JP4370818B2 JP2003165590A JP2003165590A JP4370818B2 JP 4370818 B2 JP4370818 B2 JP 4370818B2 JP 2003165590 A JP2003165590 A JP 2003165590A JP 2003165590 A JP2003165590 A JP 2003165590A JP 4370818 B2 JP4370818 B2 JP 4370818B2
Authority
JP
Japan
Prior art keywords
server
power supply
shutdown
ups
servers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003165590A
Other languages
Japanese (ja)
Other versions
JP2005004379A (en
Inventor
和之 依田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuji Electric Co Ltd
Original Assignee
Fuji Electric Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Electric Systems Co Ltd filed Critical Fuji Electric Systems Co Ltd
Priority to JP2003165590A priority Critical patent/JP4370818B2/en
Publication of JP2005004379A publication Critical patent/JP2005004379A/en
Application granted granted Critical
Publication of JP4370818B2 publication Critical patent/JP4370818B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Power Sources (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、無停電電源装置から電力供給を受ける複数のサーバを前記無停電電源装置と同一のネットワーク上に接続して構成した無停電電源システムの電源管理方法に関する。
【0002】
【従来の技術】
一般に、バックアップ用の電池、又は発電機を内部に持っている無停電電源装置(UPS:uninterruptible power supply)は、無停電が要求されるコンピュータ等のシステムの負荷に対して、常時は商用電源から電力供給し、商用電源の停電時においても当該システムをそのまま稼働できるようにする装置として広く利用されている。UPSで使用されるバックアップ用の電池は、小容量のものでもシステムを数分稼働できる程度の容量があって、その間にコンピュータシステムを安全にシャットダウン処理(終了処理)することができる。また、内部に発電機を持つ大容量のUPSには、システムを数日にわたって稼働できるものもある。
【0003】
図4は、従来の無停電電源システムの一例を示すシステム構成図である。このシステムは、ネットワークに接続可能なUPS1と、UPS1から電力供給を受ける複数台のサーバコンピュータ(以下、単にサーバという。)11,12とがハブ(HUB)2によって、例えばLANなどの同一ネットワーク上で無停電電源システムを構成している。
【0004】
図5は、従来のシャットダウン処理手順を説明するタイミング図である。図4の無停電電源システムでは、外部商用電源の停電発生時やスケジュールオフ時に、ネットワーク経由でUPS1からサーバ11,12にOSシャットダウン指令を送出して、各サーバ11,12におけるOSシャットダウンが確実に実行された後に、UPS1の出力を停止することが必要である。
【0005】
ところが、従来のUPS1を含むシステムでは、実際に各サーバ11,12が動作しているかどうかにかかわらず、UPS1で設定したすべてのサーバ11,12に対して、図5(a),(c)に示すようなシャットダウン指令C1,C2を、ネットワーク経由でUPS1から送出していた。そして、図5(b),(d)に示すように、サーバ11,12におけるOSシャットダウン処理が終了しているかどうかにかかわらず、UPS1側で設定した出力停止時刻(以下、UPS出力停止予定時刻という。)が経過した時刻t0には、UPS1からの電力供給を停止していた。
【0006】
一方、サーバ11,12側では、図5(d)に示すサーバ12のように、何らかの理由でOSシャットダウン処理に手間取って、OSシャットダウン処理が遅れる場合がある。そのような場合には、UPS1からの電力供給を時刻t1以降にまで継続しないと、OSがシャットダウンしない状態で電源が切断され、異常終了処理(ダーティシャットダウン:dirty shutdown)となることがあった。
【0007】
そこで、複数台のサーバが1台のUPS1の負荷として並列接続されたコンピュータシステムでは、各サーバでのシャットダウン時に退避させる情報にずれが発生することから、後述する特許文献1に記載されている通り、1台の負荷をマスタサーバとし、このマスタサーバとなる負荷からスレーブサーバとなる他の負荷に対してシャットダウン指令を伝送する必要があった。
【0008】
【特許文献1】
特開平11−202986号公報
【0009】
【発明が解決しようとする課題】
このような電源管理装置では、ルータやハブが商用電源から電力の供給を受けている場合、商用電源に異常が発生すると、ルータの電源が切断され、ネットワーク経由で他のサーバに対してシャットダウン動作に移行する信号を発信できず、マスタサーバ以外はすべてダーティシャットダウンして、データやハードディスクを破損するおそれがあった。そのような場合に、最悪の事態としては、サーバのダーティシャットダウンになり、スレーブサーバのシステム障害に至るおそれがあった。
【0010】
この発明の目的は、1台の無停電電源装置に接続されたサーバのダーティシャットダウンを確実に防止して、停電時などに電力供給が可能な電源管理方法を提供することにある。
【0011】
【課題を解決するための手段】
上記目的を達成するために、無停電電源装置から電力供給を受ける複数のサーバを前記無停電電源装置と同一のネットワーク上に接続して構成した無停電電源システムの電源管理方法が提供される。この電源管理方法は、前記無停電電源装置から前記各サーバに常に動作確認信号を送って実際に動作しているサーバを認識し、前記無停電電源装置から前記ネットワーク経由で前記各サーバにOSシャットダウン指令を送出する際には、前記実際に動作しているサーバを前記OSシャットダウン指令の送出対象として、前記OSシャットダウン指令への応答信号が前記サーバから送り返されるまで前記OSシャットダウン指令を繰り返し送出し、当該サーバから前記動作確認信号への応答信号がなくなった後に前記無停電電源装置の出力を停止するように構成される。
【0012】
この電源管理方法によれば、ネットワークを使用したサーバのOSシャットダウンでは、サーバにUPSからシャットダウンを指令した後に、各サーバでのOSシャットダウンの完了を確認しているので、ダーティOSシャットダウンを確実に回避することができる。
【0013】
【発明の実施の形態】
以下、この発明の実施の形態について、図面を参照して説明する。
(第1の実施の形態)
図1は、この発明の実施の形態1に係る無停電電源システムの構成を示すブロック図である。
【0014】
この無停電電源システムでは、1台のUPS1から2台のサーバ11,12に電力を供給しており、商用電源における停電発生時には、UPS1はこれら2台のサーバ11,12をバックアップするように構成されている。UPS1とサーバ11,12とは、互いにイーサネット(Ethernet:登録商標)に接続可能であって、ここでは同じLAN上に接続されている。また、このネットワークを媒介するハブ2も、停電時にはUPS1でバックアップされる。
【0015】
従来、UPS1から電力を供給しているサーバ11,12がOSシャットダウンを終了しているかどうかの判断を行わずに、UPS1の出力は設定された遅延時間が経過した後に停止されるものであった。そして、このUPS出力停止遅延時間の設定は、サーバ購入時(あるいはシステム起動時)に行われる。そのため、使用中にシステムが大きくなり、サーバのOSシャットダウン時間が延びた場合には、いわゆるダーティシャットダウンとなり、データを破壊するおそれがあった。
【0016】
図2は、実施の形態1のシャットダウン処理手順を示すタイミング図である。
UPS1からは、OSシャットダウン対象として設定されているサーバ11に対してシャットダウン指令C1を、サーバ12に対してはシャットダウン指令C2を送る(図2(a),(c))。その後、UPS1ではそれらのサーバ11,12が動作しているかどうかを知るために、それぞれに動作確認信号を送る(図2(e),(g))。これにより、シャットダウン指令に対する応答が無い場合、そもそもサーバ11,12が停止していたのか、それともネットワークのトラフィックが混んでいる等の理由で通信できなかったのかどうか、という判別ができる。
【0017】
UPS1からサーバ11,12にシャットダウン指令C1,C2を送るタイミングとしては、停電発生時、スケジュール運転による停止時、あるいはネットワーク経由でのUPS停止指令受付時、等である。
【0018】
つぎに、停電発生時のシャットダウン処理手順を具体的に説明する。停電発生時には、UPS1は商用給電からバッテリ給電に切り替わり、サーバ11,12のバックアップを行う。停電後、設定時間が経過すると、UPS1はサーバ11,12に対してシャットダウン指令C1,C2を送る(図2(a),(c))。各サーバ11,12には、OSシャットダウンを行うソフトがインストールされており、シャットダウン指令を受けるとすぐにOSシャットダウンを開始する(図2(b),(d))。その後、従来のシステムでは、UPS1で設定した時間が経過すると、サーバ11,12でのOSシャットダウンが終了したかどうかにかかわらず、サーバ11,12の電源であるUPS1の出力を停止していた。しかし、ここでは、図2(f),(h)に示すように、サーバ11,12では動作確認信号に対するレスポンスとして、応答信号R1,R2をそれぞれUPS1に送り返しており、実際のUPS1は、動作確認信号に対する応答信号R1,R2がなくなった時点で、サーバ11,12への電源供給を停止するように構成されている。
【0019】
すなわち、サーバ12ではUPS出力の停止予定時刻になっても動作確認信号に対する応答信号R2があれば、時刻t0以前にUPS1の出力(サーバ2の電源)を停止させることはなく、応答信号R2のレスポンスが無くなることが確認された時刻t1になって、UPS1の出力を停止するようにしている。したがって、サーバ12でのダーティシャットダウンを確実に回避することができる。
【0020】
以上に述べたように、ネットワークを使用したサーバのOSシャットダウンでは、UPSからサーバに対してシャットダウンを指令した後に、サーバのシャットダウンが終了していることを確認する動作確認信号を送り、サーバからの応答信号がなくなったことで、各サーバでのOSシャットダウンの完了を確認するようにしている。したがって、第1の実施の形態に記載した発明によれば、サーバのダーティOSシャットダウンを確実に回避できる無停電電源システムの電源管理方法が提供できる。
【0021】
(第2の実施の形態)
図3は、実施の形態2のシャットダウン処理手順を示すタイミング図である。
第1の実施の形態では、サーバ11,12にシャットダウン指令C1,C2が伝わっていない場合にリトライをすることが困難であった。そのため、UPS1では設定された出力停止遅延時間後にその出力を停止すると、シャットダウン指令が伝わっていないサーバではダーティシャットダウンとなり、データを破壊するおそれがあった。
【0022】
そこで、UPS1と各サーバ11,12とは常に通信を行うように構成し、図3(g),(i)に示すように、シャットダウン指令C1,C2とは無関係にUPS1からサーバ11,12に動作確認信号を送っている。すなわち、これら動作確認信号への応答信号R1,R2により、UPS1ではOSシャットダウン対象のサーバ11,12のうち、動作しているサーバ12を認識するようにしている。したがって、サーバ11が停止しているという認識に基づいて、サーバ11に対してはシャットダウン指令を送出しない。
【0023】
また、UPS1が応答信号R2によりサーバ12が動作していることを認識しているため、図3(e)に示すように、サーバ12へのシャットダウン指令C2に対する応答信号をUPS1に送り返すようにしている。したがって、この応答信号がない場合には、応答信号が送り返されるまでサーバ12へのシャットダウン指令C2を繰り返して送出するリトライ動作を行えるので、サーバ12に対するシャットダウンが確実に実行できる。
【0024】
以上、第2の実施の形態によれば、シャットダウン指令の送出対象となるサーバ11,12に対して常に動作確認信号を送ることにより、シャットダウン指令は実際に動作しているサーバ12に対してだけ送出すればよい。また、ネットワークを使用したUPS1からサーバ11,12のOSシャットダウンではサーバ12にUPSからシャットダウンを指令した後に、応答信号R2のレスポンスがなくなったことにより、当該サーバ12でのOSシャットダウンの完了を確認しているので、リトライ動作によりダーティOSシャットダウンを確実に回避できる。
【0025】
【発明の効果】
以上に説明したように、この発明の電源管理方法によれば、UPSからシャットダウン指令の送出対象となるサーバに動作確認信号を送って、動作しているサーバに対してだけシャットダウン指令を送出すればよい。また、サーバにシャットダウン指令が伝わっていない状態であっても、リトライ動作によりダーティOSシャットダウンを確実に回避するようにしたので、ネットワークを使用したサーバのOSシャットダウンの信頼性を簡単に向上できる。
【図面の簡単な説明】
【図1】この発明の実施の形態1に係る無停電電源システムの構成を示すブロック図である。
【図2】実施の形態1のシャットダウン処理手順を示すタイミング図である。
【図3】実施の形態2のシャットダウン処理手順を示すタイミング図である。
【図4】従来の無停電電源システムの一例を示すシステム構成図である。
【図5】従来のシャットダウン処理手順を説明するタイミング図である。
【符号の説明】
1 UPS
2 ハブ
11,12 サーバ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a power management method for an uninterruptible power supply system configured by connecting a plurality of servers that receive power supply from the uninterruptible power supply on the same network as the uninterruptible power supply.
[0002]
[Prior art]
In general, an uninterruptible power supply (UPS) having a backup battery or a generator inside is always supplied from a commercial power supply to a system load such as a computer that requires uninterruptible power. It is widely used as a device that supplies power and allows the system to operate as it is even when a commercial power supply fails. The backup battery used in the UPS has a capacity that can operate the system for several minutes even if it has a small capacity, and the computer system can be safely shut down (terminated) during that time. Some large-capacity UPSs with an internal generator can operate the system for several days.
[0003]
FIG. 4 is a system configuration diagram showing an example of a conventional uninterruptible power supply system. In this system, a UPS 1 that can be connected to a network, and a plurality of server computers (hereinafter simply referred to as servers) 11 and 12 that receive power supply from the UPS 1 are connected by a hub (HUB) 2 on the same network such as a LAN. Constitutes an uninterruptible power system.
[0004]
FIG. 5 is a timing chart for explaining a conventional shutdown processing procedure. In the uninterruptible power supply system of FIG. 4, when an external commercial power supply fails or when the schedule is off, an OS shutdown command is sent from the UPS 1 to the servers 11 and 12 via the network, so that the OS shutdown in each server 11 and 12 is ensured. After being executed, it is necessary to stop the output of UPS1.
[0005]
However, in a system including the conventional UPS 1, regardless of whether or not the servers 11 and 12 are actually operating, all of the servers 11 and 12 set in the UPS 1 are shown in FIGS. The shutdown commands C1 and C2 as shown in FIG. 1 are sent from the UPS 1 via the network. As shown in FIGS. 5B and 5D, the output stop time set on the UPS 1 side (hereinafter, UPS output stop scheduled time) regardless of whether or not the OS shutdown processing in the servers 11 and 12 has ended. The power supply from the UPS 1 was stopped at the time t0 when e.g.) passed.
[0006]
On the other hand, on the server 11 and 12 side, like the server 12 shown in FIG. 5D, the OS shutdown process may be delayed due to some reason for the OS shutdown process for some reason. In such a case, if the power supply from the UPS 1 is not continued until time t1 or later, the power is cut off without the OS being shut down, and an abnormal termination process (dirty shutdown) may occur.
[0007]
Therefore, in a computer system in which a plurality of servers are connected in parallel as a load of one UPS 1, a shift occurs in information saved at the time of shutdown in each server, and as described in Patent Document 1 described later. One load is a master server, and a shutdown command needs to be transmitted from the load serving as the master server to another load serving as the slave server.
[0008]
[Patent Document 1]
Japanese Patent Laid-Open No. 11-202986
[Problems to be solved by the invention]
In such a power management device, when the router or hub is supplied with power from the commercial power supply, if an abnormality occurs in the commercial power supply, the router is turned off and shuts down to other servers via the network. can not transmit a signal to migrate to, all Masutasa bus than outside and dirty shut down, there is a possibility of damage to data or a hard disk. In such a case, the worst situation was that the server was dirty shut down, leading to a system failure of the slave server.
[0010]
The purpose of the invention is to reliably prevent the connected servers dirty shutdown uninterruptible power supply one, provides a power management how capable power supply, such as during a power failure.
[0011]
[Means for Solving the Problems]
In order to achieve the above object, there is provided a power management method for an uninterruptible power supply system configured by connecting a plurality of servers that receive power supply from the uninterruptible power supply on the same network as the uninterruptible power supply. This power management method always sends an operation confirmation signal from the uninterruptible power supply to each server to recognize the server that is actually operating, and shuts down the OS from the uninterruptible power supply to each server via the network. When sending a command, the server that is actually operating is targeted for sending the OS shutdown command, and the OS shutdown command is repeatedly sent until a response signal to the OS shutdown command is sent back from the server, configured to stop the output of the previous SL uninterruptible power supply after the response signal from the server to the operation confirmation signal has disappeared.
[0012]
According to this power management method, in the OS shutdown of the server using the network, since the completion of the OS shutdown in each server is confirmed after the server is instructed to shut down from the UPS, the dirty OS shutdown is surely avoided. can do.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below with reference to the drawings.
(First embodiment)
1 is a block diagram showing a configuration of an uninterruptible power supply system according to Embodiment 1 of the present invention.
[0014]
In this uninterruptible power supply system, power is supplied from one UPS 1 to two servers 11 and 12, and UPS 1 is configured to back up these two servers 11 and 12 when a power failure occurs in a commercial power source. Has been. The UPS 1 and the servers 11 and 12 can be connected to each other via Ethernet (registered trademark), and are connected to the same LAN here. The hub 2 that mediates this network is also backed up by the UPS 1 in the event of a power failure.
[0015]
Conventionally, the output of the UPS 1 is stopped after a set delay time has elapsed without determining whether the servers 11 and 12 that supply power from the UPS 1 have finished the OS shutdown. . The UPS output stop delay time is set when the server is purchased (or when the system is activated). For this reason, when the system becomes large during use and the OS shutdown time of the server is extended, so-called dirty shutdown occurs, which may destroy data.
[0016]
FIG. 2 is a timing chart showing a shutdown processing procedure according to the first embodiment.
From the UPS 1, a shutdown command C1 is sent to the server 11 set as the OS shutdown target, and a shutdown command C2 is sent to the server 12 (FIGS. 2A and 2C). Thereafter, the UPS 1 sends an operation confirmation signal to each of the servers 11 and 12 in order to know whether the servers 11 and 12 are operating (FIGS. 2E and 2G). As a result, when there is no response to the shutdown command, it can be determined whether the servers 11 and 12 have been stopped in the first place, or whether communication has failed due to traffic on the network.
[0017]
The timing for sending the shutdown commands C1 and C2 from the UPS 1 to the servers 11 and 12 is when a power failure occurs, when a scheduled operation is stopped, or when a UPS stop command is received via the network.
[0018]
Next, the shutdown process procedure when a power failure occurs will be specifically described. When a power failure occurs, the UPS 1 switches from commercial power supply to battery power supply and backs up the servers 11 and 12. When the set time elapses after the power failure, the UPS 1 sends shutdown commands C1 and C2 to the servers 11 and 12 (FIGS. 2A and 2C). Software for performing OS shutdown is installed in each of the servers 11 and 12, and OS shutdown starts immediately upon receiving a shutdown command (FIGS. 2B and 2D). Thereafter, in the conventional system, when the time set in UPS 1 elapses, the output of UPS 1 that is the power source of servers 11 and 12 is stopped regardless of whether the OS shutdown in servers 11 and 12 is completed. However, here, as shown in FIGS. 2 (f) and 2 (h), the servers 11 and 12 send response signals R1 and R2 back to the UPS 1 as responses to the operation confirmation signal, respectively. The power supply to the servers 11 and 12 is stopped when the response signals R1 and R2 with respect to the confirmation signal disappear.
[0019]
That is, if there is a response signal R2 to the operation confirmation signal even when the UPS output scheduled stop time comes, the server 12 does not stop the output of UPS1 (the power supply of the server 2) before the time t0, and the response signal R2 The output of UPS1 is stopped at time t1 when it is confirmed that there is no response. Therefore, the dirty shutdown in the server 12 can be avoided reliably.
[0020]
As described above, in the server OS shutdown using the network, after the UPS instructs the server to shut down, an operation confirmation signal is sent to confirm that the server shutdown has been completed. When the response signal disappears, the completion of OS shutdown in each server is confirmed. Therefore, according to the invention described in the first embodiment, it is possible to provide a power management method for an uninterruptible power supply system that can reliably avoid a dirty OS shutdown of a server.
[0021]
(Second Embodiment)
FIG. 3 is a timing chart showing a shutdown processing procedure according to the second embodiment.
In the first embodiment, it is difficult to retry when the shutdown commands C1 and C2 are not transmitted to the servers 11 and 12. For this reason, when the output is stopped after the set output stop delay time in the UPS 1, there is a possibility that the server in which the shutdown command is not transmitted becomes a dirty shutdown and destroys data.
[0022]
Therefore, the UPS 1 and each of the servers 11 and 12 are configured to always communicate with each other. As shown in FIGS. 3G and 3I , the UPS 1 transfers to the servers 11 and 12 regardless of the shutdown commands C1 and C2. An operation confirmation signal is sent. That is, the response signal R1, R2 to these operation confirmation signal of UPS1 the OS shutdown target server 11, and to recognize the server 12 operating. Therefore, the shutdown command is not sent to the server 11 based on the recognition that the server 11 is stopped.
[0023]
Further, since the UPS 1 recognizes that the server 12 is operating by the response signal R2, as shown in FIG. 3E, a response signal to the shutdown command C2 to the server 12 is sent back to the UPS 1. Yes. Therefore, if there is no response signal, since it performs a retry operation to be sent to repeat the shutdown command C2 to the server 12 until a response signal is sent back, the shutdown to the server 12 can be reliably performed.
[0024]
As described above, according to the second embodiment, by always sending an operation confirmation signal to the servers 11 and 12 to which the shutdown command is sent, the shutdown command is sent only to the server 12 that is actually operating. Send it out. In addition, in the OS shutdown of the servers 11 and 12 from the UPS 1 using the network, it is confirmed that the OS 12 has been shut down in the server 12 because the response of the response signal R2 is lost after the server 12 is instructed to shut down from the UPS 1. Thus, the dirty OS shutdown can be surely avoided by the retry operation.
[0025]
【The invention's effect】
As described above, according to the power management method of the present invention , an operation confirmation signal is sent from the UPS to the server to which the shutdown command is sent, and the shutdown command is sent only to the operating server. Good. In addition, even when the shutdown command is not transmitted to the server, since the dirty OS shutdown is reliably avoided by the retry operation, the reliability of the server OS shutdown using the network can be easily improved.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration of an uninterruptible power supply system according to Embodiment 1 of the present invention.
FIG. 2 is a timing chart showing a shutdown processing procedure according to the first embodiment.
FIG. 3 is a timing chart showing a shutdown processing procedure according to the second embodiment.
FIG. 4 is a system configuration diagram showing an example of a conventional uninterruptible power supply system.
FIG. 5 is a timing chart for explaining a conventional shutdown processing procedure;
[Explanation of symbols]
1 UPS
2 Hub 11, 12 server

Claims (1)

無停電電源装置から電力供給を受ける複数のサーバコンピュータ(以下、単にサーバという。)を前記無停電電源装置と同一のネットワーク上に接続して構成した無停電電源システムの電源管理方法において、
前記無停電電源装置から前記各サーバに常に動作確認信号を送って実際に動作しているサーバを認識し、
前記無停電電源装置から前記ネットワーク経由で前記各サーバにOSシャットダウン指令を送出する際には、前記実際に動作しているサーバを前記OSシャットダウン指令の送出対象として、前記OSシャットダウン指令への応答信号が前記サーバから送り返されるまで前記OSシャットダウン指令を繰り返し送出し、
当該サーバから前記動作確認信号への応答信号がなくなった後に前記無停電電源装置の出力を停止することを特徴とする電源管理方法。
In a power management method for an uninterruptible power supply system configured by connecting a plurality of server computers that receive power supply from an uninterruptible power supply (hereinafter simply referred to as a server) on the same network as the uninterruptible power supply,
Recognizing servers that are actually operating by sending an operation confirmation signal from the uninterruptible power supply to each server at all times,
When an OS shutdown command is sent from the uninterruptible power supply to each of the servers via the network , a response signal to the OS shutdown command with the server that is actually operating as the sending target of the OS shutdown command Repeatedly sends the OS shutdown command until is sent back from the server,
Power management method characterized by stopping the output of the previous SL uninterruptible power supply after the response signal from the server to the operation confirmation signal has disappeared.
JP2003165590A 2003-06-10 2003-06-10 Power management method Expired - Fee Related JP4370818B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003165590A JP4370818B2 (en) 2003-06-10 2003-06-10 Power management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003165590A JP4370818B2 (en) 2003-06-10 2003-06-10 Power management method

Publications (2)

Publication Number Publication Date
JP2005004379A JP2005004379A (en) 2005-01-06
JP4370818B2 true JP4370818B2 (en) 2009-11-25

Family

ID=34092026

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003165590A Expired - Fee Related JP4370818B2 (en) 2003-06-10 2003-06-10 Power management method

Country Status (1)

Country Link
JP (1) JP4370818B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010039734A (en) * 2008-08-05 2010-02-18 Buffalo Inc Communication system, line concentrator and connection equipment
JP5963470B2 (en) * 2012-02-17 2016-08-03 キヤノン株式会社 PRINT CONTROL DEVICE, CONTROL METHOD FOR PRINT CONTROL DEVICE, AND PROGRAM
WO2015088569A1 (en) 2013-12-14 2015-06-18 Hewlett-Packard Development Company, L.P. Powering loads with a power supply and an uninterruptible power supply

Also Published As

Publication number Publication date
JP2005004379A (en) 2005-01-06

Similar Documents

Publication Publication Date Title
US7337355B2 (en) Method, system, and program for error handling in a dual adaptor system where one adaptor is a master
US11194679B2 (en) Method and apparatus for redundancy in active-active cluster system
US7721155B2 (en) I2C failure detection, correction, and masking
US7437598B2 (en) System, method and circuit for mirroring data
US7519856B2 (en) Fault tolerant system and controller, operation method, and operation program used in the fault tolerant system
EP1153346B1 (en) Server system and method for operating the same
US7793060B2 (en) System method and circuit for differential mirroring of data
CN114138567A (en) Substrate management control module maintenance method, device, equipment and storage medium
CN112612653B (en) A business recovery method, device, arbitration server and storage system
JP4370818B2 (en) Power management method
EP1497731B1 (en) A method and a system for ensuring a bus and a control server
CN115706437B (en) Communication methods, devices, media, and programs powered by Universal Serial Bus
CN112394656B (en) Method, external device and system for checking program execution of microcontroller
JP2002136000A (en) Uninterruptible power supply system
US6957361B2 (en) Method, system, and program for error handling in a dual adaptor system
JP4098004B2 (en) Power interlock control method
JP3377457B2 (en) Cluster system and its operation management device and method
JP4068277B2 (en) Hardware system
JPH11202986A (en) Uninterruptible power supply system
JP2005004378A (en) Power management method and apparatus
JP2005004381A (en) Power management method and apparatus
JP2004070393A (en) Remote shutdown method
JP3022860B1 (en) Electronic device and hot-swap control method thereof
JP4966610B2 (en) Information processing system, emergency power-off method for information processing system
JPH05341803A (en) Redundant switching device for programmable controller

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20060116

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060117

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20060125

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20060210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081024

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081028

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090811

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090824

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120911

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4370818

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120911

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120911

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120911

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130911

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees