Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4355688B2 - Reinforcing bar joints and precast members - Google Patents
[go: Go Back, main page]

JP4355688B2 - Reinforcing bar joints and precast members - Google Patents

Reinforcing bar joints and precast members Download PDF

Info

Publication number
JP4355688B2
JP4355688B2 JP2005208013A JP2005208013A JP4355688B2 JP 4355688 B2 JP4355688 B2 JP 4355688B2 JP 2005208013 A JP2005208013 A JP 2005208013A JP 2005208013 A JP2005208013 A JP 2005208013A JP 4355688 B2 JP4355688 B2 JP 4355688B2
Authority
JP
Japan
Prior art keywords
discharge port
joint
sleeve portion
rebar
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005208013A
Other languages
Japanese (ja)
Other versions
JP2007023629A (en
Inventor
康晴 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Tekko Co Ltd
Original Assignee
Tokyo Tekko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Tekko Co Ltd filed Critical Tokyo Tekko Co Ltd
Priority to JP2005208013A priority Critical patent/JP4355688B2/en
Publication of JP2007023629A publication Critical patent/JP2007023629A/en
Application granted granted Critical
Publication of JP4355688B2 publication Critical patent/JP4355688B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

本発明は、ネジ鉄筋からなる第1鉄筋の端部を螺合するネジ部と、第2鉄筋の端部を収容してモルタル等の充填材で固定するスリーブ部とを備えた鉄筋用継手に関し、さらに、この継手を複数埋め込んだプレキャスト部材に関する。   The present invention relates to a reinforcing bar joint including a threaded portion for screwing an end portion of a first reinforcing bar composed of a threaded reinforcing bar, and a sleeve portion that accommodates the end portion of the second reinforcing bar and is fixed with a filler such as mortar. Further, the present invention relates to a precast member in which a plurality of the joints are embedded.

特許文献1には、プレキャスト柱(プレキャスト部材)が開示されている。このプレキャスト柱には垂直に延びるネジ鉄筋からなる複数の第1鉄筋が埋め込まれているとともに、その下端部に複数の継手が垂直をなして埋め込まれている。   Patent Document 1 discloses a precast column (precast member). A plurality of first reinforcing bars made of threaded reinforcing bars extending vertically are embedded in the precast column, and a plurality of joints are embedded vertically at the lower end portion thereof.

上記継手は、ネジ部と、このネジ部から下方に延びるスリーブ部とを有している。ネジ部には、上記ネジ鉄筋の下端部が螺合されている。スリーブ部は内部空間を有し、その下端はコンクリートの下面側に開口している。スリーブ部の上端部には排出口が形成され、下端部には注入口が形成されている。   The joint has a threaded portion and a sleeve portion extending downward from the threaded portion. The lower end portion of the screw rebar is screwed to the screw portion. The sleeve portion has an internal space, and the lower end thereof opens to the lower surface side of the concrete. A discharge port is formed at the upper end of the sleeve portion, and an injection port is formed at the lower end.

プレキャスト柱は、さらに複数の排出路と少なくとも1つの注入路を備えている。排出路の内端は継手の排出口に連なり、その外端は上記コンクリートの側面に開口している。また、注入路の内端は継手の注入口に連なり、その外端は上記コンクリートの側面に開口している。   The precast column further includes a plurality of discharge paths and at least one injection path. The inner end of the discharge passage is connected to the discharge port of the joint, and the outer end is opened on the side surface of the concrete. Moreover, the inner end of the injection path is connected to the inlet of the joint, and the outer end thereof is opened on the side surface of the concrete.

上記プレキャスト柱を建造物の下側構成部に接合する際には、プレキャスト柱を吊り下げて下側構成部の上方に位置させ、継手のスリーブ部の内部空間に、下側構成部から上方に突出する第2鉄筋の上端部を入り込ませるとともに、プレキャスト柱の下面と下側構成部の上面との間に目地空間となる隙間を形成する。この状態で、注入路からモルタル(充填材)を注入する。これによりモルタルは、注入路が接続された継手を介して目地空間を満たし、さらに全ての継手の内部空間を満たした後、上記排出路を通って、その外端に達する。作業者は排出路の外端からモルタルが漏れるのを見て充填完了を確認し、モルタル注入作業を終える。   When joining the precast column to the lower component of the building, suspend the precast column and position it above the lower component, and move upward from the lower component to the internal space of the sleeve portion of the joint. The upper end of the protruding second reinforcing bar is inserted, and a gap serving as a joint space is formed between the lower surface of the precast column and the upper surface of the lower component. In this state, mortar (filler) is injected from the injection path. As a result, the mortar fills the joint space through the joint to which the injection path is connected, and further fills the internal space of all the joints, and then reaches the outer end through the discharge path. The operator confirms the completion of filling by seeing the mortar leaking from the outer end of the discharge path, and finishes the mortar injection work.

上記のようにして、プレキャスト柱が下側構成部に接合される。プレキャスト柱の第1鉄筋の下端部と下側構成部の第2鉄筋の上端部は、継手およびモルタルを介して連結される。
特開平6−322822号公報
As described above, the precast column is joined to the lower component. The lower end part of the 1st reinforcing bar of a precast pillar and the upper end part of the 2nd reinforcing bar of a lower part composition are connected via a joint and mortar.
JP-A-6-322822

特許文献1において、下側構成部の第2鉄筋とプレキャスト柱の第1鉄筋とは、同一直線上に位置するのが理想であり、その場合には、第2鉄筋は継手のスリーブ部の中心軸線上に位置し、第2鉄筋の外周面とスリーブ部の内周面との間に十分な間隔が形成される。そのため、モルタルは継手の内部空間を満たした後で排出口を大きな抵抗なく通過し、排出路を経てその外端に容易に達することができる。   In Patent Document 1, it is ideal that the second rebar of the lower component part and the first rebar of the precast column are located on the same straight line. In this case, the second rebar is the center of the sleeve portion of the joint. A sufficient distance is formed between the outer peripheral surface of the second reinforcing bar and the inner peripheral surface of the sleeve portion, which is located on the axis. Therefore, the mortar can easily pass through the discharge port after filling the internal space of the joint without great resistance and reach the outer end via the discharge path.

しかし、上記第2鉄筋の上端部が、継手のスリーブ部の中心軸線から横ずれして排出口を塞いでしまうことがある。この場合には、排出口を通るモルタルの流通抵抗が高くなり、モルタルが排出口から排出路へと円滑に流れず、モルタル注入作業に時間を要する不都合があった。   However, the upper end portion of the second rebar may be displaced laterally from the central axis of the sleeve portion of the joint and block the discharge port. In this case, the flow resistance of the mortar passing through the discharge port becomes high, the mortar does not flow smoothly from the discharge port to the discharge path, and there is a disadvantage that it takes time for mortar injection work.

上記課題を解決するため、本発明は、ネジ部と、ネジ部に連設されたスリーブ部とを備え、このスリーブ部は、内部空間と、ネジ部の反対側の開口端と、ネジ部側の端部に形成された排出口とを有し、上記ネジ部にネジ鉄筋からなる第1鉄筋の端部を螺合し、上記スリーブ部の内部空間に第2鉄筋の端部を収容した状態で、この内部空間に充填材を充填することにより、上記第1,第2の鉄筋を連結するようにした継手において、上記スリーブ部の内周面には突起が形成され、この突起は、上記排出口より上記開口端側に配置されるとともに、その周方向の位置が上記排出口とほぼ合致することを特徴とする。   In order to solve the above-described problems, the present invention includes a screw portion and a sleeve portion connected to the screw portion. The sleeve portion includes an internal space, an open end opposite to the screw portion, and a screw portion side. A state in which the end of the second reinforcing bar is housed in the internal space of the sleeve part, and the end of the first reinforcing bar made of screw reinforcing bars is screwed into the screw part. In the joint in which the first and second reinforcing bars are connected by filling the inner space with a filler, a protrusion is formed on the inner peripheral surface of the sleeve portion. It is arranged on the opening end side from the discharge port, and its circumferential position substantially coincides with the discharge port.

上記構成によれば、継手のスリーブ部に対する第2鉄筋の横ずれ量を、スリーブ部に形成した突起により制限し、これによりスリーブ部の排出口側の内周面と第2鉄筋の外周面との間隙を十分に確保できる。その結果、スリーブ内に充填材を充填する際に、排出口での流通抵抗を低く抑えることができ、排出口からの排出を容易にすることができ、充填材の充填作業時間を短縮することができる。   According to the above configuration, the amount of lateral displacement of the second reinforcing bar with respect to the sleeve portion of the joint is limited by the protrusion formed on the sleeve portion, whereby the inner peripheral surface on the discharge port side of the sleeve portion and the outer peripheral surface of the second reinforcing bar. A sufficient gap can be secured. As a result, when filling the filler in the sleeve, the flow resistance at the discharge port can be kept low, the discharge from the discharge port can be facilitated, and the filling work time of the filler is shortened. Can do.

好ましくは、上記突起が上記排出口に向かって高くなる傾斜面を有している。これによれば、第2鉄筋が継手のスリーブに対して大きな横ずれ量のまま入り込む場合でも、強制的に横ずれ量を矯正することができる。   Preferably, the protrusion has an inclined surface that becomes higher toward the discharge port. According to this, even when the second rebar enters the sleeve of the joint with a large lateral deviation amount, the lateral deviation amount can be corrected forcibly.

好ましくは、上記傾斜面の上記開口端側の端が上記スリーブ部の内周面に連なっている。これによれば、より円滑に第2鉄筋の横ずれ量を矯正することができる。   Preferably, an end of the inclined surface on the opening end side is continuous with an inner peripheral surface of the sleeve portion. According to this, the lateral deviation amount of the second rebar can be corrected more smoothly.

好ましくは、上記突起が上記排出口の近傍に配置されている。これにより、第2鉄筋がスリーブ部に対して多少傾斜していても、排出口を形成したスリーブ部内周面と第2鉄筋の外周面との間隙を確実に確保することができる。   Preferably, the protrusion is disposed in the vicinity of the discharge port. Thereby, even if the second rebar is slightly inclined with respect to the sleeve portion, a gap between the inner peripheral surface of the sleeve portion in which the discharge port is formed and the outer peripheral surface of the second rebar can be reliably ensured.

好ましくは、上記突起が上記スリーブ部の周方向に離れて一対形成され、これら一対の突起間に流通路が形成され、この流通路は上記排出口と周方向位置が一致して排出口に連なる。これによれば、充填材は一対の突起間に形成された流通路をも経由して排出口に至るので、流通抵抗をより一層低減させることができる。しかも、この構成では、突起の形成範囲を周方向に比較的広い角度範囲にわたって形成することができ、上記第2鉄筋の横ずれ制限効果を確実にすることができる。   Preferably, a pair of protrusions are formed apart from each other in the circumferential direction of the sleeve portion, and a flow passage is formed between the pair of protrusions. The flow passage is aligned with the discharge port and is connected to the discharge port. . According to this, since the filler reaches the discharge port via the flow passage formed between the pair of protrusions, the flow resistance can be further reduced. In addition, with this configuration, the protrusion can be formed over a relatively wide angular range in the circumferential direction, and the lateral displacement limiting effect of the second rebar can be ensured.

好ましくは、上記スリーブ部には、上記開口端近傍において注入口が形成されている。これによれば、継手の横方向から充填材の注入が可能となるので、継手を種々の態様で使用可能となる。   Preferably, an injection port is formed in the sleeve portion in the vicinity of the opening end. According to this, since the filling material can be injected from the lateral direction of the joint, the joint can be used in various modes.

さらに本発明は、プレキャスト部材において、コンクリートと、このコンクリートの下端部に垂直に埋め込まれた上記記載の複数の継手と、コンクリートに埋め込まれ垂直に延びるネジ鉄筋からなる複数の第1鉄筋と、複数の排出路とを備え、上記継手は、上記ネジ部を上に上記スリーブ部を下にして配置され、上記ネジ部に上記第1鉄筋の下端部が螺合され、上記スリーブ部の開口端が上記コンクリートの下面側に開口し、上記排出路は、その内端が上記継手の排出口に連なり、その外端が上記コンクリートの側面に開口しており、 下側構成部に接合する際には、上記複数の継手の内部空間に、下側構成部から上方に突出する複数の第2鉄筋の上端部をそれぞれ入り込ませて充填材を充填する。これによれば、プレキャスト部材を下側構成部に接合する際の充填材の充填作業時間を短縮することができる。   Furthermore, the present invention provides a precast member, a concrete, a plurality of joints described above vertically embedded in a lower end portion of the concrete, a plurality of first reinforcing bars including screw reinforcing bars embedded in the concrete and extending vertically, The joint is disposed with the threaded portion up and the sleeve portion facing down, and the lower end of the first rebar is screwed into the threaded portion, and the open end of the sleeve portion is Open to the lower surface side of the concrete, and the discharge path has an inner end connected to the discharge port of the joint, and an outer end opened to the side of the concrete. The upper ends of the plurality of second reinforcing bars protruding upward from the lower component portion are respectively inserted into the internal spaces of the plurality of joints, and are filled with the filler. According to this, the filling work time of the filler when the precast member is joined to the lower component can be shortened.

本発明によれば、ネジ部とスリーブ部を備え、ネジ部で第1鉄筋と螺合連結し、スリーブ部に充填される充填材により第2鉄筋と連結するようにした継手において、充填材の充填作業時間を短縮できる。   According to the present invention, in a joint provided with a screw portion and a sleeve portion, screwed and connected to the first rebar at the screw portion, and connected to the second rebar by the filler filled in the sleeve portion, The filling time can be shortened.

以下、本発明の第1実施形態を図1〜図5を参照しながら説明する。図1に示すように、プレキャスト柱10(鉄筋コンクリート製のプレキャスト部材)は、断面正方形をなすコンクリート11と、このコンクリート11内に埋め込まれた多数の鉄筋とを、基本構造として備えている。   Hereinafter, a first embodiment of the present invention will be described with reference to FIGS. As shown in FIG. 1, a precast column 10 (a precast member made of reinforced concrete) includes a concrete 11 having a square cross section and a number of reinforcing bars embedded in the concrete 11 as a basic structure.

本実施形態のプレキャスト柱10は、鉄筋として、コンクリート11の側面に沿って並べられた複数の垂直なネジ鉄筋12(第1鉄筋)と、ネジ鉄筋12に間隔をおいて巻かれた環状の剪断補強筋(図示しない)を有している。   The precast column 10 of this embodiment includes a plurality of vertical screw rebars 12 (first rebars) arranged along the side surface of the concrete 11 as rebars, and an annular shear wound around the screw rebars 12 at intervals. Reinforcing bars (not shown) are provided.

プレキャスト柱10は、さらに上記ネジ鉄筋12と同数の継手20を備えている。これら継手20は、垂直をなして、コンクリート11の下端部に埋め込まれている。各継手20は、ネジ部21と、このネジ部21と軸方向に連なりネジ部21から下方に延びるスリーブ部22とを有している。   The precast column 10 further includes the same number of joints 20 as the screw rebar 12. These joints 20 are embedded in the lower end portion of the concrete 11 in a vertical direction. Each joint 20 includes a threaded portion 21 and a sleeve portion 22 that is continuous with the threaded portion 21 in the axial direction and extends downward from the threaded portion 21.

上記継手20のネジ部21の内周には雌ネジ21aが形成されており、このネジ部21には上記ネジ鉄筋12の下端部が螺合している。
上記スリーブ部22は内部空間22aを有し、その下端22b(開口端)がコンクリート11の下面側に開口している。スリーブ部22の内径は、上端から下端に向かって段階的に大きくなっている。換言すれば、スリーブ部22の肉厚は、上端から下端に向かって段階的に薄くなっている。スリーブ部22の内周には、後述するモルタルとの付着強度を高めるための複数の環状リブ22cが、軸方向に間隔をおいて形成されている。
A female screw 21 a is formed on the inner periphery of the screw portion 21 of the joint 20, and the lower end portion of the screw rebar 12 is screwed to the screw portion 21.
The sleeve portion 22 has an internal space 22 a, and a lower end 22 b (open end) of the sleeve portion 22 opens on the lower surface side of the concrete 11. The inner diameter of the sleeve portion 22 increases stepwise from the upper end to the lower end. In other words, the thickness of the sleeve portion 22 is gradually reduced from the upper end toward the lower end. A plurality of annular ribs 22c are formed on the inner periphery of the sleeve portion 22 at intervals in the axial direction for increasing the adhesion strength with a mortar described later.

上記スリーブ部22において、上記ネジ部21に近接した上端部に排出口22dが形成されるとともに、下端部に注入口22eが形成されている。これら排出口22dと注入口22eはスリーブ22の軸方向から見て重なっている。換言すれば、排出口22dと注入口22eは、周方向位置が一致している。   In the sleeve portion 22, a discharge port 22d is formed at an upper end portion close to the screw portion 21, and an injection port 22e is formed at a lower end portion. The discharge port 22d and the injection port 22e overlap each other when viewed from the axial direction of the sleeve 22. In other words, the discharge port 22d and the injection port 22e have the same circumferential position.

各継手20の排出口22dには、直管16の内端が挿入接続されている。この管16の外端は、コンクリート11の側面に開口している。管16の内部空間は、排出路16aを提供している。   The inner end of the straight pipe 16 is inserted and connected to the discharge port 22 d of each joint 20. The outer end of the pipe 16 is open to the side surface of the concrete 11. The internal space of the pipe 16 provides a discharge path 16a.

各継手20の注入口22eには、直管18の内端が挿入接続されており、その外端が、コンクリート11の側面に開口している。管18の内部空間は注入路18aを提供している。   The inner end of the straight pipe 18 is inserted and connected to the injection port 22 e of each joint 20, and the outer end thereof opens to the side surface of the concrete 11. The internal space of the tube 18 provides an injection path 18a.

図2,図3に最も良く示すように、上記継手20のスリーブ部22の内面には、排出口22dの下方かつ近傍において一対の突起25が形成されている。これら一対の突起25の間には、排出口22dの真下に位置する流通路26が形成されている。換言すれば、スリーブ部22の周方向位置に関して、一対の突起25は排出口22dとほぼ合致し、流通路26は排出口22dと合致している。   As best shown in FIGS. 2 and 3, a pair of protrusions 25 are formed on the inner surface of the sleeve portion 22 of the joint 20 below and in the vicinity of the discharge port 22d. Between the pair of protrusions 25, a flow passage 26 is formed that is located directly below the discharge port 22d. In other words, with respect to the circumferential position of the sleeve portion 22, the pair of protrusions 25 substantially match the discharge port 22d, and the flow passage 26 matches the discharge port 22d.

上記突起25は、上方に向かうにしたがって(排出口22dに向かうにしたがって)高くなるような平坦な傾斜面25aを有している。傾斜面25aの下端はスリーブ部22の内面に連なっている。なお、一対の突起25の傾斜面25aは同一平面上にある。   The protrusion 25 has a flat inclined surface 25a that becomes higher as it goes upward (as it goes toward the discharge port 22d). The lower end of the inclined surface 25 a is continuous with the inner surface of the sleeve portion 22. The inclined surfaces 25a of the pair of protrusions 25 are on the same plane.

上記構成をなすプレキャスト柱10は、図1に示す仕口部30(建造物の下側構成部)に接合される。この仕口部30は、上記と同じ構成をなす下階のプレキャスト柱と梁(いずれも図示せず)が接合される部位であり、下階のプレキャスト柱の上面と梁の端面との間に形成された空間にコンクリート31を打設することにより構成されている。下階のプレキャスト柱のネジ鉄筋32(第2鉄筋)は、このコンクリート31に埋設され、その上端部がコンクリート31の上面から突出している。   The precast column 10 having the above-described configuration is joined to the joint portion 30 (lower structure portion of the building) shown in FIG. The joint 30 is a part where a lower-floor precast column and a beam (both not shown) having the same configuration as described above are joined, and between the upper surface of the lower-floor precast column and the end surface of the beam. It is configured by placing concrete 31 in the formed space. The screw rebar 32 (second rebar) of the precast column on the lower floor is embedded in the concrete 31, and the upper end portion protrudes from the upper surface of the concrete 31.

プレキャスト柱10を吊り下げ支持した状態で、その継手20の内部空間22aに、上記ネジ鉄筋32の上端部が入り込むように、下降させる。これにより、継手20内において、ネジ鉄筋12,32の端部同士が対峙する。なお、図1ではネジ鉄筋32が理想的な位置にあり、ネジ鉄筋12と一直線をなし、スリーブ22の中心軸線と一致し、その上端面がネジ鉄筋12の下端面から離れている。   With the precast pillar 10 suspended and supported, the precast pillar 10 is lowered so that the upper end portion of the screw rebar 32 enters the internal space 22a of the joint 20. Thereby, in the joint 20, the edge parts of the screw rebars 12 and 32 oppose each other. In FIG. 1, the screw rebar 32 is in an ideal position, is aligned with the screw rebar 12, coincides with the central axis of the sleeve 22, and its upper end surface is separated from the lower end surface of the screw rebar 12.

コンクリート31の上面には予めスペーサ(図示しない)が載せられており、このスペーサにプレキャスト柱10が載ることにより、コンクリート11の下面とコンクリート31の上面との間に狭い目地空間40が形成される。   A spacer (not shown) is previously placed on the upper surface of the concrete 31, and a narrow joint space 40 is formed between the lower surface of the concrete 11 and the upper surface of the concrete 31 by placing the precast pillar 10 on the spacer. .

次に、プレキャスト柱10のコンクリート11の下端部側面に沿うようにして、コンクリート31の上面に型枠45を設置し、これにより、上記目地空間40を塞ぐ。なお、型枠45の代わりに目地空間40の周囲にモルタルを充填することにより、目地空間40を塞いでもよい。   Next, the formwork 45 is installed on the upper surface of the concrete 31 along the side surface of the lower end of the concrete 11 of the precast column 10, thereby closing the joint space 40. The joint space 40 may be closed by filling mortar around the joint space 40 instead of the mold 45.

次に、モルタル(充填材)の充填を行なう。上記複数の管18のうちの選択された1つの外端にモルタル注入器のノズルを押し当て、圧力をかけながらモルタルを注入する。モルタルは、この選択された管18の注入路18aを通って、1つの継手20の内部空間22aを通り、目地空間40を満たす。さらに注入を続けると、モルタルは選択されなかった他の注入路18aを満たすとともに、全ての継手20の内部空間22aを満たした後、排出路16aを通ってその外端に達する。   Next, mortar (filler) is filled. The nozzle of a mortar injector is pressed against the selected one of the plurality of tubes 18 to inject the mortar while applying pressure. The mortar fills the joint space 40 through the injection path 18a of the selected pipe 18 and the internal space 22a of one joint 20. If the injection is continued further, the mortar fills the other unselected injection paths 18a and fills the inner space 22a of all the joints 20, and then reaches the outer end through the discharge path 16a.

モルタルが排出路16aの外端に達して漏れた時に、作業者はモルタル充填が完了したことを確認し、注入を終了させる。なお、上記注入作業において、注入路18a,排出路16aの外端からモルタルが漏れる度に、順次その外端を栓で塞ぐ。   When the mortar reaches the outer end of the discharge passage 16a and leaks, the operator confirms that the mortar filling is completed and finishes the injection. In the above-described injection operation, each time the mortar leaks from the outer ends of the injection path 18a and the discharge path 16a, the outer ends are sequentially closed with plugs.

上記のようにして充填されたモルタルが硬化することにより、プレキャスト柱10の仕口部30への接合が完了する。この接合状態で、ネジ鉄筋12,32同士が継手20および継手20の内部空間22aに充填されたモルタルを介して連結される。   When the mortar filled as described above is cured, the joining of the precast column 10 to the joint portion 30 is completed. In this joined state, the screw rebars 12 and 32 are connected to each other via the joint 20 and the mortar filled in the internal space 22a of the joint 20.

上記モルタルの充填の過程で、ネジ鉄筋32が図1に示すような理想的な位置にある場合、モルタルは大きな抵抗を受けることなく、排出口22dを通り、排出路16aを通る。   In the process of filling the mortar, when the screw rebar 32 is in an ideal position as shown in FIG. 1, the mortar passes through the discharge port 16a through the discharge port 22d without receiving a large resistance.

排出口22d近傍でのモルタルの流通抵抗は、図2または図3に示すように、ネジ鉄筋32の上端面がネジ鉄筋12の下端面に近づくにしたがって、また、ネジ鉄筋32の上端部がスリーブ部22の中心軸線から横ずれし排出口22dに近寄るにしたがって大きくなる。しかし本実施形態では、突起25によってモルタルの流通抵抗の増大を防止でき、モルタルが排出口22dから排出路16aへと円滑に通り抜けることができるので、モルタル充填時間が延びるのを回避することができる。以下、詳述する。   As shown in FIG. 2 or FIG. 3, the flow resistance of the mortar near the discharge port 22d is such that the upper end surface of the screw rebar 32 approaches the lower end surface of the screw rebar 12 and the upper end portion of the screw rebar 32 is the sleeve. It shifts laterally from the central axis of the portion 22 and increases as it approaches the discharge port 22d. However, in this embodiment, the protrusion 25 can prevent an increase in the flow resistance of the mortar, and the mortar can smoothly pass from the discharge port 22d to the discharge path 16a. Therefore, it is possible to avoid an increase in the mortar filling time. . Details will be described below.

図2,図3に示すように、ネジ鉄筋32の上端面がネジ鉄筋12の下端面に接するか僅かしか離れていない場合には、モルタルは矢印で示すように、ネジ鉄筋32の上端部外周を回り込みながら排出口22dに向かう。
本実施形態では、図2に示すようにネジ鉄筋32のネジ節32aが突起25に当たるか、図3に示すように平坦部32bが突起25に当たることにより、ネジ鉄筋32のスリーブ部22に対する横ずれ量が制限される。その結果、排出口22dがネジ鉄筋32に塞がれることはなく、排出口22dを形成したスリーブ部22の内周面とネジ鉄筋32の外周面との間に、十分な間隙を確保でき、モルタルは大きな抵抗なく排出口22dを通過することができる。
2 and 3, when the upper end surface of the screw rebar 32 is in contact with or slightly away from the lower end surface of the screw rebar 12, the mortar has an outer periphery at the upper end portion of the screw rebar 32 as indicated by an arrow. To the discharge port 22d.
In the present embodiment, as shown in FIG. 2, the screw node 32 a of the screw rebar 32 hits the protrusion 25, or the flat portion 32 b hits the protrusion 25 as shown in FIG. Is limited. As a result, the discharge port 22d is not blocked by the screw rebar 32, and a sufficient gap can be secured between the inner peripheral surface of the sleeve portion 22 forming the discharge port 22d and the outer peripheral surface of the screw rebar 32, The mortar can pass through the discharge port 22d without great resistance.

本実施形態では、突起25が一対形成され、その間が流通路26として提供されるため、モルタルの一部はネジ鉄筋32の外周を回り込まずに、この流通路26を軸方向に流れて排出口22dに到達することができる。これにより、モルタルの排出口22d近傍での流通抵抗を一層低下させることができる。   In the present embodiment, a pair of protrusions 25 are formed, and a gap between the protrusions 25 is provided as a flow passage 26. Therefore, a part of the mortar flows in the axial direction through the flow passage 26 without going around the outer periphery of the screw rebar 32, and is an outlet. 22d can be reached. Thereby, the flow resistance in the vicinity of the mortar outlet 22d can be further reduced.

また本実施形態では、突起25に傾斜面25aが形成されているので、ネジ鉄筋32のスリーブ部22に対する横ずれ量が大きくても、この傾斜面25aの案内により、ネジ鉄筋32を内部空間22a内に円滑に挿入することができる。   In the present embodiment, since the inclined surface 25a is formed on the protrusion 25, even if the amount of lateral displacement of the screw rebar 32 with respect to the sleeve portion 22 is large, the screw rebar 32 is guided in the internal space 22a by the guide of the inclined surface 25a. Can be inserted smoothly.

本発明は上記実施形態に制約されず、種々の形態を採用可能である。例えば、継手のスリーブ部に入り込む第2鉄筋は、ネジ鉄筋でなく縦リブと横リブを格子状に有する通常の鉄筋であってもよい。   The present invention is not limited to the above embodiment, and various forms can be adopted. For example, the second rebar that enters the sleeve portion of the joint may be a normal rebar having a vertical rib and a horizontal rib in a lattice shape instead of a screw rebar.

本発明はプレキャスト柱のみならず、プレキャスト壁(プレキャスト部材)にも適用可能である。
上記実施形態のように、モルタルを目地空間を介して全ての継手に充填する場合には、注入路は1つでもよく、この注入路を、選択された1つの継手の注入口に接続するようにしてもよい。この場合、他の継手は注入口を持たなくてもよい。
モルタルを目地空間を介さずに継手に充填する場合には、各継手に接続された注入路からモルタルを注入する。
The present invention is applicable not only to precast columns but also to precast walls (precast members).
When mortar is filled in all joints via joint spaces as in the above embodiment, there may be one injection path, and this injection path is connected to the inlet of one selected joint. It may be. In this case, the other joint may not have an inlet.
When filling a mortar into a joint without going through the joint space, the mortar is injected from an injection path connected to each joint.

本発明の鉄筋用継手は、プレキャスト部材ではなく、コンクリートを場所打ちする場合にも用いることができる。この場合、スリーブ部には排出口のみならず注入口が形成される。ネジ鉄筋からなる第1鉄筋の端部をネジ部に螺合させた状態で、第2鉄筋の端部をスリーブ部に入り込ませるが、スリーブ部の開口端には予め環状のシール部材ないしは閉塞部材を装着しておく。注入口から注入されたモルタルはスリーブ部の内部空間を満たした後、排出口から漏れる。継手に形成した突起の作用効果は、上述した実施形態と同様である。   The joint for reinforcing bars of the present invention can be used not only for a precast member but also for casting concrete. In this case, not only the discharge port but also the injection port is formed in the sleeve portion. The end of the second reinforcing bar is inserted into the sleeve part in a state where the end of the first reinforcing bar made of screw rebar is screwed into the threaded part. Put on. The mortar injected from the injection port leaks from the discharge port after filling the internal space of the sleeve portion. The effect of the protrusion formed on the joint is the same as that of the above-described embodiment.

本発明の一実施形態を示すプレキャスト柱の下端部の縦断面図である。It is a longitudinal cross-sectional view of the lower end part of the precast pillar which shows one Embodiment of this invention. 同実施形態における継手の突起の作用を説明する図であり、(A)は要部拡大縦断面図,(B)は要部拡大平断面図である。It is a figure explaining the effect | action of the protrusion of the joint in the embodiment, (A) is a principal part expanded longitudinal sectional view, (B) is a principal part enlarged flat sectional view. 同実施形態において第2鉄筋のネジ節の位置が図2の状態と異なっている場合の、突起の作用を説明する図であり、(A)は要部拡大縦断面図,(B)は要部拡大平断面図である。3A and 3B are views for explaining the action of the protrusion when the position of the screw node of the second reinforcing bar is different from the state of FIG. 2 in the same embodiment, FIG. FIG.

符号の説明Explanation of symbols

10 プレキャスト柱(プレキャスト部材)
11 コンクリート
12 ネジ鉄筋(第1鉄筋)
16a 排出路
20 継手
21 ネジ部
22 スリーブ部
22a 内部空間
22c 開口端
22d 排出口
22e 注入口
25 突起
25a 傾斜面
26 流通路
30 仕口部(建造物の下側構成部)
31 コンクリート
32 ネジ鉄筋(第2鉄筋)
10 Precast pillars (precast members)
11 Concrete 12 Screw rebar (1st rebar)
16a Discharge path 20 Joint 21 Threaded portion 22 Sleeve portion 22a Internal space 22c Open end 22d Discharge port 22e Inlet port 25 Protrusion 25a Inclined surface 26 Flow channel 30 Closure (lower component of the building)
31 Concrete 32 Screw rebar (second rebar)

Claims (6)

ネジ部と、ネジ部に連設されたスリーブ部とを備え、このスリーブ部は、内部空間と、ネジ部の反対側の開口端と、ネジ部側の端部に形成された排出口とを有し、
上記ネジ部にネジ鉄筋からなる第1鉄筋の端部を螺合し、上記スリーブ部の内部空間に第2鉄筋の端部を収容した状態で、この内部空間に充填材を充填することにより、上記第1,第2の鉄筋を連結するようにした継手において、
上記スリーブ部の内面には、上記排出口の近傍かつ当該排出口より上記開口端側において、上記排出口とほぼ合致する周方向位置にのみ突起が形成されていることを特徴とする鉄筋用継手。
A screw portion; and a sleeve portion provided continuously to the screw portion. The sleeve portion includes an internal space, an opening end opposite to the screw portion, and a discharge port formed at an end portion on the screw portion side. Have
By screwing the end of the first rebar made of screw rebar into the threaded portion, and filling the internal space with a filler in the state where the end of the second rebar is accommodated in the internal space of the sleeve portion, In the joint that connects the first and second reinforcing bars,
Reinforcing bar joints characterized in that protrusions are formed on the inner surface of the sleeve portion only in a circumferential position substantially matching the discharge port in the vicinity of the discharge port and on the opening end side of the discharge port. .
上記突起が上記排出口に向かって高くなる傾斜面を有しており、この傾斜面の排出口側の端が当該突起において最も高いことを特徴とする請求項1に記載の鉄筋用継手。 The joint for reinforcing bars according to claim 1, wherein the protrusion has an inclined surface that becomes higher toward the discharge port, and an end of the inclined surface on the discharge port side is the highest at the protrusion . 上記傾斜面の上記開口端側の端が上記スリーブ部の内周面に連なっていることを特徴とする請求項2に記載の鉄筋用継手。   The reinforcing bar joint according to claim 2, wherein an end of the inclined surface on the opening end side is continuous with an inner peripheral surface of the sleeve portion. 上記突起が上記スリーブ部の周方向に離れて一対形成され、これら一対の突起間に流通路が形成され、この流通路は上記排出口と周方向位置が一致して排出口に連なることを特徴とする請求項に記載の鉄筋用継手。 A pair of the protrusions are formed apart from each other in the circumferential direction of the sleeve portion, and a flow passage is formed between the pair of protrusions. The flow passage is aligned with the discharge port and is connected to the discharge port. The joint for reinforcing bars according to claim 3 . 上記スリーブ部には、上記開口端近傍において注入口が形成されていることを特徴とする請求項1〜4のいずれかに記載の鉄筋用継手。 The reinforcing joint according to any one of claims 1 to 4 , wherein an injection port is formed in the sleeve portion in the vicinity of the opening end. コンクリートと、このコンクリートの下端部に垂直に埋め込まれた請求項1〜5のいずれかに記載の複数の継手と、コンクリートに埋め込まれ垂直に延びるネジ鉄筋からなる複数の第1鉄筋と、複数の排出路とを備え、
上記継手は、上記ネジ部を上に上記スリーブ部を下にして配置され、上記ネジ部に上記第1鉄筋の下端部が螺合され、上記スリーブ部の開口端が上記コンクリートの下面側に開口し、
上記排出路は、その内端が上記継手の排出口に連なり、その外端が上記コンクリートの側面に開口しており、
下側構成部に接合する際には、上記複数の継手の内部空間に、下側構成部から上方に突出する複数の第2鉄筋の上端部をそれぞれ入り込ませて充填材を充填することを特徴とするプレキャスト部材。
Concrete, a plurality of joints according to any one of claims 1 to 5 embedded vertically in a lower end portion of the concrete, a plurality of first reinforcing bars made of threaded reinforcing bars embedded in the concrete, and a plurality of first reinforcing bars With a discharge path,
The joint is arranged with the threaded portion up and the sleeve portion facing down, and the lower end portion of the first rebar is screwed into the threaded portion, and the open end of the sleeve portion opens to the lower surface side of the concrete And
The discharge path has an inner end connected to a discharge port of the joint, and an outer end opened to a side surface of the concrete.
When joining to the lower component part, the upper spaces of the plurality of second reinforcing bars protruding upward from the lower component part are respectively inserted into the internal spaces of the plurality of joints and filled with a filler. A precast member.
JP2005208013A 2005-07-19 2005-07-19 Reinforcing bar joints and precast members Expired - Fee Related JP4355688B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005208013A JP4355688B2 (en) 2005-07-19 2005-07-19 Reinforcing bar joints and precast members

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005208013A JP4355688B2 (en) 2005-07-19 2005-07-19 Reinforcing bar joints and precast members

Publications (2)

Publication Number Publication Date
JP2007023629A JP2007023629A (en) 2007-02-01
JP4355688B2 true JP4355688B2 (en) 2009-11-04

Family

ID=37784760

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005208013A Expired - Fee Related JP4355688B2 (en) 2005-07-19 2005-07-19 Reinforcing bar joints and precast members

Country Status (1)

Country Link
JP (1) JP4355688B2 (en)

Also Published As

Publication number Publication date
JP2007023629A (en) 2007-02-01

Similar Documents

Publication Publication Date Title
CN107165185A (en) A prefabricated concrete column foot node with outsourcing steel plate and its construction method
JP4998198B2 (en) Mechanical joint grout filling method, PC member joining method, column beam joint construction method, column beam joint construction method, floor member and PC wall member joining method, PC member joining structure, column beam joining Structure, column beam joint structure, floor / wall joint structure
JP2014051798A (en) Joint construction method of reinforcing-bar
JP6096743B2 (en) Grout filling method for PCa members using stigma sleeve as connecting means
CN207176717U (en) A prefabricated concrete column foot node with steel plate
KR101453407B1 (en) Non-welding type seismic reinforcing method for column using key hole type bolt jointed double C-type steels
JP2003301526A (en) Method of joining precast concrete vertical members
JP5388785B2 (en) Construction method for concrete structures
JP2008002213A (en) Grouting method and grouting control system for joint part of precast reinforced concrete member
JP2012251327A (en) Coupler for joining reinforcement
JP6866257B2 (en) Joining structure and joining method
JP4355688B2 (en) Reinforcing bar joints and precast members
JP7399415B2 (en) Stopper for concrete parts
JP7687817B2 (en) Method for joining precast concrete members
JP6484036B2 (en) Wall body construction method, wall body
JP4657667B2 (en) Stopcock
JP5081040B2 (en) Reinforcing bar connection structure and joint for reinforcing bar connection
JP6512433B2 (en) Joining method of PCa member
JP2017095915A (en) Column beam joint-column connection structure, ramen viaduct, column beam joint-column connection structure construction method and precast concrete member
JP2016166498A (en) Wall body construction method and wall body
JPWO2017072815A1 (en) Sheath joint and sheath pipe structure including the same
JP3914457B2 (en) Joining method of precast panel zone and lower column member
JPH0754396A (en) Column / beam joining method
JP2007077743A (en) Precast material
JP3357157B2 (en) Method of connecting stopper and precast member

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080516

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090603

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090616

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090622

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090728

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090803

R150 Certificate of patent or registration of utility model

Ref document number: 4355688

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120807

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120807

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130807

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees