JP4296545B2 - Center-pillar structure of eyeglass tunnel - Google Patents
Center-pillar structure of eyeglass tunnel Download PDFInfo
- Publication number
- JP4296545B2 JP4296545B2 JP2004162758A JP2004162758A JP4296545B2 JP 4296545 B2 JP4296545 B2 JP 4296545B2 JP 2004162758 A JP2004162758 A JP 2004162758A JP 2004162758 A JP2004162758 A JP 2004162758A JP 4296545 B2 JP4296545 B2 JP 4296545B2
- Authority
- JP
- Japan
- Prior art keywords
- center pillar
- tunnel
- arch support
- main
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
本発明は、めがねトンネルのセンターピラー構造に係り、特に本坑の掘削に伴う本坑アーチ支保工を確実に支持し、また完成構造系においてトンネル土被り荷重を確実に負担可能な構造を有するセンターピラー構造に関する。 The present invention relates to a center pillar structure of a spectacle tunnel, and in particular, a center having a structure capable of reliably supporting a main shaft arch supporting work accompanying excavation of a main shaft and capable of reliably bearing a tunnel earth covering load in a completed structure system. It relates to the pillar structure.
たとえば、図4に示したように、道路トンネル等において、上・下車線をきわめて近接させて、中央先進導坑10内に構築された鉄筋コンクリート製の中央隔壁柱11(以下、センターピラー11と記す。)を共有構造部とし、このセンターピラーに沿って並行する2本の本坑トンネル20,30の荷重の一部を支保させるようにした近接トンネル(双設トンネル、めがねトンネル等と呼ばれるが、本明細書では、めがねトンネルと呼ぶ。)が施工されている。
For example, as shown in FIG. 4, in a road tunnel or the like, a central bulkhead column 11 (hereinafter referred to as a center pillar 11) made of reinforced concrete constructed in a central
図5は、図4に例示しためがねトンネルにおけるセンターピラー11に作用する荷重状態を模式的に示した荷重図である。同図に示したように、センターピラー11によって、双方の本坑トンネル20,30間の上方の地山ゆるみ範囲1の地山荷重と、本坑トンネル20,30の上半に作用し、吹付コンクリート21,31や鋼製アーチ支保工等を介して作用する軸圧縮力が確実に支持されることにより、めがねトンネル全体の安定が図られる。図示したように、センターピラー11の壁柱部11dはトンネルに作用する荷重のうち、鉛直方向荷重が軸圧縮力として卓越した部材であり、この軸圧縮力に耐えられる構造設計が求められている。
FIG. 5 is a load diagram schematically showing a load state acting on the
また、トンネル施工段階におけるセンターピラー11の細部構造に着目した場合、センターピラー11は、図6に示したように、2本の本坑トンネル20,30(図4参照)間の中間位置に掘削された、例えば断面形が馬蹄形トンネルをなす中央先進導坑10内に構築され、その断面形状は、本坑トンネルの側壁形状11a、本坑インバート形状11bに倣った略逆T字形をなし、トンネルの延長方向に沿って連続構築される。そして、図7に示したように、本坑トンネルの掘削時には、そのトンネル上半荷重は吹付コンクリート21及び鋼製アーチ支保工14(以下アーチ支保工)で支保され、アーチ支保工14の脚部14aがセンターピラー11の肩部に支持される構造になっている。したがって、この施工段階においては、本坑トンネル20上半荷重は上半アーチに沿って施工された吹付コンクリート21とアーチ支保工14の脚部14aから、センターピラー11へ、そしてセンターピラー11では(肩部11c→壁柱11d→底版11e)と伝達される。
When attention is paid to the detailed structure of the
このようにセンターピラー11は、前後して掘削される先進本坑トンネル20および後進本坑トンネル30(以下、先進本坑20、後進本坑30と記す。)の各施工段階と、完成構造系のすべての応力状態において安全でなければならない。このため、センターピラーの構造系の剛性を高め、効率的にセンターピラーを構築する方法として、センターピラー頂部と、先進導坑頂部とを、効率的に一体的に連結するようにしたセンターピラー頂部の構築方法も提案されている(特許文献1)。
As described above, the
特許文献1に開示された構築方法によってセンターピラーを構築した場合、センターピラーは下端が先進導坑内のインバート全面が底版として固定端を構成し、上端は先進導坑頂部に固定された構成からなる。 When the center pillar is constructed by the construction method disclosed in Patent Document 1, the center pillar has a configuration in which the lower end has a fixed end as the bottom plate of the entire invert in the advanced guide shaft, and the upper end is fixed to the top of the advanced guide shaft. .
ところで、上述の特許文献1では、上端と下端とが堅固に保持された構造からなるセンターピラーでは両端固定版としての挙動に近いことが確認されており、その応力状態を参照すると、センターピラーの高さ方向のほぼ中間位置での変位拘束を行うことでセンターピラー全体の応力状態の安全を確保できることが確認できた。ところが、このめがねトンネルの施工段階では様々な荷重状態が発生する。たとえば図7に示したように、先進本坑の掘削時に建て込まれる施工段階では、アーチ支保工14の脚部14aがセンターピラー11の肩部11cに支持され、この肩部11cにアーチ支保工14からの軸圧縮力がアーチ支保工脚部14aの接線方向にほぼ等しい角度をなした集中荷重(白矢印)として作用する。
By the way, in the above-mentioned patent document 1, it has been confirmed that the center pillar having a structure in which the upper end and the lower end are firmly held is close to the behavior as a both-end fixed plate. It was confirmed that the safety of the stress state of the entire center pillar can be secured by restraining the displacement at almost the middle position in the height direction. However, various load states occur at the construction stage of this spectacle tunnel. For example, as shown in FIG. 7, in the construction stage to be built when excavating the advanced main mine, the
図8は、その細部構造を示した拡大図である。同図に示したように、センターピラー11の肩部11cにおいては、以下のような構造上の問題が指摘されている。
(1)アーチ支保工脚部14aから作用する過大な軸圧縮力により、肩部11c付け根部にせん断ひび割れCが生じるおそれがある。
(2)アーチ形状に沿って発生する軸圧縮力をコンクリート部材の軸方向に伝達させるために肩部11cにわずかな傾斜がついているため、トンネル内空側に向けてアーチ支保工が滑るおそれがある。
(3)アーチ支保工の脚部14aのベースプレートがセンターピラーの肩部11cに設置されるが、押し抜きせん断と相まってコンクリート面の支圧耐力が不足して圧壊するおそれがある。
FIG. 8 is an enlarged view showing the detailed structure. As shown in the figure, in the
(1) There is a possibility that a shear crack C may occur at the base of the
(2) Since the
(3) Although the base plate of the
また、図5に示した完成構造系においても、トンネル施工区間の地山がが軟弱であったり、トンネル平面線形や建築限界の制限により本坑トンネル間の近接距離が十分確保できず、センターピラー壁柱部11dの断面(厚さ)が十分確保できない場合がある。この場合には、センターピラーの外形は変更できないので、高強度コンクリートの使用、鉄筋量の増加やH形鋼等の鋼材を組み合わせた鉄骨鉄筋コンクリート構造等の複合構造として設計する必要がある。しかし、中央先進導坑は内空断面が小さいため、センターピラーに過大な配筋設計や鋼材を用いる設計は、実際には施工できない場合もある。
Also in the completed structure system shown in Fig. 5, the ground in the tunnel construction section is weak, and the proximity distance between the main tunnels cannot be secured due to the tunnel plane alignment and construction limits, so the center pillar In some cases, the cross section (thickness) of the
また、アーチ支保工14の脚部14aを支持するセンターピラー11の肩部11cの補強に関しては、脚部14aのベースプレートをアンカーボルト(図示せず)でセンターピラー11に固定したり、肩部11cに大量の補強鉄筋を配筋する方法で対処することも考えられるが、上述の理由と同様に実際の施工が困難な場合がある。
Further, regarding the reinforcement of the
そこで、本発明の目的は上述した従来の技術が有する問題点を解消し、簡単な補強構造により、先進本坑の掘削時においては、アーチ支保工を支持するセンターピラーの細部構造を、簡易な構造で堅固なものとしてセンターピラーに過剰な応力が生じないようにし、完成構造系においては、本坑トンネルの土被り荷重を確実に負担可能な構造を有するセンターピラー構造を提供することにある。 Therefore, the object of the present invention is to solve the above-mentioned problems of the prior art, and to simplify the detailed structure of the center pillar that supports the arch support during excavation of the advanced main mine by a simple reinforcing structure. An object of the present invention is to provide a center pillar structure having a structure capable of reliably bearing the earth covering load of the main tunnel in the completed structure system so that excessive stress is not generated in the center pillar as a solid structure.
上記目的を達成するために、本発明は近接して並行して構築されるめがねトンネルの2本の本坑間に位置する先進導坑内に共有支持構造部としてあらかじめ設けられ、前記本坑のアーチ支保工脚部を支持するとともに、前記本坑間の地山荷重を負担するセンターピラー構造であって、前記本坑の上半アーチ支保工脚部を支持する肩部に、前記アーチ支保工脚部を載置保持する支圧鋼板が、その一部がアンカーを介して、コンクリート内に埋設され固着されたことを特徴とする。 In order to achieve the above object, the present invention is provided in advance as a shared support structure in an advanced guide shaft located between two main shafts of a spectacle tunnel constructed in close proximity to each other. A center pillar structure that supports the support leg and bears a ground load between the main shafts, and the shoulder supporting the upper half arch support leg of the main shaft has the arch support support leg. The bearing steel plate for placing and holding the part is characterized in that a part thereof is embedded and fixed in concrete via an anchor.
前記アンカーは、前記支圧鋼板の後端を屈曲したフック状部、または前記支圧鋼板の下面に植設された複数本のスタッドとすることが好ましい。 The anchor is preferably a hook-like portion obtained by bending the rear end of the bearing steel plate or a plurality of studs planted on the lower surface of the bearing steel plate.
前記支圧鋼板は前記肩部の形状に合わせて屈曲され、その背面側にスタッドを植設することが好ましい。 It is preferable that the bearing steel plate is bent in accordance with the shape of the shoulder portion and a stud is implanted on the back side thereof.
また、完成構造系において、大きな荷重が作用される場合に、近接して並行して構築されるめがねトンネルの2本の本坑間に位置する先進導坑内に共有支持構造部としてあらかじめ設けられ、前記本坑のアーチ支保工脚部を支持するとともに、前記本坑間の地山荷重を負担するセンターピラー構造であって、該センターピラー内に中詰めコンクリート鋼管柱がトンネル延長方向に沿って所定間隔をあけて立設されるとともに、前記本坑の上半アーチ支保工脚部を支持する肩部に、前記アーチ支保工脚部を載置保持する支圧鋼板が、その一部がアンカーを介して、コンクリート内に埋設され固着されたことを特徴とする。 Moreover, in the completed structure system, when a large load is applied, it is provided in advance as a shared support structure in the advanced guide shaft located between the two main shafts of the eyeglass tunnel that is constructed in close proximity to each other, A center pillar structure that supports the arch support leg of the main mine and bears a ground load between the main mine, and a concrete steel pipe column filled in the center pillar is predetermined along the tunnel extending direction. Standing at intervals, the bearing steel plate for mounting and holding the arch support leg on the shoulder supporting the upper half arch support leg of the main mine, part of which is anchored And embedded in concrete and fixed.
本発明によれば、めがねトンネルの構築において、本坑の掘削に伴うアーチ支保工の脚部を支持するセンターピラーの肩部を、シンプルで堅固な構造とすることができ、また完成構造系においては、本坑トンネルの土被り荷重によって生じる軸圧縮力を確実に支持できるという効果を奏する。 According to the present invention, in the construction of the eyeglass tunnel, the shoulder of the center pillar that supports the legs of the arch support work accompanying excavation of the main mine can be made simple and rigid, and in the completed structure system Has the effect of being able to reliably support the axial compression force generated by the earth cover load of the main tunnel.
以下、本発明のめがねトンネルのセンターピラー構造を実施するための最良の形態として、以下の実施例について添付図面を参照して説明する。 Hereinafter, the best mode for carrying out the center pillar structure of the eyeglass tunnel of the present invention will be described with reference to the accompanying drawings.
以下、本発明のセンターピラー構造の構成について、図1,図2を参照して説明する。図1に示したセンターピラー構造は、完成構造系において、センターピラーの壁柱部が負担する鉛直方向の軸方向圧縮力を鉄筋コンクリート構造として支持できる実施例である。 Hereinafter, the structure of the center pillar structure of the present invention will be described with reference to FIGS. The center pillar structure shown in FIG. 1 is an embodiment that can support a vertical axial compressive force borne by the wall pillar portion of the center pillar as a reinforced concrete structure in the completed structure system.
本実施例のセンターピラーの断面形状は、図1に示したように、本坑トンネルの側壁形状およびインバート形状が滑らかに連続した略逆T字形状をなし、頂部は残置された中央先進導坑の頂部支保工の形状に倣った円弧状をなす。コンクリートとしては、設計基準強度21〜27N/mm2程度のコンクリートが使用されているが、完成構造系での荷重条件によっては設計基準強度30〜40N/mm2程度の高強度コンクリートを使用することが好ましい。配筋16は外形形状に倣って所定の被りを確保した従来の配筋形状と同様の配筋がなされている。壁柱部の配筋16aは先進本坑の掘削時に壁柱部11dに生じる曲げモーメントに抵抗可能な配筋量とし、側壁下半下端とインバート端との連続部と、インバート11eには、上述の曲げ作用時における曲げモーメントに抵抗可能な配筋量及び完成構造系における軸圧縮力による押し抜きせん断力に抵抗可能な配筋量のハンチ筋16b及び底版鉄筋16cが配筋されている。
As shown in FIG. 1, the cross-sectional shape of the center pillar of this embodiment is a substantially inverted T shape in which the side wall shape and invert shape of the main tunnel are smoothly continuous, and the top is left at the central advanced guide shaft. It has an arc shape that follows the shape of the top support. As concrete, concrete with a design standard strength of 21 to 27 N / mm 2 is used, but depending on the load conditions in the finished structure system, high strength concrete with a design standard strength of 30 to 40 N / mm 2 should be used. Is preferred. The bar arrangement 16 is arranged in the same manner as a conventional bar arrangement shape in which a predetermined covering is secured following the outer shape. The
一方、センターピラーの肩部11cには本坑のアーチ支保工の脚部14aの据付け面15が形成されている。そしてその据え付け面には支圧鋼板17がコンクリート本体と一体的に取り付けられている。
On the other hand, the
センターピラーの肩部11cの支圧鋼板17の細部構造について、図2各図を参照して説明する。
図2(a)にはセンターピラー11の肩部11cの切欠部の支保工脚部14aの据付け面15に支圧鋼板17が取り付けられている。本実施例ではこの支圧鋼板17として、厚さ10〜20mmの一般構造用圧延鋼材(SS400)が使用されている。また、支圧鋼板17は、同図に示したように、後端側に直角に屈曲したフック17aが形成され、そのフック17a部分を含む鋼板の一部がセンターピラー11のコンクリート内に埋設されている。さらにこの支圧鋼板17の上面のアーチ支保工脚部14aの据付け面15にはベースプレート18が溶接されている。このベースプレート18は両端が上方に向けてわずかに屈曲した縁辺部18aを有し、平板部にアーチ支保工脚部14aが設置されるようになっている。このような構成からなるセンターピラー11の肩部11cでは、アーチ支保工脚部14aから伝わる軸圧縮力は支圧鋼板17を面支持するコンクリート全面に分散し、このとき生じる本坑内空側に向く分力も、ベースプレート18の縁辺部18aとコンクリート内に埋設されたフック17aが抵抗してキャンセルされるため、アーチ支保工脚部14aにはズレが生じない。
The detailed structure of the bearing
In FIG. 2 (a), a supporting
支圧鋼板の変形例について、図2(b),(c)を参照して説明する。同図(b)は支圧鋼板17のコンクリート接触面にスタッド19を植設した変形例である。このようにスタッド19をコンクリート内に埋設して支圧鋼板17を肩部11cに固定することにより、軸圧縮力によって支圧鋼板17に面荷重が作用した場合に、鋼板17からスタッド19に応力分散し、コンクリートの応力集中が緩和される。また、せん断すべりに対する抵抗性も大幅に向上する。スタッド19としては直径6〜10mm程度の細径のものを、支圧鋼板17の下面に適当なピッチであらかじめ植設しておき、コンクリート打設時にコンクリートと一体化させることが好ましい。
A modification of the bearing steel plate will be described with reference to FIGS. FIG. 2B shows a modification in which
同図(c)は、断面L字形の支圧鋼板17とすることで、肩部11cの入隅部のコンクリートに生じる高い引張応力を確実に負担することができ、コンクリートへの悪影響を防止できる。また、このとき配置されたスタッド19はアーチ支保工脚部14aの滑りに対して引張抵抗部材として有効に機能する。
FIG. 4C shows that the bearing
上述した種々の支圧鋼板を採用することにより、センターピラーの肩部11cを補強するための増し鉄筋等の配筋が不要となり、配筋作業の施工性も向上する。
By adopting the above-mentioned various bearing steel plates, it is not necessary to arrange reinforcing bars such as reinforcing bars for reinforcing the
なお、センターピラー11の全体構造として、図1に示したように、壁柱部11d及びインバート11eにコンクリート打設後に頂部に空隙が生じる場合には、高強度の無収縮モルタル12を後充填して先進導坑頂部とコンクリートとの間を完全に閉塞することが好ましい。
In addition, as shown in FIG. 1, as the entire structure of the
以下、上述したセンターピラーの肩部11cの補強構造に加え、完成構造系において、センターピラーの壁柱部を、補強鋼管柱を内蔵した鉄筋コンクリート構造とした実施例について説明する。図5に示したように、めがねトンネルとして本坑20,30の2次覆工が完了した完成構造系において、トンネル上部の土被り荷重が大きい場合には、完成後のセンターピラーの負担する軸圧縮力が非常に大きくなる場合が想定される。実施例2では、このような荷重状態を想定し、センターピラー壁柱部11dを補強鋼管柱40と上述(図1)の鉄筋コンクリート構造とからなる複合構造体とした。このように、本実施例では、センターピラー11は、図3に示したように、センターピラー11内にトンネル延長方向に、設計上設定されたピッチ(たとえば1.5〜2.5m程度)で鋼管柱40が建て込まれた鋼管柱鉄筋コンクリート構造からなる。この鋼管柱40の上下端には、所定厚さの支圧プレート42が固着され、内部に圧縮構造体としての所定強度の中詰めコンクリート41が充填されており、この鋼管柱40でセンターピラー11に作用する、本坑トンネル20,30間の上方の土被り荷重を確実に負担できる。このとき鋼管柱40への軸力伝達がスムースにできるように、鋼管柱40の頂部と中央先進導坑の支保工との間には無収縮モルタル43が充填され、両者の一体化が図られている。なお、鋼管柱40は設計上、その材質、外径、肉厚、中詰めコンクリート強度および柱の建込みピッチが、たとえば図5に示したような、適正に想定された作用荷重に対して十分な耐力を有するように設定される。
Hereinafter, in addition to the reinforcing structure of the
センターピラー11の鉄筋コンクリート構造部分は、上述した各施工段階での仮設応力状態、および完成構造系におけるアーチ支保工脚部14aから伝達される荷重を負担したときの本設応力状態を考慮して設計されている。なお、鋼管柱40はセンターピラー11の壁柱部11dに生じる曲げに対しても抵抗可能であるため、センターピラー11の鉄筋量は全体として低減することができる。
The reinforced concrete structure part of the
10 中央先進導坑
11 センターピラー
14 アーチ支保工
17 支圧鋼板
17a フック
18 ベースプレート
19 スタッド
20 先進本坑
30 後進本坑
40 鋼管柱
10 Central
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2004162758A JP4296545B2 (en) | 2004-06-01 | 2004-06-01 | Center-pillar structure of eyeglass tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2004162758A JP4296545B2 (en) | 2004-06-01 | 2004-06-01 | Center-pillar structure of eyeglass tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2005344318A JP2005344318A (en) | 2005-12-15 |
| JP4296545B2 true JP4296545B2 (en) | 2009-07-15 |
Family
ID=35496954
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2004162758A Expired - Fee Related JP4296545B2 (en) | 2004-06-01 | 2004-06-01 | Center-pillar structure of eyeglass tunnel |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4296545B2 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4665834B2 (en) * | 2006-05-30 | 2011-04-06 | 株式会社大林組 | Side-by-side tunnel structure and its construction method |
| JP4760548B2 (en) * | 2006-06-02 | 2011-08-31 | 株式会社大林組 | Side-by-side tunnel structure and its construction method |
| CN104912559B (en) * | 2015-06-02 | 2017-02-01 | 中车建设工程有限公司 | Rapid construction method for long and large double-multiple arch tunnel |
| CN106593486B (en) * | 2017-01-18 | 2018-07-17 | 山东建筑大学 | A kind of roadway crossing point concrete filled steel tube sectional shelf-unit |
| CN110924985A (en) * | 2019-12-04 | 2020-03-27 | 中铁二院贵阳勘察设计研究院有限责任公司 | Long rock pillar construction method suitable for overlying thin rock stratum |
| CN111485914B (en) * | 2020-04-13 | 2021-07-13 | 中铁二院工程集团有限责任公司 | Rock pillar construction method in replacement of high-ground-stress soft rock large-deformation ultra-small clear distance tunnel |
| CN114439518A (en) * | 2020-11-02 | 2022-05-06 | 贵州省交通规划勘察设计研究院股份有限公司 | A composite middle wall support structure of a multi-arch tunnel and its construction method |
| CN113431607B (en) * | 2021-07-19 | 2023-04-25 | 中交第二航务工程局有限公司 | Method for controlling arch foot jacking pressure sinking of weak surrounding rock tunnel |
-
2004
- 2004-06-01 JP JP2004162758A patent/JP4296545B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2005344318A (en) | 2005-12-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6166560B2 (en) | Extension structure of seismic isolation building | |
| JP4296545B2 (en) | Center-pillar structure of eyeglass tunnel | |
| JP2006104747A (en) | Joint structure and joining method of pedestal | |
| JP2022067519A (en) | Small step construction method in sloped land | |
| KR100657655B1 (en) | Prefab pile for ground stability method | |
| JP2004197373A (en) | Earthquake resistant reinforcement method of existing concrete container structure and earthquake resistant reinforcement structure | |
| JP4253795B2 (en) | Synthetic wall structure | |
| JP4279192B2 (en) | PC board for lining and manufacturing method thereof | |
| JP7294965B2 (en) | Joint structure between steel shoring and inverted concrete | |
| JPH07119549B2 (en) | Twin tunnel | |
| JP6368584B2 (en) | Foundation construction method | |
| JP4705497B2 (en) | Reinforcement method of pile foundation of existing building | |
| KR101212732B1 (en) | Arch tunnel using geometric reaction force block and arch tunnel construction method therefor | |
| KR100941437B1 (en) | 2 arch tunnel construction method for upper girder void proofing and efficient construction | |
| JP6774774B2 (en) | Pile foundation structure | |
| JP2001182015A (en) | Construction method of composite deck bridge | |
| JP6461690B2 (en) | Foundation structure and foundation construction method | |
| JP4196290B2 (en) | Reinforcement structure of the center pillar of a glasses tunnel and a tunnel construction method | |
| JP2005248428A (en) | Basic structure of the structure | |
| JP2009108500A (en) | Precast beam construction method, precast beam, precast beam joint structure, and building | |
| JP2007315136A (en) | Foundation structure using existing and new piles | |
| JP2006316495A (en) | Foundation structure of bridge pier and its construction method | |
| KR100908479B1 (en) | Multi-girder for construction and civil engineering | |
| JP2001193290A (en) | Existing building seismic isolation method | |
| JP3782083B2 (en) | Building foundation structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070118 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20081028 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090324 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090402 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120424 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120424 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130424 Year of fee payment: 4 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140424 Year of fee payment: 5 |
|
| LAPS | Cancellation because of no payment of annual fees |