Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4251255B2 - Metal bellows forming method and metal bellows forming apparatus for bulge processing - Google Patents
[go: Go Back, main page]

JP4251255B2 - Metal bellows forming method and metal bellows forming apparatus for bulge processing - Google Patents

Metal bellows forming method and metal bellows forming apparatus for bulge processing Download PDF

Info

Publication number
JP4251255B2
JP4251255B2 JP2000204350A JP2000204350A JP4251255B2 JP 4251255 B2 JP4251255 B2 JP 4251255B2 JP 2000204350 A JP2000204350 A JP 2000204350A JP 2000204350 A JP2000204350 A JP 2000204350A JP 4251255 B2 JP4251255 B2 JP 4251255B2
Authority
JP
Japan
Prior art keywords
pipe
raw
bulge processing
bulge
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000204350A
Other languages
Japanese (ja)
Other versions
JP2001340921A (en
Inventor
勇 佐々木
光雄 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Showa Rasenkan Seisakusho Co Ltd
Original Assignee
Showa Rasenkan Seisakusho Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Showa Rasenkan Seisakusho Co Ltd filed Critical Showa Rasenkan Seisakusho Co Ltd
Priority to JP2000204350A priority Critical patent/JP4251255B2/en
Priority to TW90112965A priority patent/TW534838B/en
Publication of JP2001340921A publication Critical patent/JP2001340921A/en
Application granted granted Critical
Publication of JP4251255B2 publication Critical patent/JP4251255B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Shaping Metal By Deep-Drawing, Or The Like (AREA)
  • Mounting, Exchange, And Manufacturing Of Dies (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、特にステンレス製の素管に蛇腹部を設けたステンレス製フレキシブルパイプを、効率よく製作するのに好適な金属ベローズ成形装置に関するものである。
【0002】
【従来の技術】
図14(a)に示すように、直管として形成された素管P1に波形の蛇腹部P2を形成したステンレス製フレキシブルパイプPは、耐久性に優れると共に、剛性を有するが、同時に蛇腹部P2を介して屈曲性を有するため、地中に埋設される水道管やガス管などとして使用された場合には、振動などによる変位吸収性を有している。
【0003】
また、屈曲配管に際しては屈曲継手などが不要であり、図14(b)に示したように、蛇腹部P2を介してフレキシブルパイプPを3次元方向に屈曲させることができるため、地中埋設管としてだけではなく、近年は高層ビルや集合住宅あるいは一般住宅・工場など様々な場所で多様な用途の配管として用いられてきている。そのため、金属管に波形の蛇腹部P2を形成したフレキシブルパイプPを効率よく製造することができる金属ベローズ成形装置が求められている。
【0004】
このようなフレキシブルパイプの金属ベローズ成形装置は、半円状の半割穴を有する上下一対の分割金型により一組の金型本体を形成し、素管P1の外周を径方向から一対の分割金型により一連に拘束して1山ごとの蛇腹部P2を形成する。また、このような一組の金型本体を多数列設させ、素管P1の両端を固定用端キャップ,移動用端キャップなどにより密封した上で素管P1内にバルジ加工用の水液を流入し、その液圧を高めつつ素管P1を移動用端キャップ側から固定用端キャップ側へと圧縮する。
【0005】
同時に、各金型本体も素管P1の圧縮とともに管体軸線方向に移動させ、互いに接合された金型本体同士によって形成される波形の空隙(図9参照)内に、素管P1の外周を膨出させてその外周に蛇腹部P2を形成している。
【0006】
【発明が解決しようとする課題】
ところで、上記したような従来のバルジ加工用の金属ベローズ成形装置では、金型本体を構成する分割金型は、金型本体の圧縮移動と原点位置への復帰動作を繰り返すため、消耗度が激しく、量産性が悪いという問題が指摘される。
【0007】
また、1本々々の長尺なステンレスパイプを取り扱いつつバルジ加工してステンレス製のフレキジブルパイプとし、しかもパイプ内の液体や気体などの洩れのない完成品を歩留まりよく量産するには大変な手間を有している。
【0008】
したがって、上記したように屈曲配管に際しても屈曲継手などを不要とし、その需要が増加している波形の蛇腹部を有するステンレス製のフレキシブルパイプを、効率よく製造することができる金属ベローズ成形装置が求められている。
【0009】
この発明は、このような事情に基づいてなされたものであり、1サイクルのバルジ加工時に同時に複数本の蛇腹管を得ることができると共に、欠陥のない完成品としてのステンレス製のフレキジブルパイプを、量産性よく製造することができる金属ベローズ成形装置の提供を目的とする。
【0010】
【課題を解決するための手段】
この発明は、上記のような目的を達成するために、金属ベローズ装置としては、中空状の素管を拾い上げて順次整列させ、バルジ加工を施してフレキシブルパイプを成形し、成形されたフレキシブルパイプに漏れ検査を施して欠陥品か完成品かの選別をして振り分け収納するバルジ加工用の金属ベローズ装置であって、収納用バケットに収納されている多数本の中空状の素管から、収納用バケットの底部の傾斜面と振動発生装置とにより1本ごとに素管を順次拾い上げるパイプ供給装置と、上記パイプ供給装置から拾い上げられてきた素管を、一対の素管載せ台とその間に配置されたパイプ横送り台とよりなるパイプ列設機構上に受入れると共に、受入れられた素管を転動させて横送りして所定の位置に整列さるパイプ整列送り装置と、上記パイプ整列送り装置により整列された素管を、吊り下げつつ挟持してバルジ加工送り領域の素管載せ台へと移動させる第1の素管移動装置と、上記バルジ加工送り領域の素管載せ台に載置された素管を先端側よりバルジ加工装置に送り込むパイプ移動装置と、上記パイプ移動装置の動作に同期して素管の後端側からバルジ加工用の芯金を挿入する芯金送り装置と、上記パイプ移動装置から送り込まれてきた素管は、上下側の分割金型の金型本体を素管の径方向より拘束すると共に、多数列設された金型本体を管体軸方向に圧縮移動させつつ蛇腹部を有するフレキシブルパイプをバルジ成形するバルジ加工装置と、上記バルジ加工装置より押し出されてきた蛇腹部を有するフレキシブルパイプを整列させると共に、フレキシブルパイプを第2の素管移動装置のパイプチャックにより吊り下げ可能とするバルジ加工後処理装置と、上記バルジ加工後処理装置の第2の素管移動装置によりチャックされ、水槽内に移動されたフレキシブルパイプ水槽に水没させてその両端部を密封すると共に、フレキシブルパイプ内に空気を送り込んで洩れを検出する洩れ検査装置と、上記洩れ検査装置の検査後に上記第2の素管移動装置により移動解放させられたフレキシブルパイプ傾斜面上でパイプ選別バケットに向けて転動るテーブルと、上記テーブルを転動したフレキシブルパイプ、欠陥品収納ボックスの上面に設けた開閉自在な開閉板を閉状態とし、上記欠陥品収納ボックスが開口状態の際には上記欠陥品収納ボックス内に落下させ、その開閉板を開状態とし、上記欠陥品収納ボックスが閉口状態の際には完成品収納ボックスへと通過させ、完成品と欠陥品のフレキシブルパイプを選別して振り分け収納するパイプ選別バケットと、を備えたことを特徴とする。
【0011】
【0012】
【発明の実施の形態】
以下、この発明の実施例を図面に基づき詳細に説明する。図1は、この発明に係る金属ベローズ成形装置の概略構成を示す説明用平面図であり、図2は、パイプ整列送り装置と芯金送り装置の概略構成を示す説明用平面図である。以下、装置の動作をその構成と共に説明する。
【0013】
図1に示すように、この金属ベローズ成形装置は、パイプ供給装置1,パイプ整列送り装置2,芯金送り装置3,バルジ加工装置4,バルジ加工後処理装置5,洩れ検査装置6,パイプ選別バケット7,制御用ディスク8,成型圧力発生装置9,油圧装置10,安全監視装置11などにより構成されている。
【0014】
パイプ供給装置1は、ステンレス製のフレキシブルパイプPとされる素管P1を、パイプ整列送り装置2に沿うように多数本収納すると共に、素管P1を1本ごとにパイプ整列送り装置2に順次引き上げて送り込むものである。具体的には、図3に示したように、パイプ収納用バケット100は、その底部100aがパイプ整列送り装置2の方向に漸次下向するような傾斜面とされ、また、底部100aと床面Fとの間には振動発生装置101が付設されている。パイプ収納用バケット100のパイプ整列送り装置2の側には、素管引き上げ機構102が設けられている。
【0015】
素管引き上げ機構102は、上下一対の駆動用歯車103,103と、この駆動用歯車103,103に巻回されるエンドレスチェーン104,104とが左右一対に配置された構成の機構とされ、左右のエンドレスチェーン104,104間にかけて水平状に断面L字状の素管載せ板105が適当間隔を隔てて凸設されている。この素管載せ板105は、L字状の立上り部105aがエンドレスチェーン104,104に固着され、水平部105bが素管P1を拾い上げる素管載せ部とされている。
【0016】
したがって、素管載せ板105はパイプ収納用バケット100の底部100aの傾斜面と振動発生装置101とにより、パイプ整列送り装置側へと下向されている素管P1を1本づつ拾い上げていく。なお、素管載せ板105が通過する底部100aの個所は、図示はしないが、素管載せ板105が通過できる凹部が穿設されている。
【0017】
パイプ整列送り装置2は、パイプ供給装置1から拾い上げられてきた素管P1を整列させ、バルジ加工装置4へ送り込むための処理を行うものである。このパイプ整列送り装置2におけるパイプ供給装置1近傍のテーブル面には、第1のパイプ列設機構が配置される。
【0018】
この第1のパイプ列設機構は、図2に示すように、素管P1を嵌合するU溝200aが穿設された一対の素管載せ台200,200と、素管P1の両端をフォーミングするポンチ201,201と、素管載せ台200,200間に配置されたパイプ横送り台202,202とにより構成されている。
【0019】
したがって、図2,図3からも明らかなように、パイプ供給装置1から送り込まれてきた素管P1は、まず始めに第1のパイプ列設機構の素管載せ台200,200におけるU溝200a,200aに挿嵌されて列設状態とされる。パイプ横送り台202,202は、図5に示したように、テーブル面に対して立設板202bと連接するパイプ載せ板202aが支持棒202cを介して上下動可能に設置されており、素管P1の列設時にはテーブル面に対して下動状態とされている(図5中の実線)。
【0020】
そして、ポンチ201,201が素管P1の両端方向に前進され、素管P1の両端をフォーミングして両端の変形を矯正する。その後、ポンチ201,201が素管P1の両端から離れて元の位置に戻ると、パイプ横送り台202,202はテーブル面に対して上動し、図5中の点線で示したように、素管P1を素管載せ台200,200のU溝200a,200aから持ち上げる。
【0021】
このパイプ横送り台202のパイプ載せ板202aは傾斜面とされているので、上動して素管P1を持ち上げた場合には、持ち上げた素管P1を転がして横送りすることができる(図5の点線参照)。横送りされた素管P1は、第2のパイプ列設機構に設置されている第2の素管載せ台200へと移動され、そのU溝200a,200a,200aに挿嵌される(図2参照)。
【0022】
但し、第2のパイプ列設機構における素管載せ台200へと移動された素管P1は、始めは第1番目のU溝200aに挿嵌されるが、第1番目のパイプ横送り台202,202の動作により、中央のU溝200a,200aへと移動され、次いで第2番目のパイプ横送り第202,202の動作により、中央のU溝200a,200aから図中右側の第3番目のU溝200a,200aへと移動される。このようにして、第2のパイプ列設機構には3本の素管P1,P1,P1が等間隔を隔てて列設されることとなる。
【0023】
203はパイプ端押え装置であり、このパイプ端押え装置203は、前進動作により第2のパイプ列設機構に列設されている3本の素管P1,P1,P1の端部を押圧して端部の不揃いを矯正する。端部不揃いが矯正された3本の素管P1,P1,P1は、第1の素管移動装置205(図3参照)によりチャックされて、図2中点線で示したように、バルジ加工送り領域へと移動される。
【0024】
第1の素管移動装置205は、図3に示すように、装置の上面より移動可能に吊り下げられた走行板205aと、素管P1を挟持するパイプチャック205b,205b,205bとにより構成されている。第2のパイプ列設機構に列設された3本の素管は、第1の素管移動装置205のパイプチャック205b,205b,205bに挟持されて第2のパイプ列設機構からバルジ加工送り領域へと移動され(図2参照)、3本の素管P1,P1,P1は各両端の近傍がバルジ加工送り領域の素管載せ台200におけるU溝200a,200a,200aに挿嵌される。
【0025】
この状態において、3本の素管P1,P1,P1は、図6に示すように、その後端側がパイプ移動装置206のコレットチャック206aに挟持されると共に、後端側より素管P1内に先端側をバルジ加工成形部301aとする芯金301が挿入される。
【0026】
パイプ移動装置206は、素管P1,P1,P1を挟持した状態でパイプ整列送り装置2のテーブル面でバルジ加工装置4へと敷設されているレール203に添って走行される。この際には、3本の素管P1,P1,P1の各両端近傍を載置している素管載せ台200は、パイプ移動装置206の走行の邪魔になるので、テーブル面でレール203に直交されるように敷設されているレール204に添って、図2中の点線で示した位置まで移動されパイプ移動装置206の走行を可能とする。また、第1の素管移動装置205も前記した第2のパイプ列設機構の領域に戻される。
【0027】
次いで、パイプ移動装置206が3本の素管P1,P1,P1をチャックした状態でバルジ加工装置4に向かって走行を開始し、3本の素管P1,P1,P1をその先端側よりバルジ加工装置4に送り込む。一方、これと同期して芯金送り駆動装置300が動作し、芯金301,301,301を素管P1,P1,P1内で走行させ、素管P1の蛇腹部形成位置でバルジ加工成形部301aを停止させる(図8参照)。
【0028】
バルジ加工装置4における金型本体400は、図7に示すように、上側の分割金型401と下側の分割金型402とによって構成される。分割金型401と分割金型402との接合縁辺には、互いに接合された際に一連の割穴とされて素管P1を挟持する半割穴401a,402aが、所定間隔を隔ててそれぞれ3穴開設されている。
【0029】
分割金型401の上側と分割金型402の下側には、それぞれ左右一対の分割金型用ガイド孔401c−401c,402c−402cが開設されており、このガイド孔401c,402cを挿通するガイド軸(図示略)により、分割金型401,402はそれぞれ管体軸線方向に対して直角となるように支持されつつ移動(直立移動)されることとなる。
【0030】
一方、上側の分割金型401と下側の分割金型402の互いの左右端部には、フランジ401b−401b,402b−402bが突出形成されており、上側の分割金型401におけるフランジ401bは短フランジとして突出形成され、下側の分割金型402におけるフランジ402bはフランジ401bよりもやや長いフランジとして突出形成されている。
【0031】
そして、クランプ板(図示略)は、接合された両分割金型401,402のフランジ401b−402b,401b−402bに嵌合する凹部が開設されており、この凹部が両分割金型401,402のフランジ401c,402c,フランジ401b,402bに左右側より嵌合し、両分割金型401,402を一体的に回着して一組の金型本体400を形成する。
【0032】
また、クランプ板にはクランプ板用回動孔が開設されており、この回動孔に挿通される回動軸を枢軸としてクランプ板自体が回動される。これにより、クランプ板は下側の分割金型の長尺なフランジ402bに掛かり止められた状態としつつ、上側の分割金型401の短尺なフランジ401bにおける掛かり止めを解除することもでき、且つ、クランプ板を左右方向に移動させ金型本体400への着脱を図る。このため、金型本体400の磨耗度を著しく低減化することができると共に、金型本体400への着脱が容易となる。
【0033】
なお、クランプ板はその凹部に上下分割金型401,402を挿嵌する構成として説明したが、上下分割金型401,402側に凹部を設け、この凹部にクランプ板側に設けた凸部を挿嵌するようにしてもよい。
【0034】
なお、金型本体400の分割金型401,402は、3穴とせず2穴でも1穴でもよいが、3穴としたケースが好適である。その理由は、1本のフレキシブルパイプPを形成する場合には、金型本体400の中央の割穴401a−402aを用いることができ、また、2本のフレキシブルパイプP,Pを形成する場合には、金型本体400の左右の割穴401a−402a,401a−402aを用いることができる。このようにすれば、バルジ加工の際に金型本体400にかかる荷重をバランスよくすることができると共に、フレキシブルパイプPのバルジ加工の本数にかかわらず金型本体400をその都度交換する必要がない。なお、金型本体400の重量や操作性,耐久性などを考慮すると、通常の素材で金型本体400を形成する場合は3穴が好適となる。
【0035】
また、上側の各分割金型401,・・・同士、下側の分割金型402,・・・同士は、それぞれ出没自在な連結ピン(図示略)によって互いに連結されている。また、素管P1の両端側は、移動用端キャップ401−2,402−2、固定用端キャップ401−1,402−1により密封支持されている。
【0036】
このように、このバルジ加工装置4によれば、一組の金型本体400とされる一対の分割金型401,402の3個の半割穴401a−402a,401a−402aが、それぞれ3本の素管P1の外周を径方向に一連に拘束し、そのようにされた金型本体400を管体軸方向へ多数列設させると共に、各素管P1,P1,P1のバルジ加工部分の管内に芯金301のバルジ加工形成部301aを位置させる(図8参照)。
【0037】
芯金301内には、成形圧力発生装置9で水圧が高められた水液が水液分岐機構900を介して各素管P1の芯金301内に流入され、バルジ加工形成部301aの孔301b,・・・から流出し、素管P1のバルジ加工部分を膨出させる。そして、移動用端キャップ401−2,402−2が固定用端キャップ401−1,402−1側に圧縮移動し、3本の各素管P1,P1,P1の外周の所定箇所に周時に波形の蛇腹部P2を形成する(図9参照)。302はシール用の○リングである。
【0038】
バルジ加工後処理装置5は、バルジ加工装置4より押し出されてきた成形後のフレキシブルパイプPを整列させるもので、テーブル面には、押し出されてきたフレキシブルパイプPを受け入れるガイド溝500a,500a,500aが列設されている。また、装置の上面側には移動可能に吊り下げられた第2の素管移動装置501が配置され(図11参照)、この第2の素管移動装置501は走行板501aとフレキシブルパイプP,P,Pを挟持するパイプチャック501b,501b,501bとにより構成されている。
【0039】
また、図10(b)に示した503はシリンダーであり、504は端部押し出し板でフレキシブルパイプPがバルジ加工装置4より押し出されてきた際には応動してその通過を可能とし、シリンダー503の動作によってフレキシブルパイプP,P,Pの端部を押圧して揃える。
【0040】
第2の素管移動装置501によりチャックされたフレキシブルパイプP,P,Pは、洩れ検査装置6へと移動される。この洩れ検査装置6は、図11に示すように水槽となっており、各フレキシブルパイプP,P,Pはその両端部を密封支持板600に支持されると共に、ゴムシール部材601により密封され、このゴムシール部材601を介して空気送りホース602よりフレキシブルパイプP内に空気が送り込まれる(図12参照)。フレキシブルパイプPは、洩れ検査装置6の水槽に水没されているので、ヒビ割れなどがあると気泡が発生するのでこれを検出する。
【0041】
なお、図示は省略をするが、フレキシブルパイプP内に送り込まれる空気の低下率を気体量検出装置などにより測定し、ヒビ割れなどを生じているフレキシブルパイプPを検知することができる。また、水槽に発生する気泡を目視することによっても知ることができる。
【0042】
