタイミングで作動すると共に受け取りコンベヤ(4)の速度V4 に一致するまで中継装置(3)が加速され、これにより、中継装置(3)と受け取りコンベヤ(4)の走行速度が一致し且つ該中継装置(3)の中継バケット部(33)(33)と受け取りコンベヤ(4)の受取側区画室(430)(430)の開放端相互が対向した同図(ロ)の状態になる。この状態で、四個のプッシャ(19)(19)が作動して中継装置(3)上の実線で示す物品(a)(a)が同図の想像線で示すように受け取りコンベヤ(4)の受け取りバケット部(43)(43)に二個ずつ押し込まれる。その後、中継装置(3) が初期位置まで速やかに復帰移動される。
【0012】
そして、物品(a)(a)が受け取りコンベヤ(4)の下流端部まで運ばれると、該物品(a)(a)は待機している包装箱(b2)に二個単位で充填される。
【0013】
次に、一個詰め用の包装箱に物品(a)(a)を一個詰めする小箱詰め作業を図12に基づいて説明する。
【0014】
この場合も上流側コンベヤ(1)と受け取りコンベヤ(4)の夫々は上記二個詰め作業の場合と同様にV1 ,V4 の一定速度で連続的に走行し、中継装置(3)は上記速度V4 の走行と停止を繰り返す往復移動を行う。これに対し、間欠バケットコンベヤ(2)は上記V2 より遅い速度V5 で走行した後に停止する動作を繰り返す。
【0015】
図12の(イ)に示すように、上流側コンベヤ(1)の下流端まで搬送された物品(a)が間欠バケットコンベヤ(2)の供給バケット部(23)に侵入すると、間欠バケットコンベヤ(2)が供給バケット部(23)(23)の2ピッチ分だけ速度V5 で走行して停止し、上流側コンベヤ(1)から新たな物品(a)が供給バケット部(23)内に押し込まれるまで待機する。このとき、間欠バケットコンベヤ(2)は上記2ピッチ分だけ走行しているので、図12の(イ)に示すように、供給バケット部(23)(23)には一つ置きに物品(a)(a)が収容された状態になる。
【0016】
間欠バケットコンベヤ(2)上の二個の物品(a)(a)が中継装置(3)の中継バケット部(33)(33)に対向すると、既述と同様にプッシャ(19)(19)が作動して前記二個の物品(a)(a)が同時に中継装置(3)の中継バケット部(33)(33)に押し込まれる(図12の(イ)の想像線参照)。又、中継装置(3)が所定のタイミングで作動すると共にこれが受け取りコンベヤ(4)の速度V4 に一致するまで加速される。これにより、物品(a)(a)を収容している中継装置(3)上の中継バケット部(33)(33)が受け取りコンベヤ(4)上の受け取りバケット部(43)(43)内の最上流部の受取側基準(400)(400)に位置する受取側区画室(430)(430)と同速度で走行し且つ上記中継バケット部(33)(33)と受取側基準(400)(400)に位置する受取側区画室(430)(430)の開放端相互が対向した図12(ロ)の状態になる。その後、プッシャ(19)(19)が作動して図12(ロ)の実線で示す中継装置(3)上の物品(a)(a)が同図(ロ)の想像線で示すように受け取りコンベヤ(4)の受取側基準(400)の受取側区画室(430)に移し替えられる。すると、物品(a)(a)が一つ置きに受け取りコンベヤ(4)上に整列した状態になり、該物品(a)が一個詰め用の包装箱(b1)に一個ずつ充填される。
【0017】
【発明が解決しようとする課題】
このものでは、物品(a)(a)を小箱詰めたる一個詰め作業をする場合には、上流側コンベヤ(1)が1ピッチ分だけ走行する間に間欠バケットコンベヤ(2)を2ピッチ分だけ走行させる必要がある。一方、大箱詰めたる二個詰めの作業時には、上流側コンベヤ(1)が1ピッチ分だけ走行する間に間欠バケットコンベヤ(2)を1ピッチ分だけ走行させれば良い。従って、上記従来のものでは、一個詰め時に於ける間欠バケットコンベヤ(2)の速度V5 を二個詰め時の速度V2 の約2倍に設定する必要がある。よって、間欠バケットコンベヤ(2)の駆動モータを能力限界で作動させて前記速度V5 が得られるようにした場合には、二個詰め時に於ける間欠バケットコンベヤ(2)の速度V2 は前記駆動モータの能力に余裕があるにも関わらず速度V5 より遅くしなければならないと共に、これに関連して二個詰め時に於ける上流側コンベヤ(1)や受け取りコンベヤ(4)の速度を遅く設定する必要があり、該二個詰め時の単位時間当たりに箱詰めできる物品(a)(a)の数、即ち、包装能力が低下するという問題があった。
【0018】
尚、上記に於いては、二個詰めようの包装箱に箱詰めする作業を大箱詰め作業とし、一個詰めようの包装箱に箱詰めする作業を小箱詰め作業として説明したが、これらより大きな包装箱(例えば四個詰めの大箱と二個詰めの小箱)に物品(a)(a)を箱詰めする場合も、大箱詰め時の包装能力が低下するという上記と同様の問題がある。
【0019】
本発明はかかる点に鑑みてなされたもので、
『物品を載置状態で搬送する複数の供給バケット部(23)(23)が外周に一定ピッチで配列され且つ間欠走行する間欠バケットコンベヤ(2)と、
前記間欠バケットコンベヤ(2)の走行方向の側方でこれと平行に往復移動し且つ前記各供給バケット部(23)(23)と同一ピッチで配列された大箱詰め数Nの整数倍の中継バケット部(33)(33)を上面に備えた中継装置(3)と、
前記各中継バケット部(33)(33)と同一ピッチで配列された前記大箱詰め数Nの受取側区画室(430)(430)に内部が区画されている複数の受け取りバケット部(43)(43)が外周に配列され且つ前記中継装置(3)に対して前記間欠バケットコンベヤ(2)の反対側でこれと平行に連続走行する受け取りコンベヤ(4)と、
前記受け取りコンベヤ(4)の走行域の側方の箱詰め位置にサイズの異なる包装箱たる大箱又は小箱を保持する箱保持手段(8)と、
互いに停止状態で対向している前記供給バケット部(23)(23)から前記中継バケット部(33)(33)に物品(a)(a)を移し替えると共に、同速で走行している状態で対向する前記中継バケット部(33)から前記受け取りバケット(43)に物品を移し替える移し替え装置(6)と、
前記受け取りバケット部(43)内に配列された前記大箱詰め数Nの前記受取側区画室(430)(430)内に各別に収容された全ての物品(a)(a)を前記大箱に箱詰めする大箱詰め作業と、前記受け取りバケット部(43)内に配列され且つ前記大箱詰め数Nの整商たる小箱詰め数nの受取側区画室(430)(430)に収容された物品(a)(a)を前記小箱に箱詰めする小箱詰め作業を択一的に選択する包装量選択手段(S)と、を具備する箱詰め装置を用いた箱詰め方法であって、
前記包装量選択手段(S)で大箱詰め作業が選択された場合は、前記間欠バケットコンベヤ(2)から全ての前記中継バケット部(33)(33)に物品(a)(a)を同時に移し替えると共に前記全ての中継バケット部(33)(33)内の物品(a)(a)を前記受け取りバケット部(43)内の全ての前記受取側区画室(430)(430)に移し替える、物品の箱詰め方法』において、大箱詰め作業時と小箱詰め作業時の単位時間当たりに包装できる物品の数を同数に設定できるようにして既述従来のものに比べて大箱包時に於ける包装能力の向上が図れるようにすることをその課題とする。
【0020】
【課題を解決するための手段】
〈1項〉
上記課題を解決する為の本発明の技術的手段を図1〜図4を用いて説明すると、本発明の技術的手段は、
『前記受け取りバケット部(43)内に配列された前記受取側区画室(430)(430)から選ばれた特定の受取側区画室(430)を受取側基準(400)とすると共に、前記中継装置(3)上に配列された前記中継バケット部(33)(33)群を前記小箱詰め数nと同数の中継バケット部(33)を具備するグループに分けて中継バケットグループ(G)を形成し、
前記包装量選択手段(S)で小箱詰め作業が選択された場合は、
前記間欠バケットコンベヤ(2)の各供給バケット部(23)(23)から前記中継装置(3)の全ての前記中継バケット部(33)(33)に物品(a)(a)を同時に移し替える第1移し替え工程(図2)と、
前記中継バケットグループ(G)を構成する小箱詰め数nの中継バケット部(33)が前記受け取りバケット部(43)の前記受取側基準(400)の受取側区画室(430)を含む小箱詰め数nの受取側区画室(430)に同速度で走行しながら対向したときに該対向した各中継バケット部(33)内の物品(a)を前記対向した各小箱詰め数nの受取側区画室(430)に各別に移し替える第2移し替え工程と(図2の矢印(A) )、
前記第2移し替え工程実行前の初期位置方向に前記中継装置(3)を復帰移動させると共に、前記第2移し替え工程で空になった前記中継バケットグループ(G)に続く他の中継バケットグループ(G)を構成する小箱詰め数nの中継バケット部(33)が前記受け取りコンベヤ(4)に移し替えられた最上流部の物品(a)の更に上流側に位置する前記受取側基準(400)の受取側区画室(430)を含む小箱詰め数nの受取側区画室(430)に対向するように前記中継装置(3)の位置を調節する復帰移動工程と(図3)、
前記復帰移動工程の実行によって前記受取側基準(400)の受取側区画室(430)を含む小箱詰め数nの受取側区画室(430)に対向した各中継バケット部(33)内の物品(a)を前記対向した各受取側区画室(430)に移し替える第3移し替え工程と(図4の矢印(B) )、を順次実行する』ことである。
【0021】
本発明では、小箱詰め作業時に於ける間欠バケットコンベヤ(2)の走行速度は大箱詰め作業時に於ける走行速度と同速度に設定されている。又、これら何れの箱詰め時に於いても既述した上流側コンベヤ(1)から間欠バケットコンベヤ(2)が前記上流側コンベヤ(1)と同期動作するように制御される。
【0022】
上記技術的手段によれば、小箱詰め作業は次のように行われる。
【0023】
包装量選択手段(S)で小箱詰め作業が選択されると、間欠バケットコンベヤ(2)の各供給バケット部(23)(23)から前記中継装置(3)の全ての前記中継バケット部(33)(33)に物品(a)(a)が同時に移し替えられ(第1移し替え工程)、これにより、図1の想像線で示すように、中継装置(3)の全ての中継バケット部(33)(33)に物品(a)(a)が収容される。
【0024】
次に、各中継バケットグループ(G)に属する小箱詰め数nの中継バケット部(33)(図1〜図4のものでは一個の中継バケット部(33)で中継バケットグループ(G)が構成されている場合が例示されている)内の物品(a)を、図2の矢印(A)で示すように受け受取側基準(400)を含む小箱詰め数nの受取側区画室(430)に移し替える第2移し替え工程を実行し、これにより、受け取りバケット部(43)内の小箱詰め数nの受取側区画室(430)に物品(a)が収容された状態にする(図2の想像線の物品(a)参照)。従って、小箱詰め数nが「1」の場合(図1〜図4に例示したもの)では、受け取りバケット部(43)内に一個の物品(a)(受取側基準(400)に収容される)が移し替えられる。一方、小箱詰め数nが「2」の場合は、二個の中継バケット部(33)に各別に収容された二個の物品(a)(a)が受け取りバケット部(43)に移し替えられる。従って、本発明では小箱詰めする物品(a)の数は一個であると複数であるとを問わない。このように、小箱詰め作業で箱詰めする数の物品(a)が受け取りバケット部(43)内の受取側区画室に移し替えられる。
【0025】
次に、前記第2移し替え工程で前記受取側区画室(430)に移し替えられた最上流部の物品(a)の更に上流側に対応する位置まで前記中継装置(3)が復帰移動される。又、前記第2移し替え工程で空になった小箱詰め数nの中継バケット部(33)に続く他の小箱詰め数nの中継バケット部(33)が前記上流側に位置する前記受け取りバケット部(43)の受取側基準(400)を含む小箱詰め数nの受取側区画室(430)に対向するように前記中継装置(3)の位置が調節される(復帰移動工程)。
即ち、中継装置(3)が図3で示される位置にセットされる。これにより、前記第2移し替え工程で前記小箱詰め数nの受取側区画室(430)に移し替えた最上流部の物品(a)の更に上流側に位置する受け取りバケット部(43)内の小箱詰め数nの受取側区画室(430)(受取側基(400) のものを含む)に対して物品(a)を備えた小箱詰め数nの中継バケット部(33)が対向した状態になる。そこで、図4の矢印(B)で示すように、前記小箱詰め数nの中継バケット部(33)内(図1〜図4のものでは「n=1」の場合が例示されている)の物品(a)を受け取りコンベヤ(4)の受取側区画室(430)に移し替える(第3移し替え工程)。
【0026】
以後、受け取りコンベヤ(4)の走行域の側方の箱詰め位置に箱保持手段で保持された包装箱(b)に対応する位置まで受け取りバケット部(43)が到達すると、該受け取りバケット部(43)内の小箱詰め数nの受取側区画室(430)内の物品(a)が小箱に箱詰めされる。
〈2項〉
前記1項において、『前記大箱詰め数Nが2に設定されている』ものでは、該大箱詰め数Nの整商たる一個の物品(a)を小箱に箱詰めする小箱詰め作業と、上記二個の物品(a)(a)を大箱に箱詰めする大箱詰め作業が択一的に行える。
〈3項〉
前記1項又は2項において、『前記受け取りコンベヤ(4)と前記中継装置(3)及び前記間欠バケットコンベヤ(2)は共通のモータで駆動される』ものとすることができるほか、
〈4項〉
前記1項又は2項において、『前記受け取りコンベヤ(4)及び前記間欠バケットコンベヤ(2)は共通のモータで駆動され、前記中継装置(3)は前記モータとは別なサーボモータで駆動される』ものとすることもでき、中継装置(3)をサーボモータで駆動する場合には、該サーボモータを数値制御することにより前記中継装置(3)の走行速度や受け取りコンベヤ(4)に対する位置等を制御する自由度を向上させることができる。
【0027】
【発明の効果】
大箱詰め作業時も小箱詰め作業時と同じ速度で間欠バケットコンベヤ(2)を間欠走行させることができる。従って、大箱詰め時たる二個詰め時の間欠バケットコンベヤ(2)の速度V2 を小箱詰め時たる一個詰め時の速度V5 より遅くしなければならない既述従来のもの二比べ、大箱包装時の単位時間当たりに箱詰めできる物品(a)(a)の数、即ち、包装能力の向上を図ることができる。
【0028】
【発明の実施の形態】
以下、本願発明の実施の形態を、図示例と共に説明する。
【0029】
図5は本発明の箱詰め方法を実施する箱詰め装置の正面図、図6はその平面図、図7はその側面図である。
【0030】
図6に示すように、この箱詰め装置は、本体ケース(51)上に於いて互いに平行に走行する間欠バケットコンベヤ(2)と中継装置(3)と受け取りコンベヤ(4)を備えていると共に、間欠バケットコンベヤ(2)の上流端近傍には図示しない前処理装置の下流端部に位置する上流側コンベヤ(1)の先端部が対向している。
【0031】
そして、上記中継装置(3)は可動ユニット(54)に組み込まれていると共に、該可動ユニット(54)と間欠バケットコンベヤ(2)及び受け取りコンベヤ(4)は図5に現れる共通の駆動源たるサーボモータ(52)で駆動されるようになっている。
【0032】
以下、各部の詳細を説明する。
[間欠バケットコンベヤ(2)について]
図6に示すように、間欠バケットコンベヤ(2)は駆動軸(27)と従動軸(28)に掛けられていると共に、該間欠バケットコンベヤ(2)には区画板(21)(21)が走行方向に所定ピッチで配設されており、これら区画板(21)(21)間の供給バケット部(23)(23)に物品(a)(a)が収容された状態で中継装置(3)の配設部に向けて移送されるようになっている。
【0033】
上記駆動軸(27)の一端にはスプロケット(29)が取付けられていると共に、該スプロケット(29)は、本体ケース(51)内に配設された運動変換器(26)に対して伝動チェーン(24)を介して連結されており、該運動変換器(26)の入力部にはチェーン(53)を介してサーボモータ(52)が動力伝達状態に連結されている。尚、上記スプロケット(29)及び伝動チェーン(24)の組み合わせに代えて、タイミングプーリ及びタイミングベルトの組み合わせを採用してもよい。
【0034】
上記運動変換器(26)は、サーボモータ(52)の連続回転を間欠バケットコンベヤ(2)の間欠走行動作に変換する機能を有しており、間欠バケットコンベヤ(2)が後述する上流側コンベヤ(1)から物品(a)を受け取ると、該間欠バケットコンベヤ(2)を1ピッチ分だけ走行させた後に停止させ、上流側コンベヤ(1)から供給される次の物品(a)を受け取るまでこの停止状態を維持させる。この動作は、図示しない前処理装置に備えられた上流側コンベヤ(1)を駆動するサーボモータの回転量を監視しながらサーボモータ(52)の回転量を制御し、これと上記運動変換器(26)により、上流側コンベヤ(1)と間欠バケットコンベヤ(2)を上記のように同期動作させる。
【0035】
又、上記間欠バケットコンベヤ(2)は、図7に示すように、後述の可動ユニット(54)の可動ベース(55)の上方域を走行するようになっている。
[可動ユニット(54)について]
本体ケース(51)の天板(510)上に敷設された案内レール(56)(56)上を走行する可動ユニット(54)は、図7に示すように、上記案内レール(56)(56)上を走行するスライダー(57)(57)が下面に取付けられた可動ベース(55)を具備している。そして、この可動ベース(55)に中継装置(3)及び移し替え装置(6)が配設されている。
【0036】
*中継装置(3)
上記可動ベース(55)にはレール(50)が突設されていると共に、中継装置(3)の下面に設けられたスライダ(35)が上記レール(50)上を滑動するようになっている。
【0037】
中継装置(3)の上面には、上記区画板(21)(21)間の供給バケット部(23)(23)と同一ピッチで物品(a)(a)を保持する中継バケット部(33)(33)が間隔保持壁(31)(31)の間に形成されていると共に、該中継装置(3)の一端にはシリンダ(36)の出力軸(37)が連結されており、該シリンダ(36)の基端部は可動ユニット(54)の可動ベース(55)に支持部材(30)で固定されている。従って、シリンダ(36)の出力軸(37)を伸縮させると、中継装置(3)がレール(50)に沿って往復移動する。よって、このものでは、上記レール(50)とその上を滑動するスライダ(35)と中継装置(3)に連結されたシリンダ(36)の組み合わせが受け取りコンベヤ(4)に対する中継装置(3)の相対位置を調節する為の位置補正装置となっている。
【0038】
*移し替え装置(6)
物品(a)(a)を中継装置(3)から受け取りコンベヤ(4)上等に移動させる移し替え装置(6)は、上記可動ベース(55)上に於いて前記間欠バケットコンベヤ(2)や中継装置(3)の走行方向と直交する方向に移動するようになっている。
【0039】
この為、可動ベース(55)の上面には、上記中継装置(3)等の移動方向と直交する方向に延びる平行な一対のレール(61)(61)が配設されており、側面L字状の支持枠(60)の下端に配設されたスライダ(62)(62)が上記該レール(61)(61)上を走行するようになっている。上記支持枠(60)の頂板(63)には、その長手方向に間隔を置いて昇降シリンダ(66a)(66b)が配設されていると共に、夫々の出力軸(67a)(67b)の下端には、図8に示すように物品押し出し板(68a)(68b)の水平板部(680a)(680b)が各別に固定されている。そして、物品押し出し板(68a)の前縁部からは物品(a)(a)を前方に押し出す物品押し出し爪(69a)(69a)が屈曲垂下していると共に、これらの一方の物品押し出し爪(69a)の両脇に位置する物品押し出し爪(69b)(69b)は他方の物品押し出し板(68b)から屈曲垂下している。そして、物品押し出し爪(69a)(69a)(69b)(69b)は、上記中継装置(3)に形成される中継バケット部(33)(33)の間隔と同一間隔で並んでいる。従って、昇降シリンダ(66a)(66b)の出力軸(67a)(67b)を伸長させると、図7に示すように、物品押し出し爪(69a)(69b)が間欠バケットコンベヤ(2)や中継装置(3)上の物品(a)に対向した状態になる一方、出力軸(67a)(67b)を収縮させると上記物品押し出し爪(69a)(69b)が間欠バケットコンベヤ(2)の上方に上昇する。そして、昇降シリンダ(66a)(66b)を各別に作動させることによって、物品押し出し爪(69a)(69a)と物品押し出し爪(69b)(69b)を各別に昇降させ得るようになっている。
【0040】
上記移し替え装置(6)の支持枠(60)の長手方向の両端に位置する鉛直脚(71)(71)の下端相互を繋ぐ下板(65)の上面には、図6のようにラック(72)が固定されていると共に、該ラック(72)には押し出し用駆動源たる押し出し用サーボモータ(75)の出力軸に取付けられたピニオン(76)が噛み合っている。
【0041】
従って、押し出し用サーボモータ(75)によってピニオン(76)が回転されると、これとラック(72)の噛み合いによって移し替え装置(6)の支持枠(60)がレール(61)(61)に沿って移動する。
【0042】
*速度調節機構(64)
可動ユニット(54)を案内レール(56)(56)に沿って往復移動させる為の速度調節機構(64)は、伝動チェーン(79)によってサーボモータ(52)と動力伝達状態に連結されたカム板(641)を具備していると共に、このカム板(641)に形成されたカム溝(642)には、支点軸(59)を中心に回動する揺動レバー(643)の入力側の端部に設けられたピン(645)が摺動自在に嵌入している。又、揺動レバー(643)の出力端は、可動ユニット(54)の可動ベース(55)の一側から突出する突出アーム(58)に対して連結ピン(580)で回動自在に連結されている。
【0043】
このものでは、サーボモータ(52)で速度調節機構(64)のカム板(641)が連続回転されると、揺動レバー(643)が支点軸(59)を支点として揺動する。このとき、カム板(641)に形成されたカム溝(642)の形状と揺動レバー(643)の構造により、案内レール(56)(56)に沿った方向への可動ユニット(54)の走行速度、即ち、中継装置(3)の走行速度が後述する受け取りコンベヤ(4)の走行速度V4 に一時的に一致させることができるようになっている。又、受け取りコンベヤ(4)とこれに動力伝達状態に連結されたサーボモータ(52)の位相及び該サーボモータ(52)とカム板(641)の位相関係を適宜設定することにより、上記中継装置(3)と受け取りコンベヤ(4)の走行速度が一致した状態で中継装置(3)の中継バケット部(33)(33)の一端開放部(310)(310)と受け取りコンベヤ(4)側の受け取りバケット部(43)の受取側区画室(430)(430)の開放部(440)(440)が対向するようになっており、これにより、中継バケット部(33)(33)内の物品(a)(a)を受取側区画室(430)(430)内にスライドさせて押し込めるようになっている。
[受け取りコンベヤ(4) について]
図6に示すように、受け取りコンベヤ(4)は、本体ケース(51)上にに支持脚(47)(47)で支持された駆動軸(45)と支持脚(48)(48)で支持された従動軸(46)間に架設されていると共に、駆動軸(45)にはスプロケット(81)が取付けられており、更に、図7に示すように該スプロケット(81)はサーボモータ(52)の出力軸(84)に固定されたスプロケット(85)とチェーン(82)を介して動力伝達状態に連結されている。
【0044】
この受け取りコンベヤ(4)の上面には、バケット壁(41)(41)の間の受け取りバケット部(43)(43)が形成されていると共に、該受け取りバケット(43)(43)内は区画板(42)で区画されており、これにより、本実施の形態では大箱詰め数Nとしての二個の受取側区画室(430)(430)が形成されている。
[上流側コンベヤ(1) について]
間欠バケットコンベヤ(2)の上流端部に物品(a)(a)を供給する前処理装置の上流側コンベヤ(1)は、無端ベルトの表面に搬送爪(11)(11)を所定ピッチで配設したものであり、物品(a)(a)は前記搬送爪(11)(11)で押されて間欠バケットコンベヤ(2)の供給バケット部(23)(23)側に移動する。
[箱詰め動作について]
次に、上記箱積め動作の実際を包装箱(b1)に物品(a)(a)を一個単位で箱詰めする小箱積め作業と、前記物品(a)(a)を二個単位で箱詰めする大箱詰め作業の動作に分けて説明する。
【0045】
*小箱詰め作業
前記包装量選択手段(S)で小箱詰め作業が選択された場合は、図示しない制御装置に組み込まれたマイクロコンピュータの制御により、図9の如く各部が動作する。
【0046】
間欠バケットコンベヤ(2)に物品(a)(a)を供給する前処理装置の上流側コンベヤ(1)を駆動するサーボモータの回転量は図示しない制御装置で監視されており、これにより、上流側コンベヤ(1)が1ピッチ分走行すると、受け取りコンベヤ(4)が1ピッチ分(受取側区画室(430)(430)の配設ピッチ分)だけ走行するように制御されている。
【0047】
図1に示すように、上流側コンベヤ(1)と受け取りコンベヤ(4)の夫々はV1 ,V4 の一定速度で連続的に走行し、中継装置(3)は時間的に変化する速度Vで往復移動するが、間欠バケットコンベヤ(2)はV2 で走行した後に停止する動作を繰り返す間欠走行を行う。
【0048】
図1に示すように、上流側コンベヤ(1)の下流端まで搬送された物品(a)が搬送爪(11)に押されて間欠バケットコンベヤ(2)の供給バケット部(23)に侵入すると、これまで停止していた間欠バケットコンベヤ(2)が運動変換器(26)の作用で1ピッチ分(供給バケット部(23)(23)の配設間隔分)だけV2 で走行して停止する。この走行と停止を繰り返す間欠動作が継続すると、間欠バケットコンベヤ(2)の各供給バケット部(23)(23)に物品(a)(a)が各別に収容され、やがて間欠バケットコンベヤ(2)で移送された物品(a)(a)が中継装置(3)の中継バケット部(33)(33)に対向した状態になる(図1参照)。すると、図9のステップ(ST1)で示すように上記対向状態を図示しない制御装置のマイクロコンピュータが判断し(サーボモータ(52)の回転量に基づいて判断する)、その後、ステップ(ST2)で昇降シリンダ(66a)(66b)を伸長させて物品押し出し爪(69a)(69a)(69b)(69b)を降下させる、これにより、間欠バケットコンベヤ(2)上の物品(a)(a)を物品押し出し爪(69a)(69a)(69b)(69b)で中継装置(3)側に押せる状態にする。次に、ステップ(ST3)で押し出し用サーボモータ(75)を駆動させて支持枠(60)を往復ストロークの中間位置まで移動させる。即ち、物品押し出し爪(69a)(69a)(69b)(69b)で間欠バケットコンベヤ(2)上に並んだ四個の物品(a)(a)を、図1の想像線で示すように中継装置(3)の中継バケット部(33)(33)に移し替える。
これにより、既述第1移し替え工程が完了する。
【0049】
次に、図9のステップ(ST4)で、昇降シリンダ(66a)を収縮させて物品押し出し爪(69a)(69a)を上昇させ、これにより、中継装置(3)の下流端(図1の左端)の中継バケット部(33)とその上流側(図1に於いて右側)の2つ隣に位置する中継バケット部(33)に対応する物品(a)(a)の上方に物品押し出し爪(69a)(69a)を退避させる。
【0050】
次に、ステップ(ST5)でサーボモータ(52)が所定量回転するとカム板(641)が原点から設定角度(本実施の形態では20度)だけ回転した状態になり、これにより、中継装置(3)の中継バケット部(33)(33)が受け取りコンベヤ(4)に形成された受け取りバケット部(43)内の受取側区画室(430)(430)に対向した状態でこれらと同速度で走行する。中継バケット部(33)(33)が受取側区画室(430)(430)と対向した状態でこれらと同速度で走行するのは、既述したように、カム板(641)や揺動レバー(643)の寸法及び構造、並び受け取りコンベヤ(4)及び前記カム板(641)等の位相を所定に設定することにより実現している。又、このときには、バケット壁(41)のすぐ下流側に隣接する受取側基準(400)(400)と、中継装置(3)に於ける上流端(図1に於ける右端)の中継バケット部(33)及びその2つ隣の中継バケット部(33)が上記受取側基準(400)(400)に対向した状態になっている。
【0051】
次に、ステップ(ST6)で押し出し用サーボモータ(75)を駆動して支持枠(60)を移動ストロークの最終位置まで前進させる。この場合、物品押し出し爪(69a)(69a)は物品(a)(a)の上方に上昇しているから、降下している物品押し出し爪(69b)(69b)がこれに対応する中継装置(3)の中継バケット部(33)(33)内の物品(a)(a)を受け取りコンベヤ(4)側に押し出してこれらを上記受取側基準(400)(400)内に移し替える(図2の想像線の物品(a)(a)参照)。従って、本実施の形態では、中継装置(3)の中継バケット部(33)(33)群が小箱詰め数nと等しい一個づつにグループ化されており、該一個の中継バケット部(33)が既述中継バケットグループ(G)を構成している。これにより、本実施の形態では、受け取りコンベヤ(4)の各受け取りバケット部(43)内に小箱詰め数nとしての一個の物品が移し替えられ、これにより、既述第2移し替え工程が完了する。
【0052】
次に、ステップ(ST7)で押し出し用サーボモータ(75)を逆転させることによって支持枠(60)を既述中間位置まで後退させる。
【0053】
次に、ステップ(ST9)でサーボモータ(52)の回転量を監視することによってカム板(641)が既述の原点から前記設定角度(本実施の形態では20度)だけ回転するのを監視すると共に、スライド装置を構成するシリンダ(36)を伸長させる。尚、シリンダ(36)を伸長させると、中継バケット部(33)(33)が上流側に1ピッチ分だけ移動し、これにより、物品(a)(a)を収容している中継バケット部(33)(33)が物品押し出し爪(69b)(69b)に新たに対向した状態になる。
【0054】
図3は、前記シリンダ(36)が伸長状態にあり且つ前記設定角度だけカム板(641) が回転した状態を示してる。この状態では、中継装置(3)の物品押し出し爪(69b)(69b)に対応する中継バケット部(33)(33)が受け取りコンベヤ(4)の受取側基準(400)(400)の側方開放部に対向している。尚、本実施の形態では中継装置(3)を初期位置に移動させ且つスライド装置を構成するシリンダ(36)を伸長させる動作が既述した中継装置(3)の復帰移動工程に対応する。又、カム板(641)が前記設定角度だけ回転したときには、サーボモータ(52)で駆動されるカム板(641)と揺動レバー(643)の作用によって中継装置(3)が受け取りコンベヤ(4)と同速で下流側に走行している。そこで、ステップ(ST10)で押し出し用サーボモータ(75)を駆動させて支持枠(60)を最終位置まで進出させ、これにより、物品押し出し爪(69b)(69b)でこれに対応する中継装置(3)上の物品(a)(a)を受け取りコンベヤ(4)の受取側バケット部(43)(43)内の受取側基準(400)(400)に夫々移し替える。すると、物品押し出し爪(69b)(69b)に対応する中継装置(3)上の物品(a)(a)(図4の実線参照)が、図4の想像線で示すように、受け取りコンベヤ(4)の受け取りバケット部(43)(43)に小箱詰め数nに等しい一個ずつ移し替えられる。これにより、受け取りバケット(43)(43)には、バケット壁(41)の上流側隣接部の受取側基準(400)(400)に物品(a)(a)が収容された状態になり、これら受取側基準(400)(400)が受け取りコンベヤ(4)の走行域中の箱詰め位置に箱保持手段(8)で保持された包装箱(b)部分に到達したときに図示しないプッシャで物品(a)が一個詰め用の包装箱(b1)内に押し込まれ、これにより、小箱詰め作業が完了する。
【0055】
以後、ステップ(ST10)で更に昇降シリンダ(66b)を収縮させて物品押し出し爪(69b)(69b)を上昇させて全ての物品押し出し爪(69a)(69a)(69b)(69b) を上昇状態に維持すると共に、ステップ(ST11)で押し出し用サーボモータ(75)を回転させて支持枠(60)を初期位置まで後退させると共に、シリンダ(36)を収縮させ、その後、ステップ(ST1)の工程に制御動作が戻される。
【0056】
*大箱詰め作業
前記包装量選択手段(S)で大箱詰め作業が選択された場合は、図示しない制御装置に組み込まれたマイクロコンピュータの制御により、図10の如く各部が動作する。すると、既述従来例を示す図11の(イ)(ロ)と同じ順序で物品(a)(a)が、包装箱(b2)に、上記n=1の整数倍である大箱詰め数N(本実施の形態では二個))ずつ箱詰めされる。
【0057】
即ち、図10のステップ(ST21)で図示しない制御装置のマイクロコンピュータがサーボモータ(52)の回転量を判断して間欠バケットコンベヤ(2)に形成された四個の供給バケット部(23)(23)の側方開放部が中継装置(3)に形成された四個の中継バケット部(33)(33)の側方開放部に対向するのを監視する。次に、ステップ(ST21a) で物品押し出し爪(69a)(69a)(69b)(69b)を降下させてこれらを物品(a)(a)に対向させた状態にすると共に、ステップ(ST22)で押し出し用サーボモータ(75)を駆動させて支持枠(60)を往復ストロークの中間位置まで移動させる。即ち、物品押し出し爪(69a)(69a)(69b)(69b)で間欠バケットコンベヤ(2)上に並んだ四個の物品(a)(a)を、図11に於ける(イ)の想像線で示すように中継装置(3)の中継バケット部(33)(33)に移し替える。次に、ステップ(ST23)でサーボモータ(52)の回転量に基づいてカム板(641)が既述原点から前記した設定角度(本実施の形態では20度)だけ回転するのを監視する。即ち、中継装置(3)の上流端に位置する中継バケット部(33)が受け取りコンベヤ(4)に形成された特定のバケット壁(41)の上流側隣接部に位置する受取側基準(400)に対向した状態(図11の(ロ)の状態)でこれら中継装置(3)と受け取りコンベヤ(4)が同速で走行した状態になるのを監視する。次に、ステップ(ST24)で押し出し用サーボモータ(75)を駆動させて支持枠(60)を最終位置まで進出させると、図11に於ける中継装置(3)上の四個の物品(a)(a)が(ロ)の想像線で示すように受け取りコンベヤ(4)の受取側バケット部(43)内の受取側区画室(430)(430)内に収容される。
【0058】
次に、上記ステップ(ST24)で物品押し出し爪(69a)(69a)(69b)(69b)を上昇させると共に、ステップ(ST25)で押し出し用サーボモータ(75)を逆転させて支持枠(60)を初期位置まで後退させ、その後、制御動作を(ST21)に戻す。すると、バケット壁(41)(41)間の受取側バケット部(43)(43)が受け取りコンベヤ(4)の走行域中に保持された二個詰め用の包装箱(b2)部に運ばれたときに、一つの受取側バケット(43)に収容された二個(大箱詰め数N)の物品(a)(a)が同時に図示しないプッシャで包装箱(b2)に押し込まれる。
【0059】
このように、上記実施の形態の箱詰め方法によれば、大箱詰め作業時も小箱詰め作業時も間欠バケットコンベヤ(2)が同じ速度で走行した後に停止する(同じ態様の間欠走行を行う)。よって、大箱詰め作業及び小箱詰め作業の何れの作業時でもサーボモータ(52)を能力限界で作動させることによって間欠バケットコンベヤ(2)を常に高速走行させることができる。よって、大箱詰め作業時に於ける間欠バケットコンベヤ(2)の走行速度をサーボモータ(52)の能力限界未満に設定する必要があった既述従来のものに比べ、大箱詰め作業時に於ける包装能力を大きくすることができる。
【0060】
尚、上記実施の形態では、物品(a)(a)を二個詰め(N=2)する作業を大箱詰め作業として例示し、物品(a)(a)を一個詰め(n=1)する作業を小箱詰め作業として例示したが、受け取りバケット部(43)内を大箱詰め数Nと等しい四個の受取側区画室(430)(430)に区画し、これにより、四個詰め作業(大箱詰め作業)と、上記大箱詰め数Nとしての「四個」の整商たる「一個」や「二個」の小箱詰め数n(大箱詰め数Nは除かれる)の物品(a)を小箱(b1)に箱詰めする小箱詰め作業(小箱詰め作業)が択一的に実行できるようにしてもよい。この場合、受け取りバケット部(43)内の最上流部に位置する受取側基準(400)の受取側区画室(430)から小箱詰め数nに等しい一個又は二個の受取側区画室(430)に対して中継装置(3)の中継バケット部(33)(33)から一個又は二個の物品(a)(a)を移し替え、その後、中継装置(3)を既述のように初期位置側に復帰移動させて残りの中継バケット部(33)(33)内の物品(a)(a)を新たな受取側区画室(430)(430)に移し替える。
【0061】
又、上記実施の形態ではカム板(641)や揺動レバー(643)の組み合わせからなる速度調節機構(64)で中継装置(3)の走行速度が設定できるようにしたが、サーボモータ(52)とは別に設けたサーボモータ又は汎用モータで中継装置(3)を往復移動させるようにさせ、該モータで中継装置(3)の速度を制御するようにしてもよい。汎用モータを用いる場合は、これの回転量や回転速度を判断する為のエンコーダを別途組み込む必要がある。
【0062】
又、サーボモータ(52)に代えて汎用モータを使用してもよい。この場合、別途容易したエンコーダで前記汎用モータの回転量や回転速度を判断する。
【図面の簡単な説明】
【図1】本発明の実施の形態を説明する箱詰め装置で物品(a)(a)を一個詰めする場合の動作説明図であり、間欠バケットコンベヤ(2) 上の物品(a)(a)を中継装置(3)に移し替える前の図
【図2】本発明の実施の形態を説明する箱詰め装置で物品(a)(a)を一個詰めする場合の動作説明図であり、中継装置(3)が受け取りコンベヤ(4)の走行方向下流側に走行している状態の図
【図3】本発明の実施の形態を説明する箱詰め装置で物品(a)(a)を一個詰めする場合の動作説明図であり、図2から二個の物品(a)(a)を受け取りコンベヤ(4)に移し替えた後に中継装置(3)を初期位置に後退させた状態の図
【図4】本発明の実施の形態を説明する箱詰め装置で物品(a)(a)を一個詰めする場合の動作説明図であり、図3の状態から中継装置(3)が受け取りコンベヤ(4)の走行方向の下流側に走行している状態の図。
【図5】本発明の実施の形態を説明する箱詰め装置の一部切欠の正面図
【図6】本発明の実施の形態を説明する箱詰め装置の一部省略の平面図
【図7】本発明の実施の形態を説明する箱詰め装置の一部切欠の側面図
【図8】物品押し出し板(68a)物品押し出し板(68b)の配設部の平面図
【図9】本発明の実施の形態を説明する箱詰め装置で一個詰め動作を行う場合の制御用フローチャートチャート
【図10】本発明の実施の形態を説明する箱詰め装置で二個詰め動作を行う場合の制御用フローチャートチャート
【図11】従来例の説明図
【図12】従来例の説明図
【符号の説明】
(2) ・・・間欠バケットコンベヤ (3) ・・・中継装置
(4) ・・・受け取りコンベヤ (6) ・・・移し替え装置
(8) ・・・箱保持手段 (23)・・・供給バケット部
(33)・・・中継バケット部 (43)・・・受け取りバケット部
(400) ・・・受取側基準 (430) ・・・受取側区画室
(a) ・・・物品 (G) ・・・中継バケットグループ
(S) ・・・包装量選択手段[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a boxing method for boxing articles sequentially conveyed from the upstream side.
[0002]
[Prior art]
11 and 12 are schematic plan views of an apparatus for carrying out this seed boxing method.
[0003]
Articles (a) and (a) placed on the upstream conveyor (1) for sequentially supplying articles to be packaged from the upstream side to the box stacking device are pushed and transferred by the conveying claws (11) and (11). At the same time, the articles (a) and (a) conveyed to the downstream end of the upstream conveyor (1) are moved downstream by the intermittent bucket conveyor (2) that intermittently travels in the vertical direction with respect to the upstream conveyor (1). It is to be transferred. Partition plates (21) and (21) are arranged at a predetermined pitch on the outer periphery of the intermittent bucket conveyor (2), and supply bucket portions (23) and (23) between the partition plates (21) and (21) The articles (a) and (a) are conveyed to the downstream side while being accommodated.
[0004]
On the side of the intermittent bucket conveyor (2), there is provided a relay device (3) that reciprocates in parallel with this, and the upper surface of the relay device (3) is supplied with the intermittent bucket conveyor (2). Relay bucket portions (33) and (33) for holding articles (a) and (a) at the same pitch as the bucket portions (23) and (23) are disposed.
[0005]
In addition, the part located on the opposite side of the intermittent bucket conveyor (2) across the relay device (3) is provided with a receiving conveyor (4) that runs parallel to these, and the receiving conveyor ( On the outer periphery of 4), receiving bucket portions (43) (43) formed between the bucket walls (41) (41) are disposed at a predetermined pitch. Each receiving bucket section (43) is divided into two receiving compartments (430) and (430) by partition plates (42) and (42), and the receiving compartments (430) and (430) Articles (a) and (a) are placed and accommodated.
[0006]
Next, a description will be given of two cases of packing the articles (a) and (a) in a packaging box using the above boxing device, and a single packing operation as an example of a small boxing operation.
[0007]
First, a two-packing operation for filling articles (a) and (a) in a two-packing packaging box will be described with reference to FIG.
[0008]
In this case, each of the upstream conveyor (1) and the receiving conveyor (4) is V 1 , V Four The intermittent bucket conveyor (2) runs continuously at a constant speed of 2 The relay device (3) performs a traveling speed V of the receiving conveyor (4). Four A reciprocating operation is performed to move back to the initial position after acceleration.
[0009]
As shown in FIG. 1 The specific article (a) is pushed into the inside of the supply bucket section (23) of the intermittent bucket conveyor (2) from the open claw (11) of the upstream conveyor (1) that continuously travels at the inside. Then, the intermittent bucket conveyor (2) has a speed V of one pitch. 2 It waits for a new supply bucket part (23) to coincide with the downstream end of the upstream conveyor (1) and the next article (a) to be pushed. By repeating this operation, articles (a) and (a) are filled from the upstream conveyor (1) to the supply bucket portions (23) and (23) of the intermittent bucket conveyor (2).
[0010]
The four articles (a) and (a) on the intermittent bucket conveyor (2) are intermittently opposed to the open ends of the four relay bucket parts (33) and (33) of the relay device (3). As the bucket conveyor (2) and the relay device (3) are stopped, the pushers (19) and (19) are operated, and the four articles (a) and (a) are simultaneously transferred to the relay bucket portion ( 33) It is pushed into (33) (see the imaginary line in FIG. 11 (a)).
[0011]
Next, the relay device (3) operates at a predetermined timing and the speed V of the receiving conveyor (4). Four The relay device (3) is accelerated until it matches, so that the traveling speeds of the relay device (3) and the receiving conveyor (4) match and the relay bucket portion (33) (33) of the relay device (3) (B) in which the open ends of the receiving compartments (430) and (430) of the receiving conveyor (4) face each other. In this state, the four pushers (19) and (19) are operated, and the articles (a) and (a) indicated by solid lines on the relay device (3) are received by the receiving conveyor (4) as indicated by the imaginary lines in FIG. Are pushed into the receiving bucket portions (43) and (43) two by two. Thereafter, the relay device (3) is quickly returned to the initial position.
[0012]
When the article (a) (a) is transported to the downstream end of the receiving conveyor (4), the article (a) (a) 2 ) In units of two.
[0013]
Next, a small box packing operation for packing one article (a) (a) in a single packing box will be described with reference to FIG.
[0014]
Also in this case, the upstream conveyor (1) and the receiving conveyor (4) are each V 1 , V Four The relay device (3) travels continuously at a constant speed of V Four Performs reciprocating movement that repeats running and stopping. In contrast, the intermittent bucket conveyor (2) 2 Slower speed V Five Repeat the operation to stop after driving.
[0015]
As shown in FIG. 12A, when the article (a) conveyed to the downstream end of the upstream conveyor (1) enters the supply bucket portion (23) of the intermittent bucket conveyor (2), the intermittent bucket conveyor ( 2) is the speed V by 2 pitches of the supply bucket part (23) (23) Five The vehicle travels to stop and waits until a new article (a) is pushed into the supply bucket section (23) from the upstream conveyor (1). At this time, since the intermittent bucket conveyor (2) travels by the two pitches, as shown in FIG. 12 (a), every other article (a ) (a) is contained.
[0016]
When the two articles (a) and (a) on the intermittent bucket conveyor (2) face the relay bucket part (33) and (33) of the relay device (3), the pushers (19) and (19) are the same as described above. The two articles (a) and (a) are simultaneously pushed into the relay bucket portions (33) and (33) of the relay device (3) (see the imaginary line in FIG. 12A). In addition, the relay device (3) operates at a predetermined timing, and this is the speed V of the receiving conveyor (4). Four It is accelerated until it matches. As a result, the relay bucket part (33) (33) on the relay device (3) containing the articles (a) (a) is received in the receiving bucket part (43) (43) on the receiving conveyor (4). It runs at the same speed as the receiving side compartment (430) (430) located at the receiving side reference (400) (400) of the most upstream part, and the relay bucket part (33) (33) and the receiving side reference (400) 12 (b) where the open ends of the receiving compartments (430) and (430) located at (400) face each other. Thereafter, the pushers (19) and (19) are activated and the articles (a) and (a) on the relay device (3) indicated by the solid line in FIG. 12 (B) are received as indicated by the imaginary line in the same figure (B). Transferred to the receiving compartment (430) of the receiving reference (400) of the conveyor (4). Then, every other article (a) (a) is received and aligned on the conveyor (4), and the article (a) is packed in a single packing box (b 1 ) One by one.
[0017]
[Problems to be solved by the invention]
In this case, when carrying out a single packing operation of packing goods (a) and (a) into a single box, the intermittent bucket conveyor (2) is moved by 2 pitches while the upstream conveyor (1) is running by 1 pitch. Need to run. On the other hand, at the time of packing two large boxes, the intermittent bucket conveyor (2) may be moved by one pitch while the upstream conveyor (1) is driven by one pitch. Therefore, in the above-mentioned conventional one, the speed V of the intermittent bucket conveyor (2) at the time of packing one piece. Five Speed V when packing 2 2 It is necessary to set it to about twice. Therefore, the speed V is controlled by operating the drive motor of the intermittent bucket conveyor (2) at the capacity limit. Five Is obtained, the speed V of the intermittent bucket conveyor (2) when packing two 2 Indicates that the speed V Five In addition to this, it is necessary to set the speed of the upstream conveyor (1) and the receiving conveyor (4) at the time of two packing, and the unit time per unit time at the time of two packing is related to this. There is a problem that the number of articles (a) and (a) that can be boxed, that is, the packaging ability is lowered.
[0018]
In the above description, the operation of packing in a packaging box for packing two pieces is described as a large boxing operation, and the operation of packing in a packing box for packing one piece is described as a small boxing operation. For example, when the articles (a) and (a) are packaged in a four-packed large box and a two-packed small box, there is a problem similar to the above in that the packaging capacity at the time of large box packing is reduced.
[0019]
The present invention has been made in view of such points,
`` Intermittent bucket conveyor (2) in which a plurality of supply bucket sections (23) and (23) for conveying articles in a loaded state are arranged at a constant pitch on the outer periphery and intermittently run,
Relay buckets that are reciprocally moved in parallel to the side of the intermittent bucket conveyor (2) in the running direction and that are an integral multiple of the number of large boxes N that are arranged at the same pitch as the supply buckets (23) and (23). Relay device (3) provided on the top surface with parts (33) and (33),
A plurality of receiving bucket portions (43) (43) (inside) are partitioned into the receiving side compartments (430) (430) of the large box packing number N arranged at the same pitch as each of the relay bucket portions (33) (33). 43) receiving conveyor (4) arranged on the outer periphery and continuously running in parallel with the relay device (3) on the opposite side of the intermittent bucket conveyor (2);
A box holding means (8) for holding a large box or a small box as a packaging box having a different size at a boxing position on the side of the traveling area of the receiving conveyor (4);
A state in which the articles (a) and (a) are transferred from the supply bucket portions (23) and (23) facing each other in a stopped state to the relay bucket portions (33) and (33) and traveling at the same speed. A transfer device (6) for transferring an article from the relay bucket portion (33) opposed to the receiving bucket (43),
All the articles (a) and (a) individually accommodated in the receiving compartments (430) and (430) with the number of large boxes N arranged in the receiving bucket part (43) are stored in the large box. Large boxing operation for packing, and articles (a) arranged in the receiving bucket section (43) and accommodated in the receiving side compartments (430) and (430) of the small box packing number n that is the final number of the large box packing number N ) (a) is a packaging method using a packaging apparatus comprising a packaging amount selection means (S) that selectively selects a small boxing operation to pack the small box,
When a large boxing operation is selected by the packaging amount selection means (S), the articles (a) and (a) are simultaneously transferred from the intermittent bucket conveyor (2) to all the relay bucket portions (33) and (33). And changing the articles (a) (a) in all the relay bucket parts (33) (33) to all the receiving compartments (430) (430) in the receiving bucket part (43), In the `` Packaging method of goods '', the number of articles that can be packed per unit time during large boxing and small boxing operations can be set to the same number, and the packaging capacity in large box packaging compared to the conventional ones described above. The challenge is to be able to improve.
[0020]
[Means for Solving the Problems]
<1>
The technical means of the present invention for solving the above problems will be described with reference to FIGS.
“A specific receiving side compartment (430) selected from the receiving side compartments (430) and (430) arranged in the receiving bucket section (43) is set as a receiving side reference (400), and the relay The relay bucket group (33) (33) group arranged on the device (3) is divided into a group having the same number of relay bucket sections (33) as the small box packing number n to form a relay bucket group (G) And
When a small boxing operation is selected by the packaging amount selection means (S),
The articles (a) and (a) are simultaneously transferred from the supply bucket portions (23) and (23) of the intermittent bucket conveyor (2) to all the relay bucket portions (33) and (33) of the relay device (3). A first transfer step (FIG. 2);
The number of small boxes packed in which the relay bucket portion (33) of the small number of packing boxes n constituting the relay bucket group (G) includes the receiving side compartment (430) of the receiving side reference (400) of the receiving bucket portion (43) When facing the n receiving side compartments (430) while traveling at the same speed, the articles (a) in the facing relay bucket portions (33) are placed in the facing n compartments of the facing small boxes. (430) a second transfer process for transferring each (arrow (A) in FIG. 2),
Other relay bucket groups following the relay bucket group (G) emptied in the second transfer step while returning the relay device (3) to the initial position direction before the execution of the second transfer step The receiving side reference (400) located at the further upstream side of the uppermost article (a) in which the relay bucket part (33) with a small number of small boxes forming (G) is transferred to the receiving conveyor (4). A return movement step of adjusting the position of the relay device (3) so as to oppose the receiving side compartment (430) of the small box packing number n including the receiving side compartment (430) of FIG.
Articles in each relay bucket section (33) facing the receiving compartment (430) with a small number of small boxes n including the receiving compartment (430) of the receiving reference (400) by executing the return movement step ( a) a third transfer step of transferring a) to each of the opposing receiving compartments (430) and (sequentially executing (arrow (B) in FIG. 4)).
[0021]
In the present invention, the traveling speed of the intermittent bucket conveyor (2) during the small boxing operation is set to the same speed as the traveling speed during the large boxing operation. In any of these boxing operations, the intermittent bucket conveyor (2) is controlled to operate synchronously with the upstream conveyor (1) from the upstream conveyor (1) already described.
[0022]
According to the above technical means, the small box packing operation is performed as follows.
[0023]
When a small boxing operation is selected by the packaging amount selection means (S), all the relay bucket portions (33) of the relay device (3) from each supply bucket portion (23) (23) of the intermittent bucket conveyor (2) are selected. ) (33), the articles (a) and (a) are transferred at the same time (first transfer step). As a result, as shown by the imaginary line in FIG. 1, all the relay bucket parts ( Articles (a) and (a) are accommodated in 33) and (33).
[0024]
Next, the relay bucket group (33) of n small boxes packed in each relay bucket group (G) (the relay bucket group (G) is composed of one relay bucket section (33) in FIGS. 1 to 4). The article (a) in the case of the receiving compartment (430) of the number n of small boxes containing the receiving reference (400) as shown by the arrow (A) in FIG. A second transfer step is performed to transfer the article (a) in the receiving compartment (430) of the number n of small boxes in the receiving bucket section (43) (see FIG. 2). Imaginary line item (a)). Accordingly, when the small box packing number n is “1” (as illustrated in FIGS. 1 to 4), one article (a) (received on the receiving side reference (400) is accommodated in the receiving bucket section (43). ) Is transferred. On the other hand, when the number of small boxes n is “2”, the two articles (a) and (a) separately accommodated in the two relay bucket portions (33) are transferred to the receiving bucket portion (43). . Therefore, in the present invention, the number of articles (a) to be packed in a small box is not limited to one. In this way, the number of articles (a) to be boxed in the small boxing operation is transferred to the receiving side compartment in the receiving bucket section (43).
[0025]
Next, the relay device (3) is moved back to a position corresponding to the further upstream side of the article (a) in the uppermost stream portion transferred to the receiving side compartment (430) in the second transfer step. The In addition, the receiving bucket portion in which the relay bucket portion (33) of the other small box packing number n following the relay bucket portion (33) of the small box packing number emptied in the second transfer step is located on the upstream side. The position of the relay device (3) is adjusted so as to face the receiving side compartment (430) of the small box packing number n including the receiving side reference (400) of (43) (return movement process).
That is, the relay device (3) is set at the position shown in FIG. Thereby, in the receiving bucket part (43) located in the further upstream of the goods (a) of the most upstream part transferred to the receiving side compartment (430) of the said small box packing number n by the said 2nd transfer process. The relay bucket section (33) of the small box packing number n provided with the article (a) is opposed to the receiving side compartment (430) (including the receiving side base (400)) of the small box packing number n. Become. Therefore, as indicated by an arrow (B) in FIG. 4, in the
[0026]
Thereafter, when the receiving bucket part (43) reaches the position corresponding to the packaging box (b) held by the box holding means at the side packing position of the receiving conveyor (4), the receiving bucket part (43 ) The goods (a) in the receiving compartment (430) of the number n in the small box are packed in the small box.
<
In the above-mentioned
<
In the
<
In the
[0027]
【The invention's effect】
The intermittent bucket conveyor (2) can be driven intermittently at the same speed as when packing a large box. Therefore, the speed V of the intermittent bucket conveyor (2) when packing two large boxes 2 Speed V when packing a small box Five Compared with the above-described conventional two, which must be made slower, the number of articles (a) and (a) that can be packed per unit time during large box packaging, that is, the packaging capacity can be improved.
[0028]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described together with illustrated examples.
[0029]
FIG. 5 is a front view of a boxing apparatus for carrying out the boxing method of the present invention, FIG. 6 is a plan view thereof, and FIG. 7 is a side view thereof.
[0030]
As shown in FIG. 6, the boxing device includes an intermittent bucket conveyor (2), a relay device (3), and a receiving conveyor (4) that run parallel to each other on the main body case (51), and In the vicinity of the upstream end of the intermittent bucket conveyor (2), the front end portion of the upstream conveyor (1) located at the downstream end portion of the pretreatment device (not shown) is opposed.
[0031]
The relay device (3) is incorporated in the movable unit (54), and the movable unit (54), the intermittent bucket conveyor (2), and the receiving conveyor (4) are common drive sources that appear in FIG. It is driven by a servo motor (52).
[0032]
Details of each part will be described below.
[About intermittent bucket conveyor (2)]
As shown in FIG. 6, the intermittent bucket conveyor (2) is hung on the drive shaft (27) and the driven shaft (28), and the intermittent bucket conveyor (2) has partition plates (21) and (21). The relay device (3) is arranged in a state where the articles (a) and (a) are accommodated in the supply bucket portions (23) and (23) between the partition plates (21) and (21). ) Is transferred toward the arrangement portion.
[0033]
A sprocket (29) is attached to one end of the drive shaft (27), and the sprocket (29) is connected to a motion converter (26) disposed in the body case (51). The servomotor (52) is connected to the input portion of the motion converter (26) via a chain (53) in a power transmission state. In place of the combination of the sprocket (29) and the transmission chain (24), a combination of a timing pulley and a timing belt may be employed.
[0034]
The motion converter (26) has a function of converting the continuous rotation of the servo motor (52) into the intermittent traveling operation of the intermittent bucket conveyor (2), and the intermittent bucket conveyor (2) is an upstream conveyor described later. When the article (a) is received from (1), the intermittent bucket conveyor (2) is stopped after traveling for one pitch until the next article (a) supplied from the upstream conveyor (1) is received. This stop state is maintained. This operation controls the rotation amount of the servo motor (52) while monitoring the rotation amount of the servo motor that drives the upstream conveyor (1) provided in the pre-processing device (not shown), and this motion converter ( By 26), the upstream conveyor (1) and the intermittent bucket conveyor (2) are operated synchronously as described above.
[0035]
Further, as shown in FIG. 7, the intermittent bucket conveyor (2) travels above the movable base (55) of the movable unit (54) described later.
[About movable unit (54)]
As shown in FIG. 7, the movable unit (54) traveling on the guide rails (56) (56) laid on the top plate (510) of the main body case (51) has the guide rails (56) (56). The slider (57) (57) traveling on the upper side has a movable base (55) attached to the lower surface. A relay device (3) and a transfer device (6) are disposed on the movable base (55).
[0036]
* Relay device (3)
A rail (50) projects from the movable base (55), and a slider (35) provided on the lower surface of the relay device (3) slides on the rail (50). .
[0037]
On the upper surface of the relay device (3), the relay bucket portion (33) that holds the articles (a) and (a) at the same pitch as the supply bucket portions (23) and (23) between the partition plates (21) and (21). (33) is formed between the spacing holding walls (31) (31), and an output shaft (37) of a cylinder (36) is connected to one end of the relay device (3). The base end of (36) is fixed to the movable base (55) of the movable unit (54) by the support member (30). Therefore, when the output shaft (37) of the cylinder (36) is expanded and contracted, the relay device (3) reciprocates along the rail (50). Therefore, in this case, the combination of the rail (50), the slider (35) that slides on the rail (50), and the cylinder (36) connected to the relay device (3) is a combination of the relay device (3) with respect to the receiving conveyor (4). This is a position correction device for adjusting the relative position.
[0038]
* Transfer device (6)
The transfer device (6) that receives the articles (a) and (a) from the relay device (3) and moves them onto the conveyor (4), etc., has the intermittent bucket conveyor (2) and the intermittent bucket conveyor (2) on the movable base (55). It moves in a direction orthogonal to the traveling direction of the relay device (3).
[0039]
For this reason, on the upper surface of the movable base (55), a pair of parallel rails (61) (61) extending in a direction orthogonal to the moving direction of the relay device (3) and the like are disposed, and the side surface is L-shaped. A slider (62) (62) disposed at the lower end of the support frame (60) is configured to run on the rail (61) (61). The top plate (63) of the support frame (60) is provided with elevating cylinders (66a) (66b) at intervals in the longitudinal direction, and the lower ends of the respective output shafts (67a) (67b). As shown in FIG. 8, the horizontal plate portions (680a) and (680b) of the article extrusion plates (68a) and (68b) are fixed individually. And, from the front edge portion of the article extrusion plate (68a), article extrusion claws (69a) (69a) for pushing the articles (a) (a) forward are bent and suspended, and one of these article extrusion claws ( The article extrusion claws (69b) and (69b) located on both sides of 69a) are bent and suspended from the other article extrusion plate (68b). The article pushing claws (69a), (69a), (69b), and (69b) are arranged at the same intervals as the intervals between the relay bucket portions (33) and (33) formed in the relay device (3). Accordingly, when the output shafts (67a) and (67b) of the elevating cylinders (66a) and (66b) are extended, as shown in FIG. 7, the article pushing claws (69a) and (69b) are moved to the intermittent bucket conveyor (2) and the relay device. (3) While facing the article (a) above, when the output shaft (67a) (67b) is contracted, the article pushing claws (69a) (69b) rise above the intermittent bucket conveyor (2). To do. By operating the lifting cylinders (66a) and (66b) separately, the article pushing claws (69a) and (69a) and the article pushing claws (69b) and (69b) can be raised and lowered individually.
[0040]
On the upper surface of the lower plate (65) connecting the lower ends of the vertical legs (71) (71) located at both ends in the longitudinal direction of the support frame (60) of the transfer device (6), a rack is formed as shown in FIG. (72) is fixed, and the rack (72) meshes with a pinion (76) attached to the output shaft of the pushing servo motor (75) as a pushing drive source.
[0041]
Therefore, when the pinion (76) is rotated by the pushing servo motor (75), the support frame (60) of the transfer device (6) is engaged with the rails (61) (61) by meshing with the rack (72). Move along.
[0042]
* Speed control mechanism (64)
The speed adjusting mechanism (64) for reciprocating the movable unit (54) along the guide rails (56) (56) is a cam connected to the servo motor (52) and the power transmission state by the transmission chain (79). The cam groove (642) formed in the cam plate (641) is provided on the input side of the swing lever (643) that rotates about the fulcrum shaft (59). A pin (645) provided at the end is slidably fitted. The output end of the swing lever (643) is rotatably connected to the projecting arm (58) projecting from one side of the movable base (55) of the movable unit (54) by a connection pin (580). ing.
[0043]
In this device, when the cam plate (641) of the speed adjusting mechanism (64) is continuously rotated by the servo motor (52), the swing lever (643) swings around the fulcrum shaft (59). At this time, due to the shape of the cam groove (642) formed in the cam plate (641) and the structure of the swing lever (643), the movable unit (54) in the direction along the guide rails (56) (56) The traveling speed, that is, the traveling speed of the relay device (3) is the traveling speed V of the receiving conveyor (4) described later. Four Can be temporarily matched. In addition, by appropriately setting the phase of the receiving conveyor (4) and the servo motor (52) connected to the receiving conveyor (4) and the phase relationship between the servo motor (52) and the cam plate (641), the relay device With the traveling speed of (3) and receiving conveyor (4) matched, one end open part (310) (310) of relay bucket part (33) (33) of relay device (3) and receiving conveyor (4) side The open parts (440) and (440) of the receiving side compartments (430) and (430) of the receiving bucket part (43) are opposed to each other, so that the articles in the relay bucket parts (33) and (33) (a) (a) can be slid into the receiving compartments (430) and (430) and pushed.
[About receiving conveyor (4)]
As shown in FIG. 6, the receiving conveyor (4) is supported by the drive shaft (45) and the support legs (48) and (48) supported by the support legs (47) and (47) on the main body case (51). The sprocket (81) is mounted on the drive shaft (45), and the sprocket (81) is attached to the servo motor (52) as shown in FIG. ) Is connected to a power transmission state via a sprocket (85) fixed to the output shaft (84) and a chain (82).
[0044]
On the upper surface of the receiving conveyor (4), a receiving bucket portion (43) (43) between the bucket walls (41) (41) is formed, and the inside of the receiving bucket (43) (43) is a partition. In this embodiment, two receiving-side compartments (430) and (430) are formed as a large box packing number N.
[Upstream conveyor (1)]
The upstream conveyor (1) of the pretreatment device that supplies articles (a) and (a) to the upstream end of the intermittent bucket conveyor (2) has the conveying pawls (11) and (11) at a predetermined pitch on the surface of the endless belt. The articles (a) and (a) are pushed by the conveying claws (11) and (11) and moved to the supply bucket portions (23) and (23) of the intermittent bucket conveyor (2).
[About boxing operation]
Next, the actual box loading operation is described in the packaging box (b 1 ) Are divided into operations of a small box stacking operation for packing the articles (a) and (a) in units of one unit and a large boxing operation for packing the articles (a) and (a) in units of two units.
[0045]
* Small boxing work
When the small box packing operation is selected by the packaging amount selection means (S), each part operates as shown in FIG. 9 under the control of a microcomputer incorporated in a control device (not shown).
[0046]
The rotation amount of the servo motor that drives the upstream conveyor (1) of the pretreatment device that supplies the articles (a) and (a) to the intermittent bucket conveyor (2) is monitored by a control device (not shown). When the side conveyor (1) travels by one pitch, the receiving conveyor (4) is controlled to travel by one pitch (the arrangement pitch of the receiving side compartments (430) and (430)).
[0047]
As shown in FIG. 1, each of the upstream conveyor (1) and the receiving conveyor (4) is V 1 , V Four The relay device (3) reciprocates at a speed V that changes with time, but the intermittent bucket conveyor (2) 2 The vehicle runs intermittently after repeating the operation of stopping after traveling.
[0048]
As shown in FIG. 1, when the article (a) conveyed to the downstream end of the upstream conveyor (1) is pushed by the conveyance claw (11) and enters the supply bucket section (23) of the intermittent bucket conveyor (2). The intermittent bucket conveyor (2), which has been stopped until now, is V by one pitch (for the interval between the supply buckets (23) and (23)) by the action of the motion converter (26). 2 Drive on and stop. If the intermittent operation that repeats running and stopping continues, articles (a) and (a) are individually stored in the supply bucket portions (23) and (23) of the intermittent bucket conveyor (2), and eventually the intermittent bucket conveyor (2) The articles (a) and (a) transferred in (1) face the relay bucket parts (33) and (33) of the relay device (3) (see FIG. 1). Then, as shown in step (ST1) of FIG. 9, the microcomputer of the control device (not shown) determines the facing state (based on the rotation amount of the servo motor (52)), and then in step (ST2). The lifting cylinders (66a) (66b) are extended to lower the article extrusion claws (69a) (69a) (69b) (69b), thereby moving the articles (a) (a) on the intermittent bucket conveyor (2). The product pushing claws (69a), (69a), (69b), and (69b) can be pushed to the relay device (3) side. Next, in step (ST3), the pushing servo motor (75) is driven to move the support frame (60) to an intermediate position of the reciprocating stroke. That is, the four articles (a) and (a) arranged on the intermittent bucket conveyor (2) by the article extrusion claws (69a), (69a), (69b) and (69b) are relayed as shown by the imaginary line in FIG. Transfer to the relay bucket section (33) (33) of the device (3).
Thereby, the first transfer process described above is completed.
[0049]
Next, in step (ST4) in FIG. 9, the lifting cylinder (66a) is contracted to raise the article pushing claws (69a) (69a), thereby the downstream end (the left end in FIG. 1) of the relay device (3). ) Relay bucket part (33) and the upstream side (right side in FIG. 1) of the relay bucket part (33) located next to the article (a) (a) above the articles (a) and (a) 69a) (69a) is evacuated.
[0050]
Next, in step (ST5), when the servo motor (52) is rotated by a predetermined amount, the cam plate (641) is rotated from the origin by a set angle (20 degrees in the present embodiment). The relay buckets (33) and (33) of 3) face the receiving compartments (430) and (430) in the receiving bucket (43) formed on the receiving conveyor (4) at the same speed as these. Run. As described above, the relay bucket section (33) (33) runs at the same speed as the receiving-side compartment (430) (430) facing the cam plate (641) and the swing lever. This is realized by setting the dimensions and structure of (643), the receiving conveyor (4), the phase of the cam plate (641) and the like to predetermined values. At this time, the receiving reference (400) (400) adjacent to the downstream side of the bucket wall (41) and the relay bucket portion at the upstream end (right end in FIG. 1) of the relay device (3). (33) and the relay bucket portion (33) adjacent to it (2) are in a state of facing the receiving side reference (400) (400).
[0051]
Next, in step (ST6), the pushing servo motor (75) is driven to advance the support frame (60) to the final position of the moving stroke. In this case, since the article extruding claws (69a) (69a) are raised above the articles (a) (a), the article extruding claws (69b) (69b) that are descending correspond to the corresponding relay device ( 3) The articles (a) and (a) in the relay bucket portions (33) and (33) are pushed out to the receiving conveyor (4) side, and these are transferred into the receiving side reference (400) and (400) (FIG. 2). (See (a) and (a)). Therefore, in the present embodiment, the relay bucket unit (33) (33) group of the relay device (3) is grouped one by one equal to the number n of small boxes, and the one relay bucket unit (33) The aforementioned relay bucket group (G) is configured. Thereby, in this embodiment, one article as the number of small boxes n is transferred into each receiving bucket section (43) of the receiving conveyor (4), thereby completing the second transferring process described above. To do.
[0052]
Next, in step (ST7), the pushing servo motor (75) is reversely rotated to retract the support frame (60) to the intermediate position described above.
[0053]
Next, in step (ST9), the rotation amount of the servo motor (52) is monitored to monitor the rotation of the cam plate (641) by the set angle (20 degrees in this embodiment) from the above-described origin. At the same time, the cylinder (36) constituting the slide device is extended. When the cylinder (36) is extended, the relay bucket portion (33) (33) is moved upstream by one pitch, thereby the relay bucket portion ((a) (a) containing the article (a) (a). 33) and (33) are newly opposed to the article pushing claws (69b) and (69b).
[0054]
FIG. 3 shows a state where the cylinder (36) is in the extended state and the cam plate (641) is rotated by the set angle. In this state, the relay bucket part (33) (33) corresponding to the article pushing claw (69b) (69b) of the relay device (3) is located on the side of the receiving side reference (400) (400) of the receiving conveyor (4). Opposite the opening. In this embodiment, the operation of moving the relay device (3) to the initial position and extending the cylinder (36) constituting the slide device corresponds to the return movement process of the relay device (3) described above. When the cam plate (641) rotates by the set angle, the relay device (3) receives the conveyor (4) by the action of the cam plate (641) driven by the servo motor (52) and the swing lever (643). ) And run downstream at the same speed. Therefore, in step (ST10), the pushing servo motor (75) is driven to advance the support frame (60) to the final position, thereby the article pushing claws (69b) (69b) corresponding to the relay device ( 3) The articles (a) and (a) above are transferred to the receiving side standards (400) and (400) in the receiving side buckets (43) and (43) of the receiving conveyor (4), respectively. Then, the articles (a) and (a) (see the solid line in FIG. 4) on the relay device (3) corresponding to the article extrusion claws (69b) and (69b) are transferred to the receiving conveyor ( 4) The receiving
[0055]
Thereafter, in step (ST10), the lifting cylinder (66b) is further contracted to raise the article pushing claws (69b) and (69b), and all the article pushing claws (69a) (69a) (69b) (69b) are raised. In step (ST11), the pushing servo motor (75) is rotated to retract the support frame (60) to the initial position, and the cylinder (36) is contracted, and then the process of step (ST1) Control action is returned to
[0056]
* Large box packing work
When the large box packing operation is selected by the packaging amount selection means (S), each part operates as shown in FIG. 10 under the control of a microcomputer incorporated in a control device (not shown). Then, the articles (a) and (a) in the same order as (a) and (b) of FIG. 2 ), Each box is packed by a large box number N (two in this embodiment) that is an integer multiple of n = 1.
[0057]
That is, in step (ST21) in FIG. 10, the microcomputer of the control device (not shown) determines the rotation amount of the servo motor (52), and the four supply bucket sections (23) (23) formed on the intermittent bucket conveyor (2) ( It is monitored that the side opening portion of 23) faces the side opening portions of the four relay bucket portions (33), (33) formed in the relay device (3). Next, in step (ST21a), the article extruding claws (69a) (69a) (69b) (69b) are lowered so as to face the articles (a) (a), and in step (ST22) The pushing servo motor (75) is driven to move the support frame (60) to the middle position of the reciprocating stroke. That is, the four articles (a) and (a) arranged on the intermittent bucket conveyor (2) by the article extrusion claws (69a), (69a), (69b) and (69b) are shown in FIG. As indicated by the line, the transfer is transferred to the relay bucket section (33) (33) of the relay apparatus (3). Next, in step (ST23), based on the rotation amount of the servo motor (52), it is monitored that the cam plate (641) rotates by the set angle (20 degrees in the present embodiment) from the aforementioned origin. That is, the receiving side reference (400) located at the upstream adjacent portion of the specific bucket wall (41) formed on the receiving conveyor (4) is the relay bucket portion (33) located at the upstream end of the relay device (3) It is monitored that the relay device (3) and the receiving conveyor (4) are traveling at the same speed in a state opposite to (a state of (b) in FIG. 11). Next, when the pushing servo motor (75) is driven and the support frame (60) is advanced to the final position in step (ST24), four articles (a) on the relay device (3) in FIG. ) (a) is accommodated in the receiving compartments (430) and (430) in the receiving bucket portion (43) of the receiving conveyor (4) as indicated by the phantom line (b).
[0058]
Next, in step (ST24), the article pushing claws (69a) (69a) (69b) (69b) are raised, and in step (ST25), the pushing servo motor (75) is reversed and the support frame (60). Is moved back to the initial position, and then the control operation is returned to (ST21). Then, the receiving side bucket portion (43) (43) between the bucket walls (41) (41) is held in the traveling area of the receiving conveyor (4), and the packing box (b 2 ) Portion, two articles (a) (a) packed in one receiving bucket (43) are simultaneously packed in a packaging box (b 2 ).
[0059]
Thus, according to the boxing method of the above-described embodiment, the intermittent bucket conveyor (2) stops at the same speed during both the large boxing operation and the small boxing operation (performs intermittent driving in the same manner). Therefore, the intermittent bucket conveyor (2) can always run at a high speed by operating the servo motor (52) at the capacity limit in both the large boxing operation and the small boxing operation. Therefore, the packaging capacity in the large boxing operation compared to the conventional one, which was necessary to set the traveling speed of the intermittent bucket conveyor (2) during the large boxing operation below the capacity limit of the servo motor (52). Can be increased.
[0060]
In the above embodiment, the operation of packing two articles (a) and (a) (N = 2) is illustrated as a large box packing operation, and one article (a) and (a) is packed (n = 1). Although the operation is illustrated as a small boxing operation, the inside of the receiving bucket portion (43) is divided into four receiving side compartments (430) and (430) equal to the number N of large box packings. Boxing operation) and the item (a) with the number of small boxes (n is excluded from the large box number N) of “one” or “two”, which is the “four” as the large box number N (b 1 The small boxing operation (small boxing operation) for boxing may be alternatively executed. In this case, one or two receiving side compartments (430) equal to the number n of small boxes packed from the receiving side compartment (430) of the receiving side reference (400) located at the most upstream part in the receiving bucket part (43). Transfer one or two articles (a) (a) from the relay bucket section (33) (33) of the relay device (3) to the initial position as described above. The articles (a) and (a) in the remaining relay buckets (33) and (33) are moved to the new receiving compartments (430) and (430).
[0061]
In the above embodiment, the traveling speed of the relay device (3) can be set by the speed adjusting mechanism (64) including the combination of the cam plate (641) and the swing lever (643). The relay device (3) may be reciprocated by a servo motor or a general-purpose motor provided separately from the above), and the speed of the relay device (3) may be controlled by the motor. When a general-purpose motor is used, it is necessary to incorporate an encoder for judging the rotation amount and rotation speed of the motor.
[0062]
A general-purpose motor may be used instead of the servo motor (52). In this case, the rotation amount and rotation speed of the general-purpose motor are determined by an encoder that is separately easily provided.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is an operation explanatory diagram in the case of packing one article (a) (a) with a boxing device illustrating an embodiment of the present invention, and the article (a) (a) on an intermittent bucket conveyor (2). Before moving to the relay device (3)
FIG. 2 is an operation explanatory diagram when one article (a) (a) is packed by a boxing device illustrating an embodiment of the present invention, in which the relay device (3) is downstream in the traveling direction of the receiving conveyor (4). Illustration of traveling to the side
FIG. 3 is an operation explanatory diagram in the case of packing one article (a) (a) with the boxing device illustrating the embodiment of the present invention, and receiving two articles (a) (a) from FIG. 2; Illustration of the relay device (3) retracted to the initial position after being transferred to the conveyor (4)
FIG. 4 is an operation explanatory diagram when one article (a) (a) is packed by the boxing device illustrating the embodiment of the present invention, and the relay device (3) receives the conveyor (4 The figure of the state which is drive | working in the downstream of the running direction of).
FIG. 5 is a partially cutaway front view of a boxing apparatus illustrating an embodiment of the present invention.
FIG. 6 is a plan view of a part of the boxing apparatus illustrating the embodiment of the present invention.
FIG. 7 is a partially cutaway side view of a boxing apparatus illustrating an embodiment of the present invention.
FIG. 8 is a plan view of an arrangement portion of the article extrusion plate (68a) and the article extrusion plate (68b).
FIG. 9 is a flowchart for control when performing a single packing operation in the boxing device according to the embodiment of the present invention.
FIG. 10 is a flowchart for control when performing a two-packing operation in the boxing device according to the embodiment of the present invention.
FIG. 11 is an explanatory diagram of a conventional example.
FIG. 12 is an explanatory diagram of a conventional example.
[Explanation of symbols]
(2) ... Intermittent bucket conveyor (3) ... Relay device
(4) ... Receiving conveyor (6) ... Transfer device
(8) ... Box holding means (23) ... Supply bucket
(33) ・ ・ ・ Relay bucket part (43) ・ ・ ・ Receiving bucket part
(400) ・ ・ ・ Receiving side standard (430) ・ ・ ・ Receiving side compartment
(a) ... articles (G) ... relay bucket group
(S) ... Packing quantity selection means
Claims (4)
前記間欠バケットコンベヤ(2)の走行方向の側方でこれと平行に往復移動し且つ前記各供給バケット部(23)(23)と同一ピッチで配列された大箱詰め数Nの整数倍の中継バケット部(33)(33)を上面に備えた中継装置(3)と、
前記各中継バケット部(33)(33)と同一ピッチで配列された前記大箱詰め数Nの受取側区画室(430)(430)に内部が区画されている複数の受け取りバケット部(43)(43)が外周に配列され且つ前記中継装置(3) に対して前記間欠バケットコンベヤ(2)の反対側でこれと平行に連続走行する受け取りコンベヤ(4)と、
前記受け取りコンベヤ(4)の走行域の側方の箱詰め位置にサイズの異なる包装箱たる大箱又は小箱を保持する箱保持手段(8) と、
互いに停止状態で対向している前記供給バケット部(23)(23)から前記中継バケット部(33)(33)に物品(a)(a)を移し替えると共に、同速で走行している状態で対向する前記中継バケット部(33)から前記受け取りバケット(43)に物品を移し替える移し替え装置(6)と、
前記受け取りバケット部(43)内に配列された前記大箱詰め数Nの前記受取側区画室(430)(430)内に各別に収容された全ての物品(a)(a)を前記大箱に箱詰めする大箱詰め作業と、前記受け取りバケット部(43)内に配列され且つ前記大箱詰め数Nの整商たる小箱詰め数nの受取側区画室(430)(430)に収容された物品(a)(a) を前記小箱に箱詰めする小箱詰め作業を択一的に選択する包装量選択手段(S)と、を具備する箱詰め装置を用いた箱詰め方法であって、
前記包装量選択手段(S)で大箱詰め作業が選択された場合は、前記間欠バケットコンベヤ(2)から全ての前記中継バケット部(33)(33)に物品(a)(a)を同時に移し替えると共に前記全ての中継バケット部(33)(33)内の物品(a)(a)を前記受け取りバケット部(43)内の全ての前記受取側区画室(430)(430)に移し替える、物品の箱詰め方法において、
前記受け取りバケット部(43)内に配列された前記受取側区画室(430)(430)から選ばれた特定の受取側区画室(430)を受取側基準(400)とすると共に、前記中継装置(3)上に配列された前記中継バケット部(33)(33)群を前記小箱詰め数nと同数の中継バケット部(33)を具備するグループに分けて中継バケットグループ(G)を形成し、
前記包装量選択手段(S)で小箱詰め作業が選択された場合は、
前記間欠バケットコンベヤ(2)の各供給バケット部(23)(23)から前記中継装置(3)の全ての前記中継バケット部(33)(33)に物品(a)(a)を同時に移し替える第1移し替え工程と、
前記中継バケットグループ(G)を構成する小箱詰め数nの中継バケット部(33)が前記受け取りバケット部(43)の前記受取側基準(400)の受取側区画室(430)を含む小箱詰め数nの受取側区画室(430)に同速度で走行しながら対向したときに該対向した各中継バケット部(33)内の物品(a)を前記対向した各小箱詰め数nの受取側区画室(430)に各別に移し替える第2移し替え工程と、
前記第2移し替え工程実行前の初期位置方向に前記中継装置(3)を復帰移動させると共に、前記第2移し替え工程で空になった前記中継バケットグループ(G)に続く他の中継バケットグループ(G)を構成する小箱詰め数nの中継バケット部(33)が前記受け取りコンベヤ(4)に移し替えられた最上流部の物品(a)の更に上流側に位置する前記受取側基準(400)の受取側区画室(430)を含む小箱詰め数nの受取側区画室(430)に対向するように前記中継装置(3)の位置を調節する復帰移動工程と、
前記復帰移動工程の実行によって前記受取側基準(400)の受取側区画室(430)を含む小箱詰め数nの受取側区画室(430)に対向した各中継バケット部(33)内の物品(a)を前記対向した各受取側区画室(430)に移し替える第3移し替え工程と、を順次実行する物品の箱詰め方法。An intermittent bucket conveyor (2) in which a plurality of supply bucket parts (23) and (23) for conveying articles in a placed state are arranged at a constant pitch on the outer periphery and intermittently travel,
Relay buckets that are reciprocally moved in parallel to the side of the intermittent bucket conveyor (2) in the running direction and that are an integral multiple of the number of large boxes N that are arranged at the same pitch as the supply buckets (23) and (23). Relay device (3) provided on the top surface with parts (33) and (33),
A plurality of receiving bucket portions (43) (43) (inside) are partitioned into the receiving side compartments (430) (430) of the large box packing number N arranged at the same pitch as each of the relay bucket portions (33) (33). Receiving conveyor (4) arranged on the outer periphery and continuously running in parallel with the relay device (3) on the opposite side of the intermittent bucket conveyor (2);
A box holding means (8) for holding a large box or a small box as packaging boxes of different sizes at the boxing position on the side of the traveling area of the receiving conveyor (4);
A state in which the articles (a) and (a) are transferred from the supply bucket portions (23) and (23) facing each other in a stopped state to the relay bucket portions (33) and (33) and traveling at the same speed. A transfer device (6) for transferring an article from the relay bucket portion (33) opposed to the receiving bucket (43),
All the articles (a) and (a) individually accommodated in the receiving compartments (430) and (430) with the number of large boxes N arranged in the receiving bucket part (43) are stored in the large box. Large boxing operation for packing, and articles (a) arranged in the receiving bucket section (43) and accommodated in the receiving side compartments (430) and (430) of the small box packing number n that is the final number of the large box packing number N ) (a) is a packaging method using a packaging apparatus comprising a packaging amount selection means (S) for alternatively selecting a small boxing operation for packing the small box,
When a large boxing operation is selected by the packaging amount selection means (S), the articles (a) and (a) are simultaneously transferred from the intermittent bucket conveyor (2) to all the relay bucket portions (33) and (33). And changing the articles (a) (a) in all the relay bucket parts (33) (33) to all the receiving compartments (430) (430) in the receiving bucket part (43), In the boxing method of goods,
A specific receiving-side compartment (430) selected from the receiving-side compartments (430) (430) arranged in the receiving bucket section (43) is used as a receiving-side reference (400), and the relay device (3) The relay bucket group (G) is formed by dividing the group of relay buckets (33) and (33) arranged above into groups having the same number of relay buckets (33) as the number of small boxes n. ,
When a small boxing operation is selected by the packaging amount selection means (S),
The articles (a) and (a) are simultaneously transferred from the supply bucket portions (23) and (23) of the intermittent bucket conveyor (2) to all the relay bucket portions (33) and (33) of the relay device (3). A first transfer step;
The number of small boxes packed in which the relay bucket portion (33) of the small number of packing boxes n constituting the relay bucket group (G) includes the receiving side compartment (430) of the receiving side reference (400) of the receiving bucket portion (43) When facing the n receiving side compartments (430) while traveling at the same speed, the articles (a) in the facing relay bucket portions (33) are placed in the facing n compartments of the facing small boxes. (430) a second transfer process for transferring to each separately;
Other relay bucket groups following the relay bucket group (G) emptied in the second transfer step while returning the relay device (3) to the initial position direction before the execution of the second transfer step The receiving side reference (400) located at the further upstream side of the uppermost article (a) in which the relay bucket part (33) with a small number of small boxes forming (G) is transferred to the receiving conveyor (4). A return movement step of adjusting the position of the relay device (3) so as to oppose the receiving side compartment (430) of the number n of small boxes packed including the receiving side compartment (430) of
Articles in each relay bucket section (33) facing the receiving compartment (430) with a small number of small boxes n including the receiving compartment (430) of the receiving reference (400) by executing the return movement step ( A method for packaging articles, in which a) a third transfer step of transferring a) to each of the opposing receiving compartments (430).
前記大箱詰め数Nが2に設定されている、物品の箱詰め方法。The method of boxing goods according to claim 1.
A packaging method for articles, wherein the large box packing number N is set to 2.
前記受け取りコンベヤ(4)と前記中継装置(3)及び前記間欠バケットコンベヤ(2) は共通のモータで駆動される、物品の箱詰め方法。In the boxing method of the article according to claim 1 or 2,
The boxing method for articles, wherein the receiving conveyor (4), the relay device (3) and the intermittent bucket conveyor (2) are driven by a common motor.
前記受け取りコンベヤ(4)及び前記間欠バケットコンベヤ(2)は共通のモータで駆動され、前記中継装置(3)は前記モータとは別なサーボモータで駆動される、物品の箱詰め方法。In the boxing method of the article according to claim 1 or 2,
The article packing method, wherein the receiving conveyor (4) and the intermittent bucket conveyor (2) are driven by a common motor, and the relay device (3) is driven by a servo motor different from the motor.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25464899A JP4226738B2 (en) | 1999-09-08 | 1999-09-08 | Packaging method for goods |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25464899A JP4226738B2 (en) | 1999-09-08 | 1999-09-08 | Packaging method for goods |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2001072005A JP2001072005A (en) | 2001-03-21 |
| JP4226738B2 true JP4226738B2 (en) | 2009-02-18 |
Family
ID=17267947
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25464899A Expired - Lifetime JP4226738B2 (en) | 1999-09-08 | 1999-09-08 | Packaging method for goods |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4226738B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108529191A (en) * | 2017-03-01 | 2018-09-14 | 东洋自动机株式会社 | Relay |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6930838B2 (en) * | 2017-02-06 | 2021-09-01 | 株式会社オーエム機械 | Variable capacity transfer system |
-
1999
- 1999-09-08 JP JP25464899A patent/JP4226738B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108529191A (en) * | 2017-03-01 | 2018-09-14 | 东洋自动机株式会社 | Relay |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2001072005A (en) | 2001-03-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6141943A (en) | Food article loading head and method | |
| US6907980B2 (en) | Conveyance unit and boxing unit having the same | |
| US6931824B2 (en) | Packaging system | |
| CA1056861A (en) | Transfer mechanism | |
| KR101641881B1 (en) | Packaging processing device for packaging machine | |
| JPH0446804B2 (en) | ||
| EP1278691A1 (en) | Apparatus and a method for collating and cartonning product units | |
| JPH0639703U (en) | Packaging machine | |
| US5511364A (en) | Apparatus for packing products in preformed bags | |
| US7089717B2 (en) | Tray loader | |
| JPH1059303A (en) | Goods packaging equipment | |
| JP4226738B2 (en) | Packaging method for goods | |
| US3109531A (en) | Grouping and crowding machine | |
| JP5509582B2 (en) | Accumulator | |
| JPH07285654A (en) | Collecting carrier device of article | |
| CN112429326A (en) | Multi-manipulator boxing method | |
| JP4728893B2 (en) | Packaging equipment | |
| JP2001163302A (en) | Automatic tray filling apparatus | |
| KR20190056590A (en) | bucket conveyor | |
| JP7809352B2 (en) | Goods supply device | |
| CN214002233U (en) | Multi-manipulator boxing platform | |
| CN214002232U (en) | Multi-manipulator boxing platform | |
| CN112429325B (en) | Multi-manipulator boxing system | |
| CN214002221U (en) | Multi-manipulator boxing system | |
| JP2897881B2 (en) | Sterilizer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060831 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080922 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20081118 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20081127 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111205 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4226738 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121205 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121205 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131205 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |