Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4289777B2 - Centrifugal casting chute coating method - Google Patents
[go: Go Back, main page]

JP4289777B2 - Centrifugal casting chute coating method - Google Patents

Centrifugal casting chute coating method Download PDF

Info

Publication number
JP4289777B2
JP4289777B2 JP2000326251A JP2000326251A JP4289777B2 JP 4289777 B2 JP4289777 B2 JP 4289777B2 JP 2000326251 A JP2000326251 A JP 2000326251A JP 2000326251 A JP2000326251 A JP 2000326251A JP 4289777 B2 JP4289777 B2 JP 4289777B2
Authority
JP
Japan
Prior art keywords
chute
coating
mold
trough
centrifugal casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000326251A
Other languages
Japanese (ja)
Other versions
JP2002126862A (en
Inventor
充 舟橋
幸雄 岡本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2000326251A priority Critical patent/JP4289777B2/en
Publication of JP2002126862A publication Critical patent/JP2002126862A/en
Application granted granted Critical
Publication of JP4289777B2 publication Critical patent/JP4289777B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Mold Materials And Core Materials (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は遠心鋳造用シュートの塗型方法に関する。
【0002】
【従来の技術】
鋳鉄管を製造する方法の一つとして遠心鋳造法がある。遠心鋳造法は高速回転している筒状の金型に鋳鉄の溶湯を供給し、供給された溶湯に遠心力を作用させて管体を鋳造する方法である。図3ではその遠心鋳造法の一例を示す。
【0003】
図3に示すように、遠心鋳造装置1があり、この遠心鋳造装置1の内側の鋳型となる部分は筒状をしている金型2の内周面と筒状をしているコア3の外周面とから構成されている。金型2は水冷ジャケット構造を擁し(図示は省略する)、高速回転可能であり、コア3は金型2に対して定位置になるようにコアセッター4に取付けられている。遠心鋳造装置1に鋳込まれる鋳鉄の溶湯5は取鍋6からシュート7に注がれ、トラフ8を経て金型2の内周面に供給されるように構成されている。シュート7は取鍋6より溶湯5を受ける曲面部分であり、トラフ8はシュート7が受けた溶湯5を金型2の内周面に供給する緩やかな傾斜をした直部である。
【0004】
上記構成の遠心鋳造装置1において、鋳鉄の溶湯5が取鍋6からシュート7に注がれ、トラフ8を経て、高速回転している金型2の内周面に供給される。供給された溶湯5には遠心力が作用するので鋳鉄管9を形成することができる。
【0005】
このような管の遠心鋳造方法において、管を製造した後のシュート7及びトラフ8の表面には溶湯5の残りが酸化してできる金属酸化物が付着する。この付着している金属酸化物をシュート7及びトラフ8を反転させたうえで衝撃を加えて取り去るが、シュート7及びトラフ8はこの繰り返しの衝撃に耐える必要があることから鋼(鋳鋼)製である。
【0006】
このように溶湯5と同系の材料で形成されたシュート7及びトラフ8には、取鍋6からの溶湯5の落下を受けても溶損しないように、毎回の鋳造後に例えば黒鉛系の塗型であるブラッキング材を塗布して、これらシュート7及びトラフ8の表面を保護する必要がある。この黒鉛系の塗型であるブラッキング材の成分の配合の例としては、水230リットルに対して、カーボンブラック20キログラム、鱗状黒鉛5キログラム、ベントナイト0.6キログラム、水ガラス1リットルの割合で混合するものがある。
【0007】
シュート7及びトラフ8の表面を保護するための塗型を施す際には、図4(a)に示すように鋳造後のシュート7及びトラフ8の表面を冷却し、希薄な黒鉛系の塗型10であるブラッキング材を塗布する作業であるブラッキング処理をシュート7の上部から行う。このとき、ブラッキング材の供給管の流出口11から流し出された希薄な黒鉛系の塗型10は、シュート7の上部からシュート7の下部を経て、トラフ8へ流れ塗布を行う。このブラッキングの次に、図4(b)に示すように、塗型10の上から塗型10と同成分であり、かつ塗型10よりも高濃度である黒鉛系塗型12を刷毛13でシュート7の上部から下部に渡って塗布する。
【0008】
しかし、この刷毛塗りの作業は人手作業であるので、塗り方にムラがあったりするとシュート7の内面より塗型12が剥離して製品にかみ込むことがある。このため、図5に示すように、塗型12を刷毛塗りする作業を噴射器15でスプレーすると、密着性が高くより均一性のある塗膜を得るために塗型12を勢い良くシュート7の内面にスプレーするので良い。
【0009】
【発明が解決しようとする課題】
しかし、図5に示すように、シュート7は傾斜しており塗型12を勢い良くスプレーする量が多いと垂れて溜り14が生じ、これが製品にかみ込んでしまう。また、噴射器15より噴射される塗型12の霧の状態を細かくして垂れを防止するようにスプレーすると、塗型12の密着性が下ってしまう。
【0010】
そこで本発明においては、噴射器を用いて塗型をスプレーする作業を行った際に生じる垂れを除去することにより、溜りの発生を防止してより均一性のある塗膜を得ることを目的とする。
【0011】
【課題を解決するための手段】
上記課題を解決するために請求項1記載の発明は、管の遠心鋳造用のシュートに塗型を施すに際し、シュートの上部から下向きに濃い塗型をスプレーし、その後シュートの下部に薄い塗型を用いてブラッキングを施すことによって、先にスプレーされた濃い塗型の不要部分が存在するときにその不要部分を流し去ることを特徴とするものである。
【0012】
このようにすれば、塗型を密着性良く流し込む作業を行った際に、先にスプレーされた濃い塗型の不要部分が存在するときにその不要部分を流し去ることにより、溜りの発生を防止してより均一性のある塗膜を得ることが可能である。
【0013】
【発明の実施の形態】
図1(a)に示すように、シュート7及びトラフ8があり、噴射器15によって塗型12をシュート7の上部から下部にわたって勢い良くスプレーする。塗型12の成分の配合の例としては、上述したように水230リットルに対して、カーボンブラック20キログラム、鱗状黒鉛5キログラム、ベントナイト0.6キログラム、水ガラス1リットルの割合で混合した、いわゆる濃い塗型がある。このように噴射器15によって濃厚な塗型12をシュート7の上部から下部にわたって勢い良くスプレーすることによってシュート7の内面に垂れが生じ、この垂れが原因でシュート7の内面の下部には溜り14が発生することがある。
【0014】
次に、図4(a)で示し、上述したような希薄な黒鉛系の塗型10を流し込む作業であるブラッキングを、図1(b)に示すように、シュート7の内面の下部からトラフ8へと行う。塗型10の成分の配合の例としては、水2200リットルに対して、カーボンブラック16.7キログラム、鱗状黒鉛4.2キログラム、ベントナイト6.5キログラム、酸化マグネシウム180グラム、糖蜜9.5キログラムの割合で混合するものがある。
【0015】
流出口11によってシュート7の内面の下部に流し込まれた塗型10は、シュート7の内面の下部に塗型12の溜り14が発生している場合には、この溜り14が乾燥してしまう前に溜り14をトラフ8へと流し去りながらトラフ8を塗布する。このとき、塗型12と塗型10とが混ざるが、これらの塗型12と塗型10とは同系の塗型であるのでシュート7の内面を保護する性能として問題はない。
【0016】
シュート7の内面の上部に塗型12をスプレーする量とシュート7の内面の下部及びトラフ8にブラッキングを施すのに必要な塗型10の量との関係は、例としては、スプレー量30〜100ccに対して、ブラッキング量1000〜3500cc程度である。
【0017】
このようにブラッキングをシュート7の下部からトラフ8へと行い、塗型12の溜り14が発生している場合にはこれを流し去るようにブラッキングを行うので、シュート7の内面の上部には塗型12の密着性が高くより均一性のある塗膜が残り、シュート7の下部からトラフ8にかけては問題なくブラッキングが施され、塗型10が塗布される。したがって、シュート7及びトラフ8を通じてこれを保護する性能の高い塗膜を得ることができ、かつ製品に塗型がかみ込むことを減少することが可能である。さらに、人手作業である刷毛塗り作業をなくすことにより塗型12の塗布に要した作業者を省人化することができる。
【0018】
また、上述したように、従来のブラッキングを施す作業はシュート7の冷却も兼ねて行われており、本発明の実施の形態においては、シュート7の上部のブラッキングが施されないところには、それに代えて必要に応じてシュート7の外面16よりシュート7を適宜の方法で冷却することで、そのシュート7の上部の冷却効果を補うことができる。
【0019】
また、例えば図2に示すように、一度に2つの管を製造することができる二連式の遠心鋳造装置21において駆動装置17を設け、この駆動装置17は、遠心鋳造装置21の金型2の軸方向と垂直な水平方向に、レール18に沿ってスライド可能とすることができる。遠心鋳造装置21及び取鍋6はこの駆動装置17のスライド方向に対して固定されている。
【0020】
駆動装置17には、一度の管の製造工程で使用される2つのシュート・トラフ19と使用されない2つのシュート・トラフ20の計4つのシュート・トラフが設置されている。
【0021】
一連の管の製造工程が終了すると駆動装置17は、今回の工程で使用されたシュート・トラフ19を次回の工程では使用せず、今回の工程で使用しなかったシュート・トラフ20を次回の工程では使用できるようにレール18に沿ってスライドする。
【0022】
このような毎回の管の製造工程ごとに駆動装置17をレール18に沿ってスライドさせて、シュート・トラフ2つずつを交互に利用する管の鋳造方法に本発明を適用することで、管の製造作業中に使用していない方の2つのシュート・トラフに塗型を塗布し、その塗布した塗型の乾燥時間を長くすることができるので、塗型の製品へのかみ込みを減少させてより良好なシュート・トラフの保護を行うことが可能である。
【0023】
【発明の効果】
以上のように本発明によると、濃い塗型をシュートの上部から下部にわたって勢い良くスプレーしたときに、シュートの内面に垂れが生じ、この垂れが原因でシュートの内面の下部に濃い塗型の溜りが発生することがあるが、薄い塗型をシュートの下部からトラフへと流し込んでブラッキングを施し、濃い塗型の溜りが発生している場合にはこれを流し去るように薄い塗型をシュートの内面の下部からトラフにかけて流し込むので、シュートの内面の上部には密着性が高くより均一性のある塗膜を残すことができる。したがって、シュート及びトラフを通じてこれを保護する性能の高い塗膜を得ることができ、かつシュートの内面に生じる溜りをなくすことによって、製品に塗型がかみ込むことを減少することが可能である。さらに、人手作業である刷毛塗り作業をなくすことにより塗型の塗布に要した作業者を省人化することができる。
【図面の簡単な説明】
【図1】本発明の実施の形態を示す断面図である。
【図2】本発明の実施例を示す平面図である。
【図3】鋳鉄管の遠心鋳造法の概要を示す断面図である。
【図4】従来の遠心鋳造用シュートの塗型方法を示す断面図である。
【図5】従来の遠心鋳造用シュートの塗型方法における技術的課題を示す断面図である。
【符号の説明】
7 シュート
10 塗型
12 塗型
14 溜り
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method of coating a chute for centrifugal casting.
[0002]
[Prior art]
One method for producing a cast iron pipe is a centrifugal casting method. The centrifugal casting method is a method in which a molten cast iron is supplied to a cylindrical mold rotating at high speed, and a tubular body is cast by applying centrifugal force to the supplied molten metal. FIG. 3 shows an example of the centrifugal casting method.
[0003]
As shown in FIG. 3, there is a centrifugal casting apparatus 1, and a portion that becomes a mold inside the centrifugal casting apparatus 1 is an inner peripheral surface of a cylindrical mold 2 and a cylindrical core 3. It is comprised from the outer peripheral surface. The mold 2 has a water-cooled jacket structure (not shown), can rotate at high speed, and the core 3 is attached to the core setter 4 so as to be in a fixed position with respect to the mold 2. The cast iron melt 5 cast into the centrifugal casting apparatus 1 is poured from the ladle 6 to the chute 7 and supplied to the inner peripheral surface of the mold 2 through the trough 8. The chute 7 is a curved surface portion that receives the molten metal 5 from the ladle 6, and the trough 8 is a straight portion that is gently inclined to supply the molten metal 5 received by the chute 7 to the inner peripheral surface of the mold 2.
[0004]
In the centrifugal casting apparatus 1 having the above-described configuration, the cast iron melt 5 is poured from the ladle 6 to the chute 7 and supplied to the inner peripheral surface of the mold 2 rotating at high speed through the trough 8. Since the centrifugal force acts on the supplied molten metal 5, the cast iron pipe 9 can be formed.
[0005]
In such a method of centrifugal casting of a tube, metal oxides formed by oxidizing the remainder of the molten metal 5 adhere to the surfaces of the chute 7 and the trough 8 after the tube is manufactured. The attached metal oxide is removed by reversing the chute 7 and the trough 8 and applying an impact. The chute 7 and the trough 8 are made of steel (cast steel) because they must withstand this repeated impact. is there.
[0006]
Thus, the chute 7 and the trough 8 formed of the same material as the molten metal 5 are, for example, graphite-based coating molds after each casting so that they do not melt even if the molten metal 5 falls from the ladle 6. It is necessary to protect the surfaces of the chute 7 and the trough 8 by applying a blacking material. As an example of the composition of the blackening material, which is a graphite-based coating mold, with a ratio of 20 kg of carbon black, 5 kg of scaly graphite, 0.6 kg of bentonite, and 1 liter of water glass per 230 liters of water. There is something to mix.
[0007]
When a coating mold for protecting the surfaces of the chute 7 and the trough 8 is applied, the surfaces of the chute 7 and the trough 8 after casting are cooled as shown in FIG. 10 is performed from the top of the chute 7. At this time, the thin graphite-based coating die 10 poured out from the outlet 11 of the supply pipe for the blacking material flows from the upper part of the chute 7 through the lower part of the chute 7 and is applied to the trough 8. Next to this blanking, as shown in FIG. 4B, a graphite-based coating mold 12 having the same components as the coating mold 10 and having a higher concentration than the coating mold 10 is applied to the brush 13 from above the coating mold 10. Then apply from the top of the chute 7 to the bottom.
[0008]
However, since the brush coating operation is a manual operation, if the coating method is uneven, the coating mold 12 may be peeled off from the inner surface of the chute 7 and bitten into the product. For this reason, as shown in FIG. 5, when the operation of applying the brush on the coating mold 12 is sprayed with the injector 15, the coating mold 12 is vigorously moved to obtain a more uniform coating film with high adhesion. Spray on the inside.
[0009]
[Problems to be solved by the invention]
However, as shown in FIG. 5, the chute 7 is inclined, and if the amount of spraying the coating mold 12 is vigorously sprayed, it droops and a stagnation 14 is formed, which is bitten into the product. Moreover, if the spraying state of the coating mold 12 sprayed from the injector 15 is made fine and sprayed to prevent dripping, the adhesiveness of the coating mold 12 is lowered.
[0010]
Therefore, in the present invention, the purpose is to obtain a more uniform coating film by preventing the occurrence of stagnation by removing dripping that occurs when the spraying of the coating mold is performed using an injector. To do.
[0011]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, according to the first aspect of the present invention, when applying a coating to a chute for centrifugal casting of a tube, a dark coating is sprayed downward from the upper part of the chute, and then a thin coating is applied to the lower part of the chute. By performing the blacking using the above, when there is an unnecessary portion of the dark coating mold sprayed first, the unnecessary portion is washed away.
[0012]
In this way, when an operation to pour the coating mold with good adhesion is performed, if there is an unnecessary portion of the thick coating mold that has been sprayed, the unnecessary portion is washed away, thereby preventing the accumulation. Thus, it is possible to obtain a more uniform coating film.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
As shown in FIG. 1 (a), there are a chute 7 and a trough 8, and the spray mold 15 sprays the coating mold 12 from the upper part to the lower part of the chute 7 vigorously. As an example of blending the components of the coating mold 12, as described above, with respect to 230 liters of water, 20 kilograms of carbon black, 5 kilograms of scaly graphite, 0.6 kilograms of bentonite, and 1 liter of water glass are mixed. There is a dark paint. In this way, when the dense coating mold 12 is sprayed vigorously from the upper part to the lower part of the chute 7 by the injector 15, dripping occurs on the inner surface of the chute 7. May occur.
[0014]
Next, as shown in FIG. 4 (a), the blacking, which is the work of pouring the thin graphite-based coating mold 10 as described above, is carried out from the lower portion of the inner surface of the chute 7 as shown in FIG. 1 (b). Go to 8. As an example of the composition of the coating mold 10 component, 16.7 kg of carbon black, 4.2 kg of scaly graphite, 6.5 kg of bentonite, 180 g of magnesium oxide, and 9.5 kg of molasses per 2200 liters of water. Some mix in proportion.
[0015]
The coating mold 10 poured into the lower portion of the inner surface of the chute 7 by the outlet 11 has a reservoir 14 of the coating mold 12 in the lower portion of the inner surface of the chute 7 before the pool 14 is dried. The trough 8 is applied while the reservoir 14 is poured away into the trough 8. At this time, the coating mold 12 and the coating mold 10 are mixed, but since the coating mold 12 and the coating mold 10 are similar coating molds, there is no problem in the performance of protecting the inner surface of the chute 7.
[0016]
The relationship between the amount of spraying the coating mold 12 on the inner surface of the chute 7 and the amount of coating mold 10 necessary for blacking the lower surface of the inner surface of the chute 7 and the trough 8 is, for example, a spray amount 30 The amount of blacking is about 1000 to 3500 cc with respect to ˜100 cc.
[0017]
In this way, the blacking is performed from the lower part of the chute 7 to the trough 8, and if the reservoir 14 of the coating mold 12 is generated, the blacking is performed so that it is washed away. The coating mold 12 has a high adhesiveness and a more uniform coating film remains. From the bottom of the chute 7 to the trough 8, the coating mold 10 is applied without any problem. Therefore, it is possible to obtain a high-performance coating film that protects the chute 7 and the trough 8 and to reduce the bite of the coating mold into the product. Furthermore, by eliminating the brushing operation, which is a manual operation, the number of workers required for applying the coating mold 12 can be saved.
[0018]
In addition, as described above, the work of performing the conventional blacking is also performed for cooling the chute 7, and in the embodiment of the present invention, in the place where the upper blacking of the chute 7 is not performed, Instead, the cooling effect of the upper part of the chute 7 can be supplemented by cooling the chute 7 from the outer surface 16 of the chute 7 by an appropriate method as needed.
[0019]
For example, as shown in FIG. 2, a drive device 17 is provided in a double centrifugal casting device 21 capable of producing two tubes at a time, and this driving device 17 is a mold 2 of the centrifugal casting device 21. It can be slidable along the rail 18 in a horizontal direction perpendicular to the axial direction. The centrifugal casting device 21 and the ladle 6 are fixed with respect to the sliding direction of the driving device 17.
[0020]
The drive unit 17 is provided with a total of four chute troughs, that is, two chute troughs 19 that are used in a single pipe manufacturing process and two chute troughs 20 that are not used.
[0021]
When the series of pipe manufacturing processes is completed, the driving device 17 does not use the chute trough 19 used in the current process in the next process, and uses the chute trough 20 not used in the current process in the next process. Now slide along the rail 18 for use.
[0022]
By applying the present invention to a pipe casting method in which the drive device 17 is slid along the rail 18 for each pipe manufacturing process and the chute and trough are alternately used, Since the coating mold can be applied to the two chute troughs that are not used during the manufacturing operation, and the drying time of the applied coating mold can be extended, the bite of the coating mold into the product is reduced. Better chute trough protection is possible.
[0023]
【The invention's effect】
As described above, according to the present invention, when a thick coating mold is sprayed vigorously from the upper part to the lower part of the chute, dripping occurs on the inner surface of the chute, and due to this dripping, the thick coating mold is accumulated on the lower part of the inner surface of the chute. However, if a thick paint puddle is generated, pour the thin paint mold from the bottom of the chute into the trough and shoot the thin paint mold to remove it. Since it flows from the lower part of the inner surface to the trough, a highly uniform coating can be left on the upper part of the inner surface of the chute. Therefore, it is possible to obtain a high-performance coating film that protects this through the chute and trough, and it is possible to reduce the biting of the coating mold into the product by eliminating the accumulation generated on the inner surface of the chute. Furthermore, by eliminating the brushing operation, which is a manual operation, the number of workers required for applying the coating mold can be saved.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing an embodiment of the present invention.
FIG. 2 is a plan view showing an embodiment of the present invention.
FIG. 3 is a cross-sectional view showing an outline of a centrifugal casting method for a cast iron pipe.
FIG. 4 is a cross-sectional view showing a conventional centrifugal casting chute coating method.
FIG. 5 is a cross-sectional view showing a technical problem in a conventional centrifugal casting chute coating method.
[Explanation of symbols]
7 Chute 10 Paint mold 12 Paint mold 14 Pool

Claims (1)

管の遠心鋳造用のシュートに塗型を施すに際し、シュートの上部から下向きに濃い塗型をスプレーし、その後シュートの下部に薄い塗型を用いてブラッキングを施すことによって、先にスプレーされた濃い塗型の不要部分が存在するときにその不要部分を流し去ることを特徴とする遠心鋳造用シュートの塗型方法。When coating the tube chute for casting, it was sprayed first by spraying a dark coating downward from the top of the chute and then using a thin coating at the bottom of the chute. A casting method for a chute for centrifugal casting, characterized in that when an unnecessary portion of a dark coating mold exists, the unnecessary portion is washed away.
JP2000326251A 2000-10-26 2000-10-26 Centrifugal casting chute coating method Expired - Lifetime JP4289777B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000326251A JP4289777B2 (en) 2000-10-26 2000-10-26 Centrifugal casting chute coating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000326251A JP4289777B2 (en) 2000-10-26 2000-10-26 Centrifugal casting chute coating method

Publications (2)

Publication Number Publication Date
JP2002126862A JP2002126862A (en) 2002-05-08
JP4289777B2 true JP4289777B2 (en) 2009-07-01

Family

ID=18803472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000326251A Expired - Lifetime JP4289777B2 (en) 2000-10-26 2000-10-26 Centrifugal casting chute coating method

Country Status (1)

Country Link
JP (1) JP4289777B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5473723B2 (en) * 2010-03-31 2014-04-16 株式会社クボタ Warping prevention method for pouring trough
JP6300989B1 (en) * 2017-05-15 2018-03-28 株式会社クボタ Coating mold coating method and coating apparatus
JP7252033B2 (en) * 2019-03-28 2023-04-04 株式会社栗本鐵工所 Centrifugal casting machine and method for applying blacking liquid in the centrifugal casting machine
CN114799077B (en) * 2022-04-29 2024-07-19 哈焊所华通(常州)焊业股份有限公司 Continuous casting die

Also Published As

Publication number Publication date
JP2002126862A (en) 2002-05-08

Similar Documents

Publication Publication Date Title
CN1753744A (en) Casting steel strip with low surface roughness and low porosity
JP4289777B2 (en) Centrifugal casting chute coating method
CN1048436C (en) Contained quench system for controlled cooling of continuous web
US3349835A (en) Continuous horizontal strip-casting apparatus
JP4132698B2 (en) Iron-based shape memory alloy tube and manufacturing method thereof
US5651412A (en) Strip casting with fluxing agent applied to casting roll
JPH07115124B2 (en) Continuous casting equipment
JP2012183556A (en) Method and device for casting anode for copper electrolysis
JP5455008B2 (en) Centrifugal casting method
JP2003211255A (en) Continuous casting method of aluminum ingot
JP4661857B2 (en) Magnesium alloy material and method for producing the same
JP3901764B2 (en) Method for producing aluminum alloy sheet for foil
CN108655370A (en) A kind of composite plate blanks casting method and device
JP2608152B2 (en) Cast iron pipe and method of manufacturing the same
JP3099158B2 (en) Continuous casting method of defect-free slab
JP3870644B2 (en) Anode casting method and equipment
JPH1190592A (en) Lower nozzle of ladle for continuous casting
JP2558786B2 (en) Belt coating method for belt type continuous casting machine
JPH01202349A (en) Continuous casting method
JPS5884653A (en) Centrifugal casting method of die
JPS6142676Y2 (en)
JP3532097B2 (en) Manufacturing method of continuous cast slab with excellent cleanliness
JP3015992B2 (en) Mold coating agent for continuous casting of steel and continuous casting method of steel using the same
JP2555236B2 (en) Centrifugal casting method for casting pipe with socket
JPS58209458A (en) Dust collection method in wet process drago-type mold centrifugal casting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071026

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090303

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090331

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4289777

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120410

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120410

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130410

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140410

Year of fee payment: 5

EXPY Cancellation because of completion of term