Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4405950B2 - Lifting device for construction materials - Google Patents
[go: Go Back, main page]

JP4405950B2 - Lifting device for construction materials - Google Patents

Lifting device for construction materials Download PDF

Info

Publication number
JP4405950B2
JP4405950B2 JP2005232913A JP2005232913A JP4405950B2 JP 4405950 B2 JP4405950 B2 JP 4405950B2 JP 2005232913 A JP2005232913 A JP 2005232913A JP 2005232913 A JP2005232913 A JP 2005232913A JP 4405950 B2 JP4405950 B2 JP 4405950B2
Authority
JP
Japan
Prior art keywords
lifting
stage
dimensional frame
chain
construction material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2005232913A
Other languages
Japanese (ja)
Other versions
JP2007046360A (en
Inventor
忍 山崎
寛 中村
司 毛内
秀人 上根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2005232913A priority Critical patent/JP4405950B2/en
Publication of JP2007046360A publication Critical patent/JP2007046360A/en
Application granted granted Critical
Publication of JP4405950B2 publication Critical patent/JP4405950B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、建設資材の昇降装置に関する。   The present invention relates to a lifting device for construction materials.

超高層RC集合住宅などの建設工事では、躯体構築時におけるタワークレーンの負荷を軽減する目的で、型枠やサポート材などの転用部材を下階から上階へ搬送する機能と、タワークレーンにより外部から搬入されるALC版などの資材を荷受けするステージ機能とを併せ持った昇降装置が考案され、多くの建設現場で実用化されている(例えば、特許文献1参照)。
特開2001−214614号公報
In construction work such as super high-rise RC apartment buildings, the function of transporting diverted members such as formwork and support materials from the lower floor to the upper floor for the purpose of reducing the load on the tower crane at the time of building the building and the outside by the tower crane An elevating device having a stage function for receiving materials such as ALC plates carried in is devised and put into practical use at many construction sites (for example, see Patent Document 1).
JP 2001-214614 A

しかしながら、現行の昇降装置は複数の電動式チェーンホイストを用いて資材を積載するステージを昇降させており、以下のような問題点がある。
(1)最上層に設置される複数の電動式チェーンホイストが大きいため、ALC版などの長物資材を上部開口から取り込む際に、電動式チェーンホイストが障害となり、資材の取り込みに手間が掛かる。
(2)複数の昇降駆動装置を用いる場合には、昇降動作を繰り返す間に昇降用のチェーンあるいはワイヤーロープの繰出し量に差が生じ、昇降ステージの水平度が狂ってくる。そのため、この狂いを小さく抑える、あるいは補正するための複雑な制御機構が必要となる。その結果、昇降装置のコストが上昇する、あるいは信頼性維持に手間が掛かる等の問題がある。
However, the current lifting device uses a plurality of electric chain hoists to raise and lower the stage on which the material is loaded, and has the following problems.
(1) Since a plurality of electric chain hoists installed in the uppermost layer are large, the electric chain hoist becomes an obstacle when taking a long material such as an ALC plate from the upper opening, and it takes time to take in the material.
(2) In the case of using a plurality of lifting drive units, a difference occurs in the amount of lifting of the lifting chain or wire rope while the lifting operation is repeated, and the level of the lifting stage becomes out of order. Therefore, a complicated control mechanism for suppressing or correcting this deviation is necessary. As a result, there is a problem that the cost of the lifting device is increased or that it takes time to maintain reliability.

本発明は、上述する問題点に鑑みてなされたもので、上部開口から建設資材を容易に取り込むことができ、しかも水平度を確保するための同調制御機構が不要で、高速昇降が可能な昇降ステージを有する建設資材の昇降装置を提供することを目的とする。   The present invention has been made in view of the above-described problems. Construction materials can be easily taken in from an upper opening, and a synchronization control mechanism for ensuring levelness is not required, so that it can be moved up and down at high speed. An object of the present invention is to provide a lifting device for a construction material having a stage.

上記目的を達成するため、本発明は、構造物 の複数階と略 同一の高さ寸法を有する平面視矩形状の 立体フレームと、当該 立体フレーム内を昇降する 昇降ステージと、前記立体フレームの最上層に設置され、前記 昇降ステージを懸吊して昇降させる駆動装置 と、前記立体フレームを 前記構造物 に固定支持するアウトリガーとを備える建設資材の昇降装置において、前記駆動装置が、前記立体フレームの最上層の梁に沿って設置され、第一減速機を介して電動機に連結された第一回転軸と、前記第一回転軸の両端部においてそれぞれ第二減速機を介して連結され、前記第一回転軸と直交する一対の並設された第二回転軸とを備え、前記一対の並設された第二回転軸にそれぞれ取り付けられたスプロケットに巻き掛けたチェーンの一端に、前記昇降ステージが連結されていることを特徴とする。   In order to achieve the above object, the present invention provides a three-dimensional frame having a rectangular shape in plan view having substantially the same height as a plurality of floors of a structure, an elevating stage that moves up and down in the three-dimensional frame, and the top of the three-dimensional frame. A construction material lifting device, comprising: a driving device that is installed in an upper layer and lifts and lowers the lifting stage; and an outrigger that fixes and supports the three-dimensional frame to the structure. The first rotating shaft installed along the uppermost beam and connected to the electric motor via the first speed reducer, and connected to the both ends of the first rotating shaft via the second speed reducer, A pair of side-by-side second rotation shafts orthogonal to the one rotation axis, and one end of a chain wound around a sprocket attached to each of the pair of side-by-side second rotation shafts, Wherein the elevation stage is coupled.

電動機を作動すると、第一減速機で減速された駆動力は第一回転軸から第二減速機を介して一対の並設された第二回転軸に伝達される。一対の第二回転軸とともにスプロケットが回転すると、スプロケットに巻き掛けたチェーンが上下方向に移動し、 昇降ステージが昇降する。本駆動装置の場合、電動機の回転が各スプロケットに同じ条件で伝達されるため、昇降ステージは常に水平が維持され、高速昇降も可能となる。   When the electric motor is operated, the driving force decelerated by the first reduction gear is transmitted from the first rotation shaft to the pair of second rotation shafts arranged in parallel via the second reduction gear. When the sprocket rotates with the pair of second rotating shafts, the chain wound around the sprocket moves up and down, and the lifting stage moves up and down. In the case of this drive device, since the rotation of the electric motor is transmitted to each sprocket under the same conditions, the elevating stage is always maintained horizontal and can be moved up and down at high speed.

本発明によれば、駆動機構がコンパクトになるため、従来に比べて立体フレームの上部開口面積が大きくなり、ALC版などの長物資材も手間を掛けずに取り込むことができる。また、昇降ステージの水平度が常に維持されるので、複雑な同調制御機構が不要となるうえ、昇降ステージの高速化が可能となる。   According to the present invention, since the drive mechanism is compact, the upper opening area of the three-dimensional frame is increased as compared with the conventional one, and long materials such as ALC plates can be taken in without any trouble. In addition, since the level of the elevating stage is always maintained, a complicated tuning control mechanism is not required, and the elevating stage can be speeded up.

また、本発明では、前記チェーンの他端に連結されるバランスウェイトが、鉛直方向に延在するガイドパイプ内を昇降してもよい。   In the present invention, the balance weight connected to the other end of the chain may move up and down in the guide pipe extending in the vertical direction.

チェーンの他端については、スプロケットの近くにチェーンバケットなどを設け、そこからチェーンを出し入れしてもよいが、昇降ステージが上昇した場合(無負荷側チェーンが繰り出される場合)に、スプロケットとチェーンの接触部で遊びが生じ、異音や振動が発生することがある。本発明では、この事象を防止するため、チェーンにバランスウェイトを連結することにより、無負荷側のチェーンに常にテンションを掛け、スプロケットの回転を安定させている。また、バランスウェイトがスムーズに上下できるように、鉛直方向に延在するガイドパイプ内をバランスウェイトが昇降するようにしている。   For the other end of the chain, a chain bucket or the like may be provided near the sprocket, and the chain may be taken in and out of the chain. However, when the lifting stage is raised (when the unloaded side chain is fed out), the sprocket and chain Play may occur at the contact portion, and abnormal noise and vibration may occur. In the present invention, in order to prevent this phenomenon, by connecting a balance weight to the chain, a tension is always applied to the chain on the no-load side to stabilize the rotation of the sprocket. Further, the balance weight is moved up and down in the guide pipe extending in the vertical direction so that the balance weight can be smoothly moved up and down.

本発明に係る建設資材の昇降装置では、第一減速機で減速された駆動力が第一回転軸から第二減速機を介して一対の並設された第二回転軸に伝達され、一対の第二回転軸に取り付けられたスプロケットが回転すると、スプロケットに巻き掛けたチェーンとともに 昇降ステージが昇降するコンパクトな駆動機構となっている。このため、従来に比べて立体フレームの上部開口面積が大きくなり、ALC版などの長物資材も手間を掛けずに取り込むことができる。また、昇降ステージの水平度が常に維持されるので、複雑な同調制御機構が不要となるうえ、昇降ステージの高速化が可能となる。   In the construction material lifting apparatus according to the present invention, the driving force decelerated by the first reduction gear is transmitted from the first rotation shaft to the pair of second rotation shafts arranged side by side through the second reduction device. When the sprocket attached to the second rotating shaft rotates, it is a compact drive mechanism in which the elevating stage moves up and down together with the chain wound around the sprocket. For this reason, the upper opening area of the three-dimensional frame is increased as compared with the conventional case, and a long material such as an ALC plate can be taken in without much trouble. In addition, since the level of the elevating stage is always maintained, a complicated tuning control mechanism is not required, and the elevating stage can be speeded up.

以下、本発明に係る建設資材の昇降装置の実施形態について図面に基づいて説明する。
図1は本発明に係る建設資材の昇降装置1を示したものであり、図2および図3は昇降ステージ3および駆動装置4の詳細を示したものである。
DESCRIPTION OF EMBODIMENTS Hereinafter, an embodiment of a construction material lifting apparatus according to the present invention will be described based on the drawings.
FIG. 1 shows a construction material lifting device 1 according to the present invention, and FIGS. 2 and 3 show details of a lifting stage 3 and a driving device 4.

昇降装置1は、立体フレーム2内を昇降ステージ3が昇降するものであり、構造物S に設けられた吹き抜けの開口部内 に配置されて用いられる。立体フレーム2をアウトリガー6で構造物Sに固定した後、 昇降ステージ3を利用して建設資材を下階から上階もしくは上階から下階へ搬送する。   The elevating device 1 is configured such that the elevating stage 3 moves up and down in the three-dimensional frame 2 and is used by being disposed in an opening of a blow-off provided in the structure S 1. After fixing the three-dimensional frame 2 to the structure S with the outrigger 6, the construction material is transported from the lower floor to the upper floor or from the upper floor to the lower floor using the elevating stage 3.

立体フレーム2は、構造物Sと階高を同じくし、四層分 の高さ寸法を有する平面視矩形状のラーメン構造物であり、荷の出し入れがない側面と背面はブレース2c、2dで補強されている。   The three-dimensional frame 2 has the same floor height as the structure S and is a rectangular frame structure having a height of four layers, and is rectangular in plan view. The side surface and the rear surface where no load is taken in and out are reinforced with braces 2c and 2d. Has been.

立体フレーム2 には、立体フレーム2 から水平方向 に突出・縮退可能 な一対の アウトリガー6、6 が備えられており 、これらアウトリガー6、6 が立体フレーム2 から突出して、その先端部 が構造物S の梁S 上に固定 されることにより、立体フレーム2が構造物Sに固定 支持される 。
また、立体フレーム2 は、アウトリガー6、6 を縮退させてクレーン等により揚重すれば 、その位置を盛り替えることができる。
The three-dimensional frame 2 is provided with a pair of outriggers 6 and 6 that can project and retract in the horizontal direction from the three-dimensional frame 2. by being fixed on the beam S B of the three-dimensional frame 2 is fixedly supported by the structure S.
The position of the three-dimensional frame 2 can be changed if the outriggers 6 and 6 are retracted and lifted by a crane or the like.

昇降ステージ3 は、水平方向 に突出・縮退可能な一対の ステージアウトリガー7、7を側端部に備えており、これら ステージアウトリガー7、7 は、立体フレーム2 の梁2bの位置 まで突出可能とされている。 ステージアウトリガー7、7 を突出させて、その先端部 を立体フレーム2 の梁2b上に載置して、昇降ステージ3を立体フレーム2で支持することにより、荷の出し入れを安全に行うことができる 。    The elevating stage 3 is provided with a pair of stage outriggers 7 and 7 that can project and retract in the horizontal direction at the side ends, and these stage outriggers 7 and 7 can project to the position of the beam 2b of the three-dimensional frame 2. ing. By projecting the stage outriggers 7 and 7 and placing the tip of the stage outrigger 7 on the beam 2b of the three-dimensional frame 2 and supporting the elevating stage 3 with the three-dimensional frame 2, loading and unloading can be performed safely. .

立体フレーム2の最上層の梁2aには、昇降ステージ3を昇降させるための駆動装置4が設置されており、昇降ステージ3は駆動装置4からチェーン5で吊り下げられている。
駆動装置4は平面視コ字状をしており、最上層の梁2aに沿って当該梁2aの直下に設置される。具体的には、駆動装置4は、立体フレーム2の最上層の梁2aに沿って当該梁2aの直下に設置される第一回転軸11と、第一減速機13を介して第一回転軸11を駆動するブレーキ付き電動機16と、第一回転軸11の両端部においてそれぞれ第二減速機14、14を介して連結され、第一回転軸11と直交する一対の並設された第二回転軸12、12とから概略構成される。
一対の並設された第二回転軸12、12には、それぞれ二個のスプロケット15、15が取り付けられており、各スプロケット15に巻き掛けたチェーン5の一端に昇降ステージ3が連結されている。
なお、第二減速機14には、 一段で大きな減速比が得られる、ウォームギアとウォームホィールからなるウォーム減速機が使用されている。
A driving device 4 for raising and lowering the elevating stage 3 is installed on the uppermost beam 2 a of the three-dimensional frame 2, and the elevating stage 3 is suspended from the driving device 4 by a chain 5.
The driving device 4 has a U-shape in plan view, and is installed directly below the beam 2a along the uppermost beam 2a. Specifically, the drive device 4 includes a first rotating shaft 11 installed directly below the beam 2a along the uppermost beam 2a of the three-dimensional frame 2, and a first rotating shaft via the first speed reducer 13. 11 and a pair of juxtaposed second rotations that are connected to both ends of the first rotating shaft 11 via second speed reducers 14 and 14, respectively, and orthogonal to the first rotating shaft 11. The shafts 12 and 12 are roughly configured.
Two sprockets 15 and 15 are respectively attached to the pair of second rotary shafts 12 and 12, and the lifting stage 3 is connected to one end of the chain 5 wound around each sprocket 15. .
As the second reduction gear 14, a worm reduction gear consisting of a worm gear and a worm wheel, which can obtain a large reduction ratio in one stage, is used.

各チェーン5の他端にはバランスウェイト9が連結されている。バランスウェイト9は、昇降ステージ3の昇降に伴い、立体フレーム2に付設された鉛直方向に延在するガイドパイプ8内を昇降する。図4にガイドパイプ8を、図5に昇降ステージ3とバランスウェイト9との相対位置関係をそれぞれ示す。   A balance weight 9 is connected to the other end of each chain 5. The balance weight 9 moves up and down in the guide pipe 8 that is attached to the three-dimensional frame 2 and extends in the vertical direction as the lifting stage 3 moves up and down. FIG. 4 shows the guide pipe 8 and FIG. 5 shows the relative positional relationship between the elevating stage 3 and the balance weight 9.

ブレーキ付き電動機16を作動すると、第一減速機13で減速された駆動力は第一回転軸11から第二減速機14、14を介して一対の並設された第二回転軸12、12に伝達される。そして、一対の第二回転軸12、12とともにスプロケット15…が回転すると、スプロケット15…に巻き掛けたチェーン5…が上下方向に移動し、 昇降ステージ3が昇降する。
なお、昇降ステージの両端部にそれぞれ歯車を設置して、両歯車間にチェーンを掛け渡せば、半分の本数のチェーンで昇降ステージを昇降させることができるが、このようにすると、チェーンの移動量が二倍となり、昇降速度の低下を招くことになる。
When the motor 16 with brake is operated, the driving force decelerated by the first reduction gear 13 is transferred from the first rotation shaft 11 to the pair of second rotation shafts 12 and 12 arranged in parallel via the second reduction gears 14 and 14. Communicated. When the sprockets 15 are rotated together with the pair of second rotating shafts 12, 12, the chains 5 wound around the sprockets 15 are moved in the vertical direction, and the elevating stage 3 is moved up and down.
If gears are installed at both ends of the lifting stage and the chain is spanned between both gears, the lifting stage can be lifted and lowered by half the number of chains. Will double, leading to a decrease in the lifting speed.

立体フレーム2の側面には、駆動装置4とステージアウトリガー7を駆動するための操作盤10が設置されている。この操作盤10は一端が立体フレーム2に軸支されており、 昇降装置1の位置を盛り替える際には、操作盤10を水平面内に回動して立体フレーム2内に格納する。   An operation panel 10 for driving the driving device 4 and the stage outrigger 7 is installed on the side surface of the three-dimensional frame 2. One end of the operation panel 10 is pivotally supported by the three-dimensional frame 2, and when the position of the lifting device 1 is changed, the operation panel 10 is rotated in a horizontal plane and stored in the three-dimensional frame 2.

次に、昇降装置1を用いて建設資材を所定階から上階へ 搬送する 方法について 説明する。
先ず 、駆動装置4 を駆動して、昇降ステージ3 を構造物S の所定階に停止させ、ステージアウトリガー7 を突出 させて、立体フレーム2の梁2b に支持させる。この状態から、構造物S 側に設置した ゲート(図示省略) を開き、構造物S の所定階から建設資材 を昇降ステージ3 に運び込む。そして、駆動装置4 を駆動して 昇降ステージ3 を若干上方に移動させ て停止し 、ステージアウトリガー7 を縮退させて 昇降ステージ3 内に格納し 、再び、駆動装置4 を駆動して 昇降ステージ3 をさらに上方に移動させる。
次いで 、昇降ステージ3 が上階のスラブよりも若干上方の位置まで上昇した時点で、駆動装置4 を停止し、ステージアウトリガー7 を突出 させた後 、再び駆動装置4 を駆動し て、ステージアウトリガー7 を立体フレーム2の梁2b に支持させる。そして 、昇降ステージ3 から建設資材 を上階に運び込む 。
上記一連の作業により 、建設資材 を所定階から上階まで搬送することができる。なお、建設資材 を所定階から下 階に 搬送する作業もほぼ同様の手順による。
Next, a method for conveying construction materials from a predetermined floor to an upper floor using the lifting device 1 will be described.
First, the driving device 4 is driven to stop the elevating stage 3 on a predetermined floor of the structure S 1, and the stage outrigger 7 is protruded and supported by the beam 2 b of the three-dimensional frame 2. From this state, the gate (not shown) installed on the structure S side is opened, and the construction material is carried from the predetermined floor of the structure S to the lifting stage 3. Then, the driving device 4 is driven to move the lifting / lowering stage 3 slightly upward to stop, the stage outrigger 7 is retracted and stored in the lifting / lowering stage 3, and the driving device 4 is driven again to move the lifting / lowering stage 3. Move further upward.
Next, when the elevating stage 3 rises to a position slightly above the slab on the upper floor, the driving device 4 is stopped, the stage outrigger 7 is protruded, the driving device 4 is driven again, and the stage outrigger 7 Is supported by the beam 2b of the three-dimensional frame 2. Then, the construction material is carried from the lift stage 3 to the upper floor.
Through the above series of operations, construction materials can be transported from a predetermined floor to an upper floor. The procedure for transporting construction materials from the designated floor to the lower floor follows the same procedure.

次に、昇降装置1の位置を所定階から上階へ 盛り替える手順について説明する。
先ず 、クレーン(図示省略)を用いて立体フレーム2 を保持した状態で 、アウトリガー6 を構造物Sの梁Sに固定しているアンカーボルト(図示省略)を撤去する。また、操作盤10を立体フレーム2内に格納しておく。次いで、クレーンで立体フレーム2 を若干上昇させ、アウトリガー6 を構造物Sの梁S から地切りする。そして、アウトリガー6 を縮退させた後 、クレーンで立体フレーム2 を上昇させる。
昇降ステージ3 の位置が上階のスラブよりも若干上方となった時点で、立体フレーム2 の上昇を停止して アウトリガー6 を突出 させた後 、立体フレーム2 を下降させて、アウトリガー6 を構造物Sの梁S上 に着地させる。そして 、アウトリガー6 を構造物Sの梁S にアンカーボルトで 固定する。
上記一連の作業により 、昇降装置1の所定階から上階への 盛り替えが完了する。なお、 昇降装置1の所定階から下階への 盛り替えもほぼ同様の手順による。
Next, a procedure for changing the position of the lifting device 1 from a predetermined floor to an upper floor will be described.
First, removal while retaining the three-dimensional frame 2, the anchor bolts (not shown) securing the outrigger 6 the beam S B of the structure S with a crane (not shown). Further, the operation panel 10 is stored in the 3D frame 2. Then, slightly increase the space frame 2 by a crane, to the earth cutting the outriggers 6 from the beam S B of the structure S. Then, after the outrigger 6 is retracted, the solid frame 2 is raised by the crane.
When the position of the lifting / lowering stage 3 is slightly above the slab on the upper floor, the rising of the solid frame 2 is stopped and the outrigger 6 is protruded, and then the solid frame 2 is lowered and the outrigger 6 is moved to the structure to land on the S of the beam S B. Then, fixed with anchor bolts outriggers 6 to the beam S B of the structure S.
Through the above series of operations, the reordering of the lifting device 1 from the predetermined floor to the upper floor is completed. It should be noted that the rearrangement of the lifting device 1 from the predetermined floor to the lower floor follows the same procedure.

本実施形態による建設資材の昇降装置1では、第一減速機13で減速された駆動力が第一回転軸11から第二減速機14を介して一対の並設された第二回転軸12、12に伝達され、一対の第二回転軸12、12に取り付けられたスプロケット15…が回転すると、スプロケット15…に巻き掛けたチェーン5…とともに 昇降ステージ3が昇降するコンパクトな駆動機構となっている。このため、従来に比べて立体フレーム2の上部開口面積が大きくなり、ALC版などの長物資材も手間を掛けずに取り込むことができる。また、ブレーキ付き電動機16の回転が各スプロケット15に同じ条件で伝達されるため、昇降ステージ3は常に水平を維持した状態となり、高速昇降が可能となる。その結果、昇降装置のコスト低減と信頼性の向上を図ることができる。   In the construction material lifting and lowering apparatus 1 according to the present embodiment, a pair of second rotary shafts 12 in which the driving force decelerated by the first speed reducer 13 is provided in parallel from the first rotary shaft 11 via the second speed reducer 14; 12 and the pair of second rotating shafts 12, 12 are rotated together with the sprocket 15 ..., the chain 5 ... wound around the sprocket 15 ... is a compact drive mechanism in which the elevating stage 3 moves up and down. . For this reason, compared with the past, the upper opening area of the three-dimensional frame 2 becomes large, and it is possible to take in a long material such as an ALC plate without trouble. In addition, since the rotation of the motor 16 with brake is transmitted to each sprocket 15 under the same conditions, the elevating stage 3 is always in a horizontal state and can be moved up and down at high speed. As a result, the cost of the lifting device can be reduced and the reliability can be improved.

以上、本発明に係る建設資材の昇降装置の実施形態について説明したが、本発明は上記の実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。例えば、上記の実施形態では、立体フレームは四層としているが、三層や五層などでもよいことはいうまでもない。要は、本発明において所期の機能が得られればよいのである。   As mentioned above, although embodiment of the raising / lowering apparatus of the construction material which concerns on this invention was described, this invention is not limited to said embodiment, In the range which does not deviate from the meaning, it can change suitably. For example, in the above embodiment, the three-dimensional frame has four layers, but it goes without saying that the three-dimensional frame may be three layers or five layers. The point is that the desired function can be obtained in the present invention.

本発明に係る建設資材の昇降装置を示し、(a)はその正面図、(b)は側面図、(c)は背面図である。BRIEF DESCRIPTION OF THE DRAWINGS The construction material raising / lowering apparatus which concerns on this invention is shown, (a) is the front view, (b) is a side view, (c) is a rear view. 昇降ステージおよび駆動装置の側面図である。It is a side view of a raising / lowering stage and a drive device. 昇降ステージおよび駆動装置の背面図である。It is a rear view of a raising / lowering stage and a drive device. ガイドパイプを示したものであり、(a)はその正面図、(b)はA−A矢視断面図である。A guide pipe is shown, (a) is the front view, (b) is an AA arrow sectional view. 昇降ステージとバランスウェイトとの相対位置関係を示したものであり、(a)は昇降ステージが最下層にある状態、(b)は昇降ステージが最上層にある状態である。The relative positional relationship between the lifting stage and the balance weight is shown, in which (a) shows a state where the lifting stage is in the lowermost layer, and (b) shows a state where the lifting stage is in the uppermost layer.

符号の説明Explanation of symbols

1 昇降装置
2 立体フレーム
3 昇降ステージ
4 駆動装置
5 チェーン
6 アウトリガー
7 ステージアウトリガー
8 ガイドパイプ
9 バランスウェイト
10 操作盤
11 第一回転軸
12 第二回転軸
13 第一減速機
14 第二減速機
15 スプロケット
16 ブレーキ付き電動機
S 構造物
DESCRIPTION OF SYMBOLS 1 Lifting apparatus 2 Three-dimensional frame 3 Lifting stage 4 Drive apparatus 5 Chain 6 Outrigger 7 Stage outrigger 8 Guide pipe 9 Balance weight 10 Operation panel 11 First rotating shaft 12 Second rotating shaft 13 First speed reducer 14 Second speed reducer 15 Sprocket 16 Electric motor S with brake structure

Claims (2)

構造物の複数階と略同一の高さ寸法を有する平面視矩形状の立体フレームと、当該立体フレーム内を昇降する昇降ステージと、前記立体フレームの最上層に設置され、前記 昇降ステージを懸吊して昇降させる駆動装置 と、前記立体フレームを 前記構造物 に固定支持するアウトリガーとを備える建設資材の昇降装置において、
前記駆動装置が、前記立体フレームの最上層の梁に沿って設置され、第一減速機を介して電動機に連結された第一回転軸と、前記第一回転軸の両端部においてそれぞれ第二減速機を介して連結され、前記第一回転軸と直交する一対の並設された第二回転軸とを備え、
前記一対の並設された第二回転軸にそれぞれ取り付けられたスプロケットに巻き掛けたチェーンの一端に、前記昇降ステージが連結されていることを特徴とする建設資材の昇降装置。
A three-dimensional frame having a rectangular shape in plan view having substantially the same height as a plurality of floors of the structure, an elevating stage that moves up and down in the three-dimensional frame, and installed on the uppermost layer of the three-dimensional frame, A lifting and lowering device for a construction material, comprising: a driving device that moves up and down; and an outrigger that fixes and supports the three-dimensional frame to the structure.
The driving device is installed along the uppermost beam of the three-dimensional frame, and is connected to the electric motor via the first reduction gear, and the second reduction gears at both ends of the first rotation shaft, respectively. A pair of juxtaposed second rotary shafts connected through a machine and orthogonal to the first rotary shaft,
A lifting device for a construction material, wherein the lifting stage is connected to one end of a chain wound around a sprocket attached to each of the pair of second rotating shafts arranged side by side.
前記チェーンの他端に連結されるバランスウェイトが、鉛直方向に延在するガイドパイプ内を昇降することを特徴とする請求項1に記載の建設資材の昇降装置。   The lifting / lowering device for a construction material according to claim 1, wherein a balance weight connected to the other end of the chain moves up and down in a guide pipe extending in a vertical direction.
JP2005232913A 2005-08-11 2005-08-11 Lifting device for construction materials Expired - Lifetime JP4405950B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005232913A JP4405950B2 (en) 2005-08-11 2005-08-11 Lifting device for construction materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005232913A JP4405950B2 (en) 2005-08-11 2005-08-11 Lifting device for construction materials

Publications (2)

Publication Number Publication Date
JP2007046360A JP2007046360A (en) 2007-02-22
JP4405950B2 true JP4405950B2 (en) 2010-01-27

Family

ID=37849408

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005232913A Expired - Lifetime JP4405950B2 (en) 2005-08-11 2005-08-11 Lifting device for construction materials

Country Status (1)

Country Link
JP (1) JP4405950B2 (en)

Also Published As

Publication number Publication date
JP2007046360A (en) 2007-02-22

Similar Documents

Publication Publication Date Title
JP2764891B2 (en) Lifting device and method of transporting construction materials using the device
RU2538742C2 (en) Elevator structure and method of elevator manufacturing
KR102150874B1 (en) Ground-mounted tower crane and how to install it
KR101011371B1 (en) Construction Lift
KR100982500B1 (en) Parking facility
KR20010098394A (en) Loading/unloading method, a crane rotating apparatus, and a hoisting apparatus
JP3112650B2 (en) Construction elevator and its climbing method
KR101136067B1 (en) Packing apparatus of the ground anchor cable
JP2000313578A (en) Elevator for construction
JP4405950B2 (en) Lifting device for construction materials
JP6510212B2 (en) Method for disassembling construction elevator, assembling method, and disassembling and assembling apparatus
JP2009228270A (en) Method of demolishing super-highrise building
JP4987313B2 (en) Construction method and dismantling method of scaffold for high-rise building
JP2001039652A (en) Self climbing lift
JP2008214062A (en) Lifting device and structural material mounting method
CN215666674U (en) Cellar-entering robot
CN215660279U (en) Robot for transferring wine brewing materials
KR102286398B1 (en) Elevation Drive Assembly of Tower Crane Cage
JPH05113026A (en) Temporary scaffold structure
JP4888694B2 (en) Lifting device and climbing method thereof
JP2009062729A (en) Strong support unloading vertical lift
JP4387334B2 (en) Concrete conveying equipment and conveying method
CN116537205B (en) A rotatable support beam removal bracket attached to an inner support column pile
JP3833204B2 (en) Mechanical parking equipment
CN219825283U (en) Rotatable support beam dismantling bracket attached to inner support upright post pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090917

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091020

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091105

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121113

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4405950

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121113

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121113

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131113

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term