JP4419178B2 - Control method of drainage process in water softener - Google Patents
Control method of drainage process in water softener Download PDFInfo
- Publication number
- JP4419178B2 JP4419178B2 JP22083297A JP22083297A JP4419178B2 JP 4419178 B2 JP4419178 B2 JP 4419178B2 JP 22083297 A JP22083297 A JP 22083297A JP 22083297 A JP22083297 A JP 22083297A JP 4419178 B2 JP4419178 B2 JP 4419178B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- time
- line
- signal
- controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Treatment Of Water By Ion Exchange (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、軟水器における排水工程の制御方法に関するものである。
【0002】
【従来の技術】
近年、水道水等の硬水を軟水とし、たとえば一般家庭用の風呂水等に利用する家庭用軟水器が開発されている。この家庭用軟水器は、主に原水タンク,塩水タンクおよびイオン交換樹脂を充填した樹脂筒により構成されている。
【0003】
ところで、軟水器の排水工程は、軟水器を長時間使用しないときに樹脂筒内に繁殖した雑菌を系外へ排出することを目的としたものと、再生後のイオン交換樹脂を洗浄することを目的としたものがある。
【0004】
【発明が解決しようとする課題】
従来の軟水器の排水工程の制御方法には、以下のような課題がある。従来の排水工程では、排水ラインに設けた電磁弁を所定時間開いて行うが、この所定時間は、単位時間あたりの排水量,すなわち排水速度が、所定の速度で変化しないことを前提として決めている。つまり、所定の排水速度で、所定時間電磁弁を開くことにより、一定の排水量を確保するようにしている。しかし、水道水等の原水圧力が低下したり、排水ラインが詰まると、排水速度が低下する。この結果、前記電磁弁を所定時間開いていても、所定の排水量が確保できないという問題がある。
【0005】
【課題を解決するための手段】
この発明は、前記課題を解決するためになされたものであって、原水を軟水化するイオン交換樹脂を充填した樹脂筒と、この樹脂筒へ原水を供給する原水ラインと、前記イオン交換樹脂を再生する再生液の再生液供給ラインと、前記樹脂筒内の水を排水する排水ラインとを備えるとともに、前記原水ラインに水流検出手段を設けるか、あるいは前記原水ラインと前記排水ラインの両方に水流検出手段を設け、さらに前記樹脂筒内へ原水を流入させて軟水を流出させる通水作動と、前記樹脂筒内へ前記再生液を流入させて再生排液を流出させる再生作動とを切替えて行うように構成した軟水器において、前記再生作動における排水工程時または軟水器を長時間使用しないときの排水工程時、前記水流検出手段が水流を検知した時間を連続してあるいは断続して積算し、この積算時間が所定時間に達したとき、前記排水工程を終了させることを特徴としている。
【0006】
【発明の実施の形態】
つぎに、この発明の実施の形態について説明する。この発明は、原水ラインまたは排水ラインに水流検出手段(例えば、フロースイッチ)を設けた軟水器に好適に実施できる。そして、この発明の実施の対象は、長時間軟水器を使用しなかった場合の排水工程と、再生後のイオン交換樹脂の洗浄のための排水工程における制御方法である。
【0007】
前記水流検出手段を設ける位置は、原水ラインのみ、あるいは原水ラインと排水ラインの両方のどちらでもよい。原水ラインのみに設ける場合の水流検出手段は、通水工程における水流検出に使用されるとともに、排水工程における水流検出と排水時間の積算にも使用される。また、原水ラインと排水ラインの両方に設ける場合、原水ラインに設けられた水流検出手段は、通水工程における水流検出に使用される。一方、排水ラインに設けられた水流検出手段は、排水工程における水流検出と排水時間の積算に使用される。
【0008】
ここで、この発明を実施した軟水器における排水工程の制御方法を詳細に説明する。排水工程を開始して、軟水器の制御器が原水ライン,排水ライン等に設けた電磁弁をそれぞれ開状態とすると、原水ライン,排水ラインにそれぞれ水流が発生する。水流が発生すると、前記水量検出手段がONとなり、このON信号が制御器に出力される。このON信号を受けた制御器は、このON信号を積算する。これと同時に、制御器は、給水ポンプへON信号を出力する。
【0009】
排水工程の途中で、原水圧力の低下,あるいは電磁弁や排水ライン等の詰まりが発生すると、排水速度が低下し、前記水量検出手段がOFFとなり、このOFF信号が制御器に出力される。このOFF信号を受けた制御器は、前記水量検出手段からのON信号の積算を中止する。これと同時に、制御器は、給水ポンプへOFF信号を出力する。
【0010】
そして、原水圧力が元の状態に復帰するとともに、電磁弁等の詰まりが解消されると、再び排水速度が増加し、前記水流検出手段がONとなり、このON信号が制御器に出力される。このON信号を受けた制御器は、前記水流検出手段からのON信号の積算を再開する。これと同時に、制御器は、給水ポンプへ再びON信号を出力する。
【0011】
そして、積算時間が所定時間に達したとき、制御器は前記各電磁弁をそれぞれ閉状態とする。この結果、水流が無くなって、前記水量検出手段がOFFとなり、このOFF信号が制御器に出力される。このOFF信号を受けた制御器は、給水ポンプへOFF信号を出力する。以上のような過程を経て、排水工程が完了する。
【0012】
つぎに、この発明を実施した別の形態の軟水器について説明する。この軟水器は、原水ラインの給水ポンプを省いている点で、前記形態の軟水器と異なっている。したがって、この軟水器における排水工程の制御方法においては、前記形態の軟水器のような給水ポンプの駆動,停止に関する制御は行われない。
【0013】
【実施例】
以下、この発明の具体的実施例を図面に基づいて説明する。まず、この発明の第一実施例を示す図1について説明する。図1は、第一実施例のフロー説明図である。
【0014】
図1において、樹脂筒1の上方には原水タンク2と塩水タンク3とが並列状態で配置されている。樹脂筒1の下部に設けられた原水入口部4と原水タンク2の下部とを原水ライン5で接続し、この原水ライン5には、給水ポンプ6,フロースイッチ(水流検出手段)7および第一電磁弁V1が上流側から順次設けられている。また、樹脂筒1の上部に軟水出口部8を設け、この軟水出口部8に軟水ライン(処理水ライン)9を接続し、途中に第二電磁弁V2を設けている。そして、原水ライン5と軟水ライン9とをバイパスライン10で接続している。このバイパスライン10と原水ライン5との接続地点X1は、フロースイッチ7と第一電磁弁V1との間となっている。また、このバイパスライン10と軟水ライン9との接続地点X2は、第二電磁弁V2の下流側となっている。さらに、このバイパスライン10の途中に、第三電磁弁V3を設けている。このバイパスライン10は、樹脂筒1内のイオン交換樹脂の再生中における断水を回避するものである。
【0015】
さて、前記塩水タンク3の下部と前記軟水ライン9とは、塩水流下ライン(再生液ライン)11で接続されている。この塩水流下ライン11と前記軟水ライン9との接続地点X3は、前記軟水出口部8と前記第二電磁弁V2との間となっている。また、この塩水流下ライン11には、前記塩水タンク3方向への流れを阻止する第一逆止弁G1および第四電磁弁V4が上流側から順次設けられている。そして、前記原水タンク2の下部と前記塩水流下ライン11とは、原水流下ライン12で接続されている。この原水流下ライン12と前記塩水流下ライン11との接続地点X4は、前記第四電磁弁V4と前記接続地点X3との間となっている。この原水流下ライン12の途中に、前記原水タンク2方向への流れを阻止する第二逆止弁G2を設けている。さらに、前記原水入口部4に排水ライン13を接続し、その途中に第五電磁弁V5を設けている。
【0016】
そして、前記原水タンク2には、図1に示すように、水位制御装置14(例えば、ボールタップ方式)が設けてあり、この水位制御装置14により水道水等の原水を供給する原水供給ライン15が接続してある。前記原水タンク2と前記塩水タンク3とは、前記原水タンク2方向への流れを阻止する第三逆止弁V3を設けた補水ライン16により連通されている。
【0017】
さらに、前記給水ポンプ6,前記フロースイッチ7および前記第一電磁弁V1〜前記第五電磁弁V5は、それぞれ信号線17,17,…を介して制御器18にそれぞれ接続されている。
【0018】
つぎに、第一実施例における排水工程の制御方法を説明する。以下の説明において、正常とは、排水工程中に、前記第五電磁弁V5を含む前記排水ライン13に詰まりが発生しない状態を意味し、また異常とは、詰まりが発生した状態を意味する。
【0019】
正常時の排水工程は以下のように行われる。まず、制御器18は、第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:閉,第二電磁弁V2:開,第三電磁弁V3:開,第四電磁弁V4:閉および第五電磁弁V5:開の信号をそれぞれ出力する。その結果、原水タンク2内の原水が原水ライン5を流下することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、給水ポンプ6へON信号を出力し、給水ポンプ6は駆動される。これと同時に、制御器18は、フロースイッチ7からのON信号の時間を積算する。この積算時間が所定の排水工程の時間Tに達したとき、制御器18は第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:開,第二電磁弁V2:開,第三電磁弁V3:閉,第四電磁弁V4:閉および第五電磁弁V5:閉の信号をそれぞれ出力する。その結果、原水タンク2内の原水の原水ライン5への流下が停止し、フロースイッチ7がOFFとなる。フロースイッチ7は、このOFF信号を制御器18へ出力する。このOFF信号を受けた制御器18は、給水ポンプ6へOFF信号を出力し、給水ポンプ6は停止される。
【0020】
さて、図2は、前記正常時の排水工程を示す説明図であり、フロースイッチ7のON,OFF作動と、制御器18によるフロースイッチ7からのON信号の積算時間との関係を示す。図2に示すように、フロースイッチ7がON状態をA時間継続すると、制御器18はフロースイッチ7からのON信号の時間をA時間積算する。この排水時間が所定の排水工程の時間Tに達したとき、フロースイッチ7はOFFとなり、排水工程が完了する。このように、正常時は、フロースイッチ7のON状態の時間Aが所定の排水工程の時間Tと等しくなる。
【0021】
つぎに、異常時の排水工程について説明する。まず、制御器18は、第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:閉,第二電磁弁V2:開,第三電磁弁V3:開,第四電磁弁V4:閉および第五電磁弁V5:開の信号をそれぞれ出力する。その結果、原水タンク2内の原水が原水ライン5を流下することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、給水ポンプ6へON信号を出力し、給水ポンプ6は駆動される。これと同時に、制御器18は、フロースイッチ7からのON信号の時間を積算する。ここまでは正常時と同じ制御方法である。
【0022】
ここで、図3に基づいて異常時の排水工程を詳細に説明すると、図3は異常時の排水工程を示す説明図であり、フロースイッチ7のON,OFF作動と、制御器18によるフロースイッチ7からのON信号の積算時間との関係を示している。さて、排水工程を開始して、B時間経過後異常が発生すると、原水タンク2内の原水が原水ライン5を流下する水量が減少することに伴い、フロースイッチ7がOFFとなる。フロースイッチ7は、このOFF信号を制御器18へ出力する。このOFF信号を受けた制御器18は、給水ポンプ6へOFF信号を出力し、給水ポンプ6は停止される。これと同時に、制御器18は、フロースイッチ7からのON信号の時間の積算を中断する。そして、C時間経過後正常状態に戻ると、再び原水タンク2内の原水が原水ライン5を流下する水量が増加することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、給水ポンプ6へON信号を出力し、給水ポンプ6は駆動される。これと同時に、制御器18は、前記のフロースイッチ7からのON信号の時間を再び積算するとともに、中断前に積算した「B時間」に加算する。
【0023】
そして、D時間経過後再び異常が発生すると、原水タンク2内の原水が原水ライン5を流下する水量が減少することに伴い、フロースイッチ7がOFFとなる。フロースイッチ7は、このOFF信号を制御器18へ出力する。このOFF信号を受けた制御器18は、給水ポンプ6へOFF信号を出力し、給水ポンプ6は停止される。これと同時に、制御器18は、フロースイッチ7からのON信号の時間の積算を中断する。そして、E時間経過後正常状態に戻ると、再び原水タンク2内の原水が原水ライン5を流下する水量が増加することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、給水ポンプ6へON信号を出力し、給水ポンプ6は駆動される。これと同時に、制御器18は、フロースイッチ7からのON信号の時間を再び積算するとともに、中断前に積算した「B+D時間」に加算する。
【0024】
そして、F時間経過後、制御器18によるフロースイッチ7からのON信号の時間の積算時間,すなわち「B+D+F時間」が、所定の排水工程の時間Tに達したとき、制御器18は第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:開,第二電磁弁V2:開,第三電磁弁V3:閉,第四電磁弁V4:閉および第五電磁弁V5:閉の信号をそれぞれ出力する。その結果、原水タンク2内の原水の原水ライン5への流下が停止し、フロースイッチ7がOFFとなる。フロースイッチ7は、このOFF信号を制御器18へ出力する。このOFF信号を受けた制御器18は、給水ポンプ6へOFF信号を出力し、給水ポンプ6は停止される。
【0025】
以上のごとく、図3に示すように、フロースイッチ7がON状態をB時間,D時間,F時間,…と断続的に繰り返すと、制御器18はフロースイッチ7からのON信号の時間を「B時間+D時間+F時間+…」と積算する。この積算時間が所定の排水工程の時間Tに達したとき、フロースイッチ7はOFFとなり、排水工程が完了する。このように、異常時は、フロースイッチ7のON状態の時間,すなわち「B+D+F+…時間」が所定の排水工程の時間Tと等しくなる。
【0026】
つぎに、この発明の第二実施例を示す図4について説明する。図4は、第二実施例のフロー説明図である。第二実施例は、第一実施例中の給水ポンプ6を省き、原水圧力が、直接、樹脂筒1にかかるように構成したものである。すなわち、給水ポンプ6を除く樹脂筒1から制御器18までの構成は、前記第一実施例と同一であり、したがってその詳細な説明は省略する。
【0027】
さて、第二実施例における排水工程の制御方法を説明すると、以下の説明における正常とは、排水工程中に、第五電磁弁V5を含む排水ライン13に詰まりが発生しない状態,あるいは原水圧力が低下しない状態を意味する。また、異常とは、詰まりが発生した状態,あるいは原水圧力が低下した状態を意味する。
【0028】
そして、第二実施例における正常時の排水工程は以下のように行われる。まず、制御器18は、第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:閉,第二電磁弁V2:開,第三電磁弁V3:開,第四電磁弁V4:閉および第五電磁弁V5:開の信号をそれぞれ出力する。その結果、原水が原水ライン5を流下することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、このON信号の時間を積算する。この積算時間が所定の排水工程の時間Tに達したとき、制御器18は第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:開,第二電磁弁V2:開,第三電磁弁V3:閉,第四電磁弁V4:閉および第五電磁弁V5:閉の信号をそれぞれ出力する。その結果、原水の原水ライン5への流下が停止し、フロースイッチ7がOFFとなる。
【0029】
ここにおいて、第二実施例の前記正常時の排水工程におけるフロースイッチ7のON,OFF作動と、制御器18によるフロースイッチ7からのON信号の積算時間との関係は、前記第一実施例について説明した図2と同じ関係となる。したがって、図2と同様の説明は省略する。
【0030】
つぎに、第二実施例における異常時の排水工程について説明する。まず、制御器18は、第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:閉,第二電磁弁V2:開,第三電磁弁V3:開,第四電磁弁V4:閉および第五電磁弁V5:開の信号をそれぞれ出力する。その結果、原水が原水ライン5を流下することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、このON信号の時間を積算する。ここまでは正常時と同じ制御方法である。
【0031】
さて、排水工程を開始して、B時間経過後異常が発生すると、原水が原水ライン5を流下する水量が減少することに伴い、フロースイッチ7がOFFとなる。フロースイッチ7は、このOFF信号を制御器18へ出力する。このOFF信号を受けた制御器18は、フロースイッチ7からのON信号の時間の積算を中断する。そして、C時間経過後正常状態に戻ると、原水が原水ライン5を流下する水量が増加することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、このON信号の時間を再び積算するとともに、中断前に積算した「B時間」に加算する。
【0032】
そして、D時間経過後再び異常が発生すると、原水が原水ライン5を流下する水量が減少することに伴い、フロースイッチ7がOFFとなる。フロースイッチ7は、このOFF信号を制御器18へ出力する。このOFF信号を受けた制御器18は、フロースイッチ7からのON信号の時間の積算を中断する。そして、E時間経過後正常状態に戻ると、再び原水が原水ライン5を流下する水量が増加することに伴い、フロースイッチ7がONとなる。フロースイッチ7は、このON信号を制御器18へ出力する。このON信号を受けた制御器18は、このON信号の時間を再び積算するとともに、中断前に積算した「B+D時間」に加算する。
【0033】
そして、F時間経過後、制御器18によるフロースイッチ7からのON信号の時間の積算時間,すなわち「B+D+F時間」が、所定の排水工程の時間Tに達したとき、制御器18は第一電磁弁V1〜第五電磁弁V5に対し、第一電磁弁V1:開,第二電磁弁V2:開,第三電磁弁V3:閉,第四電磁弁V4:閉および第五電磁弁V5:閉の信号をそれぞれ出力する。その結果、原水の原水ライン5への流下が停止し、フロースイッチ7がOFFとなる。
【0034】
以上のように、第二実施例の異常時の排水工程におけるフロースイッチ7のON,OFF作動と、制御器18によるフロースイッチ7からのON信号の積算時間との関係は、前記第一実施例について説明した図3と同じ関係となる。したがって、図3と同様な説明は省略する。
【0035】
【発明の効果】
以上のように、この発明によれば、排水工程時、原水ラインまたは排水ラインに設けた水流検出手段が水流を検知した時間を積算し、この積算時間が所定の排水工程の時間に達したとき、排水工程を終了させたので、排水工程時に水道水等の原水圧力の低下や排水ラインに詰まりが発生しても、排水工程を確実に行うことができる。したがって、通水時に軟水に塩水が混入することがなく、また樹脂筒内に増殖した雑菌を系外へ排出することができる。
【図面の簡単な説明】
【図1】この発明を実施する軟水器の第一実施例のフロー説明図である。
【図2】この発明の正常時の排水工程の説明図で、フロースイッチのON,OFF作動と、制御器によるフロースイッチからのON信号の積算時間との関係を示す説明図である。
【図3】この発明の異常時の排水工程の説明図で、フロースイッチのON,OFF作動と、制御器によるフロースイッチからのON信号の積算時間との関係を示す説明図である。
【図4】この発明を実施する軟水器の第二実施例のフロー説明図である。
【符号の説明】
1 樹脂筒
5 原水ライン
7 水流検出手段(フロースイッチ)
11 塩水流下ライン
13 排水ライン [0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for controlling a drainage process in a water softener.
[0002]
[Prior art]
In recent years, household water softeners have been developed that use hard water such as tap water as soft water, for example, bath water for general households. This household water softener is mainly composed of a raw water tank, a salt water tank, and a resin cylinder filled with an ion exchange resin.
[0003]
By the way, the drainage process of the water softener is intended to discharge the germs that have propagated in the resin cylinder when the water softener is not used for a long time, and to wash the ion exchange resin after regeneration. There is a purpose.
[0004]
[Problems to be solved by the invention]
The conventional method for controlling the drainage process of a water softener has the following problems. In the conventional drainage process, the solenoid valve provided in the drainage line is opened for a predetermined time, and this predetermined time is determined on the assumption that the drainage amount per unit time, that is, the drainage speed does not change at the predetermined speed. . That is, a certain amount of drainage is ensured by opening the solenoid valve for a predetermined time at a predetermined drainage speed. However, when the pressure of raw water such as tap water is reduced or the drainage line is clogged, the drainage rate is reduced. As a result, there is a problem that a predetermined amount of drainage cannot be secured even if the electromagnetic valve is opened for a predetermined time.
[0005]
[Means for Solving the Problems]
The present invention has been made to solve the above-described problem, and includes a resin cylinder filled with an ion exchange resin for softening raw water, a raw water line for supplying raw water to the resin cylinder, and the ion exchange resin. A regenerated liquid supply line for regenerating liquid to be regenerated and a drain line for draining water in the resin cylinder, and a water flow detecting means is provided in the raw water line, or a water flow is provided in both the raw water line and the drain line. A detection means is provided, and further switching is performed between a water flow operation for flowing raw water into the resin cylinder and flowing out soft water, and a regeneration operation for flowing the regeneration liquid into the resin cylinder and draining the regeneration drainage. In the water softener configured as described above, during the draining process in the regeneration operation or during the draining process when the water softener is not used for a long time, the time when the water flow detecting means detects the water flow is continuously recorded. There are integrated intermittently, when the accumulated time reaches a predetermined time, it is characterized in that to terminate the draining process.
[0006]
DETAILED DESCRIPTION OF THE INVENTION
Next, an embodiment of the present invention will be described. The present invention can be suitably implemented in a water softener in which water flow detection means (for example, a flow switch) is provided in the raw water line or the drainage line. And the object of implementation of this invention is the control method in the drainage process when not using a water softener for a long time, and the drainage process for washing | cleaning of the ion exchange resin after reproduction | regeneration.
[0007]
The position where the water flow detection means is provided may be only the raw water line or both the raw water line and the drainage line. The water flow detection means provided only in the raw water line is used for water flow detection in the water flow process, and also for water flow detection and drainage time integration in the drainage process. Moreover, when providing in both a raw | natural water line and a drainage line, the water flow detection means provided in the raw | natural water line is used for the water flow detection in a water flow process. On the other hand, the water flow detection means provided in the drainage line is used for water flow detection and drainage time integration in the drainage process.
[0008]
Here, the control method of the drainage process in the water softener which implemented this invention is demonstrated in detail. When the drainage process is started and the controller of the water softener opens the electromagnetic valves provided in the raw water line and the drainage line, respectively, water flows are generated in the raw water line and the drainage line, respectively. When the water flow is generated, the water amount detecting means is turned on, and this ON signal is output to the controller. The controller that has received this ON signal integrates this ON signal. At the same time, the controller outputs an ON signal to the feed water pump.
[0009]
If the raw water pressure decreases or the electromagnetic valve or drainage line is clogged during the drainage process, the drainage speed decreases, the water amount detecting means is turned off, and this OFF signal is output to the controller. Upon receiving this OFF signal, the controller stops integrating the ON signal from the water amount detection means. At the same time, the controller outputs an OFF signal to the water supply pump.
[0010]
When the raw water pressure returns to the original state and the clogging of the solenoid valve or the like is eliminated, the drainage speed increases again, the water flow detecting means is turned on, and this ON signal is output to the controller. The controller that has received this ON signal restarts the integration of the ON signal from the water flow detecting means. At the same time, the controller outputs an ON signal again to the water supply pump.
[0011]
When the accumulated time reaches a predetermined time, the controller closes each of the solenoid valves. As a result, there is no water flow, the water amount detecting means is turned off, and this OFF signal is output to the controller. The controller that has received this OFF signal outputs an OFF signal to the water supply pump. The drainage process is completed through the above process.
[0012]
Next, another embodiment of the water softener according to the present invention will be described. This water softener is different from the water softener of the said form by the point which omits the water supply pump of a raw | natural water line. Therefore, in the control method of the drainage process in this water softener, the control regarding the drive and stop of the water supply pump like the water softener of the said form is not performed.
[0013]
【Example】
Specific embodiments of the present invention will be described below with reference to the drawings. First, FIG. 1 showing a first embodiment of the present invention will be described. FIG. 1 is a flow explanatory diagram of the first embodiment.
[0014]
In FIG. 1, a
[0015]
Now, the lower part of the
[0016]
As shown in FIG. 1, the
[0017]
Further, the
[0018]
Below, the control method of the drainage process in a 1st Example is demonstrated. In the following description, normal means a state in which clogging does not occur in the
[0019]
The normal drainage process is performed as follows. First, the
[0020]
FIG. 2 is an explanatory diagram showing the normal drainage process, and shows the relationship between the ON / OFF operation of the
[0021]
Next, a drainage process at the time of abnormality will be described. First, the
[0022]
Here, the drainage process at the time of abnormality will be described in detail based on FIG. 3. FIG. 3 is an explanatory diagram showing the drainage process at the time of abnormality, and the ON / OFF operation of the
[0023]
Then, when an abnormality occurs again after D time has elapsed, the
[0024]
Then, after the lapse of F time, when the accumulated time of the ON signal from the
[0025]
As described above, as shown in FIG. 3, when the
[0026]
Next, FIG. 4 showing a second embodiment of the present invention will be described. FIG. 4 is a flow explanatory diagram of the second embodiment. In the second embodiment, the
[0027]
Now, the control method of the drainage process in the second embodiment will be described. The normality in the following description means that the
[0028]
And the normal drainage process in the second embodiment is performed as follows. First, the
[0029]
Here, the relationship between the ON / OFF operation of the
[0030]
Next, the drainage process at the time of abnormality in the second embodiment will be described. First, the
[0031]
Now, when the drainage process is started and an abnormality occurs after the elapse of time B, the
[0032]
When an abnormality occurs again after the lapse of time D, the
[0033]
Then, after the lapse of F time, when the accumulated time of the ON signal from the
[0034]
As described above, the relationship between the ON / OFF operation of the
[0035]
【The invention's effect】
As described above, according to the present invention, during the drainage process, the time when the water flow detection means provided in the raw water line or the drain line detects the water flow is integrated, and when this integration time reaches the predetermined drainage process time Since the drainage process is terminated, the drainage process can be performed reliably even if the raw water pressure such as tap water is reduced or the drainage line is clogged during the drainage process. Therefore, salt water is not mixed in soft water when water is passed, and miscellaneous bacteria grown in the resin cylinder can be discharged out of the system.
[Brief description of the drawings]
FIG. 1 is a flow explanatory diagram of a first embodiment of a water softener embodying the present invention.
FIG. 2 is an explanatory diagram of a normal drainage process according to the present invention, and is an explanatory diagram showing a relationship between ON / OFF operation of a flow switch and an integration time of an ON signal from the flow switch by a controller.
FIG. 3 is an explanatory diagram of a drainage process at the time of abnormality according to the present invention, and is an explanatory diagram showing a relationship between ON / OFF operation of a flow switch and an integration time of an ON signal from the flow switch by a controller.
FIG. 4 is a flow explanatory diagram of a second embodiment of the water softener embodying the present invention.
[Explanation of symbols]
1 Resin tube
5 Raw water line
7 Water flow detection means (flow switch)
11 Saltwater flow line
13 Drainage line
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22083297A JP4419178B2 (en) | 1997-07-31 | 1997-07-31 | Control method of drainage process in water softener |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22083297A JP4419178B2 (en) | 1997-07-31 | 1997-07-31 | Control method of drainage process in water softener |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1147745A JPH1147745A (en) | 1999-02-23 |
| JP4419178B2 true JP4419178B2 (en) | 2010-02-24 |
Family
ID=16757252
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22083297A Expired - Fee Related JP4419178B2 (en) | 1997-07-31 | 1997-07-31 | Control method of drainage process in water softener |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4419178B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002035745A (en) * | 2000-07-27 | 2002-02-05 | Hitachi Chem Co Ltd | Protection method for water softener and water softener |
| JP5463877B2 (en) * | 2009-11-27 | 2014-04-09 | 株式会社ノーリツ | Water softener |
| JP5786365B2 (en) * | 2011-02-23 | 2015-09-30 | 三浦工業株式会社 | Ion exchanger |
| CN108981040B (en) * | 2018-07-17 | 2023-10-10 | 珠海格力电器股份有限公司 | Cooling water replacement method, device and air conditioning system |
-
1997
- 1997-07-31 JP JP22083297A patent/JP4419178B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH1147745A (en) | 1999-02-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH06277664A (en) | Method and apparatus for clarifying surface flowing water with membrane | |
| CN110756050A (en) | Water purification system and water purification equipment | |
| CN205419862U (en) | water purification system | |
| CN213433866U (en) | Water purification system and water purification equipment | |
| JP5232393B2 (en) | Water purifier | |
| JP4419178B2 (en) | Control method of drainage process in water softener | |
| JP2007289959A (en) | Water softener | |
| JP4253831B2 (en) | Water softener | |
| JP4061716B2 (en) | Control method of water softener | |
| JP2778462B2 (en) | Water regeneration control method | |
| JP2776279B2 (en) | Control method of water softener | |
| JP2867906B2 (en) | Water softener | |
| JP3218974B2 (en) | Control method of water treatment equipment | |
| JP3525899B2 (en) | Control method of household water softener | |
| JP3147774B2 (en) | Water treatment device and water treatment method | |
| EP0803473B1 (en) | Method and apparatus for treatment of water | |
| JP4465695B2 (en) | Control method of water softener | |
| JP3446940B2 (en) | Water softener | |
| CN223780020U (en) | Water purifying equipment | |
| JP3058508U (en) | Water softener | |
| CN223879504U (en) | Water purifying equipment | |
| JPH11128755A (en) | Method for regenerating ion exchange resin in water softener | |
| JP3931472B2 (en) | Water softener | |
| JP4158294B2 (en) | Water softener | |
| JP2020039992A (en) | Water softener |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040413 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20051216 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070327 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070528 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080805 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20091109 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20091122 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121211 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131211 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |