Utility pole position detection method and route abnormal part image recording apparatus using this method Download PDF

Info

Publication number
JP4448268B2
JP4448268B2 JP2001242222A JP2001242222A JP4448268B2 JP 4448268 B2 JP4448268 B2 JP 4448268B2 JP 2001242222 A JP2001242222 A JP 2001242222A JP 2001242222 A JP2001242222 A JP 2001242222A JP 4448268 B2 JP4448268 B2 JP 4448268B2
Authority
JP
Japan
Prior art keywords
utility pole
gate
pole
distance
abnormal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001242222A
Other languages
Japanese (ja)
Other versions
JP2003057004A (en
Inventor
響 熊平
孝夫 吉沢
信弘 青木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Japan Railway Co
Hitachi High Tech Corp
Original Assignee
Hitachi High Technologies Corp
Central Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi High Technologies Corp, Central Japan Railway Co filed Critical Hitachi High Technologies Corp
Priority to JP2001242222A priority Critical patent/JP4448268B2/en
Publication of JP2003057004A publication Critical patent/JP2003057004A/en
Application granted granted Critical
Publication of JP4448268B2 publication Critical patent/JP4448268B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Length Measuring Devices By Optical Means (AREA)
  • Emergency Protection Circuit Devices (AREA)

Description

【0001】
【産業上の利用分野】
この発明は、電柱位置検出方法およびこの方法を用いる路線の異常箇所画像収録装置に関し、詳しくは、試験車あるいは検測車等に搭載され、現場に出かけることなく、トロリ線等の異常箇所の静止画映像をより少ない枚数で効率よく採取することができるような路線の異常箇所画像収録装置に関する。
【0002】
【従来の技術】
電車線路における電車等の車両は、パンタグラフがトロリ線に摺動接触し、これより電力を受電して走行する。パンタグラフの上部には、摺板が取付けられていてトロリ線がこれに接触する。この摺板は、通常、トロリ線に比べて軟質の銅線により形成されている。車両は、この摺板を介してトロリ線から所要の電力を得る。トロリ線の下面(摺動面または摺面)とパンタグラフ上面(摺板)とは、互いの摺動接触により漸次に摩耗する。パンタグラフ側の摩耗が一部分に集中しないように、トロリ線は支持電柱ごとに左右方向に交互に偏位されている。トロリ線の摩耗量と偏位量は、電気検測車等に測定装置を搭載し、定期的に走行測定してVTR等にその映像を基準位置からのキロ程(さらには電柱番号)とともに記録してその摩耗量がその場所とともに測定されている。
【0003】
例えば、このトロリ線摩耗量測定装置においてVTR等記録された映像を観察チェックしているときに、トロリ線異常が観測されることがある。このような場合には、従来は、現場まで出かけて人がその状態を確認し、あるいはその状態を撮影している。
【0004】
【発明が解決しようとする課題】
例えば、トロリ線異常を現場確認するとなると、人手による作業工数が増加する。また、その人の確認が他の人を納得させるようなものでないときには、再確認が必要になる。
このような問題を解決するために、トロリ線異常箇所を撮影することになるが、従来のようにVTR等によるものでは、鮮明な映像を捕らえることができない。そこで、トロリ線異常箇所を高密度の静止画像で検測車上で走行状態で撮像することが考えられるが、高密度の静止画像で撮像する場合に問題となるのが、異常箇所の位置とそのデータ処理量である。
【0005】
ところで、過去に測定され記録された基準位置からのキロ程データに従って検測車の現在の走行状態でその位置を確認して静止画像を採取したとしてもトロリ線異常箇所を撮影することが困難である。それは、検測車を走行させたときの走行状態により異常箇所の位置が変わるからである。実際の走行状態のキロ程は、車輪の空転スリップや車輪の摩耗、ブレーキ差動などによりそのときどきで変化する。現状の鉄道線路のキロ程データの補正には、10km間隔に基準地点(基準点P)が設けられている。そのときどきの現在の走行距離と過去に測定された距離データにより特定される異常箇所の位置は、現実の走行状態が過去の測定時の状態と異なる以上、位置ずれが生じ、数m以上のオーダで積分誤差が位置ずれが存在するので異常箇所の場所の静止画像を撮影することは難しい。数十枚の多数の静止画像をある区間にわたって撮影すれば、そのうちに異常箇所の静止画像を捕らえることも可能であるが、静止画像の枚数が多くなれば、それだけデータ処理量が膨大となり、処理ロードが大きくなって、実際上処理できなくなる。しかも、異常箇所の静止画像が多くなれば、無駄な静止画像を多く採取することになり、その中から必要なものを抽出するのに手間がかかる問題も生じる。
【0006】
撮影する静止画像の枚数を低減するためには、できるだけ精度の高い状態で異常箇所の位置検出が必要になる。ところが、従来の電柱位置検出、特開昭57−25101号に記載されているように、10kmごとの基準地点(基準点P)から距離パルスを積算して実走行距離を得て、これにより過去の電柱位置データから次の電柱検出位置にゲートをかけて電柱を検出することを考えるが、基準位置からの誤差が累積されて基準電柱位置から離れるに従って次の電柱の検出ミスが発生する問題がある。すなわち、ゲート内に複数の電柱検出信号が存在する場合、一番最初に検出した信号位置を真とするために、ゲートの中心より離れてします。このため、次の電柱へのゲートがずれてしまい。次の電柱の検出ミスが発生する問題がある。
もちろん、ゲート幅を大きく採ったり、ゲートなしでの電柱検出も考えられるが、検出ノイズが多くなり、かつ、曲引き金具、トロリ線支持金具等、多数の支障物がある鉄道線路では不可能に近い。
そこで、それには異常位置の手前の電柱を検出してそこからの距離計測により異常箇所を特定することが最良の策と考えられる。1つ前に検出した電柱を基準として次の電柱位置にゲートをかけて各電柱ごとにその位置を検出することが考えられるが、そのようにすると、電柱間での過去と現在の走行状態の相違により次の電柱が検出されないときがある。それが検出したいターゲットの電柱であると問題である。1つ手前の電柱検出に漏れがあるとトロリ線異常箇所の位置までの計測ずれ量が大きくなり、たとえ、撮像枚数を多くしても適正な異常箇所の静止画像が得られない虞がある。
この発明の目的は、このような従来技術の問題点を解決するものであって、トロリ線等の異常箇所の静止画映像等の位置検出に適した、より精度の高い電柱の位置検出ができる電柱位置検出方法を提供することにある。
また、この発明の他の目的は、前記の電柱位置検出方法を用いてトロリ線等の異常箇所の静止画像をより少ない枚数で効率よく採取することができる路線の異常箇所画像収録装置を提供することにある。
【0007】
【課題を解決するための手段】
このような目的と達成するためのこの発明の電柱位置検出方法の特徴は、鉄道線路の所定の計測基準位置を基準として鉄道線路に設けられる電柱について測定された距離データと、検測車両の走行距離とに基づいて電柱の位置に対応してゲートを設定してこのゲート内において電柱検出信号を得ることで実際の電柱位置を検出する電柱位置検出方法において、検出された電柱の位置を基準として測定された距離データに基づいて次の電柱位置にゲートとして第1のゲートを設定し、計測基準位置を基準として測定された距離データに基づいて次の電柱位置にゲートとして第2ゲートを設定して、第1のゲートおよび第2のゲートのいずれかにおいて電柱検出信号を得て実際の電柱位置を検出し、かつ、ある電柱についての測定基準位置からみた実際の電柱検出位置とある電柱についての測定基準位置からみた距離データによる電柱の位置との差が所定の誤差以下にあるときにある電柱の電柱検出位置を測定基準位置に換えてこれを基準として第2のゲートを設定するものである。
【0008】
また、前記の目的と達成するためのこの発明の路線の異常箇所画像収録装置の特徴は、検出された電柱の位置を基準として測定された距離データに基づいて次の電柱位置にゲートとして第1のゲートを設定し、計測基準位置を基準として測定された距離データに基づいて次の電柱位置にゲートとして第2ゲートを設定して、第1のゲートおよび第2のゲートのいずれかにおいて電柱検出信号を得て実際の電柱位置を検出する電柱検出手段と、ある電柱についての測定基準位置からみた実際の電柱検出位置とある電柱についての測定基準位置からみた距離データによる電柱の位置との差が所定の誤差以下となったときにある電柱の電柱検出位置を測定基準位置に換えて電柱検出手段に第2のゲートを設定させる第2ゲート設定手段と、路線の異常箇所の1つ手前の電柱が検出されその位置が得られたときにこの電柱位置から異常箇所の距離あるいはその手前までの距離を計測して異常箇所の静止画像を撮影する撮像手段とを備えるものである。
【0009】
【作用】
このように、この方法の発明にあっては、2系統のゲートを設定してそのオア条件で電柱検出信号を得る。このとき、第1ゲートは、現実のそのときどきの走行状態に直接影響されるので、電柱検出ができない状態が発生する。しかし、計測基準位置から設定される第2ゲートの位置でその漏れを防ぐことができる。この第2ゲートは、計測基準位置から過去の測定データで設定されるので、基準位置から遠くなればなるほど実際の走行状態が十分反映されていないことが起こる。そこで、計測基準位置から離れれば離れるほど累積誤差が発生して第1ゲートでの検出漏れを防ぐことはできなくなる。この漏れを防ぐために、実際の走行状態において実際に検出された電柱の位置の1つを基準位置として位置修正する。このことにより、そこから第2ゲートが再設定されるので、第1のゲートで検出されないときに第2のゲートでほぼ確実に電柱位置を検出することができる。
その結果、トロリ線等の路線構築物の異常箇所の静止画映像等の位置検出に適したより精度の高い電柱位置検出が可能になる。
【0010】
また、この発明の装置にあっては、前記の電柱位置検出でトロリ線等の異常箇所の1つ手前の電柱位置を基準として異常箇所までの距離を計測をするので、異常箇所の静止画映像を採取する場合に少ない枚数でも確実にその画像を採取できる。
【0011】
【実施例】
図1は、この発明の電柱位置検出方法および路線の異常箇所画像収録装置を適用したトロリ線異常箇所の画像収録装置のブロック図、図2は、この発明の電柱位置検出方法の一実施例として画像収録装置による静止画像収録処理のフローチャート、図3は、その具体的な内容の説明図、図4は、2つのゲートにおける電柱位置の検出についての説明図、そして、図5は、基準電柱位置の補正処理の説明図である。
図1において、10は、トロリ線異常箇所の画像収録装置であって、電柱検出センサ11と、赤外LED光源12と、検測車20の屋根上に取付られた高速度カメラ(二次元のCCDカメラ、以下カメラ)13、A/D変換回路(A/D)14、そして画像データ処理装置15とにより構成される。
ここで、電柱検出センサ11と、赤外LED光源12、そしてカメラ13との関係は、図示するように、検測車20の屋根に設置されていて、カメラ13は、4度前後の仰角で中空に向けられている。一方、赤外LED光源12は、電柱検出センサ11と同位置に設けられ、鉛直に向かってスポット状の光束(図1参照)を照射する。
【0012】
電柱検出センサ(赤外線センサ)11は、実際には、個々の電柱に取付けられているトロリ線1を支持している支持ビーム(横に張り出した腕木)を検出することで行われるので、この支持ビームの反射光を受光することで各電柱が検出される。なお、電柱検出では、曲引支持金具をはじめとして各種の支持物が検出され、かつ、ノイズ信号が多いので、電柱位置対応にゲートが設定されてそのゲート内での検出信号を電柱検出信号としている。
そこで、トロリ線の異常箇所に最も近い電柱検出信号を得て、その電柱位置を基準としてそこからトロリ線の異常箇所までの距離パルスPLを距離パルス発生回路16から得て、このパルスをカウントして異常箇所までの走行距離を測定(算出)し、画像データ処理装置15の測定プログラムを起動してカメラ13のシャッタを所定回数、所定の周期で動作させる。これによりトロリ線1の静止画映像が複数枚カメラ13により採取され、そのデータが外部記憶装置157に転送されてそのときの位置データとともに記録される。
電柱検出センサ11は、内部にホトダイオード111とアンプ(AMP)112とコンパレータ(COM)113とが内蔵されていてコンパレータ113により閾値レベルが調整され、あるいは、トロリ線1からの反射光に感度調整がなされる。これによりノイズが除去された検出信号が出力され、そのうちゲート内のものが電柱検出信号dとして出力される。
16は、距離パルス発生回路であり、走行車輪に係合して回転するロータリエンコーダ等の検出器により所定の走行距離ごとにパルス(距離パルスPL)を発生する。距離パルス発生回路16から発生する距離パルスPLは、画像データ処理装置15のインタフェース155を介して画像データ処理装置15に取込まれ、これに基づいて走行距離が計測される。
【0013】
画像データ処理装置15は、MPU151とメモリ152とCRTディスプレイ153、画像メモリ154、そしてインタフェース155を備えて、バス156によりこれら回路が相互に接続されている。そして、電柱検出信号dは、インタフェース155を介して割込み信号としてMPU151に送出され、MPU151は、電柱検出位置をカバーする範囲で過去の測定データに基づいてゲートを設定してこのゲート範囲内のもののみを真の電柱検出信号dとして扱う。そして、トロリ線の異常箇所2つ手前の電柱が検出されたか否かの判定をして、2つ手前のときにはそこから過去の測定データに基づいて異常箇所(実際には異常箇所の少し手前)までの走行距離を現在の走行状態における距離パルスPLをカウントする計測する。さらに、トロリ線の異常箇所1つ手前の電柱が検出されたか否かの判定をして、電柱が検出された場合、1つ手前のときには、2つ手前の電柱からの距離カウント値をリセットして、1つ手前の電柱から異常箇所までの距離パルスPLのカウントを開始して過去の測定データから異常箇所を計測して特定する。
このようにして、異常箇所少し手前でカメラ13を作動させて、複数枚の静止画映像を所定の周期で採る。なお、この周期は、走行速度の関係で決定され、トロリ線の異常箇所を含めて4枚〜8枚程度が20cm〜30cm程度の間隔で採取されるように設定する。なお、20cm〜30cm程度の間隔であっても1枚の画像の視野範囲からすれば、連続的な画像の採取可能である。
ここで、カメラ13の撮像映像の画素数を512×480ピクセル(ドット)のカラー画像とすれば、1回の撮像でその1フレーム分の画像データがA/D14によりA/D変換されて画像データ処理装置15に取込まれ、画像メモリ154に記憶される。それが複数枚分画像メモリ154に記憶されることになる。
【0014】
メモリ152にはゲート設定/電柱検出プログラム21と撮像位置決定プログラム22、静止画像採取プログラム23、そして基準電柱設定プログラム24とが格納され、トロリ線異常箇所のターゲット位置手前のターゲット電柱とその電柱からの距離が記憶されるデータ領域25が設けられている。そして、トロリ線異常箇所の手前の位置でMPU151により静止画像採取プログラム23が実行されて、A/D14からのデータが画像メモリ154に採取した静止画像が一旦記録され、それが外部記憶装置157に圧縮されて転送される。
なお、インタフェース155を介して接続されたハードディスク等の外部記憶装置157には、基準点Pから各電柱位置までの過去に測定された距離データが電柱位置測定データ158として記憶されている。この距離データは、過去複数回測定された各電柱についての距離データから回帰データとして求められたものである。
なお、トンネルの出入り口付近等電柱がないところもあるが、それについては電柱に対応するものの検出による。
【0015】
ゲート設定/電柱検出プログラム21は、このプログラムがMPU151に実行されたときに、過去の各電柱位置について測定距離データ(電柱位置測定データ158)と現在の走行距離とに基づいて次の電柱検出位置の前後に所定の幅のゲートを設定する。この場合のゲート幅は、過去の経験から適正な幅を採用するものであり、そのゲートは、図3に示されるように、手前の電柱位置を基準として、現在の走行により発生する距離パルスPLと測定されていた距離データとにより決定される次の電柱4までの走行距離のところがゲートの中心になるように設定される。このゲートをここでは、第1ゲート2とする。これとは別に、10kmごとに設定されている基準位置Pを基準として、現在の走行により発生する距離パルスPLと測定されていた距離データ(電柱位置測定データ158)により決定される次の電柱4までの走行距離のところにそこを中心として第2ゲート3を設定する。そして、電柱検出信号dを検出するゲート全体は、この第1ゲート2と第2ゲート3のオア条件の範囲となる。
【0016】
ここで、2つのゲート内のいずれかで実際に検出される電柱4の位置は設定したゲートの中心にあることはあまりなく、実際の電柱検出位置は、そのときの走行状態に応じて変わる。そこで、あるゲートで検出された実際の電柱位置を基準として次の電柱位置に設定する第1ゲート2は、第2ゲート3の位置からずれてくる。これらゲートにおいて電柱検出信号dにより実際に検出された現在の走行距離による電柱4の位置を基準点Pからの換算距離S1として算出する。この換算距離S1は、現在の走行距離において、ある電柱についての測定基準位置Pからみた現在の走行距離により計測された実際の電柱検出位置の距離データ(現在の測定データ)になる。一方、現在の走行距離において、電柱位置測定データ158から得られる、すでに測定されている基準位置Pを基準とした電柱4までの距離をS2とする。
なお、図3では、第2ゲート3の幅が第1ゲート2の幅より少し大きくなっている。また、理想的な場合を示していて、両者のゲート位置にはずれはないが、実際上は、次のゲートを設定するときに第1ゲート2の基準は、その都度検出された現在の走行状態で決定される実際の1つ前の電柱検出位置であるので、基準点Pを基準とした既測定データによる第2ゲート3の位置とは異なる。そこで、これらの間にずれが生じる。
また、これらゲート内での実際に検出される電柱4の位置は、そのときどきの検測車の走行状態による左右され、ゲートのどこで検出されるかによるので、過去の測定位置と同一になるとは限らない。
【0017】
第1、第2のオア条件のゲートで設定されたゲート内に電柱検出信号dがあるか否かの判定がなされて、ゲート内であるときにどこの位置で発生したかが判定され、それが現在の電柱4の位置とされる。
ところで、電柱位置には、曲引き金具、トロリ線支持金具等、多数の支持物が電柱4の位置の支持金具のほかに多数あるので、通常、ゲート内には複数個の検出信号が存在する。この場合には、複数の検出信号のうちゲートの中心位置に最も近い検出信号を電柱検出信号dとして採用する。また、検出された電柱4の実測位置S1は図4の関係によるが、これについては後述する。
電柱4は、通常、50m程度の間隔で設置されているので、基準位置Pの電柱4から次の基準位置Pの電柱4までの間に200本程度の電柱4がある。そこで、第1ゲート2の位置は、そのときどきの電柱4の間の走行状態に応じて変化する。一方、第2ゲート3の位置は、基準位置Pから積算された走行状態に応じて変化する。
【0018】
さて、ある電柱4間での走行状態において、電柱4間の過去の測定距離と現在の走行状態による測定距離との誤差が大きいときには、第1ゲート2において検出されるべき電柱4が入らないときがある。この場合には、第2ゲート3で電柱4を検出することで電柱4の間での走行状態の変動による電柱検出落ちを防止する。しかし、第2ゲート3は、10kmごとに設定されている基準位置Pを基準としているので、基準位置Pから離れれば離れるほど逆に誤差が累積されることになる。これの誤差を補正するためにここでは、後述する基準電柱設定プログラム24により基準位置P間にある電柱4をあらたに基準電柱として設定して、これを基準にその後の距離を累積測定した走行距離で第2ゲート3を設定する。このことで電柱検出漏れを回避する。このことによりトロリ線異常箇所手前の電柱検出漏れを防ぐ。
【0019】
撮像位置決定プログラム22は、電柱4が検出されたときにそれがトロリ線の異常箇所の2つ手前の電柱か、1つ手前の電柱か否かを判定していずれかの電柱であるときに、実際に検出された電柱4の位置から距離パルスPLのカウント値を算出して異常箇所までの距離計測をする。この場合、2つ手前の電柱のときには、次の電柱4までの距離+次の電柱4からトロリ線の異常箇所までの距離−αになるか否かにより、距離パルスPLに応じて異常箇所までの距離計測して撮影のスタート点を検出する。なお、−αは、異常箇所の少し手前の設定量で実際に即して決定される。このとき、次の電柱4までの距離は電柱位置測定データ158から得る。次の電柱4(ターゲット電柱)とこの位置から異常箇所までの距離は、ターゲット電柱と異常値までの距離として別途入力された値である。なお、異常箇所の1つ手前の電柱4と異常箇所までの距離は、あらかじめ入力されてメモリ152にデータ領域25に記憶されている。
さらに、このプログラムでは、電柱4が検出されたときにそれが基準点Pのポストか否かの判定もする。これにより基準点Pのときには、これを基準として電柱検出が開始される。
異常箇所の1つ手前の電柱が検出されたときには、2つ手前の電柱からの計測値をリセットして1つ手前の電柱から距離パルスPLに応じて検出された電柱4から異常箇所までの距離がその距離−αになるか否かにより、異常箇所までの距離計測する。
前記のαの設定により、例えば、異常位置の手前150cm程度において静止画像採取プログラム23をコールする。
【0020】
静止画像採取プログラム23は、このプログラムがMPU151に実行されたときに、カメラ13を起動して約30cm走行距離に対応する周期でシャッタを動作させて4〜8枚の静止画像を採取し、画像メモリ154に記憶された1フレーム分(あるいは1フィールド分)のデータごとに圧縮処理して外部記憶装置157に転送する。
基準電柱設定プログラム24は、10kmごとに設定されている基準位置Pに換えて、基準位置Pと基準位置Pとの間にある中間の電柱4のうち走行距離において過去の測定値からみて誤差が少ない電柱4を基準電柱としてあらたに設定してここを新しい開始点として走行距離の積算をし、過去の測定距離データを新しい開始点(検出された基準電柱の位置)からのものに換算してこれに基づいて電柱4ごとに第2ゲート3を設定する。これにより後続の電柱4に対する第2ゲート3の位置誤差を低減して精度を向上させる。
基準電柱の設定は、ある電柱4が検出されたときに、距離パルスPLにより算出される基準点Pからその電柱4までの検出された位置のキロ程積算値S1(現在の走行による測定距離)と、基準点Pからの現在の走行距離で電柱4までの過去の測定データに対応するその電柱までのキロ程積算値S2(過去の測定距離)との誤差をΔSとしたとき、|S1-S2|<ΔSか否かの判定をする。上記の条件を満たした場合は、|S1-S2|<ΔSのときには、図3に示すように、検出された電柱4を基準電柱Paとして、電柱位置測定データ158を参照して基準点Pから検出された基準電柱Paまで距離S1を過去の測定データ上の積算距離Mとして設定する。これによりその電柱4の検出位置までの積算距離を距離Mに補正する。あるいは、電柱位置測定データ158を参照して基準点Pから検出された基準電柱Paまで距離S1と過去の測定データとの差を積算誤差ΔMとして電柱検出の都度算出することでその都度検出しておき、ΔM<ΔSとなったときに、この誤差ΔMによりその電柱4の検出位置までの積算距離を誤差ΔMで補正する。
その結果、検出された電柱の第2のゲート3の位置の中心が実際に検出された電柱位置に引き戻されたことになり、基準点Pよりカウントをスタートすることにより積算誤差が減少する。
なお、誤差ΔSは、過去の測定データから基準電柱として採用できる誤差値の限界値として求めたものである。
【0021】
すなわち、距離パルスPLによる以後の検出電柱4までの第2ゲート3を設定する位置は、基準点Paからのキロ程積算値Saを計測して次の式により算出する。
S2=Sa+M
Saは、実際に検出された電柱4の位置にある基準電柱Paを基準として距離パルスPLにより算出される走行距離の積算値である。
これにより走行距離の積算値が基準点Pから基準電柱Paに代わる。ここで、基準電柱Paまでの積算距離Mの誤差をΔd1とし、ある電柱についての積算距離Saの誤差がΔd2とすれば、全体の誤差は、Δd1+Δd2となるが、基準点Pから設定される第2ゲート3の位置は実際に検出された基準電柱Paの位置に移行されることにより、そこから第2ゲート3の距離カウントがスタートすることで以後の第2ゲートの設定誤差とに加わる積算誤差が実質的にΔd2となり、減少され、修正される。
【0022】
実際には、距離パルスPLは、一定間隔で発生する距離パルスPLにより決定される位置と電柱検出信号が発生する位置は異なるので、2つのゲートによる電柱4の位置の検出は、図4に示すような関係で行われる。
図4(a)は、第1、第2ゲートと電柱検出信号dの発生タイミングとの関係の説明図である。第1ゲート2の距離パルスPLにより決定される位置が▲1▼〜▲4▼であり、第2ゲート3で距離パルスPLにより決定される位置が(I)〜(IV)である。
距離パルスPLと電柱検出信号dとはほぼ対応して発生することは少ないので、これらが対応して発生しないものとし、そのときには、図4(b)に示すような優先を付けてどこの距離パルス発生位置であるか、を判定して電柱検出信号dによる現実の電柱検出位置をそこの距離パルスPLにより測定されたものとする。
図4(b)において、第1ゲート2の入力信号の欄51の▲1▼、▲2▼は、電柱検出信号dが距離パルスPLで決定される位置▲1▼、▲2▼の間で発生した場合であり、そのときの位置が優先結果欄52の▲2▼の位置が実際の電柱検出位置になる。以下、同様である。もちろん、距離パルスPLと電柱検出信号dとが実質的に一致しているときには、その位置が電柱検出位置である。
同様に、第2ゲート3の入力信号の欄53の(I)、(II)は、電柱検出信号dが(I)、(II)の間で発生した場合であり、そのときの位置が優先結果欄54の距離パルスPLにより測定された位置(II)の位置が実際の電柱検出位置になる。以下、同様である。もちろん、前記したように距離パルスPLと電柱検出信号dとが実質的に一致しているときには、その位置が電柱検出位置である。
【0023】
このようにして第1ゲート2と第2ゲート3とのオア条件のゲートで電柱位置を検出し、さらに第2ゲート3の位置を途中の電柱を基準電柱Paとして設定してゲートを設定することにより確実にトロリ線の異常箇所の1つ前の電柱4を検出するようにする。
このように第1ゲート2の電柱検出によりトロリ線の異常箇所の1つ前の電柱4を基準として距離を計測することが可能になり、現在の走行状態において異常箇所までの距離誤差を少なくできる。しかし、トロリ線の異常箇所の1つ前の電柱4を検出できない場合も考慮して、ここでは、安全のために、前記したように、2つ前の電柱検出を基準とする二重の安全性を確保している。
【0024】
以下、その異常箇所での静止画像採取処理について図2のフローチャートに従って説明する。
まず、電柱位置測定データ158に対応する過去の電柱4間の測定データを参照してトロリ線異常箇所のターゲット位置手前のターゲット電柱(異常箇所の1つ前の電柱4)の位置(基準点P(10kmごとのポスト)とこの位置からの距離あるいは電柱番号)とその電柱から異常箇所までの距離とを入力してメモリ152のデータ領域25に記憶する(ステップ101)、次に、基準点Pからの走行距離測定処理を開始する(ステップ102、図3のポストP参照)。そして、第1ゲート2と第2ゲート3のオアゲート内に電柱検出があるか否かを電柱検出信号dを受けて判定することで電柱検出か否かの判定をする(ステップ103)。この判定でNOのときにはステップ103へと戻り、電柱検出の待ちループに入る。
【0025】
このような検出ループにおいて、電柱4が検出されたときには、YESとなり、このときには、撮像位置決定プログラム22がコールされてMPU151により実行され、ターゲット電柱のさらに手前の電柱4か否かの判定をし(ステップ104)、ここでNOのときには、ターゲット電柱か否かの判定をして(ステップ105)、さらにNOのときには、基準点Pのポスト電柱か否かの判定をする(ステップ106)。ここでNOのときには、ゲート設定/電柱検出プログラム21がコールされてMPU151に実行され、この電柱検出位置での距離パルスPLによる走行距離を基準点Pからの換算キロ程積算値S1として算出して(ステップ107)、電柱位置測定データ158を参照してすでに測定されている基準点Pからの検出された電柱4までのキロ程積算値S2を読出し(ステップ108)、|S1−S2|<ΔSか否かの判定をする(ステップ109)。
ここで、NOのときには、処理終了か否かの判定をして(ステップ110)、処理が終了していないときにはステップ103へと戻り、次の電柱検出に入る。
【0026】
このような処理において、ステップ109の判定でYESとなり、基準点Pからのキロ程と電柱4ごとのキロ程との差|S1-S2|が誤差ΔS以下になると、検出電柱を基準電柱Paに設定して基準点Pの位置をこの基準電柱Paが検出された実際の位置にして、処理終了かの判定をして(ステップ110)、終了していないときにステップ103へと戻る。また、ステップ106の判定でYESとなると、そこを基準点Pとしてステップ102へと戻る。
さらに、ステップ104でYESとなると、検出された電柱位置をターゲット電柱のさらに手前の電柱4として、この電柱4の検出位置を基準として実際に検出された電柱4の位置から距離パルスPLをカウントして次の電柱4までの距離+次の電柱4から異常箇所までの距離−αになるか否かを判定して、距離パルスPLに応じて異常箇所までの距離計測する(ステップ104a)。これにより、判定がYESとなると、ステップ105c(後述)へと移行する。これにより距離パルスPLに応じて異常箇所までの距離計測する。
ステップ105でYESとなると、検出された電柱位置をターゲット電柱として、ステップ104aにおける前の計測値をリセットしてステップ104aの判定/距離計測処理を中止させて(ステップ105a)、検出された電柱4から異常箇所までの距離−αになるか否かを判定し、距離パルスPLに応じて異常箇所までの距離計測する(ステップ105b)。そして、ステップ104aあるいはここでの距離計測が終了すると、静止画像採取プログラム23をコールして複数枚の静止画像を撮影して(ステップ105c)、画像メモリに記憶し、外部記憶装置に転送する(ステップ105d)。
【0027】
図5は、基準電柱位置Paの位置を補正する補正処理の説明図である。
図5において、検出された基準電柱位置Paの位置を2つ前の検出電柱間の位置を利用して補正して実際の位置を前後に移動させる。
その補正は、2つ前の検出電柱6の検出位置の基準点Pからの測定距離S1=a2とし、1つ前の検出電柱7の検出位置の基準点Pからの測定距離S1=a1とし、基準電柱8(基準電柱Pa)までの距離をS1=a0とすれば、2つ前と1つ前の電柱間の距離(a1−a2)と電柱位置測定データ158から得られる電柱6と電柱7の間の過去の測定データとの差Δaを算出して、基準電柱Paを(a0−a1)−Δaとして基準電柱Paの位置を移動させる。ただし、距離(a1−a2)が測定データより大きいときには、差Δaは+値として扱い、距離(a1−a2)が測定データより小さいときには差Δaは−値として扱う。
これにより精度の高い設定をする。ただし、Δa<ΔSより小さい値とする。
【0028】
以上説明してきたが、実施例では、第1ゲートで電柱を検出して、その漏れを第2ゲートの電柱検出で補うように電柱検出をしているが、第2ゲートの検出位置を図4において、(I),(II),▲1▼,▲2▼,▲3▼,▲4▼,(III),(IV)として、第1ゲートと重複させて、第1ゲートと第2ゲートとで同時に電柱を検出して、第1ゲートの電柱検出位置を優先するように処理してもよい。
【0029】
【発明の効果】
以上の説明のとおり、この発明にあっては、2系統のゲートを設定してそのオア条件で電柱検出信号を得る。このとき、第1ゲートは、現実のそのときどきの走行状態に直接影響されるので、電柱検出ができない状態が発生するが、実際の走行状態において実際に検出された電柱の位置の1つを基準位置として位置修正してそこから第2ゲートが再設されるので、第1のゲートで検出されないときに第2のゲートでほぼ確実に電柱位置を検出することができる。
さらに、この発明の装置においては、前記の電柱位置検出でトロリ線の異常箇所の手前の電柱位置を基準として異常箇所の計測をするので、異常箇所の静止画映像を採取する場合に少ない枚数でも確実に得ることができる。
その結果、トロリ線異常箇所の静止画映像等の位置検出に適したより精度の高い電柱位置検出が可能になる。
【図面の簡単な説明】
【図1】図1は、この発明の電柱位置検出方法および路線の異常箇所画像収録装置を適用したトロリ線異常箇所の画像収録装置のブロック図である。
【図2】図2は、この発明の電柱位置検出方法の一実施例として画像収録装置による静止画像収録処理のフローチャートである。
【図3】図3は、その具体的な内容の説明図である。
【図4】図4は、2つのゲートにおける電柱位置の検出についての説明図であり、(a)は、距離パルスにより決定される位置と電柱検出信号の発生タイミングとの関係の説明図、(b)は、距離パルスにより決定される位置についての優先順位の説明図である。
【図5】図5は、基準電柱位置の補正処理の説明図である。
【符号の説明】
1…トロリ線、2…第1ゲート、3…第2ゲート、
4,6,7,8…電柱、11…電柱検出センサ、
12…赤外LED光源、13…カメラ、
14…A/D変換回路(A/D)、
15…画像データ処理装置、151…MPU、
152…メモリ、153…CRTディスプレイ、
154…画像メモリ、155…インタフェース、
156…バス、157…外部記憶装置。
21…ゲート設定/電柱検出プログラム、
22…撮像位置決定プログラム、
23…静止画像採取プログラム、
24…基準電柱設定プログラム、25…データ領域。
[0001]
[Industrial application fields]
The present invention relates to a utility pole position detection method and an abnormal part image recording device for a route using this method. More specifically, the present invention is mounted on a test car or a test car, and the stationary part of an abnormal part such as a trolley line can be stopped without going to the site. The present invention relates to an apparatus for recording an abnormal part of a route so that a picture can be efficiently collected with a smaller number of images.
[0002]
[Prior art]
A vehicle such as a train on a train track travels by receiving electric power from the pantograph in sliding contact with the trolley line. A sliding plate is attached to the upper part of the pantograph, and the trolley wire contacts this. This sliding board is usually formed of a soft copper wire as compared with the trolley wire. The vehicle obtains necessary electric power from the trolley line through the sliding plate. The lower surface (sliding surface or sliding surface) of the trolley wire and the upper surface of the pantograph (sliding plate) are gradually worn by mutual sliding contact. The trolley wire is alternately displaced in the left-right direction for each supporting power pole so that the wear on the pantograph side does not concentrate on a part. The amount of wear and displacement of the trolley wire is equipped with a measuring device in an electric inspection vehicle, etc., and is periodically measured and recorded on the VTR etc. along with the distance from the reference position (and the pole number). The amount of wear is measured along with the location.
[0003]
For example, a trolley wire abnormality may be observed when an image recorded on a VTR or the like is observed and checked in this trolley wire wear amount measuring apparatus. In such a case, conventionally, a person goes to the site and confirms the state, or photographs the state.
[0004]
[Problems to be solved by the invention]
For example, when the trolley wire abnormality is confirmed on-site, the number of man-hours for manpower increases. Also, if the person's confirmation does not convince another person, reconfirmation is necessary.
In order to solve such a problem, an abnormal portion of the trolley line is photographed, but a clear image cannot be captured with a conventional VTR or the like. Therefore, it is conceivable to capture abnormal locations on the trolley line with a high-density still image while running on the inspection vehicle, but the problem when imaging with a high-density still image is the location of the abnormal location. This is the data processing amount.
[0005]
By the way, it is difficult to shoot a trolley line abnormality spot even if a still image is collected by checking its position in the current running state of the inspection vehicle according to the kilometer data from the reference position measured and recorded in the past. is there. This is because the position of the abnormal location changes depending on the running state when the test vehicle is run. The kilometer of the actual running state changes from time to time due to slipping of wheels, wheel wear, brake differential, and the like. Reference points (reference points P) are provided at intervals of 10 km for correction of kilometer data of the current railway track. At that time, the position of the abnormal location specified by the current travel distance and the distance data measured in the past is misaligned as the actual travel state differs from the previous measurement state, and the order of several meters or more. Therefore, it is difficult to take a still image of the location of the abnormal part because the integration error has a positional deviation. If you shoot dozens of still images over a certain section, it is possible to capture still images of abnormal locations, but if the number of still images increases, the amount of data processing becomes enormous. The load becomes so large that it cannot actually be processed. In addition, if the number of still images at the abnormal location increases, a lot of useless still images are collected, and there is a problem that it takes time and effort to extract necessary ones.
[0006]
In order to reduce the number of still images to be taken, it is necessary to detect the position of an abnormal part with as high a precision as possible. However, as described in the conventional utility pole position detection, Japanese Patent Application Laid-Open No. 57-25101, the distance pulse is integrated from the reference point (reference point P) every 10 km to obtain the actual travel distance. It is considered that the utility pole is detected by applying a gate from the current pole position data to the next utility pole detection position, but there is a problem that errors in the next utility pole occur as the error from the reference position accumulates and the distance from the reference pole position increases. is there. In other words, when there are multiple pole detection signals in the gate, the signal position detected first is set apart from the center of the gate to make it true. For this reason, the gate to the next utility pole will shift. There is a problem that the following detection mistake of the utility pole occurs.
Of course, it is conceivable to use a large gate width or to detect a utility pole without a gate, but detection noise increases, and it is impossible for railway tracks with many obstacles such as bent metal fittings and trolley wire support fittings. close.
Therefore, it is considered best to detect the utility pole in front of the abnormal position and specify the abnormal part by measuring the distance from it. It is conceivable to detect the position of each power pole by setting the gate to the next power pole position based on the previously detected power pole. The next utility pole may not be detected due to the difference. It is a problem if it is a power pole of a target to be detected. If there is a leak in the detection of the immediately preceding utility pole, the amount of measurement deviation up to the position of the trolley wire abnormality location becomes large, and even if the number of images is increased, there is a possibility that a still image of an appropriate abnormality location cannot be obtained.
An object of the present invention is to solve such a problem of the prior art, and can detect a position of a power pole with higher accuracy suitable for detecting a position of a still image image or the like of an abnormal portion such as a trolley line. An object of the present invention is to provide a utility pole position detection method.
Another object of the present invention is to provide a route abnormal part image recording apparatus capable of efficiently collecting still images of abnormal parts such as trolley lines with a smaller number of sheets using the above-mentioned utility pole position detection method. There is.
[0007]
[Means for Solving the Problems]
The features of the utility pole position detection method of the present invention for achieving such an object are the distance data measured for the utility pole provided on the railway track with reference to the predetermined measurement reference position of the railway track, and the traveling of the inspection vehicle In the utility pole position detection method that detects the actual utility pole position by setting the gate corresponding to the position of the utility pole based on the distance and obtaining the utility pole detection signal in this gate, the detected position of the utility pole is used as a reference Based on the measured distance data, the first gate is set as the gate at the next utility pole position, and based on the distance data measured using the measurement reference position as the reference, the second gate is set as the gate at the next utility pole position. Thus, the utility pole detection signal is obtained at either the first gate or the second gate to detect the actual utility pole position, and the measurement reference position for a particular utility pole is viewed. When the difference between the actual pole detection position and the pole position based on the distance data from the measurement reference position of the pole is less than a predetermined error, the pole detection position of the pole is changed to the measurement reference position. The second gate is set.
[0008]
Further, the feature of the abnormal part image recording device of the route of the present invention for achieving the above object is the first as a gate at the next power pole position based on the distance data measured on the basis of the position of the detected power pole. The second gate is set as the gate at the next power pole position based on the distance data measured with reference to the measurement reference position, and the power pole is detected at either the first gate or the second gate. There is a difference between the utility pole detection means that obtains a signal and detects the actual utility pole position, and the actual utility pole detection position as seen from the measurement reference position for a certain utility pole and the position of the utility pole based on the distance data as seen from the measurement reference position for a given utility pole. Different from the second gate setting means for changing the pole detection position of the utility pole to a measurement reference position and setting the second gate to the utility pole detection means when the error is below a predetermined error. An imaging means for taking a still image of an abnormal location by measuring the distance from the location of the utility pole to the location of the abnormal location or the distance to the front when the location of the utility pole immediately before the location is detected It is.
[0009]
[Action]
Thus, in the invention of this method, two system gates are set, and a utility pole detection signal is obtained under the OR condition. At this time, since the first gate is directly influenced by the actual traveling state at that time, a state in which the utility pole cannot be detected occurs. However, the leakage can be prevented at the position of the second gate set from the measurement reference position. Since the second gate is set by past measurement data from the measurement reference position, the actual traveling state may not be sufficiently reflected as the distance from the reference position increases. Therefore, as the distance from the measurement reference position increases, an accumulated error occurs, and it becomes impossible to prevent detection failure at the first gate. In order to prevent this leakage, the position is corrected using one of the positions of the utility pole actually detected in the actual traveling state as a reference position. As a result, the second gate is reset from there, so that the pole position can be detected almost certainly by the second gate when it is not detected by the first gate.
As a result, it is possible to detect the position of the power pole with higher accuracy suitable for detecting the position of a still image image or the like of an abnormal part of a route structure such as a trolley line.
[0010]
Further, in the apparatus of the present invention, the distance to the abnormal part is measured based on the position of the electric pole immediately before the abnormal part such as the trolley wire in the above-mentioned electric pole position detection, so that the still image video of the abnormal part When collecting images, even a small number of images can be reliably collected.
[0011]
【Example】
FIG. 1 is a block diagram of an image recording device for a trolley wire abnormal part to which the utility pole position detecting method and abnormal line image recording device of the present invention are applied, and FIG. 2 is an embodiment of the electric pole position detecting method of the present invention. Flowchart of still image recording processing by image recording apparatus, FIG. 3 is an explanatory diagram of the specific contents, FIG. 4 is an explanatory diagram of detection of a power pole position at two gates, and FIG. 5 is a reference power pole position It is explanatory drawing of this correction process.
In FIG. 1, reference numeral 10 denotes an image recording device for an abnormal portion of a trolley line, which is a utility pole detection sensor 11, an infrared LED light source 12, and a high-speed camera (two-dimensional) mounted on the roof of the inspection vehicle 20. A CCD camera (hereinafter referred to as camera) 13, an A / D conversion circuit (A / D) 14, and an image data processing device 15.
Here, the relationship between the utility pole detection sensor 11, the infrared LED light source 12, and the camera 13 is installed on the roof of the inspection vehicle 20, as shown in the figure, and the camera 13 has an elevation angle of about 4 degrees. It is aimed hollow. On the other hand, the infrared LED light source 12 is provided at the same position as the utility pole detection sensor 11, and irradiates a spot-like light beam (see FIG. 1) vertically.
[0012]
The utility pole detection sensor (infrared sensor) 11 is actually performed by detecting a support beam (arms projecting laterally) that supports the trolley wire 1 attached to each utility pole. Each telephone pole is detected by receiving the reflected light of the beam. In the utility pole detection, various supports such as bent support brackets are detected, and there are many noise signals, so a gate is set corresponding to the utility pole position, and the detection signal in that gate is used as the utility pole detection signal. Yes.
Therefore, the utility pole detection signal closest to the abnormal location of the trolley wire is obtained, the distance pulse PL from there to the abnormal location of the trolley wire is obtained from the location of the utility pole as a reference, and this pulse is counted. Then, the travel distance to the abnormal point is measured (calculated), the measurement program of the image data processing device 15 is started, and the shutter of the camera 13 is operated at a predetermined cycle for a predetermined number of times. As a result, the still image video of the trolley line 1 is collected by the plurality of cameras 13, and the data is transferred to the external storage device 157 and recorded together with the position data at that time.
The utility pole detection sensor 11 includes a photodiode 111, an amplifier (AMP) 112, and a comparator (COM) 113, and the threshold level is adjusted by the comparator 113, or sensitivity adjustment is performed on the reflected light from the trolley wire 1. Made. As a result, a detection signal from which noise has been removed is output, and the signal within the gate is output as the utility pole detection signal d.
Reference numeral 16 denotes a distance pulse generation circuit which generates a pulse (distance pulse PL) for each predetermined travel distance by a detector such as a rotary encoder that rotates by engaging with the travel wheel. The distance pulse PL generated from the distance pulse generation circuit 16 is taken into the image data processing device 15 via the interface 155 of the image data processing device 15, and the travel distance is measured based on this.
[0013]
The image data processing device 15 includes an MPU 151, a memory 152, a CRT display 153, an image memory 154, and an interface 155, and these circuits are connected to each other by a bus 156. Then, the utility pole detection signal d is sent to the MPU 151 as an interrupt signal via the interface 155. The MPU 151 sets a gate based on past measurement data in a range covering the utility pole detection position, and within this gate range. Is treated as a true utility pole detection signal d. Then, it is determined whether or not the power pole two abnormal places before the trolley wire has been detected, and when it is two places ahead, an abnormal place (actually a little before the abnormal place) is based on the past measurement data. Is measured by counting the distance pulse PL in the current running state. Further, it is determined whether or not a power pole immediately before the abnormal portion of the trolley wire has been detected. If a power pole is detected, the distance count value from the power pole before the second is reset when the power pole is one. Then, counting of the distance pulse PL from the immediately preceding utility pole to the abnormal part is started, and the abnormal part is measured and specified from the past measurement data.
In this way, the camera 13 is operated slightly before the abnormal part, and a plurality of still image images are taken at a predetermined cycle. This period is determined based on the traveling speed, and is set so that about 4 to 8 sheets are collected at intervals of about 20 cm to 30 cm including the abnormal part of the trolley wire. In addition, even if it is a space | interval of about 20 cm-30 cm, if it considers from the visual field range of one image, a continuous image can be extract | collected.
Here, if the number of pixels of the captured image of the camera 13 is a color image of 512 × 480 pixels (dots), the image data for one frame is A / D converted by the A / D 14 in one imaging and the image The data is taken into the data processor 15 and stored in the image memory 154. A plurality of images are stored in the image memory 154.
[0014]
The memory 152 stores a gate setting / electric pole detection program 21, an imaging position determination program 22, a still image collection program 23, and a reference electric pole setting program 24. From the target electric pole before the target position of the trolley line abnormality location and its electric pole A data area 25 for storing the distances is provided. Then, the still image collection program 23 is executed by the MPU 151 at a position in front of the trolley line abnormality portion, and the still image obtained by collecting the data from the A / D 14 in the image memory 154 is temporarily recorded, and this is stored in the external storage device 157. Compressed and transferred.
In the external storage device 157 such as a hard disk connected via the interface 155, distance data measured in the past from the reference point P to each power pole position is stored as the power pole position measurement data 158. This distance data is obtained as regression data from the distance data for each power pole measured a plurality of times in the past.
There are places where there is no utility pole, such as near the entrance of the tunnel, but this is due to detection of the one corresponding to the utility pole.
[0015]
When this program is executed by the MPU 151, the gate setting / electric pole detection program 21 determines the next electric pole detection position based on the measured distance data (electric pole position measurement data 158) and the current travel distance for each of the past electric pole positions. A gate with a predetermined width is set before and after. As the gate width in this case, an appropriate width is adopted based on past experience. As shown in FIG. 3, the gate width is a distance pulse PL generated by the current running on the basis of the front pole position. And the distance traveled to the next utility pole 4 determined by the measured distance data is set to be the center of the gate. This gate is referred to as the first gate 2 here. Separately from this, with the reference position P set every 10 km as a reference, the next utility pole 4 determined by the distance pulse PL generated by the current traveling and the measured distance data (electric pole position measurement data 158). The second gate 3 is set around the travel distance up to. The entire gate for detecting the utility pole detection signal d is in the range of the OR condition of the first gate 2 and the second gate 3.
[0016]
Here, the position of the utility pole 4 that is actually detected in one of the two gates is not often at the center of the set gate, and the actual utility pole detection position changes according to the traveling state at that time. Therefore, the first gate 2 set as the next utility pole position is shifted from the position of the second gate 3 with the actual utility pole position detected at a certain gate as a reference. At these gates, the position of the utility pole 4 based on the current travel distance actually detected by the utility pole detection signal d is calculated as the converted distance S1 from the reference point P. This converted distance S1 becomes distance data (current measurement data) of an actual utility pole detection position measured by the current travel distance viewed from the measurement reference position P for a certain utility pole at the current travel distance. On the other hand, let S2 be the distance to the utility pole 4 based on the already measured reference position P obtained from the utility pole position measurement data 158 at the current travel distance.
In FIG. 3, the width of the second gate 3 is slightly larger than the width of the first gate 2. Also, an ideal case is shown, and there is no deviation between the gate positions of both, but in practice, when setting the next gate, the reference of the first gate 2 is the current running state detected each time Therefore, it is different from the position of the second gate 3 based on the already measured data with the reference point P as a reference. Therefore, a deviation occurs between them.
In addition, the position of the utility pole 4 actually detected in these gates depends on the traveling state of the inspection vehicle at that time, and depends on where it is detected on the gate, so it is the same as the past measurement position. Not exclusively.
[0017]
It is determined whether or not the utility pole detection signal d is present in the gate set by the gates of the first and second OR conditions, and it is determined where the signal is generated when it is in the gate. Is the current position of the utility pole 4.
By the way, since there are a large number of supports such as a bent metal fitting and a trolley wire support metal in addition to the support metal at the position of the electric pole 4, there are usually a plurality of detection signals in the gate. . In this case, the detection signal closest to the center position of the gate among the plurality of detection signals is adopted as the utility pole detection signal d. The detected actual position S1 of the utility pole 4 depends on the relationship shown in FIG. 4, which will be described later.
Since the utility poles 4 are usually installed at intervals of about 50 m, there are about 200 utility poles 4 between the utility pole 4 at the reference position P and the utility pole 4 at the next reference position P. Therefore, the position of the first gate 2 changes according to the traveling state between the utility poles 4 at that time. On the other hand, the position of the second gate 3 changes according to the running state accumulated from the reference position P.
[0018]
Now, when the electric pole 4 to be detected in the first gate 2 does not enter when there is a large error between the past measured distance between the electric poles 4 and the measured distance due to the current running state in the running state between certain poles 4 There is. In this case, the utility pole 4 is detected by the second gate 3 to prevent the detection of the utility pole due to the fluctuation of the running state between the utility poles 4. However, since the second gate 3 is based on the reference position P set every 10 km, the error is accumulated as the distance from the reference position P increases. In order to correct this error, here, a utility distance 4 is set as a new reference utility pole between reference positions P by a reference utility pole setting program 24 to be described later, and the distance measured thereafter is cumulatively measured based on this. Then, the second gate 3 is set. This avoids a utility pole detection leak. This prevents a utility pole detection leak before the trolley wire abnormality point.
[0019]
When the electric pole 4 is detected, the imaging position determination program 22 determines whether the electric pole 4 is the electric pole two before the trolley wire abnormality point or the electric pole one before, and when the electric pole 4 is one of the electric poles Then, the count value of the distance pulse PL is calculated from the actually detected position of the utility pole 4, and the distance to the abnormal part is measured. In this case, in the case of the power pole two before, the distance to the next power pole 4 + the distance from the next power pole 4 to the abnormal position of the trolley wire −α or not, depending on the distance pulse PL, to the abnormal position Measure the distance and detect the start point of shooting. It should be noted that -α is determined in accordance with the set amount slightly before the abnormal part. At this time, the distance to the next utility pole 4 is obtained from the utility pole position measurement data 158. The distance from the next utility pole 4 (target utility pole) to the abnormal location from this position is a value separately input as the distance from the target utility pole to the abnormal value. The distance between the utility pole 4 immediately before the abnormal location and the abnormal location is input in advance and stored in the data area 25 in the memory 152.
Further, in this program, when the utility pole 4 is detected, it is also determined whether or not it is a post of the reference point P. As a result, when the reference point P is detected, the utility pole detection is started with this as a reference.
When a power pole in front of the abnormal point is detected, the measured value from the power pole in front of the second point is reset, and the distance from the power pole 4 detected in accordance with the distance pulse PL from the power pole in front of the distance to the abnormal point The distance to the abnormal part is measured depending on whether or not the distance becomes −α.
With the setting of α, for example, the still image collection program 23 is called at about 150 cm before the abnormal position.
[0020]
When this program is executed by the MPU 151, the still image collection program 23 activates the camera 13 and operates the shutter at a cycle corresponding to a travel distance of about 30 cm to collect 4 to 8 still images. Each frame (or one field) of data stored in the memory 154 is compressed and transferred to the external storage device 157.
The reference utility pole setting program 24 is replaced with the reference position P set every 10 km, and the error is seen from the past measurement value in the travel distance of the intermediate utility pole 4 between the reference position P and the reference position P. Set a small number of utility poles 4 as reference poles, add the mileage as a new starting point, and convert past measured distance data to those from the new starting point (detected reference pole position) Based on this, the second gate 3 is set for each utility pole 4. Thereby, the position error of the second gate 3 with respect to the subsequent utility pole 4 is reduced, and the accuracy is improved.
The setting of the reference pole is such that when a certain pole 4 is detected, the kilometer integrated value S1 of the detected position from the reference point P calculated by the distance pulse PL to the pole 4 (measured distance by current running) When the error between the current travel distance from the reference point P and the accumulated value S2 (past measurement distance) to the utility pole corresponding to the past measurement data up to the utility pole 4 is ΔS. It is determined whether S2 | <ΔS. When the above condition is satisfied, when | S1-S2 | <ΔS, as shown in FIG. 3, the detected utility pole 4 is used as a reference utility pole Pa and the reference position P is referred to with reference to the utility pole position measurement data 158. The distance S1 to the detected reference power pole Pa is set as the integrated distance M on the past measurement data. Thereby, the integrated distance to the detection position of the utility pole 4 is corrected to the distance M. Alternatively, it is detected each time by calculating the difference between the distance S1 and the past measurement data from the reference point P to the detected reference pole Pa with reference to the pole position measurement data 158 as an integration error ΔM every time the pole is detected. When ΔM <ΔS, the accumulated distance to the detection position of the utility pole 4 is corrected with the error ΔM by the error ΔM.
As a result, the center of the position of the second gate 3 of the detected utility pole is pulled back to the actually detected utility pole position, and the counting error is reduced by starting counting from the reference point P.
The error ΔS is obtained from the past measurement data as a limit value of error values that can be adopted as the reference utility pole.
[0021]
That is, the position where the second gate 3 is set up to the subsequent detection pole 4 by the distance pulse PL is calculated from the following equation by measuring the kilometer integration value Sa from the reference point Pa.
S2 = Sa + M
Sa is an integrated value of the travel distance calculated by the distance pulse PL with reference to the reference power pole Pa at the position of the actually detected power pole 4.
Thereby, the integrated value of the travel distance is changed from the reference point P to the reference utility pole Pa. Here, if the error of the accumulated distance M to the reference pole P is Δd1, and the error of the accumulated distance Sa for a certain pole is Δd2, the total error is Δd1 + Δd2, but the first error is set from the reference point P. When the position of the second gate 3 is shifted to the position of the actually detected reference pole P, the distance error of the second gate 3 starts from there, and the accumulated error added to the subsequent setting error of the second gate Becomes substantially Δd 2 and is reduced and corrected.
[0022]
Actually, since the position determined by the distance pulse PL generated at a constant interval and the position where the utility pole detection signal is generated are different in the distance pulse PL, detection of the position of the utility pole 4 by two gates is shown in FIG. It is done in such a relationship.
FIG. 4A is an explanatory diagram of the relationship between the first and second gates and the generation timing of the utility pole detection signal d. The positions determined by the distance pulse PL of the first gate 2 are (1) to (4), and the positions determined by the distance pulse PL in the second gate 3 are (I) to (IV).
Since the distance pulse PL and the utility pole detection signal d are rarely generated in correspondence with each other, it is assumed that they do not occur in correspondence with each other. In this case, the distance is given with priority as shown in FIG. It is assumed that it is a pulse generation position and the actual utility pole detection position based on the utility pole detection signal d is measured by the distance pulse PL there.
In FIG. 4B, (1) and (2) in the input signal column 51 of the first gate 2 are between positions (1) and (2) where the utility pole detection signal d is determined by the distance pulse PL. In this case, the position at (2) in the priority result column 52 becomes the actual utility pole detection position. The same applies hereinafter. Of course, when the distance pulse PL substantially matches the utility pole detection signal d, the position is the utility pole detection position.
Similarly, (I) and (II) in the input signal column 53 of the second gate 3 are cases where the utility pole detection signal d is generated between (I) and (II), and the position at that time has priority. The position of the position (II) measured by the distance pulse PL in the result column 54 becomes the actual utility pole detection position. The same applies hereinafter. Of course, as described above, when the distance pulse PL substantially matches the utility pole detection signal d, the position is the utility pole detection position.
[0023]
In this way, the position of the utility pole is detected by the gate of the OR condition of the first gate 2 and the second gate 3, and the gate is set by setting the position of the second gate 3 as the reference utility pole Pa. Thus, the utility pole 4 immediately before the abnormal portion of the trolley wire is reliably detected.
Thus, it becomes possible to measure the distance based on the utility pole 4 immediately before the abnormal part of the trolley line by detecting the electric pole of the first gate 2, and to reduce the distance error to the abnormal part in the current running state. . However, in consideration of the case where the utility pole 4 immediately before the abnormal portion of the trolley wire cannot be detected, here, for the sake of safety, as described above, the double safety based on the detection of the previous utility pole is used. The sex is secured.
[0024]
Hereinafter, the still image collection process at the abnormal location will be described with reference to the flowchart of FIG.
First, referring to the measurement data between the power poles 4 in the past corresponding to the power pole position measurement data 158, the position (reference point P) of the target power pole (the power pole 4 immediately before the abnormal position) in front of the target position of the trolley line abnormal position. (Posts every 10 km), the distance from this position or the pole number) and the distance from the pole to the abnormal part are input and stored in the data area 25 of the memory 152 (step 101), and then the reference point P Is started (see step 102, post P in FIG. 3). Then, it is determined whether or not the utility pole is detected by receiving the utility pole detection signal d to determine whether or not the utility pole is detected in the OR gates of the first gate 2 and the second gate 3 (step 103). If the determination is NO, the process returns to step 103 and enters a utility pole detection waiting loop.
[0025]
In such a detection loop, when the utility pole 4 is detected, the answer is YES. At this time, the imaging position determination program 22 is called and executed by the MPU 151 to determine whether the utility pole 4 is in front of the target utility pole. (Step 104) When it is NO, it is determined whether or not it is a target utility pole (Step 105), and when it is NO, it is determined whether or not it is a post utility pole at the reference point P (Step 106). When the answer is NO, the gate setting / electric pole detection program 21 is called and executed by the MPU 151, and the distance traveled by the distance pulse PL at this pole detection position is calculated as the converted kilometer integrated value S1 from the reference point P. (Step 107), with reference to the utility pole position measurement data 158, the accumulated value S2 of kilometers from the reference point P that has already been measured to the detected utility pole 4 is read (Step 108), and | S1-S2 | <ΔS Is determined (step 109).
Here, when NO, it is determined whether or not the process is finished (step 110), and when the process is not finished, the process returns to step 103 to enter the next utility pole detection.
[0026]
In such a process, the determination in step 109 is YES, and if the difference | S1-S2 | between the kilometer distance from the reference point P and the kilometer distance for each utility pole 4 is equal to or less than the error ΔS, the detected utility pole is changed to the reference utility pole Pa. It is set and the position of the reference point P is set to the actual position where the reference utility pole Pa is detected, and it is determined whether or not the process is finished (step 110). If not finished, the process returns to step 103. Further, when the determination in step 106 is YES, the process returns to step 102 using that as a reference point P.
Further, when YES is determined in step 104, the detected pole position is set as the pole 4 in front of the target pole, and the distance pulse PL is counted from the position of the pole 4 actually detected with the detected position of the pole 4 as a reference. Then, it is determined whether or not the distance to the next utility pole 4 + the distance from the next utility pole 4 to the abnormal location−α, and the distance to the abnormal location is measured according to the distance pulse PL (step 104a). Thus, when the determination is YES, the process proceeds to step 105c (described later). Thereby, the distance to the abnormal part is measured according to the distance pulse PL.
If “YES” is determined in Step 105, the previous measurement value in Step 104 a is reset using the detected utility pole position as the target utility pole, and the determination / distance measurement process in Step 104 a is stopped (Step 105 a), and the detected utility pole 4 It is determined whether or not the distance to the abnormal location is -α, and the distance to the abnormal location is measured according to the distance pulse PL (step 105b). When the step 104a or the distance measurement here is completed, the still image collection program 23 is called to take a plurality of still images (step 105c), stored in the image memory, and transferred to the external storage device ( Step 105d).
[0027]
FIG. 5 is an explanatory diagram of a correction process for correcting the position of the reference power pole position Pa.
In FIG. 5, the detected position of the reference power pole position Pa is corrected using the position between the two previous detection power poles, and the actual position is moved back and forth.
The correction is made such that the measurement distance S1 = a2 from the reference point P of the detection position of the previous detection electric pole 6 and the measurement distance S1 = a1 from the reference point P of the detection position of the previous detection electric pole 7; If the distance to the reference utility pole 8 (reference utility pole Pa) is S1 = a0, the utility pole 6 and the utility pole 7 obtained from the distance (a1-a2) between the previous and previous utility poles and the utility pole position measurement data 158. A difference Δa from the past measurement data is calculated, and the position of the reference power pole Pa is moved with the reference power pole Pa as (a0−a1) −Δa. However, when the distance (a1−a2) is larger than the measurement data, the difference Δa is treated as a positive value, and when the distance (a1−a2) is smaller than the measurement data, the difference Δa is treated as a negative value.
Thereby, a highly accurate setting is made. However, the value is smaller than Δa <ΔS.
[0028]
As described above, in the embodiment, the utility pole is detected by detecting the utility pole by the first gate and compensating for the leakage by the utility pole detection of the second gate, but the detection position of the second gate is shown in FIG. (I), (II), (1), (2), (3), (4), (III), (IV), the first gate and the second gate are overlapped with the first gate. The power pole may be detected at the same time, and processing may be performed so as to give priority to the power pole detection position of the first gate.
[0029]
【The invention's effect】
As described above, according to the present invention, two systems of gates are set, and a utility pole detection signal is obtained under the OR condition. At this time, since the first gate is directly affected by the actual traveling state at that time, a state in which the utility pole cannot be detected occurs, but one of the positions of the utility pole actually detected in the actual traveling state is used as a reference. Since the position is corrected as the position and the second gate is re-established therefrom, the position of the utility pole can be detected almost certainly by the second gate when it is not detected by the first gate.
Furthermore, in the apparatus of the present invention, the abnormal part is measured based on the position of the utility pole in front of the abnormal part of the trolley wire in the above-mentioned electric pole position detection, so even when a still image image of the abnormal part is taken, even with a small number of images You can definitely get it.
As a result, it is possible to detect the position of the power pole with higher accuracy suitable for detecting the position of a still image image or the like of the trolley line abnormality portion.
[Brief description of the drawings]
BRIEF DESCRIPTION OF DRAWINGS FIG. 1 is a block diagram of an image recording device for an abnormal part of a trolley line to which the utility pole position detection method and an abnormal part image recording device for a route according to the present invention are applied.
FIG. 2 is a flowchart of still image recording processing by an image recording apparatus as an embodiment of the utility pole position detection method of the present invention.
FIG. 3 is an explanatory diagram of specific contents thereof.
FIG. 4 is an explanatory diagram regarding detection of a utility pole position in two gates, and (a) is an explanatory diagram of a relationship between a position determined by a distance pulse and a generation timing of a utility pole detection signal; b) is an explanatory diagram of priorities for positions determined by distance pulses.
FIG. 5 is an explanatory diagram of a correction process for a reference power pole position.
[Explanation of symbols]
1 ... trolley line, 2 ... first gate, 3 ... second gate,
4, 6, 7, 8 ... electric pole, 11 ... electric pole detection sensor,
12 ... Infrared LED light source, 13 ... Camera,
14 ... A / D conversion circuit (A / D),
15 ... Image data processing device, 151 ... MPU,
152 ... Memory, 153 ... CRT display,
154 ... Image memory, 155 ... Interface,
156: Bus, 157: External storage device.
21 ... Gate setting / electric pole detection program,
22 ... Imaging position determination program,
23. Still image collection program,
24 ... reference pole setting program, 25 ... data area.

Claims (6)

鉄道線路の所定の計測基準位置を基準として前記鉄道線路に設けられる電柱について測定された距離データと、検測車両の走行距離とに基づいて前記電柱の位置に対応してゲートを設定してこのゲート内において電柱検出信号を得ることで実際の電柱位置を検出する電柱位置検出方法において、
前記検出された電柱の位置を基準として前記測定された距離データに基づいて次の電柱位置に前記ゲートとして第1のゲートを設定し、前記計測基準位置を基準として前記測定された距離データに基づいて前記次の電柱位置に前記ゲートとして第2ゲートを設定して、前記第1のゲートおよび第2のゲートのいずれかにおいて前記電柱検出信号を得て前記実際の電柱位置を検出し、かつ、現在の走行距離において、ある電柱についての前記測定基準位置からみた前記実際の電柱検出位置と前記ある電柱についての前記測定基準位置からみた前記距離データによる電柱の位置との差が所定の誤差以下にあるときに前記ある電柱の電柱検出位置を前記測定基準位置に換えてこれを基準として前記第2のゲートを設定することを特徴とする電柱位置検出方法。
The gate is set corresponding to the position of the power pole based on the distance data measured for the power pole provided on the railway track with reference to a predetermined measurement reference position of the railway track and the travel distance of the inspection vehicle. In the utility pole position detection method of detecting the actual utility pole position by obtaining the utility pole detection signal in the gate,
A first gate is set as the gate at the next utility pole position based on the measured distance data with the detected pole position as a reference, and based on the measured distance data with the measurement reference position as a reference A second gate is set as the gate at the next utility pole position, and the utility pole detection signal is obtained at any one of the first gate and the second gate to detect the actual utility pole position; and At the current travel distance, the difference between the actual utility pole detection position seen from the measurement reference position for a certain utility pole and the position of the utility pole based on the distance data seen from the measurement reference position for the given utility pole is less than a predetermined error The utility pole position is characterized in that the utility gate detection position of the utility pole is changed to the measurement reference position and the second gate is set based on the measurement reference position. Way out.
前記電柱検出信号は、前記第1あるいは第2のゲート内において複数の検出信号のうちゲートの中心に最も近いものとする請求項1記載の電柱位置検出方法。2. The utility pole position detection method according to claim 1, wherein the utility pole detection signal is closest to the center of the gate among the plurality of detection signals in the first or second gate. 鉄道線路の所定の計測基準位置を基準として前記鉄道線路に設けられる電柱について測定された距離データと、検測車両の走行距離とに基づいて前記電柱の位置に対応してゲートを設定してこのゲート内において電柱検出信号を得ることで実際の電柱位置を検出して路線の異常箇所の静止画像を収録する路線の異常箇所画像収録装置であって、
前記検出された電柱の位置を基準として前記測定された距離データに基づいて次の電柱位置に前記ゲートとして第1のゲートを設定し、前記計測基準位置を基準として前記測定された距離データに基づいて前記次の電柱位置に前記ゲートとして第2ゲートを設定して、前記第1のゲートおよび第2のゲートのいずれかにおいて前記電柱検出信号を得て前記実際の電柱位置を検出する電柱検出手段と、
現在の走行距離において、ある電柱についての前記測定基準位置からみた前記実際の電柱検出位置と前記ある電柱についての前記測定基準位置からみた前記距離データによる電柱の位置との差が所定の誤差以下となったときに前記ある電柱の電柱検出位置を前記測定基準位置に換えて前記電柱検出手段に前記第2のゲートを設定させる第2ゲート設定手段と、
前記路線の異常箇所の1つ手前の電柱が検出されその位置が得られたときにこの電柱位置から前記異常箇所の距離あるいはその手前までの距離を計測して前記異常箇所の静止画像を撮影する撮像手段とを備えることを特徴とする路線の異常箇所画像収録装置。
The gate is set corresponding to the position of the power pole based on the distance data measured for the power pole provided on the railway track with reference to a predetermined measurement reference position of the railway track and the travel distance of the inspection vehicle. An abnormal part image recording device for a route that detects the actual pole position by obtaining a utility pole detection signal in the gate and records a still image of the abnormal part of the route,
A first gate is set as the gate at the next utility pole position based on the measured distance data with the detected utility pole position as a reference, and based on the measured distance data with the measurement reference position as a reference. The utility pole detection means for setting the second gate as the gate at the next utility pole position and obtaining the utility pole detection signal at either the first gate or the second gate to detect the actual utility pole position. When,
At the current travel distance, the difference between the actual utility pole detection position seen from the measurement reference position for a certain utility pole and the position of the utility pole based on the distance data seen from the measurement reference position for the given utility pole is less than a predetermined error. A second gate setting means for causing the utility pole detection means to set the second gate by changing the utility pole detection position of the certain utility pole to the measurement reference position,
When a power pole immediately before an abnormal point on the route is detected and its position is obtained, the distance from the power pole position to the abnormal point or the distance to the front is measured to shoot a still image of the abnormal point. An abnormal part image recording device for a route characterized by comprising imaging means.
前記電柱検出信号は、前記第1あるいは第2のゲート内において複数の検出信号のうちゲートの中心に最も近いものとする請求項3記載の路線の異常箇所画像収録装置。4. The abnormal part image recording device for a route according to claim 3, wherein the utility pole detection signal is the closest to the center of the gate among the plurality of detection signals in the first or second gate. 前記撮像手段は、前記路線の異常箇所の2つ手前の電柱が検出されその位置が得られたときにこの電柱位置から前記異常箇所の距離あるいはその手前までの距離を計測し、かつ、前記1つ手前の電柱が検出されその位置が得られたときに前記計測を中止して前記路線の異常箇所の1つ手前の電柱位置から前記異常箇所の距離あるいはその手前までの距離を計測して前記異常箇所の静止画像を撮影する請求項4記載の路線の異常箇所画像収録装置。The imaging means measures the distance from the position of the utility pole to the location of the abnormal location or the distance before the location when the location of the utility pole two before the abnormal location of the route is detected, and the 1 When the previous power pole is detected and its position is obtained, the measurement is stopped, and the distance from the power pole position immediately before the abnormal location on the route to the abnormal location or the distance to the front is measured and The abnormal part image recording device for a route according to claim 4, wherein a still image of the abnormal part is photographed. 前記路線の異常箇所はトロリ線の異常箇所である請求項5記載の路線の異常箇所画像収録装置。The abnormal part image recording device of a route according to claim 5, wherein the abnormal part of the route is an abnormal part of a trolley line.
JP2001242222A 2001-08-09 2001-08-09 Utility pole position detection method and route abnormal part image recording apparatus using this method Expired - Fee Related JP4448268B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001242222A JP4448268B2 (en) 2001-08-09 2001-08-09 Utility pole position detection method and route abnormal part image recording apparatus using this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001242222A JP4448268B2 (en) 2001-08-09 2001-08-09 Utility pole position detection method and route abnormal part image recording apparatus using this method

Publications (2)

Publication Number Publication Date
JP2003057004A JP2003057004A (en) 2003-02-26
JP4448268B2 true JP4448268B2 (en) 2010-04-07

Family

ID=19072534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001242222A Expired - Fee Related JP4448268B2 (en) 2001-08-09 2001-08-09 Utility pole position detection method and route abnormal part image recording apparatus using this method

Country Status (1)

Country Link
JP (1) JP4448268B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5283548B2 (en) * 2009-03-27 2013-09-04 川崎重工業株式会社 Railway rail fastening looseness inspection apparatus and method
JP2014198524A (en) * 2013-03-29 2014-10-23 株式会社日立ハイテクノロジーズ Overhead wire inspection method and apparatus
JP6270271B2 (en) * 2014-03-19 2018-01-31 三和テッキ株式会社 Trolley wire height / deviation measuring device
JPWO2019188718A1 (en) * 2018-03-28 2020-04-30 バンドー化学株式会社 Surface shape monitoring device, wear amount measuring system and surface shape monitoring system
CN113218306B (en) * 2021-04-28 2022-02-15 大连理工大学 FPGA-based light spot position detection system and method
CN116740289B (en) * 2023-08-14 2023-12-19 长沙能川信息科技有限公司 Power transmission line model generation method and device, electronic equipment and storage medium
CN120876453B (en) * 2025-09-23 2025-12-09 湖南苏科智能科技有限公司 Intelligent detection method, system, equipment and medium for installation angle of corner rod cross arm

Also Published As

Publication number Publication date
JP2003057004A (en) 2003-02-26

Similar Documents

Publication Publication Date Title
CN110425977A (en) A detection system and detection method for geometric parameters of a contact rail
KR20160100788A (en) Apparatus and method for measuring speed of moving object
JP4448268B2 (en) Utility pole position detection method and route abnormal part image recording apparatus using this method
JP4056813B2 (en) Obstacle detection device
CN116320712A (en) Image acquisition method, device, equipment and medium for loading state of railway wagons
CN113256512B (en) Depth image completion method, device and inspection robot
CN205991785U (en) A kind of railway tunnel gauge dynamic detection system
CN110763143A (en) Detection device and detection method for operation and maintenance of contact network
JP4685494B2 (en) Trolley wire position measuring device
JP3019901B2 (en) Vehicle specification automatic measurement device
JP4312729B2 (en) Rail joint plate fastening bolt dropout detection device
CN117781868B (en) Detection system and method combining train wheel set size detection with dynamic image detection
JP2001357488A (en) Vehicle dimension measuring device
JP4238016B2 (en) Image information recording device
CN109238149B (en) Vehicle body attitude detection device and contact line dynamic offset detection system
US11443620B2 (en) Method and apparatus for measuring a height of a vehicle
EP3829155B1 (en) Imaging system for railway vehicle
JPS61112918A (en) Automotive road surface condition measurement device
CN117657258B (en) Train head detection device and method
JP4312728B2 (en) Rail joint plate fastening bolt dropout detection device
JP3958566B2 (en) Measuring equipment for railway vehicles
JP3418328B2 (en) Method and apparatus for measuring road surface unevenness
KR101369498B1 (en) Inspection system for railway ground facility using image processing technology and method thereof
JP3504359B2 (en) Trolley wire height and deflection measuring device
JP2006017676A (en) Measuring system and measuring method

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20060516

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070821

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100119

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100122

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130129

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees