JP4284858B2 - Manufacturing method of heat insulation box - Google Patents
Manufacturing method of heat insulation box Download PDFInfo
- Publication number
- JP4284858B2 JP4284858B2 JP2000346769A JP2000346769A JP4284858B2 JP 4284858 B2 JP4284858 B2 JP 4284858B2 JP 2000346769 A JP2000346769 A JP 2000346769A JP 2000346769 A JP2000346769 A JP 2000346769A JP 4284858 B2 JP4284858 B2 JP 4284858B2
- Authority
- JP
- Japan
- Prior art keywords
- plate
- box
- forming
- inner box
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Packages (AREA)
- Thermal Insulation (AREA)
- Refrigerator Housings (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は外箱と内箱との間に発泡体原液を注入して断熱箱体を製造する方法に関する。
【0002】
【従来の技術】
断熱箱体は外箱(外板)と内箱とこれらを満たす断熱材により構成されている。このような断熱箱体を製造する場合、全面に断熱材が行き渡るようにするため、時間が経つと化学反応により固体化する液状の断熱材を用いるのが一般的である。
この場合、外箱と内箱との突き合わせの部分等に生じる隙間から液状の断熱体が漏出するのを防止するため、組み込んだ後に隙間を塞ぐようにシール材を塗布する必要がある。その方法として例えば特開昭61−120973号公報に示されるように細長いニードルガンを用いて塗布することも考えられるが、このような隙間はノズルが被塗布材に干渉しやすい位置にあり十分に塗布できない、よって通常は作業に慎重を期すため手作業で行われる。しかし手作業では、個人差による品質のばらつきが大きい上、作業に時間がかかり効率が悪く、さらに片面からシール材を塗布するようになるため、特に材質の異なる内箱と外箱の境界の隙間を確実にシールすることが難しいという問題があった。このような問題を解決する方法としては、例えば特開昭58−95179号公報のようなものもある。
【0003】
特開昭58−95179号公報では、コイル状に巻かれた鋼板を引き出した時点で、鋼板を折り曲げたときに内箱等との突き合わせに当る部分に、押出成形機にてシール用の合成樹脂材である軟質塩化ビニール樹脂を装着し、それから鋼板をカット、成形する方法が示されている。
【0004】
【発明が解決しようとする課題】
しかし、特開昭58−95179号公報に示されている方法では、押出成形機により鋼板上に付着したシール材のうち余分なものは次工程の切欠金型で取り除いているが、実際に組み立てたときに隙間が生じる範囲は狭いため、シール材のほとんどが捨てられることとなる。また、塩化ビニール樹脂は、軟質を指定するとはいえ変形しにくいため、内箱挿入時に内箱を圧迫し変形させるおそれがあるとともに十分なシール効果が得られないおそれがある。
【0005】
本発明はこれらの問題点を解決するためになされたものであり、自動化を可能とし、シール材の使用を必要最低限としてコストダウンを図りつつ特に内箱と外箱の隙間からの発泡体原液の漏出防止を確実にすることを目的とする。
【0006】
【課題を解決するための手段】
長方形の金属薄板をカットプレス加工することで相対する長辺の片側に仕切り板固定用穴を有する外板を形成する第一の工程と、
長辺をロールフォーミング加工することで二重フランジ部、一重フランジ部およびフランジ下部を形成する第二の工程と、
仕切り板固定用穴から300mm以下の距離に位置するフランジ下部と外板との間に発泡ゴムを塗布する第三の工程と、
外板を門型に曲げ加工して外箱を形成する第四の工程と、
内箱を外箱に挿入する第五の工程と、
底板および背面板を取り付ける第六の工程と、
外箱と内箱と背面板とからなる空間に大気中に放置した時点より3秒から6秒で粘度300cpsに到達する発泡体原液を注入する第七の工程とを具備する。
【0007】
長方形の金属薄板をカットプレス加工することで相対する長辺の相二個所に切欠を有する外板を形成する第一の工程と、
長辺をロールフォーミング加工することでフランジ部およびフランジ下部を形成する第二の工程と、
切欠から300mm以下の距離に位置するフランジ下部と外板との間に発泡ゴムを塗布する第三の工程と、
外板を切欠部分で門型に曲げ加工して外箱を形成する第四の工程と、
内箱を外箱に挿入する第五の工程と、
底板および背面板を取り付ける第六の工程と、
外箱と内箱と背面板とからなる空間に大気中に放置した時点より3秒から6秒で粘度300cpsに到達する発泡体原液を注入する第七の工程とを具備する。
【0008】
【発明の実施の形態】
実施の形態1.
この発明の実施の形態を図1から図10を用いて説明する。図1は断熱箱体の製造方法の流れを示すフローチャート、図2は製造過程の説明図、図3は断熱箱体の断面図、図4は外板の構成を示す構成図、図5は仕切り板を接続する部分の構成を示す構成図、図6はコーナ部分の前面フランジと内箱の構成を示す構成図、図7はシール材塗布後の外板の構成を示す構成図、図8は発泡体原液とシール材の塗布距離の関係を示すグラフ、図9は曲げ加工及び内箱挿入した状態でのシール部の外観を示す構成図、図10は発泡ゴム塗布後のシール状態を示す断面図である。
【0009】
まず、図1及び図2に基づいてこの発明の製造方法について説明する。第一の工程では、鋼板を切断して作られた長方形の切板をカットプレス加工し外板1を形成する(S1)。次に、第二の工程では、外板1の長辺(折り曲げ加工したときに断熱箱体の側面を形成する面に平行)をロールフォーミング成形することで一重フランジ部と二重フランジ部からなる前面フランジ2を有する外板1を作成する(S2)。次に、第三の工程では、前面フランジ2の所定の箇所に塗布ノズル3で発泡ゴムを塗布する(S3)。次に第四の工程では、門形状への折り曲げ加工を行う(S4)。次に第五の工程では、内箱4を挿入する(S5)。次に第六の工程では、鋼板製の底板5を組み付ける(S6)。次に第七の工程では、背面板6を取り付ける(S7)。次に第八の工程では、外板1と内箱4と背面板6とからなる空間に発泡原液としてウレタン発泡体原液を注入ノズル7にて注入する(S8)。これが化学反応により発泡し、固体化することで箱体の断熱性が高まる。
このようにして、断熱箱体は製造される。なお、図1あるいは図2における最終工程後の断熱箱体の断面図は図3のようになっている。
【0010】
以上のように、この発明はロールフォーミング成形後で門形状折り曲げ加工前である第三の工程で発泡ゴムを塗布する工程を設けている。この工程について図4から図10をもとに説明する。
【0011】
まず、発泡ゴムを塗布しなかったならば発泡体原液注入時に発生する漏出箇所について説明する。
図4に示す外板1はカットプレス、ロールフォーミングによって形成されたものであり、前面フランジ部2が設けられている。この前面フランジ部2には、ねじ穴8と切欠部9が設けられており、第三の工程における外板1の初期状態に相当する。図中の二点鎖線で示されるように、この切欠部9が曲げ加工後に断熱箱体のコーナ部に相当する。
【0012】
次に図5に外箱1に内箱4を組み込んだ状態、すなわちS6の状態、の構造を示す。図中、X−X断面図に示すように、予め仕切り板10が取り付けられた内箱4は、S2のロールフォーミングで作られた外板1の前面フランジ2の一重フランジ部11と二重フランジ部12の間に挟み込み、ねじ13により固定される。この前面フランジ2の一重フランジ部11と二重フランジ部12とを繋ぐ鋼板部分であるフランジ下部14には、折り曲げ加工で成形している関係上、隙間15ができてしまう。さらに、二重フランジ部12の中にも隙間16ができてしまう。よって、発泡体原液がこれらの隙間を通りねじ穴8から外部に漏出してしまうことがあり、仕切り板10を取り付ける部分(ねじ穴8の周囲)の隙間15を確実に塞ぐ必要がある。
なお、図中、Y−Y断面図は比較のためねじ穴8の無い部分の前面フランジ2と内箱4の接触部分を示している。
【0013】
次に、図6に外板1を門型に折り曲げたときのコーナ部(図4における切欠部9に相当)の構造を示す。図4の切欠部9は折り曲げて重ね合わせたときの隙間を減らすために切欠の片側には切残し17が設けられている。しかし、このように配慮しても隙間18が生じる。従って、隙間15から入り込んだ発泡体原液が二重フランジ部12の内部の隙間16を通り、隙間18から外部に漏出してしまう。このため、この切欠部9での隙間15も確実に塞ぐ必要がある。
なお、参考までに図6にはコーナ部近傍での断面状態の例として、Z−Z断面の状態も示している。
【0014】
また、図4及び図6に示すとおり、切欠部9は、曲げ加工時に干渉しないよう一重フランジ部11を除去しているため、内箱は一重フランジ部11と二重フランジ部12とで挟み込み固定することができない。従って、内箱4の先端部19と前面フランジ部2との間に隙間20が生じてしまうとともに、二重フランジ部12と内箱4の間にも隙間が生じ、これらを経由して発泡体原液が外部に漏出してしまう。このため隙間20を確実に塞ぐ必要がある。
【0015】
このように、発泡体原液漏出の原因となるのは、ねじ穴8の近傍の前面フランジ部2と外板1との隙間15、及び切欠部9の近傍の内箱4と前面フランジ部2との隙間20である。しかし、これらの隙間を塞ぐために発泡ゴム(シール材)を外板1の前面フランジ2に沿って端から端まで全て塗布したのでは大量の発泡ゴムが必要となってしまい、材料費がかさんでしまう。
【0016】
そこで、各箇所について検討すると、まず、隙間20は切欠部9に相当する部分だけ発泡ゴムを塗布すればよいことはすぐにわかる。一方、隙間15から侵入した発泡体原液は二重フランジ部12の隙間16を流れて外部に対して開口している部分から漏出するが、この隙間16は狭いため、発泡体原液の特性によって流れうる距離が変わってくる。すなわち、流動性の大きい発泡体原液を使用した場合には、考慮すべき距離は長く、流動性の小さい発泡体原液を使用した場合には短くて済む。
【0017】
そのため、図7に示すように各漏出箇所に適正な距離(図7中のA)だけ発泡ゴムを塗布すればよいこととなる。なお、この距離は、発泡体原液の特性(硬化時間)により異なるため、距離を求めるために、以下の実験を行った。
まず、発泡体原液を大気中で粘度300cpsまで到達するのに要する時間(以下、粘度300cps到達時間)から12種類に分ける。続いて、分類された発泡体原液を、それぞれ断熱箱体に注入し、漏出箇所の距離を測定し適正なシール材の塗布距離を求める。この時、発泡体原液が十分に断熱能力を発揮するためには、発泡後に断熱箱体内の所定の空間を全て満たしている必要があり、満たされていない領域(ボイド)の有無により断熱箱体としての品質が左右される。そのため、この点についても確認する。
このような実験による発泡体原液の種類とシール材の塗布距離との関係および品質についてのグラフを図8に示す。グラフの横軸は粘度300cps到達時間であり、縦軸は発泡体原液の漏出を防止するために必要な塗布距離である。また、グラフで灰色の領域は断熱箱体内にボイドが存在する状態を示す。さらに、粘度300cps到達時間が11秒以上の発泡体原液は流動性が良い状態が長く続くため、これに応じてシール材をフランジに沿って全面に塗布する必要がある。なお、実験は20℃で行っている。
【0018】
この実験の結果、大気中に取り出した後、粘度300cps到達時間が3秒から10秒の発泡体原液を選択すれば、フランジに沿って全面に塗布する必要が無くなることがわかる。また、粘度300cps到達時間が1秒から5秒までの間は、時間が1秒増加してもシール材の塗布距離の増加は最大で80mm程度であるが、7秒から10秒ではシール材の距離の増加は最小で120mmであるとともに二次曲線的に増加する傾向を示す。
これから、シール材の塗布距離を短くし、ボイドの発生を抑制しつつ実験環境と製造工程の環境との違いによる粘度300cps到達時間の変化をも考慮すると、発泡体原液は粘度300cps到達時間が3秒から6秒のものが望ましく、この場合シール材は300mm程度の塗布距離で十分である。
【0019】
実際に塗布後に組み立てると図9に示すような外観となる。図中Bは外板1を曲げ加工した直後の天井コーナ部の状態を示している。また、Cは内箱4の挿入後における天井コーナ部の状態を示している。これを、更に詳細に表したのが図10であり、図中、(a)は切欠部での発泡ゴムによるシール状態を示している。図6と比較して、隙間15と隙間20が塞がれることがわかる。特に外板1と内箱4との隙間20は、一枚の板を曲げて生じたフランジ部の隙間と違って、材質が異なるため(外板1は鋼板、内箱4は合成樹脂)、物性の違いから設置環境による変形が予測しずらい。そのため、隙間が使用中に変化することが考えられるので、図に示すように、フランジ下部14の上面にシール材(発泡ゴム)21が添付されていると、内箱4を外箱に挿入したときに、内箱4の先端部19が塗布された発泡ゴム内に食い込むようになる。その結果、先端部19を両側から確実にシールすることとなる。また、シール材21はゴム体であるから板などの変形に対する追従性がよい。
これに対し、図中、(b)はねじ穴8の周囲のシール状態であるが、この場合は一重フランジ部11があるため、隙間15を塞ぐようにシール部21が存在すれば十分である。
【0020】
このような工程である第三の工程により、曲げ加工する前の、ほぼ平板の状態でシール材の塗布作業が可能となるため、注入ノズル7が干渉することもなく、ロボットなどを使用した自動化が容易に行える。
また、干渉要因を排除したことで、注入ノズル7は、外板1の前面フランジ2の直近に接近した上で、注入角度の変更や塗布速度の変更といった制御が可能となり、シール材の塗布品質が向上する。
【0021】
さらに、塗布しなければならない箇所も、必要十分の範囲とすることができたので、広範囲を塗布する必要がなくなり、シール材の消費量が少なくなる。
【0022】
さらに、材質のことなる外板と内箱のシールが確実に行えるとともに、発泡ゴムを使用するため変形に対する追従性がよくなり、長期間の信頼性が向上する。 また、同種の材質である外板とフランジ間の隙間防止においても、追従性向上により発泡体原液の漏出防止に効果がある。
【0023】
【発明の効果】
長方形の金属薄板をカットプレス加工することで相対する長辺の片側に仕切り板固定用穴を有する外板を形成する第一の工程と、
長辺をロールフォーミング加工することで二重フランジ部、一重フランジ部およびフランジ下部を形成する第二の工程と、
仕切り板固定用穴から300mm以下の距離に位置するフランジ下部と外板との間に発泡ゴムを塗布する第三の工程と、
外板を門型に曲げ加工して外箱を形成する第四の工程と、
内箱を外箱に挿入する第五の工程と、
底板および背面板を取り付ける第六の工程と、
外箱と内箱と背面板とからなる空間に大気中に放置した時点より3秒から6秒で粘度300cpsに到達する発泡体原液を注入する第七の工程とを具備するので、門形状に成形後に仕切り板固定用穴にシール材を塗布する必要がなくなるとともにノズルと被塗布材が干渉することもない。また、一定距離にだけ選択的に塗布するのでシール材の使用量を低減できるとともに予め塗布した発泡ゴムにより内箱の先端部分を両側からシールを施した場合と同様の状態となるため確実にシールされるとともに、弾力性があるため内箱と外板の材質の違いによる歪みにも確実に追従し、断熱箱体内の空間全体が発泡体原液で満たされボイドが生じない。
【0024】
長方形の金属薄板をカットプレス加工することで相対する長辺の相二個所に切欠を有する外板を形成する第一の工程と、
長辺をロールフォーミング加工することでフランジ部およびフランジ下部を形成する第二の工程と、
切欠から300mm以下の距離に位置するフランジ下部と外板との間に発泡ゴムを塗布する第三の工程と、
外板を切欠部分で門型に曲げ加工して外箱を形成する第四の工程と、
内箱を外箱に挿入する第五の工程と、
底板および背面板を取り付ける第六の工程と、
外箱と内箱と背面板とからなる空間に大気中に放置した時点より3秒から6秒で粘度300cpsに到達する発泡体原液を注入する第七の工程とを具備するので、門形状に成形後にコーナ部にシール材を塗布する必要がなくなるとともにノズルと被塗布材が干渉することもない。また、一定距離にだけ選択的に塗布するのでシール材の使用量を低減できるとともに予め塗布した発泡ゴムにより内箱の先端部分を両側からシールを施した場合と同様の状態となるため確実にシールされるとともに、弾力性があるため内箱と外板の材質の違いによる歪みにも確実に追従し、断熱箱体内の空間全体が発泡体原液で満たされボイドが生じない。
【図面の簡単な説明】
【図1】 断熱箱体の製造の流れを示すフロー図である。
【図2】 断熱箱体の製造過程の説明図である。
【図3】 断熱箱体の断面図である。
【図4】 外板の構成を示す構成図である。
【図5】 仕切り板を接続する部分の構成を示す構成図である。
【図6】 コーナ部分の前面フランジと内箱の構成を示す構成図である。
【図7】 シール材塗布後の外板の構成を示す構成図である。
【図8】 発泡体原液とシール材の塗布距離の関係を示すグラフである。
【図9】 内箱を挿入した状態でのシール部の外観を示す構成図である。
【図10】 発泡ゴム塗布後のシール状態を示す断面図である。
【符号の説明】
1 外板、 2 前面フランジ、 3 塗布ノズル、 4 内箱、 5 底板、 6 背面板、 7 注入ノズル、 8 ねじ穴、 9 切欠部、 10 仕切り板、 11 一重フランジ部、 12 二重フランジ部、 13 ねじ、 14 フランジ下部、 15 隙間、 16 隙間、 17 切残し、 18 隙間、 19 先端部、 20 隙間、 21 シール部。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for producing a heat insulating box by injecting a foam stock solution between an outer box and an inner box.
[0002]
[Prior art]
The heat insulation box is composed of an outer box (outer plate), an inner box, and a heat insulating material that satisfies them. When manufacturing such a heat insulating box, in order to spread the heat insulating material over the entire surface, it is common to use a liquid heat insulating material that is solidified by a chemical reaction over time.
In this case, in order to prevent the liquid heat insulator from leaking out from the gap generated at the abutting portion between the outer box and the inner box, it is necessary to apply a sealing material so as to close the gap after the assembly. For example, as shown in Japanese Patent Application Laid-Open No. 61-120973, it is conceivable to apply using a long and narrow needle gun. However, such a gap is located at a position where the nozzle easily interferes with the material to be applied. Cannot be applied, so usually done manually to be cautious of the work. However, in manual work, quality variation due to individual differences is large, work is time consuming and inefficient, and seal material is applied from one side, so the gap between the inner and outer boxes of different materials is particularly important. There was a problem that it was difficult to seal securely. As a method for solving such a problem, there is a method as disclosed in, for example, Japanese Patent Application Laid-Open No. 58-95179.
[0003]
In Japanese Patent Laid-Open No. 58-95179, when a steel sheet wound in a coil shape is pulled out, a synthetic resin for sealing with an extrusion molding machine is applied to a portion that is abutted against an inner box or the like when the steel sheet is bent. A method is shown in which a soft vinyl chloride resin material is attached, and then a steel sheet is cut and formed.
[0004]
[Problems to be solved by the invention]
However, in the method disclosed in Japanese Patent Application Laid-Open No. 58-95179, an excess of the sealing material adhering to the steel plate by the extruder is removed by a notch die in the next process. Since the range in which the gap is generated is narrow, most of the sealing material is discarded. In addition, although vinyl chloride resin is soft, it is difficult to be deformed. Therefore, the inner box may be pressed and deformed when the inner box is inserted, and a sufficient sealing effect may not be obtained.
[0005]
The present invention has been made in order to solve these problems, and is capable of automation, and in particular, the foam stock solution from the gap between the inner box and the outer box while reducing the cost by using the sealing material as a minimum requirement The purpose is to ensure the prevention of leakage.
[0006]
[Means for Solving the Problems]
A first step of forming an outer plate having a partition plate fixing hole on one side of the opposing long side by cut-pressing a rectangular metal thin plate;
A second step of forming a double flange part, a single flange part and a flange lower part by roll forming the long side;
A third step of applying foamed rubber between the flange lower part and the outer plate located at a distance of 300 mm or less from the partition plate fixing hole;
A fourth step of bending the outer plate into a gate shape to form the outer box;
A fifth step of inserting the inner box into the outer box;
A sixth step of attaching the bottom plate and the back plate;
And a seventh step of injecting a foam stock solution that reaches a viscosity of 300 cps in 3 to 6 seconds after being left in the air in the space consisting of the outer box, the inner box, and the back plate.
[0007]
A first step of forming an outer plate having a notch in two opposite long sides by cut-pressing a rectangular metal thin plate;
A second step of forming the flange portion and the flange lower portion by roll forming the long side;
A third step of applying foamed rubber between the lower flange portion and the outer plate located at a distance of 300 mm or less from the notch;
A fourth step of forming the outer box by bending the outer plate into a gate shape at the notch,
A fifth step of inserting the inner box into the outer box;
A sixth step of attaching the bottom plate and the back plate;
And a seventh step of injecting a foam stock solution that reaches a viscosity of 300 cps in 3 to 6 seconds after being left in the air in the space consisting of the outer box, the inner box, and the back plate.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
An embodiment of the present invention will be described with reference to FIGS. 1 is a flowchart showing the flow of a method for manufacturing a heat insulating box, FIG. 2 is an explanatory view of the manufacturing process, FIG. 3 is a sectional view of the heat insulating box, FIG. 4 is a block diagram showing the structure of the outer plate, and FIG. FIG. 6 is a configuration diagram showing the configuration of the front flange and inner box of the corner portion, FIG. 7 is a configuration diagram showing the configuration of the outer plate after applying the sealing material, and FIG. 9 is a graph showing the relationship between the foam stock solution and the application distance of the sealing material, FIG. 9 is a configuration diagram showing the appearance of the seal part in a state of bending and inserting the inner box, and FIG. 10 is a cross-sectional view showing the seal state after application of foam rubber FIG.
[0009]
First, the manufacturing method of this invention is demonstrated based on FIG.1 and FIG.2. In the first step, a rectangular cut plate made by cutting a steel plate is cut-pressed to form the outer plate 1 (S1). Next, in the second step, the long side of the outer plate 1 (parallel to the surface forming the side surface of the heat insulation box when bent) is formed by roll forming to form a single flange portion and a double flange portion. An
Thus, a heat insulation box is manufactured. In addition, sectional drawing of the heat insulation box after the last process in FIG. 1 or FIG. 2 is as FIG.
[0010]
As described above, the present invention includes a step of applying foamed rubber in the third step after roll forming and before gate-shaped bending. This process will be described with reference to FIGS.
[0011]
First, the leakage location that occurs when the foam stock solution is injected if no foam rubber is applied will be described.
The
[0012]
Next, FIG. 5 shows a structure in which the
In the drawing, the YY sectional view shows a contact portion between the
[0013]
Next, FIG. 6 shows a structure of a corner portion (corresponding to the
For reference, FIG. 6 also shows a state of a ZZ cross section as an example of a cross sectional state in the vicinity of a corner portion.
[0014]
Further, as shown in FIGS. 4 and 6, the
[0015]
In this way, the foam stock solution leaks are caused by the
[0016]
Thus, when each part is examined, it can be readily understood that the
[0017]
Therefore, as shown in FIG. 7, it is only necessary to apply foamed rubber to each leakage location by an appropriate distance (A in FIG. 7). In addition, since this distance changes with the characteristics (curing time) of a foam stock solution, in order to obtain | require distance, the following experiment was conducted.
First, the foam stock solution is divided into 12 types from the time required to reach a viscosity of 300 cps in the air (hereinafter, the viscosity reaches 300 cps). Subsequently, each of the classified foam stock solutions is poured into a heat insulating box, and the distance of the leaked portion is measured to obtain an appropriate application distance of the sealing material. At this time, in order for the foam stock solution to sufficiently exhibit the heat insulation capability, it is necessary to fill all the predetermined spaces in the heat insulation box after foaming, and the heat insulation box body depending on the presence or absence of unfilled areas (voids) As the quality is affected. Therefore, this point is also confirmed.
FIG. 8 shows a graph of the relationship between the type of foam stock solution and the application distance of the sealing material and the quality of the experiment. The horizontal axis of the graph represents the viscosity reaching time of 300 cps, and the vertical axis represents the coating distance necessary for preventing leakage of the foam stock solution. Moreover, the gray area | region shows the state in which a void exists in a heat insulation box in a graph. Furthermore, since the foam stock solution with a viscosity of 300 cps reaching time of 11 seconds or more continues to have a good fluidity for a long time, it is necessary to apply a sealing material along the flange accordingly. The experiment was conducted at 20 ° C.
[0018]
As a result of this experiment, it is found that if a foam stock solution having a viscosity of 300 cps reaching time of 3 to 10 seconds is selected after being taken out into the atmosphere, it is not necessary to apply the whole surface along the flange. Further, when the viscosity reaches 300 cps from 1 second to 5 seconds, the increase in the coating distance of the sealing material is about 80 mm at maximum even if the time is increased by 1 second, but from 7 seconds to 10 seconds, The increase in distance is at least 120 mm and tends to increase in a quadratic curve.
From this, when considering the change in the viscosity reaching time of 300 cps due to the difference between the experimental environment and the manufacturing process environment while shortening the coating distance of the sealing material and suppressing the generation of voids, the foam stock solution has a viscosity reaching time of 300 cps. In this case, a coating distance of about 300 mm is sufficient.
[0019]
When assembled after actual application, the appearance is as shown in FIG. B in the figure shows the state of the ceiling corner immediately after bending the
On the other hand, in the figure, (b) shows a sealed state around the
[0020]
The third process, which is such a process, allows the sealing material to be applied in a substantially flat state before bending, so that the
Further, by eliminating the interference factor, the
[0021]
Furthermore, since the portion that must be applied can be within the necessary and sufficient range, it is not necessary to apply a wide area, and the consumption of the sealing material is reduced.
[0022]
Further, the outer plate and the inner box, which are different materials, can be reliably sealed, and since foamed rubber is used, the followability to deformation is improved, and long-term reliability is improved. Moreover, also in prevention of the clearance gap between the outer plate and the flange which are the same kind of materials, it is effective in preventing leakage of the foam stock solution by improving followability.
[0023]
【The invention's effect】
A first step of forming an outer plate having a partition plate fixing hole on one side of the opposing long side by cut-pressing a rectangular metal thin plate;
A second step of forming a double flange part, a single flange part and a flange lower part by roll forming the long side;
A third step of applying foamed rubber between the flange lower part and the outer plate located at a distance of 300 mm or less from the partition plate fixing hole;
A fourth step of bending the outer plate into a gate shape to form the outer box;
A fifth step of inserting the inner box into the outer box;
A sixth step of attaching the bottom plate and the back plate;
And a seventh step of injecting a foam stock solution that reaches a viscosity of 300 cps in 3 to 6 seconds after being left in the air in the space consisting of the outer box, inner box and back plate. It is not necessary to apply the sealing material to the partition plate fixing hole after molding, and the nozzle and the material to be coated do not interfere with each other. In addition, since it can be applied selectively only at a fixed distance, the amount of sealant used can be reduced, and the same state as when the tip of the inner box is sealed from both sides with pre-applied foamed rubber ensures a reliable seal. In addition, since it is elastic, it can reliably follow the distortion caused by the difference in material between the inner box and the outer plate, and the entire space in the heat insulating box is filled with the foam stock solution and no voids are generated.
[0024]
A first step of forming an outer plate having a notch in two opposite long sides by cut-pressing a rectangular metal thin plate;
A second step of forming the flange portion and the flange lower portion by roll forming the long side;
A third step of applying foamed rubber between the lower flange portion and the outer plate located at a distance of 300 mm or less from the notch;
A fourth step of forming the outer box by bending the outer plate into a gate shape at the notch,
A fifth step of inserting the inner box into the outer box;
A sixth step of attaching the bottom plate and the back plate;
And a seventh step of injecting a foam stock solution that reaches a viscosity of 300 cps in 3 to 6 seconds after being left in the air in the space consisting of the outer box, inner box and back plate. It is not necessary to apply a sealing material to the corner after molding, and the nozzle and the material to be coated do not interfere with each other. In addition, since it can be applied selectively only at a fixed distance, the amount of sealant used can be reduced, and the same state as when the tip of the inner box is sealed from both sides with pre-applied foamed rubber ensures a reliable seal. In addition, since it is elastic, it can reliably follow the distortion caused by the difference in material between the inner box and the outer plate, and the entire space in the heat insulating box is filled with the foam stock solution and no voids are generated.
[Brief description of the drawings]
FIG. 1 is a flowchart showing a flow of manufacturing a heat insulating box.
FIG. 2 is an explanatory diagram of a manufacturing process of a heat insulating box.
FIG. 3 is a cross-sectional view of a heat insulating box.
FIG. 4 is a configuration diagram showing a configuration of an outer plate.
FIG. 5 is a configuration diagram showing a configuration of a portion to which a partition plate is connected.
FIG. 6 is a configuration diagram showing configurations of a front flange and an inner box of a corner portion.
FIG. 7 is a configuration diagram showing a configuration of an outer plate after application of a sealing material.
FIG. 8 is a graph showing the relationship between the foam stock solution and the application distance of the sealing material.
FIG. 9 is a configuration diagram showing an appearance of a seal portion in a state where an inner box is inserted.
FIG. 10 is a cross-sectional view showing a sealed state after applying foamed rubber.
[Explanation of symbols]
DESCRIPTION OF
Claims (2)
前記長辺をロールフォーミング加工することで二重フランジ部、一重フランジ部およびフランジ下部を形成する第二の工程と、
前記仕切り板固定用穴から300mm以下の距離に位置する前記フランジ下部と前記外板との間に発泡ゴムを塗布する第三の工程と、
前記外板を門型に曲げ加工して外箱を形成する第四の工程と、
内箱を前記外箱に挿入する第五の工程と、
底板および背面板を取り付ける第六の工程と、
前記外箱と前記内箱と前記背面板とからなる空間に大気中に放置した時点より3秒から6秒で粘度300cpsに到達する発泡体原液を注入する第七の工程とを具備することを特徴とする断熱箱体の製造方法。A first step of forming an outer plate having a partition plate fixing hole on one side of the opposing long side by cut-pressing a rectangular metal thin plate;
A second step of forming a double flange part, a single flange part and a flange lower part by roll-forming the long side;
A third step of applying foamed rubber between the lower flange portion and the outer plate located at a distance of 300 mm or less from the partition plate fixing hole;
A fourth step of bending the outer plate into a gate shape to form an outer box;
A fifth step of inserting an inner box into the outer box;
A sixth step of attaching the bottom plate and the back plate;
And a seventh step of injecting a foam stock solution that reaches a viscosity of 300 cps in 3 to 6 seconds after being left in the air in the space consisting of the outer box, the inner box, and the back plate. A method for producing a heat-insulated box body.
前記長辺をロールフォーミング加工することでフランジ部およびフランジ下部を形成する第二の工程と、
前記切欠から300mm以下の距離に位置する前記フランジ下部と前記外板との間に発泡ゴムを塗布する第三の工程と、
前記外板を前記切欠部分で門型に曲げ加工して外箱を形成する第四の工程と、
内箱を前記外箱に挿入する第五の工程と、
底板および背面板を取り付ける第六の工程と、
前記外箱と前記内箱と前記背面板とからなる空間に大気中に放置した時点より3秒から6秒で粘度300cpsに到達する発泡体原液を注入する第七の工程とを具備することを特徴とする断熱箱体の製造方法。A first step of forming an outer plate having a notch in two opposite long sides by cut-pressing a rectangular metal thin plate;
A second step of forming a flange portion and a flange lower portion by roll forming the long side;
A third step of applying foamed rubber between the lower flange portion and the outer plate located at a distance of 300 mm or less from the notch;
A fourth step of forming the outer box by bending the outer plate into a gate shape at the cutout portion;
A fifth step of inserting an inner box into the outer box;
A sixth step of attaching the bottom plate and the back plate;
And a seventh step of injecting a foam stock solution that reaches a viscosity of 300 cps in 3 to 6 seconds after being left in the air in the space consisting of the outer box, the inner box, and the back plate. A method for producing a heat-insulated box body.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000346769A JP4284858B2 (en) | 2000-11-14 | 2000-11-14 | Manufacturing method of heat insulation box |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000346769A JP4284858B2 (en) | 2000-11-14 | 2000-11-14 | Manufacturing method of heat insulation box |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2008302641A Division JP4349472B2 (en) | 2008-11-27 | 2008-11-27 | Manufacturing method of heat insulation box |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002147941A JP2002147941A (en) | 2002-05-22 |
| JP4284858B2 true JP4284858B2 (en) | 2009-06-24 |
Family
ID=18820591
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000346769A Expired - Lifetime JP4284858B2 (en) | 2000-11-14 | 2000-11-14 | Manufacturing method of heat insulation box |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4284858B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102314421B (en) | 2010-06-29 | 2014-12-10 | 中兴通讯股份有限公司 | Self-rescuing method and self rescuing device for file system after being damaged |
| JP2014081176A (en) * | 2012-10-18 | 2014-05-08 | Panasonic Corp | Heat insulating casing, method of manufacturing the heat insulating casing and refrigerator-freezer |
| CN108068590B (en) * | 2017-01-04 | 2024-07-26 | 太仓中集冷藏物流装备有限公司 | Thermal insulation door plate, refrigeration transport equipment and manufacturing method |
| JP7297616B2 (en) | 2019-09-13 | 2023-06-26 | シャープ株式会社 | Heat-insulating box, refrigerator, and method for manufacturing heat-insulating box |
-
2000
- 2000-11-14 JP JP2000346769A patent/JP4284858B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002147941A (en) | 2002-05-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100343719B1 (en) | Refrigerator door equipped with vacuum insulating material panel | |
| US2263806A (en) | Motor vehicle | |
| JPH1071628A (en) | Hollow chamber blocker for hollow structure and method of manufacturing the same | |
| JP4284858B2 (en) | Manufacturing method of heat insulation box | |
| GB2421211A (en) | A component for a vehicle interior and a method of assembly | |
| JPH0575568B2 (en) | ||
| JPH01297319A (en) | Door weatherstrip for automobile | |
| JPH11201382A (en) | Pipe joint with heat insulating layer and method of manufacturing the same | |
| JP4349472B2 (en) | Manufacturing method of heat insulation box | |
| JPH01164867A (en) | Expansible sealer | |
| JPH02200926A (en) | Construction work method of concrete using cut-off frame | |
| CA1110151A (en) | Foam in place breaker strip seal | |
| JPS5913590Y2 (en) | insulation door | |
| JP3254411B2 (en) | Extruder unit | |
| JPS62284176A (en) | Manufacture of heat-insulating door | |
| JPS5848533Y2 (en) | Boxes for refrigerators, etc. | |
| JPH0688676A (en) | Method for manufacturing door of refrigerator and door of refrigerator made under utilization of it | |
| JP3515700B2 (en) | Molding equipment for resin parts | |
| JPH10315245A (en) | Foam molded article and method for producing the same | |
| JPH02133786A (en) | Heat-insulated box | |
| JPH10281633A (en) | Binding structure of heat insulator cover | |
| JPH01166939A (en) | Thermosetting foam sealing material | |
| JPS6326700Y2 (en) | ||
| JP2570330B2 (en) | Foam sealer | |
| JPH0235652B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20040701 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060727 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080519 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080527 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080616 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20081028 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081127 |
|
| A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20090113 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090303 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090316 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120403 Year of fee payment: 3 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 4284858 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120403 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120403 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130403 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130403 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140403 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |