JP4417014B2 - Blast furnace construction method - Google Patents
Blast furnace construction method Download PDFInfo
- Publication number
- JP4417014B2 JP4417014B2 JP2003019074A JP2003019074A JP4417014B2 JP 4417014 B2 JP4417014 B2 JP 4417014B2 JP 2003019074 A JP2003019074 A JP 2003019074A JP 2003019074 A JP2003019074 A JP 2003019074A JP 4417014 B2 JP4417014 B2 JP 4417014B2
- Authority
- JP
- Japan
- Prior art keywords
- block
- furnace
- blast furnace
- furnace bottom
- joined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
- Blast Furnaces (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、高炉の建設工事の工期短縮および安全性向上を可能にする高炉建設方法に関する。
【0002】
【従来の技術】
高炉の改修にともなう建設あるいは新たな高炉の建設を行なう際には、まず建設現場となる高炉基礎とは異なる場所に作業場(いわゆる地組場)を設置し、その地組場で、高炉を炉頂部から炉底部まで2個以上のリング状のブロックに分割して製作する。このとき、地組場で耐火れんがやステーブ等の付設装備の施工を完了する。こうして地組場で製作した各ブロックを高炉基礎へ搬送して高炉を建設する。
【0003】
高炉の建設にあたっては、複数個のブロックのうちの最上段に位置するブロックA(すなわち炉頂部ブロック)を高炉基礎へ搬送し、図5に示すように、炉体支持柱1に配設される昇降装置2aを用いて炉頂部ブロックAを吊り上げる。次いで、炉頂部ブロックAの下段に位置する第2段ブロックBを移動装置3に載置して、第2段ブロックBを炉頂部ブロックAの直下に誘導する。
【0004】
次に、炉頂部ブロックAを降下させて、炉頂部ブロックAと第2段ブロックBとを接合する。
さらに、炉頂部ブロックAと第2段ブロックBとを接合したブロック接合体を昇降装置2a,2bで吊り上げて、その下段に位置する第3段ブロックCをその直下に誘導した後、ブロック接合体を下降させ、ブロック接合体と第3段ブロックCとを接合する。
【0005】
こうして、図6に示すように、順次、 上段に位置するブロック接合体を昇降装置2a,2bで吊り上げて、下段に位置するブロック(以下、 下段ブロックという)をブロック接合体の直下に誘導した後、ブロック接合体を下降させ、ブロック接合体と下段ブロックとを接合して高炉を建設する。なお、図6には高炉を5個のブロックに分割して建設する例を示す。
【0006】
このようにして高炉を建設するにあたって工期の短縮を達成するために、種々の技術が検討されている。
たとえば特許文献1には、高炉の短期改修・建設方法が開示されている。この技術は、各ブロックの真円度を高めて、運搬や吊り上げによる耐火れんがの割れや崩壊,あるいは付設機器の破損や損耗を防止することによって、工期を短縮するものである。しかし特許文献1に開示された技術では、最後に接合する炉底部ブロックは真円度のくずれは少ないとして、炉底部ブロックの製作について格別の配慮はなされていない。
【0007】
図6に示すように炉底部ブロックEは高炉の最下段に位置するブロックであり、通常、羽口部の下方から炉底れんがを含む高炉最下部までの範囲からなるブロックである。したがって、炉底部ブロックEの高さは14〜15mにも及ぶ。
炉底部ブロックEの最下層部は、図1に示すように、上底板5と下底板6との間に耐火物8や冷却配管7を配設するとともに、アンカーボルト9等を有する複雑な構造になっている。したがって図1に示す炉底部ブロックEの最下層部は、炉底部ブロックEの製作過程で最も作業負荷の大きい部分である。なお図1には、鉄皮4の近傍(片側のみ)を図示する。
【0008】
炉底部ブロックEには、図2に示すように高炉炉底部の炉底冷却構造体を含み、さらに上底板5の上面には炉底れんが10が積み上げられて高炉炉底が構築される。この炉底部ブロックEを製作するにあたって、作業者は炉底部ブロックE内に入って、炉底冷却構造体である上底板5,下底板6,冷却配管7を配設し、上底板5と下底板6との間に耐火物8を圧入充填する等の作業を行なう必要がある。したがって作業者は、これらの作業のため、高さH=14〜15mの鉄皮を越えて炉底部ブロックE内に入らなければならない。
【0009】
しかも、作業に用いる装置,工具および各種材料を炉底部ブロックE内に搬入する必要がある。なお図2には、鉄皮4の近傍(片側のみ)を図示する。
作業者が鉄皮(高さH=14〜15m)を越えて炉底部ブロックE内に入る際には、梯子を使用せざるを得ないので、作業効率が低下するばかりでなく、安全性の観点から改善の余地が残されている。また、装置や工具あるいは各種材料の搬入についても同様に、作業効率の向上,安全性の向上を図る必要がある。
【0010】
【特許文献1】
特許第3165362 号公報
【特許文献2】
特許第3157723 号公報
【0011】
【発明が解決しようとする課題】
本発明は上記のような問題を解消し、高炉の建設工事の工期短縮および安全性向上を可能にする高炉建設方法を提供することを目的とする。
【0012】
【課題を解決するための手段】
本発明は、高炉を炉頂部から炉底部まで2個以上のリング状のブロックに分割して地組場で製作し、次いで高炉基礎上で炉頂部ブロックを吊り上げて、下段に位置する第2段ブロックを炉頂部ブロックの直下に誘導し、炉頂部ブロックを降下させて第2段ブロックと接合させた後、順次、上段に位置するブロック接合体を高炉基礎上で吊り上げて、下段ブロックをブロック接合体の直下に誘導し、ブロック接合体を降下させて下段ブロックと接合させて高炉を建設する高炉建設方法において、最後に接合する炉底部ブロックは、下底板から上底板までを含む炉底下層ブロックとその炉底下層ブロックの上方の炉底上層ブロックとからなり、炉底下層ブロックの鉄皮を上底板の上方に 300〜1500mm突出させ、上底板と下底板との間に冷却配管を配設し、さらに耐火物を圧入充填して炉底下層ブロックを製作した後、周囲を囲う鉄皮がない状態で炉底れんがを炉底部ブロックの内径より小径の寸法で炉底下層ブロック上に構築し、他の地組場で鉄皮にあらかじめ炉体冷却用ステーブを組込んで製作された炉底上層ブロックを炉底下層ブロックの上に誘導し、炉底下層ブロックの鉄皮と炉底上層ブロックの鉄皮とを接合し、鉄皮と炉底れんがの側面との空間に耐火物を圧入充填して、炉底部ブロックとし、しかる後に上段に位置するブロック接合体を高炉基礎上で吊り上げて、炉底部ブロックをブロック接合体の直下に誘導し、ブロック接合体を降下させて接合する高炉建設方法である。
【0013】
【発明の実施の形態】
本発明では、炉底部ブロックEを炉底下層ブロックと炉底上層ブロックとに2分割して、それぞれ個別に地組場で製作する。図1は、炉底下層ブロックの例を模式的に示す断面図である。
図1に示すように、炉底部ブロックEの最下層部に位置する炉底下層ブロックには、上底板5,下底板6,アンカーボルト9,上底板5の上方に僅かに 300〜1500mm程度突出する鉄皮4,上底板5と下底板6との間に配設される耐火物8や冷却配管7,上底板5上面に積み上げられる耐火れんが(図示せず)等が含まれる。なおアンカーボルト9は、鉄皮4の外側に位置することもあり、図1の例は炉底ブロックEの直径が旧炉体より拡大された結果、炉体を支持するアンカーボルト9が炉底ブロックEの内側に位置することになった例を示している。
【0014】
この炉底ブロックEの炉底下層ブロックの高さhは1〜1.5 m程度であり、地組場で作業者は容易かつ安全に炉底下層ブロックE1 内に入ることが可能である。したがって、作業効率の向上および安全性の向上を達成できる。しかも、作業に用いる装置,工具および各種材料の搬入も容易に行なえるので、作業負荷の大きい炉底下層ブロックE1 を短期間で製作できる。
【0015】
一方、 図2に示す炉底部ブロックEのうちの、炉底下層ブロックE1 を除く上層部分(以下、炉底上層ブロックE2 という)は、他の地組場で製作する。なお地組場で製作する炉底上層ブロックE2 には、炉体冷却用ステーブ等あらかじめ炉内に取り込めるものを装備することもできる。
このようにして、炉底下層ブロックE1 と炉底上層ブロックE2 を個別に製作した後、炉底下層ブロックE1 の上に炉底上層ブロックE2 を接合して、炉底部ブロックEとする。ここで、炉底下層ブロックE1 と炉底上層ブロックE2 とを接合するにあたって、鉄皮4を接合し、かつ炉底れんが10を接合する必要がある。本発明では、鉄皮4や炉底れんが10を接合する技術は、炉底下層ブロックE1 および炉底上層ブロックE2 には、あらかじめ装備できる内部構造が組み込まれているため、鉄皮4の外側から片面溶接で接合する方法が好ましく、特許文献2に開示されているような従来から知られている技術が使用できる。
【0016】
図3,図4を用いて、炉底部ブロックEの構築例について説明する。
まず図3は、炉底部ブロックE内に炉底れんが10を施工する例であって、図3(a) に示すように炉底下層ブロックE1 を製作した後、続いて炉底れんが10を炉底部ブロックEの内径より小径の寸法で構築する。この炉底下層ブロックE1 の上に構築される炉底れんが10は、通常のれんが積み作業であり、また周囲を囲う鉄皮4もないことから作業性が良い。図3(a) に示す構築が完了した後、炉底部ブロックEの上部の組合せに入る。
【0017】
図3(b) では、他の地組場で製作された炉底上層ブロックE2 を組合せて、炉底部ブロックEとするもので、ここでは炉底上層ブロックE2 を構成する鉄皮4には、あらかじめ炉体冷却用ステーブ11が他の地組場で組込まれており、12は炉体冷却用ステーブ11の背面に充填されている耐火物を示し、13は炉体冷却用ステーブ11の冷却配管を示す。
【0018】
この炉底上層ブロックE2 を炉底下層ブロックE1 の上に接合する。図3(b) の接合された炉底上層ブロックE2 の鉄皮4と炉底れんが10の側面14との空間には耐火物が圧入充填されて、炉底部ブロックEが完成する。
また図4は炉底部ブロックEの他の例であって、図4(a) の炉底下層ブロックE1 の上に炉体冷却用ステーブ11,その背面に施工した耐火物12および炉体冷却用ステーブ11の冷却配管13をあらかじめ組み込んだ炉底上層ブロックE2 を接合する。これを炉底部ブロックEとし、炉底れんが10は炉底部ブロックEを高炉炉体として、他のブロックと接合させて高炉炉体を建設した後、炉内で施工された。
【0019】
次に、図6に示すように、炉底部ブロックEを移動装置3に載置する。一方、 あらかじめ炉頂部ブロックA〜ブロックDを接合したブロック接合体を吊り上げて、炉底部ブロックEをブロック接合体の直下に誘導し、ブロック接合体を降下させて炉底部ブロックEと接合させて高炉を建設する。炉頂部ブロックA〜炉底部ブロックEの各ブロックを接合する際には、従来から知られている技術が使用できる。
【0020】
なお図6には、5個のブロックに分割して高炉を建設する例を示したが、本発明は高炉を2個以上のブロックに分割して建設する際に適用でき、ブロックの個数は特定の数値に限定するものではない。
本発明では、作業負荷の大きい炉底部ブロックEの製作に要する時間を短縮できるので、建設工事の工期を短縮し、建設費用を削減できる。しかも安全性の向上も達成できる。
【0021】
【実施例】
高炉の改修工事を行なうにあたって、5個のブロックに分割して解体し、地組場で組込み接合等の工事を行ない、炉体組立て用のブロックを製作した。次いで炉頂部ブロックAを吊り上げて第2段ブロックBをその直下に誘導した後、炉頂部ブロックAを降下させて第2段ブロックBと接合した。同様の手順でブロックCを接合し、さらにブロックDを順次接合した。
【0022】
炉底部ブロックEの組込み接合等の工事をする際には、図1に示すように下底板6の下面から高さh= 1.5mまでの部分を炉底下層ブロックとして炉底部ブロックEから分割して、地組場で組込み接合等の工事を行なった。炉底部ブロックEから炉底下層ブロックE1 を分割した他方の炉底上層ブロックE2 は、炉底下層ブロックE1 とは異なる地組場で工事を行なった。
【0023】
このようにして、それぞれ個別に製作された炉底下層ブロックE1 と炉底上層ブロックE2 とを接合して炉底部ブロックEを製作した。
次に、図6に示すように、炉底部ブロックEを移動装置3に載置する。一方、 あらかじめ炉頂部ブロックA〜ブロックDを接合したブロック接合体を吊り上げて、炉底部ブロックEをブロック接合体の直下に誘導し、ブロック接合体を降下させて炉底部ブロックEと接合させて高炉を建設した。これを発明例とする。
【0024】
一方、同じ高炉を同様に5個のブロックに分割して、炉底部ブロックEを2分割せずに行なった場合の過去の実績を従来例とする。
発明例と比較例について、高炉の建設に要する工事期間を比べると、発明例の方が3日短縮された。しかも発明例では、炉底部ブロックEの製作工事の安全性が向上した。
【0025】
【発明の効果】
本発明によれば、高炉の建設工事の工期を短縮するとともに、安全性を向上できる。
【図面の簡単な説明】
【図1】炉底下層ブロックの例を模式的に示す断面図である。
【図2】炉底部ブロックの例を模式的に示す断面図である。
【図3】炉底部ブロック内に炉底れんがを施工する例を模式的に示す断面図である。
【図4】炉底部ブロックの他の例を模式的に示す断面図である。
【図5】炉頂部ブロックを吊り上げた状態を模式的に示す断面図である。
【図6】ブロック接合体を吊り上げた状態を模式的に示す断面図である。
【符号の説明】
1 炉体支持柱
2a 昇降装置
2b 昇降装置
3 移動装置
4 鉄皮
5 上底板
6 下底板
7 冷却配管
8 耐火物
9 アンカーボルト
10 炉底れんが
11 炉体冷却用ステーブ
12 耐火物
13 冷却配管
14 側面
H 炉底部ブロックの高さ
h 炉底下層ブロックの高さ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a blast furnace construction method capable of shortening the construction period and improving safety of blast furnace construction.
[0002]
[Prior art]
When constructing a blast furnace due to refurbishment or constructing a new blast furnace, first, a work place (so-called ground assembly) is set up at a location different from the blast furnace foundation, which is the construction site. It is divided into two or more ring-shaped blocks from the top to the furnace bottom. At this time, construction of additional equipment such as refractory bricks and staves is completed at the assembly ground. In this way, each block manufactured at the assembly ground is transported to the blast furnace foundation to construct a blast furnace.
[0003]
In the construction of the blast furnace, the block A (that is, the top block of the furnace) located at the uppermost stage among the plurality of blocks is transported to the blast furnace foundation and is disposed on the furnace body support column 1 as shown in FIG. The furnace top block A is lifted using the
[0004]
Next, the furnace top block A is lowered and the furnace top block A and the second stage block B are joined.
Further, the block joined body obtained by joining the furnace top block A and the second stage block B is lifted by the
[0005]
Thus, as shown in FIG. 6, after sequentially lifting the block assembly located in the upper stage with the
[0006]
In order to achieve a shortening of the construction period in constructing the blast furnace in this way, various techniques have been studied.
For example, Patent Document 1 discloses a short-term renovation / construction method for a blast furnace. This technique increases the roundness of each block and prevents breakage or collapse of refractory bricks caused by transportation or lifting, or damage or wear of attached equipment, thereby shortening the construction period. However, in the technique disclosed in Patent Document 1, no special consideration is given to the manufacture of the furnace bottom block, assuming that the round bottom block of the furnace bottom block to be joined last is small.
[0007]
As shown in FIG. 6, the furnace bottom block E is a block located at the lowest stage of the blast furnace, and is usually a block including a range from the lower part of the tuyere to the lowest part of the blast furnace including the furnace bottom brick. Therefore, the height of the furnace bottom block E reaches 14-15 m.
As shown in FIG. 1, the bottom layer portion of the furnace bottom block E has a complicated structure in which a refractory 8 and a
[0008]
The furnace bottom block E includes a furnace bottom cooling structure at the bottom of the blast furnace as shown in FIG. 2, and a
[0009]
In addition, it is necessary to carry the apparatus, tools and various materials used in the work into the furnace bottom block E. FIG. 2 shows the vicinity (only one side) of the
When the worker enters the furnace bottom block E beyond the iron skin (height H = 14 to 15m), a ladder must be used, which not only lowers work efficiency but also improves safety. There is room for improvement from the viewpoint. Similarly, it is necessary to improve work efficiency and safety for carrying in devices, tools, and various materials.
[0010]
[Patent Document 1]
Japanese Patent No. 3165362 [Patent Document 2]
Japanese Patent No. 3157723 [0011]
[Problems to be solved by the invention]
An object of the present invention is to provide a blast furnace construction method that solves the above-described problems and enables shortening the construction period and improving safety of blast furnace construction.
[0012]
[Means for Solving the Problems]
In the present invention, the blast furnace is divided into two or more ring-shaped blocks from the top to the bottom of the furnace, and is manufactured at the ground assembly, and then the top block is lifted on the blast furnace foundation, and the second stage located at the lower stage. induced block directly below the furnace top block, after bonded to the second stage blocks is lowered the furnace top block, sequentially, to lift the block assembly located in the upper part on the blast furnace foundation, block the lower block In a blast furnace construction method in which a blast furnace is constructed by inducing directly below the joined body and lowering the block joined body to join the lower block to construct the blast furnace, the bottom floor block to be joined last includes the bottom bottom plate including the bottom bottom plate It consists block and above the hearth upper block of the furnace bottom subblock, the furnace shell of the furnace bottom subblock is 300~1500mm protrude above the upper base plate, distribution of cooling pipes between the upper base plate and the lower bottom plate Setting In addition , after making a furnace bottom lower block by press-filling with refractory, the bottom brick is constructed on the bottom bottom block with a diameter smaller than the inner diameter of the furnace bottom block without the surrounding iron shell. The furnace bottom upper block manufactured by incorporating the furnace cooling stave into the iron shell in advance at another assembly site is guided to the furnace bottom lower block. The refractory is press-fitted into the space between the iron skin and the side of the furnace bottom brick to form a furnace bottom block, and then the block assembly located in the upper stage is lifted on the blast furnace foundation, This is a blast furnace construction method in which a furnace bottom block is guided directly below a block joined body, and the block joined body is lowered and joined.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
In the present invention, the furnace bottom block E is divided into two parts, a furnace bottom lower block and a furnace bottom upper block, which are individually manufactured at the assembly ground. FIG. 1 is a cross-sectional view schematically illustrating an example of a furnace bottom lower layer block.
As shown in FIG. 1, the bottom bottom block located at the bottom layer of the bottom block E projects slightly above the
[0014]
The height h of the bottom bottom block of the bottom bottom block E is about 1 to 1.5 m, and an operator can easily and safely enter the bottom bottom block E 1 at the assembly site. Therefore, improvement in work efficiency and improvement in safety can be achieved. In addition, since the equipment, tools and various materials used for the work can be easily carried in, the furnace bottom lower layer block E 1 having a large work load can be manufactured in a short period of time.
[0015]
On the other hand, of the furnace bottom block E shown in FIG. 2, the upper layer portion (hereinafter referred to as the furnace bottom upper block E 2 ) excluding the furnace bottom lower block E 1 is manufactured at another assembly site. It should be noted that the furnace bottom upper layer block E 2 manufactured at the building site can be equipped with a furnace body cooling stave or the like that can be taken into the furnace in advance.
After the furnace bottom lower layer block E 1 and the furnace bottom upper layer block E 2 are individually manufactured in this way, the furnace bottom upper layer block E 2 is joined onto the furnace bottom lower layer block E 1 , and the furnace bottom block E and To do. Here, in joining the furnace bottom lower layer block E 1 and the furnace bottom upper layer block E 2, it is necessary to join the
[0016]
A construction example of the furnace bottom block E will be described with reference to FIGS.
FIG. 3 shows an example in which a
[0017]
In FIG. 3 (b), the furnace bottom upper layer block E 2 manufactured at another ground is combined to form a furnace bottom block E. Here, the
[0018]
The furnace bottom upper layer block E 2 is joined onto the furnace bottom lower layer block E 1 . The furnace bottom block E is completed by press-fitting a refractory into the space between the
FIG. 4 shows another example of the furnace bottom block E. The furnace body cooling stave 11 is placed on the furnace bottom lower block E 1 shown in FIG. bonding the hearth upper block E 2 incorporating
[0019]
Next, as shown in FIG. 6, the furnace bottom block E is placed on the moving
[0020]
Although FIG. 6 shows an example in which a blast furnace is constructed by dividing it into five blocks, the present invention can be applied when constructing a blast furnace by dividing it into two or more blocks, and the number of blocks is specified. It is not limited to the numerical value of.
In the present invention, the time required to manufacture the furnace bottom block E having a large work load can be shortened, so the construction period can be shortened and the construction cost can be reduced. Moreover, safety can be improved.
[0021]
【Example】
When renovating the blast furnace, it was divided into 5 blocks and disassembled, and built-in joints and other work were carried out at the assembly site to produce a block for assembling the furnace body. Next, after the furnace top block A was lifted and the second stage block B was guided directly below, the furnace top block A was lowered and joined to the second stage block B. The block C was joined in the same procedure, and further the block D was joined sequentially.
[0022]
When construction such as built-in joining of the furnace bottom block E is performed, the part from the lower surface of the
[0023]
In this way, the furnace bottom block E 1 and the furnace bottom block E 2 , which were individually manufactured, were joined together to manufacture the furnace bottom block E.
Next, as shown in FIG. 6, the furnace bottom block E is placed on the moving
[0024]
On the other hand, the past results when the same blast furnace is divided into five blocks in the same manner and the furnace bottom block E is divided into two are used as conventional examples.
When the construction period required for the construction of the blast furnace was compared between the inventive example and the comparative example, the inventive example was shortened by 3 days. In addition, in the example of the invention, the safety of the manufacturing work of the furnace bottom block E is improved.
[0025]
【The invention's effect】
According to the present invention, it is possible to shorten the construction period of blast furnace construction and improve safety.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view schematically showing an example of a furnace bottom lower layer block.
FIG. 2 is a cross-sectional view schematically showing an example of a furnace bottom block.
FIG. 3 is a cross-sectional view schematically showing an example of constructing a furnace bottom brick in the furnace bottom block.
FIG. 4 is a cross-sectional view schematically showing another example of a furnace bottom block.
FIG. 5 is a cross-sectional view schematically showing a state where a furnace top block is suspended.
FIG. 6 is a cross-sectional view schematically showing a state where a block joined body is lifted.
[Explanation of symbols]
1 Furnace column
2a Lifting device
10 Furnace bottom brick
11 Furnace cooling stave
12 Refractories
13 Cooling piping
14 Side H Height of bottom block h Height of bottom floor block
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003019074A JP4417014B2 (en) | 2003-01-28 | 2003-01-28 | Blast furnace construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003019074A JP4417014B2 (en) | 2003-01-28 | 2003-01-28 | Blast furnace construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2004231990A JP2004231990A (en) | 2004-08-19 |
| JP4417014B2 true JP4417014B2 (en) | 2010-02-17 |
Family
ID=32949043
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003019074A Expired - Lifetime JP4417014B2 (en) | 2003-01-28 | 2003-01-28 | Blast furnace construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4417014B2 (en) |
-
2003
- 2003-01-28 JP JP2003019074A patent/JP4417014B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP2004231990A (en) | 2004-08-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1222626C (en) | Method for reconstructing and building blast furnace in short time and its equipment | |
| KR101179806B1 (en) | Method for constructing and repairing body of blast furnace | |
| JP3165362B2 (en) | Short-term repair and construction of blast furnace | |
| JP3110684B2 (en) | Dismantling method of blast furnace bottom | |
| JP4417014B2 (en) | Blast furnace construction method | |
| JP4472115B2 (en) | Blast furnace assembly method | |
| JP2009052123A (en) | Construction method of hot stove | |
| JP2006183105A (en) | How to remove the blast furnace body | |
| JP3777543B2 (en) | Side wall construction method for underground tank | |
| JP2018062599A (en) | Coke oven and repairing method thereof | |
| JP4592860B2 (en) | Blast furnace component installation method | |
| JP4841809B2 (en) | Blast furnace construction method | |
| JP4984493B2 (en) | Blast furnace demolition method and blast furnace construction method | |
| JP2005139482A (en) | Method for reconstructing hot blast stove | |
| JP3046552B2 (en) | Blast furnace furnace construction method | |
| JP2006283183A (en) | Method for removing blast furnace body | |
| JP5336893B2 (en) | How to replace the bottom block of a blast furnace | |
| JP3656523B2 (en) | Furnace body support method during blast furnace renovation | |
| JP2003105413A (en) | Blast furnace residual iron removal method | |
| JP4220926B2 (en) | Blast furnace repair method | |
| JPH1046216A (en) | Blast furnace hearth method for blast furnace | |
| KR20210090936A (en) | Unit having cart for carrying in and carrying out iron plate and method for carrying in and carrying out iron plate using the same | |
| JPH0949008A (en) | Hot stove repair work method | |
| JP4784209B2 (en) | Blast furnace construction method and blast furnace disassembly method | |
| JP5193535B2 (en) | Method of dismantling the bottom of the blast furnace furnace |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20051026 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070418 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070424 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070621 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20071023 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071218 |
|
| A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20080214 |
|
| A912 | Re-examination (zenchi) completed and case transferred to appeal board |
Free format text: JAPANESE INTERMEDIATE CODE: A912 Effective date: 20080307 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091023 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20091125 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4417014 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121204 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121204 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131204 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |