Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4301974B2 - Load survey meter - Google Patents
[go: Go Back, main page]

JP4301974B2 - Load survey meter - Google Patents

Load survey meter Download PDF

Info

Publication number
JP4301974B2
JP4301974B2 JP2004062748A JP2004062748A JP4301974B2 JP 4301974 B2 JP4301974 B2 JP 4301974B2 JP 2004062748 A JP2004062748 A JP 2004062748A JP 2004062748 A JP2004062748 A JP 2004062748A JP 4301974 B2 JP4301974 B2 JP 4301974B2
Authority
JP
Japan
Prior art keywords
phase
wire
survey meter
load survey
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004062748A
Other languages
Japanese (ja)
Other versions
JP2005249683A (en
Inventor
正春 武田
直秀 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP2004062748A priority Critical patent/JP4301974B2/en
Publication of JP2005249683A publication Critical patent/JP2005249683A/en
Application granted granted Critical
Publication of JP4301974B2 publication Critical patent/JP4301974B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Distribution Board (AREA)

Description

本発明は、電力使用状況を調査するロードサーベイメータに関する。   The present invention relates to a load survey meter for investigating power usage.

一般家庭の電力使用状況は、各種の調査機器を一般家庭に設置して行われる。電力使用状況を調査する調査機器としては、例えば電力量計、ロードサーベイメータなどがある。   The power usage of ordinary households is performed by installing various survey devices in ordinary households. As a survey device for investigating the power usage status, for example, a watt-hour meter, a load survey meter and the like are available.

電力量計は、使用電力量の総量が測定される。ロードサーベイメータは、使用電力量の総量のみではなく例えば30分ごとの使用電力量などを測定することができる。ロードサーベイメータを用いることによって30分ごとの使用電力量に基づく日負荷曲線を描くことができる。一般的に、ロードサーベイメータは、一般家庭の電力量計の近傍に設置される。   The watt-hour meter measures the total amount of power used. The load survey meter can measure not only the total amount of power used but also the amount of power used every 30 minutes, for example. By using a load survey meter, a daily load curve based on the amount of power used every 30 minutes can be drawn. Generally, a load survey meter is installed in the vicinity of a watt-hour meter in a general household.

ロードサーベイメータは、一般家庭の使用電力量の他、エアーコンディショナーなど個別の電気機器の使用電力量を測定する場合もある。   A load survey meter may measure the amount of power used by an individual electrical device such as an air conditioner in addition to the amount of power used by a general household.

この個別の電気機器の使用電力量を測定するロードサーベイメータは、測定対象の電気機器の近傍、具体的には家庭内のコンセントと測定対象の電気機器との間に設置される。電力は、ロードサーベイメータ経由で測定対象の電気機器に供給される。ロードサーベイメータは、個別機器への電力供給状態に基づいて電気機器の使用電力量を測定する。
特開平7−134144号公報
The load survey meter that measures the amount of electric power used by each individual electric device is installed in the vicinity of the electric device to be measured, specifically, between the outlet in the home and the electric device to be measured. Electric power is supplied to the electrical device to be measured via a load survey meter. The load survey meter measures the amount of electric power used by an electric device based on the state of power supply to the individual device.
JP-A-7-134144

一般家庭全体の使用電力量を測定する従来のロードサーベイメータは、電力量計の近傍に設置される。この場合、家の壁に穴をあけることがある。また、家屋を外から眺めた場合、ロードサーベイメータと電力量計とが目に付く場合がある。したがって、ロードサーベイメータの設置について抵抗感を持つ人がいる。   A conventional load survey meter that measures the amount of electric power used by a general household is installed in the vicinity of the watt hour meter. In this case, a hole may be made in the wall of the house. Further, when the house is viewed from the outside, the load survey meter and the watt hour meter may be noticed. Therefore, there are people who feel resistance about the installation of the load survey meter.

また、個別の電気機器測定用の従来のロードサーベイメータは、一般家庭の屋内に設置されるため、部屋の中が煩雑になるなどの理由により設置に対して抵抗感を持つ人がいる。   In addition, since a conventional load survey meter for measuring individual electrical equipment is installed indoors in a general household, there are people who have a sense of resistance to installation because the interior of the room becomes complicated.

また、個別の電気機器測定用の従来のロードサーベイメータは、コンセントと測定対象機器との間に設置されるため、例えば床暖房などのように、コンセントに接続されるのではなく一般家庭の分電盤から電力供給を受ける機器の測定は困難であった。   In addition, since a conventional load survey meter for measuring individual electrical devices is installed between an outlet and a device to be measured, it is not connected to an outlet, such as floor heating, but is distributed to a general household. Measuring equipment that receives power from the panel was difficult.

本発明は、以上のような実情に鑑みてなされたもので、個々の電気機器の使用電力量を容易に測定可能であり、設置に対する抵抗感が低減するロードサーベイメータを提供することを目的とする。   The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a load survey meter that can easily measure the amount of electric power used by each electrical device and can reduce resistance to installation. .

本発明を実現するにあたって講じた具体的手段について以下に説明する。   Specific means taken for realizing the present invention will be described below.

本発明の実施例において、ロードサーベイメータは、分電盤内の単相3線の一方側の電流値を測定する第1の電流測定手段と、単相3線の他方側の電流値を測定する第2の電流測定手段と、単相3線の分岐ブレーカ接続用の第1端子と接続可能な第1接続端子と、単相3線の分岐ブレーカ接続用の第2端子と接続可能な第2接続端子と、単相3線の第3端子と接続可能なコネクタと、第1接続端子と第2接続端子との間の単相3線の一方側の電圧値を測定する第1電圧測定手段と、第2接続端子とコネクタとの間の単相3線の他方側の電圧値を測定する第2電圧測定手段と、一方側の電流値と一方側の電圧値とに基づいて一方側の使用電力量を演算し、他方側の電流値と他方側の電圧値とに基づいて他方側の使用電力量を演算し、一方側の使用電力量と他方側の使用電力量とに基づいて単相3線の総使用電力量を演算する演算手段とを具備する。 In the first embodiment of the present invention, the load survey meter includes a first current measuring means for measuring a current value on one side of the single-phase three-wire in the distribution board, and a current value on the other side of the single-phase three-wire. Connectable to a second current measuring means for measuring, a first connection terminal connectable to a first terminal for connecting a single-phase three-wire branch breaker, and a second terminal connecting to a single-phase three-wire branch breaker A connector that can be connected to the second connection terminal, the third terminal of the single-phase three-wire, and a first voltage that measures a voltage value on one side of the single-phase three-wire between the first connection terminal and the second connection terminal One of the measuring means, the second voltage measuring means for measuring the voltage value on the other side of the single-phase three-wire between the second connection terminal and the connector, and the one based on the current value on one side and the voltage value on one side The power consumption on the other side is calculated, and the power consumption on the other side is calculated based on the current value on the other side and the voltage value on the other side. Comprising a calculating means for, based on the power usage and the other side of the power usage for calculating the total electric energy consumption of the single-phase three-wire.

実施例において、ロードサーベイメータは、分電盤内の単相3線の一方側の電流値を測定する第1の電流測定手段と、単相3線の他方側の電流値を測定する第2の電流測定手段と、単相3線の分岐ブレーカ接続用の第1端子と接続可能な第1接続端子と、単相3線の分岐ブレーカ接続用の第2端子と接続可能な第2接続端子と、第1接続端子と第2接続端子との間の単相3線の一方側の電圧値を測定する電圧測定手段と、単相3線の他方側の電圧値を入力するコネクタと、一方側の電流値と一方側の電圧値とに基づいて一方側の使用電力量を演算し、他方側の電流値と他方側の電圧値とに基づいて他方側の使用電力量を演算し、一方側の使用電力量と他方側の使用電力量とに基づいて単相3線式の総使用電力量を演算する演算手段とを具備する。 In the second embodiment, the load survey meter includes first current measuring means for measuring a current value on one side of the single-phase three-wire in the distribution board, and a current value on the other side of the single-phase three-wire. 2 current measuring means, a first connection terminal connectable to a first terminal for connecting a single-phase three-wire branch breaker, and a second connection connectable to a second terminal for connecting a single-phase three-wire branch breaker A voltage measuring means for measuring a voltage value on one side of the single-phase three-wire between the terminal, the first connection terminal and the second connection terminal, a connector for inputting a voltage value on the other side of the single-phase three-wire, Calculate the power consumption on one side based on the current value on one side and the voltage value on one side, calculate the power consumption on the other side based on the current value on the other side and the voltage value on the other side, Computation means for computing the total power consumption of a single-phase three-wire system based on the power consumption on one side and the power consumption on the other side To.

実施例において、ロードサーベイメータは、分電盤内の単相3線の一方側に接続されている分岐ブレーカから測定対象の電気機器に流れる電流値を測定する電流測定手段と、単相3線の一方側の分岐ブレーカ接続用端子と接続可能な接続端子と、接続端子に与えられる電圧値を測定する電圧測定手段と、電流値と電圧値とに基づいて一方側の使用電力量を演算する演算手段と、使用電力量を示すデータを出力する出力装置が単相3線の一方側に接続されている場合、電灯線搬送を用いて出力装置に前記データを出力する手段と、出力装置が単相3線の他方側に接続されている場合、他方側の電灯線搬送ユニットに対してデータを出力するためのデータ出力コネクタとを具備する。 In the third embodiment, the load survey meter includes current measuring means for measuring a current value flowing from the branch breaker connected to one side of the single-phase three-wire in the distribution board to the electrical device to be measured, and the single-phase three A connection terminal that can be connected to a branch breaker connection terminal on one side of the wire, a voltage measuring means for measuring a voltage value applied to the connection terminal, and an electric energy used on one side based on the current value and the voltage value And means for outputting the data to the output device using power line conveyance when the output means for outputting the data indicating the amount of power used is connected to one side of the single-phase three-wire, and the output device Is connected to the other side of the single-phase three-wire, a data output connector is provided for outputting data to the other-side power line carrier unit.

本発明により、ロードサーベイメータを用いて個々の電気機器の使用電力量を容易に測定でき、またロードサーベイメータの設置に対する抵抗感が低減される。   According to the present invention, it is possible to easily measure the amount of power used by each electric device using a load survey meter, and to reduce the resistance to installation of the load survey meter.

以下、図面を参照しながら本発明の実施の形態について説明する。なお、以下の各実施の形態において、同様の部分については同様の符号を付して説明を省略する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following embodiments, the same parts are denoted by the same reference numerals and the description thereof is omitted.

(第1の実施の形態)
本実施の形態では、分電盤の分岐ブレーカと同形状の接続端子を具備し、分電盤内に分岐ブレーカと同様の状態で設置され、分岐ブレーカ単位で使用電力量を測定するロードサーベイメータについて説明する。
(First embodiment)
In the present embodiment, a load survey meter that has a connection terminal having the same shape as a branch breaker of a distribution board, is installed in the same state as the branch breaker in the distribution board, and measures the amount of power used for each branch breaker. explain.

図1は、本実施の形態に係るロードサーベイメータ1の一例を示すブロック図である。なお、この図1では、分電盤2のうちロードサーベイメータ1と漏電ブレーカ3と測定対象の電気機器44と接続されている分岐ブレーカ51、分岐ブレーカ接続用端子8a〜8cを図示しており、他の部分については省略している。   FIG. 1 is a block diagram showing an example of a load survey meter 1 according to the present embodiment. In FIG. 1, a branch breaker 51 and branch breaker connection terminals 8 a to 8 c connected to the load survey meter 1, the earth leakage breaker 3, and the electrical device 44 to be measured in the distribution board 2 are illustrated. Other parts are omitted.

図2は、ロードサーベイメータ1の一例を示す正面図である。   FIG. 2 is a front view showing an example of the load survey meter 1.

図3は、ロードサーベイメータ1の一例を示す右側面図である。   FIG. 3 is a right side view showing an example of the load survey meter 1.

図4は、ロードサーベイメータ1の一例を示す上面図である。   FIG. 4 is a top view showing an example of the load survey meter 1.

図5は、ロードサーベイメータ1の設置された分電盤2の一例を示す正面図である。   FIG. 5 is a front view showing an example of the distribution board 2 in which the load survey meter 1 is installed.

本実施の形態においては、例えば一般家庭などの電力供給先に対して単相3線式の配電形式により電力が供給されるとする。   In the present embodiment, it is assumed that power is supplied to a power supply destination such as a general household by a single-phase three-wire power distribution format.

分電盤2は、電力供給先全体に対する主幹スイッチ6、漏電ブレーカ3、ケーブル7a〜7c、分岐ブレーカ接続用端子8a〜8c、分岐ブレーカ51〜57を具備する。   The distribution board 2 includes a main switch 6, an earth leakage breaker 3, cables 7a to 7c, branch breaker connection terminals 8a to 8c, and branch breakers 51 to 57 for the entire power supply destination.

電力は、主幹ブレーカ6からケーブル7a〜7c経由で漏電ブレーカ3に供給される。さらに電力は、漏電ブレーカ3から分岐ブレーカ接続用端子8a〜8cのうちの2つの端子8a,8b経由で分電盤2下側に設置されている分岐ブレーカ55〜57に供給され、2つの端子8b,8c経由で分電盤2上側に設置されている分岐ブレーカ51〜54に供給される。分岐ブレーカ51〜57は、同機種である。   Electric power is supplied from the main breaker 6 to the earth leakage breaker 3 via the cables 7a to 7c. Furthermore, electric power is supplied from the earth leakage breaker 3 to the branch breakers 55 to 57 installed on the lower side of the distribution board 2 via the two terminals 8a and 8b of the branch breaker connection terminals 8a to 8c. It is supplied to the branch breakers 51-54 installed in the distribution board 2 upper side via 8b, 8c. The branch breakers 51 to 57 are the same model.

各分岐ブレーカ55〜57に備えられている接続端子9a,9bは、分岐ブレーカ接続用の端子8a,8bと接続される。そして、分岐ブレーカ55〜57は、端子8a,8bから入力した電力を線10a,10b経由で個別の電気機器に供給する。   The connection terminals 9a and 9b provided in the branch breakers 55 to 57 are connected to the branch breaker connection terminals 8a and 8b. The branch breakers 55 to 57 supply the electric power input from the terminals 8a and 8b to the individual electric devices via the lines 10a and 10b.

各分岐ブレーカ55〜57、及び分岐ブレーカ55〜57と接続されている個別の電気機器には、分岐ブレーカ接続用端子8a〜8cのうち端子8a,8b間の片側電圧100Vが印加される。   A voltage of 100 V on one side between the terminals 8a and 8b among the branch breaker connection terminals 8a to 8c is applied to each of the branch breakers 55 to 57 and the individual electric devices connected to the branch breakers 55 to 57.

一方、分岐ブレーカ51〜54に備えられる接続端子9a,9bは、端子8b,8cと接続される。そして、分岐ブレーカ51〜54は、端子8b,8cから入力した電力を線10a,10b経由で個別の電気機器に供給する。   On the other hand, connection terminals 9a and 9b provided in branch breakers 51 to 54 are connected to terminals 8b and 8c. And the branch breakers 51-54 supply the electric power input from terminal 8b, 8c to an individual electric equipment via line 10a, 10b.

各分岐ブレーカ51〜54、及び分岐ブレーカ51〜54と接続されている個別の電気機器には、分岐ブレーカ接続用端子8a〜8cのうち端子8b,8c間の片側電圧100Vが印加される。   One-side voltage 100V between terminals 8b and 8c among branch breaker connection terminals 8a to 8c is applied to each of the branch breakers 51 to 54 and the individual electric devices connected to the branch breakers 51 to 54.

本実施の形態では、分岐ブレーカ51に測定対象の電気機器44が接続されているとする。   In the present embodiment, it is assumed that the electrical device 44 to be measured is connected to the branch breaker 51.

ロードサーベイメータ1は、分岐ブレーカ51〜57の接続端子9a,9bと同形状の接続端子11a,11bを具備し、分電盤2内の分岐ブレーカの空スペースに分岐ブレーカと同様の状態で設置される。このため、ロードサーベイメータ1の接続方向と垂直な断面は、分岐ブレーカの接続方向と垂直な断面とほぼ同様であるとする。本実施の形態では、ロードサーベイメータ1の接続端子11a,11bは、分電盤2内の下側において端子8a,8bに対して接続されるとする。   The load survey meter 1 includes connection terminals 11a and 11b having the same shape as the connection terminals 9a and 9b of the branch breakers 51 to 57, and is installed in an empty space of the branch breaker in the distribution board 2 in the same state as the branch breaker. The For this reason, it is assumed that the cross section perpendicular to the connection direction of the load survey meter 1 is substantially the same as the cross section perpendicular to the connection direction of the branch breaker. In the present embodiment, it is assumed that the connection terminals 11 a and 11 b of the load survey meter 1 are connected to the terminals 8 a and 8 b on the lower side in the distribution board 2.

ロードサーベイメータ1は、接続端子11a,11b間の電圧を測定する電圧測定部12を具備する。電圧測定部12によって測定された電圧値は、電力演算部13に出力される。   The load survey meter 1 includes a voltage measurement unit 12 that measures a voltage between the connection terminals 11a and 11b. The voltage value measured by the voltage measurement unit 12 is output to the power calculation unit 13.

なお、電圧測定部12は、接続端子11a,11b間の電圧を適切に降圧し、電力演算部13に与えるとしてもよい。   Note that the voltage measurement unit 12 may appropriately step down the voltage between the connection terminals 11 a and 11 b and supply the voltage to the power calculation unit 13.

ロードサーベイメータ1は、ケーブル14a経由で本体1aと接続される電流測定器14を具備する。電流測定器14としては、例えば貫通形電流センサが用いられる。   The load survey meter 1 includes a current measuring instrument 14 connected to the main body 1a via a cable 14a. As the current measuring instrument 14, for example, a through-type current sensor is used.

電流測定器14は、分電盤2の内部において、電気機器44と接続されている分岐ブレーカ51の線10a,10bのいずれか一方に対して設置される。電流測定器14は、測定された電流値をケーブル14a経由でロードサーベイメータ1の電力演算部13に出力する。   The current measuring device 14 is installed inside the distribution board 2 with respect to either one of the wires 10 a and 10 b of the branch breaker 51 connected to the electric device 44. The current measuring device 14 outputs the measured current value to the power calculation unit 13 of the load survey meter 1 via the cable 14a.

ロードサーベイメータ1の設定部15には、電気機器44に100Vが与えられるか又は200Vが与えられるかを設定する電圧設定スイッチ15aが備えられている。   The setting unit 15 of the load survey meter 1 is provided with a voltage setting switch 15a for setting whether 100V or 200V is applied to the electrical equipment 44.

ロードサーベイメータ1の正面には、設定部15の説明を記したラベル16が貼られている。   On the front surface of the load survey meter 1, a label 16 describing the setting unit 15 is attached.

ロードサーベイメータ1の電力演算部13は、電圧設定スイッチ15aが100Vに設定されている場合、入力した電圧値と入力した電流値との積に基づいて使用電力量を演算する。   When the voltage setting switch 15a is set to 100V, the power calculation unit 13 of the load survey meter 1 calculates the power consumption based on the product of the input voltage value and the input current value.

一方、ロードサーベイメータ1の電力演算部13は、電圧設定スイッチ15aが200Vに設定されている場合、測定された電力量の2倍の値を使用電力量として演算する。例えば、電圧設定スイッチ15aが200Vに設定されている場合、電力演算部13は、入力した電圧値を2倍した値と入力した電流値との積に基づいて使用電力量を演算する。   On the other hand, when the voltage setting switch 15a is set to 200V, the power calculator 13 of the load survey meter 1 calculates a value twice as much as the measured power amount as the used power amount. For example, when the voltage setting switch 15a is set to 200V, the power calculator 13 calculates the amount of power used based on the product of a value obtained by doubling the input voltage value and the input current value.

なお、電力演算部13は、所定期間毎の使用電力量を求めるとしてもよい。   Note that the power calculation unit 13 may determine the amount of power used for each predetermined period.

以上説明した本実施の形態では、ロードサーベイメータ1が分電盤2の内部に設置される。このため、取り付け後の家内でロードサーベイメータ1が目に付くことがなく、部屋内における機器の整理を行うことができる。   In the present embodiment described above, the load survey meter 1 is installed inside the distribution board 2. For this reason, the load survey meter 1 is not noticeable in the house after attachment, and the apparatus in the room can be arranged.

また、本実施の形態では、分電盤2の分岐ブレーカとコンセントを介して接続される電気機器に限らず、分電盤2の分岐ブレーカから直接電力が供給される電気機器についても個別に使用電力量を測定できる。   Further, in the present embodiment, not only the electric device connected to the branch breaker of the distribution board 2 via the outlet, but also the electric device to which power is directly supplied from the branch breaker of the distribution board 2 is used individually. The amount of power can be measured.

また、本実施の形態では、測定対象の電気機器に200Vが与えられる場合であっても、電圧設定スイッチ15aを切り換えるのみで容易にこの測定対象の電気機器の使用電力量を演算することができる。   Further, in the present embodiment, even when 200 V is applied to the electrical device to be measured, the power consumption of the electrical device to be measured can be easily calculated simply by switching the voltage setting switch 15a. .

200Vが与えられる電気機器の使用電力量を測定する装置は、通常100Vが与えられる電気機器の使用電力量を測定する装置よりも大型になる。   A device that measures the amount of electric power used by an electric device to which 200 V is applied is larger than a device that measures the amount of electric power used by an electric device that is normally supplied with 100 V.

しかしながら、本実施の形態では、ロードサーベイメータ1の電圧設定スイッチ15aの切り替えにより演算手法を切り換えることで、ロードサーベイメータ1の大きさを変えることなく、容易に100Vが与えられる電気機器と200Vが与えられる電気機器の双方について使用電力量を測定できる。   However, in the present embodiment, by switching the calculation method by switching the voltage setting switch 15a of the load survey meter 1, it is possible to easily apply an electric device that can be given 100V and 200V without changing the size of the load survey meter 1. The power consumption can be measured for both electrical devices.

なお、本実施の形態では、ロードサーベイメータ1が分電盤2の下側に設置された場合について説明したが、分電盤2の上側に設置された場合についても同様である。   In the present embodiment, the case where the load survey meter 1 is installed on the lower side of the distribution board 2 has been described, but the same applies to the case where the load survey meter 1 is installed on the upper side of the distribution board 2.

(第2の実施の形態)
本実施の形態では、上記第1の実施の形態の変形例であり、電力供給先の総使用電力量を測定するロードサーベイメータについて説明する。
(Second Embodiment)
In the present embodiment, a load survey meter that is a modification of the first embodiment and that measures the total power consumption of the power supply destination will be described.

図6は、本実施の形態に係るロードサーベイメータ17の一例を示すブロック図である。なお、この図6では、分電盤2内に設置される分岐ブレーカについては省略している。   FIG. 6 is a block diagram showing an example of the load survey meter 17 according to the present embodiment. In FIG. 6, the branch breaker installed in the distribution board 2 is omitted.

ロードサーベイメータ17は、分岐ブレーカの接続端子9a,9bと同形状の接続端子11a,11bを具備する。本実施の形態において、接続端子11a,11bは、分岐ブレーカ接続用端子のうち端子8a,8bと接続される。ロードサーベイメータ17は、分岐ブレーカの空きスペースに、分岐ブレーカに代えて設置可能である。   The load survey meter 17 includes connection terminals 11a and 11b having the same shape as the connection terminals 9a and 9b of the branch breaker. In the present embodiment, the connection terminals 11a and 11b are connected to the terminals 8a and 8b among the branch breaker connection terminals. The load survey meter 17 can be installed in an empty space of the branch breaker instead of the branch breaker.

さらに、ロードサーベイメータ17は、他の端子8cと接続されるコネクタ11cを具備する。   Further, the load survey meter 17 includes a connector 11c connected to the other terminal 8c.

ロードサーベイメータ17は、接続端子11a,11b間の電圧を測定する電圧測定部12を具備する。電圧測定部12によって測定された単相3線の一方側の電圧値は、電力演算部18に出力される。   The load survey meter 17 includes a voltage measurement unit 12 that measures a voltage between the connection terminals 11a and 11b. The voltage value on one side of the single-phase three-wire measured by the voltage measurement unit 12 is output to the power calculation unit 18.

また、ロードサーベイメータ17は、接続端子11b、コネクタ11c間の電圧を測定する電圧測定部19を具備する。電圧測定部19によって測定された単相3線の他方側の電圧値は、電力演算部18に出力される。   The load survey meter 17 includes a voltage measuring unit 19 that measures a voltage between the connection terminal 11b and the connector 11c. The voltage value on the other side of the single-phase three-wire measured by the voltage measurement unit 19 is output to the power calculation unit 18.

なお、電圧測定部19は、接続端子11b、コネクタ11c間の電圧を適切に降圧し、電力演算部18に与えるとしてもよい。   Note that the voltage measurement unit 19 may appropriately step down the voltage between the connection terminal 11 b and the connector 11 c and give the voltage to the power calculation unit 18.

ロードサーベイメータ17は、ケーブル14a経由で本体17aと接続される電流測定器14を具備する。   The load survey meter 17 includes a current measuring instrument 14 connected to the main body 17a via a cable 14a.

本実施の形態において、電流測定器14は、分電盤2の内部において、端子8a,8bにより供給される一方側の電流値を測定する。具体的には、電流測定器14は、主幹ブレーカ6と漏電ブレーカ3との間を接続するケーブル7a,7cのうち端子8a,8bにより供給される単相3線の片側の電流に対応する一方のケーブル7aに対して設置される。   In the present embodiment, the current measuring instrument 14 measures the current value on one side supplied by the terminals 8 a and 8 b inside the distribution board 2. Specifically, the current measuring device 14 corresponds to the current on one side of the single-phase three-wire supplied by the terminals 8a and 8b among the cables 7a and 7c connecting the main breaker 6 and the earth leakage breaker 3. The cable 7a is installed.

電流測定器14は、測定された電流値をケーブル14a経由でロードサーベイメータ17の電力演算部18に出力する。   The current measuring device 14 outputs the measured current value to the power calculation unit 18 of the load survey meter 17 via the cable 14a.

ロードサーベイメータ17の本体17aには、ケーブル20a経由で電流測定器20が接続される。   A current measuring device 20 is connected to the main body 17a of the load survey meter 17 via a cable 20a.

本実施の形態において、電流測定器20は、分電盤2の内部において、端子8b,8cにより供給される他方側の電流値を測定する。具体的には、電流測定器20は、主幹ブレーカ6と漏電ブレーカ3との間を接続するケーブル7a,7cのうち端子8b,8cにより供給される単相3線の片側の電流に対応する一方のケーブル7cに対して設置される。   In the present embodiment, the current measuring instrument 20 measures the current value on the other side supplied by the terminals 8 b and 8 c inside the distribution board 2. Specifically, the current measuring device 20 corresponds to the current on one side of the single-phase three-wire supplied by the terminals 8b and 8c among the cables 7a and 7c connecting the main breaker 6 and the earth leakage breaker 3. The cable 7c is installed.

電流測定器20は、測定された電流値をケーブル20a経由でロードサーベイメータ17の電力演算部18に出力する。   The current measuring device 20 outputs the measured current value to the power calculation unit 18 of the load survey meter 17 via the cable 20a.

電力量演算部18は、電圧測定部12によって測定された電圧値と電流測定器14によって測定された電流値の積に基づいて、端子8a,8bから供給される単相3線の一方側の使用電力量を演算する。   Based on the product of the voltage value measured by the voltage measuring unit 12 and the current value measured by the current measuring device 14, the power amount calculating unit 18 is connected to one side of the single-phase three-wire supplied from the terminals 8a and 8b. Calculate power consumption.

同様に、電力量演算部18は、電圧測定部19によって測定された電圧値と電流測定器20によって測定された電流値の積に基づいて、端子8b,8cから供給される単相3線の他方側の使用電力量を演算する。   Similarly, the electric energy calculation unit 18 determines the single-phase three-wire supplied from the terminals 8b and 8c based on the product of the voltage value measured by the voltage measurement unit 19 and the current value measured by the current measuring device 20. The amount of power used on the other side is calculated.

そして、電力量演算部18は、単相3線の一方側の使用電力量と単相3線の他方側の使用電力量の和に基づいて、単相3線の両側の総使用電力量を演算する。   And the electric energy calculating part 18 calculates the total electric energy used on both sides of the single-phase three-wire based on the sum of the electric power used on one side of the single-phase three-wire and the electric power used on the other side of the single-phase three-wire. Calculate.

以上説明した本実施の形態では、ロードサーベイメータ17が分電盤2の内部に設置される。このため、電気供給先全体の総使用電力量を測定する場合に、ロードサーベイメータ17取り付け後の家屋の外観が損なわれることはなく、家屋の外壁に穴を設けるなどの特別な取り付け工事も必要ない。   In the present embodiment described above, the load survey meter 17 is installed inside the distribution board 2. For this reason, when measuring the total power consumption of the entire power supply destination, the appearance of the house after the load survey meter 17 is attached is not impaired, and no special installation work such as providing a hole in the outer wall of the house is necessary. .

なお、本実施の形態では、ロードサーベイメータ17が分電盤2の下側に設置された場合について説明したが、分電盤2の上側に設置された場合についても同様である。   In the present embodiment, the case where the load survey meter 17 is installed on the lower side of the distribution board 2 has been described, but the same applies to the case where the load survey meter 17 is installed on the upper side of the distribution board 2.

(第3の実施の形態)
本実施の形態では、上記第2の実施の形態の変形例について説明する。
(Third embodiment)
In the present embodiment, a modification of the second embodiment will be described.

本実施の形態では、ロードサーベイメータの設置されている側の逆側に、電圧通知ユニットを具備する。   In the present embodiment, a voltage notification unit is provided on the side opposite to the side where the load survey meter is installed.

図7は、本実施の形態に係るロードサーベイメータ21の一例を示すブロック図である。なお、この図7では、分電盤2内に設置される分岐ブレーカについては省略している。   FIG. 7 is a block diagram showing an example of the load survey meter 21 according to the present embodiment. In FIG. 7, the branch breaker installed in the distribution board 2 is omitted.

電圧通知ユニット22は、分岐ブレーカの接続端子9a,9bと同形状の接続端子11a,11bを具備する。電圧通知ユニット22の接続端子11a、11bは、それぞれ端子8b,8cと接続される。   The voltage notification unit 22 includes connection terminals 11a and 11b having the same shape as the connection terminals 9a and 9b of the branch breaker. The connection terminals 11a and 11b of the voltage notification unit 22 are connected to the terminals 8b and 8c, respectively.

電圧通知ユニット22の通知部23は、11a、11b間の電圧値をケーブル24経由でロードサーベイメータ21に出力する。なお、通知部23は、接続端子11a、11b間の電圧を適切に降圧してロードサーベイメータ21に出力するとしてもよい。   The notification unit 23 of the voltage notification unit 22 outputs the voltage value between 11 a and 11 b to the load survey meter 21 via the cable 24. The notification unit 23 may appropriately lower the voltage between the connection terminals 11a and 11b and output the voltage to the load survey meter 21.

ロードサーベイメータ21は、接続端子11a,11b、電圧測定部12、電力演算部18を具備する。また、ロードサーベイメータ21の本体21aには、ケーブル14a,20a経由で電流測定器14,20が接続される。   The load survey meter 21 includes connection terminals 11a and 11b, a voltage measurement unit 12, and a power calculation unit 18. In addition, current measuring devices 14 and 20 are connected to the main body 21a of the load survey meter 21 via cables 14a and 20a.

ロードサーベイメータの接続端子11a,11bは、それぞれ端子8a,8bと接続される。   Connection terminals 11a and 11b of the load survey meter are connected to terminals 8a and 8b, respectively.

さらに、ロードサーベイメータ21のコネクタ25は、ケーブル24と接続され、ケーブル24経由で電圧通知ユニット22の通知部23と接続される。電圧通知ユニット22の接続端子11a,11b間における単相3線の他方側の電圧値は、通知部23、ケーブル24、コネクタ25経由で電力演算部18に出力される。   Further, the connector 25 of the load survey meter 21 is connected to the cable 24 and is connected to the notification unit 23 of the voltage notification unit 22 via the cable 24. The voltage value on the other side of the single-phase three-wire between the connection terminals 11a and 11b of the voltage notification unit 22 is output to the power calculation unit 18 via the notification unit 23, the cable 24, and the connector 25.

電力演算部18の動作は、上記第2の実施の形態の場合と同様である。これにより、上記第2の実施の形態と同様の効果を得ることができる。   The operation of the power calculation unit 18 is the same as in the case of the second embodiment. As a result, the same effect as in the second embodiment can be obtained.

本実施の形態において、ロードサーベイメータ21及び電圧通知ユニット22は、分岐ブレーカの空きスペースに、分岐ブレーカに代えて設置可能である。   In the present embodiment, the load survey meter 21 and the voltage notification unit 22 can be installed in an empty space of the branch breaker instead of the branch breaker.

(第4の実施の形態)
本実施の形態では、電力演算部によって測定された使用電力量を示す使用電力量データの出力について説明する。
(Fourth embodiment)
In the present embodiment, output of power consumption data indicating the power consumption measured by the power calculator will be described.

図8は、本実施の形態に係るロードサーベイメータ26の一例を示すブロック図である。なお、この図8では、分電盤2のうちロードサーベイメータ26、漏電ブレーカ3、測定対象の電気機器に接続されている分岐ブレーカ51,55,56、分岐ブレーカ接続用端子8a〜8c、出力ユニット34を図示しており、他の部分については省略している。   FIG. 8 is a block diagram showing an example of the load survey meter 26 according to the present embodiment. In FIG. 8, the load survey meter 26, the leakage breaker 3, the branch breakers 51, 55, and 56 connected to the electrical device to be measured, the branch breaker connection terminals 8 a to 8 c, and the output unit. 34 is illustrated, and other portions are omitted.

ロードサーベイメータ26は、接続端子11a,11b、電圧測定部12に加えて、電力演算部27、電灯線搬送部28、コネクタ29を具備する。   In addition to the connection terminals 11 a and 11 b and the voltage measurement unit 12, the load survey meter 26 includes a power calculation unit 27, a power line conveyance unit 28, and a connector 29.

出力ユニット34の本体34aには、ケーブル33が接続される。出力ユニット34は、接続端子11a、11bと電灯線搬送部28bを具備する。   A cable 33 is connected to the main body 34 a of the output unit 34. The output unit 34 includes connection terminals 11a and 11b and a power line conveyance unit 28b.

電灯線搬送部28a,28bは、電灯線搬送用のインタフェース装置である。電灯線搬送部28aは、電灯線搬送信号を端子8a,8b、分岐ブレーカ56経由で線10a,10bにのせ、電灯線搬送部28bは、電灯線搬送信号を端子8b,8c、分岐ブレーカ51経由で線10a,10bにのせる。   The power line conveyance units 28a and 28b are interface apparatuses for power line conveyance. The power line transport unit 28a places the power line transport signal on the lines 10a and 10b via the terminals 8a and 8b and the branch breaker 56, and the power line transport unit 28b passes the power line transport signal on the terminals 8b and 8c and the branch breaker 51. To put on the lines 10a and 10b.

本実施の形態において、ロードサーベイメータ26の本体26aとケーブル14aを経由して接続されている電流測定器14は、測定対象の電気機器と分岐ブレーカ55との間に設置される。   In the present embodiment, the current measuring instrument 14 connected to the main body 26 a of the load survey meter 26 via the cable 14 a is installed between the electrical device to be measured and the branch breaker 55.

単相3線のうちロードサーベイメータ26の接続されている一方側のコンセント30aには、発信装置31aが備えられる。   Outlet 30a on one side to which load survey meter 26 is connected among single-phase three-wires is provided with transmission device 31a.

単相3線のうちロードサーベイメータ26の接続されていない他方側のコンセント30bには、発信装置31bが備えられる。   Of the single-phase three-wire, the other outlet 30b to which the load survey meter 26 is not connected is provided with a transmitting device 31b.

発信装置31a,31bには、例えば電話回線などのネットワーク32が接続される。発信装置31a,31bには、例えば網制御ユニットなどを用いることができる。   A network 32 such as a telephone line is connected to the transmission devices 31a and 31b. As the transmission devices 31a and 31b, for example, a network control unit or the like can be used.

電力演算部27は、一方側のコンセント30aに発信装置31aが備えられている場合、測定された使用電力量を示す使用電力量データを電灯線搬送部28aに出力する。   When the power outlet 27a is provided with the transmitting device 31a, the power calculator 27 outputs the used power amount data indicating the measured used power amount to the power line transport unit 28a.

一方、電力演算部27は、他方側のコンセント30bに発信装置31bが備えられている場合、使用電力量データをコネクタ29、ケーブル33経由で出力ユニット34の電灯線搬送部28bに出力する。   On the other hand, when the power outlet 27 b is provided with the transmitter 31 b, the power calculator 27 outputs the power consumption data to the power line carrier 28 b of the output unit 34 via the connector 29 and the cable 33.

電灯線搬送部28aは、電力演算部27から使用電力量データを入力した場合、使用電力量データを端子8a,8b、分岐ブレーカ56、線10a,10b、コンセント30aコンセント30a経由で発信装置31aに出力する。   When the power line transport unit 28a receives the power consumption data from the power calculation unit 27, the power line transport unit 28a sends the power consumption data to the transmitting device 31a via the terminals 8a and 8b, the branch breaker 56, the lines 10a and 10b, and the outlet 30a and the outlet 30a. Output.

出力ユニット34の電灯線搬送部28bは、ロードサーベイメータ26からケーブル33経由で使用電力量データを入力し、使用電力量データを端子8b,8c、分岐ブレーカ51、線10a,10b、コンセント30b経由で発信装置31bに出力する。   The power line conveyance unit 28b of the output unit 34 inputs the power consumption data from the load survey meter 26 via the cable 33, and the power consumption data is transmitted via the terminals 8b and 8c, the branch breaker 51, the lines 10a and 10b, and the outlet 30b. Output to the transmitter 31b.

以上説明した本実施の形態では、使用電力量データ出力用の通信線を新設することなく、容易に使用電力量データを出力できる。   In the present embodiment described above, it is possible to easily output power consumption data without newly installing a communication line for power consumption data output.

本実施の形態において、単相3線のうちロードサーベイメータ26の設置されている側に発信装置31aが設置されている場合には、電灯線搬送を用いてロードサーベイメータ26から発信装置31aに使用電力量データを出力することができる。   In the present embodiment, when the transmission device 31a is installed on the side where the load survey meter 26 is installed in the single-phase three-wire, the power used from the load survey meter 26 to the transmission device 31a using power line conveyance. Quantity data can be output.

さらに、本実施の形態において、単相3線のうちロードサーベイメータ26の設置されていない側に発信装置31bが設置されている場合であっても、ロードサーベイメータ26から出力ユニット34を経由して、電灯線搬送を用いて発信装置31bに使用電力量データを出力することができる。   Further, in the present embodiment, even if the transmitting device 31b is installed on the side where the load survey meter 26 is not installed in the single-phase three-wire, the load survey meter 26 via the output unit 34, The power consumption data can be output to the transmitting device 31b by using power line conveyance.

本実施の形態において、電灯線搬送部28a,28bは、小型化が容易であるため、分電盤2内の限られたスペースに対してロードサーベイメータ26及び出力ユニット34を設置できる。   In the present embodiment, the power line conveyance units 28a and 28b can be easily miniaturized, so that the load survey meter 26 and the output unit 34 can be installed in a limited space in the distribution board 2.

(第5の実施の形態)
本実施の形態では、複数の測定対象の電気機器について使用電力量を測定する場合について説明する。
(Fifth embodiment)
In the present embodiment, a case will be described in which the amount of power used is measured for a plurality of electrical devices to be measured.

本実施の形態では、例えばエアーコンディショナーなどの測定対象の電気機器と接続されている分岐ブレーカが分電盤2内に複数存在し、この測定対象の電気機器と接続されている分岐ブレーカの数だけ、上記各実施の形態に係るロードサーベイメータを設置することが困難な状態の場合に適用される。   In the present embodiment, for example, there are a plurality of branch breakers connected to the measurement target electrical device such as an air conditioner in the distribution board 2, and only the number of branch breakers connected to the measurement target electrical device. This is applied to a case where it is difficult to install the load survey meter according to each of the above embodiments.

図9は、本実施の形態に係るロードサーベイメータ36〜38の一例を示すブロック図である。なお、この図9では、分電盤2のうちロードサーベイメータ36〜38、漏電ブレーカ3、測定対象の電気機器に接続されている分岐ブレーカ55〜57、分岐ブレーカ接続用端子8a〜8cを図示しており、他の部分については省略している。   FIG. 9 is a block diagram illustrating an example of the load survey meters 36 to 38 according to the present embodiment. 9, the load survey meters 36 to 38, the earth leakage breaker 3, the branch breakers 55 to 57 connected to the electric device to be measured, and the branch breaker connection terminals 8a to 8c are illustrated. The other parts are omitted.

ロードサーベイメータ36の本体36aは、電流測定器14とケーブル14a経由で接続されている。電力演算部39は、接続端子11a,11b間の電圧値と自己の電流測定器14から入力した電流値とに基づいて、電流測定器14の設置された分岐ブレーカ57に接続されている電気機器の使用電力量を演算する。   The main body 36a of the load survey meter 36 is connected to the current measuring instrument 14 via the cable 14a. The electric power calculation unit 39 is an electric device connected to the branch breaker 57 in which the current measuring device 14 is installed based on the voltage value between the connection terminals 11a and 11b and the current value input from the own current measuring device 14. The amount of power used is calculated.

ロードサーベイメータ36は、電源と電圧測定部12からの電圧値信号とを出力するコネクタ40を具備する。   The load survey meter 36 includes a connector 40 that outputs a power supply and a voltage value signal from the voltage measurement unit 12.

ロードサーベイメータ37の本体37に接続されているケーブル41は、ロードサーベイメータ36のコネクタ40に接続される。   The cable 41 connected to the main body 37 of the load survey meter 37 is connected to the connector 40 of the load survey meter 36.

ロードサーベイメータ37は、ロードサーベイメータ36から自己のケーブル41経由で電源と電圧値信号とを入力する。ロードサーベイメータ37は、自己のケーブル41から入力した電源に基づいて動作する。   The load survey meter 37 inputs a power supply and a voltage value signal from the load survey meter 36 via its own cable 41. The load survey meter 37 operates based on the power source input from its own cable 41.

ロードサーベイメータ37の電力演算部42は、ロードサーベイメータ36から入力した電圧値信号と自己の電流測定器14から入力した電流値に基づいて、自己の測定対象の電気機器の使用電力量を演算する。   Based on the voltage value signal input from the load survey meter 36 and the current value input from its own current measurement device 14, the power calculation unit 42 of the load survey meter 37 calculates the amount of power used by the electrical device to be measured.

また、ロードサーベイメータ37は、自己のケーブル41から入力した電源と電圧値信号とを出力するためのコネクタ43を具備する。   In addition, the load survey meter 37 includes a connector 43 for outputting a power source and a voltage value signal input from its own cable 41.

ロードサーベイメータ38は、上記ロードサーベイメータ37と同一構成である。ロードサーベイメータ37のコネクタ43に、ロードサーベイメータ38のケーブル41を接続することにより、さらに他の電気機器の使用電力量を測定可能となる。   The load survey meter 38 has the same configuration as the load survey meter 37. By connecting the cable 41 of the load survey meter 38 to the connector 43 of the load survey meter 37, it becomes possible to measure the amount of power used by another electrical device.

本実施の形態に係るロードサーベイメータ37,38において、電流測定器14は本体37a,38aの外部にある。また、使用電力測定のための電圧測定部12は、他のロードサーベイメータ36に備えられる。また、電源も他のロードサーベイメータ36から供給される。本実施の形態では、ロードサーベイメータ36〜38間で、電源と電圧測定部12とが共用された状態である。   In the load survey meters 37 and 38 according to the present embodiment, the current measuring instrument 14 is outside the main bodies 37a and 38a. In addition, the voltage measurement unit 12 for measuring the used power is provided in another load survey meter 36. The power is also supplied from another load survey meter 36. In the present embodiment, the power supply and the voltage measuring unit 12 are shared between the load survey meters 36 to 38.

ロードサーベイメータのサイズは、電流測定器、電圧測定部、電源回路のサイズに大きく影響を受ける。   The size of the load survey meter is greatly influenced by the size of the current measuring instrument, voltage measuring unit, and power supply circuit.

しかしながら、本実施の形態に係るロードサーベイメータ37,38においては、電流測定器14は本体37a,38aの外部に備えられ、電圧値信号と電源とは外部から供給されるため、本体37a,38aから電流測定器、電圧測定部及び電源回路を省略できる。   However, in the load survey meters 37 and 38 according to the present embodiment, the current measuring device 14 is provided outside the main bodies 37a and 38a, and the voltage value signal and the power source are supplied from the outside. The current measuring device, voltage measuring unit, and power supply circuit can be omitted.

したがって、ロードサーベイメータ37,38の本体37a,38aは、小型化できる。この結果、複数のロードサーベイメータ37,38を分電盤2内に配置することができる。   Therefore, the main bodies 37a and 38a of the load survey meters 37 and 38 can be reduced in size. As a result, a plurality of load survey meters 37 and 38 can be arranged in the distribution board 2.

なお、上記各実施の形態において、各構成要素は、同様の動作を実現可能であれば自由に変形可能であり、配置を変更させてもよく、自由に組み合わせることが可能であり、分割することも可能である。   In each of the above embodiments, each component can be freely deformed as long as the same operation can be realized, the arrangement may be changed, and the components can be freely combined and divided. Is also possible.

例えば、ロードサーベイメータ1,17,21,26,36〜38、電圧通知ユニット22、出力ユニット34の構成要素を自由に組み合わせてもよい。   For example, the constituent elements of the load survey meters 1, 17, 21, 26, 36 to 38, the voltage notification unit 22, and the output unit 34 may be freely combined.

本発明の第1の実施の形態に係るロードサーベイメータの一例を示すブロック図。The block diagram which shows an example of the load survey meter which concerns on the 1st Embodiment of this invention. 同実施の形態に係るロードサーベイメータの一例を示す正面図。The front view which shows an example of the load survey meter which concerns on the embodiment. 同実施の形態に係るロードサーベイメータの一例を示す右側面図。The right view which shows an example of the load survey meter which concerns on the embodiment. 同実施の形態に係るロードサーベイメータの一例を示す上面図。The top view which shows an example of the load survey meter which concerns on the embodiment. 同実施の形態に係るロードサーベイメータの設置状態の一例を示すブロック図。The block diagram which shows an example of the installation state of the load survey meter which concerns on the embodiment. 本発明の第2の実施の形態に係るロードサーベイメータの一例を示すブロック図。The block diagram which shows an example of the load survey meter which concerns on the 2nd Embodiment of this invention. 本発明の第3の実施の形態に係るロードサーベイメータの一例を示すブロック図。The block diagram which shows an example of the load survey meter which concerns on the 3rd Embodiment of this invention. 本発明の第4の実施の形態に係るロードサーベイメータの一例を示すブロック図。The block diagram which shows an example of the load survey meter which concerns on the 4th Embodiment of this invention. 本発明の第5の実施の形態に係るロードサーベイメータの一例を示すブロック図。The block diagram which shows an example of the load survey meter which concerns on the 5th Embodiment of this invention.

符号の説明Explanation of symbols

1,17,21,26,36〜38…ロードサーベイメータ、1a,17a,21a、26a,36a〜38a…本体、2…分電盤、3…ブレーカ、6…主幹ブレーカ、7a〜7c,14a,20a,24,33,41…ケーブル、8a〜8c…端子、9a,9b,11a,11b…接続端子、11c,25,29,40,43…コネクタ、10a,10b…線、12,19…電圧測定部、13,18,27,39,42…電力演算部、14,20…電流測定器、15…設定部、15a…電圧設定スイッチ、22…電圧通知ユニット、23…通知部、28a,28b…電灯線搬送部,30a,30b…コンセント、31a,31b…発信装置、32…ネットワーク、34…出力ユニット   DESCRIPTION OF SYMBOLS 1,17,21,26,36-38 ... Load survey meter, 1a, 17a, 21a, 26a, 36a-38a ... Main body, 2 ... Distribution board, 3 ... Breaker, 6 ... Master breaker, 7a-7c, 14a, 20a, 24, 33, 41 ... cable, 8a-8c ... terminal, 9a, 9b, 11a, 11b ... connection terminal, 11c, 25, 29, 40, 43 ... connector, 10a, 10b ... wire, 12, 19 ... voltage Measurement unit 13, 18, 27, 39, 42 ... power calculation unit, 14, 20 ... current measuring device, 15 ... setting unit, 15a ... voltage setting switch, 22 ... voltage notification unit, 23 ... notification unit, 28a, 28b ... Power line conveyance unit, 30a, 30b ... Outlet, 31a, 31b ... Transmission device, 32 ... Network, 34 ... Output unit

Claims (5)

分電盤内の単相3線の一方側の電流値を測定する第1の電流測定手段と、
前記単相3線の他方側の電流値を測定する第2の電流測定手段と、
前記単相3線の分岐ブレーカ接続用の第1端子と接続可能な第1接続端子と、
前記単相3線の分岐ブレーカ接続用の第2端子と接続可能な第2接続端子と、
前記単相3線の第3端子と接続可能なコネクタと、
前記第1接続端子と前記第2接続端子との間の前記単相3線の一方側の電圧値を測定する第1電圧測定手段と、
前記第2接続端子と前記コネクタとの間の前記単相3線の他方側の電圧値を測定する第2電圧測定手段と、
前記一方側の電流値と前記一方側の電圧値とに基づいて前記一方側の使用電力量を演算し、前記他方側の電流値と前記他方側の電圧値とに基づいて前記他方側の使用電力量を演算し、前記一方側の使用電力量と前記他方側の使用電力量とに基づいて前記単相3線の総使用電力量を演算する演算手段と
を具備するロードサーベイメータ。
First current measuring means for measuring a current value on one side of the single-phase three-wire in the distribution board;
Second current measuring means for measuring a current value on the other side of the single-phase three-wire;
A first connection terminal connectable to the first terminal for connecting the single-phase three-wire branch breaker;
A second connection terminal connectable with the second terminal for connecting the single-phase three-wire branch breaker;
A connector connectable to the third terminal of the single-phase three-wire;
First voltage measuring means for measuring a voltage value on one side of the single-phase three-wire between the first connection terminal and the second connection terminal;
Second voltage measuring means for measuring a voltage value on the other side of the single-phase three-wire between the second connection terminal and the connector;
Based on the current value on the one side and the voltage value on the one side, the power consumption on the one side is calculated, and on the other side based on the current value on the other side and the voltage value on the other side. A load survey meter comprising: a calculation means for calculating a power amount and calculating a total power consumption amount of the single-phase three-wire based on the power consumption amount on the one side and the power consumption amount on the other side.
分電盤内の単相3線の一方側の電流値を測定する第1の電流測定手段と、
前記単相3線の他方側の電流値を測定する第2の電流測定手段と、
前記単相3線の分岐ブレーカ接続用の第1端子と接続可能な第1接続端子と、
前記単相3線の分岐ブレーカ接続用の第2端子と接続可能な第2接続端子と、
前記第1接続端子と前記第2接続端子との間の前記単相3線の一方側の電圧値を測定する電圧測定手段と、
前記単相3線の他方側の電圧値を入力するコネクタと、
前記一方側の電流値と前記一方側の電圧値とに基づいて前記一方側の使用電力量を演算し、前記他方側の電流値と前記他方側の電圧値とに基づいて前記他方側の使用電力量を演算し、前記一方側の使用電力量と前記他方側の使用電力量とに基づいて前記単相3線の総使用電力量を演算する演算手段と
を具備するロードサーベイメータ。
First current measuring means for measuring a current value on one side of the single-phase three-wire in the distribution board;
Second current measuring means for measuring a current value on the other side of the single-phase three-wire;
A first connection terminal connectable to the first terminal for connecting the single-phase three-wire branch breaker;
A second connection terminal connectable with the second terminal for connecting the single-phase three-wire branch breaker;
Voltage measuring means for measuring a voltage value on one side of the single-phase three-wire between the first connection terminal and the second connection terminal;
A connector for inputting a voltage value on the other side of the single-phase three-wire;
Based on the current value on the one side and the voltage value on the one side, the power consumption on the one side is calculated, and on the other side based on the current value on the other side and the voltage value on the other side. A load survey meter comprising: a calculation means for calculating a power amount and calculating a total power consumption amount of the single-phase three-wire based on the power consumption amount on the one side and the power consumption amount on the other side.
分電盤内の単相3線の一方側に接続されている分岐ブレーカから測定対象の電気機器に流れる電流値を測定する電流測定手段と、
前記単相3線の一方側の分岐ブレーカ接続用端子と接続可能な接続端子と、
前記接続端子に与えられる電圧値を測定する電圧測定手段と、
前記電流値と前記電圧値とに基づいて前記一方側の使用電力量を演算する演算手段と、
前記使用電力量を示すデータを出力する出力装置が前記単相3線の一方側に接続されている場合、電灯線搬送を用いて前記出力装置に前記データを出力する手段と、
前記出力装置が前記単相3線の他方側に接続されている場合、前記他方側の電灯線搬送ユニットに対して前記データを出力するためのデータ出力コネクタと
を具備するロードサーベイメータ。
Current measuring means for measuring a current value flowing from the branch breaker connected to one side of the single-phase three-wire in the distribution board to the electrical device to be measured;
A connection terminal connectable with a branch breaker connection terminal on one side of the single-phase three-wire;
Voltage measuring means for measuring a voltage value applied to the connection terminal;
Calculation means for calculating the amount of power used on the one side based on the current value and the voltage value;
Means for outputting the data to the output device using a power line carrier when an output device for outputting the data indicating the amount of power used is connected to one side of the single-phase three-wire;
A load survey meter comprising: a data output connector for outputting the data to the power line conveyance unit on the other side when the output device is connected to the other side of the single-phase three-wire.
請求項1乃至請求項記載のロードサーベイメータにおいて、
前記電圧値と電源とを出力する増設コネクタをさらに具備することを特徴とするロードサーベイメータ。
The load survey meter according to any one of claims 1 to 3 ,
A load survey meter, further comprising an extension connector for outputting the voltage value and the power source.
請求項記載のロードサーベイメータと接続される増設ロードサーベイメータであり、
前記増設コネクタに接続される増設ケーブルと、
他の電気機器とこの他の電気機器に接続されている分岐ブレーカとの間の電流値を測定する増設電流測定手段と、
前記増設ケーブルから入力した電源に基づいて動作し、前記増設ケーブルから入力した電圧値と前記増設電流測定手段によって測定された電流値とに基づいて前記他の電気機器の使用電力量を演算する増設演算手段と
を具備するロードサーベイメータ。
An additional load survey meter connected to the load survey meter according to claim 4 ,
An extension cable connected to the extension connector;
An additional current measuring means for measuring a current value between another electrical device and a branch breaker connected to the other electrical device;
An extension that operates based on the power source input from the extension cable and calculates the power consumption of the other electric device based on the voltage value input from the extension cable and the current value measured by the extension current measuring means. A load survey meter comprising a calculation means.
JP2004062748A 2004-03-05 2004-03-05 Load survey meter Expired - Fee Related JP4301974B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004062748A JP4301974B2 (en) 2004-03-05 2004-03-05 Load survey meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004062748A JP4301974B2 (en) 2004-03-05 2004-03-05 Load survey meter

Publications (2)

Publication Number Publication Date
JP2005249683A JP2005249683A (en) 2005-09-15
JP4301974B2 true JP4301974B2 (en) 2009-07-22

Family

ID=35030279

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004062748A Expired - Fee Related JP4301974B2 (en) 2004-03-05 2004-03-05 Load survey meter

Country Status (1)

Country Link
JP (1) JP4301974B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6029340B2 (en) * 2012-06-15 2016-11-24 三菱電機株式会社 DC switchboard system
JP6267021B2 (en) * 2014-03-14 2018-01-24 積水化学工業株式会社 Power monitoring system, power monitoring method, and program
CN104535832A (en) * 2015-01-19 2015-04-22 国家电网公司 Intelligent household appliance electric energy metering device and intelligent household appliance

Also Published As

Publication number Publication date
JP2005249683A (en) 2005-09-15

Similar Documents

Publication Publication Date Title
US7546214B2 (en) System for power sub-metering
US7623043B2 (en) Method and system for metering consumption of energy
KR101012271B1 (en) Multi-line power measurement system increases efficiency and simplicity
JP2017038517A (en) Energy measuring device compatible with breaker in distribution switchboard
US20180246150A1 (en) Phase aligned branch energy meter
US20020014887A1 (en) Three-phase electrical power measurement system including three transformers and a measurement circuit to calculate the power thereof
US20120327563A1 (en) Load Center with Branch-Level Current Sensors Integrated into Power Buses on a Unit with On-Board Circuit Breaker Mounts
US20140167786A1 (en) Current Sensor For Power Measurement Applications
US10371721B2 (en) Configuration system for a power meter
JP4915659B2 (en) Power monitoring system
JP2001103622A (en) Home Energy Measurement System
US10698012B2 (en) Power measuring system and power measuring method
US20120197563A1 (en) Electric power meter
KR20170053719A (en) Self-calibrating contactless power consumption sensing
CN103748475A (en) Electricity meter
JP4301974B2 (en) Load survey meter
KR20090119394A (en) Electric power measurement system by home classification
US9128131B2 (en) Device for measuring two phase power with single voltage input
KR20110015358A (en) Multi-line power measurement system increases efficiency and simplicity
JP6215520B2 (en) Power usage management system
JP2002071734A (en) Electric energy-integrating apparatus and distribution board
JP2013250094A (en) Solar power generation system
CA2808735A1 (en) Load center with branch-level current sensors integrated into power buses on a unit with on-board circuit breaker mounts
JP6528322B2 (en) Measurement system, distribution board, and construction method of measurement system
JP5106510B2 (en) Power measuring apparatus and power measuring method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060216

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080731

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080805

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081006

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090106

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090205

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20090313

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090331

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090421

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120501

Year of fee payment: 3

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D03

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130501

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130501

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140501

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees