Building unit fastening tool, building unit and fastening method thereof Download PDF

Info

Publication number
JP4397474B2
JP4397474B2 JP22455199A JP22455199A JP4397474B2 JP 4397474 B2 JP4397474 B2 JP 4397474B2 JP 22455199 A JP22455199 A JP 22455199A JP 22455199 A JP22455199 A JP 22455199A JP 4397474 B2 JP4397474 B2 JP 4397474B2
Authority
JP
Japan
Prior art keywords
bolt
fastening
building unit
fastening tool
bolt holding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP22455199A
Other languages
Japanese (ja)
Other versions
JP2001047372A (en
Inventor
稔 屋代
和好 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOBAYASHI BYORA CO., LTD.
Sekisui Chemical Co Ltd
Original Assignee
KOBAYASHI BYORA CO., LTD.
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOBAYASHI BYORA CO., LTD., Sekisui Chemical Co Ltd filed Critical KOBAYASHI BYORA CO., LTD.
Priority to JP22455199A priority Critical patent/JP4397474B2/en
Publication of JP2001047372A publication Critical patent/JP2001047372A/en
Application granted granted Critical
Publication of JP4397474B2 publication Critical patent/JP4397474B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、バルコニーユニット、居室ユニット等の、建物ユニット締結工具及び建物ユニットとその締結方法に関する。
【0002】
【従来の技術】
従来、建物ユニットを、基礎もしくは下階建物ユニット(下部構造体)の上に据付けるに際し、建物ユニットの中空柱をボルトによってそれらの下部構造体に締結するため、特開平8-277581号公報(特願平7-22634)に記載の如く、締結工具の先端に、強力な磁力でボルトを保持するボルト保持部を設けたものを用い、このボルト保持部に保持したボルトを中空柱の開口から該中空柱内に挿入し、このボルトを下部構造体の側の接続部に螺着するものがある。
【0003】
また、この従来技術では、締結工具による締結完了の確認のために、締結工具の操作部に設けた工具係合部にトルクレンチを係着し、これによって必要な締結トルクをボルトに与えるとともに、このトルクにより柱の上面に締結トルク確認マークをインク噴射する締結トルク確認装置を備えることにより、ボルトの締結完了の管理を行なうこととしている。
【0004】
【発明が解決しようとする課題】
しかしながら、従来技術には以下の問題点がある。
▲1▼ボルトの締結完了の管理を行なうために、トルクレンチを用いることと、締結トルク確認装置を付帯的に備えることを必須としており、締結の施工管理に複雑を要する。
【0005】
▲2▼ボルトを締結工具に保持するために、強力な磁力をオン/オフできる複雑なボルト保持部を備えることを必須としており、ボルトの保持に複雑を要する。
【0006】
本発明の課題は、ボルトの締結トルクを簡易かつ確実に管理することにある。
【0007】
また、本発明の課題は、ボルトを締結工具の先端に簡易かつ確実に保持することにある。
【0008】
【課題を解決するための手段】
請求項1に記載の本発明は、下部構造体の上に建物ユニットを搭載し、この建物ユニットの中空構造物の底部をボルトによって該下部構造体に締結するに際して用いられる建物ユニット締結工具において、適用ボルトとして、頭部が上下に区分され、上頭部と下頭部の間に細径くびれ部を備えたものを用い、ボルト保持部と、該ボルト保持部を回動操作する操作部と、ボルト保持部と操作部との間に延在する軸部とを有し、ボルト保持部が、ボルトの上頭部を受容し、該上頭部と上記回動操作方向で係合する角孔状係合孔部と、ボルトの下頭部を受容し、該下頭部と上記回動操作方向で係合しない丸孔状非係合孔部と、係合孔部と非係合孔部の間に設けられ、ボルトのくびれ部に係止して該ボルトの上頭部を軸方向にて該係合孔部に保持する係止部とを有してなるようにしたものである。
【0010】
請求項に記載の本発明は、請求項1に記載の締結工具を用いた建物ユニットの下部構造体への締結方法であって、締結工具のボルト保持部の係合孔部と非係合孔部のそれぞれにボルトの上頭部と下頭部のそれぞれを差し込み、該ボルト保持部の係止部をボルトのくびれ部に係止して該ボルトを保持し、締結工具のボルト保持部を中空構造物の上部開口から該中空構造物内に挿入し、該ボルト保持部に保持してあるボルトを下部構造体の側の接続部に初期セットするとともに、更に所定の締め込み量をもって螺着せしめた後に、該ボルトのくびれ部が切れるまで該ボルトに締結トルクを与えるように該ボルト保持部を回動操作し、締結工具のボルト保持部を中空構造物の上部開口から抜き出し、該ボルト保持部の係合孔部に残留するボルトの上頭部を該ボルト保持部から取り出すようにしたものである。
【0015】
【作用】
(a)締結工具のボルト保持部は、ボルトの上頭部を係合孔部に受容し、下頭部を非係合孔部に受容した状態で、操作部により回動操作される。従って、操作部に加えられる操作トルクはボルトの上頭部に加えられ、この操作トルクが必要な締結トルクを超えると、ボルトの上頭部と下頭部の間の細径くびれ部をねじり破断せしめる。即ち、ボルトは必ず、くびれ部の断面が定める締結トルクで締結され、その締結の完了は上頭部の欠落の有無によって簡易かつ確実に確認できる。
【0016】
尚、締結工具のボルト保持部は、ボルトのくびれ部のねじり破断後の回動操作により、上頭部だけを係合孔部に保持したまま、非係合部を下頭部に対してただ空転せしめるものとなる。
【0017】
(b)ボルト保持部は、係合孔部と非係合孔部の間に設けた係止部を、ボルトのくびれ部に係止することにより、ボルトを簡易かつ確実に保持する。
【0021】
【発明の実施の形態】
図1はバルコニーユニットの中空手摺の下階建物ユニットへの締結方法を示す断面図、図2は締結工具を示す正面図、図3は締結用ボルトを示し、(A)は座金を装着した状態を示す正面図、(B)は正面図、(C)は側面図、図4は中空手摺に設ける案内板を示し、(A)は平面図、(B)は断面図、図5は締結工具のボルト保持部へのボルト保持手順を示す正面図、図6は締結工具の挿入状態を示し、(A)は全体斜視図、(B)は要部拡大図、図7は締結工具の軸部に設けたマークを示し、(A)は第1マークによる初期セット状態を示す斜視図、(B)は第2マークによる締め込み完了状態を示す斜視図、図8は締結工具のボルト保持部からの上頭部回収手順を示す正面図である。
【0022】
図1〜図8は、ユニット建物(図6)の構築において、本発明を適用した一実施形態を示すものであり、下部構造体としての下階建物ユニット1の上に、バルコニーユニット2を搭載し、このバルコニーユニット2の中空手摺3(中空構造物)の底部を、締結工具20によって操作されるボルト10により下階建物ユニット1に締結するものである。
【0023】
本実施形態に適用されるボルト10は、図3に示す如く、頭部11とねじ部12を有し、頭部11を上下に2分し、上頭部11Aと下頭部11Bの間に細径くびれ部11Cを備え、頭部11とねじ部12の間の座金装着部13に座金(ばね座金14、平座金14a)を脱落しない状態で予め組み込んである。また、ボルト10は、頭部11と座金14、14aの間に、座金14、14aと略同一外径の円柱状被ガイド部15を備えている。
【0024】
しかるに、締結工具20は、図2に示す如く、ボルト保持部21と、ハンドル状操作部22と、軸部23とを有する。
【0025】
ボルト保持部21は、図2に示す如く、軸部23に交換可能にキャップスクリュー24で取着され、手摺3の上部開口3A(図6)から該手摺3内に挿入される。ボルト保持部21は、図5に示す如く、ボックススパナ状をなし、ボルト10の上頭部11Aを受容し、上頭部11Aと締結工具10の回動操作方向で係合する角孔状係合孔部21Aと、ボルト10の下頭部11Bを受容し、下頭部11Bと締結工具20の回動操作方向で係合しない(空転する)丸孔状非係合孔部21Bとを有している。また、ボルト保持部21は、図5に示す如く、係合孔部21Aと非係合孔部21Bの間に、ボルト10のくびれ部11Cに係止して該ボルト10を軸方向にて保持する係止部21Cを有する。係止部21Cは、L型棒スパナ25で螺着される小ねじ26によって構成できる。係止部21Cは、小ねじ26以外に、ボルト保持部21の内面に組み込まれる弾発ボール、係止爪等により構成できる。
【0026】
操作部22は、ボルト保持部21を手摺3に挿入したとき、手摺3の外にあって、ボルト保持部21を回動操作可能とする。操作部22は、図2に示す如く、キャップスクリュー27で着脱されるハンドル28を備えて手動操作可能とされるとともに、トルクレンチ等を使用可能とする工具係合部29を軸部23と同軸に備えて電動操作可能とされる。
【0027】
軸部23は、ボルト保持部21と操作部22の間に延在し、ボルト保持部21と操作部22を連結する。軸部23は、中間部の軸方向2位置に第1マーク31と第2マーク32を備える。第1マーク31は、ボルト保持部21に保持したボルト10が下階建物ユニット1の側の接続部1Aに初期セットされたことを、手摺3の側の不動物としての上面板5との位置関係(位置の一致)によって判別可能とする。第2マーク32は、ボルト10が下階建物ユニット1の接続部1Aに所定の締め込み量をもって螺着されたことを、上述の上面板5との位置関係(位置の一致)によって判別可能とする。
【0028】
このとき、下階建物ユニット1は、図1、図6に示す如く、バルコニーユニット2が搭載されて接続される部分(接続部1A)を構成する中空柱又は梁(天井梁)にテーパ軸状のジョイントピン4を一体化され、ジョイントピン4の天面に雌ねじ4Aを備えている。他方、バルコニーユニット2の手摺3は、中空柱又は梁(天井梁と床梁)の上部に設けられる上面板5に前述の開口3Aを備えて締結工具20が挿入可能とされるとともに、それらの底部に底板6を取着されてこの底板6をボルト10によって下階建物ユニット1の接続部1Aに締結可能としている。底板6はジョイントピン4が嵌合するテーパ孔状の凹部6Aを備え、底板6の天面には、ジョイントピン4の雌ねじ4Aに合致するボルト挿通孔6Bが設けられている。このボルト挿通孔6Bには、バルコニーユニット2の手摺3を下階建物ユニット1に締結するためのボルト10が挿通される。
【0029】
更に、バルコニーユニット2の手摺3にあっては、案内板7を中間部に備える。案内板7は、図4に示す如く、締結工具20が保持するボルト10を下階建物ユニット1の接続部1A(ジョイントピン4の雌ねじ4A)とのセット位置に案内するためのボルトガイドテーパ7Aを備えるとともに、ボルトガイドテーパ7Aの中央にボルトガイド孔7Bを備える。ボルトガイド孔7Bの孔径は、締結工具20が保持するボルト10の座金14、被ガイド部15の外径よりわずかに大きく設定される。案内板7は、脚をつけて、これを底板6に取付けても良い。案内板7のボルトガイドテーパ7Aのテーパ角度θ(図4(B))は、締結工具20の重みでボルト10を自然に滑らせてボルトガイド孔7Bに導くように、略45度以上とするのが良い。
【0030】
以下、締結工具20を用いた締結手順について説明する。
(1) 締結工具20のボルト保持部21にボルト10の頭部11を保持せしめる(図5)。ボルト10の上頭部11Aをボルト保持部21の係合孔部21Aに、ボルト10の下頭部11Bをボルト保持部21の非係合孔部21Bに差し込み、ボルト10のくびれ部11Cにボルト保持部21の係止部21C(小ねじ26)をスパナ25を用いて係止し、締結工具20の先端にボルト10を脱落しない状態で保持する。
【0031】
(2) 締結工具20のボルト保持部21を、図6に示す如く、手摺3の開口3Aから該手摺3に挿入し、ボルト保持部21に保持してあるボルト10を手摺3の底板6のボルト挿通孔6Bに通して下階建物ユニット1の側の接続部1A(ジョイントピン4の雌ねじ4A)に初期セットする。このボルト保持部21の挿入過程で、ボルト保持部21に保持されているボルト10は、手摺3の案内板7のボルトガイドテーパ7A、ボルトガイド孔7Bに案内されて上記接続部1Aに導かれる。このとき、ボルト10が初期セットされたことの判別は、締結工具20の軸部23に設けてある第1マーク31が、図7(A)に示す如く、手摺3の側の上面板5に一致したことにより確認する。
【0032】
(3) 締結工具20のボルト保持部21に保持されているボルト10が下階建物ユニット1の接続部1A(ジョイントピン4の雌ねじ4A)に初期セットされたことが確認されたら、操作部22を用いてボルト保持部21及びボルト10を回動し、ボルト10をジョイントピン4の雌ねじ4Aに螺着し、手摺3の底板6を下階建物ユニット1の接続部1Aでそのジョイントピン4に締結する。このとき、締結工具20の軸部23に設けてある第2マーク32が、手摺3の側の上面板5に一致し、更に下動することの確認により、ボルト10がジョイントピン4の雌ねじ4Aに所定の締め込み量をもって螺着完了したことを判別する。その後、締結工具20の回動操作を続け、ボルト10のくびれ部11Cが必要な締結トルクを超える操作トルクの付与によりねじり破断するまで締め込む。
【0033】
(4) 締結工具20の回動操作により、ボルト10のくびれ部11Cが破断し、締め込み操作が軽くなったら、締結工具20を手摺3の外に抜き取る(図8)。このとき、締結工具20のボルト保持部21の係合孔部21Aには、切断された上頭部11Aが未だくびれ部11Cの部分を係止部21Cに係止されて保持される。締結工具20のボルト保持部21の係止部21Cを構成している小ねじ26をスパナ25で取外し、係合孔部21Aから上頭部11Aを締結完了確認用として回収する。
【0034】
尚、下階建物ユニット1の接続部1A(ジョイントピン4の雌ねじ4A)に締結されたボルト10が備える下頭部11Bは、ボルト10の締結不良の修復、下階建物ユニット1からのバルコニーユニット2の分離等に際し、ボルト10を下階建物ユニット1の接続部1Aから取外すために用いられる。
【0035】
従って、本実施形態によれば、以下の作用がある。
▲1▼締結工具20のボルト保持部21は、ボルト10の上頭部11Aを係合孔部21Aに受容し、下頭部11Bを非係合孔部21Bに受容した状態で、操作部22により回動操作される。従って、操作部22に加えられる操作トルクはボルト10の上頭部11Aに加えられ、この操作トルクが必要な締結トルクを超えると、ボルト10の上頭部11Aと下頭部11Bの間の細径くびれ部11Cをねじり破断せしめる。即ち、ボルト10は必ず、くびれ部11Cの断面が定める締結トルクで締結され、その締結の完了は上頭部11Aの欠落の有無によって簡易かつ確実に確認できる。
【0036】
尚、締結工具20のボルト保持部21は、ボルト10のくびれ部11Cのねじり破断後の回動操作により、上頭部11Aだけを係合孔部21Aに保持したまま、非係合部を下孔部に対してただ空転せしめるものとなる。
【0037】
▲2▼ボルト保持部21は、係合孔部21Aと非係合孔部21Bの間に設けた係止部21Cを、ボルト10のくびれ部11Cに係止することにより、ボルト10を簡易かつ確実に保持する。
【0038】
▲3▼締結工具20の軸部23に、ボルト保持部21に保持したボルト10が下階バルコニーユニット21の側の接続部1Aに初期セットされたことを中空手摺3の側の上面板5との位置関係から判別可能とする第1マーク31と、該ボルト10が該接続部1Aに所定の締め込み量をもって螺着されたことを中空手摺3の側の上面板5との位置関係から判別可能とする第2マーク32とを備えた。従って、操作者は、それら第1マーク31と第2マーク32により、ボルト10の初期セットと締め込み量の確認を簡易かつ確実に管理できる。
【0039】
▲4▼バルコニーユニット2の中空構造物の底部をボルト10によって下階バルコニーユニット2に締結するに際し、中空構造物の中間部に案内板7を備えることにより、締結工具20が保持するボルト10を下階建物ユニット1の側の接続部1Aとのセット位置に簡易かつ確実に案内でき、操作性を向上できる。
【0040】
▲5▼ボルト10に座金14、14aと略同一外径の被ガイド部15を備えたから、ボルト10を下階バルコニーユニット2の側の接続部1Aに至るまでの長い範囲に渡って、上述▲4▼の案内板に設けたボルトガイド孔7Bと少ない遊びをもって該案内板7によりがたなく安定的に案内できる。
【0041】
尚、ボルト10にあっては、座金14、14aを被ガイド部15で受けることができ、頭部11(上頭部11A、下頭部11B)を座金14、14aより小径にでき、結果として、締結工具20のボルト保持部21を細くでき、中空構造物(手摺3)の開口3Aが小なる場合にも適用できる。
【0042】
以上、本発明の実施の形態を図面により詳述したが、本発明の具体的な構成はこの実施の形態に限られるものではなく、本発明の要旨を逸脱しない範囲の設計の変更等があっても本発明に含まれる。例えば、本発明の実施において、建物ユニットは、バルコニーユニットに限らず、居室ユニット、屋根ユニット等の他のユニットでも良い。また、下部構造体は下階建物ユニットに限らず、基礎等であっても良い。
【0043】
【発明の効果】
以上のように本発明によれば、ボルトの締結トルクを簡易かつ確実に管理することができる。
【0044】
また、本発明によれば、ボルトを締結工具の先端に簡易かつ確実に保持することができる
【図面の簡単な説明】
【図1】 図1はバルコニーユニットの中空手摺の下階建物ユニットへの締結方法を示す断面図である。
【図2】 図2は締結工具を示す正面図である。
【図3】 図3は締結用ボルトを示し、(A)は座金を装着した状態を示す正面図、(B)は正面図、(C)は側面図である。
【図4】 図4は中空手摺に設ける案内板を示し、(A)は平面図、(B)は断面図である。
【図5】 図5は締結工具のボルト保持部へのボルト保持手順を示す正面図である。
【図6】 図6は締結工具の挿入状態を示し、(A)は全体斜視図、(B)は要部拡大図である。
【図7】 図7は締結工具の軸部に設けたマークを示し、(A)は第1マークによる初期セット状態を示す斜視図、(B)は第2マークによる締め込み完了状態を示す斜視図である。
【図8】 図8は締結工具のボルト保持部からの上頭部回収手順を示す正面図である。
【符号の説明】
1 下階建物ユニット(下部構造体)
1A 接続部
2 バルコニーユニット(建物ユニット)
3 中空手摺(中空構造物)
3A 開口
10 ボルト
11 頭部
11A 上頭部
11B 下頭部
11C くびれ部
12 ねじ部
20 締結工具
21 ボルト保持部
21A 係合孔部
21B 非係合孔部
21C 係止部
22 操作部
23 軸部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a building unit fastening tool such as a balcony unit and a living room unit, a building unit, and a fastening method thereof.
[0002]
[Prior art]
Conventionally, when installing a building unit on a foundation or a lower floor building unit (lower structure), the hollow columns of the building unit are fastened to the lower structure with bolts. As described in Japanese Patent Application No. 7-22634), the end of the fastening tool is provided with a bolt holding part that holds the bolt with a strong magnetic force, and the bolt held by this bolt holding part is opened from the opening of the hollow column. There is one that is inserted into the hollow column and screwed into the connecting portion on the lower structure side.
[0003]
Further, in this prior art, in order to confirm the completion of the fastening by the fastening tool, a torque wrench is engaged with the tool engaging portion provided in the operation portion of the fastening tool, thereby giving a necessary fastening torque to the bolt, The fastening completion of bolts is managed by providing a fastening torque confirmation device that ejects ink with a fastening torque confirmation mark on the upper surface of the column by this torque.
[0004]
[Problems to be solved by the invention]
However, the prior art has the following problems.
(1) In order to manage the completion of bolt fastening, it is essential to use a torque wrench and to additionally provide a fastening torque confirmation device, which requires complicated construction management.
[0005]
(2) In order to hold the bolt on the fastening tool, it is essential to provide a complicated bolt holding portion capable of turning on / off a strong magnetic force, and the holding of the bolt is complicated.
[0006]
The subject of this invention is managing the fastening torque of a volt | bolt simply and reliably.
[0007]
Another object of the present invention is to simply and reliably hold the bolt at the tip of the fastening tool.
[0008]
[Means for Solving the Problems]
The present invention described in claim 1 is a building unit fastening tool used when a building unit is mounted on a lower structure and the bottom of the hollow structure of the building unit is fastened to the lower structure with a bolt. As an applied bolt, the head is divided into upper and lower parts, and has a narrow constricted part between the upper and lower heads, a bolt holding part, and an operation part for rotating the bolt holding part , , and a shaft portion extending between the operation unit bolt holding portion, the bolt holding portion, the head portion and the receiving on the bolt, engages the upper head and the rotational operation direction angle a hole-shaped engagement hole, to receive the lower head of the bolt, and Maruanajo Hikakarigoana portion does not engage with the lower head and the rotational operation direction, engaging holes and Hikakarigoana Is provided between the two portions, and is engaged with the constricted portion of the bolt to hold the upper head of the bolt in the engagement hole portion in the axial direction. It is obtained by the so and a stop portion.
[0010]
The present invention according to claim 2 is a method for fastening the building unit to the lower structure using the fastening tool according to claim 1, and is not engaged with the engagement hole portion of the bolt holding portion of the fastening tool. Insert each of the upper and lower heads of the bolt into each of the holes, and lock the bolt holding portion to the constricted portion of the bolt to hold the bolt. Inserted into the hollow structure through the upper opening of the hollow structure, the bolt held in the bolt holding part is initially set in the connection part on the lower structure side, and is further screwed with a predetermined tightening amount. After tightening, the bolt holding part is rotated so as to give a fastening torque to the bolt until the constricted part of the bolt is cut, and the bolt holding part of the fastening tool is extracted from the upper opening of the hollow structure, and the bolt holding Of the bolt remaining in the engagement hole The head in which they were taken out from the bolt holding portion.
[0015]
[Action]
(a) The bolt holding portion of the fastening tool is rotated by the operation portion in a state where the upper head portion of the bolt is received in the engagement hole portion and the lower head portion is received in the non-engagement hole portion. Therefore, the operating torque applied to the operating part is applied to the upper head of the bolt, and if this operating torque exceeds the required fastening torque, the narrow neck between the upper and lower heads of the bolt is twisted and broken. Let me. That is, the bolt is surely fastened with a fastening torque determined by the cross section of the constricted portion, and the completion of the fastening can be easily and reliably confirmed by the presence or absence of the lack of the upper head.
[0016]
In addition, the bolt holding part of the fastening tool is configured such that the non-engagement part is only held with respect to the lower head while the upper part of the bolt is held in the engagement hole part by the turning operation after the torsional fracture of the constriction part of the bolt. It will be idle.
[0017]
(b) The bolt holding portion holds the bolt easily and reliably by locking the locking portion provided between the engaging hole portion and the non-engaging hole portion to the constricted portion of the bolt.
[0021]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is a cross-sectional view showing a method of fastening a balcony unit to a lower floor building unit, FIG. 2 is a front view showing a fastening tool, FIG. 3 shows a fastening bolt, and FIG. (B) is a front view, (C) is a side view, FIG. 4 shows a guide plate provided on a hollow handrail, (A) is a plan view, (B) is a sectional view, and FIG. 5 is a fastening tool. The front view which shows the bolt holding procedure of the bolt holding part of FIG. 6, FIG. 6 shows the insertion state of a fastening tool, (A) is a whole perspective view, (B) is a principal part enlarged view, FIG. (A) is a perspective view showing an initial setting state by the first mark, (B) is a perspective view showing a fastening completion state by the second mark, and FIG. 8 is a view from the bolt holding portion of the fastening tool. It is a front view which shows the upper head collection | recovery procedure.
[0022]
FIGS. 1-8 shows one Embodiment to which this invention was applied in construction of a unit building (FIG. 6), and mounts the balcony unit 2 on the lower-floor building unit 1 as a lower structure. And the bottom part of the hollow handrail 3 (hollow structure) of this balcony unit 2 is fastened to the lower-floor building unit 1 by the bolt 10 operated by the fastening tool 20.
[0023]
As shown in FIG. 3, the bolt 10 applied to the present embodiment has a head portion 11 and a screw portion 12. The head portion 11 is vertically divided into two parts, and between the upper head portion 11 </ b> A and the lower head portion 11 </ b> B. A narrow constriction portion 11C is provided, and a washer (spring washer 14, flat washer 14a) is incorporated in advance in a washer mounting portion 13 between the head portion 11 and the screw portion 12 without being dropped. Further, the bolt 10 includes a columnar guided portion 15 having an outer diameter substantially the same as that of the washers 14 and 14a between the head 11 and the washers 14 and 14a.
[0024]
However, the fastening tool 20 includes a bolt holding portion 21, a handle-like operation portion 22, and a shaft portion 23, as shown in FIG.
[0025]
As shown in FIG. 2, the bolt holding portion 21 is attached to the shaft portion 23 by a cap screw 24 so as to be replaceable, and is inserted into the handrail 3 from the upper opening 3 </ b> A (FIG. 6) of the handrail 3. As shown in FIG. 5, the bolt holding portion 21 has a box spanner shape, receives the upper head portion 11 </ b> A of the bolt 10, and engages with the upper head portion 11 </ b> A in the rotational operation direction of the fastening tool 10. 21 A of joint holes and the lower head part 11B of the volt | bolt 10 are received, and the lower head part 11B and the round hole-like non-engagement hole part 21B which does not engage in the rotation operation direction of the fastening tool 20 (it idles) are provided. is doing. Further, as shown in FIG. 5, the bolt holding portion 21 is engaged with the constricted portion 11C of the bolt 10 between the engaging hole portion 21A and the non-engaging hole portion 21B to hold the bolt 10 in the axial direction. It has a locking portion 21C. The locking portion 21 </ b> C can be configured by a machine screw 26 that is screwed with an L-shaped bar spanner 25. The locking portion 21 </ b> C can be constituted by a ball, a locking claw or the like incorporated in the inner surface of the bolt holding portion 21 in addition to the small screw 26.
[0026]
When the bolt holding unit 21 is inserted into the handrail 3, the operation unit 22 is outside the handrail 3 and enables the bolt holding unit 21 to be rotated. As shown in FIG. 2, the operation unit 22 includes a handle 28 that can be attached and detached with a cap screw 27 and can be manually operated, and a tool engagement unit 29 that can use a torque wrench or the like is coaxial with the shaft unit 23. It is possible to operate it electrically.
[0027]
The shaft portion 23 extends between the bolt holding portion 21 and the operation portion 22 and connects the bolt holding portion 21 and the operation portion 22. The shaft portion 23 includes a first mark 31 and a second mark 32 at two positions in the axial direction of the intermediate portion. The first mark 31 indicates that the bolt 10 held in the bolt holding part 21 is initially set in the connecting part 1A on the lower floor building unit 1 side, and the position with the top plate 5 as an animal on the handrail 3 side. Discrimination is possible based on the relationship (position match). The second mark 32 can determine that the bolt 10 is screwed to the connecting portion 1A of the lower-floor building unit 1 with a predetermined tightening amount based on the positional relationship (position matching) with the upper surface plate 5 described above. To do.
[0028]
At this time, as shown in FIGS. 1 and 6, the lower-floor building unit 1 has a taper shaft shape on a hollow column or beam (ceiling beam) constituting a portion (connection portion 1 </ b> A) on which the balcony unit 2 is mounted and connected. The joint pin 4 is integrated, and the top surface of the joint pin 4 is provided with a female screw 4A. On the other hand, the handrail 3 of the balcony unit 2 is provided with the above-described opening 3A in the upper plate 5 provided on the upper part of the hollow column or beam (ceiling beam and floor beam), and the fastening tool 20 can be inserted therein. The bottom plate 6 is attached to the bottom, and the bottom plate 6 can be fastened to the connecting portion 1 </ b> A of the lower floor building unit 1 with a bolt 10. The bottom plate 6 is provided with a tapered hole-like recess 6A into which the joint pin 4 is fitted, and a bolt insertion hole 6B that matches the female screw 4A of the joint pin 4 is provided on the top surface of the bottom plate 6. A bolt 10 for fastening the handrail 3 of the balcony unit 2 to the lower floor building unit 1 is inserted into the bolt insertion hole 6B.
[0029]
Furthermore, in the handrail 3 of the balcony unit 2, the guide plate 7 is provided in the intermediate part. As shown in FIG. 4, the guide plate 7 is a bolt guide taper 7A for guiding the bolt 10 held by the fastening tool 20 to the set position with the connecting portion 1A (the female thread 4A of the joint pin 4) of the lower floor building unit 1. And a bolt guide hole 7B at the center of the bolt guide taper 7A. The diameter of the bolt guide hole 7 </ b> B is set slightly larger than the outer diameter of the washer 14 and the guided portion 15 of the bolt 10 held by the fastening tool 20. The guide plate 7 may be attached to the bottom plate 6 with legs. The taper angle θ (FIG. 4B) of the bolt guide taper 7A of the guide plate 7 is approximately 45 degrees or more so that the bolt 10 is naturally slid by the weight of the fastening tool 20 and guided to the bolt guide hole 7B. Is good.
[0030]
Hereinafter, the fastening procedure using the fastening tool 20 will be described.
(1) The head 11 of the bolt 10 is held on the bolt holding portion 21 of the fastening tool 20 (FIG. 5). The upper head portion 11A of the bolt 10 is inserted into the engagement hole portion 21A of the bolt holding portion 21 and the lower head portion 11B of the bolt 10 is inserted into the non-engagement hole portion 21B of the bolt holding portion 21 and the bolt 10 is inserted into the constricted portion 11C of the bolt 10 The locking portion 21C (the small screw 26) of the holding portion 21 is locked using the spanner 25, and the bolt 10 is held at the tip of the fastening tool 20 without dropping off.
[0031]
(2) The bolt holding portion 21 of the fastening tool 20 is inserted into the handrail 3 through the opening 3A of the handrail 3 as shown in FIG. 6, and the bolt 10 held on the bolt holding portion 21 is inserted into the bottom plate 6 of the handrail 3. It passes through the bolt insertion hole 6B and is initially set in the connecting portion 1A (the female screw 4A of the joint pin 4) on the lower floor building unit 1 side. In the process of inserting the bolt holding portion 21, the bolt 10 held by the bolt holding portion 21 is guided by the bolt guide taper 7A and the bolt guide hole 7B of the guide plate 7 of the handrail 3 and guided to the connecting portion 1A. . At this time, the first mark 31 provided on the shaft portion 23 of the fastening tool 20 is identified on the upper surface plate 5 on the handrail 3 side as shown in FIG. Confirm by matching.
[0032]
(3) When it is confirmed that the bolt 10 held by the bolt holding part 21 of the fastening tool 20 is initially set to the connection part 1A (the female thread 4A of the joint pin 4) of the lower floor building unit 1, the operation part 22 Are used to rotate the bolt holding portion 21 and the bolt 10, screw the bolt 10 into the female screw 4 </ b> A of the joint pin 4, and attach the bottom plate 6 of the handrail 3 to the joint pin 4 at the connecting portion 1 </ b> A of the lower building unit 1. Conclude. At this time, when the second mark 32 provided on the shaft portion 23 of the fastening tool 20 coincides with the upper surface plate 5 on the handrail 3 side and further moves downward, the bolt 10 is connected to the female thread 4A of the joint pin 4. It is determined that the screwing is completed with a predetermined tightening amount. Thereafter, the turning operation of the fastening tool 20 is continued, and the constricted portion 11C of the bolt 10 is tightened until it is torsionally broken by applying an operation torque exceeding the necessary fastening torque.
[0033]
(4) When the constricted portion 11C of the bolt 10 is broken by the turning operation of the fastening tool 20 and the tightening operation becomes lighter, the fastening tool 20 is removed from the handrail 3 (FIG. 8). At this time, in the engagement hole portion 21A of the bolt holding portion 21 of the fastening tool 20, the cut upper head portion 11A is still held with the portion of the constricted portion 11C locked to the locking portion 21C. The small screw 26 constituting the locking portion 21C of the bolt holding portion 21 of the fastening tool 20 is removed with a spanner 25, and the upper head portion 11A is collected from the engagement hole portion 21A for confirmation of fastening completion.
[0034]
In addition, the lower head part 11B with which the bolt 10 fastened to the connection part 1A (the female screw 4A of the joint pin 4) of the lower-floor building unit 1 is the repair of the fastening failure of the bolt 10, and the balcony unit from the lower-floor building unit 1 2 is used to remove the bolt 10 from the connecting portion 1A of the lower-floor building unit 1 when separating the two.
[0035]
Therefore, according to the present embodiment, there are the following operations.
(1) The bolt holding portion 21 of the fastening tool 20 receives the upper head portion 11A of the bolt 10 in the engagement hole portion 21A and the lower head portion 11B in the non-engagement hole portion 21B. Is rotated. Accordingly, the operation torque applied to the operation unit 22 is applied to the upper head 11A of the bolt 10, and when this operation torque exceeds the required fastening torque, the fine torque between the upper head 11A and the lower head 11B of the bolt 10 is reduced. The diameter constricted portion 11C is twisted and broken. That is, the bolt 10 is surely fastened with a fastening torque determined by the cross section of the constricted portion 11C, and the completion of the fastening can be easily and reliably confirmed by the presence or absence of the upper head portion 11A.
[0036]
It should be noted that the bolt holding portion 21 of the fastening tool 20 moves the non-engaging portion down while holding only the upper head portion 11A in the engaging hole portion 21A by the turning operation after the torsional fracture of the constricted portion 11C of the bolt 10. It will be simply idle with respect to the hole.
[0037]
(2) The bolt holding portion 21 is configured to lock the bolt 10 easily and easily by locking the locking portion 21C provided between the engaging hole portion 21A and the non-engaging hole portion 21B to the constricted portion 11C of the bolt 10. Hold securely.
[0038]
(3) The fact that the bolt 10 held by the bolt holding part 21 is initially set in the connecting part 1A on the lower floor balcony unit 21 side on the shaft part 23 of the fastening tool 20 and the upper surface plate 5 on the hollow handrail 3 side, It is determined from the positional relationship between the first mark 31 that can be determined from the positional relationship between and the top plate 5 on the side of the hollow handrail 3 that the bolt 10 is screwed to the connecting portion 1A with a predetermined tightening amount. The second mark 32 is provided. Accordingly, the operator can easily and reliably manage the initial setting of the bolt 10 and the confirmation of the tightening amount by using the first mark 31 and the second mark 32.
[0039]
(4) When the bottom of the hollow structure of the balcony unit 2 is fastened to the lower floor balcony unit 2 with the bolt 10, the guide plate 7 is provided in the middle of the hollow structure so that the bolt 10 held by the fastening tool 20 is Guidance can be easily and reliably guided to the set position with the connecting portion 1A on the lower floor building unit 1 side, and operability can be improved.
[0040]
(5) Since the bolt 10 is provided with the guided part 15 having substantially the same outer diameter as the washers 14, 14a, the bolt 10 is extended over the long range from the connecting part 1A on the lower floor balcony unit 2 side to With the bolt guide hole 7B provided on the guide plate 4) and with a little play, the guide plate 7 can guide the ball without any difficulty.
[0041]
In the bolt 10, the washers 14, 14a can be received by the guided portion 15, and the head 11 (upper head 11A, lower head 11B) can be made smaller in diameter than the washers 14, 14a. The bolt holding portion 21 of the fastening tool 20 can be thinned, and the present invention can also be applied to the case where the opening 3A of the hollow structure (handrail 3) is small.
[0042]
Although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration of the present invention is not limited to this embodiment, and there are design changes and the like without departing from the gist of the present invention. Is included in the present invention. For example, in the implementation of the present invention, the building unit is not limited to a balcony unit, but may be other units such as a living room unit and a roof unit. Further, the lower structure is not limited to the lower floor building unit but may be a foundation or the like.
[0043]
【The invention's effect】
As described above, according to the present invention, the fastening torque of the bolt can be managed easily and reliably.
[0044]
Further, according to the present invention, the bolt can be easily and reliably held at the tip of the fastening tool.
FIG. 1 is a cross-sectional view showing a method of fastening a balcony unit to a lower floor building unit of a hollow handrail.
FIG. 2 is a front view showing a fastening tool.
FIG. 3 shows a fastening bolt, (A) is a front view showing a state where a washer is mounted, (B) is a front view, and (C) is a side view.
4A and 4B show a guide plate provided on a hollow handrail, where FIG. 4A is a plan view and FIG. 4B is a cross-sectional view.
FIG. 5 is a front view showing a procedure for holding a bolt on a bolt holding portion of a fastening tool.
6A and 6B show an insertion state of a fastening tool, where FIG. 6A is an overall perspective view and FIG. 6B is an enlarged view of a main part.
7A and 7B show marks provided on the shaft portion of the fastening tool, wherein FIG. 7A is a perspective view showing an initial setting state using a first mark, and FIG. 7B is a perspective view showing a tightening completion state using a second mark. FIG.
FIG. 8 is a front view showing an upper head recovery procedure from a bolt holding portion of a fastening tool.
[Explanation of symbols]
1 Lower-floor building unit (lower structure)
1A Connection 2 Balcony unit (building unit)
3 Hollow handrail (hollow structure)
3A Opening 10 Bolt 11 Head 11A Upper head 11B Lower head 11C Constriction 12 Screw part 20 Fastening tool 21 Bolt holding part 21A Engagement hole 21B Non-engagement hole 21C Locking part 22 Operation part 23 Shaft part

Claims (2)

下部構造体の上に建物ユニットを搭載し、この建物ユニットの中空構造物の底部をボルトによって該下部構造体に締結するに際して用いられる建物ユニット締結工具において、
適用ボルトとして、頭部が上下に区分され、上頭部と下頭部の間に細径くびれ部を備えたものを用い、
ボルト保持部と、該ボルト保持部を回動操作する操作部と、ボルト保持部と操作部との間に延在する軸部とを有し、
ボルト保持部が、ボルトの上頭部を受容し、該上頭部と上記回動操作方向で係合する角孔状係合孔部と、ボルトの下頭部を受容し、該下頭部と上記回動操作方向で係合しない丸孔状非係合孔部と、係合孔部と非係合孔部の間に設けられ、ボルトのくびれ部に係止して該ボルトの上頭部を軸方向にて該係合孔部に保持する係止部とを有してなることを特徴とする建物ユニット締結工具。
In the building unit fastening tool used when mounting the building unit on the lower structure and fastening the bottom of the hollow structure of the building unit to the lower structure with a bolt,
As an applicable bolt, use a head whose head is divided into upper and lower parts and a narrow neck between the upper and lower heads.
A bolt holding part, an operating part for rotating the bolt holding part, and a shaft part extending between the bolt holding part and the operating part,
A bolt holding portion receives the upper head of the bolt, receives a square hole-like engagement hole that engages the upper head in the rotational operation direction, and receives the lower head of the bolt. And a round hole-shaped non-engagement hole portion that is not engaged in the rotation operation direction, and is provided between the engagement hole portion and the non-engagement hole portion, and is locked to a constricted portion of the bolt to A building unit fastening tool comprising a locking portion that holds the portion in the engagement hole portion in the axial direction.
請求項1に記載の締結工具を用いた建物ユニットの下部構造体への締結方法であって、
締結工具のボルト保持部の係合孔部と非係合孔部のそれぞれにボルトの上頭部と下頭部のそれぞれを差し込み、該ボルト保持部の係止部をボルトのくびれ部に係止して該ボルトを保持し、
締結工具のボルト保持部を中空構造物の上部開口から該中空構造物内に挿入し、該ボルト保持部に保持してあるボルトを下部構造体の側の接続部に初期セットするとともに、更に所定の締め込み量をもって螺着せしめた後に、該ボルトのくびれ部が切れるまで該ボルトに締結トルクを与えるように該ボルト保持部を回動操作し、
締結工具のボルト保持部を中空構造物の上部開口から抜き出し、該ボルト保持部の係合孔部に残留するボルトの上頭部を該ボルト保持部から取り出す、建物ユニットの締結方法。
A fastening method to a substructure of a building unit using the fastening tool according to claim 1,
The upper and lower heads of the bolt are inserted into the engaging hole and the non-engaging hole of the bolt holding part of the fastening tool, and the locking part of the bolt holding part is locked to the constricted part of the bolt. Hold the bolt,
The bolt holding portion of the fastening tool is inserted into the hollow structure from the upper opening of the hollow structure, and the bolt held by the bolt holding portion is initially set at the connection portion on the lower structure side, and further, The bolt holding portion is rotated so as to give a fastening torque to the bolt until the constricted portion of the bolt is cut.
A method for fastening a building unit, wherein a bolt holding portion of a fastening tool is extracted from an upper opening of a hollow structure, and an upper head portion of a bolt remaining in an engagement hole portion of the bolt holding portion is taken out from the bolt holding portion.
JP22455199A 1999-08-06 1999-08-06 Building unit fastening tool, building unit and fastening method thereof Expired - Lifetime JP4397474B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22455199A JP4397474B2 (en) 1999-08-06 1999-08-06 Building unit fastening tool, building unit and fastening method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22455199A JP4397474B2 (en) 1999-08-06 1999-08-06 Building unit fastening tool, building unit and fastening method thereof

Publications (2)

Publication Number Publication Date
JP2001047372A JP2001047372A (en) 2001-02-20
JP4397474B2 true JP4397474B2 (en) 2010-01-13

Family

ID=16815568

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22455199A Expired - Lifetime JP4397474B2 (en) 1999-08-06 1999-08-06 Building unit fastening tool, building unit and fastening method thereof

Country Status (1)

Country Link
JP (1) JP4397474B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018186304A1 (en) * 2017-04-05 2018-10-11 株式会社ロブストス Anti-skid tool, anti-skid tool kit, and side hooks provided to anti-skid tool

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102932314B1 (en) * 2025-05-07 2026-03-03 (주)플랜엠 Modular connection structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018186304A1 (en) * 2017-04-05 2018-10-11 株式会社ロブストス Anti-skid tool, anti-skid tool kit, and side hooks provided to anti-skid tool
JPWO2018186304A1 (en) * 2017-04-05 2020-02-20 株式会社ロブストス Non-slip device, anti-slip kit and side hooks provided on the anti-slip device
JP7093092B2 (en) 2017-04-05 2022-06-29 株式会社ロブストス Center stud for non-slip, non-slip and non-slip kit

Also Published As

Publication number Publication date
JP2001047372A (en) 2001-02-20

Similar Documents

Publication Publication Date Title
CA2265261C (en) Anchor bolt for friable material
US6454768B1 (en) Removable gripping set screw
JP3271980B2 (en) Tools for extracting broken bolts, etc.
US7547171B2 (en) Wall mounted toggle hook
US20130058736A1 (en) Drivable eye bolt
JP2008518690A5 (en)
CN101516275A (en) Nail system and method for an olecranon osteotomy
US10473137B2 (en) Winged threaded fastener
GB2124536A (en) A hand machine tool provided with an auxiliary handle
US20030000991A1 (en) Setting tool for nail-in anchors
US20130004260A1 (en) Connection means and lock mounting device with such connection means
WO2008056455A1 (en) Shank attaching device
US3078754A (en) Drive socket insert for bolt heads having tapered conical surface to match bolt
US7296501B2 (en) Limited access building connection
JP4224431B2 (en) Combination of target and / or nailing device and intramedullary pin
JP4397474B2 (en) Building unit fastening tool, building unit and fastening method thereof
US3049358A (en) Tooling and method of installing expansion shells
US4805495A (en) Bolt head reforming tool
US12546355B2 (en) Post-to-beam fastener
CN101688548B (en) Mounting/assembly element for assembling workpieces, particularly overlapping plates and/or components
US12398558B2 (en) Floating connection fastening system
JP2008309200A (en) Mounting bracket with locking piece, electric tool for mounting bracket, mounting bracket installation unit
JP4268840B2 (en) Removal tool
JPS63283875A (en) Setter for anchor
JP2002519253A (en) Automatic corkscrew

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090507

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090703

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090728

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090910

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091006

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091021

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121030

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4397474

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121030

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131030

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term