第2の素管移動装置501は、漏れ検査後にはテーブル502上でフレキシブルパイプPを解放する。テーブル502は、パイプ選別バケット7に向けた傾斜面とされているので、解放されたフレキシブルパイプPは必然的にパイプ選別バケット7に向けて転動していく。
【0043】
パイプ選別バケット7は、フレキシブルパイプPの完成品を収納する完成品収納ボックス700と、欠陥品を収納する欠陥品収納ボックス701とにより構成されている。図11に示したように、欠陥品収納ボックス701は装置側に設置されており、完成品収納ボックス700は欠陥品収納ボックス701の外側に配置されている。
【0044】
欠陥品収納ボックス701の上面側には、適当間隔を隔てて複数の開閉板702が取付けられており、この開閉板702が開状態のときには、図11に示したように、欠陥品収納ボックス701の上面に開閉板702により完成品収納ボックス700への通路を作ることになり、テーブル502を通過してきたフレキシブルパイプPは、欠陥品収納ボックス701には落下せず完成品収納ボックス700へ落下される。
【0045】
また、開閉板702が閉状態のときには、図13に示したように、欠陥品収納ボックス701の上面には開閉板702が完成品収納ボックス700への通路を作らないため、テーブル502を通過してきたフレキシブルパイプPは、そのまま開口状態とされている欠陥品収納ボックス701へ落下されることになり、欠陥品のフレキシブルパイプPと、完成品のフレキシブルパイプPとを選別して振り分け収納することができる。
【0046】
次に、この発明に係る金属ベローズ加工装置の電気的システム構成を、図15のブロック図に基づき説明する。すなわち、電気的システム構成としては、各部の動作を統括し制御するシステム制御部800,インターフェース部801,システム動作記憶部802,非常時検出部803,パイプ供給指令部804,パイプ整列送り指令部805,芯金送り指令部806,バルジ加工指令部807,バルジ加工後処理指令部808,洩れ検査指令部809,パイプ選別指令部810,成形圧指令部811,油圧指令部812などにより構成される。
【0047】
インターフェース部801は、装置に接続される制御用ディスク8における情報入力部900から、各部の作動ベース情報をシステム制御部800に入力する。情報入力部900としては、文字キーやテンキーなどを有するキーボード操作手段、プログラムソフト読み取り手段、パソコン端末手段などいずれでもよい。
【0048】
システム動作記憶部802は、情報入力部900からの入力情報や装置内における各部の進行動作を格納し、システム制御部800の統括指令に基づき装置各部のシーケンス制御動作を可能にする。
【0049】
非常時検出部803は、安全監視装置11が監視領域内に作業員などが侵入したことを検知すると、非常時検出信号を出力し、システム制御部800により装置の各部全動作あるいは関係する各部の動作を停止可能とする。
【0050】
パイプ供給指令部804は、モータ駆動信号を出力し、パイプ供給装置1における駆動用歯車300の動作信号を出力するもので、図示しないが、駆動用歯車300の駆動用モータへ動作開始信号あるいは動作停止を行なわす。
【0051】
パイプ整列送り指令部805は、第1パイプ列設確認指令手段,フォーミング指令手段,第1パイプ横送り指令手段,第2パイプ列設確認指令手段,第2パイプ横送り指令手段,パイプ端押え指令手段,素管移動指令手段,コレットチャック指令手段,パイプ移動指令手段などにより構成される。
【0052】
第1パイプ列設確認指令手段は、列設確認信号を出力し、第1のパイプ列設機構に配置されている素管載せ台200に素管P1が列設されたか否かを検出する。フォーミング指令手段は、ポンチ動作信号を出力し、第1のパイプ列設機構に載置された素管P1の両端を拡管するようにポンチ201を作動させる。
【0053】
第1パイプ横送り指令手段は、上下動動作信号を出力し、第1のパイプ列設機構に配置されている横送り台202を動作させ、素管P1を第2のパイプ列設機構の素管載せ台200へと移動させる,
【0054】
第2パイプ列設手指令段は、1次載置確認信号,2次載置確認信号などの第2列設確認信号を出力し、第2のパイプ列設機構領域の素管載せ台200へと移動されてきた素管P1の載置箇所を検出し、その載置移動を行なう。まず、第1番目のU溝200a内に素管P1が挿嵌されると、1次載置確認信号が出力され、第1パイプ横送り指令手段が1次載置確認信号の出力に基づいて第1番目の横送り台202を動作させ、素管P1を第2番目(中央)のU溝200a内に移動させる。そして、2次載置確認信号が出力されると、第2パイプ横送り指令手段は2次載置確認信号の出力に基づいて第2番目の横送り台202を動作させ、素管P1を第3番目のU溝200a内に移動させる。
【0055】
上記した場合には、システム動作記憶部802に3本のフレキシブルパイプPの処理情報が格納されているが、1本の場合には、素管P1を第2番目(中央)のU溝200a内に載置し、2本の場合には、素管P1を第1番目のU溝200aと第3番目のU溝200aに載置するように動作される。
【0056】
パイプ端押え指令手段は、進退指令信号を出力し、パイプ端押え板203により素管P1の端部の不揃いを矯正させる。また、素管移動手段は、素管移動信号を出力し、第1の素管移動装置205を動作させて端部が所定位置に揃えられた素管P1をバルジ加工送り領域へと移動させる。
【0057】
コレットチャック指令手段811は、素管チャック信号を出力し、バルジ加工送り領域へと移動された素管P1の後端部をコレットチャック206aに挟持させる。また、パイプ移動手段は、パイプ移動信号を出力し、コレットチャックされた状態の素管P1をパイプ移動装置206を走行させてバルジ加工装置4へと送り込む。
【0058】
芯金送り指令部806は、芯金送り信号を出力し、パイプ移動装置206が素管P1をチャックした状態でバルジ加工装置4に向かって走行を開始するのに同期して、芯金送り駆動装置300を動作させ、芯金301を素管P1内で走行させ素管P1の蛇腹部形成位置で先端側のバルジ加工成形部301aを停止させる。
【0059】
成形圧指令部811は、成形圧指令信号を出力し、成形圧力発生装置9で圧力が高められた水液を水液分岐機構900を介して芯金301内に流入させ、バルジ加工成形部301aの孔301b,・・・から流出させ素管P1のバルジ加工部分を膨出させる。また、油圧指令部812は、油圧指令信号を出力し、バルジ加工装置4におけるバルジ成形加圧力を付加させる。
【0060】
バルジ加工指令部807は、バルジ指令信号を出力し、バルジ加工装置4に送り込まれてくる素管P1に金型本体400を駆動してバルジ加工を施す。このバルジ加工指令部807におけるバルジ指令信号は、金型開閉信号により上下側の分割金型401,分割金型402,の開閉を行い、進退信号により移動用端キャップ401−2,402−2圧縮と開放を行なう。勿論、このバルジ指令信号は、芯金送り指令部806の芯金送り信号と成型圧指令部811の成型指令信号,油圧指令部812の油圧指令信号などと同期がとられる。
【0061】
バルジ加工後処理指令部809は、加工後処理信号を出力し、バルジ加工装置4より押し出されてきたフレキシブルパイプPをガイド溝500aに整列させるも。また、パイプ端押え信号を出力し、バルジ加工後処理装置5に設けられているシリンダー503とパイプ端押え板504を動作させてフレキシブルパイプPの端部を揃える。さらに、素管チャック信号を出力し、テーブル面上に吊り下げ配置されている第2の素管移動装置501を動作させ、フレキシブルパイプPを挟持し洩れ検査装置6へと移動させ、洩れ検査の終了後にはテーブル502にフレキシブルパイプPを解放するる。
【0062】
洩れ検査指令部809は、パイプ密封信号を出力し、密封支持板600より凸設されているゴムシール部材601により、第2の素管移動装置501にチャックされているフレキシブルパイプPの両端部を密封支持させつつ洩れ検査装置6の水槽に水没させ、圧縮気体送り装置(図示略)と連通されている空気送りホース602よりゴムシール部材601を介してフレキシブルパイプP内に空気を送り込ませる。
【0063】
パイプ選別指令部810は、パイプ選別信号を出力するもので、フレキシブルパイプPが完成品と判断された場合には、完成信号を出力し、欠陥品収納ボックス701の上面側に適当間隔を隔てて取付けられている複数の開閉板702を開状態とし、欠陥品収納ボックス701の上面側に完成品収納ボックス700へ至る通路を作り、欠陥品収納ボックス701上面を通過させ完成品収納ボックス700へ落下させる。
【0064】
また、フレキシブルパイプPが欠陥品と判断された場合には、欠陥信号を出力し、開閉板702を閉状態とし、欠陥品収納ボックス701の上面側を開口状態とさせ、欠陥フレキシブルパイプPを完成品収納ボックス700側に送ることなく、そのまま欠陥品収納ボック701に落下させる。
【0065】
次に、この発明に係る金属ベローズ加工装置の動作を、図16と図17のフローチャートに基づき説明する。装置に電源が投入されて装置の動作がスタート状態とされると、ステップ100でシステム動作記憶部802には成形すべき素管P1の本数や蛇腹部P2の成形間隔など、フレキシブルパイプPの成形に必要な情報が格納されているか否かが判断される。
【0066】
ステップ100でシステム動作記憶部802には成形に必要な情報が格納されていると判断された場合には、ステップ101へ進み、装置の各部は動作待機状態とされ、さらにステップ102へ進み、パイプ供給装置1が動作されパイプ収納用選別バケット100から素管P1を1本ごとに拾い上げパイプ整列送り装置2に送り込む。
【0067】
ステップ103では、パイプ整列送り装置2における第1のパイプ整列機構に素管P1が列設されたか否かが判断され、素管P1が列設されたと判断された場合にはステップ104に進み、第1のパイプ整列機構に列設された素管P1の両端部をポンチ201により拡管フォーミングする。
【0068】
ステップ105では、パイプ横送り台201が動作され拡管フォーミングされた素管P1を第2のパイプ整列機構に横送りし、第2のパイプ整列機構上で素管P1を整列させる。
【0069】
ステップ106では、パイプ横送り台201の動作により第2のパイプ整列機構上で素管P1の整列さが完了されたか否かが判断され、ステップ107では、第1の素管移動装置205が動作され、第2のパイプ整列機構上で整列されている素管P1を挟持しバルジ加工送り領域へと移動させる。
【0070】
ステップ108では、バルジ加工送り領域へと移動された素管P1はパイプ移動装置206のコレットチャック206aに挟持され、芯金送り装置3の動作により素管P1の後端部より芯金301のバルジ加工成形部が素管P1内に挿入され、バルジ加工待機状態とされる。
【0071】
ステップ109では、パイプ移動装置206がコレットチャックされた状態の素管P1を走行させてバルジ加工装置4へと送り込むと共に、芯金送り装置3もパイプ移動装置206に同期して芯金送り駆動装置300を動作させ、芯金301のバルジ加工成形部300aを素管P1の蛇腹部形成位置とし、バルジ加工可能状態とする。
【0072】
ステップ110では、バルジ加工装置4が金型本体400を駆動してバルジ加工を施す素管P1の箇所に上下側の分割金型401,402の開閉を行バルジ成形加工を行なうのであるが、この際には、成形圧力発生装置9と水液分岐機構900や油圧装置10なども同期し、水圧が高められた水液を芯金301内に流入させバルジ加工形成部301aの孔301b,・・・から流出させ、素管P1のバルジ加工部分を膨出させる。
【0073】
ステップ111では、バルジ加工装置4において素管P1に対して必要箇所のバルジ加工を終了するか否かが判断される。ここで、バルジ加工は終了されていないと判断された場合にはステップ108に戻るが、バルジ加工終了と判断された場合にはステップ112に進む。
【0074】
ステップ112では、バルジ加工後処理装置5がバルジ加工装置4より押し出されてきたフレキシブルパイプPを整列させると共に、第2の素管移動装置501の動作によりフレキシブルパイプPを挟持し漏れ検査装置6へと移動させ、バルジ加工を終了するか否かが判断される。
【0075】
ステップ113では、漏れ検査装置6が動作され第2の素管移動装置501によりチャックされている各フレキシブルパイプPの両端部を密封支持させつつ水槽に水没させ、圧縮気体送り装置を介してフレキシブルパイプP内に空気を送り込ませ、洩れ検査が行なわれる。
【0076】
ステップ114では、圧縮気体送り装置の気体減少率や目視などにより、フレキシブルパイプPの漏れが検査されたか否かが判断され、漏れが検出されたか場合にはステップ115へ進み、漏れが検出されない場合にはステップ116へ進む。
【0077】
【0078】
ステップ115では、パイプ選別バケット7が動作され、欠陥品収納ボックス701の上面側の開閉板702を閉状態とされて欠陥品収納ボックス701は開口状態とされ、ステップ117に進む。ステップ117では、第2の素管移動装置501にチャックされている欠陥品フレキシブルパイプPは、テーブル502上で解放され完成品収納ボックス700側に送られることなく、そのまま欠陥品収納ボック701に落下させられる。
【0079】
ステップ116では、欠陥品収納ボックス701の上面側の開閉板702が開状態とされ、欠陥品収納ボックス701の上面側は閉口状態とされステップ119に進む。ステップ119では、第2の素管移動装置501にチャックされている完成フレキシブルパイプPは、テーブル502上で解放され、欠陥品収納ボック701上で開放され、欠陥品収納ボックス701上面を通過させ完成品収納ボックス700落下される。
【0080】
このように、この実施例によれば、素管を貯めるパイプ供給装置から1本ごとに素管をパイプ整列送り装置に送り込み、パイプ整列送り装置において素管を整列すると共に、移送可能に挟持し、且つ、素管の後端側から前端側へとバルジ加工用の芯金を内挿し、パイプ整列送り装置よりバルジ加工装置へ芯金を内挿した状態の素管を送り込んで蛇腹部を有するフレキシブルパイプをバルジ成形し、バルジ加工装置より送り出されてきたフレキシブルパイプに漏れ検査を施して完成品か欠陥品かの選別を図り、完成品と欠陥品とを各別に回収するように構成されている。また、パイプ整列送り装置は少なくとも3本の素管を整列可能とし、また、バルジ加工装置は少なくとも3本の素管をバルジ加工可能とするように構成されている。
【0081】
したがって、素管の拾い上げから整列,バルジ加工,後加工処理,漏れ検査,欠陥品選別などを一連の動作としてシーケンス制御することができると共に、欠陥のない完成品としてのステンレス製のフレキシブルパイプPを量産性よく製造することができる。
【発明の効果】
以上説明したように、この発明によれば、完成品であるフレキジブルパイプを得るに際し、一連の動作を一体的な構成の装置とし、素管の取り出し,素管の移動及び整列と芯金の挿入,バルジ加工,バルジ後加工処理,漏れ検査,完成品と欠陥品の選別などを効率よく準備できるので、素管から完成品としてのステンレス製のフレキジブルパイプを量産性よく効率よく製造することができる。
【図面の簡単な説明】
【図1】 この発明に係る金属ベローズ成形装置の概略構成を示す説明用平面図である。
【図2】 図1におけるパイプ整列送り装置と芯金送り装置の概略構成を示す説明用平面図である。
【図3】 図1におけるパイプ供給装置とパイプ整列送り装置の概略構成を示す説明用断面図である。
【図4】 素管載せ台の1例を示す斜視図である。
【図5】 素管載せ台とパイプ横送り台との関係を示す説明図である。
【図6】 素管後端部と芯金挿入状態を示す説明用平面図である。
【図7】 金型本体の組み合わせを示す説明用正面図である。
【図8】 バルジ加工状態を示す説明用断面図である。
【図9】 蛇腹部形成状態を示す説明用断面図である。
【図10】 図1におけるバルジ加工後処理装置を示す説明用正面図である。
【図11】 図1におけるバルジ加工後処理装置と洩れ検査装置とパイプ選別バケットを示す説明用正面図である。
【図12】 図1における洩れ検査装置を示す説明用平面図である。
【図13】 図1におけるパイプ選別バケットを示す説明用断面図である。
【図14】 フレキシブルパイプを示す概観図である。
【図15】 この発明に係る金属ベローズ成形装置の電気的構成を示すブロック図である。
【図16】 この発明に係る金属ベローズ成形装置のバルジ加工待機動作までの動作を示すフローチャートである。
【図17】 この発明に係る金属ベローズ成形装置のバルジ加工可能状態からの動作を示すフローチャートである。
【符号の説明】
1 パイプ供給装置
2 パイプ整列送り装置
3 芯金送り装置
4 バルジ加工装置
5 バルジ加工後処理装置
6 漏れ検査装置
7 パイプ選別バケット
8 制御用ディスク
9 成型圧力発生装置
[0001]
BACKGROUND OF THE INVENTION
In particular, the present invention relates to a metal bellows forming apparatus suitable for efficiently producing a stainless steel flexible pipe having a bellows portion provided on a stainless steel tube.
[0002]
[Prior art]
As shown in FIG. 14 (a), the stainless steel flexible pipe P in which the corrugated bellows part P2 is formed on the element pipe P1 formed as a straight pipe has excellent durability and rigidity, but at the same time, the bellows part P2 Therefore, when used as a water pipe or a gas pipe buried in the ground, it has a displacement absorbability due to vibration or the like.
[0003]
In addition, a bent joint or the like is not required for bent piping, and the flexible pipe P can be bent in a three-dimensional direction via the bellows portion P2 as shown in FIG. In recent years, it has been used as piping for various purposes in various places such as high-rise buildings, apartment houses, general houses and factories. Therefore, there is a demand for a metal bellows forming apparatus that can efficiently manufacture a flexible pipe P in which a corrugated bellows portion P2 is formed on a metal tube.
[0004]
Such a flexible pipe metal bellows forming apparatus forms a pair of mold bodies by a pair of upper and lower divided molds having a semicircular half-divided hole, and the outer periphery of the base pipe P1 is divided into a pair from the radial direction. The bellows part P2 for every mountain is formed by constraining in series by a mold. In addition, a large number of such a set of mold bodies are arranged in a row, and both ends of the raw pipe P1 are sealed with a fixing end cap, a moving end cap, and the like, and then a bulge-processing aqueous solution is poured into the raw pipe P1. It flows in and compresses the raw pipe P1 from the moving end cap side to the fixing end cap side while increasing the hydraulic pressure.
[0005]
At the same time, each mold body is also moved in the axial direction of the tube body along with the compression of the element tube P1, and the outer periphery of the element tube P1 is placed in a wavy gap (see FIG. 9) formed by the mold bodies joined together. The bellows part P2 is formed on the outer periphery by swelling.
[0006]
[Problems to be solved by the invention]
By the way, in the conventional metal bellows forming apparatus for bulge processing as described above, the split mold constituting the mold body repeats the compression movement of the mold body and the return operation to the origin position, so that the degree of wear is severe. The problem of mass productivity is pointed out.
[0007]
In addition, it is difficult to bulge and handle each long stainless steel pipe to make a flexible pipe made of stainless steel, and to produce a finished product that does not leak liquid or gas in the pipe with high yield. Have a lot of trouble.
[0008]
Therefore, there is a need for a metal bellows molding apparatus that can efficiently produce a flexible pipe made of stainless steel having a corrugated bellows portion that does not require a bent joint or the like even in the case of bent piping as described above, and whose demand is increasing. It has been.
[0009]
The present invention has been made based on such circumstances, and a plurality of bellows tubes can be obtained simultaneously during one cycle of bulge processing, and a stainless flexible pipe as a finished product without defects. An object of the present invention is to provide a metal bellows forming apparatus capable of manufacturing a metal bellows with high productivity.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, the present invention provides a metal bellows device that picks up hollow raw tubes and aligns them in order, and forms a flexible pipe by bulging to form a molded flexible pipe. A metal bellows device for bulge processing that performs leak inspection and sorts and stores defective products and finished products, and is used for storage from a number of hollow hollow tubes stored in storage buckets. A pipe supply device that sequentially picks up the pipes one by one by the inclined surface of the bottom of the bucket and the vibration generator, and a pipe that has been picked up from the pipe supply device is disposed between the pair of raw pipe mounts and between them. A pipe alignment feeding device that receives the pipe on a pipe arrangement mechanism comprising a horizontal pipe feed base and rolls the received raw pipe to make a horizontal feed and align it at a predetermined position; and The aligned hollow shell by type aligning feeder is moved to sandwich while hanging to base pipe stand of bulging feed region First A pipe moving device, a pipe moving device that feeds the raw pipe placed on the base of the base pipe in the bulge processing feed area to the bulge processing apparatus from the tip side, and The raw pipe is synchronized with the movement of the pipe moving device. Insert a bulge core bar from the rear end side A mandrel feeder; The raw pipe fed from the pipe moving device restrains the upper and lower divided mold main bodies from the radial direction of the main pipe, and compresses and moves the multiple rows of main mold bodies in the axial direction of the pipe body. Bulge forming device that bulges a flexible pipe having a bellows part while being pushed out from the bulge processing device With bellows Align flexible pipes and align flexible pipes Second A bulge processing post-processing device that can be suspended by a pipe chuck of a raw pipe moving device, and the bulge processing post-processing device Second Flexible pipe that has been chucked and moved into the water tank The A leak inspection device for detecting leakage by submerging the water tank and sealing both ends thereof, and sending air into the flexible pipe, and after the inspection of the leak inspection device By the second tube moving device Move , release Made Flexible pipe But Rolls onto a pipe sorting bucket on an inclined surface You Table and flexible pipe rolling the above table The Openable open / close plate provided on top of defective product storage box Is closed and the above defective storage box opens. In case of condition Above defect Falling into the product storage box Let , Its opening and closing plate Open and the above defective box is closed. A pipe sorting bucket is provided that passes through a finished product storage box in a state and sorts and stores the finished product and defective flexible pipes.
[0011]
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is an explanatory plan view showing a schematic configuration of a metal bellows forming apparatus according to the present invention, and FIG. 2 is an explanatory plan view showing schematic configurations of a pipe alignment feeding device and a core metal feeding device. Hereinafter, the operation of the apparatus will be described together with its configuration.
[0013]
As shown in FIG. 1, this metal bellows forming apparatus includes a pipe feeding device 1, a pipe alignment feeding device 2, a core metal feeding device 3, a bulge processing device 4, a bulge processing post-processing device 5, a leak inspection device 6, and a pipe selection. The bucket 7, the control disk 8, the molding pressure generator 9, the hydraulic device 10, the safety monitoring device 11, etc.
[0014]
The pipe supply device 1 stores a large number of raw pipes P1 which are flexible pipes P made of stainless steel along the pipe alignment feed device 2, and sequentially puts the raw pipes P1 into the pipe alignment feed device 2 one by one. It will be pulled up and sent. Specifically, as shown in FIG. 3, the pipe storage bucket 100 has an inclined surface such that the bottom 100 a gradually descends in the direction of the pipe alignment feeding device 2, and the bottom 100 a and the floor surface A vibration generating device 101 is attached between F. A raw pipe pulling mechanism 102 is provided on the pipe storage feeder 2 side of the pipe storage bucket 100.
[0015]
The tube pulling mechanism 102 is a mechanism in which a pair of upper and lower drive gears 103 and 103 and endless chains 104 and 104 wound around the drive gears 103 and 103 are arranged in a pair of left and right. Between the endless chains 104, 104, a raw tube placing plate 105 having an L-shaped cross section is provided in a horizontal shape with an appropriate interval. The raw tube mounting plate 105 has an L-shaped rising portion 105a fixed to the endless chains 104 and 104, and a horizontal portion 105b serving as a raw tube mounting portion for picking up the raw tube P1.
[0016]
Therefore, the raw pipe placing plate 105 is formed by the pipe alignment feeding device by the inclined surface of the bottom 100a of the pipe storage bucket 100 and the vibration generating device 101. 2 Pick up the pipes P1 that are facing downwards one by one. In addition, although not shown in the figure, a concave portion through which the raw tube mounting plate 105 can pass is formed in the portion of the bottom 100a through which the raw tube mounting plate 105 passes.
[0017]
The pipe aligning / feeding device 2 performs processing for aligning the raw pipes P1 picked up from the pipe supply device 1 and feeding them to the bulge processing device 4. A first pipe arrangement mechanism is disposed on the table surface in the vicinity of the pipe supply device 1 in the pipe alignment feed device 2.
[0018]
As shown in FIG. 2, the first pipe arrangement mechanism forms a pair of raw tube mounts 200, 200 each having a U groove 200a into which the raw tube P1 is fitted, and both ends of the raw tube P1. Punches 201 and 201, and pipe horizontal feed tables 202 and 202 disposed between the raw tube mounts 200 and 200, respectively.
[0019]
Therefore, as can be seen from FIGS. 2 and 3, the raw pipe P1 fed from the pipe supply device 1 starts with the U groove 200a in the raw pipe mounts 200 and 200 of the first pipe arrangement mechanism. , 200a to be arranged. As shown in FIG. 5, the pipe lateral feed bases 202 and 202 are provided with a pipe mounting plate 202 a connected to a standing plate 202 b with respect to a table surface so as to be movable up and down via a support bar 202 c. When the pipes P1 are arranged, they are moved downward with respect to the table surface (solid line in FIG. 5).
[0020]
Then, the punches 201 are advanced in the direction of both ends of the raw tube P1, and both ends of the raw tube P1 are formed to correct the deformation at both ends. After that, when the punches 201 and 201 are moved away from both ends of the raw pipe P1 and returned to the original positions, the pipe lateral feed bases 202 and 202 are moved upward with respect to the table surface, as indicated by the dotted lines in FIG. The raw pipe P1 is lifted from the U grooves 200a and 200a of the raw pipe mounts 200 and 200.
[0021]
Since the pipe mounting plate 202a of the pipe lateral feed table 202 is inclined, when the raw pipe P1 is lifted up to lift the raw pipe P1, the lifted raw pipe P1 can be rolled and laterally fed (see FIG. (See dotted line 5). The rawly fed raw pipe P1 is moved to the second raw pipe placing base 200 installed in the second pipe arranging mechanism, and is inserted into the U grooves 200a, 200a, 200a (FIG. 2). reference).
[0022]
However, the raw pipe P1 moved to the raw pipe placing base 200 in the second pipe arranging mechanism is initially inserted into the first U groove 200a, but the first pipe lateral feed base 202 is inserted. , 202 is moved to the central U-grooves 200a, 200a, and then the second pipe transverse feeds 202, 202 are moved from the central U-grooves 200a, 200a to the third right side in the figure. It moves to U-groove 200a, 200a. In this way, the three pipes P1, P1, P1 are arranged at equal intervals in the second pipe arrangement mechanism.
[0023]
203 is a pipe end pressing device, and this pipe end pressing device 203 presses the end portions of the three elementary pipes P1, P1, P1 arranged in the second pipe arranging mechanism by a forward movement. Correct uneven edges. The three pipes P1, P1, P1 whose end irregularities are corrected are First It is chucked by the raw tube moving device 205 (see FIG. 3) and moved to the bulge processing feed region as indicated by the dotted line in FIG.
[0024]
First As shown in FIG. 3, the raw tube moving device 205 includes a travel plate 205 a that is movably suspended from the upper surface of the device, and pipe chucks 205 b, 205 b, 205 b that sandwich the raw tube P <b> 1. The three pipes arranged in the second pipe arrangement mechanism are First It is sandwiched between the pipe chucks 205b, 205b, 205b of the raw pipe moving device 205 and moved from the second pipe arrangement mechanism to the bulge processing feed area (see FIG. 2), and the three raw pipes P1, P1, P1 are The vicinity of each end is inserted into the U-grooves 200a, 200a, 200a in the blank tube mount 200 in the bulge processing feed region.
[0025]
In this state, as shown in FIG. 6, the three elementary tubes P1, P1, and P1 are held at the rear end side by the collet chuck 206a of the pipe moving device 206, and at the leading end in the elementary tube P1 from the rear end side. A metal core 301 having a bulge forming part 301a on the side is inserted.
[0026]
The pipe moving device 206 travels along the rail 203 laid on the bulge processing device 4 on the table surface of the pipe aligning and feeding device 2 with the raw pipes P1, P1 and P1 sandwiched therebetween. At this time, the raw tube mounting base 200 on which the both ends of the three raw tubes P1, P1, and P1 are placed obstructs the travel of the pipe moving device 206. Along with the rails 204 laid so as to be orthogonal to each other, the pipes are moved to a position indicated by a dotted line in FIG. Also, First The raw tube moving device 205 is also returned to the region of the second pipe arranging mechanism.
[0027]
Next, the pipe moving device 206 starts traveling toward the bulge processing device 4 with the three elementary tubes P1, P1, and P1 chucked, and the three elementary tubes P1, P1, and P1 are bulged from the tip side. It feeds into the processing device 4. On the other hand, the cored bar feed driving device 300 operates in synchronism with this, and the cored bars 301, 301, 301 are caused to travel in the element pipes P1, P1, P1, and the bulge forming part is formed at the bellows part forming position of the element pipe P1. 301a is stopped (see FIG. 8).
[0028]
As shown in FIG. 7, the mold main body 400 in the bulge processing apparatus 4 includes an upper divided mold 401 and a lower divided mold 402. At the joining edge of the divided mold 401 and the divided mold 402, there are 3 half-divided holes 401a and 402a which are formed as a series of divided holes when they are joined to each other and sandwich the element pipe P1 with a predetermined interval therebetween. A hole has been opened.
[0029]
A pair of left and right split mold guide holes 401c-401c, 402c-402c are formed on the upper side of the split mold 401 and the lower side of the split mold 402, respectively, and guides are inserted through the guide holes 401c, 402c. The split molds 401 and 402 are moved (upright movement) while being supported by the shaft (not shown) so as to be perpendicular to the axial direction of the tube body.
[0030]
On the other hand, flanges 401b-401b and 402b-402b are formed to project from left and right ends of the upper split mold 401 and the lower split mold 402, and the flange 401b in the upper split mold 401 is The flange 402b in the lower split mold 402 is formed as a flange that is slightly longer than the flange 401b.
[0031]
The clamp plate (not shown) is provided with recesses that fit into the flanges 401b-402b, 401b-402b of both split molds 401, 402 that are joined. Are fitted to the flanges 401c and 402c and the flanges 401b and 402b from the left and right sides, and the two divided molds 401 and 402 are integrally attached to form a set of mold bodies 400.
[0032]
Further, a clamp plate rotation hole is formed in the clamp plate, and the clamp plate itself is rotated about a rotation shaft inserted through the rotation hole. Accordingly, the clamp plate can be released from the short flange 401b of the upper split mold 401 while being held in a state of being hooked to the long flange 402b of the lower split mold, and The clamp plate is moved in the left-right direction to be attached to and detached from the mold body 400. For this reason, the degree of wear of the mold body 400 can be remarkably reduced, and attachment to and removal from the mold body 400 is facilitated.
[0033]
The clamp plate has been described as having a configuration in which the upper and lower divided molds 401 and 402 are inserted into the concave portion. However, a concave portion is provided on the upper and lower divided molds 401 and 402 side, and a convex portion provided on the clamp plate side is provided in the concave portion. You may make it insert.
[0034]
The divided molds 401 and 402 of the mold body 400 may be two holes or one hole instead of three holes, but a case with three holes is preferable. The reason for this is that when forming one flexible pipe P, the center split holes 401a-402a of the mold body 400 can be used, and when forming two flexible pipes P, P. The left and right split holes 401a-402a, 401a-402a of the mold body 400 can be used. In this way, it is possible to balance the load applied to the mold body 400 during bulging, and it is not necessary to replace the mold body 400 each time regardless of the number of bulgings of the flexible pipe P. . In consideration of the weight, operability, durability and the like of the mold main body 400, three holes are suitable when the mold main body 400 is formed of a normal material.
[0035]
Further, the upper divided molds 401,... And the lower divided molds 402,... Are connected to each other by connecting pins (not shown) that can be freely moved. Further, both ends of the raw tube P1 are hermetically supported by moving end caps 401-2 and 402-2 and fixing end caps 401-1 and 402-1.
[0036]
As described above, according to the bulge processing apparatus 4, the three half holes 401 a to 402 a and 401 a to 402 a of the pair of divided molds 401 and 402 that constitute a pair of mold main bodies 400 are respectively three. The outer periphery of the raw pipe P1 is constrained in a series in the radial direction, and a large number of the mold bodies 400 thus arranged are arranged in the axial direction of the pipe, and the inside of the bulging portion of each of the raw pipes P1, P1, P1 The bulge forming part 301a of the cored bar 301 is positioned on the top (see FIG. 8).
[0037]
In the metal core 301, the water liquid whose water pressure has been increased by the molding pressure generator 9 flows into the metal core 301 of each element pipe P1 via the water-liquid branching mechanism 900, and the hole 301b of the bulge forming portion 301a is formed. ,... Swell out the bulge processing portion of the raw pipe P1. Then, the moving end caps 401-2 and 402-2 are compressed and moved to the fixing end caps 401-1 and 402-1 side, and are moved to predetermined positions on the outer circumferences of the three elementary pipes P1, P1, and P1 at the peripheral time. A corrugated bellows portion P2 is formed (see FIG. 9). 302 is a ring for sealing.
[0038]
The bulge processing post-processing device 5 aligns the molded flexible pipe P extruded from the bulge processing device 4, and guide grooves 500a, 500a, 500a for receiving the extruded flexible pipe P on the table surface. Are lined up. In addition, it was suspended movably on the top side of the device. Second A tube moving device 501 is arranged (see FIG. 11). Second The raw pipe moving device 501 includes a travel plate 501a and pipe chucks 501b, 501b, and 501b that sandwich the flexible pipes P, P, and P.
[0039]
In addition, reference numeral 503 shown in FIG. 10B denotes a cylinder, and reference numeral 504 denotes an end pushing plate, and when the flexible pipe P is pushed out from the bulge processing apparatus 4, it can respond and pass through the cylinder 503. The ends of the flexible pipes P, P, and P are pressed and aligned by the above operation.
[0040]
Second The flexible pipes P, P, and P chucked by the raw tube moving device 501 are moved to the leakage inspection device 6. As shown in FIG. 11, the leak inspection apparatus 6 is a water tank. Each flexible pipe P, P, P is supported at both ends by a sealing support plate 600 and sealed by a rubber seal member 601. Air is fed into the flexible pipe P from the air feed hose 602 through the rubber seal member 601 (see FIG. 12). Since the flexible pipe P is submerged in the water tank of the leak inspection apparatus 6, if a crack is generated, bubbles are generated and detected.
[0041]
In addition, although illustration is abbreviate | omitted, the flexible pipe P which has produced the crack etc. can be detected by measuring the fall rate of the air sent in the flexible pipe P with a gas amount detection apparatus etc. It can also be known by visually observing bubbles generated in the water tank.
[0042]
Second The raw tube moving device 501 releases the flexible pipe P on the table 502 after the leak inspection. Since the table 502 is inclined to the pipe sorting bucket 7, the released flexible pipe P inevitably rolls toward the pipe sorting bucket 7.
[0043]
The pipe sorting bucket 7 includes a finished product storage box 700 that stores a finished product of the flexible pipe P, and a defective product storage box 701 that stores a defective product. As shown in FIG. 11, the defective product storage box 701 is installed on the apparatus side, and the finished product storage box 700 is disposed outside the defective product storage box 701.
[0044]
A plurality of open / close plates 702 are attached to the upper surface side of the defective product storage box 701 at appropriate intervals. When the open / close plates 702 are in the open state, as shown in FIG. A path to the finished product storage box 700 is created by the opening / closing plate 702 on the upper surface, and the flexible pipe P that has passed through the table 502 is dropped into the finished product storage box 700 without falling into the defective product storage box 701. The
[0045]
When the open / close plate 702 is closed, the open / close plate 702 does not form a passage to the finished product storage box 700 on the upper surface of the defective product storage box 701 as shown in FIG. The flexible pipe P is dropped into the defective storage box 701 that is left open as it is, and the defective flexible pipe P and the finished flexible pipe P can be sorted and stored. it can.
[0046]
Next, the electrical system configuration of the metal bellows processing apparatus according to the present invention will be described with reference to the block diagram of FIG. That is, as an electrical system configuration, a system control unit 800 that controls and controls the operation of each unit, an interface unit 801, a system operation storage unit 802, an emergency detection unit 803, a pipe supply command unit 804, and a pipe alignment feed command unit 805 , A metal core feed command unit 806, a bulge processing command unit 807, a bulge processing post-processing command unit 808, a leak inspection command unit 809, a pipe selection command unit 810, a molding pressure command unit 811, a hydraulic pressure command unit 812, and the like.
[0047]
The interface unit 801 inputs operation base information of each unit to the system control unit 800 from the information input unit 900 in the control disk 8 connected to the apparatus. The information input unit 900 may be any of keyboard operation means having character keys and numeric keys, program software reading means, personal computer terminal means, and the like.
[0048]
The system operation storage unit 802 stores input information from the information input unit 900 and a progress operation of each unit in the apparatus, and enables a sequence control operation of each unit of the apparatus based on a general command of the system control unit 800.
[0049]
When the safety monitoring device 11 detects that an operator or the like has entered the monitoring area, the emergency detection unit 803 outputs an emergency detection signal, and the system control unit 800 causes the entire operation of each part of the device or related parts to be detected. The operation can be stopped.
[0050]
The pipe supply command unit 804 outputs a motor drive signal and outputs an operation signal of the drive gear 300 in the pipe supply device 1, although not shown, an operation start signal or an operation to the drive motor of the drive gear 300. Stop.
[0051]
The pipe alignment feed command unit 805 includes a first pipe row confirmation command unit, a forming command unit, a first pipe lateral feed command unit, a second pipe row confirmation command unit, a second pipe lateral feed command unit, and a pipe end press command. , A pipe movement command means, a collet chuck command means, a pipe movement command means, and the like.
[0052]
The first pipe arrangement confirmation command means outputs an arrangement confirmation signal, and determines whether or not the raw pipe P1 is arranged on the raw pipe mount 200 arranged in the first pipe arrangement mechanism. To detect . The forming command means outputs a punch operation signal, and operates the punch 201 so as to expand both ends of the raw pipe P1 placed on the first pipe arranging mechanism.
[0053]
The first pipe transverse feed command means outputs a vertical movement operation signal, operates the transverse feed base 202 arranged in the first pipe arranging mechanism, and moves the raw pipe P1 to the element of the second pipe arranging mechanism. Move to tube mount 200,
[0054]
The second pipe row setting command stage outputs a second row setting confirmation signal such as a primary placement confirmation signal and a secondary placement confirmation signal to the raw pipe stage 200 in the second pipe row mechanism region. The placement location of the raw pipe P1 that has been moved is detected, and the placement movement is performed. First, when the raw pipe P1 is inserted into the first U-groove 200a, the primary placement confirmation signal is output, and the first pipe lateral feed command means is based on the output of the primary placement confirmation signal. The first lateral feed base 202 is operated to move the raw pipe P1 into the second (center) U groove 200a. Then, when the secondary placement confirmation signal is output, the second pipe transverse feed command means operates the second transverse feed base 202 based on the output of the secondary placement confirmation signal, and the raw pipe P1 is moved to the first place. Move into the third U-groove 200a.
[0055]
In the above case, the processing information of the three flexible pipes P is stored in the system operation storage unit 802. However, in the case of one, the raw pipe P1 is placed in the second (center) U groove 200a. In the case of two tubes, the raw tube P1 is operated to be placed in the first U-groove 200a and the third U-groove 200a.
[0056]
The pipe end press command means outputs an advance / retreat command signal, and corrects the unevenness of the end of the raw pipe P1 by the pipe end press plate 203. The tube moving means outputs a tube moving signal, First The raw pipe moving device 205 is operated to move the raw pipe P1 whose end is aligned at a predetermined position to the bulge processing feed region.
[0057]
The collet chuck command means 811 outputs a raw tube chuck signal and causes the rear end portion of the raw tube P1 moved to the bulge processing feed region to be clamped by the collet chuck 206a. Further, the pipe moving means outputs a pipe moving signal, and feeds the raw pipe P1 in the collet chucked state to the bulge processing apparatus 4 by running the pipe moving apparatus 206.
[0058]
The mandrel feed command unit 806 outputs a mandrel feed signal, and the mandrel feed driving is performed in synchronization with the pipe moving device 206 starting to travel toward the bulge processing device 4 with the base pipe P1 chucked. The apparatus 300 is operated, and the cored bar 301 is caused to travel in the element pipe P1 and the bulge forming part 301a on the tip side is stopped at the bellows part forming position of the element pipe P1.
[0059]
The molding pressure command unit 811 outputs a molding pressure command signal, and causes the water liquid whose pressure has been increased by the molding pressure generator 9 to flow into the metal core 301 via the water-liquid branching mechanism 900, and the bulge processing molding unit 301a. , And the bulge-processed portion of the element tube P1 is bulged. Further, the hydraulic pressure command unit 812 outputs a hydraulic pressure command signal and adds the bulge forming pressure in the bulge processing apparatus 4.
[0060]
The bulge processing command unit 807 outputs a bulge command signal and drives the die body 400 to the raw pipe P1 sent to the bulge processing device 4 to perform bulge processing. The bulge command signal in the bulge processing command unit 807 opens and closes the upper and lower divided molds 401 and 402 by a mold opening / closing signal, and the moving end caps 401-2 and 402-2 are compressed by an advance / retreat signal. And release. Of course, the bulge command signal is synchronized with the core bar feed signal of the core bar feed command unit 806, the molding command signal of the molding pressure command unit 811, the hydraulic command signal of the hydraulic command unit 812, and the like.
[0061]
The bulge processing post-processing command unit 809 outputs a post-processing signal and aligns the flexible pipe P pushed out from the bulge processing device 4 with the guide groove 500a. Further, a pipe end pressing signal is output, and the cylinder 503 and the pipe end pressing plate 504 provided in the bulge processing post-processing device 5 are operated to align the ends of the flexible pipes P. Furthermore, it outputs a tube chuck signal and is suspended from the table surface. Second The raw pipe moving device 501 is operated to hold the flexible pipe P and move it to the leakage inspection device 6. After the leakage inspection is completed, the flexible pipe P is released to the table 502.
[0062]
The leak inspection command unit 809 outputs a pipe sealing signal, and a rubber seal member 601 protruding from the sealing support plate 600 Second Both ends of the flexible pipe P chucked by the raw pipe moving device 501 are sealed and supported in a water tank of the leak inspection device 6, and a rubber seal is provided from an air feed hose 602 communicated with a compressed gas feed device (not shown). Air is sent into the flexible pipe P through the member 601.
[0063]
The pipe selection command unit 810 outputs a pipe selection signal. When the flexible pipe P is determined to be a completed product, the pipe selection command unit 810 outputs a completion signal, with an appropriate interval on the upper surface side of the defective product storage box 701. A plurality of attached opening and closing plates 702 are opened, a passage leading to the finished product storage box 700 is formed on the upper surface side of the defective product storage box 701, and the upper surface of the defective product storage box 701 is passed through and dropped to the finished product storage box 700. Let
[0064]
When the flexible pipe P is determined to be defective, a defect signal is output, the open / close plate 702 is closed, and the upper surface side of the defective product storage box 701 is opened to complete the defective flexible pipe P. Without being sent to the product storage box 700 side, it is dropped into the defective product storage box 701 as it is.
[0065]
Next, the operation of the metal bellows processing apparatus according to the present invention is as follows. 16 and 17 It demonstrates based on the flowchart of these. When the apparatus is turned on and the operation of the apparatus is started, in step 100, the system operation storage unit 802 stores the flexible pipe P in the system operation storage unit 802 such as the number of raw pipes P1 to be formed and the forming interval of the bellows part P2. Whether necessary information is stored is determined.
[0066]
If it is determined in step 100 that information necessary for molding is stored in the system operation storage unit 802, the process proceeds to step 101, where each unit of the apparatus is set in an operation standby state, and further proceeds to step 102, where The supply device 1 is operated to pick up the pipes P1 one by one from the pipe storage sorting bucket 100 and feed them into the pipe alignment feed device 2.
[0067]
In step 103, it is determined whether or not the raw pipes P1 are arranged in the first pipe alignment mechanism in the pipe alignment feed device 2. If it is determined that the raw pipes P1 are arranged, the process proceeds to step 104. Both ends of the elementary pipes P1 arranged in the first pipe alignment mechanism are expanded by the punch 201.
[0068]
In step 105, the pipe transverse feed table 201 is operated and the expanded pipe P1 is laterally fed to the second pipe alignment mechanism, and the raw pipe P1 is aligned on the second pipe alignment mechanism.
[0069]
In Step 106, it is determined whether or not the alignment of the raw pipe P1 is completed on the second pipe alignment mechanism by the operation of the pipe transverse feed table 201. In Step 107, First The raw pipe moving device 205 is operated to sandwich the raw pipe P1 aligned on the second pipe alignment mechanism and move it to the bulge processing feed region.
[0070]
In step 108, the base pipe P1 moved to the bulge processing feed region is sandwiched between the collet chucks 206a of the pipe moving device 206, and the bulge of the core metal 301 from the rear end of the base pipe P1 by the operation of the core metal feed device 3. The machined portion is inserted into the raw pipe P1 and is put into a bulge processing standby state.
[0071]
In Step 109, the pipe moving device 206 is caused to travel on the raw pipe P1 in a state of being collet-chucked and fed to the bulge processing device 4, and the core metal feeding device 3 is also synchronized with the pipe moving device 206. 300 is operated, and the bulge forming part 300a of the cored bar 301 is set to the bellows part forming position of the base tube P1, and the bulge processing is possible.
[0072]
In step 110, the bulge processing device 4 drives the mold body 400 to open and close the upper and lower divided molds 401 and 402 at the location of the base pipe P1 to perform bulge processing. At this time, the forming pressure generating device 9, the water / liquid branching mechanism 900, the hydraulic device 10 and the like are also synchronized so that the water / liquid with the increased water pressure flows into the metal core 301 and the holes 301b of the bulge forming portion 301a,. -Let it flow out and bulge the bulge processing part of the elementary pipe P1.
[0073]
In step 111, it is determined whether or not the bulging processing of the necessary portion for the raw pipe P <b> 1 is finished in the bulging processing device 4. Here, when it is determined that the bulge processing has not been completed, the process returns to step 108, but when it is determined that the bulge process has been completed, the process proceeds to step 112.
[0074]
In step 112, the bulge processing post-processing device 5 aligns the flexible pipes P extruded from the bulge processing device 4, and Second The flexible pipe P is clamped and moved to the leak inspection device 6 by the operation of the raw tube moving device 501, and it is determined whether or not the bulge processing is finished.
[0075]
In step 113, the leakage inspection device 6 is operated. Second Both ends of each flexible pipe P chucked by the raw pipe moving device 501 are submerged in a water tank while hermetically supporting both ends, and air is fed into the flexible pipe P through a compressed gas feeding device, and leakage inspection is performed.
[0076]
In step 114, it is determined whether or not the leakage of the flexible pipe P has been inspected by the gas reduction rate of the compressed gas feeder or by visual observation. If the leakage is detected, the process proceeds to step 115, and no leakage is detected. Then go to step 116.
[0077]
[0078]
In step 115, the pipe sorting bucket 7 is operated, the open / close plate 702 on the upper surface side of the defective product storage box 701 is closed, and the defective product storage box 701 is opened, and the process proceeds to step 117. In step 117, Second The defective flexible pipe P chucked by the raw tube moving device 501 is dropped on the defective product storage box 701 without being released on the table 502 and sent to the finished product storage box 700 side.
[0079]
In step 116, the opening / closing plate 702 on the upper surface side of the defective product storage box 701 is opened, and the upper surface side of the defective product storage box 701 is closed, and the process proceeds to step 119. In step 119, Second The completed flexible pipe P chucked by the blank tube moving device 501 is released on the table 502, released on the defective product storage box 701, passes through the upper surface of the defective product storage box 701, and is dropped. .
[0080]
As described above, according to this embodiment, the pipes are fed one by one from the pipe supply device for storing the pipes to the pipe aligning / feeding apparatus, and the pipes are aligned in the pipe aligning / feeding apparatus and sandwiched so as to be transportable. In addition, a core metal for bulge processing is inserted from the rear end side to the front end side of the raw pipe, and the base pipe in a state where the core metal is inserted from the pipe alignment feeder to the bulge processing apparatus is fed to have a bellows portion. The flexible pipe is bulged, the flexible pipe sent out from the bulge processing device is subjected to leakage inspection to determine whether it is a finished product or defective product, and the finished product and defective product are collected separately. Yes. Further, the pipe aligning / feeding apparatus is configured to align at least three element pipes, and the bulge processing apparatus is configured to be capable of bulging at least three element pipes.
[0081]
Therefore, it is possible to perform sequence control as a series of operations from picking up the raw tube to aligning, bulging, post-processing, leak inspection, defective product sorting, etc., and the flexible pipe P made of stainless steel as a finished product without defects. It can be manufactured with high productivity.
【The invention's effect】
As described above, according to the present invention, when a flexible pipe as a finished product is obtained, a series of operations is performed as an apparatus having an integral structure, and the raw tube is taken out, moved and aligned, and the cored bar. Insertion, bulge processing, post-bulge processing, leakage inspection, sorting of finished and defective products, etc. can be efficiently prepared, so stainless steel flexible pipes can be efficiently manufactured from raw pipes with high mass productivity. can do.
[Brief description of the drawings]
FIG. 1 is an explanatory plan view showing a schematic configuration of a metal bellows forming apparatus according to the present invention.
FIG. 2 is an explanatory plan view showing a schematic configuration of the pipe alignment feeding device and the core metal feeding device in FIG. 1;
3 is a cross-sectional view illustrating the schematic configuration of a pipe supply device and a pipe alignment feed device in FIG.
FIG. 4 is a perspective view showing an example of a raw tube mount.
FIG. 5 is an explanatory diagram showing a relationship between a raw tube placing table and a pipe lateral feed table.
FIG. 6 is an explanatory plan view showing a rear end portion of a raw tube and a cored bar insertion state.
FIG. 7 is an explanatory front view showing a combination of mold bodies.
FIG. 8 is an explanatory sectional view showing a bulge processing state.
FIG. 9 is an explanatory sectional view showing a bellows portion forming state.
10 is an explanatory front view showing the bulge processing post-processing apparatus in FIG. 1; FIG.
11 is an explanatory front view showing a bulge processing post-processing device, a leak inspection device, and a pipe sorting bucket in FIG. 1; FIG.
12 is a plan view for explaining the leakage inspection apparatus in FIG. 1. FIG.
13 is an explanatory cross-sectional view showing a pipe sorting bucket in FIG. 1. FIG.
FIG. 14 is an overview diagram showing a flexible pipe.
FIG. 15 is a block diagram showing an electrical configuration of the metal bellows forming apparatus according to the present invention.
FIG. 16 is a flowchart showing an operation until a bulge processing standby operation of the metal bellows forming apparatus according to the present invention.
FIG. 17 is a flowchart showing an operation of the metal bellows forming apparatus according to the present invention from a bulgeable state.
[Explanation of symbols]
1 Pipe feeder
2 Pipe alignment feeder
3 Core feeder
4 Bulge processing equipment
5 Post-processing equipment for bulge processing
6 Leak inspection device
7 Pipe sorting bucket
8 Control disk
9 Molding pressure generator

Claims (1)

中空状の素管を拾い上げて順次整列させ、バルジ加工を施してフレキシブルパイプを成形し、成形されたフレキシブルパイプに漏れ検査を施して欠陥品か完成品かの選別をして振り分け収納するバルジ加工用の金属ベローズ装置であって、
収納用バケットに収納されている多数本の中空状の素管から、収納用バケットの底部の傾斜面と振動発生装置とにより1本ごとに素管を順次拾い上げるパイプ供給装置と、
上記パイプ供給装置から拾い上げられてきた素管を、一対の素管載せ台とその間に配置されたパイプ横送り台とよりなるパイプ列設機構上に受入れると共に、受入れられた素管を転動させて横送りして所定の位置に整列さるパイプ整列送り装置と、
上記パイプ整列送り装置により整列された素管を、吊り下げつつ挟持してバルジ加工送り領域の素管載せ台へと移動させる第1の素管移動装置と、
上記バルジ加工送り領域の素管載せ台に載置された素管を先端側よりバルジ加工装置に送り込むパイプ移動装置と、
上記パイプ移動装置の動作に同期して素管の後端側からバルジ加工用の芯金を挿入する芯金送り装置と、
上記パイプ移動装置から送り込まれてきた素管は、上下側の分割金型の金型本体を素管の径方向より拘束すると共に、多数列設された金型本体を管体軸方向に圧縮移動させつつ蛇腹部を有するフレキシブルパイプをバルジ成形するバルジ加工装置と、
上記バルジ加工装置より押し出されてきた蛇腹部を有するフレキシブルパイプを整列させると共に、フレキシブルパイプを第2の素管移動装置のパイプチャックにより吊り下げ可能とするバルジ加工後処理装置と、
上記バルジ加工後処理装置の第2の素管移動装置によりチャックされ、水槽内に移動されたフレキシブルパイプ水槽に水没させてその両端部を密封すると共に、フレキシブルパイプ内に空気を送り込んで洩れを検出する洩れ検査装置と、
上記洩れ検査装置の検査後に上記第2の素管移動装置により移動解放させられたフレキシブルパイプ傾斜面上でパイプ選別バケットに向けて転動るテーブルと、
上記テーブルを転動したフレキシブルパイプ、欠陥品収納ボックスの上面に設けた開閉自在な開閉板を閉状態とし、上記欠陥品収納ボックスが開口状態の際には上記欠陥品収納ボックス内に落下させ、その開閉板を開状態とし、上記欠陥品収納ボックスが閉口状態の際には完成品収納ボックスへと通過させ、完成品と欠陥品のフレキシブルパイプを選別して振り分け収納するパイプ選別バケットと、
を備えたことを特徴とするバルジ加工用の金属ベローズ成形装置。
Bulge processing that picks up hollow tubes and aligns them sequentially, forms bulges to form flexible pipes, performs leak inspection on the formed flexible pipes, sorts out defective products, and sorts and stores them. Metal bellows device for
A pipe supply device that sequentially picks up the pipes one by one by the inclined surface of the bottom part of the storage bucket and the vibration generator from a plurality of hollow pipes stored in the storage bucket;
The raw pipe picked up from the pipe supply device is received on a pipe arrangement mechanism composed of a pair of raw pipe mounting bases and a pipe horizontal feed base arranged therebetween, and the received raw pipes are rolled. A pipe aligning and feeding device that is laterally fed and aligned at a predetermined position;
A first pipe moving device for holding the pipe aligned by the pipe aligning and feeding apparatus while suspending the pipe and moving the pipe to a base of the bulge processing feed area;
A pipe moving device that feeds the raw tube placed on the raw tube mount in the bulge processing feed region from the tip side to the bulge processing device;
A metal core feeding device for inserting a metal core for bulge processing from the rear end side of the raw pipe in synchronization with the operation of the pipe moving device ;
The raw pipe sent from the pipe moving device restrains the upper and lower split mold main bodies from the radial direction of the main pipe and compresses and moves the multiple rows of main bodies arranged in the axial direction. A bulge processing device for bulging a flexible pipe having a bellows portion while
A bulge processing post-processing device that aligns the flexible pipe having the bellows portion extruded from the bulge processing device, and enables the flexible pipe to be suspended by the pipe chuck of the second element pipe moving device;
The flexible pipe that has been chucked and moved into the water tank by the second bulge processing post-processing apparatus is submerged in the water tank and sealed at both ends, and air is sent into the flexible pipe to leak. A leak inspection device to detect;
Moved by said second base tube moving device after the inspection of the leak test apparatus, a table freed allowed was flexible pipe you roll toward the pipe sorting bucket on the inclined surface,
The flexible pipe that has rolled the table is closed with the openable opening / closing plate provided on the upper surface of the defective product storage box, and when the defective product storage box is open , it is dropped into the defective product storage box. The opening and closing plate is opened, and when the defective product storage box is in the closed state, it is passed through the finished product storage box, and the pipe sorting bucket for sorting and storing the finished product and the defective flexible pipe,
A metal bellows forming apparatus for bulge processing characterized by comprising:
JP2000204350A 2000-06-02 2000-06-02 Metal bellows forming method and metal bellows forming apparatus for bulge processing Expired - Fee Related JP4251255B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2000204350A JP4251255B2 (en) 2000-06-02 2000-06-02 Metal bellows forming method and metal bellows forming apparatus for bulge processing
TW90112965A TW534838B (en) 2000-06-02 2001-05-29 Method for forming bellows of metallic tube and apparatus for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000204350A JP4251255B2 (en) 2000-06-02 2000-06-02 Metal bellows forming method and metal bellows forming apparatus for bulge processing

Publications (2)

Publication Number Publication Date
JP2001340921A JP2001340921A (en) 2001-12-11
JP4251255B2 true JP4251255B2 (en) 2009-04-08

Family

ID=18701621

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000204350A Expired - Fee Related JP4251255B2 (en) 2000-06-02 2000-06-02 Metal bellows forming method and metal bellows forming apparatus for bulge processing

Country Status (2)

Country Link
JP (1) JP4251255B2 (en)
TW (1) TW534838B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013011595A1 (en) * 2011-07-15 2013-01-24 株式会社 昭和螺旋管製作所 Method for forming metal bellows for bulge processing, and device for forming metal bellows

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107471618A (en) * 2016-12-21 2017-12-15 温州风神硅胶制品有限公司 A kind of corrugated pipe forming machine
JP6319699B1 (en) * 2016-12-24 2018-05-09 株式会社昭和螺旋管製作所 Metal tube bellows forming method for bulge processing and metal tube bellows forming apparatus
CN107866459B (en) * 2017-11-29 2024-05-10 佛山市永恒液压机械有限公司 Internal high-pressure forming machine for processing clamping and pressing type pipe fitting
WO2021029392A1 (en) * 2019-08-15 2021-02-18 住友重機械工業株式会社 Display device and shaping device
CN112547840B (en) * 2020-12-23 2023-05-09 珠海格力智能装备有限公司 Feeding control method and device of pipe bending machine and feeding controller of pipe bending machine
CN113441600B (en) * 2021-07-20 2022-03-18 佛山市永恒液压机械有限公司 Efficient elbow forming device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013011595A1 (en) * 2011-07-15 2013-01-24 株式会社 昭和螺旋管製作所 Method for forming metal bellows for bulge processing, and device for forming metal bellows
JP2013039617A (en) * 2011-07-15 2013-02-28 Showarasenkan Seisakusho Co Ltd Method of forming metal bellows for bulging and apparatus for forming the metal bellows

Also Published As

Publication number Publication date
TW534838B (en) 2003-06-01
JP2001340921A (en) 2001-12-11

Similar Documents

Publication Publication Date Title
CN209503422U (en) A kind of manual razor automatically assembles equipment
JP4251255B2 (en) Metal bellows forming method and metal bellows forming apparatus for bulge processing
CN111375694B (en) Compressor shell stamping and welding robot production line
KR102048461B1 (en) Equipment for manufacturing separator for fuel cell and method of manufacturing the same
KR101519365B1 (en) Pipe T Molding Machine and Molding Method of Pipe Thereof
CN113003164A (en) High-speed feeding device for cigarette filter tip paper tubes
CN112171286A (en) TIG Circumferential Seam Welding Device and TIG Circular Seam Welding Process for Tank Bottom
CN109514230A (en) A kind of manual razor automatically assembles equipment and its control method
CN109822319A (en) A kind of sealing diaphragm automatic assembly equipment
CN217122358U (en) Assembling machine for additionally installing clamp spring in wind bell pipe
CN106695181A (en) Automatic pipe welding device
CN113211871B (en) A fully automatic blood bag making machine
CN114378587B (en) Automatic production line for plate core of super-large flat plate collector
CN120170468A (en) Adjustment mechanism, automation system and automatic forming device for flexible forming mold of nuclear power steel lining
JPH0420135B2 (en)
WO2001094046A1 (en) Bulging metal-bellows forming method, and metal bellows forming device
CN115008193A (en) Automatic roller assembly line
CN110682098B (en) Circulating type automatic assembling equipment for sole massage ring
CN105618893B (en) Cylinder and its lid arc welding equipment
CN209632496U (en) One kind dialling key row seat full automatic assembly machine
CN222972921U (en) Blood bag making equipment
CN111113063A (en) Double-block type sleeper steel bar manufacturing and mounting system
CN114505365B (en) Processing equipment for rolling metal strip into umbrella tube
JPH05208298A (en) Plate joint welding method and automatic welding apparatus thereof
CN211105948U (en) Bag making machine

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20001222

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20061205

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061129

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20070214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070220

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070302

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070507

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070703

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070717

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071016

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071112

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080122

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20080227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080826

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081007

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081007

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20081216

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090107

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120130

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130130

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140130

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees