JP4319780B2 JP2000393609A JP2000393609A JP4319780B2 JP 4319780 B2 JP4319780 B2 JP 4319780B2 JP 2000393609 A JP2000393609 A JP 2000393609A JP 2000393609 A JP2000393609 A JP 2000393609A JP 4319780 B2 JP4319780 B2 JP 4319780B2
Authority
JP
Japan
Prior art keywords
formwork
mold
concrete
support
separator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000393609A
Other languages
Japanese (ja)
Other versions
JP2002194893A (en
Inventor
徳田義治
中川良隆
尾高義夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2000393609A priority Critical patent/JP4319780B2/en
Publication of JP2002194893A publication Critical patent/JP2002194893A/en
Application granted granted Critical
Publication of JP4319780B2 publication Critical patent/JP4319780B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、型枠装置及び構造物の連続施工方法に関するもので、特に置き型枠方式で支保工を連続的に移動させる型枠装置及び構造物の連続施工方法に関するものである。
【0002】
【従来の技術】
一般に、コンクリート構造物の施工手順は、鉄筋組立、型枠組立、コンクリート打設、コンクリート養生、型枠脱型のサイクルを繰り返している。
この種のコンクリート構造物の構築作業を連続して行う工法として滑動型枠工法(スリップフォーム工法)がよく知られている。滑動型枠工法は、型枠内にコンクリートを打設しつつ、ジャッキ等を駆動して型枠を順次移動させるものである。
このため、コンクリート構造物を上方または水平方向に連続して構築することができ、特にコンクリート構造物を短期で構築しなければならない等、高速施工が要求されるときは極めて便利である。
【0003】
【本発明が解決しようとする課題】
しかしながら、前記した従来の滑動型枠工法にあっては、次のような問題点がある。
<イ>コンクリートが十分に強度を発揮していない養生中に型枠がコンクリート表面に接したままスリップして移動する。このため、コンクリート表面に擦り傷が生じたり、クラックが発生する等、コンクリート表層部の品質に欠陥が生じ易かった。
<ロ>型枠がコンクリート表面全面に接した状態で、コンクリートとの付着を切りながら型枠を移動させるため、摺動抵抗が非常に大きくなる。したがって、容量の大きなジャッキを使用する等装置全体が大掛かりなものとなっていた。
<ハ>セパレータを使用しない場合、大きなコンクリート圧力に抗するように型枠を強固に支持しなければならず、支保工全体の剛性を上げる必要がある。この結果、支保工設備が大型化して重くなり、取り扱い、組みばらし等の負担が大きくなり、施工性が極めて悪い。
【0004】
【本発明の目的】
本発明は上記したような従来の問題点に鑑みて考えられたもので、支保工の軽量化を図り、コンクリート表層部の品質を保ちつつ、しかもコンクリート構造物の高速施工を可能にした型枠装置及び構造物の連続施工方法を提供することを目的とする。
【0005】
【課題を解決するための手段】
上記のような目的を達成するために、本発明の型枠装置は、コンクリート構造物の壁面を形成するために配置する型枠と、該型枠の外側に配置され、型枠に対して移動する支保工と、からなり、前記型枠は複数枚のプレートで構成し、前記支保工の移動方向に並ぶ前記プレート間を連結金具で接続し、前記型枠と前記支保工との間に支保工の移動時の摩擦抵抗を低減する第1の摩擦低減装置を設け、対向する前記型枠間に架設したセパレータに接続する型枠締付ボルトには支保工との間に第2の摩擦低減装置を設け、前記型枠に発生したコンクリートの側圧を前記第1の摩擦低減装置及び第2の摩擦低減装置を介して前記セパレータに受け持たすようにしたことを特徴としている。
以上の構成とすることで型枠を動かすことなく、支保工のみを移動させることができる。
また、本発明の構造物の連続施工方法は、前記記載の型枠装置を設置し、前記型枠を移動することなく、前記支保工のみを移動する工程と、前記支保工の移動に応じて前記型枠を継ぎ足す工程と、対向する前記継ぎ足した型枠間にセパレータを架設する工程と、前記型枠内部のコンクリートが硬化した後、前記型枠を取り外す工程と、を繰り返して行い、前記型枠に囲まれた内部には順次コンクリートを打設して行うようになっている。
【0006】
【本発明の実施の形態】
以下図面を参照しながら、本発明に係る実施の形態について説明する。
【0007】
<イ>全体の構成
型枠装置1は、コンクリート構造物10の壁面11を形成するために配置した型枠2と、型枠2の外側にあってこれを支持する支保工3とからなる。型枠2が上昇することなく、支保工3のみが上昇し、支保工3が所定の高さまで上昇したとき、型枠2を上方へ継ぎ足していく方式である(図1、図2参照)。
【0008】
<ロ>型枠
型枠2は、複数枚の矩形のプレート21からなる。
支保工3の移動方向に並ぶプレート21の接続は、連結金具4で行う。
連結金具4は、例えばランドセルのカバー止め金と同様にオス金具41とメス金具42を使い、オス金具41の矢の中にばねを内蔵し、メス金具42がばねを圧縮して係止する構造とすることができる。これらオス金具41とメス金具42をプレート21の上下に所定個数(実施例ではオス金具41、メス金具42を夫々3個)取り付けている(図2参照)。
既に設置している下方のプレート21に向けて上方から別のプレート21を配置することによって、下方のプレート21のオス金具41に上方のプレート21のメス金具42を係止することができる。オス金具41、メス金具42を係止することによって上下のプレート21を接続し、上下方向に型枠2を形成していくことができる。
なお、オス金具41、メス金具42を上下逆に取り付けてもよい。
【0009】
プレート21には所要な箇所にセパレータ穴22をあけている。このセパレータ穴22は、対向する対の型枠2(互いに向かい合うプレート21)間にセパレータ6を取り付けるためのものである。
また、プレート21のコンクリート打設面の反対側(支保工3側)には、手で持ち運ぶことができるように所要箇所に把手23を取り付けることもできる。
【0010】
<ハ>支保工
支保工3は、縦材31と横材32とで構成する。
縦材31は、例えば断面コの字形の二本の鋼材を向かい合わせ、隙間33を空けて接合したもの、角型鋼管の長手方向に隙間33を設けたもの、リップ溝形鋼等で構成する。この隙間33は、後述する型枠締付ボルト62をコーン61に取り付ける際、その操作を容易に行えるようにすると同時に、縦材31が上方へ移動するとき型枠締付ボルト62と干渉することがないようにするためである。
縦材31の外側にH形鋼等からなる横材32を水平方向に所定の間隔を持って複数本固定する。
縦材31と横材32を組み合わせて構成した支保工3を、型枠2の外側に配置し、後述する第1の摩擦低減装置52を介して型枠2を支持している。
なお、図示していないが、支保工3は公知の油圧ジャッキ等の駆動装置と連結している。
【0011】
<ニ>摩擦低減装置
型枠2と支保工3との間に第1の摩擦低減装置51を設ける。
第1の摩擦低減装置51は、縦材31の上下方向に所定間隔にわたって固定した軸受ブロック53に、例えば円筒状のローラーを水平方向に回転自在に取り付けて構成する(図2、図3参照)。
支保工3と後述する型枠締付ボルト62との間に第2の摩擦低減装置52を設ける。
第2の摩擦低減装置52は、例えば一対のローラーをナット63で型枠締付ボルト62に締付可能に取り付けて構成する(図3参照)。
ナット63を締め付けて第2の摩擦低減装置52を縦材31に押し付け、縦材31を第1の摩擦低減装置51と第2の摩擦低減装置52との間に挟み、更に第1の摩擦低減装置51を型枠2に当接させて取り付ける。なお、型枠2の不陸を吸収することができるように、スプリング付き型枠締付ボルト62で締め付けるのが好ましい。
第1の摩擦低減装置51及び第2の摩擦低減装置52は、支保工3の上昇時の摩擦抵抗を低減することができ、支保工3をスムーズに上昇させる。
このため、小さな力で支保工3を上昇させることができ、容量の小さな上昇ジャッキを使用することができる。
【0012】
<ホ>セパレータ
対向する型枠2間には多数のセパレータ6を架設している。セパレータ6にコーン61をねじ結合して取り付ける。プレート21のセパレータ穴22から型枠締付ボルト62を差し込み、コーン61にねじ結合してセパレータ6を型枠2間に架設する。型枠締付ボルト62の操作は、縦材31の隙間33を利用して行うことができる。
【0013】
<ヘ>力の伝達経路
本発明で重要なことは、コンクリート打設時の型枠2にかかる側圧は、支保工3を経由してセパレータ6に受け持たせ、この状態で支保工3が上昇することにある。
打設されたコンクリート12の側圧をセパレータ6が受け持つまでの力の伝達経路は、以下の通りである。
コンクリート打設によって発生した側圧は、型枠2に圧縮力として伝わり、第1の摩擦低減装置51を介して縦材31に圧縮力として伝達される。そして縦材31の圧縮力は、第2の摩擦低減装置52を介して型枠締付ボルト62の引張り力となり、セパレータ6に引張り力を与える。
支保工3が上昇する際、前記のごとく縦材31に隙間33を設けてあるので、型枠締結ボルト62に干渉することなく支保工3は上昇する。
これによって、コンクリート打設時の型枠2にかかる側圧を支保工3を経由してセパレータ6に受け持たせ、この状態で支保工3が上昇することを可能にした。
また、打設されたコンクリート12の側圧をセパレータ6が受け持つので、型枠2にかかる力が軽減し、型枠2を強固に支持する必要がなく、したがって支保工3を大型化することがなく、支保工3の軽量化を図ることができる。
【0014】
次に以上の型枠装置1を用いたコンクリート構造物の連続施工方法を図4から図6を参照して説明する。
【0015】
<イ>鉄筋の組立(図4)
先ず図4は、既に型枠2内にコンクリート12が打設され、養生している状態を示している。なお、下方のコンクリート13は十分養生して硬化し、所要の強度を発揮し、コンクリート構造物10の一部を構成している。
コンクリート12の上方には、鉄筋7が突き出ている。
コンクリート12が硬化するまでの間は、コンクリート12の上方において鉄筋7の組立作業が行われる。即ち、コンクリート12から突き出ている鉄筋7に、更に縦筋の接合及び横筋の配筋作業を行う。
【0016】
<ロ>型枠の継ぎ足し(図5)
次いで、型枠装置1のコンクリート打設面側に新たな型枠2を継ぎ足して配置する。即ち、鉄筋7を組み立てた箇所に新たな型枠2を継ぎ足す。
把手23を掴んでプレート21を、下方に設置されている型枠2に向けて上方から挿し込む。この際、プレート21のメス金具42を型枠2のオス金具41に向けて挿し込み、メス金具42がオス金具41の矢の中のばねを圧縮して係止するようにする。
コンクリート構造物10の壁面11を形成するように順次、プレート21を挿し込んで下方に設置されている型枠2の上方に新たな型枠2を配置する。
このようにして鉄筋7を継ぎ足した箇所に、新たな型枠2を連結金具4(オス金具41、メス金具42)で連結固定して継ぎ足す。
【0017】
<ハ>セパレータの架設(図5)
対向する型枠2(継ぎ足した新たな型枠2)間にセパレータ6を架設する。
対向する型枠2間にセパレータ6を配置し、セパレータ6にコーン61をねじ結合して取り付け、型枠締付ボルト62をコーン61にねじ結合する。ナット63をねじ込んで縦材31を第1の摩擦低減装置51、52の間に挟み、第1の摩擦低減装置51を型枠2に当接し、セパレータ6を架設する。
これによって、継ぎ足した新たな型枠2間がセパレータ6で一定間隔に保持するように位置決め固定され、次のコンクリート打設準備状態となる。
【0018】
<ニ>コンクリートの打設(図6)
継ぎ足した新たな型枠2で囲った打設空間にコンクリート14を打設する。硬化したコンクリート12上にコンクリート14を打設することによってコンクリート構造物10が上方へ構築される。
型枠2間がセパレータ6で支持され、一定間隔に保持するように位置決め固定されているので、打設されたコンクリート12の側圧をセパレータ6が受け持つことができる。
【0019】
<ホ>支保工の上昇
支保工3と型枠2との間には第1の摩擦低減装置51及び第2の摩擦低減装置52を介在しているので、支保工3は型枠2に対してスリップし、支保工3のみがスムーズに上昇していく。
支保工3の上昇手段は、図示していないがコンクリート内に埋め込んだロッドに反力を取り、ジャッキで上昇する方式をとることができる。
なお、支保工3の上昇手段としては上記以外に、構築物の上方にブラケットを先行架設し、これを反力に引き上げる方式、あるいは外部にロッドを設置し、これを反力に押し上げる方式など公知のいずれの方式も採用することができる。
【0020】
本発明は型枠2が上昇することなく、支保工3のみが上昇する方式であるため、型枠2の共上がりを防止する必要がある。
型枠2に働く力は、
▲1▼型枠2に働く上向きの力=コンクリート側圧によるセパレータ6の張力×コロガリ摩擦係数、
▲2▼型枠2に働く下向きの力=型枠2自重+コンクリートの付着による下向き力+セパレータ6によるコンクリートの硬化後の上昇反力、
であり、コンクリートによる下向き力が少ない場合、型枠2が共上がりする可能性がある。
本発明では、型枠2に連結金具4を取り付け、上部の型枠2と下部の型枠2を次々と連結固定して型枠2の自重を大きくし、型枠2の共上がりを防止している。
【0021】
<ヘ>型枠の取り外し(図6)
硬化し、所要の強度を発揮している下方のコンクリート13の箇所から型枠2を取り外す。
先ず、型枠締付ボルト62を取り外す。既に支保工3は上昇しているので、型枠2、コーン61及びセパレータ6は壁面11と直角の水平方向に引っ張り出すことができる。
このように型枠2の取り外しは、硬化して所要の強度を発揮しているコンクリート13から行うので、コンクリートの品質を十分に確保することができる。
なお、取り外した型枠2、コーン61及びセパレータ6は上部へ転用使用することができる。この場合、ケレン清掃、ハクリ剤塗布などの作業が工程に影響を及ぼすことなく可能であり、コンクリート表面をきれいに仕上げることができる。
【0022】
以下、次々に、鉄筋7組立、支保工3上昇、型枠2継ぎ足し、セパレータ6架設、セパレータ6除去、型枠2取り外しを繰り返し、型枠2に囲まれた内部に順次コンクリートを打設することにより、コンクリート構造物10を連続して構築することができる。
本発明では、支保工3は常時上昇(連続上昇)させることができる。
また、本発明は、橋脚など垂直方向に延びるコンクリート構造物だけでなく、水路など水平方向へ延びるコンクリート構造物にも使用することができる。
【0023】
【本発明の効果】
本発明の型枠装置及び構造物の連続施工方法は、以上説明したようになるから次のような効果を得ることができる。
<イ>支保工と型枠との間に摩擦低減装置を介在しているので、型枠に対して支保工がスムーズに移動する。したがって、容量の小さなジャッキを使用する等装置全体を軽量化できる。
<ロ>上記の摩擦低減装置に加えて、複数のプレートを連結金具で接続して型枠を形成しているので、支保工が移動しても型枠が移動することはない。したがって、型枠がコンクリート表面をスリップすることがないので、スリップによるコンクリート品質へ与える悪影響がない。
<ハ>コンクリート打設時の型枠にかかる側圧は、支保工を経由してセパレータに受け持たせるので、高剛性の支保工は必要なく、支保工を軽量化できる。
<ニ>型枠の取り外しは、コンクリートの養生を十分に行った後に行うことができるので、コンクリートの品質を十分に確保することができる。また、取り外した型枠を上部へ転用使用する際、ケレン清掃、ハクリ剤塗布などの作業が工程に影響を及ぼすことなく可能である。
<ホ>連続してコンクリートを打設することができ、コンクリート構造物の連続施工を可能にした。
<ヘ>型枠の脱型工程がないことと、バッチ式コンクリート打設方式に比べ、打ち継ぎ目処理工程がないことで連続したコンクリート打設が行え、高速施工が可能となる。
【図面の簡単な説明】
【図1】型枠装置の側面図。
【図2】型枠装置の正面図。
【図3】型枠装置の平面図。
【図4】コンクリート構造物の施工手順を示す図。
【図5】コンクリート構造物の施工手順を示す図。
【図6】コンクリート構造物の施工手順を示す図。
【符号の説明】
1・・・型枠装置
2・・・型枠
21・・・プレート
3・・・支保工
4・・・連結金具
51・・・第1の摩擦低減装置
52・・・第2の摩擦低減装置
6・・・セパレータ
10・・・コンクリート構造物
12、13、14・・・コンクリート
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a formwork apparatus and a continuous construction method for a structure, and more particularly to a formwork apparatus and a continuous construction method for a structure in which a support is continuously moved by a standing formwork method.
[0002]
[Prior art]
Generally, the construction procedure of a concrete structure repeats a cycle of rebar assembly, formwork assembly, concrete placement, concrete curing, and formwork demolding.
A sliding form method (slip form method) is well known as a method for continuously performing construction work of this type of concrete structure. The sliding formwork method is to move the formwork sequentially by driving a jack or the like while placing concrete in the formwork.
For this reason, the concrete structure can be constructed continuously in the upward or horizontal direction, which is extremely convenient particularly when high-speed construction is required, such as when the concrete structure must be constructed in a short period of time.
[0003]
[Problems to be solved by the present invention]
However, the above-described conventional sliding mold method has the following problems.
<I> The concrete slips and moves with the concrete surface in contact with the concrete surface during curing where the concrete is not sufficiently strong. For this reason, defects in the quality of the surface layer of the concrete are likely to occur, such as scratches on the concrete surface or cracks.
<B> In a state where the mold is in contact with the entire surface of the concrete, the mold is moved while cutting off the adhesion to the concrete, so that the sliding resistance becomes very large. Therefore, the entire apparatus, such as using a jack with a large capacity, has become large.
<C> When a separator is not used, it is necessary to firmly support the mold so as to resist a large concrete pressure, and it is necessary to increase the rigidity of the entire support work. As a result, the support equipment becomes larger and heavier, the burden of handling, assembly, etc. increases, and the workability is extremely poor.
[0004]
[Object of the present invention]
The present invention was conceived in view of the conventional problems as described above, and was designed to reduce the weight of the support work, maintain the quality of the concrete surface layer, and enable high-speed construction of concrete structures. It aims at providing the continuous construction method of an apparatus and a structure.
[0005]
[Means for Solving the Problems]
In order to achieve the above-described object, the formwork apparatus of the present invention includes a formwork arranged to form a wall surface of a concrete structure, an outside of the formwork, and movement with respect to the formwork The mold is composed of a plurality of plates, the plates arranged in the moving direction of the support are connected by a connecting metal fitting, and the support is supported between the mold and the support. A first friction reducing device for reducing frictional resistance during the movement of the work is provided, and a second bolt for reducing friction between the mold clamping bolt connected to the separator laid between the opposing molds and the support An apparatus is provided, and the side pressure of the concrete generated in the mold is received by the separator via the first friction reducing device and the second friction reducing device.
By setting it as the above structure, only a support work can be moved, without moving a formwork.
Moreover, the continuous construction method of the structure of this invention installs the said formwork apparatus, The process of moving only the said support work, without moving the said formwork, According to the movement of the said support work Repetitively performing the step of adding the formwork, the step of laying a separator between the opposing formwork, and the step of removing the formwork after the concrete inside the formwork has hardened, Concrete is placed in the inside surrounded by the formwork.
[0006]
[Embodiments of the Invention]
Embodiments according to the present invention will be described below with reference to the drawings.
[0007]
<A> The entire structural formwork apparatus 1 includes a formwork 2 arranged to form the wall surface 11 of the concrete structure 10 and a support 3 that is outside the formwork 2 and supports it. This is a system in which only the support 3 rises without raising the mold 2 and when the support 3 rises to a predetermined height, the mold 2 is added upward (see FIGS. 1 and 2).
[0008]
<B> Formwork Formwork 2 is composed of a plurality of rectangular plates 21.
The connection of the plates 21 arranged in the moving direction of the support 3 is performed by the connecting bracket 4.
The connection metal fitting 4 uses, for example, a male metal fitting 41 and a female metal fitting 42 like a cover clasp of a school bag, and has a structure in which a spring is built in an arrow of the male metal fitting 41 and the female metal fitting 42 compresses and locks the spring. It can be. A predetermined number of male fittings 41 and female fittings 42 are attached to the top and bottom of the plate 21 (three male fittings 41 and three female fittings 42 in the embodiment) (see FIG. 2).
By disposing another plate 21 from above toward the lower plate 21 already installed, the female fitting 42 of the upper plate 21 can be locked to the male fitting 41 of the lower plate 21. By locking the male metal fitting 41 and the female metal fitting 42, the upper and lower plates 21 can be connected to form the mold 2 in the vertical direction.
In addition, you may attach the male metal fitting 41 and the female metal fitting 42 upside down.
[0009]
The plate 21 has a separator hole 22 at a required location. The separator hole 22 is for attaching the separator 6 between a pair of opposing molds 2 (plates 21 facing each other).
Moreover, the handle 23 can also be attached to a required location so that it can carry by hand on the opposite side (supporting work 3 side) of the concrete placement surface of the plate 21.
[0010]
<C> Support work support work 3 is composed of vertical members 31 and cross members 32.
The vertical member 31 is made of, for example, two steel materials having a U-shaped cross section facing each other and joined with a gap 33 therebetween, a rectangular steel pipe provided with a gap 33 in the longitudinal direction, a lip groove steel, or the like. . This gap 33 makes it possible to easily perform the operation when attaching a mold clamping bolt 62 described later to the cone 61, and at the same time interferes with the mold clamping bolt 62 when the vertical member 31 moves upward. This is so that there is not.
A plurality of cross members 32 made of H-shaped steel or the like are fixed to the outside of the vertical member 31 with a predetermined interval in the horizontal direction.
A support 3 configured by combining the vertical members 31 and the horizontal members 32 is arranged outside the mold 2 and supports the mold 2 via a first friction reduction device 52 described later.
Although not shown, the support 3 is connected to a driving device such as a known hydraulic jack.
[0011]
<D> Friction reduction device A first friction reduction device 51 is provided between the formwork 2 and the support 3.
The first friction reducing device 51 is configured by, for example, attaching a cylindrical roller to a bearing block 53 fixed at a predetermined interval in the vertical direction of the vertical member 31 so as to be rotatable in the horizontal direction (see FIGS. 2 and 3). .
A second friction reducing device 52 is provided between the support 3 and a mold fastening bolt 62 described later.
The second friction reducing device 52 is configured by, for example, attaching a pair of rollers to a mold fastening bolt 62 with a nut 63 so as to be fastened (see FIG. 3).
The nut 63 is tightened to press the second friction reducing device 52 against the longitudinal member 31, the longitudinal member 31 is sandwiched between the first friction reducing device 51 and the second friction reducing device 52, and the first friction reducing device is further interposed. The device 51 is attached in contact with the mold 2. In addition, it is preferable to clamp | tighten with the mold fastening bolt 62 with a spring so that the unevenness of the mold 2 can be absorbed.
The 1st friction reduction apparatus 51 and the 2nd friction reduction apparatus 52 can reduce the frictional resistance at the time of the raise of the support work 3, and raise the support work 3 smoothly.
For this reason, the support 3 can be raised with a small force, and a raising jack with a small capacity can be used.
[0012]
<E> A large number of separators 6 are installed between the molds 2 facing each other. A cone 61 is screwed to the separator 6 and attached. A mold clamping bolt 62 is inserted from the separator hole 22 of the plate 21 and is screwed to the cone 61 so that the separator 6 is installed between the molds 2. The operation of the mold clamping bolt 62 can be performed using the gap 33 of the longitudinal member 31.
[0013]
<F> Force transmission path The important thing in the present invention is that the side pressure applied to the mold 2 at the time of placing concrete is received by the separator 6 via the support 3, and the support 3 rises in this state. There is to do.
The transmission path of the force until the separator 6 takes over the lateral pressure of the concrete 12 that has been placed is as follows.
The lateral pressure generated by the concrete placement is transmitted as a compressive force to the mold 2 and is transmitted as a compressive force to the longitudinal member 31 via the first friction reducing device 51. The compressive force of the longitudinal member 31 becomes the tensile force of the mold clamping bolt 62 via the second friction reducing device 52 and gives the separator 6 a tensile force.
When the support 3 is raised, since the gap 33 is provided in the vertical member 31 as described above, the support 3 is raised without interfering with the formwork fastening bolt 62.
As a result, the side pressure applied to the mold 2 at the time of placing the concrete is received by the separator 6 via the support 3 and the support 3 can be raised in this state.
Further, since the separator 6 takes charge of the lateral pressure of the placed concrete 12, the force applied to the mold 2 is reduced, it is not necessary to support the mold 2 firmly, and therefore the support 3 is not enlarged. The weight of the support 3 can be reduced.
[0014]
Next, the continuous construction method of the concrete structure using the above formwork apparatus 1 is demonstrated with reference to FIGS.
[0015]
<I> Reinforcement assembly (Fig. 4)
First, FIG. 4 shows a state where the concrete 12 has already been placed in the mold 2 and is being cured. The lower concrete 13 is sufficiently cured and hardened, exhibits a required strength, and constitutes a part of the concrete structure 10.
Reinforcing bars 7 protrude above the concrete 12.
Until the concrete 12 is cured, the rebar 7 is assembled above the concrete 12. That is, the reinforcing bars 7 projecting from the concrete 12 are further subjected to the joining of the longitudinal bars and the arranging of the horizontal bars.
[0016]
<B> Addition of formwork (Fig. 5)
Next, a new mold 2 is added and arranged on the concrete placing surface side of the mold apparatus 1. That is, a new formwork 2 is added to the place where the rebar 7 is assembled.
The handle 21 is grasped and the plate 21 is inserted from above toward the mold 2 installed below. At this time, the female fitting 42 of the plate 21 is inserted toward the male fitting 41 of the mold 2 so that the female fitting 42 compresses and locks the spring in the arrow of the male fitting 41.
In order to form the wall surface 11 of the concrete structure 10, the plate 21 is sequentially inserted and a new formwork 2 is arranged above the formwork 2 installed below.
In this way, the new formwork 2 is connected and fixed by the connecting fitting 4 (male fitting 41, female fitting 42) at the location where the reinforcing bar 7 is added.
[0017]
<C> Installation of separator (Fig. 5)
A separator 6 is erected between the opposing molds 2 (added new molds 2).
A separator 6 is disposed between the opposing molds 2, and a cone 61 is screwed to the separator 6 and attached, and a mold clamping bolt 62 is screwed to the cone 61. The nut 63 is screwed to sandwich the vertical member 31 between the first friction reducing devices 51 and 52, the first friction reducing device 51 is brought into contact with the mold 2, and the separator 6 is installed.
As a result, the fixed new formwork 2 is positioned and fixed so as to be held at a constant interval by the separator 6, and the next concrete placement preparation state is obtained.
[0018]
<D> Placing concrete (Figure 6)
Concrete 14 is placed in the placement space surrounded by the new formwork 2 that has been added. The concrete structure 10 is constructed upward by placing concrete 14 on the hardened concrete 12.
Since the space between the molds 2 is supported by the separator 6 and positioned and fixed so as to be held at a constant interval, the separator 6 can take on the lateral pressure of the placed concrete 12.
[0019]
<E> Ascending support work 3 Since the first friction reduction device 51 and the second friction reduction device 52 are interposed between the support work 3 and the mold 2, the support work 3 is attached to the mold 2. Slip, and only the support 3 rises smoothly.
Although the raising means of the support 3 is not shown, it can take a reaction force against a rod embedded in concrete and ascend with a jack.
In addition to the above, as a lifting means of the support 3, there is a known method such as a method in which a bracket is erected above the structure and pulled up to the reaction force, or a rod is installed outside and the force is pushed up to the reaction force. Either method can be adopted.
[0020]
Since the present invention is a method in which only the support 3 is raised without raising the mold 2, it is necessary to prevent the mold 2 from being raised together.
The force acting on the formwork 2 is
(1) upward force acting on the mold 2 = tension of the separator 6 due to the concrete side pressure x coefficient of friction of the roller
(2) Downward force acting on the mold 2 = Mold 2 self-weight + Downward force due to adhesion of concrete + Rising reaction force after hardening of the concrete by the separator 6
When there is little downward force by concrete, there is a possibility that the formwork 2 rises together.
In the present invention, the connecting metal fitting 4 is attached to the mold 2, and the upper mold 2 and the lower mold 2 are connected and fixed one after another to increase the weight of the mold 2 and prevent the mold 2 from rising together. ing.
[0021]
<F> Removing the formwork (Figure 6)
The formwork 2 is removed from the portion of the lower concrete 13 that is cured and exhibits the required strength.
First, the mold clamping bolt 62 is removed. Since the support 3 has already risen, the mold 2, the cone 61 and the separator 6 can be pulled out in the horizontal direction perpendicular to the wall surface 11.
Thus, the removal of the mold 2 is performed from the concrete 13 that has been cured and exhibits the required strength, so that the quality of the concrete can be sufficiently ensured.
The removed mold 2, cone 61 and separator 6 can be diverted to the upper part. In this case, operations such as cleansing and applying a brushing agent are possible without affecting the process, and the concrete surface can be finished cleanly.
[0022]
In the following, one after another, rebar 7 assembly, support 3 ascending, formwork 2 addition, separator 6 installation, separator 6 removal and formwork 2 removal are repeated, and concrete is sequentially placed inside the formwork 2. Thus, the concrete structure 10 can be continuously constructed.
In the present invention, the support work 3 can always be raised (continuously raised).
Further, the present invention can be used not only for a concrete structure extending in the vertical direction such as a pier but also for a concrete structure extending in a horizontal direction such as a water channel.
[0023]
[Effect of the present invention]
Since the formwork apparatus and the continuous construction method of the present invention are as described above, the following effects can be obtained.
<I> Since the friction reducing device is interposed between the support and the mold, the support moves smoothly with respect to the mold. Accordingly, the entire apparatus can be reduced in weight, for example, using a small capacity jack.
<B> In addition to the above-described friction reducing device, a plurality of plates are connected by connecting metal fittings to form a mold, so that the mold does not move even if the support works. Therefore, since the mold does not slip on the concrete surface, there is no adverse effect on the concrete quality due to the slip.
<C> Since the side pressure applied to the formwork at the time of placing the concrete is received by the separator via the support, high-stiffness support is not required, and the support can be reduced in weight.
<D> Since the formwork can be removed after the concrete is sufficiently cured, the quality of the concrete can be sufficiently secured. In addition, when the removed formwork is diverted to the upper part, operations such as cleansing of the kelen and application of the peeling agent can be performed without affecting the process.
<E> It was possible to place concrete continuously, enabling continuous construction of concrete structures.
<F> Since there is no demolding process of the formwork and there is no seam treatment process compared to the batch type concrete placing system, continuous concrete placement can be performed and high speed construction is possible.
[Brief description of the drawings]
FIG. 1 is a side view of a mold apparatus.
FIG. 2 is a front view of a mold apparatus.
FIG. 3 is a plan view of a mold apparatus.
FIG. 4 is a diagram showing a construction procedure of a concrete structure.
FIG. 5 is a diagram showing a construction procedure of a concrete structure.
FIG. 6 is a diagram showing a construction procedure of a concrete structure.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Formwork apparatus 2 ... Formwork 21 ... Plate 3 ... Supporting work 4 ... Connection metal fitting 51 ... 1st friction reduction apparatus 52 ... 2nd friction reduction apparatus 6 ... Separator 10 ... Concrete structure 12, 13, 14 ... Concrete

Claims (2)

コンクリート構造物の壁面を形成するために配置する型枠と、
該型枠の外側に配置され、型枠に対して移動する支保工と、からなり、
前記型枠は複数枚のプレートで構成し、
前記支保工の移動方向に並ぶ前記プレート間を連結金具で接続し、
前記型枠と前記支保工との間に支保工の移動時の摩擦抵抗を低減する第1の摩擦低減装置を設け、
対向する前記型枠間に架設したセパレータに接続する型枠締付ボルトには支保工との間に第2の摩擦低減装置を設け、
前記型枠に発生したコンクリートの側圧を前記第1の摩擦低減装置及び第2の摩擦低減装置を介して前記セパレータに受け持たすようにしたことを特徴とする、型枠装置。
A formwork placed to form the wall of the concrete structure;
A support that is arranged outside the formwork and moves relative to the formwork,
The mold is composed of a plurality of plates,
Connecting the plates lined up in the moving direction of the support with a connecting bracket,
A first friction reduction device is provided between the mold and the support to reduce frictional resistance when the support is moved,
The mold clamping bolt connected to the separator laid between the opposing molds is provided with a second friction reducing device between the support work and
A formwork apparatus characterized in that a side pressure of concrete generated in the formwork is received by the separator via the first friction reduction apparatus and the second friction reduction apparatus.
請求項1に記載の型枠装置を設置し、
前記型枠を移動することなく、前記支保工のみを移動する工程と、
前記支保工の移動に応じて前記型枠を継ぎ足す工程と、
対向する前記継ぎ足した型枠間にセパレータを架設する工程と、
前記型枠内部のコンクリートが硬化した後、前記型枠を取り外す工程と、を繰り返して行い、
前記型枠に囲まれた内部には順次コンクリートを打設して行う、構造物の連続施工方法。
Installing the formwork device according to claim 1;
Without moving the mold, moving only the support,
Adding the formwork according to the movement of the support;
Constructing a separator between the joined formwork facing each other;
After the concrete inside the mold is cured, the process of removing the mold is repeated,
A method for continuously constructing a structure, in which concrete is successively placed inside the mold frame.
JP2000393609A 2000-12-25 2000-12-25 Formwork apparatus and structure continuous construction method Expired - Fee Related JP4319780B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000393609A JP4319780B2 (en) 2000-12-25 2000-12-25 Formwork apparatus and structure continuous construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000393609A JP4319780B2 (en) 2000-12-25 2000-12-25 Formwork apparatus and structure continuous construction method

Publications (2)

Publication Number Publication Date
JP2002194893A JP2002194893A (en) 2002-07-10
JP4319780B2 true JP4319780B2 (en) 2009-08-26

Family

ID=18859375

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000393609A Expired - Fee Related JP4319780B2 (en) 2000-12-25 2000-12-25 Formwork apparatus and structure continuous construction method

Country Status (1)

Country Link
JP (1) JP4319780B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100439610C (en) * 2004-07-23 2008-12-03 润弘精密工程事业股份有限公司 Form sealing construction method of building external wall
KR100862275B1 (en) 2007-06-20 2008-10-09 주식회사 근하기공 GS construction for high-rise building
KR101212463B1 (en) 2012-08-03 2012-12-14 (주)동남종합감리공단건축사사무소 Apparatus for fixing concrete mold
JP5832689B1 (en) * 2015-08-05 2015-12-16 鹿島建設株式会社 Method for manufacturing concrete structure, friction reducing member, and formwork structure for concrete structure
ITUB20154872A1 (en) 2015-10-27 2017-04-27 Despe S P A Climbing system and method for building construction
CN119392922A (en) * 2024-12-31 2025-02-07 河南正川建设工程有限公司 Auxiliary support device for steel formwork installation construction

Also Published As

Publication number Publication date
JP2002194893A (en) 2002-07-10

Similar Documents

Publication Publication Date Title
CN102713106A (en) Method and apparatus for strengthening and lightweighting floor and roof frames
EP1815087A1 (en) Concrete panel construction system and method of making panels
CN112031401A (en) Two-way adjustable automatic opening and closing formwork system for climbing formwork and using method thereof
JP4319780B2 (en) Formwork apparatus and structure continuous construction method
JPH0860618A (en) Suspension bridge saddle installation method and suspension bridge saddle device
CN111827671A (en) A kind of structural pull joint applied to aluminum formwork and its construction technology
JPH01105867A (en) Wall formwork supporter
CN217967597U (en) Adjustable device for preventing prefabricated wallboard subtracts heavy piece come-up
CN112144859A (en) Prefabricated laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure
CN111691657A (en) Anchoring bolt structure of cantilever scaffold and mounting method
CN216665082U (en) Leveling device for prefabricated floor slab
CN109537599B (en) Construction method of support replacing structure of deep foundation pit support system
CN210947771U (en) Electronic rail mounted hammering template system of vibrating
CN211596456U (en) Large-height large-cantilever concrete structure prefabricated construction support
CN224149149U (en) Leakage-proof structure of post-pouring strip of superimposed sheet
JPH11343734A (en) Construct method for concrete structure
CN218264930U (en) Assembly type laminated slab joint template mounting device
CN217175704U (en) Post-cast belt combination formwork
JP3860024B2 (en) Mobile formwork device
CN222976387U (en) Template-free wood board wood beam and concrete combined node
KR100347787B1 (en) Application of Continuous Preflex Composite Beams to Building Structures Using Load Loading
CN218374739U (en) Positioning device for ensuring accuracy of vertical prestress elevation
CN113089918A (en) Construction method for mounting abutted seam filler of prefabricated composite floor slab
CN121246030B (en) A method for constructing precast piers
CN222681290U (en) A prefabricated hanging plate support type steel frame positioning device for building exterior walls

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070906

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090519

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090529

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120605

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4319780

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120605

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150605

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees