Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4298465B2 - Formation method of through-hole and arrangement method of wire rod - Google Patents
[go: Go Back, main page]

JP4298465B2 - Formation method of through-hole and arrangement method of wire rod - Google Patents

Formation method of through-hole and arrangement method of wire rod Download PDF

Info

Publication number
JP4298465B2
JP4298465B2 JP2003369581A JP2003369581A JP4298465B2 JP 4298465 B2 JP4298465 B2 JP 4298465B2 JP 2003369581 A JP2003369581 A JP 2003369581A JP 2003369581 A JP2003369581 A JP 2003369581A JP 4298465 B2 JP4298465 B2 JP 4298465B2
Authority
JP
Japan
Prior art keywords
hole
steel pipe
steel
forming
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003369581A
Other languages
Japanese (ja)
Other versions
JP2005133395A (en
Inventor
茂治 岩永
昭浩 中北
章文 荒木
壮太郎 松本
喬 岡田
仁 手塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP2003369581A priority Critical patent/JP4298465B2/en
Publication of JP2005133395A publication Critical patent/JP2005133395A/en
Application granted granted Critical
Publication of JP4298465B2 publication Critical patent/JP4298465B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、地中あるいは水中に設置された鋼管の側面に貫通孔を形成する方法と線材を上記鋼管の側面を貫通させるように配置する方法に関するものである。   The present invention relates to a method for forming a through hole in a side surface of a steel pipe installed in the ground or in water, and a method for arranging a wire rod so as to penetrate the side surface of the steel pipe.

従来、図11に示すように、地中に複数本の鋼管51を互いに隣接させて埋設した地中構造物50を構築する場合には、上記鋼管51同士を連結部材52を用いて連結して補強するようにしていた。しかしながら、上記鋼管51を地中に埋設するという制約上、鋼管51には予め上記連結部材52を取付けるための貫通孔51sを設けることができないため、鋼管51の埋設後、上記鋼管51内に作業員が入り、上記鋼管51の側面を機械的にくり抜いたり溶断したりなどして貫通孔51sを形成するようにしていた。
また、図12に示すように、地中または水中において複数本の鋼管60を設置した後、上記鋼管60内に充填剤を充填する際には、通常、同図の紙面手前側または奥側の注入側より注入管を上記鋼管60内に送って充填剤の充填を行うが、スペースの関係や、注入側を早期に他の工程で利用する場合のように、注入側より注入管を設置できない場合には、上記の場合と同様に、上記鋼管60内に作業員が入り、上記鋼管60の側面を機械的にくり抜いたり溶断したりなどして貫通孔60sを形成し、この貫通孔60sを介して上記鋼管60内に注入管61を送って充填剤の充填を行わなければならなかった。
Conventionally, as shown in FIG. 11, when constructing an underground structure 50 in which a plurality of steel pipes 51 are buried adjacent to each other in the ground, the steel pipes 51 are connected to each other using a connecting member 52. I was trying to reinforce it. However, because of the restriction that the steel pipe 51 is buried in the ground, the steel pipe 51 cannot be provided with a through-hole 51 s for attaching the connecting member 52 in advance. A worker enters, and the side surface of the steel pipe 51 is mechanically cut out or melted to form the through hole 51s.
In addition, as shown in FIG. 12, when a plurality of steel pipes 60 are installed in the ground or in the water, and then the filler is filled in the steel pipe 60, the front side or the back side of the paper in FIG. The injection pipe is sent from the injection side into the steel pipe 60 and filled with the filler. However, the injection pipe cannot be installed from the injection side as in the case of using the injection side in other processes at an early stage because of space. In the case, as in the above case, an operator enters the steel pipe 60, and the through-hole 60s is formed by mechanically hollowing out or fusing the side surface of the steel pipe 60. Therefore, it was necessary to fill the filler by feeding the injection pipe 61 into the steel pipe 60.

一方、トンネル坑口部や土被りが薄い場合における掘削・支保では、地山に扁平なアーチを構成する必要があることから、トンネルの軸方向に、上記扁平なアーチ部に沿って、多数の筒体を互いに隣接させて推進・埋設して先行支保工を構築して上記地山を補強する方法が行われている。このとき、上記先行支保工を安定させる方法として、例えば、図13に示すように、トンネルのアーチ部に沿って、継手を有する複数本の継手付き鋼管10を連結しながら推進・埋設するとともに、上記継手付き鋼管10の角型管11の両側面に貫通孔18sを設け、この貫通孔18sに鋼線20zを束ねた鋼線束20を貫通させ、上記継手付き鋼管10内にコンクリートを充填して先行支保工2を構築した後、上記先行支保工2の両端部で反力をとりながら上記鋼線束20に引張力を作用させて固定して上記先行支保工2に圧縮力を与え、上記コンクリートは圧縮領域内で変形させることにより、上記先行支保工2を安定させる方法が考えられる。   On the other hand, in excavation and support when the tunnel pit or cover is thin, it is necessary to form a flat arch on the natural ground, so a large number of tubes are formed along the flat arch in the axial direction of the tunnel. There is a method of reinforcing the above-mentioned ground by constructing a preceding support work by pushing and burying the bodies adjacent to each other. At this time, as a method for stabilizing the preceding support work, for example, as shown in FIG. 13, along the arch portion of the tunnel, while propelling and burying a plurality of jointed steel pipes 10 having joints, Through holes 18s are provided on both side surfaces of the square pipe 11 of the steel pipe with joint 10, the steel wire bundle 20 in which the steel wires 20z are bundled is passed through the through holes 18s, and the steel pipe 10 with joint is filled with concrete. After constructing the preceding support 2, a tensile force is applied and fixed to the steel wire bundle 20 while applying a reaction force at both ends of the preceding support 2 to apply a compressive force to the preceding support 2. A method of stabilizing the preceding support work 2 by deforming in the compression region can be considered.

しかしながら、地中あるいは水中に埋設される鋼管10,51,60は、一般に耐圧性を要求されるため肉厚が厚く、そのため、鋼管10,51,60の埋設後に貫通孔18s,51s,60sを形成するのが大変であった。
また、鋼管10,51,60内の空間が狭い場合には、大型の機械を導入することが困難であるため、貫通孔18s,51s,60sの形成は人力に頼らざるを得なかった。
However, the steel pipes 10, 51, 60 buried in the ground or in the water are generally thick because they are required to have pressure resistance. Therefore, the through holes 18s, 51s, 60s are formed after the steel pipes 10, 51, 60 are buried. It was hard to form.
In addition, when the space inside the steel pipes 10, 51, 60 is narrow, it is difficult to introduce a large machine, so the formation of the through holes 18s, 51s, 60s has to rely on human power.

本発明は、従来の問題点に鑑みてなされたもので、地中あるいは水中に埋設された鋼管の側面に、容易にかつ効率的に貫通孔を形成する方法と、線材を上記鋼管の側面を貫通させるように配置する方法を提供することを目的とする。   The present invention has been made in view of the conventional problems, and a method for easily and efficiently forming a through-hole in a side surface of a steel pipe buried in the ground or in water, and a method of forming the side surface of the steel pipe with a wire rod. It aims at providing the method of arrange | positioning so that it may penetrate.

本発明の請求項に記載の発明は、地中または水中に設置された鋼管の側面の外側及び内側のいずれか一方または両方に、貫通孔を形成するための切り込み部を設けた貫通孔予定箇所を予め形成し、上記鋼管の設置後に、上記貫通孔予定箇所を打ち抜いて貫通孔を形成する貫通孔の形成方法において、上記鋼管内に、走行手段に搭載された、シリンダロッドを備えた1台の油圧ジャッキを配置し、上記シリンダロッドを伸長させて上記貫通孔予定箇所を打ち抜いて、上記鋼管の両側面に複数の貫通孔を形成するようにしたことを特徴とする
また、請求項2に記載の発明は、地中または水中に設置された鋼管の側面を予めくり抜いた後、上記くり抜き部に、上記くり抜かれた空隙と同じ断面を有する蓋部材を溶接にて取付けて、貫通孔予定箇所を形成し、上記鋼管の設置後に、上記貫通孔予定箇所を打ち抜いて貫通孔を形成する貫通孔の形成方法において、上記鋼管内に、走行手段に搭載された、シリンダロッドを備えた1台の油圧ジャッキを配置し、上記シリンダロッドを伸長させて上記貫通孔予定箇所を打ち抜いて、上記鋼管の両側面に複数の貫通孔を形成するようにしたことを特徴とする。
これにより、地中または水中に設置された鋼管の側面に容易に貫通孔を形成することができるとともに、鋼管内の空間が狭い場合でも、容易にかつ効率的に貫通孔を形成することが可能となる。
According to a first aspect of the present invention, either or both the outer and inner sides of the installed steel pipe in the ground or water, through holes going having a cut portion for forming a through hole In the method for forming a through hole, in which a portion is formed in advance, and after the installation of the steel pipe, the predetermined through hole is punched out to form a through hole , a cylinder rod mounted on traveling means is provided in the steel pipe. A hydraulic jack is provided, and the cylinder rod is extended to punch out the predetermined through hole, thereby forming a plurality of through holes on both side surfaces of the steel pipe .
According to the second aspect of the present invention, after a side surface of a steel pipe installed underground or in water is hollowed out in advance, a lid member having the same cross section as the hollowed out space is attached to the hollowed portion by welding. In the method for forming a through-hole, in which a through-hole planned portion is formed and the through-hole planned portion is punched out to form a through-hole after installation of the steel pipe, the cylinder rod mounted on the traveling means in the steel pipe One hydraulic jack provided with the above is arranged, and the cylinder rod is extended to punch out the predetermined through hole, thereby forming a plurality of through holes on both side surfaces of the steel pipe.
As a result, through holes can be easily formed on the side surface of a steel pipe installed in the ground or underwater, and even when the space in the steel pipe is narrow, it is possible to easily and efficiently form a through hole. It becomes.

また、請求項に記載の発明は、トンネル軸方向に延長する鋼管を、所定の距離を隔てて互いに連結した後、上記鋼管の側面に線材を貫通させるための貫通孔を形成し上記線材を上記鋼管を貫通するように配置する線材の配置方法であって、上記請求項1または請求項2に記載の貫通孔の形成方法を用いて、上記貫通孔を形成するようにしたことを特徴とする。
請求項に記載の発明は、請求項に記載の線材の配置方法において、上記鋼管内または形成された上記貫通孔に、上記線材を上記貫通孔に案内するガイド管を設けたことを特徴とする。
The invention according to claim 3, a steel pipe extending to the tunnel axis, after connected to each other at a predetermined distance, forming a through hole for passing the wire to the side of the steel tube, the wire A wire rod is disposed so as to pass through the steel pipe, and the through hole is formed using the through hole forming method according to claim 1 or 2. And
According to a fourth aspect of the present invention, in the wire rod arranging method according to the third aspect , a guide tube for guiding the wire rod to the through hole is provided in the steel pipe or in the formed through hole. And

以上説明したように、本発明によれば、地中または水中に設置された鋼管の側面に切り込み部やくり抜き部を蓋部材で閉鎖した貫通孔予定箇所を設け、上記鋼管の設置後に上記貫通孔予定箇所を打ち抜いたり、蓋部材を開放するなどして貫通孔を形成するようにしたので、地中または水中に設置された鋼管の側面に容易にかつ迅速に貫通孔を形成することができる。   As described above, according to the present invention, a through-hole planned portion in which a cut portion or a cut-out portion is closed with a lid member is provided on a side surface of a steel pipe installed in the ground or in water, and the through-hole is installed after the steel pipe is installed. Since the through hole is formed by punching out a predetermined location or opening the lid member, the through hole can be formed easily and quickly on the side surface of the steel pipe installed in the ground or in water.

以下、本発明の最良の形態について、図面に基づき説明する。
本例では、トンネルのアーチ部に先行支保工を構築するために用いられる筒体の側面に線材を貫通させるための貫通孔を形成する方法について説明する。
図1は、地中に埋設された後に、筒体の側面に上記貫通孔が形成される継手付き鋼管10の構成を示す図である。同図において、11は断面が長方形の鋼管から成る角型管、12A,12B及び12C,12Dは上記角型管11の両側面11a,11bの上端部と下端部とから水平に突出する、第1及び第2の継手である。上記第1の継手12A,12Bは、詳細には、上記角型管11の側面11aから上記側面11aに垂直に突出する、トンネル軸方向に延長する平板状の第1及び第2の腕部13a,13bと、上記第1及び第2の腕部13a,13bの上記角型管11側から垂直方向に突出する取付片14a,14bと、上記第1及び第2の腕部13a,13bの突出方向の先端部に取付けられた、トンネル軸方向に延長する円筒状の係合部材15a,15bとから成り、各取付片14a,14bがそれぞれ上記側面11aの内側に向くように、上記取付片14a,14bを上記角型管11の側面11aに固定することにより、第1の継手12A,12Bを上記側面11aに取付ける。第2の継手12C,12Dは、上記角型管11の側面11bから上記側面11bに垂直に突出する、トンネル軸方向に延長する平板状の第3及び第4の腕部13c,13dと、上記第3及び第4の腕部13c,13dの上記角型管11側から垂直方向に突出する取付片14c,14dと、上記第3及び第4の腕部13c,13dの突出方向の先端部に取付けられた、上記円筒状の係合部材15a,15bをそれぞれ挿入して把持するための、上記円筒の一部をなす凹部16sを有する把持部材16a,16bとから成り、各取付片14c,14dがそれぞれ上記側面11bの内側に向くように、上記取付片14c,14dを上記角型管11の側面11bに固定することにより、上記第2の継手12C,12Dを上記側面11bに取付ける。
Hereinafter, the best mode of the present invention will be described with reference to the drawings.
In this example, a method of forming a through hole for penetrating a wire on the side surface of a cylindrical body used for constructing a preceding support work in an arch portion of a tunnel will be described.
FIG. 1 is a diagram illustrating a configuration of a steel pipe 10 with a joint in which the through hole is formed on the side surface of a cylindrical body after being buried in the ground. In the figure, 11 is a rectangular tube made of a steel pipe having a rectangular cross section, and 12A, 12B and 12C, 12D are projected horizontally from the upper and lower ends of both side surfaces 11a, 11b of the rectangular tube 11, 1 and the second joint. Specifically, the first joints 12A and 12B are formed by flat plate-like first and second arm portions 13a that project perpendicularly from the side surface 11a of the rectangular tube 11 to the side surface 11a and extend in the tunnel axis direction. , 13b, mounting pieces 14a, 14b projecting vertically from the square tube 11 side of the first and second arm portions 13a, 13b, and projections of the first and second arm portions 13a, 13b. The cylindrical mounting members 15a and 15b are attached to the front end of the direction and extend in the tunnel axis direction. The mounting pieces 14a and 14b face the inner side of the side surface 11a. , 14b are fixed to the side surface 11a of the rectangular tube 11 to attach the first joints 12A, 12B to the side surface 11a. The second joints 12C and 12D include flat plate-like third and fourth arm portions 13c and 13d extending perpendicularly to the side surface 11b from the side surface 11b of the rectangular tube 11 and extending in the tunnel axis direction, Mounting pieces 14c and 14d projecting in the vertical direction from the square tube 11 side of the third and fourth arm portions 13c and 13d, and distal ends of the third and fourth arm portions 13c and 13d in the projecting direction. Each of the mounting pieces 14c, 14d includes a gripping member 16a, 16b having a recessed portion 16s forming a part of the cylinder for inserting and gripping the cylindrical engaging members 15a, 15b. The second joints 12C and 12D are attached to the side surface 11b by fixing the attachment pieces 14c and 14d to the side surface 11b of the square tube 11 so that each faces the inside of the side surface 11b.

本例では、上記継手付き鋼管10によりトンネルのアーチ部に先行支保工を構成するため、上記アーチ部の扁平率に応じて、角型管11の側面11bの上端部に取付けられる第3の腕部13cの幅を、下端部に取付けられる第4の腕部13dの幅よりも広く設定してあるが、角型管11の側面11aの上端部の第1の腕部13aの幅を、下端部の第2の腕部13bの幅よりも広く設定してもよいし、上記腕部13aと腕部13cの幅をそれぞれ上記腕部13bと腕部13dの幅よりも広く設定してもよい。
また、本例では、上記角型管11の両側面11a,11bの外側に、トンネル軸方向に所定の間隔を隔てて、後述する貫通孔を形成するための切り込みが設けられた貫通孔予定箇所18が形成されており、上記角型管11の上面11cと下面11dには、角型管11の内部から角型管11の上面側と下面側の地山に地盤固化材を注入する際に使用する複数の逆止弁19が設けられている。
In this example, since the steel pipe with joint 10 constitutes a pre-supporting work in the arch portion of the tunnel, the third arm attached to the upper end portion of the side surface 11b of the square tube 11 according to the flatness of the arch portion. The width of the portion 13c is set wider than the width of the fourth arm portion 13d attached to the lower end portion, but the width of the first arm portion 13a at the upper end portion of the side surface 11a of the rectangular tube 11 is set to the lower end portion. May be set wider than the width of the second arm portion 13b, or the width of the arm portion 13a and the arm portion 13c may be set wider than the width of the arm portion 13b and the arm portion 13d, respectively. .
Moreover, in this example, the through-hole planned location by which the notch for forming the through-hole mentioned later was provided in the tunnel axial direction on the outer side of the both side surfaces 11a and 11b of the said square tube 11 is provided. 18 is formed, and the solidified material is injected into the upper surface 11c and the lower surface 11d of the rectangular tube 11 from the inside of the rectangular tube 11 to the ground on the upper surface side and the lower surface side of the rectangular tube 11. A plurality of check valves 19 to be used are provided.

次に、本発明による継手付き鋼管10を用いて、大断面を有するトンネルの先行支保工を構築する方法について説明する。
本例では、図2(a),(b)に示すように、地山1に構築される先行支保工2の横断面のアーチ部3の両端となる部分に先進導坑4A,4Bを設け、上記アーチ部3に沿って上記継手付き鋼管10,10,‥‥を挿入・埋設した後、上記複数の継手付き鋼管10を貫通するように、複数の鋼線20zを束ねて成る鋼線束20を上記アーチ部3に沿って配置する。そして、上記鋼線束20の両端部を上記先進導坑4A,4B内に設けられた、上記継手付き鋼管10の両端部が固定された反力板5A,5Bに仮止めした後、上記継手付き鋼管10内にコンクリートを充填させて先行支保工2を構築する。
本例では、更に、上記先行支保工2の構築後、上記先進導坑4A,4B内に設置された反力板5A,5Bで反力をとりながら、上記鋼線束20の両端部をそれぞれ固定した固定端20a,20bをジャッキ等により上記アーチ部3の延長線上に緊張力pを作用させ、上記緊張力pにより上記固定端20a,20bと上記反力板5A,5Bとの間にできた隙間に楔6を打ち込んで固定するなどして、上記鋼線束20の固定端20a,20bを固定し、上記反力板5Aと反力板5Bとの間に配置された先行支保工2に、トンネルの横断面の上記アーチ部3に沿った圧縮力Pを与えるようにしている。
Next, a method for constructing a preceding support for a tunnel having a large cross section using the steel pipe with joint 10 according to the present invention will be described.
In this example, as shown in FIGS. 2 (a) and 2 (b), advanced guiding shafts 4 </ b> A and 4 </ b> B are provided at both ends of the arch portion 3 in the cross section of the preceding support construction 2 constructed in the natural ground 1. The steel pipe bundle 20 is formed by bundling a plurality of steel wires 20z so as to penetrate the plurality of steel pipes 10 with joints after inserting and embedding the steel pipes with joints 10, 10,... Is arranged along the arch portion 3. Then, after temporarily fixing both ends of the steel wire bundle 20 to the reaction force plates 5A and 5B provided in the advanced guiding pits 4A and 4B to which both ends of the steel pipe with joint 10 are fixed, the joints are attached. The preceding support 2 is constructed by filling the steel pipe 10 with concrete.
In this example, after constructing the preceding support structure 2, both ends of the steel wire bundle 20 are fixed while taking reaction force with the reaction force plates 5A and 5B installed in the advanced guiding shafts 4A and 4B. The fixed ends 20a and 20b are made to exert tension force p on the extension line of the arch portion 3 by a jack or the like, and are formed between the fixed ends 20a and 20b and the reaction force plates 5A and 5B by the tension force p. For example, the fixed ends 20a and 20b of the steel wire bundle 20 are fixed by driving a wedge 6 into the gap, and the preceding support 2 disposed between the reaction force plate 5A and the reaction force plate 5B. A compressive force P along the arch portion 3 of the cross section of the tunnel is applied.

継手付き鋼管10を地山1に挿入・埋設する際には、図3に示すように、次に埋設する継手付き鋼管10Aの係合部材15a,15aを、先に埋設した継手付き鋼管10の把持部材16a,16bの凹部16s,16sに挿入するようにして、上記継手付き鋼管10Aを地山1内に挿入する。なお、図3では挿入状態を分かり易くするため、腕部13cの幅と腕部13dの幅とを同じにしているが、実際には、図1に示すように、上記角型管11の上端部に取付けられた腕部13cの幅を、下端部に取付けられた腕部13dの幅よりも広く設定してあるので、角型管11の上面11cの幅と下面11dの幅とが同じであっても、図4に示すように、腕部13cの幅を変更するだけで複数の継手付き鋼管10をトンネルのアーチ部3となる所定の曲線上に配置することができる。
また、継手付き鋼管10の埋設後には、沈下対策のため、上記継手付き鋼管10の上部側及び下部側の地山に地盤固化剤を注入して、上記継手付き鋼管10の上下の地山1を予め改良しておくことが望ましい。
When inserting and embedding the steel pipe with joint 10 in the natural ground 1, as shown in FIG. 3, the engaging members 15a and 15a of the steel pipe with joint 10A to be buried next are connected to the steel pipe 10 with joint previously buried. The steel pipe with joint 10A is inserted into the natural ground 1 so as to be inserted into the recesses 16s and 16s of the gripping members 16a and 16b. In FIG. 3, the width of the arm portion 13c and the width of the arm portion 13d are the same in order to make the insertion state easy to understand, but actually, as shown in FIG. Since the width of the arm portion 13c attached to the lower portion is set wider than the width of the arm portion 13d attached to the lower end portion, the width of the upper surface 11c of the square tube 11 and the width of the lower surface 11d are the same. Even if it exists, as shown in FIG. 4, the steel pipe 10 with a some joint can be arrange | positioned on the predetermined | prescribed curve used as the arch part 3 of a tunnel only by changing the width | variety of the arm part 13c.
Moreover, after embedding the steel pipe 10 with a joint, in order to prevent settlement, a ground solidifying agent is injected into the ground on the upper side and the lower side of the steel pipe 10 with a joint, and the ground 1 above and below the steel pipe 10 with the joint is inserted. It is desirable to improve in advance.

その後、図5に示すように、トンネルの横断面の上記アーチ部に沿って、上記複数の継手付き鋼管10を貫通する複数の鋼線20zを束ねた鋼線束20を配置する。具体的には、図6(a)に示すように、上記継手付き鋼管10の角型管11内に走行手段31に搭載された油圧ジャッキ32を備えた打ち抜き装置30を導入し、上記角型管11の貫通孔予定箇所18を打ち抜いて貫通孔18sを形成する。角型管11の上記貫通孔予定箇所18は、角型管11の側面11b(または、側面11a)を構成する鋼管に外側から予め切り込み18zが入れられているので、上記油圧ジャッキ32のシリンダロッド32aの先端部とは反対側に設けられた反力板32bを、角型管11の打ち抜くべき貫通孔予定箇所18とは反対側の側面の内壁側に当接させて、上記反力板32bにより反力をとりながら、上記シリンダロッド32aを伸長させ、上記貫通孔予定箇所18を筒体外側に押出すようにすれば、上記貫通孔予定箇所18を容易に打ち抜いて、貫通孔18sを形成することができる。
また、鋼管を打ち抜く際には、図6(b)に示すように、上記打ち抜き装置30を一方向に走行させながら上記角型管11の一方の側面の貫通孔予定箇所18を順次打ち抜いた後、上記油圧ジャッキ32を反転させて、上記打ち抜き装置30を反対方向に走行させ、上記角型管11の他方の側面の貫通孔予定箇所18を順次打ち抜くようにすれば、角型管11内の空間が狭い場合でも、容易に貫通孔18sを形成することができる。
なお、上記打ち抜き装置30により上記角型管11の一方の側面の貫通孔予定箇所18を順次打ち抜いた後、上記打ち抜き装置30を戻して反転させ、他方の側面の貫通孔予定箇所18を順次打ち抜くようにしてもよい。
あるいは、上記油圧ジャッキ32に代えて、両方向に伸縮するシリンダロッドを有する油圧ジャッキにて、上記角型管11の他方の側面でそれぞれ反力をとりながら、両方の側面のの貫通孔予定箇所18を同時に打ち抜くようにしてもよい。
Then, as shown in FIG. 5, the steel wire bundle 20 which bundled the some steel wire 20z which penetrates the said several steel pipe 10 with a joint is arrange | positioned along the said arch part of the cross section of a tunnel. Specifically, as shown in FIG. 6 (a), a punching device 30 including a hydraulic jack 32 mounted on a traveling means 31 is introduced into the square tube 11 of the steel pipe 10 with a joint. A through-hole 18s is formed by punching the through-hole planned portion 18 of the tube 11. Since the through hole planned portion 18 of the rectangular tube 11 is cut in advance from the outside into the steel pipe constituting the side surface 11b (or the side surface 11a) of the rectangular tube 11, the cylinder rod of the hydraulic jack 32 is provided. The reaction force plate 32b provided on the opposite side of the tip of the 32a is brought into contact with the inner wall side of the side surface opposite to the through hole planned portion 18 to be punched out of the square tube 11, so that the reaction force plate 32b. If the cylinder rod 32a is extended while the reaction force is applied, and the through-hole planned portion 18 is pushed out of the cylindrical body, the through-hole planned portion 18 can be easily punched to form a through-hole 18s. can do.
Further, when punching a steel pipe, as shown in FIG. 6B, after the punching device 30 is run in one direction, the through-hole planned portion 18 on one side surface of the rectangular pipe 11 is sequentially punched. If the hydraulic jack 32 is reversed and the punching device 30 travels in the opposite direction so as to sequentially punch the through-hole planned portion 18 on the other side surface of the rectangular tube 11, Even when the space is narrow, the through hole 18s can be easily formed.
The punching device 30 sequentially punches the planned through-hole portion 18 on one side surface of the rectangular tube 11, and then returns the punching device 30 to turn it over, and sequentially punches the through-hole planned portion 18 on the other side surface. You may do it.
Alternatively, in place of the hydraulic jack 32, a hydraulic jack having a cylinder rod that expands and contracts in both directions is used to apply a reaction force to the other side surface of the rectangular tube 11, while the through-hole planned portions 18 on both side surfaces are taken. May be punched at the same time.

次に、上記鋼線束20を、一方の先進導坑4A(または、先進導坑4B)の内側から、上記貫通孔18sを介して、上記連結して埋設された継手付き鋼管10内に導入する。このとき、図7(a)に示すように、角型管11内にレール部材21を敷設し、このレール部材21上の上記貫通孔18s,18s間に、上記貫通孔18sとほぼ同じ内径を有する円筒状のガイド管22を並べておき、一方の貫通孔18sから角型管11内に導入された上記鋼線束20を上記ガイド管22を通して他方の貫通孔18sから送り出すようにすれば、図7(b)に示すように、連結された複数の角型管11,11,11,‥‥に上記鋼線束20をスムースに貫通させることができる。
なお、上記ガイド管22に代えて、図7(c)に示すように、上記角型管11の幅よりも長いガイド管23を準備し、このガイド管23を上記角型管11の互いに対向する貫通孔18pと貫通孔18qとを連通するように上記貫通孔18s,18sに取付け、このガイド管23を用いて上記鋼線束20を貫通させるようにしてもよい。
Next, the steel wire bundle 20 is introduced into the jointed steel pipe 10 connected and buried through the through hole 18s from the inside of one advanced guide shaft 4A (or advanced guide shaft 4B). . At this time, as shown in FIG. 7A, a rail member 21 is laid in the square tube 11, and the inner diameter between the through holes 18s and 18s on the rail member 21 is substantially the same as that of the through hole 18s. If the cylindrical guide pipes 22 are arranged side by side and the steel wire bundle 20 introduced into the square pipe 11 from one through hole 18s is sent out from the other through hole 18s through the guide pipe 22, FIG. As shown in (b), the steel wire bundle 20 can be smoothly passed through a plurality of connected rectangular tubes 11, 11, 11,.
Instead of the guide tube 22, as shown in FIG. 7C, a guide tube 23 longer than the width of the rectangular tube 11 is prepared, and the guide tube 23 is opposed to the rectangular tube 11. The through-hole 18p and the through-hole 18q may be attached to the through-holes 18s and 18s so as to communicate with each other, and the steel wire bundle 20 may be passed through the guide tube 23.

ところで、アーチ部3の形状が扁平であるので、上記連結された継手付き鋼管10,10間の角度は極めて小さい。したがって、隣接する角型管11,11の対向するガイド管23,23同士の間に多少の隙間があった場合はもとより、角型管11内にガイド管22を設置した場合でも、一方の先進導坑4A(または、先進導坑4B)から導入された鋼線束20を、上記ガイド管22またはガイド管23内を通って、他方の先進導坑4B(または、先進導坑4A)までスムースに送ることができる。
次に、上記鋼線束20の両端部を反力板5A,5Bに仮止めした後、上記継手付き鋼管10の角型管11内及び継手12A〜12Dにより囲まれた筒状の空間にコンクリートを充填して先行支保工2を構築した後、図1(a),(b)に示すように、反力板5A,5Bで反力をとりながら、上記鋼線束20の両端部をそれぞれ固定した固定端20a,20bをジャッキ等により上記アーチ部3の延長線上に緊張力pを作用させる。そして、上記緊張力pにより上記固定端20a,20bと上記反力板5A,5Bとの間にできた隙間に楔6を打ち込んで固定するなどして、上記鋼線束20の固定端20a,20bを固定することにより、上記反力板5Aと反力板5Bとの間に配置された上記先行支保工2に、トンネルの横断面の上記アーチ部3に沿った圧縮力Pを与える。なお、上記鋼線束20に緊張力pを作用させるのは、継手付き鋼管10内のコンクリートが固まった後であるので、上記鋼線束20は保護管等で予め覆っておき、コンクリートと一体化しないようにしておく必要があることはいうまでもない。
最後に、上記先進導坑4A,4B及び上記先行支保工2で囲まれた地山1を掘削して、大断面を有するトンネルを構築する。
本例では、上記先行支保工2のコンクリートには予め圧縮力が加えられているので、地山1の掘削後に、上記アーチ型の先行支保工2に引張力が作用した場合でも、上記コンクリートは圧縮領域内で変形して上記引張力を受けることができる。したがって、上記先行支保工2は、継手12A〜12Dや、継手12Aと継手12Cとの接続部及び継手12Bと継手12Dとの接続部を補強しなくても、上記引張力に十分に対応することができる。
By the way, since the shape of the arch part 3 is flat, the angle between the connected steel pipes 10 and 10 with a joint is very small. Therefore, not only when there is a slight gap between the opposing guide tubes 23, 23 of the adjacent rectangular tubes 11, 11, but also when the guide tube 22 is installed in the rectangular tube 11, one advanced The steel wire bundle 20 introduced from the guide shaft 4A (or the advanced guide shaft 4B) passes smoothly through the guide tube 22 or the guide tube 23 to the other advanced guide shaft 4B (or the advanced guide shaft 4A). Can send.
Next, both ends of the steel wire bundle 20 are temporarily fixed to the reaction force plates 5A and 5B, and then concrete is put into the cylindrical space surrounded by the joints 12A to 12D in the square pipe 11 of the steel pipe with joint 10 and the joints 12A to 12D. After filling and constructing the preceding support work 2, as shown in FIGS. 1 (a) and 1 (b), both ends of the steel wire bundle 20 were fixed while taking reaction force with the reaction force plates 5A and 5B. A tension force p is applied to the fixed ends 20a and 20b on the extension line of the arch portion 3 by a jack or the like. And the fixed ends 20a and 20b of the steel wire bundle 20 are driven by fixing the wedge 6 in the gap formed between the fixed ends 20a and 20b and the reaction force plates 5A and 5B by the tension force p. Is applied to the preceding support 2 disposed between the reaction force plate 5A and the reaction force plate 5B, thereby applying a compressive force P along the arch portion 3 of the cross section of the tunnel. The tension p is applied to the steel wire bundle 20 after the concrete in the steel pipe with joint 10 has hardened, so the steel wire bundle 20 is previously covered with a protective pipe or the like and is not integrated with the concrete. Needless to say, this is necessary.
Finally, a ground having a large cross section is constructed by excavating the natural ground 1 surrounded by the advanced guiding shafts 4A and 4B and the preceding support structure 2.
In this example, since the compressive force is applied in advance to the concrete of the preceding support work 2, even if a tensile force acts on the arch-type advance support work 2 after excavation of the natural ground 1, the concrete is It can be deformed within the compression region to receive the tensile force. Therefore, the preceding supporting work 2 can sufficiently cope with the tensile force without reinforcing the joints 12A to 12D, the joint between the joint 12A and the joint 12C, and the joint between the joint 12B and the joint 12D. Can do.

このように、本最良の形態では、トンネルのアーチ部となる地山1内へ、断面が長方形の鋼管から成る角型管11と、この角型管11の両側面11a,11bの上端部と下端部とから水平に突出する継手12A〜12Dを備えた、トンネル軸方向に延長する複数の継手付き鋼管10を、継手12A,12Bに取付けられた係合部材15a,15bと、継手12C,12Dに取付けられた把持部材16a,16bとを互いに係合させて連結させながら、上記アーチ部3に沿って挿入・埋設するとともに、上記継手付き鋼管10の両端側を上記アーチ部3の両端側に構築された先進導坑4A,4Bに設けられた反力板5A,5Bに当接または固定し、更に、上記アーチ部3に沿って、上記複数の継手付き鋼管10を貫通する鋼線束20を配置してから、上記継手付き鋼管10内にコンクリートを充填して先行支保工2を構築し、その後、上記反力板5A,5Bで反力をとりながら、上記鋼線束20に緊張力を作用させた状態で上記鋼線束20の固定端20a,20bを反力板5A,5Bに固定して、上記反力板5Aと反力板5Bとの間に配置された上記先行支保工2に予め圧縮力を作用させるようにし、しかる後に上記先行支保工2と先進導坑4A,4Bとで囲まれた部分の地山1を掘削するようにしたので、上記アーチ部3に引張力が作用した場合でも、上記先行支保工2の上記引張力に対する強度を向上させることができる。したがって、簡単な継手構造でかつ継手を補強することなく、強固な大断面トンネル用の先行支保工2を構築することができる。
また、上記角型管11の側面に鋼線束20を貫通させるための貫通孔18sを形成する際に、上記角型管11の側面の外側に上記貫通孔18sを形成するための切り込み18zを設けた貫通孔予定箇所18を予め形成し、上記角型管11の埋設後に上記貫通孔予定箇所18を打ち抜いて、貫通孔18sを形成するようにしたので容易に上記貫通孔18sを形成することができる。
また、上記角型管11内に、走行手段31に搭載された、一方向のみに伸縮するシリンダロッド32aを備えた油圧ジャッキ32を配置して、上記角型管11の貫通孔予定箇所18を打ち抜きながらこれを走行させ、往復にて、上記角型管11の両側面に複数の貫通孔18sを形成するようにしたので、上記角型管11内の空間が狭い場合でも上記貫通孔18sを効率的に形成することができる。
Thus, in this best mode, the square tube 11 made of a steel pipe having a rectangular cross section and the upper ends of both side surfaces 11a and 11b of the square tube 11 are entered into the natural ground 1 which is the arch portion of the tunnel. A plurality of joint-attached steel pipes 10 provided with joints 12A to 12D projecting horizontally from the lower ends and extending in the tunnel axis direction are engaged members 15a and 15b attached to joints 12A and 12B, and joints 12C and 12D. While inserting and embedding along the arch part 3 while engaging and connecting the gripping members 16a and 16b attached to each other, both end sides of the jointed steel pipe 10 are connected to both end sides of the arch part 3. A steel wire bundle 20 that contacts or is fixed to reaction force plates 5A and 5B provided in the constructed advanced guiding shafts 4A and 4B, and further penetrates the plurality of steel pipes with joints 10 along the arch portion 3 is provided. Place Then, concrete is filled in the steel pipe with joint 10 to construct the preceding support work 2, and then a tension force is applied to the steel wire bundle 20 while taking the reaction force with the reaction force plates 5A and 5B. The fixed ends 20a, 20b of the steel wire bundle 20 are fixed to the reaction force plates 5A, 5B, and a compressive force is applied in advance to the preceding support work 2 disposed between the reaction force plate 5A and the reaction force plate 5B. Since it was made to act, and since it was made to excavate the natural ground 1 of the part enclosed by the said preceding support work 2 and advanced guiding mine 4A, 4B after that, even when a tensile force acted on the said arch part 3, The strength against the tensile force of the preceding support work 2 can be improved. Therefore, it is possible to construct a strong support structure 2 for a large cross section tunnel with a simple joint structure and without reinforcing the joint.
Further, when the through hole 18s for penetrating the steel wire bundle 20 is formed on the side surface of the square tube 11, a notch 18z for forming the through hole 18s is provided outside the side surface of the square tube 11. Since the through-hole planned portion 18 is formed in advance and the through-hole planned portion 18 is punched out after embedding the rectangular tube 11 to form the through-hole 18s, the through-hole 18s can be easily formed. it can.
Further, a hydraulic jack 32 provided with a cylinder rod 32a mounted on the traveling means 31 and extending and contracting in only one direction is disposed in the square tube 11, and the through hole planned portion 18 of the square tube 11 is provided. Since the plurality of through holes 18s are formed on both side surfaces of the square tube 11 by reciprocating while being punched, the through holes 18s are formed even when the space in the square tube 11 is narrow. It can be formed efficiently.

なお、上記最良の形態では、連結された継手付き鋼管10,10,‥‥にプレストレスを与えるための鋼線束20を通すための貫通孔18sを形成する場合について説明したが、これに限るものではなく、上記図11に示した、地中に埋設された複数本の鋼管51同士を、連結する連結部材52を取付けるための貫通孔51sを形成する場合や、上記図12に示した、地中または水中において複数本の鋼管60を設置した後、鋼管60の軸方向の両端部を密閉して上記鋼管60内に充填剤を充填するための注入管61を通す貫通孔60sを形成するような場合にも適用可能である。   In the above-described best mode, the case where the through hole 18s for passing the steel wire bundle 20 for applying prestress to the connected steel pipes with joints 10, 10,. Instead, when forming the through-hole 51s for attaching the connecting member 52 for connecting the plurality of steel pipes 51 embedded in the ground, as shown in FIG. 11, the ground shown in FIG. After installing a plurality of steel pipes 60 in the water or in the water, both end portions in the axial direction of the steel pipes 60 are sealed to form through holes 60s through which the injection pipes 61 for filling the steel pipes 60 are passed. It is applicable to any case.

また、上記例では、角型管11の側面11a,11bを構成する鋼管に外側から予め切り込み18zを設けて貫通孔予定箇所18を形成したが、図8(a),(b)に示すように、上記鋼管の側面を予めくり抜いて貫通孔となるくり抜き部18hを形成した後、上記くり抜き部18hに、上記くり抜かれた空隙と同じ断面を有する蓋部材18mを溶接にて取付けて、上記貫通孔予定箇所18Bを形成してもよい。そして、継手付き鋼管10の埋設後には、上記例と同様に、上記打ち抜き装置30を用いて上記貫通孔予定箇所18Bを順次打ち抜くようにする。上記貫通孔予定箇所18Bは、溶接箇所18yのみで取付けられており側面11a,11bと連結されていないので、容易に貫通孔を形成することができる。あるいは、図9(a)に示すように、上記鋼管の側面を予めくり抜いたくり抜き部18hを形成した後、上記くり抜き部18hを蓋部材18fで封鎖しておき、上記継手付き鋼管10の埋設後に、上記蓋部材18fを取り外して貫通孔を形成するようにしてもよい。あるいは、図9(b)に示すように、上記くり抜き部18hにネジ部11gを形成するとともに、上記くり抜き部18hに螺入する、上記ネジ部11gに対応するネジ部18gを有する蓋部材18nを準備し、この蓋部材18nにより上記くり抜き部18hを封鎖するようにしてもよい。
また、図8(a),(b)の蓋部材18mの取付けを、溶接ではなく、図10(a),(b)に示すように、上記蓋部材18mの鋼管の挿入・方向の一側辺にヒンジ18iを取付けて上記蓋部材18mを上記鋼管の側面11bに取付け、上記蓋部材18mを鋼管内から押圧することにより開放して貫通孔を形成するようにしてもよい。
Moreover, in the said example, although the notch 18z was previously provided from the outer side in the steel pipe which comprises the side surfaces 11a and 11b of the square pipe 11, the through-hole planned location 18 was formed, as shown to Fig.8 (a), (b). Then, the side surface of the steel pipe is hollowed out in advance to form a hollowed portion 18h that becomes a through hole, and then a lid member 18m having the same cross section as the hollowed out space is attached to the hollowed portion 18h by welding, The planned hole location 18B may be formed. And after embedding the steel pipe 10 with a joint, the said through-hole planned location 18B is sequentially punched using the said punching apparatus 30 similarly to the said example. Since the planned through-hole portion 18B is attached only at the welded portion 18y and is not connected to the side surfaces 11a and 11b, the through-hole can be easily formed. Alternatively, as shown in FIG. 9 (a), after the hollow portion 18h is formed by previously hollowing the side surface of the steel pipe, the hollow portion 18h is sealed with a lid member 18f, and after the embedded steel tube 10 is embedded. The lid member 18f may be removed to form a through hole. Alternatively, as shown in FIG. 9B, a screw member 11g is formed in the cut-out portion 18h, and a lid member 18n having a screw portion 18g corresponding to the screw portion 11g and screwed into the cut-out portion 18h. It is also possible to prepare and seal the cut-out portion 18h by the lid member 18n.
Also, the attachment of the lid member 18m in FIGS. 8 (a) and (b) is not welding, but as shown in FIGS. 10 (a) and 10 (b), one side of the steel pipe insertion / direction of the lid member 18m. A hinge 18i may be attached to the side, the lid member 18m may be attached to the side surface 11b of the steel pipe, and the lid member 18m may be opened by pressing from within the steel pipe to form a through hole.

以上説明したように、本発明によれば、地中または水中に設置された鋼管の側面に容易かつ迅速に貫通孔を形成することができるので、肉厚が厚い鋼管であっても、大型の機械を導入することなく、鋼管同士の連結や注入管の設置などを容易に行うことができる。   As described above, according to the present invention, since the through-hole can be easily and quickly formed in the side surface of the steel pipe installed in the ground or in water, even a thick steel pipe has a large size. Without introducing a machine, it is possible to easily connect steel pipes or install an injection pipe.

本最良の形態に係る継手付き鋼管の構成を示す図である。It is a figure which shows the structure of the steel pipe with a joint which concerns on this best form. 本最良の形態に係る先行支保工の構築方法を示す図である。It is a figure which shows the construction method of the advance support work which concerns on this best form. 本最良の形態に係る継手付き鋼管の連結方法を示す図である。It is a figure which shows the connection method of the steel pipe with a joint which concerns on this best form. 本最良の形態に係る継手付き鋼管の連結状態を示す図である。It is a figure which shows the connection state of the steel pipe with a joint which concerns on this best form. 本最良の形態に係るプレストレスの付加方法を示す図である。It is a figure which shows the prestress addition method which concerns on this best form. 本最良の形態に係る鋼管の打ち抜き方法を示す図である。It is a figure which shows the punching method of the steel pipe which concerns on this best form. 本最良の形態に係る鋼線束の導入方法を示す図である。It is a figure which shows the introduction method of the steel wire bundle which concerns on this best form. 本発明に係る貫通孔予定箇所の形成方法を示す図である。It is a figure which shows the formation method of the through-hole planned location which concerns on this invention. 本発明に係る貫通孔予定箇所の形成方法を示す図である。It is a figure which shows the formation method of the through-hole planned location which concerns on this invention. 本発明に係る貫通孔予定箇所の形成方法を示す図である。It is a figure which shows the formation method of the through-hole planned location which concerns on this invention. 地中に埋設された鋼管の接続例を示す図である。It is a figure which shows the example of a connection of the steel pipe embed | buried in the ground. 地中に埋設された鋼管に注入管を設置した例を示す図である。It is a figure which shows the example which installed the injection pipe in the steel pipe embed | buried in the ground. 継手付き鋼管に鋼線を貫通する方法を示す図である。It is a figure which shows the method of penetrating a steel wire to the steel pipe with a joint.

符号の説明Explanation of symbols

1 地山、2 先行支保工、3 アーチ部、4A,4B 先進導坑、5A,5B 反力板、10,10A 継手付き鋼管、11 角型管、12A,12B 第1の継手、
12C,12D 第2の継手、13a〜13d 腕部、14a〜14d 取付片、
15a,15b 係合部材、16a,16b 把持部材、16s 把持部材の凹部、
18 貫通孔予定箇所、18s 貫通孔、19 逆止弁、20 鋼線束、20z 鋼線、21 レール部材、22,23 ガイド管、30 打ち抜き装置、31 走行手段、
32 油圧ジャッキ、32a シリンダロッド、32b 反力板。
DESCRIPTION OF SYMBOLS 1 Ground, 2 Advance support work, 3 Arch part, 4A, 4B Advanced guide shaft, 5A, 5B Reaction force plate, 10, 10A Steel pipe with a joint, 11 Square pipe, 12A, 12B 1st joint,
12C, 12D 2nd joint, 13a-13d arm, 14a-14d mounting piece,
15a, 15b engaging member, 16a, 16b gripping member, 16s recess of gripping member,
18 through hole planned location, 18s through hole, 19 check valve, 20 steel wire bundle, 20z steel wire, 21 rail member, 22, 23 guide tube, 30 punching device, 31 traveling means,
32 Hydraulic jack, 32a Cylinder rod, 32b Reaction force plate.

Claims (4)

地中または水中に設置された鋼管の側面の外側及び内側のいずれか一方または両方に、貫通孔を形成するための切り込み部を設けた貫通孔予定箇所を予め形成し、上記鋼管の設置後に、上記貫通孔予定箇所を打ち抜いて貫通孔を形成する貫通孔の形成方法において、上記鋼管内に、走行手段に搭載された、シリンダロッドを備えた1台の油圧ジャッキを配置し、上記シリンダロッドを伸長させて上記貫通孔予定箇所を打ち抜いて、上記鋼管の両側面に複数の貫通孔を形成するようにしたことを特徴とする貫通孔の形成方法。 In either one or both of the outer side and the inner side of the side surface of the steel pipe installed in the ground or in the water, a through-hole planned portion provided with a cut portion for forming a through-hole is formed in advance, and after the installation of the steel pipe, In the method for forming a through hole in which the predetermined through hole is punched to form a through hole, one hydraulic jack provided with a cylinder rod mounted on the traveling means is disposed in the steel pipe, and the cylinder rod is to extend by punching the through hole planned portion, transmural hole forming method for you, characterized in that to form a plurality of through-holes on both sides of the steel tube. 地中または水中に設置された鋼管の側面を予めくり抜いた後、上記くり抜き部に、上記くり抜かれた空隙と同じ断面を有する蓋部材を溶接にて取付けて、貫通孔予定箇所を形成し、上記鋼管の設置後に、上記貫通孔予定箇所を打ち抜いて貫通孔を形成する貫通孔の形成方法において、上記鋼管内に、走行手段に搭載された、シリンダロッドを備えた1台の油圧ジャッキを配置し、上記シリンダロッドを伸長させて上記貫通孔予定箇所を打ち抜いて、上記鋼管の両側面に複数の貫通孔を形成するようにしたことを特徴とする貫通孔の形成方法。 After hollowing out the side surface of the steel pipe installed in the ground or in water, a lid member having the same cross section as the hollowed out space is attached to the hollowed portion by welding to form a through-hole planned portion, In the method for forming a through hole, in which a predetermined through hole is punched after the steel pipe is installed, a hydraulic jack having a cylinder rod mounted on a traveling means is disposed in the steel pipe. the cylinder rod is extended by punching the through hole planned portion, transmural hole forming method for you, characterized in that to form a plurality of through-holes on both sides of the steel tube. トンネル軸方向に延長する鋼管を、所定の距離を隔てて互いに連結した後、上記鋼管の側面に線材を貫通させるための貫通孔を形成し上記線材を上記鋼管を貫通するように配置する線材の配置方法において、上記請求項1または請求項2に記載の貫通孔の形成方法を用いて、上記貫通孔を形成するようにしたことを特徴とする線材の配置方法。 The steel pipe to extend the tunnel axis, after connected to each other at a predetermined distance, wire forming a through hole for passing the wire to the side of the steel tube, positioning the wire so as to penetrate the steel tube In the arranging method, the through hole is formed by using the through hole forming method according to claim 1 or 2. The wire arranging method according to claim 1, wherein the through hole is formed. 上記鋼管内または形成された上記貫通孔に、上記線材を上記貫通孔に案内するガイド管を設けたことを特徴とする請求項に記載の線材の配置方法。 The wire arrangement method according to claim 3 , wherein a guide pipe for guiding the wire to the through hole is provided in the steel pipe or in the formed through hole.
JP2003369581A 2003-10-29 2003-10-29 Formation method of through-hole and arrangement method of wire rod Expired - Fee Related JP4298465B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003369581A JP4298465B2 (en) 2003-10-29 2003-10-29 Formation method of through-hole and arrangement method of wire rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003369581A JP4298465B2 (en) 2003-10-29 2003-10-29 Formation method of through-hole and arrangement method of wire rod

Publications (2)

Publication Number Publication Date
JP2005133395A JP2005133395A (en) 2005-05-26
JP4298465B2 true JP4298465B2 (en) 2009-07-22

Family

ID=34646884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003369581A Expired - Fee Related JP4298465B2 (en) 2003-10-29 2003-10-29 Formation method of through-hole and arrangement method of wire rod

Country Status (1)

Country Link
JP (1) JP4298465B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6560922B2 (en) * 2015-07-27 2019-08-14 株式会社技研製作所 Steel pipe pile, steel pipe pile press-in method and steel pipe pile continuous wall

Also Published As

Publication number Publication date
JP2005133395A (en) 2005-05-26

Similar Documents

Publication Publication Date Title
JP4757959B2 (en) Steel sheet pile wall and its construction method
JP2021071026A (en) Column-beam joint structure
JP3733533B2 (en) Foundation reinforcement method under pressure of existing structures
JP4298465B2 (en) Formation method of through-hole and arrangement method of wire rod
JP5036650B2 (en) Construction method of arch type advance support work
JP4230386B2 (en) Tube unit
JP5399292B2 (en) Element propulsion method and blade element used for element propulsion method
JP2004339753A (en) Construction method for vaulted type underground structural body
JP2000192446A (en) Steel sheet pile and steel sheet pile wall construction method
JP5827102B2 (en) Precast member installation method and precast member used therefor
JP3245126B2 (en) Casting method of steel pipe sheet pile
JP4958044B2 (en) Installation structure and installation method for shield tunnel approach
JP2008019608A (en) Steel pipe sheet pile, steel pipe sheet pile wall, steel pipe for pipe roof, and pipe roof
JP4451177B2 (en) Inter-block joint structure
JP3834126B2 (en) A sinking body having a protrusion on the outer peripheral surface and a split ring constituting the sinking body
JP4833089B2 (en) Water stop device for underground penetrating body and construction method of underground penetrating body using the same
JP4672700B2 (en) Tightening method for underground structures
JP3240264B2 (en) Segment piece for tunnel connection and tunnel connection method
JP2935633B2 (en) Drilling rig for steel sheet pile wall construction
KR20190021769A (en) Closeup tunnel construction method
CN118933184A (en) A prefabricated component connection structure and construction method
JP2005248613A (en) Underground reinforcement method for columnar structures
JP4749914B2 (en) Partition facility construction structure and partition facility construction method in the approach part of underpass tunnel
JPH0731934U (en) H-shaped steel sheet pile
JP2002021466A (en) Embedded body with opening forming portion structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061006

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080530

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080603

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090414

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090415

R150 Certificate of patent or registration of utility model

Ref document number: 4298465

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120424

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120424

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130424

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130424

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140424

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees