JP4340525B2 - Fireproof coating structure for cable conduit in tunnel - Google Patents
Fireproof coating structure for cable conduit in tunnel Download PDFInfo
- Publication number
- JP4340525B2 JP4340525B2 JP2003413550A JP2003413550A JP4340525B2 JP 4340525 B2 JP4340525 B2 JP 4340525B2 JP 2003413550 A JP2003413550 A JP 2003413550A JP 2003413550 A JP2003413550 A JP 2003413550A JP 4340525 B2 JP4340525 B2 JP 4340525B2
- Authority
- JP
- Japan
- Prior art keywords
- cable
- tunnel
- coating material
- fireproof
- refractory
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Description
本発明は、トンネル内に電気・通信用ケーブルを付設するためにトンネル内壁に設置されるケーブル管路の耐火被覆構造に関するものである。 The present invention relates to a fire protection structure of a cable duct that will be installed in the tunnel inner wall to attached the electrical and communications cables in the tunnel.
通常、トンネル内には、ケーブル管路が設置されており、その内部に1本または複数本の電気・通信用ケーブルが付設されている。このケーブル管路は鋼製電線管または硬質塩化ビニル管等から構成されており、また、電気・通信用ケーブルは塩化ビニル等のプラスチック被覆材により被覆されたものが多用されている。トンネル内で火災等が発生すると、トンネル内という特殊な環境下であるが故に、熱の逃げ場がなく、ケーブル管路は短時間で高温(1200℃以上)に曝され、内部に付設された電気・通信用ケーブルの損傷、切断といった深刻なトラブルの原因となる恐れがある。そこで、火災による熱を遮断するために、セラミック系耐火板とロックウールより構成された保護ボックスが開発され、例えば、トンネルの内壁に付設されたケーブル管路を保護ボックスで囲み、火災による熱からケーブル管路を遮断することが試みられている。 Usually, a cable conduit is installed in the tunnel, and one or a plurality of electric / communication cables are attached inside the tunnel. The cable conduit is composed of a steel conduit tube or a hard polyvinyl chloride tube, and an electric / communication cable is often used which is covered with a plastic coating material such as vinyl chloride. When a fire, etc. occurs in a tunnel, there is no escape from heat because of the special environment of the tunnel, and the cable conduit is exposed to high temperatures (1200 ° C or higher) in a short time, and the electricity installed inside・ Severe troubles such as damage or disconnection of communication cable may occur. Therefore, in order to cut off the heat caused by the fire, a protective box composed of a ceramic fireproof plate and rock wool has been developed. For example, the cable conduit attached to the inner wall of the tunnel is surrounded by a protective box to prevent the heat from the fire. Attempts have been made to block cable conduits.
すなわち、特許文献1には、トンネルの内壁を利用して設けられた設備を耐火板構造の保護ボックスにより囲んでトンネル空間より遮断し、そのトンネル内での車両事故等による火災時に保護ボックス内に伝播した熱を、該保護ボックスの内面側に設けられたトンネルのコンクリート躯体側と接する金属板を通して、コンクリート躯体側へ逃がすことを特徴とするトンネル内の電気・通信ケーブル等の耐火保護方法が開示されている。 That is , Patent Document 1 discloses that a facility provided by using an inner wall of a tunnel is surrounded by a protective box having a fireproof plate structure and cut off from the tunnel space, and is placed in the protective box in the event of a fire in the tunnel due to a vehicle accident or the like. Disclosed is a fireproof protection method for electrical / communication cables and the like in a tunnel, wherein the propagated heat is released to the concrete housing side through a metal plate in contact with the concrete housing side of the tunnel provided on the inner surface side of the protection box Has been.
更に、特許文献2には、ケーブルを内蔵したケーブル保護管の外周に接合すると共にその内面及び外面の一方又は両方に蒸気の通過を阻止するための耐熱膜を有する第1断熱材層と、前記第1断熱材層の外周に形成され袋内に液又はゲル状物質よりなる水分を内蔵させてなる吸熱材と、前記吸熱材の外周に設けられた第2断熱材層とよりなり、屋外に設置して用いるようにしたことを特徴とする通信ケーブル保護管の屋外設置型耐火被覆構造が開示されている。 Furthermore, in Patent Document 2, a first heat insulating material layer having a heat-resistant film for joining the outer periphery of a cable protection tube containing a cable and preventing passage of steam on one or both of the inner surface and the outer surface, It consists of a heat-absorbing material formed on the outer periphery of the first heat-insulating material layer and containing moisture consisting of a liquid or a gel substance in the bag, and a second heat-insulating material layer provided on the outer periphery of the heat-absorbing material. An outdoor installation type fireproof covering structure for a communication cable protection tube characterized by being installed and used is disclosed.
また、特許文献3には、ダクト本体1の金属製函体の底部が底部耐火断熱被覆材により被覆され、同函体の側壁が側部耐火断熱被覆材により被覆されてなる耐火断熱被覆付金属製ダクトにおいて、底部耐火断熱被覆材と側部耐火断熱被覆材の隅の接合部分間に、難燃性材料により所定形状に成形されたスペーサーが挟着され、同スペーサーは前記接合部分間に挟着される挟着部の上面に連接され且つ前記側部耐火断熱被覆材の内面に沿って立ち上がる縦重合部が設けられたものであることを特徴とする耐火断熱被覆付金属製ダクトの耐火断熱被覆構造が開示されている。さらに、その特許文献3には、「底部耐火断熱被覆材4、側部耐火断熱被覆材6、上部耐火断熱被覆材16には、いずれも従来からの耐火断熱被覆材と同じ材料、即ち、ゾーノトライト系結晶、ワラストナイト系結晶、トベルモライト系結晶、或いはこれらの混合物を主体とし、必要に応じて粘土や繊維質物質等の補強材を含有させた、けい酸カルシウム系成形材等が使用される。」という記載もある。
Patent Document 3 discloses a metal with a refractory heat insulation coating in which the bottom of a metal box of the duct body 1 is covered with a bottom refractory heat insulating covering material, and the side wall of the box is covered with a side refractory heat insulating covering material. in manufacturing the duct, between the corners of the joint portion of the bottom insulating refractory coating material and the side insulating refractory coating material, a spacer over molded into a predetermined shape by a flame-retardant material is sandwiched, the spacer over the between the junction portion A metal duct with a refractory insulation coating, characterized in that a vertical polymerization portion is provided which is connected to the upper surface of the sandwiching portion sandwiched between the two sides and rises along the inner surface of the side portion refractory insulation coating. A fireproof insulation coating structure is disclosed. Further, the patent document 3 describes that “the bottom fireproof insulation coating material 4, the side fireproof
更に、特許文献4には、トンネル構造物の耐火被覆材として有用なケイ酸カルシウム材として、ケイ酸カルシウム水和物からなるマトリックスと繊維とを含有してなるケイ酸カルシウム材において、前記ケイ酸カルシウム水和物はトバモライトとゾノトライトとからなるとともに、前記ゾノトライトの(001)面のX線回折強度と前記トバモライトの(002)面のX線回折強度との比が、前者/後者として0.3〜5.0であり、前記ケイ酸カルシウム材は、前記繊維として20〜60質量%の範囲で針状ワラストナイトおよび1〜10質量%の範囲のセルロースパルプを含有することにより、1200℃における加熱残存収縮率が5%以下であることを特徴とするケイ酸カルシウム材が開示されている。 Furthermore, in Patent Document 4, as a calcium silicate material useful as a fireproof covering material for a tunnel structure, a calcium silicate material containing a matrix and a fiber made of calcium silicate hydrate, The calcium hydrate is composed of tobermorite and zonotrite, and the ratio of the X-ray diffraction intensity of the (001) plane of the zonotrite to the (002) plane of the tobermorite is 0.3 as the former / the latter. ˜5.0, and the calcium silicate material contains acicular wollastonite and cellulose pulp in the range of 1-10% by mass in the range of 20-60% by mass as the fiber at 1200 ° C. A calcium silicate material having a residual shrinkage ratio of 5% or less is disclosed.
また、特許文献5には、吸熱パックを使用した耐火被覆構造として、2枚のフィルム間に区画形成されたセルの中に水または水を含浸させたポリマー等の液体またはゲル状の物質等の吸熱材を封入し周囲をヒートシールして構成された吸熱パックと、無機繊維混合マット等の様な耐火断熱材とを、耐火被覆すべき電線管の周りに巻き付け、針金またはテープまたは金網にて固定し、必要に応じて金属板で被覆して成ることを特徴とする電線管の耐火被覆構造が開示されている。 Further, in Patent Document 5, as a fireproof coating structure using an endothermic pack, a liquid or gel-like substance such as water or a polymer impregnated with water in a cell partitioned between two films, etc. Wrap a heat-absorbing pack with a heat-absorbing material enclosed and heat-sealed around it, and a fire-resistant insulating material such as an inorganic fiber mixed mat around the wire tube to be fire-resistant coated, and use wire, tape, or wire mesh A fireproof covering structure for a conduit is disclosed which is fixed and covered with a metal plate as necessary.
更に、特許文献6には、管路の周囲に巻着して使用する被覆材料であって、上記被覆材料が、アルミクロス保護材、不燃材及び吸熱パックの三層積層体構造よりなる可撓性袋体状シートに形成してなることを特徴とする耐火被覆材料が開示されている。
Further,
また、本出願人らは、特願2003−283311号(特許第4066179号明細書)において、トンネル内に設置される、内部に1本または複数本のケーブルが付設されたケーブル管路またはケーブル管路の複数本集合体の耐火被覆構造において、トンネル内壁に取り付けられたケーブル管路またはケーブル管路の複数本集合体の外周に断熱マット材が当接して被覆され、断熱マット材の外周にはアルミ箔層が当接して被覆され、更に、その外側がトンネル内壁及び耐火被覆材によって取り囲まれることにより、ケーブル管路またはケーブル管路の複数本集合体がトンネル内の空間から遮蔽される構成を有し、断熱マット材の密度が24〜48kg/m3で、厚さが15〜50mmの範囲内にあり、耐火被覆材は、2枚のフィルム間に区画形成されたセルの中に水または水を含浸させたポリマーよりなる液体またはゲル状の物質よりなる吸熱材を封入し周囲をシールした構成を有し且つ4000〜5000g/m2の水分を有する吸熱パック層と、密度が0.8〜1.1g/cm3で、厚さが15〜50mmの範囲内にあるケイ酸カルシウム板層とから構成され、その吸熱パック層がアルミ箔層と空間を置くように設置されていることにより、RABT曲線に基づいて1200℃で30分の耐火試験を行なった時のケーブル管路の内部温度が85℃以下であることを特徴とするトンネル内ケーブル管路の耐火被覆構造を提案している。
In addition, in Japanese Patent Application No. 2003-283111 (Patent No. 4066179) , the applicants of the present invention are a cable conduit or cable pipe installed in a tunnel and having one or more cables attached inside. In a fireproof covering structure of a plurality of aggregates of roads, a heat insulating mat material is in contact with and coated on the outer periphery of a cable conduit attached to a tunnel inner wall or a plurality of aggregates of cable conduits. The aluminum foil layer is abutted and covered, and the outer side is surrounded by the tunnel inner wall and the fireproof coating material, so that the cable conduit or a plurality of cable conduit assemblies are shielded from the space in the tunnel. The insulation mat material has a density of 24 to 48 kg / m 3 and a thickness of 15 to 50 mm. The formed cell has a structure in which a heat absorbing material made of water or a polymer impregnated with water or a gel-like substance is enclosed and the periphery is sealed, and has a water content of 4000 to 5000 g / m 2. It is composed of an endothermic pack layer and a calcium silicate plate layer having a density of 0.8 to 1.1 g / cm 3 and a thickness of 15 to 50 mm, and the endothermic pack layer includes an aluminum foil layer and a space. by being installed to put the tunnel in a cable tube, wherein the internal temperature of the cable conduit when subjected to
ここで、シールドトンネル、沈埋トンネル等の最近のトンネル工法に伴うトンネル躯体の耐火試験における加熱条件としてRABT曲線が採用され、トンネル内に設置されるケーブル管路の耐火試験においても同一条件で行なうことが必要となっている。ケーブル管路に付設される電気・通信用ケーブル等に使用される被覆材の軟化温度は通常85℃程度であることから、上記トンネル躯体の耐火試験、すなわち、1200℃で60分の耐火試験における加熱条件下で、ケーブル管路の内部温度を85℃未満とする必要があるが、未だこの条件を満たすケーブル管路の耐火被覆構造が開発されていないのが現状である。 Here, the RABT curve is adopted as the heating condition in the fire resistance test of the tunnel frame accompanying the recent tunnel construction method such as shield tunnel, submerged tunnel, etc., and the same condition is also applied in the fire resistance test of the cable pipe installed in the tunnel Is required. Since the softening temperature of the covering material used for electric and communication cables attached to cable conduits is usually about 85 ° C, it is used for the fire resistance test of the above-mentioned tunnel body, that is, the fire resistance test at 1200 ° C for 60 minutes. in definitive heating conditions, but the internal temperature of the cable ducts must be less than 85 ° C., is still reality is fire protection structure of this condition full plus cable ducts is not developed.
従って、本発明の目的は、RABT曲線に基づき1200℃で60分の耐火試験を行なった時にケーブル管路の内部温度を85℃未満とすることができるトンネル内ケーブル管路の耐火被覆構造を提供することにある。
Accordingly, an object of the present invention, the tunnel in the cable duct fire protection structure of which the internal temperature of the cable ducts may be less than 85 ° C. when subjected to
即ち、本発明のトンネル内ケーブル管路の耐火被覆構造は、トンネル内壁に取り付けられる、内部に1本または複数本のケーブルが付設されたケーブル管路またはケーブル管路の複数本集合体の耐火被覆構造であって、ケーブル管路またはケーブル管路の複数本集合体の外周に、アルミ箔層を外周に当接して被覆した断熱マット材が当接して被覆され、その耐火被覆材の外側を第2耐火被覆材によってさらに取り囲まれ、且つ耐火被覆材および第2耐火被覆材とトンネル内壁の接触部位に、各耐火被覆材とトンネル内壁の間の隙間による耐火・断熱性能の低下を防止するための不陸調整材を設置することにより、ケーブル管路またはケーブル管路の複数本集合体がトンネル内の空間から遮断される構成を有するケーブル管路の耐火被覆構造において、前記断熱マット材はその密度が24〜48kg/m3で、厚さが15〜50mmの範囲内にあり、前記耐火被覆材は、密度が0.8〜1.1g/cm 3 で、厚さが15〜50mmの範囲内にあるケイ酸カルシウム板と、2枚のフィルム間に区画形成されたセルの中に水または水を含浸させたポリマーよりなる液体またはゲル状の物質よりなる吸熱材を封入して周囲をシールした、8000〜10000g/m2の水分を有する吸熱パック層とから構成され、その吸熱パック層が前記断熱マット材の外周のアルミ箔層と対面しかつ空間を設けるように設置され、前記第2耐火被覆材は、密度が0.8〜1.1g/cm3で、厚さが15〜50mmの範囲内にあるケイ酸カルシウム板から構成されることによって、RABT曲線に基づき1200℃で60分の耐火試験を行なった時のケーブル管路の内部温度が85℃未満であることを特徴とする。
In other words, fire protection structure of the tunnel in the cable duct of the present invention is attached to the tunnel wall, the refractory of the inner one or a plurality of cable ducts cable is attached or cable ducts plurality collection of a coating structure, the outer periphery of the plurality of assemblies of the cable conduit or cable conduit, insulating mat material in which contact with the coating on the outer periphery of the aluminum foil layer is coated in contact with, the outside of the refractory coating material further surrounded by a second refractory coating material, and the contact portion of the refractory coating material and a second fireproofing material and the tunnel inner wall, in order to prevent a decrease in fireproof heat insulating performance due to gaps between the refractory coating material and the tunnel inner wall by installing the uneven surface adjustment member of the fire protection structure of the cable conduit to have a configuration in which plural assemblies of the cable conduit or cable conduit is disconnected from the space in the tunnel There are, the density of the insulating mat material Waso is 24~48kg / m 3, there thickness in the range of 15 to 50 mm, the refractory coating material has a density in 0.8~1.1g / cm 3 , A calcium silicate plate having a thickness in the range of 15 to 50 mm, and a liquid or gel substance made of water or a polymer impregnated with water in a cell defined between two films. sealing the periphery to enclose the endothermic material is composed of an endothermic pack layer having a moisture 8000~10000g / m 2, a facing vital space endothermic pack layer and the insulating mat material aluminum foil layer of the outer circumference of is installed so as to provide said second refractory coating material has a density in 0.8~1.1g / cm 3, by Rukoto it consists of calcium silicate board having a thickness in the range of 15 to 50 mm, Based on RABT curve Internal temperature of the cable conduit when subjected to
また、本発明のケーブル管路の耐火被覆構造は、トンネル内壁に取り付けられる、内部に1本または複数本のケーブルが付設されたケーブル管路またはケーブル管路の複数本集合体の耐火被覆構造であって、ケーブル管路またはケーブル管路の複数本集合体の外周に、少なくとも片面にアルミ箔層を備えてなる断熱マット材が、そのアルミ箔層が片面の場合にはそのアルミ箔層が外周と接しないように当接して被覆され、その外側をトンネル内壁と耐火被覆材によって取り囲まれ、その耐火被覆材の外側が第2耐火被覆材によってさらに取り囲まれ、且つ耐火被覆材および第2耐火被覆材とトンネル内壁の接触部位に、各耐火被覆材とトンネル内壁の間の隙間による耐火・断熱性能の低下を防止するための不陸調整材を設置することにより、ケーブル管路またはケーブル管路の複数本集合体がトンネル内の空間から遮断される構成を有するケーブル管路の耐火被覆構造において、前記少なくとも片面にアルミ箔層を備える断熱マット材はその密度が24〜48kg/m3、厚さが15〜50mmの範囲内にあり、前記耐火被覆材は、密度が0.8〜1.1g/cm 3 で、厚さが15〜50mmの範囲内にあるケイ酸カルシウム板と、2枚のフィルム間に区画形成されたセルの中に水または水を含浸させたポリマーよりなる液体またはゲル状の物質よりなる吸熱材を封入して周囲をシールした、8000〜10000g/m2の水分を有する吸熱パック層とから構成され、その吸熱パック層が前記断熱マット材のアルミ箔層と対面しかつ空間を設けるように設置され、前記第2耐火被覆材は、密度が0.8〜1.1g/cm3で厚さが15〜50mmの範囲内にあるケイ酸カルシウム板から構成されることによって、RABT曲線に基づき1200℃で60分の耐火試験を行なった時のケーブル管路の内部温度が85℃未満であることを特徴とするものである。 Moreover, fire protection structure of the cable conduit of the present invention is attached to the tunnel wall, fire protection structure of a plurality of assemblies of one or a plurality of cable ducts cable is attached or cable ducts inside And a heat insulating mat member comprising an aluminum foil layer on at least one surface on the outer periphery of a cable conduit or a plurality of cable conduit assemblies, and if the aluminum foil layer is a single surface, the aluminum foil layer coated in contact so as not to be in contact with the outer peripheral person, the outer surrounded by the tunnel inner wall and the refractory coating material, outside of the refractory coating material is further surrounded by a second refractory coating material, and fireproofing material and a second refractory the contact portion of the dressing and the tunnel inner wall, by placing the uneven surface adjustment member for preventing a gap reduction of fireproof heat insulating performance due between each fireproofing material and the tunnel inner wall, In fire protection structure of a cable conduit plural assemblies of Buru conduit or cable conduit to have a structure that is cut off from the space in the tunnel, the density of the insulating mat material Waso comprising at least one surface of the aluminum foil layer There 24~48kg / m 3, there thickness in the range of 15 to 50 mm, the refractory coating material has a density in 0.8~1.1g / cm 3, a thickness within the range of 15 to 50 mm A calcium silicate plate and a heat absorbing material made of a liquid or gel substance made of water or a polymer impregnated with water were sealed in a cell defined between two films, and the periphery was sealed . is composed of a heat-absorbing pack layer having a moisture 8000~10000g / m 2, the heat absorbing pack layer is placed so that provided facing vital space and the aluminum foil layer of the heat insulating mat member, said second resistance Dressing by Rukoto density thickness in 0.8~1.1g / cm 3 is composed of calcium silicate board which is within the range of 15 to 50 mm, 60 minutes based-out 1200 ° C. to RABT curve internal temperature of the cable conduit when subjected to fire test is characterized in that less than 85 ° C..
更に、本発明のトンネル内ケーブル管路の耐火被覆構造は、その吸熱パック層とこれに対面するアルミ箔層との間には、発生する水蒸気のための空間が設けられていることを特徴とするものである。 Moreover, fire protection structure of the tunnel in the cable duct of the invention, between the aluminum foil layer facing thereto and endothermic pack layer, and characterized in that the space for the steam generated is provided it is intended to.
また、本発明のトンネル内ケーブル管路の耐火被覆構造は、ケイ酸カルシウム板が、マトリックスがトバモライトとゾノトライトとからなり、繊維として20〜60質量%の針状ワラストナイト及び1〜10質量%のセルロースパルプを含有するものであることを特徴とするものである。 Moreover, the fireproof covering structure of the cable conduit in the tunnel according to the present invention is such that the calcium silicate plate is composed of tobermorite and zonotlite, and the fiber is 20 to 60% by mass of acicular wollastonite and 1 to 10% by mass. It contains the cellulose pulp of this .
更に、本発明のトンネル内ケーブル管路の耐火被覆構造は、耐火被覆材と第2耐火被覆材の間に所定の間隔でスペーサーが設置されていることを特徴とするものである。 Moreover, fire protection structure of the tunnel in the cable duct of the present invention is characterized in that the spacer is installed at a predetermined interval between the refractory coating material and the second refractory coating material.
また、本発明のトンネル内ケーブル管路の耐火被覆構造は、スペーサーが、抄造石膏板またはケイ酸カルシウム板より構成されることを特徴とするものである。 Moreover, fire protection structure of the tunnel in the cable duct of the invention, the spacer is characterized in being composed of papermaking gypsum board or calcium silicate board.
また、本発明のトンネル内ケーブル管路の耐火被覆構造は、不陸調整材がセラミックウール製マット材またはケイ酸カルシウム板とセラミックウール製ブランケットとの積層体から構成されることを特徴とするものである。 Moreover, fire protection structure of the tunnel in the cable duct of the invention, which is characterized in that uneven surface adjustment member is constructed from a laminate of a ceramic wool mat material or calcium silicate board and ceramic wool blankets It is .
本発明のトンネル内ケーブル管路の耐火被覆構造によれば、既存の耐火被覆構造に比してトンネル内に占める体積が小さくても、トンネル内で火災発生時に、ケーブル管路内に付設された電気・通信用ケーブルを損傷することがない良好な耐火・断熱性能、すなわち、RABT曲線に基づき1200℃で60分の耐火試験を行なった時のケーブル管路の内部温度が85℃未満であるという効果を奏するものである。 According to the fireproof covering structure of the cable conduit in the tunnel of the present invention, even if the volume occupying the tunnel is small compared to the existing fireproof covering structure, it is attached in the cable conduit when a fire occurs in the tunnel. Good fire resistance and heat insulation performance without damaging electrical / communication cables , that is, the internal temperature of the cable line is less than 85 ° C when a fire resistance test is performed at 1200 ° C for 60 minutes based on the RABT curve. There is an effect.
本発明のトンネル内ケーブル管路の耐火被覆構造は、まず、ケーブル管路またはケーブル管路の複数本集合体(以下、単に「ケーブル管路等)と記載する)の外周に、断熱マット材を当接して被覆し、その外側にアルミ箔層を当接して被覆し、その外側に吸熱パック層とケイ酸カルシウム板とから構成された耐火被覆材を吸熱パック層がアルミ箔層と対面するように設置して、トンネル内壁及び耐火被覆材でケーブル管路等を取り囲み、更に、その外側に、所定の間隔を開けて第2耐火被覆材を設置して、第2耐火被覆材とトンネル内壁でケーブル管路等を取り囲み、且つ耐火被覆材とトンネル内壁の接触部位並びに第2耐火被覆材とトンネル内壁の接触部位に不陸調整材を設置することにより、ケーブル管路等とトンネル内の空間とを遮断している。 The fireproof covering structure for a cable conduit in a tunnel according to the present invention first comprises a heat insulating mat material on the outer periphery of a cable conduit or a plurality of cable conduit assemblies (hereinafter simply referred to as “cable conduit etc.”). Aluminium foil layer is abutted and coated on the outside, and a heat-resistant covering material composed of a heat absorbing pack layer and a calcium silicate plate is arranged on the outside so that the heat absorbing pack layer faces the aluminum foil layer. The cable is surrounded by a tunnel inner wall and a fireproof coating material, and a second fireproof coating material is installed on the outside of the tunnel with a predetermined interval between the second fireproof coating material and the tunnel inner wall. Surrounding the cable pipeline, etc., and installing a non-land adjuster at the contact site between the fireproof coating and the tunnel inner wall and the contact site between the second fireproof coating and the tunnel inner wall, the cable pipeline and the space in the tunnel the cut-off To have.
本発明のトンネル内ケーブル管路の耐火被覆構造において、トンネル内壁に取り付けられるケーブル管路は、例えば鋼製電線管(JIS C8305)、硬質塩化ビニル管(JIS K6741)またはFRP(繊維補強プラスチック)管等を用いることができる。また、ケーブル管路等に付設される電気・通信用ケーブルは特に限定されるものではなく、公知・慣用のケーブルを用いることができる。なお、ケーブル管路に付設される電気・通信用ケーブルの本数は特に限定されるものではなく、1本であっても複数本であっても良い。また、ケーブル管路の複数本集合体の構成もまた特に限定されるものではなく、複数本のケーブル管路の集合体の構成でもよい。 In the fireproof coating structure of the cable conduit in the tunnel of the present invention, the cable conduit attached to the inner wall of the tunnel is, for example, a steel conduit (JIS C8305), a hard vinyl chloride tube (JIS K6741), or an FRP (fiber reinforced plastic) tube. Etc. can be used. Further, the electric / communication cable attached to the cable conduit or the like is not particularly limited, and a known / conventional cable can be used. The number of electrical / communication cables attached to the cable conduit is not particularly limited, and may be one or plural. Further, the configuration of the plurality of cable conduits is not particularly limited , and may be a configuration of a plurality of cable conduits.
上述のような構成を有するケーブル管路等の外周には、断熱マット材を当接して被覆し、更に、その外周にはアルミ箔層を当接して被覆する。ここで、アルミ箔層は、熱により後述する吸熱パックが破損して内部の水分が水蒸気となりケーブル管路等に直接接触することを防止するための作用をするものであり、そのためアルミ箔層が断熱マット材の少なくとも外周面に配置されていることが肝要である。アルミ箔層が断熱マット材の内周面、即ち、ケーブル管路等に接する面のみに配置されていると、水蒸気温度がアルミ箔層からケーブル管路等に直接伝播し、ケーブル管路等の内部温度の上昇に繋がるために好ましくない。なお、断熱マットの密度は24〜48kg/m3、好ましくは30〜40kg/m3の範囲内である。ここで、該密度が24kg/m3未満であると、ケーブル管路等に被覆する際に不均一となることがあるために好ましくなく、また、該密度が48kg/m3を超えると、柔軟性が低下して被覆作業がし難くなると共に、被覆する際に不均一となることがあるために好ましくない。また、断熱マットの厚さは15〜50mm、好ましくは20〜40mm、最適には25〜30mmの範囲内である。断熱マットの厚さが15mm未満であると、熱を受ける際にケーブル管路等の内部温度が上昇し易くなるために好ましくなく、また、断熱マットの厚さが50mmを超えると、トンネル内の空間中に占める耐火被覆構造の体積が大きくなり過ぎるために好ましくない。なお、断熱マットの材質は断熱性を有すると共に、柔軟性を有し、巻付施工可能であれば特に限定されるものではなく、例えば、グラスウール、ロックウール、セラミックウール等のマットやフェルトを用いることができ、価格及び施工性の点からグラスウールが特に好ましい。また、アルミ箔層の厚さは、4〜20μm、好ましくは5〜15μmの範囲内である。ここで、アルミ箔層の厚さが4μm未満であると、施工時に破損し易くなるために好ましくなく、また、アルミ箔層の厚さが20μmを超えると、それに伴ってコストの上昇を招くが、それに見合う耐火性能の向上が得られないために好ましくない。 The outer periphery of the cable conduit or the like having the above-described configuration is covered with a heat insulating mat material, and the outer periphery thereof is covered with an aluminum foil layer. Here, the aluminum foil layer, which interior moisture endothermic pack to be described later by heat is corrupt acts to prevent direct contact with the cable conduit becomes steam, etc., therefore the aluminum foil layer it is is important, which is disposed on the outer peripheral surface also reduce the insulating mat material. If the aluminum foil layer is disposed only on the inner peripheral surface of the heat insulating mat material, that is, the surface in contact with the cable conduit, the water vapor temperature directly propagates from the aluminum foil layer to the cable conduit, etc. This is not preferable because it leads to an increase in internal temperature. The density of the heat insulating mat is in the range of 24 to 48 kg / m 3 , preferably 30 to 40 kg / m 3 . Here, when the density is less than 24 kg / m 3, it is not preferable because it may become non-uniform when covering a cable pipe or the like, and when the density exceeds 48 kg / m 3 , This is not preferable because the coating property is lowered and the coating operation is difficult to perform, and the coating may become non-uniform. The thickness of the heat insulating mat is 15 to 50 mm, preferably 20 to 40 mm, and most preferably 25 to 30 mm. If the thickness of the heat insulating mat is less than 15 mm, it is not preferable because the internal temperature of the cable conduit and the like tends to rise when receiving heat, and if the thickness of the heat insulating mat exceeds 50 mm, This is not preferable because the volume of the fireproof covering structure in the space becomes too large. The material of the heat insulating mat is not particularly limited as long as it has heat insulating properties and flexibility and can be wound, and for example , glass wool, rock wool, ceramic wool or the like mat or felt is used. Glass wool is particularly preferable from the viewpoints of price and workability. The thickness of the aluminum foil layer is 4 to 20 μm, preferably 5 to 15 μm. Here, if the thickness of the aluminum foil layer is less than 4 μm, it is not preferable because the aluminum foil layer easily breaks during construction, and if the thickness of the aluminum foil layer exceeds 20 μm, the cost increases accordingly. It is not preferable because an improvement in fire resistance corresponding to that cannot be obtained.
なお、本発明のトンネル内ケーブル管路の耐火被覆構造においては、ケーブル管路等の外周に、断熱マット材を当接して被覆し、更に、その外周にアルミ箔層を当接して被覆する構成とする代わりに少なくとも片面にアルミ箔層を有する断熱マット材をケーブル管路等の外周に当接して被覆することができる。この場合、片面にアルミ箔層を備える断熱マット材にあっては、そのアルミ箔層がケーブル管路等の外周と接しないように被覆することが肝要である。 In the fireproof covering structure of the cable conduit in the tunnel according to the present invention, the outer periphery of the cable conduit or the like is covered with a heat-insulating mat material, and the outer periphery is further covered with an aluminum foil layer. Instead of this, a heat insulating mat member having an aluminum foil layer on at least one surface can be applied to the outer periphery of a cable conduit or the like. In this case, in the insulating mat material comprising an aluminum foil layer on one side, it is important that the aluminum foil layer is covered so as not to be in contact with the outer periphery of the cable ducts and the like.
上述のような外周にアルミ箔層を当接して被覆した断熱マット材及びまたは少なくとも片面にアルミ箔層を備える断熱マット材で被覆されたケーブル管路等がトンネル内壁に取り付けられる。取り付け方法は特に限定されるものではなく、例えばトンネル内壁に設置された取り付け具によりトンネル上部から吊り下げたり、取り付け具により固定するなどの種々の方法を採用することができる。 A heat insulating mat material coated with an aluminum foil layer in contact with the outer periphery as described above and / or a cable conduit coated with a heat insulating mat material having an aluminum foil layer on at least one surface is attached to the inner wall of the tunnel. The attachment method is not particularly limited, and various methods such as hanging from the upper part of the tunnel with an attachment installed on the inner wall of the tunnel or fixing with an attachment can be employed.
次に、トンネル内壁に取り付けられた断熱マット材で被覆されたケーブル管路等を取り囲むように耐火被覆材を設置してケーブル管路等をトンネル内の空間から遮断する。ここで、本発明のトンネル内ケーブル管路の耐火被覆構造に使用される耐火被覆材は、吸熱パック層及びケイ酸カルシウム板よりなる2層構造を有する。吸熱パック層は、2枚のフィルム間に区画形成されたセルの中に水または水を含浸させたポリマーよりなる液体またはゲル状の物質よりなる吸熱材を封入し周囲をヒートシール等の方法によりシールした構成を有するものである。例えば、吸熱パック層は、2枚のナイロンフィルムやポリエチレンフィルム等のような合成樹脂フィルムの間にアルミ箔をサンドイッチ構造に挟持してなるフィルム2枚の間に区画形成されたセルの中に水または水を含浸させたポリマー等の液体またはゲル状物質等の吸熱材を封入し、周囲をヒートシールしたもので、例えば5〜10cm四方のパック、即ち、セルが連続的に設置されたシート状のものであることができる。なお、吸熱パック層は、8000〜10000g/m2、好ましくは8600〜9400g/m2の水分を有する。吸熱パック層の水分量が8000g/m2未満では、本発明のトンネル内ケーブル管路の耐火被覆構造にRABT曲線に基づく1200℃での60分の耐火試験でケーブル管路の内部温度が85℃を超えることがあるために好ましくなく、また、吸熱パック層の水分量が10000g/m2を超えると、吸熱パック層の厚さが厚くなり過ぎ、それに伴ってトンネル内の空間中に占める耐火被覆構造の体積が大きくなるために好ましくない。なお、吸熱パック層は、30gの水分を封入したセルを1m2当たり150個(4500g/m2)厚さ4.5mmのものを二重にして使用することが最適である。 Next, a fireproof covering material is installed so as to surround the cable conduit covered with the heat insulating mat member attached to the inner wall of the tunnel, thereby blocking the cable conduit from the space in the tunnel. Here, the fireproof covering material used for the fireproof covering structure of the cable conduit in the tunnel of the present invention has a two-layer structure including an endothermic pack layer and a calcium silicate plate. The endothermic pack layer encloses an endothermic material made of a liquid or gel-like substance made of water or a polymer impregnated with water in a cell defined between two films, and the periphery is sealed by a method such as heat sealing. It has a sealed configuration. For example, the endothermic pack layer is water in a cell that is partitioned between two films formed by sandwiching an aluminum foil in a sandwich structure between two synthetic resin films such as nylon film and polyethylene film. Alternatively, a liquid such as a polymer impregnated with water or an endothermic material such as a gel-like substance is enclosed, and the surroundings are heat-sealed, for example, a 5 to 10 cm square pack, that is, a sheet in which cells are continuously installed Can be. The endothermic pack layer has a water content of 8000 to 10000 g / m 2 , preferably 8600 to 9400 g / m 2 . When the moisture content of the endothermic pack layer is less than 8000 g / m 2 , the internal temperature of the cable pipe line is 85 ° C. in the fireproof coating structure at 1200 ° C. based on the RABT curve in the fireproof coating structure of the cable pipe in the tunnel of the present invention. And if the water content of the endothermic pack layer exceeds 10,000 g / m 2 , the thickness of the endothermic pack layer becomes too thick, and the fireproof coating occupies the space in the tunnel accordingly. This is not preferable because the volume of the structure becomes large. Incidentally, the endothermic pack layer is optimally used in a cell enclosing the moisture 30 g 0.99 per 1 m 2 things (4500g / m 2) thickness 4.5mm double.
また、耐火被覆材を構成するケイ酸カルシウム板の密度は、0.8〜1.1g/cm3で、好ましくは0.9〜1.05g/cm3の範囲内にある。ここで、密度が0.8g/cm3未満であると、破損し易くなるために好ましくなく、また、密度が1.1g/cm3を超えると、断熱性能が低下するために好ましくない。更に、ケイ酸カルシウム板の厚さは、15〜50mm、好ましくは20〜40mm、最適には25〜30mmの範囲内である。ここで、厚さが15mm未満であると、耐火性能が低下するために好ましくなく、また、厚さが50mmを超えると、トンネル内の空間中に占める耐火被覆構造の体積が大きくなるために好ましくない。なお、ケイ酸カルシウム板は特に限定されるものではないが、例えば特許文献4に記載されているようなマトリックスがトバモライトとゾノトライトとからなり、繊維として20〜60質量%の針状ワラストナイト及び1〜10質量%のセルロースパルプを含有するケイ酸カルシウム板を好適に使用することができる。 The density of the calcium silicate plate constituting the refractory coating material is a 0.8~1.1g / cm 3, preferably in the range of 0.9~1.05g / cm 3. Here, when the density is less than 0.8 g / cm 3, it is not preferable because it is easily damaged, and when the density exceeds 1.1 g / cm 3 , the heat insulation performance is deteriorated, which is not preferable. Furthermore, the thickness of the calcium silicate plate is in the range of 15-50 mm, preferably 20-40 mm, optimally 25-30 mm. Here, when the thickness is less than 15 mm, it is not preferable because fire resistance performance is lowered, and when the thickness exceeds 50 mm, it is preferable because the volume of the fireproof coating structure in the space in the tunnel becomes large. Absent. Although the calcium silicate plate is not particularly limited, for example, a matrix as described in Patent Document 4 is composed of tobermorite and zonotolite, and 20 to 60% by mass of acicular wollastonite and fibers are used. A calcium silicate plate containing 1 to 10% by mass of cellulose pulp can be suitably used.
なお、吸熱パック層とケイ酸カルシウム板の積層方法は特に限定されるものではなく、例えば、接着することにより積層したり、タッカーを用いてケイ酸カルシウム板に吸熱パック層のシール部分を取り付けることにより積層することができる。 In addition, the lamination | stacking method of an endothermic pack layer and a calcium silicate board is not specifically limited, For example, it laminates | stacks by adhere | attaching or attaches the seal part of an endothermic pack layer to a calcium silicate board using a tucker. Can be laminated.
上述のような構成を有する耐火被覆材は、その吸熱パック層がトンネル内壁に取り付けられたケーブル管路等を被覆する断熱マット材と対面し、且つトンネル内壁及び耐火被覆材で囲まれる区域がトンネル内の空間から遮断されるようにトンネル内壁に設置される。 なお、耐火被覆材を設置する方法は特に限定されるものではなく、トンネル内壁に不陸調整材を設置し、この不陸調整材に耐火被覆材を取り付けることもできる。また、不陸調整材と耐火被覆材の継ぎ目や耐火被覆材同志の継ぎ目は、耐火・断熱性を有するシーリング剤例えばシリコーンシーリング剤を用いてシールすることができる。更に、長さ方向の継ぎ目部分は、継ぎ目部分にセラミック製または鋼製下地を設置して耐火被覆材を取り付け、継ぎ目部分は上記と同様にシーリング剤を用いてシールすることにより施工することができる。 Fireproofing material having the above-described configuration is to face the insulating mat material endothermic pack layer covers the attached cable ducts or the like to the tunnel inner wall, is and tunnel inner wall and areas Ru surrounded by fireproof coating materials It is installed on the inner wall of the tunnel so as to be cut off from the space in the tunnel. A method of installing a refractory coating material is not particularly limited, established the Furiku adjusting material to the tunnel inner wall, it is also possible to attach the fireproof coating materials to the uneven surface adjustment member. The seams of the seam and fireproofing material comrades uneven surface adjustment member and the refractory coating material can be sealed using a sealing agent such as silicone sealants have a fireproof thermal insulation. Furthermore, the seam portion in the length direction can be constructed by installing a ceramic or steel base on the seam portion and attaching a fireproof coating, and sealing the seam portion using a sealing agent in the same manner as described above. .
ここで、トンネル内壁に設置される不陸調整材は、トンネル内壁の歪み等に起因して生ずることがある耐火被覆材や後述の第2耐火被覆材とトンネル内壁の間の隙間による耐火・断熱性能の低下を防止するものであり、例えばセラミックウール製マット材やケイ酸カルシウム板とセラミックウール製ブランケットとの積層体等から構成されるものである。そして、不陸調整材のトンネル内壁への設置方法は特に限定されるものではなく、例えば耐火被覆材及び第2ケイ酸カルシウム板をトンネル内壁に設置する際に、それらとトンネル内壁との間に挟んで取り付けたり、トンネル内ケーブル管路の耐火被覆構造の長さ方向に、帯状の不陸調整材をトンネル内壁の壁面に打ち込んだコンクリートアンカーとボルトとによって該壁面に固定することにより設置することができる。そして、不陸調整材に対して内側に耐火被覆材を設置し、その外側に後述の第2耐火被覆材を設置する。 Here, the unevenness adjusting material installed on the inner wall of the tunnel is a fireproof / heat insulation due to a gap between the inner wall of the tunnel and the fireproof coating material that may be caused by the distortion of the tunnel inner wall or the second fireproof coating material described later. It is intended to prevent a decrease in performance, and is composed of, for example, a ceramic wool mat or a laminate of a calcium silicate plate and a ceramic wool blanket. And the installation method to the inner wall of a tunnel is not specifically limited, For example, when installing a fireproof covering material and a 2nd calcium-silicate board in a tunnel inner wall, between them and an inner wall of a tunnel. Install by sandwiching or fixing the belt-like unevenness adjusting material to the wall surface of the tunnel inner wall with concrete anchors and bolts in the length direction of the fireproof coating structure of the cable conduit in the tunnel Can do. Then, the fireproofing material is disposed inwardly relative uneven surface adjustment member, installing a second refractory coating material described later to the outside.
また、耐火被覆材をトンネル内壁に設置するに際して、ケーブル管路等の外周に、その外周にアルミ箔層が被覆された断熱マット材または少なくとも片面にアルミ箔層を有する断熱マット材と、耐火被覆材の吸熱パック層とが接することなく、ある程度の間隔、例えば5mm以上の空間を有するように耐火被覆材を取り付けることがよい。ここで、間隔をあける、即ち、空間を設けることにより、熱により吸熱パック層が破損して空間内で発生する水蒸気によりケーブル管路等の温度上昇を抑制する効果をより一層高めることができる。なお、間隔が150mmを上回ると、トンネル内の空間に占める耐火被覆構造の容積が増加するために好ましくない。 In addition, when installing the fireproof covering material on the inner wall of the tunnel , the outer periphery of the cable pipe or the like, the heat insulating mat material coated with an aluminum foil layer on the outer periphery, or the heat insulating mat material having an aluminum foil layer on at least one side, and the fireproof covering without in contact with the endothermic pack layer of wood, certain intervals, for example, may be attached to the refractory coating material so as to have a space on 5mm or more. Here, by providing a space, that is, by providing a space, it is possible to further enhance the effect of suppressing the temperature rise of the cable pipe line or the like due to water vapor generated in the space due to breakage of the heat absorption pack layer. Note that if the distance exceeds 150 mm, the volume of the fireproof covering structure occupying the space in the tunnel increases, which is not preferable.
本発明のトンネル内耐火被覆構造においては、耐火被覆材の外側に、その耐火被覆材と所定の間隔を開けて第2ケイ酸カルシウム板層を設置し、トンネル内壁と第2耐火被覆材で囲まれた区域がトンネル内の空間から遮断される。なお、第2耐火被覆材は、ケイ酸カルシウム板から構成され、その密度や厚さ等は、耐火被覆材のケイ酸カルシウム板を構成する上記ケイ酸カルシウム板に準ずるものである。また、第2耐火被覆材を設置する方法は特に限定されるものではなく、例えばトンネル内壁に不陸調整材を設置し、この不陸調整材に第2耐火被覆材を取り付けることができる。なお、不陸調整材は、上述の耐火被覆材を取り付けるための不陸調整材と共用されることができる。また、不陸調整材と第2耐火被覆材の継ぎ目や耐火被覆材同志の継ぎ目は、耐火・断熱性を有するシーリング剤例えばシリコーンシーリング剤を用いてシールすることもできる。更に、長さ方向の継ぎ目部分は、継ぎ目部分にセラミック製または鋼製下地を設置して耐火被覆材を取り付け、継ぎ目部分は上記と同様にシーリング剤を用いてシールすることにより施工することができる。 In the fireproof coating structure in the tunnel of the present invention, the second calcium silicate plate layer is installed outside the fireproof coating material at a predetermined interval from the fireproof coating material, and is surrounded by the tunnel inner wall and the second fireproof coating material. the zone Ru is isolated from the space in the tunnel. The second refractory coating material is composed of a calcium silicate plate, and its density, thickness, and the like are similar to those of the calcium silicate plate constituting the calcium silicate plate of the fireproof coating material. Moreover, the method of installing the second fireproof coating material is not particularly limited. For example, a non-land adjustment material can be installed on the inner wall of the tunnel, and the second fireproof coating material can be attached to the non-land adjustment material. In addition, the unevenness adjusting material can be shared with the unevenness adjusting material for attaching the above-mentioned fireproof covering material. Further, the joint between the unevenness adjusting material and the second fireproof coating material or the joint between the fireproof coating materials can be sealed using a sealing agent having fire resistance and heat insulation, for example, a silicone sealing agent. Furthermore, the seam portion in the length direction can be constructed by installing a ceramic or steel base on the seam portion and attaching a fireproof coating, and sealing the seam portion using a sealing agent in the same manner as described above. .
なお、前記耐火被覆材と第2耐火被覆材とは、所定の間隔をあけて設置する場合には、この間隔は、少なくとも4mm、好ましくは4〜10mm、最適には4〜5mm程度である。この間隔、即ち、空間を設けることにより、本発明のトンネル内ケーブル管路の耐火断熱構造における耐火・断熱性能を飛躍的に向上させることができる。なお、前記耐火被覆材と第2耐火被覆材の間の空間を確実に確保するために、耐火被覆材と第2耐火被覆材の間に、空間の間隔に相当する厚さの無機質成形体、例えば抄造石膏板またはケイ酸カルシウム板等よりなる帯状板をスペーサーとしてトンネル内ケーブル管路の耐火被覆構造の長さ方向に沿って所定の間隔で設置することができる。 In addition, when installing the said fireproof coating material and the 2nd fireproof coating material at predetermined intervals, this space | interval is at least 4 mm, Preferably it is about 4-10 mm, The optimal is about 4-5 mm. By providing this space, that is, a space, it is possible to dramatically improve the fire resistance and heat insulation performance in the fire resistant heat insulation structure of the cable conduit in the tunnel of the present invention. In addition, in order to ensure a space between the fireproof coating material and the second fireproof coating material, between the fireproof coating material and the second fireproof coating material, an inorganic molded body having a thickness corresponding to the space interval, for example it is possible to a strip-shaped plate made of a paper-making gypsum board or calcium silicate board or the like along the length of the refractory coating structure of a tunnel in the cable conduit as spacers placed at a predetermined interval.
上述のような構成を有する本発明のトンネル内ケーブル管路の耐火被覆構造によれば、ドイツ連邦交通省道路建設局の「道路トンネルの設備と運用に関する指針(RABT)」に定められた時間−温度曲線「RABT曲線:図2]に基づいて1200℃で60分の耐火試験を行なった時に、ケーブル管路等の内部温度を85℃未満に抑えることができる。 According to the fireproof covering structure of the cable conduit in the tunnel of the present invention having the above-described configuration, the time specified in the “Guideline for Road Tunnel Equipment and Operation (RABT)” of the Road Construction Bureau of the German Federal Ministry of Transport— When a fire resistance test is performed at 1200 ° C. for 60 minutes based on the temperature curve “RABT curve: FIG. 2”, the internal temperature of the cable conduit or the like can be suppressed to less than 85 ° C.
本発明の1実施態様を図1に示されたトンネル内ケーブル管路の耐火被覆構造について説明する。トンネル内壁の代替として長さ1820mm、幅600mm、厚さ100mmのALC板(1)を用い、その長さ方向の下面側に8本のFRP製管路(2a〜2h)を吊り下げ金具(図示せず)により取り付けた。なお、FRP製ケーブル管路(2a)(2b)(2g)(2h)には、光ケーブル(被覆材:塩化ビニル)(3)を、FRP製ケーブル管路(2c)(2d)(2e)(2f)には、電線ケーブル(被覆材:塩化ビニル)(4)をそれぞれ付設した。
次に、8本のFRP製ケーブル管路(2a〜2h)を集合体とし、その外周に片面にアルミ箔層(アルミ箔厚:7μm)(6)を備えたグラスウール(グラスウール密度:32kg/m3、厚さ:25mm)(5)を断熱マット材として、アルミ箔層(6)がFRP製ケーブル管路(2a〜2h)と接しないように当接した被覆した。
次に、ALC板(1)に厚さ50mm、幅60mmのセラミックウール製マット材よりなる不陸調整材(9)を長さ方向に沿って設置し、不陸調整材(9)の下面内側に、アルミ箔層(6)を備えた断熱マット材であるグラスウール(5)が被覆されたFRP製ケーブル管路(2a〜2h)の側面及び下面を取り囲むように吸熱パック層(7)とケイ酸カルシウム板(8)よりなる耐火被覆材を、その吸熱パック層(7)がアルミ箔層(6)と対面しかつ空間を設けるように設置した。
なお、吸熱パック層(7)は、2枚のナイロンフィルムの間にアルミ箔をサンドイッチ構造に挟持してなるフィルム2枚の間に区画形成されたセルの中に30gの水を封入して周囲をヒートシールしたセルを1m2当たり150個(4500g/m2)有するもので、厚さ4.5cmのものを二重にして使用した。
また、ケイ酸カルシウム板(8)は、石灰質原料として消石灰を用い、ケイ酸質原料として非晶質ケイ酸としてのAl2O3含量0.5質量%及びSiO2含量98質量%のフェロシリコンダストと、結晶質ケイ酸としてのAl2O3含量1質量%、SiO2含量98質量%及びブレーン値3000cm2/gの粉末珪石とを用い、繊維原料として平均繊維長さ約100μm、アスペクト比約10の針状ワラストナイトと、CSF200mlの叩解セルロースパルプとを用い、CaO/SiO2質量比1.05、非晶質ケイ酸/結晶質ケイ酸質量比0.18、消石灰43.7質量%、フェロシリコンダスト5質量%、粉末珪石28.3質量%、針状ワラストナイト20質量%、叩解セルロースパルプ3質量%の配合を有する原料スラリーを調製し、90℃で2時間加熱養生し、続いて4MPaの圧力で加圧脱水成形してケーキを形成し、得られたケーキを195℃で、10時間オートクレーブ養生して得た密度1.0、厚さ25mmのものである。なお、得られたケイ酸カルシウム板のゾノトライト(001)面/トバモライト(002)面のX線回折強度の比は1.1であった。
耐火被覆材は、上記構成の吸熱パック層(7)のシール部分をケイ酸カルシウム板(8)にタッカーにより取り付けることにより積層されたものであった。
また、不陸調整材(9)と耐火被覆材の継ぎ目並びに耐火被覆材同志の継ぎ目は、シリコーンシーリング剤を用いてシールした。
次に、不陸調整材(9)の下面には、耐火被覆材の外側を取り囲むように、耐火被覆材との間に所定間隔で設置した長さ方向に幅30mm、厚さ4mmの抄造石膏板よりなるスペーサー(11)を介して第2耐火被覆材(10)を設置した。なお、図1に示す実施態様では、耐火被覆材の下面板を横方向に延長して位置(A)で第2耐火被覆材(10)と接触する構成としている。この構成とすることにより、第2耐火被覆材(10)の継ぎ目部分から万一火炎等が耐火被覆構造内に侵入しても、内部への火炎の更なる侵入を阻止することができる。なお、セラミック製下地材からなる不陸調整材(9)と耐火被覆材の継ぎ目並びに耐火被覆材同志の継ぎ目は、シリコーンシーリング剤を用いてシールした。また、第2耐火被覆材(10)としては、ケイ酸カルシウム板を用い、その材質及び厚さは、上記耐火被覆材のケイ酸カルシウム板(8)と同様である。
最後に、長さ方向に所定の間隔で取付金具(13)を用いて、ALC板(1)に第2耐火被覆材(10)を固定した。なお、この実施態様においては、取付金具(13)の内側には、厚さ6mmのセラミックウール製フェルト(15)を配置したものを使用した。
なお、得られた耐火被覆構造の断面の高さ方向の寸法は310mmであり、横方向の寸法は445mmであった。
One embodiment of the present invention will be described with respect to a fireproof covering structure for a cable line in a tunnel shown in FIG . An ALC plate (1) with a length of 1820 mm, a width of 600 mm, and a thickness of 100 mm is used as an alternative to the inner wall of the tunnel, and eight FRP pipes (2a to 2h) are suspended on the lower side in the length direction (Fig. (Not shown). The FRP cable conduits (2a), (2b), (2g), and (2h) are optical cables (covering material: vinyl chloride) (3) and FRP cable conduits (2c) (2d) (2e) ( In 2f), an electric cable (covering material: vinyl chloride) (4) was attached.
Next, glass wool (glass wool density: 32 kg / m) comprising eight FRP cable conduits (2a to 2h) as an aggregate and having an aluminum foil layer (aluminum foil thickness: 7 μm) (6) on one side of the outer periphery thereof. 3 , thickness: 25 mm) (5) was used as a heat insulating mat material, and the aluminum foil layer (6) was in contact with the FRP cable conduits (2a to 2h) so as not to contact them.
Next, a non-land surface adjusting material (9) made of a ceramic wool mat material having a thickness of 50 mm and a width of 60 mm is installed along the length direction on the ALC plate (1), and the inside of the bottom surface of the non-land surface adjusting material (9). In addition, the endothermic pack layer (7) and the silica are surrounded so as to surround the side and bottom surfaces of the FRP cable pipes (2a to 2h) coated with glass wool (5), which is a heat insulating mat material provided with an aluminum foil layer (6). A fireproof covering material made of a calcium oxide plate (8) was placed so that the endothermic pack layer (7) faced the aluminum foil layer (6) and provided a space .
The endothermic pack layer (7) is formed by enclosing 30 g of water in a cell formed by partitioning between two films formed by sandwiching an aluminum foil between two nylon films in a sandwich structure. A cell having 150 cells per 1 m 2 (4500 g / m 2 ) and having a thickness of 4.5 cm was used in duplicate.
The calcium silicate plate (8) uses slaked lime as a calcareous raw material, and ferrosilicon having an Al 2 O 3 content of 0.5% by mass and an SiO 2 content of 98% by mass as amorphous silicic acid as the siliceous raw material. Using dust and powdered silica with an Al 2 O 3 content of 1% by mass as crystalline silicic acid, an SiO 2 content of 98% by mass and a brane value of 3000 cm 2 / g, an average fiber length of about 100 μm and an aspect ratio Using about 10 acicular wollastonite and 200 ml of CSF beaten cellulose pulp, CaO / SiO 2 mass ratio 1.05, amorphous silicic acid / crystalline silicic acid mass ratio 0.18, slaked lime 43.7 mass %, Ferrosilicon dust 5% by weight, powdered silica 28.3% by weight,
The fireproof covering material was laminated by attaching the seal portion of the endothermic pack layer (7) having the above configuration to the calcium silicate plate (8) with a tacker.
Further, the joint between the non-land surface adjusting material (9) and the fireproof coating material and the joint between the fireproof coating materials were sealed with a silicone sealant.
Next, on the lower surface of the uneven surface adjustment member (9), so as to surround the outside of the refractory coating material, 30mm wide in the longitudinal direction which is installed at a predetermined interval between the refractory coating material, 4mm thick sheet forming gypsum The 2nd fireproof covering material (10) was installed through the spacer (11) which consists of a board. In addition, in the embodiment shown in FIG. 1, it is set as the structure which contacts the 2nd fireproof coating material (10) in the position (A) by extending the lower surface board of a fireproof coating material to a horizontal direction. With this configuration, even if a flame or the like enters the fireproof coating structure from the joint portion of the second fireproof coating material (10), further penetration of the flame into the inside can be prevented. In addition, the seam of the non-land conditioner (9) made of a ceramic base material and the fireproof coating material and the joints of the fireproof coating materials were sealed using a silicone sealing agent. Moreover, as a 2nd fireproof covering material (10), a calcium silicate board is used, The material and thickness are the same as the calcium silicate board (8) of the said fireproof covering material .
Finally, the second refractory coating material (10) was fixed to the ALC plate (1) using the mounting brackets (13) at predetermined intervals in the length direction. In this embodiment, a ceramic wool felt (15) having a thickness of 6 mm is used on the inner side of the mounting bracket (13).
In addition, the dimension of the height direction of the cross section of the obtained fireproof coating structure was 310 mm, and the dimension of the horizontal direction was 445 mm.
上述のような構成を有するトンネル内ケーブル管路の耐火被覆構造の試験体の両端を耐火材で密封するとともに、FRP製ケーブル管路(2a〜2h)の端部にもセラミックウール製フェルトを充填した後、該試験体の長さ方向の中央部890mmを小型水平炉に上方より設置し、図2に示すRABT曲線に従って最初の5分間で室温から1200℃まで昇温し、1200℃で60分間保持し、その後直線的に冷却して加熱開始から170分後に室温まで冷却した。この時のFRP製ケーブル管路(2a〜2h)中の長さ方向の中央部の光ケーブル(3)及び電線ケーブル(4)表面に取り付けられた熱電対により測定した温度のデータを図3に記載した。図3のデータから明かであるように、ケーブル表面の最高温度は57℃[FRP製ケーブル管路(2h)中]であり、本発明のトンネル内ケーブル管路の耐火被覆構造は、充分な耐火・断熱性能を有するものである。
なお、加熱試験終了後、耐火被覆構造の内部を調査したところ、小型水平炉にて加熱された帯域の吸熱パック層の個々のセルは破損していることが観察された。
Both ends of the test piece of the fireproof coating structure of the cable conduit in the tunnel having the above-described configuration are sealed with a fireproof material, and the end of the FRP cable conduit (2a to 2h) is also filled with felt made of ceramic wool. After that, a central portion 890 mm in the length direction of the test specimen was installed in a small horizontal furnace from above, and the temperature was raised from room temperature to 1200 ° C. in the first 5 minutes according to the RABT curve shown in FIG. After that, it was cooled linearly and then cooled to room temperature 170 minutes after the start of heating. FIG. 3 shows temperature data measured by the thermocouple attached to the surface of the optical cable (3) and the electric cable (4) at the center in the length direction in the FRP cable conduits (2a to 2h) at this time. did. As is clear from the data in FIG. 3, the maximum temperature of the cable surface is 57 ° C. (in the FRP cable conduit (2h)), and the fireproof covering structure of the cable conduit in the tunnel of the present invention has sufficient fire resistance. -It has heat insulation performance.
When the inside of the refractory coating structure was investigated after the heating test was completed, it was observed that the individual cells of the endothermic pack layer in the zone heated in the small horizontal furnace were damaged.
なお、図1の実施態様においては、取付金具(13)は、ALC板(1)に直接ボルト及びナットで固定されているが、図4に示すように、不陸調整材(9)を取付金具(13)の端部まで延長し、この不陸調整材(9)を介してALC板(1)に取付金具(13)を固定することもできる。また、図5に示すように、取付金具(13)を用いずに、ALC板(1)の下面に本発明の耐火被覆構造を構築することもできる。なお、図4及び5に示す実施態様においては、不陸調整材(9)としてケイ酸カルシウム板(16)とセラミックウール製ブランケット(14)の積層体を使用した例を示している。 In the embodiment shown in FIG. 1, the mounting bracket (13) is directly fixed to the ALC plate (1) with bolts and nuts. However, as shown in FIG. The mounting bracket (13) can be fixed to the ALC plate (1) through the unevenness adjusting member (9) by extending to the end of the bracket (13). Moreover, as shown in FIG. 5, the fireproof covering structure of this invention can also be constructed | assembled on the lower surface of ALC board (1), without using attachment bracket (13). In addition, in the embodiment shown in FIG.4 and 5, the example which uses the laminated body of the calcium silicate board (16) and the ceramic wool blanket (14) is shown as a non-land surface adjustment material (9).
本発明のトンネル内ケーブル管路の耐火被覆構造は、非常に優れた耐火・断熱性能を有すると共に簡便な施工により設置することができ、新設のトンネルは勿論のこと既存のトンネル内ケーブル管路の耐火被覆構造として好適に採用することができるものである。 The fireproof coating structure of the cable conduit in the tunnel of the present invention has a very excellent fireproof and heat insulation performance and can be installed by simple construction, as well as a new tunnel as well as the existing cable conduit in the tunnel. It can be suitably employed as a fireproof coating structure.
1 ALC板
2a〜2h FRP製ケーブル管路
3 光ケーブル
4 電線ケーブル
5 グラスウール
6 アルミ箔層
7 吸熱パック層
8 ケイ酸カルシウム板層
9 不陸調整材
10 第2耐火被覆材
11 スペーサー
13 取付金具
14 セラミックウール製ブランケット
15 セラミックウール製フェルト
16 ケイ酸カルシウム板
DESCRIPTION OF SYMBOLS 1
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003413550A JP4340525B2 (en) | 2003-12-11 | 2003-12-11 | Fireproof coating structure for cable conduit in tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003413550A JP4340525B2 (en) | 2003-12-11 | 2003-12-11 | Fireproof coating structure for cable conduit in tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2005176510A JP2005176510A (en) | 2005-06-30 |
| JP4340525B2 true JP4340525B2 (en) | 2009-10-07 |
Family
ID=34733658
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003413550A Expired - Fee Related JP4340525B2 (en) | 2003-12-11 | 2003-12-11 | Fireproof coating structure for cable conduit in tunnel |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4340525B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102017118851B4 (en) | 2017-08-18 | 2025-12-04 | Bombardier Transportation Gmbh | Device with at least one wall element, rail vehicle with the device and use of the device in a rail vehicle |
| ES2992132T3 (en) * | 2020-11-26 | 2024-12-09 | Soletanche Freyssinet | Fire protection coating |
| JP7657174B2 (en) * | 2022-03-25 | 2025-04-04 | 東京電力ホールディングス株式会社 | Fireproof wrapping structure |
| CN118137385B (en) * | 2024-05-10 | 2024-07-23 | 国网山东省电力公司平度市供电公司 | Cable accessory installation device |
-
2003
- 2003-12-11 JP JP2003413550A patent/JP4340525B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2005176510A (en) | 2005-06-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0811098B1 (en) | Fire barrier protected dynamic joint | |
| US8007888B2 (en) | Fire protection blanket and associated method | |
| JP4340525B2 (en) | Fireproof coating structure for cable conduit in tunnel | |
| CN1108352C (en) | Fire extinguishing package and its making method | |
| JP4066179B2 (en) | Fireproof coating structure for cable conduit in tunnel | |
| JP2006304501A (en) | Fireproof coating structure for cable conduit in tunnel | |
| KR102824968B1 (en) | Method for fire protection by means of fire pad assembly and fire pad suitable for the method | |
| JP4026120B2 (en) | Fireproof coating for cable | |
| CN111636581A (en) | A fire resistance test structure for fire blocking of valve hall of converter station and its installation method | |
| CN219866689U (en) | Prefabricated composite heat-insulating steam pipeline | |
| CN111614054A (en) | A kind of cable engineering fireproof and heat insulation protection device | |
| CN216552497U (en) | Fire retardant belt for building deformation joint | |
| CN217949159U (en) | Submarine tunnel tube coupling connects fire-proof explosion-proof construction | |
| CN212462728U (en) | Connector device of fireproof bus duct | |
| CN111561065B (en) | A seismic isolation rubber bearing flexible fire protection structure and its construction technology | |
| CN211369094U (en) | Heat-insulating composite board and building furniture | |
| JP2614642B2 (en) | Slab penetrating steel pipe joint structure | |
| CN208009480U (en) | Joint Structure of Immersed Tube Tunnel | |
| CN220318883U (en) | Building outer wall fireproof structure | |
| CN206941977U (en) | A kind of flexible water heat-insulating light roofing | |
| CN223593221U (en) | A fire-resistant main cable air clamp | |
| CN215769158U (en) | Reinforced silicon core pipe with flame retardant function | |
| CN222126091U (en) | Fireproof corrosion-resistant power cable | |
| CN215600141U (en) | Anti-freezing cable for building | |
| JP2006109548A (en) | Fireproof protective structure for cable and fireproof protective unit for cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060704 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080714 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080902 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081031 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090630 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090706 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4340525 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120710 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120710 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130710 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130710 Year of fee payment: 4 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130710 Year of fee payment: 4 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140710 Year of fee payment: 5 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |