Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4249084B2 - Excavation soil removal method of muddy water type shield method - Google Patents
[go: Go Back, main page]

JP4249084B2 - Excavation soil removal method of muddy water type shield method - Google Patents

Excavation soil removal method of muddy water type shield method Download PDF

Info

Publication number
JP4249084B2
JP4249084B2 JP2004153177A JP2004153177A JP4249084B2 JP 4249084 B2 JP4249084 B2 JP 4249084B2 JP 2004153177 A JP2004153177 A JP 2004153177A JP 2004153177 A JP2004153177 A JP 2004153177A JP 4249084 B2 JP4249084 B2 JP 4249084B2
Authority
JP
Japan
Prior art keywords
muddy water
tunnel
shield machine
excavated soil
vicinity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004153177A
Other languages
Japanese (ja)
Other versions
JP2005336717A (en
Inventor
克巳 内田
努 中山
啓介 今北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP2004153177A priority Critical patent/JP4249084B2/en
Publication of JP2005336717A publication Critical patent/JP2005336717A/en
Application granted granted Critical
Publication of JP4249084B2 publication Critical patent/JP4249084B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、泥水式シールド工法における掘削土の搬出方法に関する。   The present invention relates to a method for carrying out excavated soil in a muddy water type shield method.

トンネルの切羽全面に対し泥水を充満させた状態でシールド機により掘削する泥水式シールド工法において、当該工事のために工事用地(地上)に設置された泥水処理設備から立坑を通しトンネル内のシールド機まで送泥水管及び排泥水管を配設して、ポンプにより加圧した泥水を切羽面に向けて循環させるようにしている(例えば特許文献1参照)。
特開平10−115180号公報
In the muddy water type shield method that excavates with a shield machine in a state where the entire face of the tunnel is filled with muddy water, the shield machine in the tunnel through the shaft from the muddy water treatment facility installed on the construction site (above ground) for the construction concerned The muddy water pipe and the discharged muddy water pipe are arranged until the muddy water pressurized by the pump is circulated toward the face surface (see, for example, Patent Document 1).
JP-A-10-115180

前述したように従来は、地上に設置した泥水処理設備から立坑を通しトンネル内のシールド機まで送泥水管及び排泥水管を配設しており、泥水処理のための長い配管を必要としていた。
さらに、シールド機による掘削の進行に伴い、送泥用ポンプと排泥用ポンプをトンネル坑内の配管途中に増設し、送排泥水の配管も連続して延伸し、その配管延長に伴う泥水の圧力損失の発生に伴い切羽に送られる泥水の安定性を確保する必要があり、よって、送排泥水の配管内圧力及び流量を制御する必要もあった。
そして、泥水処理設備で分級処理されて残った掘削土をダンプトラックにより残土処分場まで陸上輸送していたことから、交通渋滞や排ガスなど環境に影響を与える心配もあった。
As described above, conventionally, a muddy water pipe and a muddy water pipe are arranged from a muddy water treatment facility installed on the ground to a shield machine in a tunnel through a shaft, and a long pipe for muddy water treatment is required.
In addition, along with the progress of excavation by the shield machine, a mud pump and a mud pump were added in the middle of the tunnel tunnel, and the pipe of the mud was also continuously extended. It is necessary to ensure the stability of the muddy water that is sent to the face as the loss occurs, and therefore it is necessary to control the pressure and flow rate in the piping of the muddy water.
And, since the excavated soil that had been classified by the muddy water treatment facility was transported to the remaining soil disposal site by a dump truck, there was also a concern that it would affect the environment such as traffic congestion and exhaust gas.

本発明の課題は、泥水式シールド工法において、泥水処理のための配管を始めとする諸設備を最小限とし、シールド機の後方近傍で直ぐに泥水を処理して、泥水の輸送効率を向上するとともに、泥水輸送設備を簡略化し、併せてトンネル坑外への掘削土搬出量を削減することである。
さらに、本発明の課題は、地上環境に配慮した掘削土の搬送を実現することである。
The object of the present invention is to improve the efficiency of the muddy water transport process in the muddy water type shield method by minimizing various facilities including pipes for muddy water treatment and immediately treating the muddy water near the rear of the shield machine. It is to simplify the muddy water transport facility and reduce the amount of excavated soil carried out of the tunnel mine.
Furthermore, the subject of this invention is implement | achieving conveyance of excavated soil in consideration of the ground environment.

以上の課題を解決するため、請求項1に記載の発明は、例えば図4に示すように、トンネルの切羽に対し泥水を充満させた状態でシールド機1により掘削する泥水式シールド工法において、トンネル103坑内の前記シールド機1の後方近傍に、前記シールド機1に泥水を供給し、かつ前記シールド機1から掘削土とともに排出される泥水を処理する泥水処理設備10を配置しておく一方、前記シールド機1が発進する立坑101から別のサービストンネル111を河川近傍または海岸近傍まで掘削しておき、トンネル103坑内の前記泥水処理装置10により分級処理されて残った掘削土を前記立坑101に搬出してから前記サービストンネル111を通して前記河川近傍または海岸近傍まで搬出することを特徴とする。 In order to solve the above-mentioned problems, the invention described in claim 1 is directed to a muddy water type shield method for excavating with a shield machine 1 in a state where muddy water is filled in the face of the tunnel as shown in FIG. In the vicinity of the rear of the shield machine 1 in the 103 mine, a muddy water treatment facility 10 for supplying muddy water to the shield machine 1 and treating muddy water discharged together with excavated soil from the shield machine 1 is disposed, Another service tunnel 111 is excavated from the vertical shaft 101 where the shield machine 1 starts to the vicinity of the river or the coast, and the excavated soil left after classification by the muddy water treatment device 10 in the tunnel 103 is transported to the vertical shaft 101. Then, it is carried out to the vicinity of the river or the coast through the service tunnel 111.

このように、シールド機の後方近傍に泥水処理設備を配置したので、泥水処理のための配管を始めとする諸設備はシールド機の後方近傍に延ばすだけの最小限で良い。また、シールド機の後方近傍において、直ぐに泥水を処理できるので、泥水輸送効率が向上するとともに、泥水輸送設備も簡略化できる。
そして、トンネル坑内の泥水処理装置により分級処理されて残った掘削土を立坑へ搬出してからサービストンネルを通して河川近傍または海岸近傍まで搬出するので、掘削土を泥水とともに搬出する場合に比べて、掘削土搬出量を削減できる上、掘削土の陸上輸送を廃したことから、地上環境に影響を及ぼす心配もない。
As described above, since the muddy water treatment facility is disposed in the vicinity of the rear of the shield machine, various facilities such as pipes for muddy water treatment are minimally required to extend near the rear of the shield machine. Further, since the muddy water can be immediately processed in the vicinity of the rear of the shield machine, the muddy water transport efficiency is improved and the muddy water transport facility can be simplified.
And since the excavated soil left after the classification treatment by the muddy water treatment device in the tunnel mine is carried out to the shaft or through the service tunnel to the vicinity of the river or the coast, the excavated soil is excavated as compared with the case of carrying out the mud with mud. In addition to reducing the amount of soil transported, ground transportation of excavated soil has been abolished, so there is no concern about the impact on the ground environment.

請求項2に記載の発明は、請求項に記載の泥水式シールド工法の掘削土搬出方法であって、例えば図4に示すように、前記河川近傍または海岸近傍に搬出された掘削土を船舶113により残土処分場まで水上輸送することを特徴とする。 The invention according to claim 2 is a method for carrying out excavated soil of the muddy water type shield construction method according to claim 1 , for example, as shown in FIG. It is characterized by being transported by water to 113 to a remaining soil disposal site.

このように、立坑からサービストンネルを通して河川近傍または海岸近傍に搬出された掘削土を船舶により残土処分場まで水上輸送することで、大量の掘削土を効率良く残土処分場まで輸送できる。   In this way, a large amount of excavated soil can be efficiently transported to the residual soil disposal site by transporting the excavated soil transported from the shaft through the service tunnel to the vicinity of the river or the coast to the residual soil disposal site by a ship.

請求項1に記載の発明によれば、シールド機の後方近傍に泥水処理設備を配置したため、泥水処理のための配管を始めとする諸設備はシールド機の後方近傍に延ばすだけの最小限で足りるとともに、シールド機の後方近傍において、直ぐに泥水を処理できることから、泥水輸送効率の向上並びに泥水輸送設備の簡略化も達成できる。
そして、トンネル坑内の泥水処理装置により分級処理されて残った掘削土を立坑へ搬出してからサービストンネルを通して河川近傍または海岸近傍まで搬出することによって、掘削土を泥水とともに搬出する場合に比べて、掘削土搬出量を削減できる上、掘削土の陸上輸送を廃したことから、地上環境に影響を及ぼす心配もないといった利点が得られる。
According to the first aspect of the present invention, since the muddy water treatment facility is disposed in the vicinity of the rear of the shield machine, various facilities including the pipe for muddy water treatment are sufficient to extend to the vicinity of the rear of the shield machine. In addition, since the muddy water can be treated immediately in the vicinity of the rear of the shield machine, the muddy water transport efficiency can be improved and the muddy water transport facility can be simplified.
And, compared with the case where the excavated soil is carried out together with the mud by carrying out the remaining excavated soil classified by the mud treatment device in the tunnel mine to the shaft or the vicinity of the river through the service tunnel, In addition to reducing the amount of excavated soil carried out, the ground transportation of excavated soil has been abolished, so there is an advantage that there is no fear of affecting the ground environment.

請求項2に記載の発明によれば、請求項1に記載の発明により得られる効果に加えて、立坑からサービストンネルを通して河川近傍または海岸近傍に搬出された掘削土を船舶により残土処分場まで水上輸送することによって、大量の掘削土を効率良く残土処分場まで輸送できるといった利点が得られる。 According to the second aspect of the present invention, in addition to the effect obtained by the first aspect of the invention, the excavated soil carried from the shaft through the service tunnel to the vicinity of the river or the coast is moved to the remaining soil disposal site by the ship. By transporting, there is an advantage that a large amount of excavated soil can be efficiently transported to the remaining soil disposal site.

以下、図を参照して本発明を実施するための最良の形態を詳細に説明する。
本発明を適用した一実施形態の構成を示す図1及び図2において、1はシールド機、2はセグメント供給受台車(後方台車)、3はコントロールルーム、4はセグメント台車、5は牽引車両、6は流体輸送台車、7は1次処理台車、8は2次処理台車、9はホイスト、10は泥水処理プラント、11は牽引トラス(桟橋、ホイストビーム)、21は1次処理ライン、31は2次処理ラインである。
Hereinafter, the best mode for carrying out the present invention will be described in detail with reference to the drawings.
1 and 2 showing the configuration of an embodiment to which the present invention is applied, 1 is a shield machine, 2 is a segment supply carriage (rear carriage), 3 is a control room, 4 is a segment carriage, 5 is a towing vehicle, 6 is a fluid transport carriage, 7 is a primary treatment carriage, 8 is a secondary treatment carriage, 9 is a hoist, 10 is a muddy water treatment plant, 11 is a tow truss (pier, hoist beam), 21 is a primary treatment line, 31 is It is a secondary processing line.

図示のように、大断面のトンネルを掘削するシールド機1の直後に配置されてシールド機1により牽引されるセグメント供給受台車2の上部にコントロールルーム3が設けられている。セグメント供給受台車2には、図示例では、3両連結のセグメント台車4に搭載されたセグメントが後述するようにして供給される。なお、セグメント台車4の前後に牽引車両5が連結されている。
そして、シールド機1の後方近傍、すなわち、セグメント供給受台車2の後方近傍には、図示例では、3両連結の台車6・7・8が配置されており、その3両連結の台車6・7・8に泥水処理プラント10が搭載されている。
As shown in the figure, a control room 3 is provided at the upper part of a segment supply receiving carriage 2 that is arranged immediately after the shield machine 1 excavating a large-section tunnel and is pulled by the shield machine 1. In the example shown in the drawing, the segments mounted on the segment carriage 4 connected to each other are supplied to the segment supply receiving carriage 2 as described later. A towing vehicle 5 is connected to the front and rear of the segment cart 4.
In the example shown in the drawing, in the vicinity of the rear of the shield machine 1, that is, in the vicinity of the rear of the segment supply carriage 2, three-carriage trucks 6, 7, and 8 are arranged. A muddy water treatment plant 10 is installed at 7.8.

泥水処理プラント10を搭載する台車6・7・8は、一両目の台車6が、図示のような牽引トラス11を介してセグメント供給受台車2に連結されており、シールドトンネル底部に施工された床版上を移動する。なお、台車6・7・8は、牽引車両5の牽引により同じく床版上を移動するセグメント台車4が通過できるようほぼ門形のものである。
また、牽引トラス11は、桟橋を兼ねるとともに、ホイストビームを装備している。
なお、牽引トラス11の上部にはセグメント輸送のコンベア設備を設けることができ、その両端にセグメント専用のエレベータを設けることにより、ホイストを使用しない方式でセグメント供給を提供できる。
The carts 6, 7, 8 equipped with the muddy water treatment plant 10 are constructed at the bottom of the shield tunnel, with the first cart 6 being connected to the segment supply cart 2 via a traction truss 11 as shown in the figure. Move on the floor slab. The carts 6, 7, and 8 are substantially gate-shaped so that the segment cart 4 that also moves on the floor slab can be passed by towing the towing vehicle 5.
The tow truss 11 also serves as a pier and is equipped with a hoist beam.
In addition, the segment transportation conveyor equipment can be provided in the upper part of the traction truss 11, and the segment supply can be provided in a manner not using a hoist by providing the segment dedicated elevators at both ends thereof.

ホイスト9は、床版上を移動してほぼ門形の台車6・7・8を通過してその前方に停止したセグメント台車4上からセグメントを吊り上げて、ホイストビーム(牽引トラス;桟橋)11に沿って移動することによりセグメント供給受台車2に載せるものである。セグメント供給受台車2に載せたセグメントは、図示しないセグメント供給装置によりシールド機1内のエレクターにより組立てられて、これにより覆工が行われる。
また、ホイスト9は、セグメント台車4(または図略のカルバート台車)上からプレキャストボックスカルバートを吊り上げて図示のようにシールドトンネル底部にセットすることもできる。
The hoist 9 moves on the floor slab, passes through the gate-shaped carts 6, 7, 8 and stops in front of the segment cart 4, and lifts the segment to the hoist beam 11 It moves on the segment supply receiving cart 2 by moving along. The segments placed on the segment supply receiving carriage 2 are assembled by an erector in the shield machine 1 by a segment supply device (not shown), and thereby lining is performed.
The hoist 9 can also be set at the bottom of the shield tunnel as shown by lifting a precast box culvert from the segment cart 4 (or a culvert cart not shown).

泥水処理プラント10は、図2に示すように、1両目の流体輸送台車6に搭載した送泥水ポンプ(送泥水サンドポンプ)12及び調整槽14と、2両目の1次処理ライン台車7に搭載した2次処理ライン21と、3両目の2次処理ライン台車8に搭載した2次処理ライン31等により構成される。
1次処理ライン21は、ローヘッドスクリーン22、サンドセパレータ24、泥水受槽25、スラリー槽26等により構成される。2次処理ライン31は、フィルタープレス32、プレスポンプ33、濁水処理装置34等により構成される。以上の機器は、ほぼ門形をなす台車6・7・8の左右に分けてそれぞれ搭載されている。
As shown in FIG. 2, the muddy water treatment plant 10 is mounted on the first muddy water pump (mud water sand pump) 12 and the adjustment tank 14 mounted on the first fluid transport carriage 6, and on the second primary treatment line truck 7. The secondary processing line 21 and the secondary processing line 31 mounted on the third secondary processing line carriage 8 are configured.
The primary processing line 21 includes a low head screen 22, a sand separator 24, a muddy water receiving tank 25, a slurry tank 26, and the like. The secondary treatment line 31 includes a filter press 32, a press pump 33, a muddy water treatment device 34, and the like. The above devices are mounted separately on the left and right sides of the carts 6, 7 and 8 having a substantially gate shape.

そして、送泥水ポンプ12とシールド機1とをつなぐ送泥水管13が設けられるとともに、ローヘッドスクリーン22とシールド機1とをつなぐ排泥水管23が設けられている。
また、2次処理ライン台車8には排土ベルトコンベア35が搭載されていて、その後方には坑内ベルトコンベア36が連続して設けられている。
A muddy water pipe 13 that connects the muddy water pump 12 and the shield machine 1 is provided, and a muddy water pipe 23 that connects the low head screen 22 and the shield machine 1 is provided.
Moreover, the earth removal belt conveyor 35 is mounted in the secondary processing line trolley | bogie 8, and the underground belt conveyor 36 is continuously provided in the back.

以上の泥水処理プラント10において、シールド機1から排出された泥水は、排泥水管23を通りローヘッドスクリーン22を経て泥水受槽25に溜められ、図3に示したように、通常の水中サンドポンプによるサイクロンポンプ27によりサイクロン28を経てサンドセパレータ24に送られ、1次処理として排泥水から砂が除去される。
ここで、ローヘッドスクリーン22は、排泥水に含まれる大きな礫・固結シルトを泥水から分離する。このローヘッドスクリーン22により大きな礫・固結シルトが分離された泥水が泥水受槽25に溜められる。
サイクロンポンプ27は、泥水受槽25中の泥水をサイクロン28へ送水する。
サイクロン28は、サンドセパレータ24の上部に設置され、泥水にサイクロン(渦流)を発生させて、比重差を利用し砂・粘土水を分離する。このサイクロンで分離された砂がサンドセパレータ24に落下し、粘土水(余泥水)がスラリー槽26に送られる。
サンドセパレータ24は、砂粒子に付着している水分を脱水することを目的とする振動式の篩い装置である。このサンドセパレータ24により脱水された砂が取り出され、水分は泥水受槽25に落下する。
In the muddy water treatment plant 10 described above, the muddy water discharged from the shield machine 1 passes through the muddy water pipe 23 and is stored in the muddy water receiving tank 25 through the low head screen 22, and as shown in FIG. A cyclone pump 27 passes the cyclone 28 to the sand separator 24, and sand is removed from the discharged mud water as a primary treatment.
Here, the low head screen 22 separates large gravel / consolidated silt contained in the drained muddy water from the muddy water. The muddy water from which large gravel and consolidated silt are separated by the low head screen 22 is stored in the muddy water receiving tank 25.
The cyclone pump 27 feeds the muddy water in the muddy water receiving tank 25 to the cyclone 28.
The cyclone 28 is installed in the upper part of the sand separator 24, generates a cyclone (vortex) in the muddy water, and separates sand / clay water using a specific gravity difference. The sand separated by the cyclone falls on the sand separator 24, and clay water (sludge water) is sent to the slurry tank 26.
The sand separator 24 is a vibration type sieving device for the purpose of dehydrating water adhering to the sand particles. The dehydrated sand is taken out by the sand separator 24 and the water falls into the muddy water receiving tank 25.

そして、スラリー槽26、調整槽14を経て送泥水ポンプ12により送泥水管13を通ってシールド機1に泥水が供給される一方、2次・3次処理水槽等の濁水処理槽34で処理される。また、濁水処理槽34で処理後の泥水がフィルタープレス33に送られる。
こうして泥水式シールド掘進を行うシールド機1直後のセグメント供給受台車2の後方近傍において、シールドトンネル内に移動式の泥水処理設備を配置構成する。
Then, the muddy water is supplied to the shield machine 1 through the slurry tank 26 and the adjusting tank 14 through the muddy water pump 13 through the muddy water pump 13, while being processed in a muddy water treatment tank 34 such as a secondary / tertiary treated water tank. The Further, the muddy water treated in the muddy water treatment tank 34 is sent to the filter press 33.
Thus, in the vicinity of the rear of the segment supply carriage 2 immediately after the shield machine 1 that performs the muddy water shield excavation, a mobile muddy water treatment facility is arranged and configured in the shield tunnel.

以上のように、シールド機1直後のセグメント供給受台車2の後方近傍に泥水処理プラント10が位置しているため、台車6・7・8に搭載した泥水処理プラント10による泥水処理のための配管(送泥水管13及び排泥水管23)はシールド機1直後からセグメント供給受台車2の後方近傍の泥水処理プラント10に延ばすだけの最小限の長さで足りるものとなる。しかも、シールド機1に牽引されることにより、配管長さも変わらず、延長や中継ポンプの設置も必要としない。
そして、このようなシールド機1直後のセグメント供給受台車2の後方近傍において、移動式の泥水処理プラント10により直ぐに泥水を処理でき、泥水輸送効率を向上できる。しかも、処理後の泥水をシールド機1に最短で戻すことができる。従って、泥水輸送設備も簡略化できる。
As described above, since the muddy water treatment plant 10 is located in the vicinity of the rear of the segment supply cart 2 immediately after the shield machine 1, piping for muddy water treatment by the muddy water treatment plant 10 mounted on the carts 6, 7, 8. (The muddy water pipe 13 and the discharged muddy water pipe 23) need only have a minimum length that extends from immediately after the shield machine 1 to the muddy water treatment plant 10 in the vicinity of the rear of the segment supply carriage 2. Moreover, by being pulled by the shield machine 1, the pipe length does not change, and no extension or installation of a relay pump is required.
Then, in the vicinity of the rear of the segment supply receiving carriage 2 immediately after the shield machine 1, muddy water can be immediately treated by the mobile muddy water treatment plant 10, and muddy water transport efficiency can be improved. Moreover, the treated muddy water can be returned to the shield machine 1 in the shortest time. Therefore, the muddy water transport facility can be simplified.

また、泥水処理プラント10による処理土は、一部がトンネル坑内に構築される構造物の隙間、実施形態ではインバート104の隙間に充填されて、残りがトンネル坑外へ排出される。すなわち、1次処理ライン21で1次分級処理された砂と、2次処理ライン31で2次分級処理された粘土は、一部が図示例ではプレキャストボックスカルバートの両側方に充填されて、残りが排土ベルトコンベア35から坑内ベルトコンベア36により坑外へ排出される。従って、掘削土を有効利用できるとともに、トンネル坑外への土砂排出量を削減できる。   In addition, the soil treated by the muddy water treatment plant 10 is partially filled in a gap between structures built in the tunnel mine, in the embodiment, a gap in the invert 104, and the rest is discharged outside the tunnel mine. That is, the sand subjected to the primary classification treatment in the primary treatment line 21 and the clay subjected to the secondary classification treatment in the secondary treatment line 31 are partially filled on both sides of the precast box culvert in the illustrated example, and the remaining Is discharged from the earth discharging belt conveyor 35 to the outside by the underground belt conveyor 36. Therefore, the excavated soil can be used effectively, and the amount of sediment discharged outside the tunnel mine can be reduced.

図4は本発明が適用される大深度シールドトンネル施工システムを示すもので、低土被りからの斜め発進A、掘削土の坑内処理B、インバートの同時施工C、セグメントの現地製作D、タイヤ式運搬車両による資機材搬送E、サービストンネルの活用F、バージ積み出し・船舶輸送Gまでのシステム全体を示している。
この図3において、101は立坑、102は斜坑、103はシールドトンネル、104はインバート、105はセグメント工場、106は大気浄化装置、107は換気ファン、108は換気配管、109は建屋、110はセグメント搬送トラック、111はサービストンネル、112は資材運搬車、113は土運船である。
FIG. 4 shows a deep shield tunnel construction system to which the present invention is applied, oblique start A from a low earth covering, underground processing B of excavated soil, simultaneous construction C of invert, local production D of a segment, tire type It shows the entire system from material / equipment transportation E by transport vehicles, service tunnel utilization F, barge loading / ship transportation G.
In FIG. 3, 101 is a vertical shaft, 102 is a tilt shaft, 103 is a shield tunnel, 104 is an invert, 105 is a segment factory, 106 is an air purification device, 107 is a ventilation fan, 108 is a ventilation pipe, 109 is a building, and 110 is a segment A transport truck, 111 is a service tunnel, 112 is a material transporter, and 113 is an earth transport ship.

先ず、シールド発進は、図示のように、浅い立坑101において、低土被りからの斜め発進Aによる斜坑102を含んでシールドトンネル103を施工する。このように浅い立坑101から低土被りによる斜め発進Aとすることで、周辺環境への配慮とともにコスト縮減を図っている。
そして、前述したように、掘削土の坑内処理Bを行うことで、泥水輸送設備の簡略化とともに地上工事用地の最小化を図っている。さらに、インバート104の同時施工Cを行うことで、施工全体の高速化とともに掘削土の有効利用を図っている。
First, as shown in the drawing, the shield tunnel 103 is constructed in a shallow shaft 101 including a tilt shaft 102 by a diagonal start A from a low earth covering. In this way, by making the diagonal start A by the low earth covering from the shallow shaft 101, cost reduction as well as consideration for the surrounding environment is achieved.
And as mentioned above, by performing the underground processing B of excavated soil, simplification of the muddy water transport facility and minimization of the ground work site are achieved. Furthermore, the simultaneous construction C of the invert 104 is performed, so that the entire construction is speeded up and the excavated soil is effectively used.

他方、地上においては、立坑101の周辺にセグメント工場105が設置されている。こうして、セグメントの現地製作Dを行って、コスト縮減とともに環境負荷低減を図っている。
また、立坑101の地上開口部に大気浄化装置106が設置されている。この大気浄化装置106は、トンネル坑内に配される換気ファン107を先端に有する換気配管108を備えており、立坑101の地上開口部を高所まで覆う囲い状の建屋109の煙突109aから浄化処理空気が排気されるようになっている。こうして、坑内環境の改善とともに周辺環境への負荷低減を図っている。
On the other hand, a segment factory 105 is installed around the shaft 101 on the ground. In this way, the local production D of the segment is performed to reduce the environmental load as well as cost reduction.
An air purification device 106 is installed at the ground opening of the shaft 101. This air purification device 106 includes a ventilation pipe 108 having a ventilation fan 107 disposed at the tip of a tunnel mine, and a purification treatment from a chimney 109a of an enclosure 109 that covers the ground opening of the vertical shaft 101 to a high place. Air is exhausted. Thus, the load on the surrounding environment is reduced along with the improvement of the underground mine environment.

ここで、立坑101周辺のセグメント工場105で製作されたセグメントは、立坑101からセグメント搬送トラック110によっても行われる。すなわち、前述した牽引車両5及びセグメント台車4とともにセグメント搬送トラック110によるいずれもタイヤ式運搬車両による資機材搬送Eが行われる。こうして、坑内設備の簡略化を図るとともに、大断面施工で特に有効な資機材搬送を図っている。
そして、斜坑102には、前述した坑内ベルトコンベア36に連続して延伸ベルトコンベア37・38が設けられている。
このように、シールドトンネル103坑内の泥水処理プラント10から立坑101までまで設ける延伸ベルトコンベア36・37・38によって、トンネル掘削施工の効率化を図るとともに、長距離施工で有効な掘削土搬出方式となっている。
Here, the segment manufactured in the segment factory 105 around the shaft 101 is also performed by the segment conveyance truck 110 from the shaft 101. In other words, both the towing vehicle 5 and the segment cart 4 described above and the segment transport truck 110 perform the material / material transport E by the tire transport vehicle. In this way, while aiming at simplification of the underground facilities, it is aiming at conveying materials and equipment that are particularly effective in large-section construction.
The inclined shaft 102 is provided with stretch belt conveyors 37 and 38 continuously to the above-described underground belt conveyor 36.
In this way, the stretching belt conveyors 36, 37, and 38 provided from the muddy water treatment plant 10 to the vertical shaft 101 in the shield tunnel 103 are used to increase the efficiency of tunnel excavation work and to excavate soil that is effective for long-distance construction. It has become.

次に、立坑101から河川の河口や海岸口までサービストンネル111を掘削しておく。このサービストンネル111には、斜坑102の延伸ベルトコンベア38に連続する延伸ベルトコンベア39を設けておく。こうして、サービストンネル111を利用して、掘削土を排出する。さらに、サービストンネル111には資材運搬車112を通行させる。
このように、サービストンネル111を活用Fして、周辺環境への配慮とともに掘削土搬出の効率化を図っている。
Next, the service tunnel 111 is excavated from the shaft 101 to the river mouth and the coast. The service tunnel 111 is provided with a stretching belt conveyor 39 that is continuous with the stretching belt conveyor 38 of the inclined shaft 102. Thus, the excavated soil is discharged using the service tunnel 111. Further, the material transport vehicle 112 is caused to pass through the service tunnel 111.
In this way, the service tunnel 111 is utilized to improve the efficiency of carrying out excavated soil while considering the surrounding environment.

そして、サービストンネル111の延伸ベルトコンベア39から排出される掘削土は、土運船113に積んで埋立地(残土処分場)に水上(海上)輸送される。
このバージ積み出し・船舶輸送Gによって、周辺環境への配慮とともに残土処理の効率化を図っている。
Then, the excavated soil discharged from the extending belt conveyor 39 of the service tunnel 111 is loaded on the earth ship 113 and transported to the landfill (residual land disposal site) on the water (sea).
By this barge loading and ship transportation G, consideration is given to the surrounding environment and the efficiency of the remaining soil treatment is improved.

以上のような大深度シールドトンネル施工システムにより、立坑基地は泥水処理設備と残土搬出のための敷地(ヤード)がなくなり、従来の大規模立坑に代えてシールド機発進のための小規模の浅い立坑で済み、このため、建築工事に必要な地上の作業用地が小さくて良く、例えば市街地の用地確保の問題が軽減される。   Due to the above-described deep shield tunnel construction system, the shaft base has no muddy water treatment facilities and a site (yard) for carrying out residual soil, and instead of the conventional large-scale shaft, a small shallow shaft for starting shield machines For this reason, the work area on the ground necessary for the construction work may be small, and for example, the problem of securing the land in the urban area is reduced.

なお、以上の実施形態においては、三両の台車に分けて搭載した泥水処理プラントとしたが、本発明はこれに限定されるものではなく、具体的な台車の編成やプラントの構成は他の構成であっても良い。
また、実施形態では泥水処理プラントによる処理土をインバートの隙間に充填したが、インバートに限らずトンネル坑内に構築される他の構造物の隙間に充填しても良い。
さらに、その他、具体的な細部構造等についても適宜に変更可能であることは勿論である。
In the above embodiment, the muddy water treatment plant is divided and mounted on three carriages, but the present invention is not limited to this, and the specific arrangement of the carriage and the configuration of the plant are not limited thereto. It may be a configuration.
Further, in the embodiment, the soil treated by the muddy water treatment plant is filled in the gap of the invert, but the gap is not limited to the invert but may be filled in a gap of another structure constructed in the tunnel mine.
Furthermore, it is needless to say that other specific detailed structures can be appropriately changed.

本発明を適用した一実施形態の構成を示すもので、シールド機及び泥水処理設備を示した概略斜視図である。1 is a schematic perspective view showing a configuration of an embodiment to which the present invention is applied, showing a shield machine and a muddy water treatment facility. 同じく概略側面図である。It is a schematic side view similarly. 1次処理のフローを示した図である。It is the figure which showed the flow of the primary process. 本発明が適用される大深度シールドトンネル施工システムを示すもので、低土被りからの斜め発進A、掘削土の坑内処理B、インバートの同時施工C、セグメントの現地製作D、タイヤ式運搬車両による資機材搬送E、サービストンネルの活用F、バージ積み出し・船舶輸送Gまでのシステム全体を示した概要図である。1 shows a deep shield tunnel construction system to which the present invention is applied, oblique start A from low earth covering, underground treatment B of excavated soil, simultaneous construction C of invert, local production D of segment, tire type transport vehicle It is the outline figure which showed the whole system to material equipment conveyance E, utilization F of service tunnel, barge unloading, and ship transportation G.

符号の説明Explanation of symbols

1 シールド機
2 セグメント供給受台車(後方台車)
3 コントロールルーム
4 セグメント台車
5 牽引車両
6 流体輸送台車
7 1次処理ライン台車
8 2次処理ライン台車
9 ホイスト
10 泥水処理プラント
11 牽引トラス(桟橋、ホイストビーム)
12 送泥水ポンプ
13 送泥水管
14 調整槽
21 1次処理ライン
22 ローヘッドスクリーン
23 排泥水管
24 サンドセパレータ
25 泥水受槽
26 スラリー槽
27 サイクロンポンプ
28 サイクロン
31 2次処理ライン
32 フィルタープレス
33 プレスポンプ
34 濁水処理装置
35 排土ベルトコンベア
36 坑内ベルトコンベア
37・38・39 延伸ベルトコンベア
101 立坑
102 斜坑
103 シールドトンネル
104 インバート
105 セグメント工場
106 大気浄化装置
107 換気ファン
108 換気配管
109 建屋
110 セグメント搬送トラック
111 サービストンネル
112 資材運搬車
113 土運船(船舶)
1 Shield machine 2 Segment supply trolley (rear trolley)
3 Control room 4 Segment bogie 5 Towing vehicle 6 Fluid transport bogie 7 Primary treatment line bogie 8 Secondary treatment line bogie 9 Hoist 10 Mud treatment plant 11 Traction truss (pier, hoist beam)
12 Muddy water pump 13 Muddy water pipe 14 Adjustment tank 21 Primary treatment line 22 Low head screen 23 Drainage water pipe 24 Sand separator 25 Muddy water receiving tank 26 Slurry tank 27 Cyclone pump 28 Cyclone 31 Secondary treatment line 32 Filter press 33 Press pump 34 Muddy water Processing device 35 Earth removal belt conveyor 36 Underground belt conveyor 37/38/39 Stretch belt conveyor 101 Vertical shaft 102 Slope shaft 103 Shield tunnel 104 Invert 105 Segment factory 106 Air purification device 107 Ventilation fan 108 Ventilation piping 109 Building 110 Segment transport truck 111 Service tunnel 112 Material Handling Vehicle 113 Earth Cargo (Ship)

Claims (2)

トンネルの切羽に対し泥水を充満させた状態でシールド機により掘削する泥水式シールド工法において、
トンネル坑内の前記シールド機の後方近傍に、前記シールド機に泥水を供給し、かつ前記シールド機から掘削土とともに排出される泥水を処理する泥水処理設備を配置しておく一方、
前記シールド機が発進する立坑から別のサービストンネルを河川近傍または海岸近傍まで掘削しておき、
トンネル坑内の前記泥水処理設備により分級処理されて残った掘削土を前記立坑に搬出してから前記サービストンネルを通して前記河川近傍または海岸近傍まで搬出することを特徴とする泥水式シールド工法の掘削土搬出方法。
In the muddy water shield method of excavating with a shield machine in a state where muddy water is filled to the face of the tunnel,
In the vicinity of the rear of the shield machine in the tunnel mine, while the muddy water treatment equipment for supplying the muddy water to the shield machine and treating the muddy water discharged together with the excavated soil from the shield machine is arranged,
Drill another service tunnel from the vertical shaft where the shield machine starts, to the vicinity of the river or the coast,
Excavation soil removal by the muddy water type shield method, wherein the remaining excavated soil classified by the muddy water treatment facility in the tunnel mine is carried out to the vertical shaft and then to the vicinity of the river or the coast through the service tunnel. Method.
前記河川近傍または海岸近傍に搬出された掘削土を船舶により残土処分場まで水上輸送することを特徴とする請求項に記載の泥水式シールド工法の掘削土搬出方法。 The excavated soil carrying out excavated soil in the muddy water type shield method according to claim 1 , wherein the excavated soil carried out in the vicinity of the river or the coast is transported by water to a remaining soil disposal site.
JP2004153177A 2004-05-24 2004-05-24 Excavation soil removal method of muddy water type shield method Expired - Fee Related JP4249084B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004153177A JP4249084B2 (en) 2004-05-24 2004-05-24 Excavation soil removal method of muddy water type shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004153177A JP4249084B2 (en) 2004-05-24 2004-05-24 Excavation soil removal method of muddy water type shield method

Publications (2)

Publication Number Publication Date
JP2005336717A JP2005336717A (en) 2005-12-08
JP4249084B2 true JP4249084B2 (en) 2009-04-02

Family

ID=35490586

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004153177A Expired - Fee Related JP4249084B2 (en) 2004-05-24 2004-05-24 Excavation soil removal method of muddy water type shield method

Country Status (1)

Country Link
JP (1) JP4249084B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3000280B1 (en) * 2012-12-20 2015-02-27 Electricite De France INSTALLATION OF WATER SUPPLY FOR COOLING A NUCLEAR POWER PLANT, AND NUCLEAR POWER PLANT COMPRISING SUCH INSTALLATION
CN108442936B (en) * 2018-05-16 2024-05-03 华东交通大学 Slag discharging shield machine for conveying belt
CN109869162A (en) * 2019-04-09 2019-06-11 中国水利水电第四工程局有限公司 A kind of moving platform device for accelerating the cooling of tunnel high temperature section
CN111911170A (en) * 2020-06-19 2020-11-10 中铁工程服务有限公司 Starting device of integrated shield tunneling machine and using method thereof
CN113202535B (en) * 2021-05-17 2025-06-03 中铁四院集团西南勘察设计有限公司 Subway tunnel ventilation system and control method
CN113417650A (en) * 2021-07-09 2021-09-21 中铁一局集团有限公司 Slurry shield split starting construction method under deep foundation pit high water pressure small operation space

Also Published As

Publication number Publication date
JP2005336717A (en) 2005-12-08

Similar Documents

Publication Publication Date Title
CN107100639B (en) Shield transportation system for large-particle-size sand pebbles
CN101775821B (en) Device and method for vertically transporting earthwork through reverse construction method
EA029688B1 (en) Ore production system
JP4249084B2 (en) Excavation soil removal method of muddy water type shield method
CN108941146A (en) A kind of barren rock and crude tailings mixing stacked arrangement
JP6283979B2 (en) Method and system for removing ceiling in tunnel
KR102254537B1 (en) Soil transfer device of urban NATM method
JP2005336716A (en) Muddy water treatment facility and shield tunnel construction method for muddy water shield method
CN111634696A (en) Linhai earthwork conveying system and its construction method
KR102254532B1 (en) Vertical soil transfer device of urban NATM method
KR101059128B1 (en) Belt conveyor system for earth and sand loading on coastal road
KR101027742B1 (en) Earth and sand unloading from sea to coastal road
CN213474801U (en) Coal bottom recovery device applied to car dumper system
JP5869232B2 (en) Excavation soil transport system
JP2006266031A (en) Muddy water treatment facility and muddy water treatment method for muddy water shield method
US20220081339A1 (en) System for coal ash cleanup
JP2837602B2 (en) Sediment transport system for shield method
JP2004332322A (en) Earth and sand container
CN220563144U (en) TBM dismantles transition conveyer
CN118774827B (en) A stripping system for open-pit coal mines with high slope pit walls
JP3026075B2 (en) Transport device for tunnel waste and transport method using the same
JP4759695B2 (en) Shield method
JP4275295B2 (en) Shield drilling system and shield drilling method
CN113323720B (en) Underground ore trackless transportation system and trackless transportation method
JP4357363B2 (en) Contaminated soil treatment system and contaminated soil treatment method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080812

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080819

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081020

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090106

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090114

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120123

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4249084

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150123

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees