Scrap preheating equipment Download PDF

Info

Publication number
JP4442020B2
JP4442020B2 JP2000344046A JP2000344046A JP4442020B2 JP 4442020 B2 JP4442020 B2 JP 4442020B2 JP 2000344046 A JP2000344046 A JP 2000344046A JP 2000344046 A JP2000344046 A JP 2000344046A JP 4442020 B2 JP4442020 B2 JP 4442020B2
Authority
JP
Japan
Prior art keywords
scrap
exhaust gas
preheating
side wall
damper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000344046A
Other languages
Japanese (ja)
Other versions
JP2002147971A (en
Inventor
勉 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daido Steel Co Ltd
Original Assignee
Daido Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daido Steel Co Ltd filed Critical Daido Steel Co Ltd
Priority to JP2000344046A priority Critical patent/JP4442020B2/en
Publication of JP2002147971A publication Critical patent/JP2002147971A/en
Application granted granted Critical
Publication of JP4442020B2 publication Critical patent/JP4442020B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Furnace Details (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、金属溶解炉に投入する溶解原料であるスクラップを、該金属溶解炉から排出される排ガスに接触させて予熱するスクラップ予熱装置に関する。
【0002】
【従来の技術】
従来のこの種の予熱装置としては、たとえば特開平8ー54191号公報や特開平9ー105590号公報に記載のように、シャフト(塔体)内に通気性を有する開閉自在なゲートを複数段にわたって設置して、上下に2乃至3室の予熱室を形成し、最下段の予熱室より下側のシャフト壁と最上段の予熱室の側壁上部とを分流ダクトで接続し、最上段の予熱室の下側の予熱室の側壁上部に排気ダクトを接続したものが知られている。
【0003】
上記の予熱装置は、排ガスが2つのガス流に分流され排ガスの熱量が分散されるので、スクラップが局部的に過熱されて溶融したり酸化したりするのが防止されるという点ですぐれたものであるが、シャフト内に上下に複数の予熱室を形成する必要があるのでシャフトの全高が高くなり、建屋の高さによっては設置困難になるという問題点があった。
【0004】
【発明が解決しようとする課題】
この発明は上記従来の問題点を解決しようとするもので、予熱装置の高さが低くて済むとともに、排ガスの保有熱やスクラップ量が変動しても高い予熱効率が得られるスクラップ予熱装置を提供することを目的とする。
【0005】
【課題を解決するための手段】
上記目的を達成するために、請求項1記載のスクラップ予熱装置は、スクラップ装入口を上端部にそなえ溶解炉のスクラップ投入口に対向するスクラップ排出口を下端部にそなえたシャフトの下部に、通気性を有する開閉自在なゲートを設けて、該ゲートの上側に前記スクラップ装入口に至るひとつの予熱室を形成し、前記ゲートの下側のシャフト側壁と前記予熱室の側壁の上部とを、ダンパを有する分流ダクトで接続するとともに、前記予熱室の側壁の中間部に複数段にわたって設けた中間部排気口に、それぞれスクラップ分離室を介してダンパを有する排ガスダクトを接続したことを特徴とする。
0006
また請求項記載のスクラップ予熱装置は、スクラップ装入口を上端部にそなえ溶解炉のスクラップ投入口に対向するスクラップ排出口を下端部にそなえたシャフトの下部に、通気性を有する開閉自在なゲートを設けて、該ゲートの上側に前記スクラップ装入口に至るひとつの予熱室を形成し、前記ゲートの下側のシャフト側壁と前記予熱室の側壁の上部とを、ダンパを有する分流ダクトで接続するとともに、前記予熱室の側壁の上部に設けた上部排気口に、ダンパを有する排ガスダクトを接続し、前記予熱室の側壁の中間部に設けた中間部排気口に、スクラップ分離室を介してダンパを有する排ガスダクトを接続したことを特徴とする。
0007
この発明において予熱室の側壁の上部とは、予熱装置使用時にスクラップ量の変動によって、予熱室に最大容積のスクラップが装入されたときのスクラップ層上面位置より上側の側壁部分を指すものとする。また予熱室の側壁の中間部とは、同じく予熱室に最小容積のスクラップが装入されたときのスクラップ層上面位置より下側の側壁部分を指すものとするが、中間部排気口を複数段にわたって設ける場合は、上段側の中間部排気口は上記両スクラップ層上面位置間の側壁部分に設けてもよく、この場合はこの側壁部分も予熱室の側壁の中間部に包含されるものとする。
0008
またこの発明においてスクラップ分離室とは、気体流中から該気体流中に含まれるスクラップを分離する構造を有する室で、たとえば流路断面積の拡大(流速の減少)によりスクラップを重力落下させるものや、衝突板への衝突によりスクラップを慣性力により分離するスクラップキャッチャ方式のものなど、各種の分離原理にもとづくものを用いることができる。
0009
請求項1〜の手段によれば、シャフト内にはひとつの予熱室を設けるだけでよいので、シャフトの全高、従って予熱装置の高さが低くて済む。また予熱室内のスクラップ層の側面部に中間部排気口が開口するとともに分流ダクトをそなえているので、排ガスの保有熱が高い時期においても、予熱室がひとつでありながら排ガスを分流してスクラップ層を上下両側から局部的な過熱なしに予熱することができ、また中間部排気口からのスクラップの排ガス下流側への流出は、スクラップ分離室により防止される。
0010
【発明の実施の形態】
以下この発明の実施の形態の説明の前に、図1および図2に示すこの発明の参考例を説明する。図中1は溶解炉であるアーク炉で、その炉体2は図示しない傾動装置により傾動可能に支持され、その炉蓋3にはスクラップ投入口4が設けてある。
0011
10はスクラップ予熱装置であり、11はその主体を構成する角筒状のシャフトで、図示しない横行自在な機枠により基礎上に支持されている。12はシャフト上端部のスクラップ装入口、13はシャフト下端部のスクラップ排出口で、アーク炉1のスクラップ投入口4に対向して開口しており、アーク炉1からの排ガス受入口を兼ねるものであって、その周壁下端面は、スクラップ投入口4の上端面に沿う円弧面状を呈している。
0012
14はシャフト11の下部に設けたゲートで、シャフト側壁に沿って配置した回動軸にフィンガーを間隔をおいて多数枚固着した一対のフォーク状のものであり、図示しないシリンダ等の駆動装置により水平位置(閉鎖位置)と下方へ傾動した傾斜位置(開放位置)との間を回動駆動することにより、開閉される。
0013
上記のゲート14の設置により、シャフト11内にはスクラップ装入口12に至るひとつの予熱室15が形成されている。16は分流ダクトで、ゲート14の下側のシャフト側壁11aと予熱室15の上部側壁15aとを接続している。図1にはスクラップ量の変動により予熱室15内に最大容積のスクラップが装入されたときのスクラップ層Sの上面を実線で示してあり、このスクラップ層Sの上面位置Hより上側の側壁部分に、分流ダクト16が接続されている。
0014
21Aは予熱室15の中間部側壁15bに設けた中間部排気口であり、図中鎖線で示す予熱室15に最小容積のスクラップが装入されたときのスクラップ層Sの上面位置Lよりも下側の側壁部分に設けられている。
0015
22Aは中間部排気口21Aの外側に形成したスクラップ分離室で、図2にも示すように、その下部に中間部排気口21Aが開口し、上方に向ってガス流路断面積が増加する箱状体23内に形成され、その側板24の上部には、排ガスダクト25Aが接続されている。そしてこの排ガスダクト25Aは、図示しない集じん装置への送風用の送風機の吸気口に接続されている。なおスクラップ分離室の箱状体23への排ガスダクトの接続は、図2に鎖線で示すように箱状体23の左右の側壁部への接続とすれば、スクラップの分離はさらに良好となる。
0016
次に上記構成の装置においては、アーク炉1において炉体2内に装入されたスクラップに対してアーク熱により溶解がおこなわれ、この溶解に伴う排ガスをスクラップ予熱装置10のシャフト11内を流通させて、予熱室15内に装入されたスクラップの予熱をおこなう。このときこのスクラップ予熱装置10においては、スクラップ層Sの上面が、スクラップ量最大時の前記上面位置H〜スクラップ量最小時の前記上面位置Lの間のいずれの位置にある場合でも、すなわちスクラップ量に関係なく、また排ガスGの保有熱の高低にも関係なく、常に排ガスGの分流ガスGを分流ダクト16を経てスクラップ層Sの上側から下向流として、残りの分流ガスGをスクラップ層Sの下側から上向流として、それぞれ供給して、スクラップ予熱後合流した排ガスを、中間部排気口21Aから排ガスダクト25Aを経てシャフト外へ流出させる。
0017
このように中間部排気口21Aはスクラップ層Sの側部に開口し、スクラップ層Sは分流ダクト16による分流ガスGと分流ガスGにより常に上下両側から加熱されるので、スクラップ層Sは局部的な過熱なしに効率よく予熱でき、また後述の各例のようなダンパ操作は不要なので操業に手間がかからず、排ガスダクトの本数は少なくダンパも不要なこともあいまって、装置が簡潔で安価に製作でき、特に最大スクラップ量(予熱室容積)やスクラップ量の変動が小さい場合に好適に使用することができる。また装置自体としては、シャフト11内にはひとつの予熱室15を設けるだけでよいので、シャフト11、従ってスクラップ予熱装置10の高さが低くて済む。
0018
そして上記の排ガス流による予熱時においては、中間部排気口21A付近にはスクラップが堆積しており、スクラップ層自体がフィルタとして作用はするものの、小形のスクラップ片など一部のスクラップは排ガスと共に中間部排気口21Aから排出されることがあるが、スクラップ分離室22A内において排ガス流は急速に減速してスクラップ吹上力は弱まるので、スクラップは自重降下して箱状体23の側板24の傾斜板部24aの下部付近上面部に堆積する。これによって排ガスダクト25A内にスクラップが流出するのが防止され、該ダクトおよびその下流側の機器の保守が容易となる。そして上記の傾斜板部24a上に堆積したスクラップは、予熱終了時に予熱室15内のスクラップと共にアーク炉1の炉体2内へと落下して溶融に供されるのである。
0019
次に図3に示す第例により、請求項記載の発明の実施の形態を説明する。この例のスクラップ予熱装置30は、前記参考例のスクラップ予熱装置10において、分流ダクト16にダンパ17を、排ガスダクト25Aにダンパ26Aを、それぞれ設けるとともに、中間部排気口21Aの上段側において中間部側壁15bに中間部排気口21Bを設け、この中間部排気口21Bの外側に形成したスクラップ分離室22Bに、ダンパ26Bを有する排ガスダクト25Bを接続したものであり、その他の構成はスクラップ予熱装置10と同じであるので、図1と同一部分には同一符号を付して、それらの部分の詳細な説明は省略する。(以下他の例においても同様とする。)
0020
そして上段側の中間部排気口21Bは、図中鎖線で示す予熱室15に最小容積のスクラップが装入されたときのスクラップ層Sの上面位置Lよりも上側(ただし前記スクラップ層の上面位置Hよりも下側)の側壁部分に設けられている。またスクラップ分離室22Bはスクラップ分離室22Aと同構造を有し、スクラップ分離室22Aと同様な排ガスダクト内へのスクラップ流出を防止する機能を有するものであり、また排ガスダクト25A,25Bは図示のように下流側で合流している。
0021
このスクラップ予熱装置30においても、アーク炉1からの排ガスの流通により、予熱室15内のスクラップの予熱をおこなうのであるが、一般にアーク炉1からの排ガスの保有熱は、アーク炉の操業工程中の時期によって変動し、溶鋼の酸化精錬期やカーボンインジェクション期などにおいては排ガスの保有熱が高いが、上記以外のたとえばスクラップ溶解期などにおいては、排ガスの保有熱は上記高保有熱の約1/2〜1/10程度と低い。また予熱室15内へ装入される1回の予熱ごとのスクラップ量も、そのかさ比重の変動等によりスクラップ容積がかなり変動する。
0022
そこでこの排ガスの保有熱とスクラップ量の変動に対して、スクラップ予熱装置30においては次のようにして対処する。すなわち、まず図中実線で示すように、予熱室15内に装入されたスクラップ量が多量であってスクラップ層Sの上面がスクラップ量最大時の上面位置H付近にある場合は、排ガスGの保有熱の高低に関係なく常にダンパ17,26Bを開、ダンパ26Aを閉として、参考例と同様に排ガスGの分流ガスGを分流ダクト16を経てスクラップ層Sの上側から下向流として、残りの分流ガス をスクラップ層Sの下側から上向流として、それぞれ供給して、スクラップ予熱後合流した排ガスは、中間部排気口21Bから排ガスダクト25Bを経てシャフト外へ流出させる。
0023
また図中鎖線で示すように予熱室15内に装入されたスクラップ量が少量であってスクラップ層Sの上面がスクラップ量最小時の上面位置L付近にある場合、排ガスGの保有熱が高い時期においては、ダンパ17,26Aを開、ダンパ26Bを閉として、排ガスGの分流ガスGを分流ダクト16を経て下向流として、残りの分流ガスGを上向流として、それぞれ供給して、スクラップ予熱後合流した排ガスは鎖線矢印で示すように中間部排気口21Aから排ガスダクト25Aを経てシャフト外へ流出させる。
0024
また同じくスクラップ量が少量である場合、排ガスの保有熱が低い時期においては、ダンパ26Bを開、ダンパ17,26Aを閉として、破線矢印で示すように排ガスGの全量を上向流として供給し、スクラップ予熱後の排ガスは、破線矢印で示すように中間部排気口21Bから排ガスダクト25Bを経てシャフト外へ流出させる。
0025
これによって排ガスが高温の場合でも、排ガスの分流により排ガスの保有熱が分散され、スクラップが局部的に過熱されて溶融したり酸化するのが防止され、スクラップ層各部は温度差の少ないほぼ均熱状態に加熱され、排ガスは良好な熱交換により降温して排出されるので、高い予熱効率が得られる。また排ガスGの保有熱が低い時期においては、スクラップ層Sはスクラップ量に応じて分流ガスGと分流ガスGにより、あるいは排ガスGの上向流により、局部的に過熱されることなく予熱される。またスクラップ分離室22A,22Bによって、排ガスと共にスクラップがダンパ26A,26B側へ流出するのが防止され、これらダンパの保守が容易となる。また参考例と同様にひとつの予熱室15を設けるだけでよいので、スクラップ予熱装置30の高さは低くて済む。
0026
以上はスクラップ層Sの上面が、上面位置HあるいはL付近にある場合について説明したが、その中間に上面がある場合、たとえば上面が中間部排気口21B付近にある場合は、排ガスの保有熱が高い時期においては前述の中間部排気口21Bのかわりに中間部排気口21Aからスクラップ予熱後の排ガスを排出させるようにダンパ操作をおこなうなど、排ガスの保有熱とスクラップ量に応じて、ダンパ操作により最適の排ガス流通経路を選択してスクラップを効率よく予熱することができる。
0027
次に図4〜図6に示す第例により、請求項記載の発明の実施の形態を説明する。この例のスクラップ予熱装置40は、前記第例のスクラップ予熱装置30において、予熱室の上部側壁15aに上部排気口27を設け、この上部排気口27に、ダンパ29を有する排ガスダクト28を接続したものであり、その他の構成はスクラップ予熱装置30と同じであるので、図3と同一部分には同一符号を付してある。なお排ガスダクト25A,25B,28は図示のようにその下流側で合流し、図示しない集じん装置への送風用の送風機の吸気口に接続されている。
0028
このスクラップ予熱装置40においても、アーク炉1からの排ガスの流通により予熱室15内のスクラップの予熱をおこなうのであるが、前述の排ガスの保有熱の変動とスクラップ量の変動に対して次のように対処する。すなわち、まず図4および図5に示すように、予熱室15内に装入されたスクラップ量が多量であってスクラップ層Sの上面が上面位置H付近にある場合、排ガスGの保有熱が高い時期においては図4に示すようにダンパ17,26Bを開、ダンパ29,26Aを閉として、排ガスGの一部の分流ガスGを分流ダクト16を経てスクラップ層Sの上側からスクラップ層S内に下向流として供給し、残りの分流ガスGをスクラップ層Sの下側から上向流として供給して、スクラップ予熱後合流した排ガスを、中間部排気口21Bから排ガスダクト25Bを経てシャフト外へ流出させる。
0029
これによって排ガスが高温の場合でも、排ガスの分流により排ガスの保有熱が分散され、スクラップが局部的に過熱されて溶融したり酸化するのが防止され、スクラップ層各部は温度差の少ないほぼ均熱状態に加熱され、排ガスは良好な熱交換により降温して排出されるので、高い予熱効率が得られる。また前記第例と同様に、スクラップ分離室22Bによって、排ガスと共にスクラップがダンパ26B側へ流出するのが防止される。
0030
また同じくスクラップ量が多量である場合、排ガスGの保有熱が低い時期においては、図5に示すようにダンパ29のみを開、残りのダンパ17,26A,26Bを閉として、排ガスGの全量をスクラップ層Sの下側から上昇流として供給し、予熱後の排ガスを上部排気口27から排ガスダクト28を経てシャフト外へ流出させる。
0031
排ガス温度は低いためスクラップ層Sは局部的に過熱されることはなく、また分流ダクト16内への分流による熱損失もなく、高効率でスクラップの予熱をおこなうことができる。また上部排気口27はスクラップ層Sの上方離間位置にあるため該排気口からのスクラップの流出のおそれはない。
0032
次に図6に示すように予熱室15内に装入されたスクラップ量が少量であって、スクラップ層Sの上面が上面位置L付近にある場合は、排ガスGの保有熱が高い時期においては、同図に実線で示すようにダンパ17,26Aを開、ダンパ29,26Bを閉として、図4の場合と同様に分流ガスGを分流ダクト16を経てスクラップ層Sの上側から下向流として、残りの分流ガスGをスクラップ層Sの下側から上向流として、それぞれ供給して、合流した排ガスは下側の中間部排気口21Aから排ガスダクト25Aを経てシャフト外へ流出させる。
0033
これによって排ガス温度が高温の場合でも、図4の場合と同様な良好な加熱作用が得られ、またスクラップ分離室22Aによって図4におけるスクラップ分離室22Bと同様なスクラップ流出防止作用が得られる。
0034
また同じくスクラップ量が少量である場合、排ガスGの保有熱が低い時期においては、図6に破線で示すようにダンパ29のみを開、残りのダンパ17,26A,26Bを閉として、図3の場合と同様に排ガスGの全量をスクラップ層Sの下側から上向流として供給し、上部排気口27から排ガスダクト28を経てシャフト外へ流出させる。
0035
これによって図5の場合と同様にスクラップを高効率で予熱でき、スクラップ流出のおそれもない。なおこの例のようにスクラップ層Sの上面位置Lより上方に中間部排気口21Bが開口している場合は、スクラップ予熱後の排ガスを上部排気口27のかわりに中間部排気口21Bから流出させてもよいが、スクラップ予熱後の排ガスの保有熱をシャフト11内に少しでも多く蓄熱させて次回のスクラップ装入にそなえるためには、シャフト頂部の上部排気口27からの排気の方が好ましく、これによってスクラップ予熱の熱効率が向上する。
0036
なお前記第例と同様に、スクラップ層Sの上面が上面位置Hと上面位置Lの中間にある場合、たとえば上面が中間部排気口21B付近にある場合は、排ガスの保有熱が高い時期においては前述の中間部排気口21Bにかわりに中間部排気口21Aからスクラップ予熱後の排ガスを排出させるようにダンパ操作をおこなうなど、排ガスの保有熱とスクラップ量に応じて、ダンパ操作により最適の排ガス流通経路を選択してスクラップを効率よく予熱することができる。
0037
以上のように、スクラップ層Sの側面部に排気用の中間部排気口21A,21Bを開口させるとともに分流ダクト16を設けてあるので、予熱室がひとつでありながら排ガスを分流してスクラップ層を局部的な過熱なしに効率よく予熱することができ、また排ガスの保有熱とスクラップ量の変動に応じて、各ダンパの操作により排ガス流通経路を切換えることにより、上記変動に対しても常に高い予熱効率が得られる。また装置自体としては、シャフト11内にはひとつの予熱室15を設けるだけでよいので、シャフト11、従ってスクラップ予熱装置40の高さが低くて済むのである。またこの例では上下2段の中間部排気口21A,21Bを設けているので、スクラップ量の変動に対して最適の中間部排気口を選択でき、スクラップ量の変動に対する適応性に富む。
0038
次に図7に示す第例により、請求項記載の発明の他の実施の形態を説明する。この例のスクラップ予熱装置50は、前記第例のスクラップ予熱装置40において、図4における上段側の中間部排気口21Bとスクラップ分離室22Bとダンパ26Bおよび排ガスダクト25Bを除去したものであり、その他の構成はスクラップ予熱装置40と同じであるので、図4と同一部分には同一符号を付してある。
0039
このスクラップ予熱装置50においては、スクラップ層Sの上面が、スクラップ量最大時の前記上面位置H〜スクラップ量最小時の前記上面位置Lの間のいずれの位置にある場合でも、すなわちスクラップ量に関係なく、排ガスGの保有熱が高い時期においては、ダンパ17,26Aを開、ダンパ29を閉として、参考例と同様に排ガスGの分流ガスGを分流ダクト16を経てスクラップ層Sの上側から下向流として、残りの分流ガスGをスクラップ層Sの下側から下向流として、それぞれ供給して、スクラップ予熱後合流した排ガスは、中間部排気口21Aから排ガスダクト25Aを経てシャフト外へ流出させる。
0040
また同じく予熱室15内のスクラップ量に関係なく、排ガスの保有熱が低い時期においては、ダンパ29のみを開、残りのダンパ17,26Aを閉として、破線矢印で示すように参考例と同様に排ガスGの全量をスクラップ層Sの下側から上向流として供給し、スクラップ予熱後の排ガスを上部排気口27から排ガスダクト28を介してシャフト外へ流出させる。
0041
このように、この例では、排ガスの保有熱の高低に応じて、各ダンパの操作により排ガス流通経路を切換えることにより、上記保有熱が変動しても高い予熱効率が得られ、特にスクラップ量には関係なく上記ダンパの操作をおこなえばよいので、ダンパの操作が容易である。また第例と同様にひとつの予熱室15を設けるだけでよいので、スクラップ予熱装置50の高さは低くて済む。
0042
この発明は上記各例に限定されるものではなく、たとえばスクラップ分離室としては、図8に示すように、上記各例のスクラップ分離室の箱状体23内に邪魔板61を突設して、スクラップ捕集をさらに確実にしたスクラップ分離室60や、図9に示すように、ケーシング71内に衝突板72を垂下状に設け、下部のスクラップ貯留部73の底に開閉底板74を設け、連結ダクト75とスクラップ返流管76とで中間部側壁15bに接続した、スクラップキャッチャ方式のスクラップ分離室70など、各種形式のものを用いることができる。なおスクラップ分離室は上記各例のように中間部側壁15bに一体に付設するほか、スクラップ分離室70のように、ダクトを介して中間部側壁15bに接続してもよい。
0043
またゲートは、上記の揺動フォーク式のものの他、水平方向に直動し塔体内に挿入引出される直動フォーク式のものなど、他形式のものとしてもよい。また溶解炉は、上記のアーク炉以外のものであってもよく、この溶解炉の形式や構造等によって塔体を横行させる必要のない場合は、塔体は基礎上に固設させてもよい。
0044
【発明の効果】
以上説明したようにこの発明によれば、シャフト内に設ける予熱室はひとつでよいので、シャフトの全高、従ってスクラップ予熱装置の高さが低くて済み、低い建屋内への設置も可能となる。また排ガスの保有熱が高い時期においても、予熱室がひとつでありながら排ガスを分流してスクラップ層を上下両側から局部的な過熱なしに予熱することができるのに加えて、排ガスの保有熱やスクラップ量が変動してもダンパの操作により排ガス流通経路を切換えることにより、高い予熱効率が得られる。
0045
また上記の効果に加えて、請求項記載の発明によれば、上部排気口を設けたので、排ガス保有熱が低いときはスクラップ量に関係なく分流ダクトの使用は不要で該分流ダクト内への分流による熱損失もなくなり、一層高い予熱効率が得られる。
【図面の簡単な説明】
【図1】 この発明の参考例を示すスクラップ予熱装置の縦断面図である。
【図2】 図1のA−A線拡大断面図である。
【図3】 この発明の実施の形態の第例を示すスクラップ予熱装置の縦断面図である。
【図4】 この発明の実施の形態の第例を示すスクラップ予熱装置の縦断面図である。
【図5】 図4のスクラップ予熱装置の使用状態を示す縦断面図である。
【図6】 図4のスクラップ予熱装置の他の使用状態を示す縦断面図である。
【図7】 この発明の実施の形態の第例を示すスクラップ予熱装置の縦断面図である。
【図8】 この発明におけるスクラップ分離室の他の実施形態を示す縦断面図である。
【図9】 この発明におけるスクラップ分離室のさらに他の実施形態を示す縦断面図である。
【符号の説明】
1…アーク炉(溶解炉)、10…スクラップ予熱装置、11…シャフト、11a…シャフト側壁、12…スクラップ装入口、13…スクラップ排出口、14…ゲート、15…予熱室、15a…上部側壁、15b…中間部側壁、16…分流ダクト、17…ダンパ、21A…中間部排気口、21B…中間部排気口、22A…スクラップ分離室、22B…スクラップ分離室、25A…排ガスダクト、25B…排ガスダクト、26A…ダンパ、26B…ダンパ、27…上部排気口、28…排ガスダクト、29…ダンパ、30…スクラップ予熱装置、40…スクラップ予熱装置、50…スクラップ予熱装置、60…スクラップ分離室、70…スクラップ分離室。
[0001]
BACKGROUND OF THE INVENTION
  The present invention relates to a scrap preheating device that preheats scrap, which is a melting raw material to be charged into a metal melting furnace, by bringing it into contact with exhaust gas discharged from the metal melting furnace.
[0002]
[Prior art]
  As a conventional preheating device of this type, for example, as disclosed in JP-A-8-54191 and JP-A-9-105590, a plurality of stages of openable and closable gates having air permeability are provided in a shaft (tower). 2 to 3 preheating chambers are formed on the upper and lower sides, the shaft wall below the lowermost preheating chamber is connected to the upper side of the uppermost preheating chamber with a shunt duct, and the uppermost preheating chamber is connected. An exhaust duct connected to the upper part of the side wall of the preheating chamber below the chamber is known.
[0003]
  The above preheating device is superior in that the exhaust gas is divided into two gas streams and the amount of heat of the exhaust gas is dispersed, so that the scrap is prevented from being locally heated and melted or oxidized. However, since it is necessary to form a plurality of preheating chambers in the upper and lower sides in the shaft, the total height of the shaft is increased, and there is a problem that it is difficult to install depending on the height of the building.
[0004]
[Problems to be solved by the invention]
  The present invention is intended to solve the above-mentioned conventional problems, and the height of the preheating device can be reduced.WithProviding a scrap preheating device that can achieve high preheating efficiency even if the retained heat of the exhaust gas or the amount of scrap varies.PurposeAnd
[0005]
[Means for Solving the Problems]
  In order to achieve the above object, a scrap preheating apparatus according to claim 1 is characterized in that a scrap charging inlet is provided at an upper end portion and a lower portion of a shaft provided with a scrap discharge opening opposed to a scrap charging inlet of a melting furnace is provided at a lower end portion. An openable and closable gate is formed, and a preheating chamber reaching the scrap charging inlet is formed above the gate, and a shaft side wall below the gate and an upper portion of the side wall of the preheating chamber are formed.Have a damperConnected with a shunt duct and at the middle part of the side wall of the preheating chamberAcross multiple levelsIn the provided middle exhaust port,RespectivelyThrough the scrap separation chamberWith damperAn exhaust gas duct is connected.
[0006]
  And claims2The scrap preheating apparatus described is provided with a gas-permeable openable and closable gate at the lower part of the shaft provided with a scrap charging inlet at the upper end and a scrap discharge opening facing the scrap charging inlet of the melting furnace at the lower end. One preheating chamber is formed on the upper side of the gate to reach the scrape inlet, the shaft side wall on the lower side of the gate and the upper part of the side wall of the preheating chamber are connected by a shunt duct having a damper, and the preheating is performed. An exhaust gas duct having a damper is connected to an upper exhaust port provided at the upper part of the side wall of the chamber, and an exhaust gas duct having a damper is connected to an intermediate exhaust port provided in an intermediate part of the side wall of the preheating chamber via a scrap separation chamber Is connected.
[0007]
  In the present invention, the upper part of the side wall of the preheating chamber refers to the side wall portion above the upper surface position of the scrap layer when the maximum volume of scrap is charged into the preheating chamber due to fluctuations in the amount of scrap when the preheating device is used. . Also, the middle part of the side wall of the preheating chamber refers to the side wall part below the upper surface of the scrap layer when the minimum volume of scrap is charged into the preheating chamber. In the case where it is provided over the upper side, the upper middle side exhaust port may be provided in the side wall portion between the upper surface positions of both scrap layers, and in this case, this side wall portion is also included in the middle portion of the side wall of the preheating chamber. .
[0008]
  Further, in the present invention, the scrap separation chamber is a chamber having a structure for separating the scrap contained in the gas flow from the gas flow, and for example, the scrap is gravity-dropped by increasing the cross-sectional area of the flow path (decreasing the flow velocity). In addition, those based on various separation principles such as a scrap catcher type that separates scraps by inertial force by collision with a collision plate can be used.
[0009]
  Claims 1 to2According to this means, since only one preheating chamber needs to be provided in the shaft, the overall height of the shaft, and hence the height of the preheating device, can be reduced. In addition, an exhaust port is provided in the side of the scrap layer in the preheating chamber, and a shunt duct is provided. Therefore, even when the heat stored in the exhaust gas is high, the exhaust gas is shunted while the preheating chamber is single, and the scrap layer Can be preheated from both the upper and lower sides without local overheating, and the outflow of scrap from the intermediate exhaust port to the exhaust gas downstream side is prevented by the scrap separation chamber.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
  Less thanBefore the description of the embodiment of the present invention,As shown in FIG. 1 and FIG.Reference example of this inventionWill be explained. In the figure, 1 is an arc furnace which is a melting furnace, and its furnace body 2 is supported by a tilting device (not shown) so as to be tiltable, and a scrap charging port 4 is provided in the furnace lid 3.
[0011]
  Reference numeral 10 denotes a scrap preheating apparatus, and 11 is a rectangular tube shaft constituting the main body, and is supported on a foundation by a traversable machine frame (not shown). Reference numeral 12 denotes a scrap inlet at the upper end of the shaft, and 13 denotes a scrap outlet at the lower end of the shaft, which is opposed to the scrap inlet 4 of the arc furnace 1 and serves also as an exhaust gas inlet from the arc furnace 1. In addition, the lower end surface of the peripheral wall has an arcuate shape along the upper end surface of the scrap input port 4.
[0012]
  Reference numeral 14 denotes a gate provided at the lower portion of the shaft 11, which is a pair of forks in which a large number of fingers are fixed to a rotating shaft arranged along the side wall of the shaft at intervals, and is driven by a driving device such as a cylinder (not shown). It is opened and closed by rotationally driving between a horizontal position (closed position) and an inclined position tilted downward (open position).
[0013]
  By installing the gate 14, a single preheating chamber 15 reaching the scrap charging inlet 12 is formed in the shaft 11. A shunt duct 16 connects the shaft side wall 11 a on the lower side of the gate 14 and the upper side wall 15 a of the preheating chamber 15. In FIG. 1, the upper surface of the scrap layer S when the maximum volume of scrap is charged into the preheating chamber 15 due to fluctuations in the amount of scrap is indicated by a solid line, and the side wall portion above the upper surface position H of the scrap layer S In addition, a shunt duct 16 is connected.
[0014]
  21A is an intermediate part exhaust port provided in the intermediate part side wall 15b of the preheating chamber 15, and is lower than the upper surface position L of the scrap layer S when the minimum volume of scrap is charged into the preheating chamber 15 indicated by a chain line in the figure. It is provided on the side wall portion on the side.
[0015]
  22A is a scrap separation chamber formed outside the intermediate exhaust port 21A. As shown in FIG. 2, the intermediate exhaust port 21A is opened at the lower part of the scrap separation chamber, and the gas channel cross-sectional area increases upward. An exhaust gas duct 25 </ b> A is connected to the upper portion of the side plate 24 formed in the shape body 23. The exhaust gas duct 25A is connected to an intake port of a blower for blowing air to a dust collector (not shown). In addition, if the connection of the exhaust gas duct to the box-like body 23 of the scrap separation chamber is a connection to the left and right side walls of the box-like body 23 as shown by a chain line in FIG. 2, the separation of the scrap is further improved.
[0016]
  Next, in the apparatus configured as described above, the scrap charged in the furnace body 2 in the arc furnace 1 is melted by arc heat, and the exhaust gas accompanying this melting is circulated in the shaft 11 of the scrap preheating apparatus 10. Thus, the scrap charged in the preheating chamber 15 is preheated. At this time, in the scrap preheating device 10, the upper surface of the scrap layer S is located at any position between the upper surface position H when the scrap amount is maximum and the upper surface position L when the scrap amount is minimum, that is, the scrap amount. Regardless of the temperature of the exhaust gas G and regardless of the heat held by the exhaust gas G, the shunt gas G of the exhaust gas G is always1As a downward flow from the upper side of the scrap layer S through the shunt duct 16, and the remaining shunt gas G2As an upward flow from the lower side of the scrap layer S, and the exhaust gas that has joined after scrap preheating flows out of the shaft from the intermediate exhaust port 21A through the exhaust gas duct 25A.
[0017]
  Thus, the intermediate part exhaust port 21A opens to the side part of the scrap layer S, and the scrap layer S is divided gas G by the branch duct 16.1And split gas G2Therefore, the scrap layer S can be efficiently preheated without local overheating, and it is not necessary to operate a damper as in each of the examples described later. Therefore, the apparatus can be manufactured simply and inexpensively, and can be suitably used especially when the maximum scrap amount (preheating chamber volume) and the amount of scrap are small. Further, as the apparatus itself, only one preheating chamber 15 needs to be provided in the shaft 11, so that the height of the shaft 11, and hence the scrap preheating apparatus 10, can be reduced.
[0018]
  During the preheating with the exhaust gas flow, scrap is accumulated near the intermediate exhaust port 21A, and the scrap layer itself acts as a filter, but some scraps such as small scrap pieces are intermediate with the exhaust gas. Although the exhaust gas flow is rapidly decelerated in the scrap separation chamber 22A and the scrap blowing force is weakened, the scrap falls by its own weight and the inclined plate of the side plate 24 of the box-like body 23 Deposited on the upper surface near the lower portion of the portion 24a. This prevents scrap from flowing into the exhaust gas duct 25A and facilitates maintenance of the duct and the downstream equipment. The scrap accumulated on the inclined plate portion 24a falls into the furnace body 2 of the arc furnace 1 together with the scrap in the preheating chamber 15 at the end of preheating and is used for melting.
[0019]
  Next, as shown in FIG.1By example, claims1Embodiments of the described invention will be described. The scrap preheating device 30 of this example isReference exampleIn the scrap preheating device 10, the damper 17 is provided in the shunt duct 16, the damper 26 A is provided in the exhaust gas duct 25 A, and the intermediate exhaust port 21 B is provided in the intermediate side wall 15 b on the upper side of the intermediate exhaust port 21 A. An exhaust gas duct 25B having a damper 26B is connected to a scrap separation chamber 22B formed outside the intermediate exhaust port 21B, and the other configuration is the same as that of the scrap preheating device 10, and therefore the same part as FIG. Are denoted by the same reference numerals, and detailed description thereof is omitted. (The same applies to other examples below.)
[0020]
  The upper middle side exhaust port 21B is located above the upper surface position L of the scrap layer S when the minimum volume of scrap is charged into the preheating chamber 15 indicated by the chain line in the drawing (however, the upper surface position H of the scrap layer). (Below the lower side). The scrap separation chamber 22B has the same structure as the scrap separation chamber 22A, and has a function of preventing the outflow of scrap into the exhaust gas duct similar to the scrap separation chamber 22A. The exhaust gas ducts 25A and 25B are shown in the figure. So that it joins downstream.
[0021]
  In the scrap preheating device 30 as well, the scrap in the preheating chamber 15 is preheated by the flow of the exhaust gas from the arc furnace 1, but generally the retained heat of the exhaust gas from the arc furnace 1 is during the operation process of the arc furnace. The heat retention of the exhaust gas is high in the oxidative refining period and the carbon injection period of the molten steel, but in other cases such as the scrap melting period, the heat retention of the exhaust gas is about 1 / of the above high retained heat. It is as low as 2 to 1/10. Further, the amount of scrap for each preheating charged into the preheating chamber 15 also varies considerably due to the change in bulk specific gravity and the like.
[0022]
  Therefore, the scrap preheating device 30 copes with the fluctuation of the heat retained in the exhaust gas and the amount of scrap as follows. That is, as indicated by a solid line in the figure, when the amount of scrap charged into the preheating chamber 15 is large and the upper surface of the scrap layer S is near the upper surface position H when the scrap amount is maximum, The dampers 17 and 26B are always open and the damper 26A is closed regardless of the level of heat held.Reference exampleAs with the split gas G of the exhaust gas G1As a downward flow from the upper side of the scrap layer S through the shunt duct 16, and the remaining shunt gasG 2 Is supplied as an upward flow from the lower side of the scrap layer S, and the exhaust gas that has joined after scrap preheating flows out of the shaft from the intermediate exhaust port 21B through the exhaust gas duct 25B.
[0023]
  Further, as shown by a chain line in the figure, when the amount of scrap charged into the preheating chamber 15 is small and the upper surface of the scrap layer S is near the upper surface position L when the scrap amount is minimum, the retained heat of the exhaust gas G is high. At the time, the dampers 17 and 26A are opened, the damper 26B is closed, and the shunt gas G of the exhaust gas G1As a downward flow through the diverting duct 16 and the remaining diverted gas G2And the exhaust gas that has joined after scrap preheating flows out of the shaft from the intermediate exhaust port 21A through the exhaust gas duct 25A as indicated by the chain arrow.
[0024]
  Similarly, when the amount of scrap is small, the damper 26B is opened, the dampers 17 and 26A are closed, and the entire amount of the exhaust gas G is supplied as an upward flow as indicated by the broken arrows when the retained heat of the exhaust gas is low. The exhaust gas after preheating the scraps flows out of the shaft from the intermediate exhaust port 21B through the exhaust gas duct 25B as indicated by the broken line arrows.
[0025]
  As a result, even when the exhaust gas is hot, the stored heat of the exhaust gas is dispersed by the split flow of the exhaust gas, and the scrap is prevented from being locally heated and melted or oxidized. Since it is heated to a state and the exhaust gas is cooled and discharged by good heat exchange, high preheating efficiency is obtained. In addition, when the retained heat of the exhaust gas G is low, the scrap layer S is divided into the diverted gas G according to the amount of scrap.1And split gas G2Or by the upward flow of the exhaust gas G, it is preheated without being overheated locally. Further, the scrap separation chambers 22A and 22B prevent scrap from flowing out to the dampers 26A and 26B side together with the exhaust gas, and the maintenance of these dampers becomes easy. AlsoReference exampleSince only one preheating chamber 15 needs to be provided, the height of the scrap preheating device 30 may be low.
[0026]
  The above has described the case where the upper surface of the scrap layer S is in the vicinity of the upper surface position H or L. However, when there is an upper surface in the middle, for example, when the upper surface is in the vicinity of the intermediate exhaust port 21B, the retained heat of the exhaust gas is increased. At high times, a damper operation is performed so that the exhaust gas after scrap preheating is discharged from the intermediate exhaust port 21A instead of the intermediate exhaust port 21B. The scrap can be efficiently preheated by selecting the optimum exhaust gas distribution route.
[0027]
  Next, as shown in FIGS.2By example, claims2Embodiments of the described invention will be described. The scrap preheating device 40 in this example is the first one.1In the scrap preheating device 30 of the example, an upper exhaust port 27 is provided in the upper side wall 15a of the preheating chamber, and an exhaust gas duct 28 having a damper 29 is connected to the upper exhaust port 27, and the other configuration is a scrap preheating device. 30 and the same parts as those in FIG. The exhaust gas ducts 25A, 25B, and 28 merge on the downstream side as shown in the figure, and are connected to the intake port of a blower for blowing air to a dust collector (not shown).
[0028]
  Also in this scrap preheating device 40, the scrap in the preheating chamber 15 is preheated by the flow of the exhaust gas from the arc furnace 1, but the following changes are made with respect to the above-mentioned fluctuation of the retained heat of the exhaust gas and the fluctuation of the scrap amount. To deal with. That is, first, as shown in FIGS. 4 and 5, when the amount of scrap charged in the preheating chamber 15 is large and the upper surface of the scrap layer S is near the upper surface position H, the retained heat of the exhaust gas G is high. As shown in FIG. 4, the dampers 17 and 26B are opened, the dampers 29 and 26A are closed, and a part of the shunt gas G of the exhaust gas G is closed.1Is supplied as a downward flow into the scrap layer S from the upper side of the scrap layer S through the shunt duct 16, and the remaining shunt gas G is supplied.2Is supplied as an upward flow from the lower side of the scrap layer S, and the exhaust gas merged after the scrap preheating is caused to flow out of the shaft from the intermediate part exhaust port 21B through the exhaust gas duct 25B.
[0029]
  As a result, even when the exhaust gas is hot, the stored heat of the exhaust gas is dispersed by the split flow of the exhaust gas, and the scrap is prevented from being locally heated and melted or oxidized. Since it is heated to a state and the exhaust gas is cooled and discharged by good heat exchange, high preheating efficiency is obtained. Also said1Similarly to the example, the scrap separation chamber 22B prevents scrap from flowing out to the damper 26B side together with the exhaust gas.
[0030]
  Similarly, when the amount of scrap is large, when the retained heat of the exhaust gas G is low, only the damper 29 is opened and the remaining dampers 17, 26A, 26B are closed as shown in FIG. It is supplied as an upward flow from the lower side of the scrap layer S, and the preheated exhaust gas flows out of the shaft from the upper exhaust port 27 through the exhaust gas duct 28.
[0031]
  Since the exhaust gas temperature is low, the scrap layer S is not locally overheated, and there is no heat loss due to the diversion into the diversion duct 16, so that the scrap can be preheated with high efficiency. Further, since the upper exhaust port 27 is located above the scrap layer S, there is no possibility of scrap flowing out from the exhaust port.
[0032]
  Next, as shown in FIG. 6, when the amount of scrap charged into the preheating chamber 15 is small and the upper surface of the scrap layer S is in the vicinity of the upper surface position L, the retained heat of the exhaust gas G is high. As shown by the solid line in the figure, the dampers 17 and 26A are opened, the dampers 29 and 26B are closed, and the shunt gas G is the same as in FIG.1As a downward flow from the upper side of the scrap layer S through the shunt duct 16, and the remaining shunt gas G2Are fed as an upward flow from the lower side of the scrap layer S, and the combined exhaust gas flows out of the shaft from the lower intermediate exhaust port 21A through the exhaust gas duct 25A.
[0033]
  As a result, even when the exhaust gas temperature is high, a good heating action similar to that in the case of FIG. 4 is obtained, and the scrap outflow prevention action similar to the scrap separation chamber 22B in FIG. 4 is obtained by the scrap separation chamber 22A.
[0034]
  Similarly, when the amount of scrap is small, when the retained heat of the exhaust gas G is low, only the damper 29 is opened and the remaining dampers 17, 26A, 26B are closed as shown by the broken line in FIG. As in the case, the entire amount of the exhaust gas G is supplied as an upward flow from the lower side of the scrap layer S, and flows out of the shaft from the upper exhaust port 27 through the exhaust gas duct 28.
[0035]
  As a result, the scrap can be preheated with high efficiency as in the case of FIG. When the intermediate exhaust port 21B is opened above the upper surface position L of the scrap layer S as in this example, the exhaust gas after scrap preheating flows out from the intermediate exhaust port 21B instead of the upper exhaust port 27. However, in order to store as much heat as possible in the shaft 11 after the scrap preheating, the exhaust from the upper exhaust port 27 at the top of the shaft is preferable. This improves the thermal efficiency of scrap preheating.
[0036]
  The first1Similarly to the example, when the upper surface of the scrap layer S is in the middle between the upper surface position H and the upper surface position L, for example, when the upper surface is in the vicinity of the intermediate exhaust port 21B, the above-described intermediate is performed at a time when the retained heat of the exhaust gas is high. Select the optimal exhaust gas distribution route by damper operation according to the heat stored in the exhaust gas and the amount of scrap, such as performing damper operation to discharge exhaust gas after scrap preheating from the intermediate exhaust port 21A instead of the intermediate exhaust port 21B Thus, scrap can be preheated efficiently.
[0037]
  As described above, since the intermediate exhaust ports 21A and 21B for exhaust are opened in the side surface portion of the scrap layer S and the shunt duct 16 is provided, the exhaust gas is shunted while the preheating chamber is one, and the scrap layer is formed. Preheating can be performed efficiently without local overheating, and the exhaust gas flow path is switched by operating each damper in accordance with fluctuations in the heat stored in the exhaust gas and the amount of scrap. Efficiency is obtained. Further, as the apparatus itself, it is only necessary to provide one preheating chamber 15 in the shaft 11, so that the height of the shaft 11, and hence the scrap preheating apparatus 40, can be reduced. In this example, since the upper and lower intermediate exhaust ports 21A and 21B are provided, the optimum intermediate exhaust port can be selected with respect to the variation of the scrap amount, and the adaptability to the variation of the scrap amount is high.
[0038]
  Next, as shown in FIG.3By example, claims2Another embodiment of the described invention will be described. The scrap preheating device 50 in this example is the first one.2In the scrap preheating device 40 of the example, the upper intermediate side exhaust port 21B, the scrap separation chamber 22B, the damper 26B, and the exhaust gas duct 25B in FIG. 4 are removed, and the other configurations are the same as the scrap preheating device 40. Therefore, the same parts as those in FIG.
[0039]
  In the scrap preheating device 50, the upper surface of the scrap layer S is in any position between the upper surface position H when the scrap amount is maximum and the upper surface position L when the scrap amount is minimum, that is, it is related to the scrap amount. In the period when the retained heat of the exhaust gas G is high, the dampers 17 and 26A are opened and the damper 29 is closed.Reference exampleAs with the split gas G of the exhaust gas G1As a downward flow from the upper side of the scrap layer S through the shunt duct 16, and the remaining shunt gas G2From the lower side of the scrap layer S is supplied as a downward flow, and the exhaust gas merged after scrap preheating flows out of the shaft from the intermediate exhaust port 21A through the exhaust gas duct 25A.
[0040]
  Similarly, regardless of the amount of scrap in the preheating chamber 15, when the retained heat of the exhaust gas is low, only the damper 29 is opened and the remaining dampers 17, 26 </ b> A are closed, as indicated by broken line arrows.Reference exampleSimilarly, the entire amount of the exhaust gas G is supplied as an upward flow from the lower side of the scrap layer S, and the exhaust gas after scrap preheating flows out of the shaft from the upper exhaust port 27 through the exhaust gas duct 28.
[0041]
  Thus, in this example, by switching the exhaust gas flow path by operating each damper according to the level of the retained heat of the exhaust gas, high preheating efficiency can be obtained even if the retained heat fluctuates, especially in the amount of scrap. Regardless of the above, it is only necessary to operate the damper, so that the operation of the damper is easy. The second2Since only one preheating chamber 15 needs to be provided as in the example, the height of the scrap preheating device 50 may be low.
[0042]
  The present invention is not limited to the above examples. For example, as a scrap separation chamber, as shown in FIG. 8, a baffle plate 61 is provided in a box-like body 23 of the scrap separation chamber of each of the above examples. , A scrap separation chamber 60 that further ensures the collection of scrap, and as shown in FIG. 9, a collision plate 72 is provided in a suspended manner in the casing 71, and an open / close bottom plate 74 is provided at the bottom of the lower scrap storage portion 73, Various types such as a scrap catcher type scrap separation chamber 70 connected to the intermediate side wall 15b by a connecting duct 75 and a scrap return pipe 76 can be used. The scrap separation chamber may be integrally attached to the intermediate side wall 15b as in the above examples, or may be connected to the intermediate side wall 15b via a duct as in the scrap separation chamber 70.
[0043]
  Further, the gate may be of other types such as the above-mentioned swinging fork type, or a direct acting fork type that moves in the horizontal direction and is inserted into and pulled out from the tower body. Further, the melting furnace may be other than the above-mentioned arc furnace, and if it is not necessary to traverse the tower depending on the type and structure of the melting furnace, the tower may be fixed on the foundation. .
[0044]
【The invention's effect】
  As described above, according to the present invention, since only one preheating chamber is provided in the shaft, the overall height of the shaft, and hence the height of the scrap preheating device, can be reduced, and installation in a low building is also possible. In addition, even when the retained heat of the exhaust gas is high, it is possible to preheat the scrap layer from both the upper and lower sides without local overheating by diverting the exhaust gas while having a single preheating chamber.In addition to being able toEven if the retained heat of the exhaust gas or the amount of scrap fluctuates, high preheating efficiency can be obtained by switching the exhaust gas distribution path by operating the damper.
[0045]
  In addition to the above effects, the claims2In the invention describedAccording to the upper exhaustTherefore, when the exhaust gas holding heat is low, it is not necessary to use a diverting duct regardless of the amount of scrap, and heat loss due to the diverting into the diverting duct is eliminated, and higher preheating efficiency is obtained.
[Brief description of the drawings]
FIG. 1 of the present inventionReference exampleIt is a longitudinal cross-sectional view of the scrap preheating apparatus which shows.
FIG. 2 is an enlarged cross-sectional view taken along line AA in FIG.
FIG. 3 shows the first embodiment of the present invention.1It is a longitudinal cross-sectional view of the scrap preheating apparatus which shows an example.
FIG. 4 shows the first embodiment of the present invention.2It is a longitudinal cross-sectional view of the scrap preheating apparatus which shows an example.
5 is a longitudinal sectional view showing a usage state of the scrap preheating device of FIG.
6 is a longitudinal sectional view showing another usage state of the scrap preheating device of FIG. 4; FIG.
FIG. 7 shows the first embodiment of the present invention.3It is a longitudinal cross-sectional view of the scrap preheating apparatus which shows an example.
FIG. 8 is a longitudinal sectional view showing another embodiment of the scrap separation chamber according to the present invention.
FIG. 9 is a longitudinal sectional view showing still another embodiment of the scrap separation chamber according to the present invention.
[Explanation of symbols]
  DESCRIPTION OF SYMBOLS 1 ... Arc furnace (melting furnace), 10 ... Scrap preheating apparatus, 11 ... Shaft, 11a ... Shaft side wall, 12 ... Scrap charging inlet, 13 ... Scrap discharge port, 14 ... Gate, 15 ... Preheating chamber, 15a ... Upper side wall, 15b ... Intermediate side wall, 16 ... Shunt duct, 17 ... Damper, 21A ... Intermediate exhaust port, 21B ... Intermediate exhaust port, 22A ... Scrap separation chamber, 22B ... Scrap separation chamber, 25A ... Exhaust gas duct, 25B ... Exhaust gas duct 26A ... damper, 26B ... damper, 27 ... upper exhaust port, 28 ... exhaust gas duct, 29 ... damper, 30 ... scrap preheating device, 40 ... scrap preheating device, 50 ... scrap preheating device, 60 ... scrap separation chamber, 70 ... Scrap separation room.

Claims (2)

スクラップ装入口を上端部にそなえ溶解炉のスクラップ投入口に対向するスクラップ排出口を下端部にそなえたシャフトの下部に、通気性を有する開閉自在なゲートを設けて、該ゲートの上側に前記スクラップ装入口に至るひとつの予熱室を形成し、前記ゲートの下側のシャフト側壁と前記予熱室の側壁の上部とを、ダンパを有する分流ダクトで接続するとともに、前記予熱室の側壁の中間部に複数段にわたって設けた中間部排気口に、それぞれスクラップ分離室を介してダンパを有する排ガスダクトを接続したことを特徴とするスクラップ予熱装置。  An openable and closable gate is provided at the lower part of the shaft having a scrap loading inlet at the upper end and a scrap discharge port facing the scrap charging inlet of the melting furnace at the lower end, and the scrap is disposed above the gate. A preheating chamber is formed to reach the loading port, and the shaft side wall on the lower side of the gate and the upper portion of the side wall of the preheating chamber are connected by a shunt duct having a damper, and in the middle portion of the side wall of the preheating chamber. A scrap preheating apparatus, wherein an exhaust gas duct having a damper is connected to an intermediate exhaust port provided over a plurality of stages via a scrap separation chamber. スクラップ装入口を上端部にそなえ溶解炉のスクラップ投入口に対向するスクラップ排出口を下端部にそなえたシャフトの下部に、通気性を有する開閉自在なゲートを設けて、該ゲートの上側に前記スクラップ装入口に至るひとつの予熱室を形成し、前記ゲートの下側のシャフト側壁と前記予熱室の側壁の上部とを、ダンパを有する分流ダクトで接続するとともに、前記予熱室の側壁の上部に設けた上部排気口に、ダンパを有する排ガスダクトを接続し、前記予熱室の側壁の中間部に設けた中間部排気口に、スクラップ分離室を介してダンパを有する排ガスダクトを接続したことを特徴とするスクラップ予熱装置。  An openable and closable gate is provided at the lower part of the shaft having a scrap loading inlet at the upper end and a scrap discharge port facing the scrap charging inlet of the melting furnace at the lower end, and the scrap is disposed above the gate. A preheating chamber is formed to reach the charging port, and the shaft side wall on the lower side of the gate and the upper portion of the side wall of the preheating chamber are connected by a shunt duct having a damper and provided on the upper portion of the side wall of the preheating chamber. An exhaust gas duct having a damper is connected to the upper exhaust port, and an exhaust gas duct having a damper is connected to an intermediate exhaust port provided in an intermediate part of the side wall of the preheating chamber via a scrap separation chamber. Scrap preheating equipment.
JP2000344046A 2000-11-10 2000-11-10 Scrap preheating equipment Expired - Lifetime JP4442020B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000344046A JP4442020B2 (en) 2000-11-10 2000-11-10 Scrap preheating equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000344046A JP4442020B2 (en) 2000-11-10 2000-11-10 Scrap preheating equipment

Publications (2)

Publication Number Publication Date
JP2002147971A JP2002147971A (en) 2002-05-22
JP4442020B2 true JP4442020B2 (en) 2010-03-31

Family

ID=18818309

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000344046A Expired - Lifetime JP4442020B2 (en) 2000-11-10 2000-11-10 Scrap preheating equipment

Country Status (1)

Country Link
JP (1) JP4442020B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110183096A (en) * 2019-05-31 2019-08-30 中材科技股份有限公司 The pre-heating system of block stock for rock wool, basalt fibre or glass production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110183096A (en) * 2019-05-31 2019-08-30 中材科技股份有限公司 The pre-heating system of block stock for rock wool, basalt fibre or glass production
CN110183096B (en) * 2019-05-31 2020-06-16 中材科技股份有限公司 Preheating system for bulk raw materials for rock wool, basalt fiber or glass production

Also Published As

Publication number Publication date
JP2002147971A (en) 2002-05-22

Similar Documents

Publication Publication Date Title
CN1041557C (en) Smelting plant with two melting furnaces arranged in juxtaposed relationship
RU2092599C1 (en) Plant for continuously melting copper
US7374716B2 (en) Metallurgical oven and a material basket for a metallurgical oven
CN2841673Y (en) Regenerated aluminium smelter hearth
JP4442020B2 (en) Scrap preheating equipment
CN1856584B (en) Method for collecting and treating reaction gases from a production plant for molten metal and dust-removing machine therefor
KR101485496B1 (en) Apparatus for conveying and pre-heating a metal charge for a melting plant and connected method
EP0121858B1 (en) Fumes control system for electric arc furnaces
RU2213919C2 (en) Dc arc furnace for making steel and method of steelmaking
CN1062556A (en) The method of continuous copper smelting
RU2725246C2 (en) Furnace for melting and processing of metal and metal-containing wastes and method of such melting and processing
RU2246669C2 (en) Electric arc melting furnace and method of operation of such furnace
JP3826454B2 (en) Electric furnace scrap furnace top preheater
JP3536365B2 (en) Scrap preheating equipment
US2063401A (en) Method of and means for operating furnaces for melting and refining metals and the like
CN107208973A (en) Smelting equipment and method of smelting
US4781581A (en) Melting and holding furnace
JP2004510939A5 (en)
US2795409A (en) Open hearth apparatus
JPH10300365A (en) Scrap preheating equipment
JPH10300366A (en) Scrap preheating equipment
KR100255885B1 (en) Preheating device of molten material and melting furnace to which such preheating device is attached
JP2018159508A (en) Scrap preheating device of melting furnace
RU2161083C2 (en) Apparatus for removing impurities at casting metals
JP2912808B2 (en) Scrap melting and separation equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090309

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090317

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090508

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091222

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100104

R150 Certificate of patent or registration of utility model

Ref document number: 4442020

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130122

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130122

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140122

Year of fee payment: 4

EXPY Cancellation because of completion of term