JP4457801B2 - Automated guided vehicle operation control system - Google Patents
[go: Go Back, main page]

JP4457801B2 - Automated guided vehicle operation control system - Google Patents

Automated guided vehicle operation control system Download PDF

Info

Publication number
JP4457801B2
JP4457801B2 JP2004225483A JP2004225483A JP4457801B2 JP 4457801 B2 JP4457801 B2 JP 4457801B2 JP 2004225483 A JP2004225483 A JP 2004225483A JP 2004225483 A JP2004225483 A JP 2004225483A JP 4457801 B2 JP4457801 B2 JP 4457801B2
Authority
JP
Japan
Prior art keywords
power consumption
automatic guided
agv
guided vehicle
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004225483A
Other languages
Japanese (ja)
Other versions
JP2006048210A (en
Inventor
良美 新原
伸雄 木原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mazda Motor Corp
Original Assignee
Mazda Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mazda Motor Corp filed Critical Mazda Motor Corp
Priority to JP2004225483A priority Critical patent/JP4457801B2/en
Publication of JP2006048210A publication Critical patent/JP2006048210A/en
Application granted granted Critical
Publication of JP4457801B2 publication Critical patent/JP4457801B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Position, Course, Altitude, Or Attitude Of Moving Bodies (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)

Description

本発明は、所定の生産ライン上で複数の無人搬送車を運行制御するための無人搬送車運行制御システムに関する。   The present invention relates to an automatic guided vehicle operation control system for controlling the operation of a plurality of automatic guided vehicles on a predetermined production line.

周知の通り、例えば組立生産ラインや加工生産ライン等の生産ラインにおいては、生産対象となるワークや該ワークに対する組付部品の搬送を、無人搬送車(Automated Guided Vehicles:以下、AGVと表記)を用いて行うことが知られている。AGVは、通常、搭載されたバッテリを駆動源として、床面に設定された誘導路に沿って電動モータで走行する。AGVを用いた生産ラインでは、AGVの走行経路に沿って、各種の作業ステーションが設定されており、各ステーションに配置された作業者により、AGVに対して、ワークや組付部品が積載され、また、積載された組付部品が取り出されてワークの組立作業が行われる。   As is well known, in production lines such as assembly production lines and processing production lines, for example, automated guided vehicles (hereinafter abbreviated as AGV) are used to convey workpieces to be produced and assembly parts for the workpieces. It is known to use. The AGV usually travels with an electric motor along a guide path set on the floor surface using a mounted battery as a drive source. In the production line using AGV, various work stations are set along the traveling route of AGV, and a worker or an assembly part is loaded on AGV by an operator arranged at each station. Also, the assembled parts loaded are taken out and the work is assembled.

生産ラインにおけるAGVの走行経路は種々の様式で設定可能であるが、従来では、例えば特許公報第2809294号に開示されるように、AGVの走行経路の一部が分岐されることで、並列した分岐経路が設定される様式が知られている。この様式では、通常、並列した各分岐経路に作業者が配置され、各作業者により、分岐経路に進入してきた無人搬送車に積載された単一のワークに対して所定の作業(組立作業など)が行われる。近年、生産ラインとしては、ユーザの好みの多様化に対応して同一ラインで複数種類のワークを生産すべく、複数種類のワークが、単一ワーク毎にAGVに積載されて、例えば納期順など、種類毎あるいは機種毎には纏まりのない不規則な順序で搬送されるライン(所謂混流ライン)が採用される機会が増えてきているが、特に混入ラインが採用される場合には、複数種類のワークに対する作業の効率化を図る上で、複数の分岐経路が設定される様式は非常に有用である。かかる様式においては、従来、各AGVの分岐経路への進入に際し、AGVが一旦停止させられ、進入先の分岐経路として、作業が終了して空き状態にある分岐経路がAGVの停止位置に近い側から選択されることが一般的であった。   The travel route of AGV in the production line can be set in various ways. Conventionally, for example, as disclosed in Japanese Patent No. 2809294, a part of the travel route of AGV is branched to be parallel. A mode in which a branch path is set is known. In this mode, an operator is usually placed on each parallel branch path, and each worker performs a predetermined work (such as assembly work) on a single workpiece loaded on the automatic guided vehicle that has entered the branch path. ) Is performed. In recent years, as a production line, in order to produce a plurality of types of workpieces on the same line in response to the diversification of user preferences, a plurality of types of workpieces are loaded on the AGV for each single workpiece, for example, in order of delivery However, there are increasing opportunities to adopt lines (so-called mixed flow lines) that are transported in an irregular order that is not grouped for each type or model, but in particular, when mixed lines are used, there are multiple types. In order to increase the efficiency of the work on the workpiece, a mode in which a plurality of branch paths are set is very useful. In such a mode, conventionally, when each AGV enters the branch path, the AGV is temporarily stopped, and the branch path that is in an empty state after the operation is completed is close to the stop position of the AGV. It was common to choose from.

特許公報第2809294号Patent Publication No. 2809294

ところで、複数の分岐経路が設定される様式において、各分岐経路が互いに異なる走行長を有する経路として設定された場合には、分岐経路毎にAGVの走行距離が異なることから、通過する分岐経路次第で、AGVに搭載されるバッテリの消費電力量が異なってくる。このため、生産ラインを稼動させた場合には、必然的に、各AGVの消費電力量にバラツキが生じてくる。通常、各AGVに搭載されるバッテリの容量は、AGVの利用に際して可能性がある最大消費電力量に対応すべく設定されるため、平均消費電力量を大きく上回るバッテリの容量が全てのAGVに必要とされ、コスト増大が避けられない。したがって、互いに異なる走行長を有する分岐経路が設定された場合には、各AGVの分岐経路への進入に際して、全てのAGV間でバッテリの消費電力量を平均化するように、進入先となる分岐経路を選択することが好ましい。しかしながら、全てのAGV間での消費電力量の平均化が過度に重視されると、消費電力量の平均化を達成する上で最適な分岐経路が空き状態になるまで、各AGVが長期にわたり停止位置で待機することとなり、生産ラインの稼働効率が悪化する可能性がある。したがって、全てのAGV間でのバッテリの消費電力量の平均化及び各AGVの待機時間の短縮化の両立を図り、各AGVについて分岐経路を選択することが求められる。   By the way, in a manner in which a plurality of branch routes are set, when each branch route is set as a route having a different travel length, the travel distance of the AGV is different for each branch route. Thus, the power consumption of the battery mounted on the AGV is different. For this reason, when the production line is operated, the power consumption of each AGV inevitably varies. Normally, the capacity of the battery installed in each AGV is set to correspond to the maximum power consumption that can be used when using the AGV, so a battery capacity that greatly exceeds the average power consumption is required for all AGVs. Therefore, an increase in cost is inevitable. Therefore, when branch paths having different travel lengths are set, the branch that becomes the entry destination is set so that the power consumption of the battery is averaged among all AGVs when each AGV enters the branch path. It is preferable to select a route. However, if too much importance is placed on the averaging of power consumption among all AGVs, each AGV will be stopped for a long time until the optimum branch path becomes empty to achieve the averaging of power consumption. There is a possibility that the operation efficiency of the production line will deteriorate due to waiting at the position. Therefore, it is required to select the branch path for each AGV in order to achieve both the average power consumption of the battery among all the AGVs and the shortening of the standby time of each AGV.

本発明は、上記技術的課題に鑑みてなされたもので、AGV用の走行経路として走行長の異なる複数の分岐経路が設定される場合に、使用される全てのAGV間でのバッテリの消費電力量の平均化及び待機時間の短縮化の両立を図り、各AGVが走行すべき分岐経路を選択し得る無人搬送車運行制御システムを提供することを目的とする。   The present invention has been made in view of the above technical problem. When a plurality of branch paths having different travel lengths are set as the travel paths for AGV, the power consumption of the battery among all the AGVs used. It is an object of the present invention to provide an automatic guided vehicle operation control system capable of selecting a branch route on which each AGV should travel while achieving both an average amount and a shortened waiting time.

本願の請求項1に係る発明は、ワークを積載し搬送する複数の無人搬送車がそれぞれ搭載されたバッテリの駆動力により所定の走行経路に沿って周回走行する生産ラインであって、該所定の走行経路の一部には、それぞれ走行長の異なるように分岐され、それぞれに上記ワークに対して作業者による所定の同一作業が行われる作業領域が設定される複数の分岐経路が設定されている生産ライン内で、該複数の分岐路のいずれかを選択して上記所定の走行経路を周回走行するよう無人搬送車の運行を制御する無人搬送車運行制御システムにおいて、該各無人搬送車について当該各無人搬送車が上記所定の走行経路に沿って走行した場合のバッテリの消費電力量を算出する消費電力量算出手段と、上記各無人搬送車の1つが上記分岐経路手前の分岐地点に到着した時点で、当該分岐地点に到着した無人搬送車について上記消費電力量算出手段により算出された消費電力量が、全無人搬送車の消費電力量の中で上位にあるか下位にあるかを比較判断する第1比較手段と、上記第1比較手段により上記分岐地点に到着した無人搬送車の消費電力量が、全無人搬送車の消費電力量の中で上位にあると判断された場合は、走行長が短い分岐経路の優先順位が高くなるよう重み付け順位を設定する一方、全無人搬送車の消費電力量の中で下位にあると判断された場合は、走行長が長い分岐経路の優先順位が高くなるよう重み付け順位を設定する第1重み付け順位設定手段と、上記各分岐経路の作業領域において作業開始から作業終了までに必要であると予測される予測作業時間を上記ワークの種類に応じて予め記憶する予測作業時間記憶手段と、上記作業領域に停止した時点からの経過時間を実作業時間として計測する実作業時間計測手段と、上記予測作業時間記憶手段により記憶された予測作業時間と、上記実作業時間計測手段により計測された実作業時間とに基づき、各作業領域での作業完了までの作業残り時間を算出する作業残り時間算出手段と、上記無人搬送車が上記分岐地点に到着した時点で、上記作業残り時間算出手段により算出された各作業領域の作業残り時間を比較して各分岐経路での作業終了順位を求める第2比較手段と、上記第2比較手段により求められた各分岐経路間の作業終了順位に基づいて作業残り時間が短い分岐経路の優先順位が高くなるよう重み付け順位を設定する第2重み付け順位設定手段と、上記分岐地点に到着した無人搬送車が走行すべき分岐経路を選択し、該無人搬送車に対して指示する運行制御手段であって、上記無人搬送車の1つが上記分岐地点に到着した時点で、上記第1重み付け順位設定手段により設定された重み付け順位と、上記第2重み付け順位設定手段により設定された重み付け順位とを積算することにより総合的な重み付け順位を設定し、該総合的な重み付け順位に基づいて上記分岐地点に到着した無人搬送車が走行すべき分岐経路を選択する運行制御手段と、を有していることを特徴としたものである。
The invention according to claim 1 of the present application is a production line that travels around a predetermined travel route by a driving force of a battery on which a plurality of automatic guided vehicles for loading and transporting a workpiece are respectively mounted. A plurality of branch paths are set in a part of the travel route, each of which is branched so as to have a different travel length, and in each of which a work area in which the same predetermined work is performed by the worker is set for the workpiece. in the production line, the AGV operation control system for controlling the operation of the automatic guided vehicle to orbit travels the predetermined travel route by selecting one of the plurality of branch routes, the respective AGV A power consumption amount calculating means for calculating a power consumption amount of a battery when each of the automatic guided vehicles travels along the predetermined travel route; and one of the automatic guided vehicles is located before the branch route. At the time of arrival at the bifurcation point, the power consumption calculated by the power consumption calculation means for the automatic guided vehicle arriving at the branch point is higher or lower than the power consumption of all automatic guided vehicles. It is determined that the power consumption amount of the automatic guided vehicle arriving at the branch point by the first comparison means for comparing and determining whether or not there is higher than the power consumption amount of all the automatic guided vehicles. If it is determined that it is lower in the power consumption of all automatic guided vehicles, the branching route with a longer travel length is set. First weighting order setting means for setting the weighting order so that the priority order of the route becomes higher, and the predicted work time predicted to be necessary from the start of the work to the end of the work in the work area of each branch path. seed Predicted work time storage means stored in advance according to the above, an actual work time measurement means for measuring an elapsed time from the time when the work area was stopped as an actual work time, and a predicted work stored by the predicted work time storage means Based on the time and the actual work time measured by the actual work time measuring means, the remaining work time calculating means for calculating the remaining work time until the work is completed in each work area, and the automatic guided vehicle is at the branch point The second comparison means for comparing the remaining work times of the respective work areas calculated by the remaining work time calculation means and determining the work end rank on each branch path, and the second comparison means. Second weighting rank setting means for setting a weighting rank so as to increase the priority of the branch path having a short remaining work time on the basis of the work end rank between the respective branch paths, It is an operation control means that selects the branch route that the automatic guided vehicle that has arrived at the branch point should travel and instructs the automatic guided vehicle, and when one of the automatic guided vehicles arrives at the branch point, A total weighting rank is set by integrating the weighting rank set by the first weighting rank setting means and the weighting rank set by the second weighting rank setting means, and the total weighting rank is set. And an operation control means for selecting a branch route on which the automatic guided vehicle that has arrived at the branch point should travel.

更に、本願の請求項に係る発明は、請求項1に係る発明において、上記第1比較手段は、全無人搬送車の消費電力量についての降順を求め、上記分岐地点に到着した無人搬送車についての順位が中央より上位にある場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で上位にあると判断し、また、一方、上記分岐地点に到着した無人搬送車についての順位が中央より下位にある場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で下位にあると判断することを特徴としたものである。
Further, the invention according to claim 2 of the present application is the invention according to claim 1, said first comparing means determines the descending of the power consumption of all the AGV, the AGV arriving at the branch point If the rank is higher than the center, it is determined that the power consumption of the automatic guided vehicle arriving at the branch point is higher than the power consumption of all the automatic guided vehicles. If the rank of the automated guided vehicle that arrives at the branch point is lower than the center, the power consumption of the automated guided vehicle that arrives at the branch point is lower than the power consumption of all automated guided vehicles. It is characterized by judging.

また、更に、本願の請求項に係る発明は、請求項1に係る発明において、上記第1比較手段は、全無人搬送車の消費電力量の平均値を求め、上記分岐地点に到着した無人搬送車の消費電力量が該平均値以上である場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で上位にあると判断し、また、一方、上記分岐地点に到着した無人搬送車の消費電力量が該平均値未満である場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で下位にあると判断することを特徴としたものである。
Also, unmanned further, according to the invention of claim 3 of the present application is the invention according to claim 1, said first comparing means for obtaining an average value of the power consumption amounts of all the AGV, we arrived at the branch point When the power consumption of the transport vehicle is equal to or higher than the average value, it is determined that the power consumption of the automatic guided vehicle that has arrived at the branch point is higher than the power consumption of all the automatic transport vehicles. On the other hand, if the power consumption of the automatic guided vehicle arriving at the branch point is less than the average value, the power consumption of the automatic guided vehicle arriving at the branch point is equal to the power consumption of all the automatic guided vehicles. It is characterized in that it is determined to be in the lower order .

また、更に、本願の請求項に係る発明は、請求項1〜に係る発明のいずれか一において、上記消費電力量算出手段は、上記無人搬送車に装備された電力量計であることを特徴としたものである。
Furthermore, in the invention according to claim 4 of the present application, in any one of the inventions according to claims 1 to 3 , the power consumption calculating means is a watt-hour meter mounted on the automatic guided vehicle. It is characterized by.

また、更に、本願の請求項5に係る発明は、請求項1〜3に係る発明のいずれか一において、上記消費電力量算出手段は、上記生産ライン内における所定の走行経路を走行するときに消費される電力量と、上記所定の走行経路を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴としたものである。
本願の請求項6に係る発明は、請求項1〜3に係る発明のいずれか一において、上記消費電力量算出手段が、上記生産ライン内における所定の走行経路の総走行長と、上記所定の走行経路を走行する場合の単位長さ当たりの消費電力量と、上記所定の走行経路を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴としたものである。
本願の請求項7に係る発明は、請求項1〜3に係る発明のいずれか一において、上記消費電力量算出手段が、所定の走行経路の一部である区間の長さと、各区間を走行する場合の単位長さ当たりの消費電力量と、上記各区間を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴としたものである。
本願の請求項8に係る発明は、請求項1〜3に係る発明のいずれか一において、上記消費電力量算出手段が、上記無人搬送車が上記生産ライン内における所定の走行経路を走行した場合の消費電力と、上記所定の走行経路での走行時間と、上記所定の走行経路を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴としたものである。
本願の請求項9に係る発明は、請求項1〜3に係る発明のいずれか一において、上記消費電力量算出手段が、上記無人搬送車のパルスモータの1パルス当たりの消費電力量と、上記パルスモータのパルスの積算値とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴としたものである。
本願の請求項10に係る発明は、請求項1〜3に係る発明のいずれか一において、上記消費電力量算出手段が、上記無人搬送車の走行時間当たりの消費電力量と、走行時間の積算値とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴としたものである。
Furthermore, the invention according to claim 5 of the present application is the invention according to any one of claims 1 to 3, wherein the power consumption calculating means travels on a predetermined travel route in the production line. The power consumption of the automatic guided vehicle is calculated by integrating the amount of power consumed and the number of times of traveling on the predetermined travel route .
The invention according to claim 6 of the present application is the invention according to any one of claims 1 to 3, wherein the power consumption calculating means includes a total travel length of a predetermined travel route in the production line, and the predetermined The power consumption of the automatic guided vehicle is calculated by integrating the power consumption per unit length when traveling on the travel route and the number of times of traveling on the predetermined travel route. It is.
The invention according to claim 7 of the present application is the invention according to any one of claims 1 to 3, wherein the power consumption calculating means travels in the length of a section that is a part of a predetermined travel route and in each section. In this case, the power consumption amount of the automatic guided vehicle is calculated by integrating the power consumption amount per unit length and the number of times of traveling in each section.
The invention according to claim 8 of the present application is the invention according to any one of claims 1 to 3, wherein the power consumption calculating means causes the automatic guided vehicle to travel along a predetermined travel route in the production line. consumption and power, a travel time in the predetermined travel path, by multiplying the number of times the vehicle travels the predetermined travel path, which was characterized by calculating the power consumption of the AGV is there.
The invention according to claim 9 of the present application is the invention according to any one of claims 1 to 3, wherein the power consumption calculation means includes the power consumption per pulse of the pulse motor of the automatic guided vehicle, The power consumption amount of the automatic guided vehicle is calculated by integrating the integrated pulse value of the pulse motor.
The invention according to claim 10 of the present application is the power consumption calculation unit according to any one of claims 1 to 3, wherein the power consumption calculation means calculates the power consumption per driving time of the automatic guided vehicle and the total of the driving time. The power consumption amount of the automatic guided vehicle is calculated by integrating the values.

また、更に、本願の請求項11に係る発明は、請求項1〜10に係る発明のいずれか一において、上記無人搬送車が、該無人搬送車に積載されるワークに組み付けられるワーク組付部品を収納する部品棚を備えていることを特徴としたものである。
Furthermore, the invention according to claim 11 of the present application is the work assembly part according to any one of claims 1 to 10 , wherein the automatic guided vehicle is assembled to a work loaded on the automatic guided vehicle. It is characterized by having a parts shelf for storing the.

本願の請求項1に係る発明によれば、生産ライン内における全てのAGV間で消費電力量が平均化され、各AGVに搭載されるバッテリの容量を抑制することができ、コスト削減が実現可能である。また、消費電力量が平均化されることにより、各バッテリの維持管理が容易になる。更に、消費電力量の平均化に伴い、各バッテリの充電に要する時間が平均化されるため、充電時にAGVが停止して待機する時間の長期化を回避することができる。   According to the invention according to claim 1 of the present application, the power consumption is averaged among all the AGVs in the production line, the capacity of the battery mounted on each AGV can be suppressed, and the cost can be reduced. It is. In addition, since the power consumption is averaged, the maintenance of each battery is facilitated. Further, as the power consumption is averaged, the time required for charging each battery is averaged, so that it is possible to avoid an increase in the time during which the AGV stops and waits during charging.

また、本願の請求項に係る発明によれば、各分岐経路上に設定される作業領域での作業残り時間を考慮することで、無人搬送車の消費電力量の平均化に加え、無人搬送車の待機時間の短縮化を図り、生産ラインの稼動効率を向上させることができる。
In addition, according to the invention according to claim 1 of the present application, in addition to averaging the power consumption of the automatic guided vehicle, the unmanned transport can be performed in consideration of the remaining work time in the work area set on each branch path. It is possible to shorten the waiting time of the car and improve the operation efficiency of the production line.

更に、本願の請求項に係る発明によれば、各無人搬送車の消費電力量が降順で中央より上位にあるか下位にあるかの判断結果に基づき、消費電力量の大小関係を容易に判断することができる。
Furthermore, according to the invention according to claim 2 of the present application, the magnitude relationship between the power consumption amounts can be easily determined based on the determination result whether the power consumption amount of each automatic guided vehicle is higher or lower than the center in descending order. Judgment can be made.

また、更に、本願の請求項に係る発明によれば、各無人搬送車の消費電力量が平均値以上であるか平均値未満であるかの判断結果に基づき、消費電力量の大小関係を容易に判断することができる。
Furthermore, according to the invention according to claim 3 of the present application, the magnitude relation of the power consumption is determined based on the determination result of whether the power consumption of each automatic guided vehicle is equal to or greater than the average value or less than the average value. It can be easily judged.

また、更に、本願の請求項に係る発明によれば、電力量計を用いて、無人搬送車の消費電力量を容易に求めることができる。
Furthermore, according to the invention of claim 4 of the present application, the power consumption of the automatic guided vehicle can be easily obtained using the watt-hour meter.

また、更に、本願の請求項5〜10のいずれか一に係る発明によれば、全走行距離,走行区間毎の走行距離若しくは走行時間に基づき、無人搬送車の消費電力量を容易に求めることができる。
Furthermore, according to the invention according to any one of claims 5 to 10, the power consumption amount of the automatic guided vehicle can be easily obtained based on the total travel distance, the travel distance for each travel section, or the travel time. Can do.

また、更に、本願の請求項11に係る発明によれば、作業者は、部品棚に収納されたワーク組付部品を取り出して、無人搬送車に積載されるワークに組み付けることができ、良好な作業効率を実現することができる。
Furthermore, according to the invention according to claim 11 of the present application, the operator can take out the work assembly part stored in the parts shelf and assemble it to the work loaded on the automatic guided vehicle. Work efficiency can be realized.

以下、本発明の実施形態について、添付図面を参照しながら説明する。なお、本実施形態では、無人搬送車(以下、AGVという)を用いた組立ラインシステム(以下、組立ラインという)として、複数種類のワーク(例えば車両のインストルメントパネル等)が、単一ワーク毎にAGV10に積載されて、例えば納期順など、種類毎あるいは機種毎には纏まりのない不規則な順序で搬送され、組み立てられる混流ラインを取り上げる。   Embodiments of the present invention will be described below with reference to the accompanying drawings. In this embodiment, as an assembly line system (hereinafter referred to as an assembly line) using an automatic guided vehicle (hereinafter referred to as AGV), a plurality of types of workpieces (for example, an instrument panel of a vehicle) are provided for each single workpiece. A mixed flow line that is loaded on the AGV 10 and transported and assembled in an irregular order that is not grouped by type or model, such as in order of delivery date, is taken up.

図1は、本発明の実施形態に係るAGVを用いた組立ラインのレイアウトを示す図である。組立ライン1は、基本的に、移載ステーション20,第1〜3の部品ピッキングステーション30,40,50,部品組立ステーション60,自動充電ステーション70から構成されている。この組立ライン1では、AGV10を誘導するための磁気誘導路9が、AGV10が矢印Dで示す方向に各ステーションを順次に通過するための走行経路を規定するように床面に設けられている。   FIG. 1 is a diagram showing a layout of an assembly line using an AGV according to an embodiment of the present invention. The assembly line 1 basically includes a transfer station 20, first to third component picking stations 30, 40, 50, a component assembly station 60, and an automatic charging station 70. In this assembly line 1, a magnetic guide path 9 for guiding the AGV 10 is provided on the floor surface so as to define a travel path for the AGV 10 to sequentially pass through each station in the direction indicated by the arrow D.

移載ステーション20では、AGV10の発進に先立ち、組立ライン1で扱われるワークを固定するための治具120(図3A参照)がAGV10上に自動的に積載される一方、組立ライン1におけるAGV10の1周回後に、完成したワークが固定された治具120がAGV10から自動的に取り出される。かかる積載及び取出し機構としては、コンベヤ21A,21Bと、昇降リフト22A,22Bとが設けられている。コンベヤ21A,21Bは、磁気誘導路9上で一旦停止したAGV10と治具120の受け渡しを行い、AGV10の走行方向に対して垂直な方向に治具120を搬送する。他方、昇降リフト22A,22Bは、それぞれ、コンベヤ21A,21Bと治具120の受け渡しを行い、図1に示される組立ライン1が設置されているフロアと異なるフロアとの間で治具120を搬送する。   In the transfer station 20, prior to the start of the AGV 10, a jig 120 (see FIG. 3A) for fixing a workpiece handled in the assembly line 1 is automatically loaded on the AGV 10, while the AGV 10 in the assembly line 1 is loaded. After one round, the jig 120 to which the completed workpiece is fixed is automatically taken out from the AGV 10. As such a loading and unloading mechanism, conveyors 21A and 21B and lifting lifts 22A and 22B are provided. The conveyors 21 </ b> A and 21 </ b> B deliver the AGV 10 once stopped on the magnetic guide path 9 and the jig 120, and convey the jig 120 in a direction perpendicular to the traveling direction of the AGV 10. On the other hand, the lifts 22A and 22B transfer the conveyors 21A and 21B and the jig 120, respectively, and convey the jig 120 between the floor where the assembly line 1 shown in FIG. 1 is installed and a different floor. To do.

なお、特に図示しないが、この実施形態では、組立ライン1が設置されているフロアと異なるフロア(例えば階下のフロア又は階上のフロア)に車両のメインボディ用の組立ライン(不図示)が設置されており、昇降リフト22A,22Bは、メインボディ用の組立ラインとワーク用の組立ライン1との間で、非積載状態にある治具120及び完成したワークが固定された治具120を搬送する。   Although not particularly illustrated, in this embodiment, an assembly line (not shown) for the main body of the vehicle is installed on a floor different from the floor on which the assembly line 1 is installed (for example, a lower floor or an upper floor). The lifting lifts 22A and 22B convey the jig 120 in a non-stacked state and the jig 120 to which the completed workpiece is fixed between the assembly line for the main body and the assembly line 1 for the workpiece. To do.

第1〜3の部品ピッキングステーション30,40及び50では、それぞれ、AGV10を誘導する磁気誘導路9に沿って、ワーク用の各種組付部品が格納された棚31,41,51が設置されている。各ステーション30,40及び50における作業者39,49,59は、AGV10の通過に際して、棚31,41,51から所定の組付部品を取り出し、AGV10側に設けられた部品棚102f,102r(図2参照)に供給する。本実施形態では、ワーク用の組付部品として、第1の部品ピッキングステーション30の棚31に、ヒータ部品,クーラ部品,ステアリングシャフト,ダクト,ABS(アンチロックブレーキシステム)部品,小物類等が格納され、また、第2の部品ピッキングステーション40の棚41には、フード部品,メータ部品,オーディオ機器部品,センターパネル,ヒーコン部品,コントロールスイッチ部品等が格納され、更に、第3のピッキングステーション50の棚51には、ハーネス部品等が格納されている。また、第3のピッキングステーション50には、ワーク(例えばインストルメントパネル本体)52が準備され、このステーション50における作業者59は、AGV10の通過に際して、棚51から取り出したハーネス部品を部品棚102f,102rに供給するとともに、AGV10上に積載された治具120に対してワーク52を固定する。
なお、これらの組付部品は一例にすぎず、異なる車種のインストルメントパネルを組み立てる場合若しくはインストルメントパネル以外を組立対象とする場合には、他の組付部品が各部品ピッキングステーション30,40,50の棚31,41,51に格納される。
In the first to third component picking stations 30, 40, and 50, shelves 31, 41, and 51 in which various assembly components for work are stored are installed along the magnetic guide path 9 that guides the AGV 10, respectively. Yes. Workers 39, 49, and 59 at the stations 30, 40, and 50 take out predetermined assembly parts from the shelves 31, 41, and 51 when passing through the AGV 10, and the parts shelves 102f and 102r provided on the AGV 10 side (see FIG. 2). In the present embodiment, heater parts, cooler parts, steering shafts, ducts, ABS (anti-lock brake system) parts, accessories, and the like are stored in the shelf 31 of the first part picking station 30 as assembly parts for the workpiece. The shelf 41 of the second part picking station 40 stores hood parts, meter parts, audio equipment parts, center panels, hecon parts, control switch parts, and the like. The shelf 51 stores harness parts and the like. In addition, a work (for example, an instrument panel main body) 52 is prepared in the third picking station 50, and an operator 59 in this station 50 removes the harness component taken out from the shelf 51 when passing through the AGV 10 into the component shelf 102f, While supplying to 102r, the workpiece | work 52 is fixed with respect to the jig | tool 120 loaded on AGV10.
In addition, these assembly parts are only examples, and when assembling an instrument panel of a different vehicle type or when assembling objects other than the instrument panel, the other assembly parts are the parts picking stations 30, 40, It is stored in 50 shelves 31, 41, 51.

また、各部品ピッキングステーション30,40,50では、ステーション入口近傍に、ID読取りユニット32,42,52が設置されている。これらID読取りユニット32,42,52は、各AGV10に搭載された情報書込み可能なID記憶部107(図2参照)に対応して設けられたもので、ID記憶部107に書き込まれた情報を読み取ることができる。これに対応して、この組立ライン1では、ID記憶部107に対して情報を書き込むためのID書込みユニット2が、部品ピッキングステーション30より上流側(ここでは移載ステーション20の下流側近傍)に設置されている。ID書込みユニット2は、AGV10に搭載されたID記憶部107に、所定の車種に対応するワークを組み立てるために必要な組付部品等の生産情報を書き込み、他方、ID読取りユニット32,42,52は、AGV10の通過に際して、ID記憶部107に書き込まれた生産情報を読み取る。各部品ピッキングステーション30,40,50では、このようにID読取りユニット32,42,52により読み取られた生産情報に基づき、AGV10側の部品棚102f,102rに供給されるべき組付部品が判断される。本実施形態では、各部品ピッキングステーション30,40,50の各棚31,41,51にランプ(不図示)が取り付けられ、AGV10側の部品棚102f,102rに供給されるべき組付部品が判断されるに伴い、該組付部品が格納された棚31,41,51のランプが点灯されるようになっており、これにより、作業者39,49,59が必要な組付部品を迅速に把握し効率良く棚31,41,51から取り出すことができる。   In each component picking station 30, 40, 50, an ID reading unit 32, 42, 52 is installed in the vicinity of the station entrance. These ID reading units 32, 42, 52 are provided corresponding to the ID writable ID storage unit 107 (see FIG. 2) mounted in each AGV 10, and the information written in the ID storage unit 107 is stored in the ID reading unit 32, 42, 52. Can be read. Correspondingly, in this assembly line 1, the ID writing unit 2 for writing information to the ID storage unit 107 is upstream of the component picking station 30 (here, in the vicinity of the downstream side of the transfer station 20). is set up. The ID writing unit 2 writes production information such as assembly parts necessary for assembling a work corresponding to a predetermined vehicle type in the ID storage unit 107 mounted on the AGV 10, while the ID reading units 32, 42, 52 Reads the production information written in the ID storage unit 107 when the AGV 10 passes. In each of the component picking stations 30, 40, 50, the assembly components to be supplied to the component shelves 102f, 102r on the AGV 10 side are determined based on the production information read by the ID reading units 32, 42, 52 as described above. The In the present embodiment, a lamp (not shown) is attached to each shelf 31, 41, 51 of each component picking station 30, 40, 50, and an assembly component to be supplied to the component shelves 102f, 102r on the AGV 10 side is determined. Accordingly, the lamps of the shelves 31, 41, 51 in which the assembled parts are stored are turned on, so that the workers 39, 49, 59 can quickly find the necessary assembled parts. It can be grasped and taken out from the shelves 31, 41, 51 efficiently.

次に、部品組立ステーション60では、作業者により、部品棚102f,102rに格納された組付部品が順次に取り出されワークに組み付けられて、ワークが完成させられる。この部品組立ステーション60においては、混流ラインをなす組立ライン1内における複数種類のワークに対する作業の効率化を図り、磁気誘導路9が分岐され、互いに並列した複数(ここでは4本)の分岐経路62A,62B,62C,62Dがそれぞれ互いに異なる走行長をなすように設定されている。分岐経路62A,62B,62C,62Dを通過した場合における部品組立ステーション60での走行長L,L,L,Lの間には、
<L<L<L
という大小関係がある。
Next, at the parts assembly station 60, the assembly parts stored in the parts shelves 102f and 102r are sequentially taken out and assembled to the work by the worker, thereby completing the work. In this component assembly station 60, work efficiency for a plurality of types of workpieces in the assembly line 1 forming a mixed flow line is improved, and the magnetic guide path 9 is branched, and a plurality (four in this case) of branch paths parallel to each other. 62A, 62B, 62C, and 62D are set to have different running lengths. Between the travel lengths L A , L B , L C and L D at the parts assembly station 60 when passing through the branch paths 62A, 62B, 62C and 62D,
L A <L B <L C <L D
There is a big and small relationship.

また、分岐経路62A,62B,62C,62D上にはそれぞれ作業位置が設定され、各位置には作業者69A,69B,69C,69Dが配置される。分岐経路62A,62B,62C,62Dに進入してきたAGV10が作業位置に停止させられると、各作業者69A,69B,69C,69Dは、AGV10の部品棚102f,102r(図2参照)から組付部品を順次に取り出し、AGV10に予め固定されたインパネ本体52に対して組み付ける。ここでは、単一のワークに対する組付部品の組付け作業が、複数の作業者に分担されずに、1人の作業者により行われる。   Further, work positions are set on the branch paths 62A, 62B, 62C, and 62D, and workers 69A, 69B, 69C, and 69D are arranged at the respective positions. When the AGV 10 that has entered the branch paths 62A, 62B, 62C, and 62D is stopped at the work position, the workers 69A, 69B, 69C, and 69D are assembled from the parts shelves 102f and 102r (see FIG. 2) of the AGV 10. The components are sequentially taken out and assembled to the instrument panel main body 52 fixed in advance to the AGV 10. Here, the assembly work of the assembly parts with respect to a single workpiece is performed by one worker without being shared by a plurality of workers.

更に、自動充電ステーション70では、前述した移載ステーション20,部品ピッキングステーション30,40,50,部品組立ステーション60を通過してきたAGV10に搭載されるバッテリ110(図3A参照)が、磁気誘導路9に沿って設置された充電装置により充電される。充電装置は、AGV10に搭載されたバッテリ110へ電力を供給する充電器71と、該充電器71からバッテリ110への電力供給を制御する充電制御盤72とから構成されている。この組立ライン1では、充電装置がAGV10用の1本の磁気誘導路9に沿って2機設置されるが、これに限定されることなく、1機だけ設けられても、若しくは、3機以上設けられてもよい。あるいは、磁気誘導路9が並列式に設けられ、互いに並列する誘導路毎に1機の充電装置が設置されてもよい。   Further, in the automatic charging station 70, the battery 110 (see FIG. 3A) mounted on the AGV 10 that has passed through the transfer station 20, the component picking stations 30, 40, 50 and the component assembly station 60 described above is connected to the magnetic induction path 9. It is charged by the charging device installed along. The charging device includes a charger 71 that supplies power to the battery 110 mounted on the AGV 10, and a charge control panel 72 that controls power supply from the charger 71 to the battery 110. In this assembly line 1, two charging devices are installed along one magnetic induction path 9 for AGV 10. However, the present invention is not limited to this, and only one or three or more charging devices are provided. It may be provided. Alternatively, the magnetic guiding path 9 may be provided in parallel, and one charging device may be installed for each of the guiding paths that are parallel to each other.

また、この組立ライン1においては、AGV10の進行方向における各ステーションの上流側及び下流側に、それぞれ、各ステーションにおける開始位置及び終了位置を指示する番地プレート8u及び8dが設けられている。AGV10に搭載される構成として図2及び3を参照しながら後述するが、番地プレート8u及び8dに対応して、AGV10には、番地プレート8u及び8dを検出する番地プレート検出センサ106が設けられている。AGV10の走行に際し、番地プレート検出センサ106により各番地プレート8u及び8dが検出されることで、組立ライン1内でのAGV10の位置が特定される。   In the assembly line 1, address plates 8u and 8d are provided on the upstream side and the downstream side of each station in the traveling direction of the AGV 10 to indicate the start position and end position in each station, respectively. As will be described later with reference to FIGS. 2 and 3 as the configuration mounted on the AGV 10, the address plate detection sensor 106 for detecting the address plates 8u and 8d is provided in the AGV 10 corresponding to the address plates 8u and 8d. Yes. When the AGV 10 travels, the address plate detection sensor 106 detects the address plates 8u and 8d, whereby the position of the AGV 10 in the assembly line 1 is specified.

なお、図1に示す組立ライン1では、番地プレート8u及び8dが磁気誘導路9の近傍に設けられるが、各AGV10の番地プレート検出センサ106が検出することが可能であれば、磁気誘導路9上など、いかなる位置に設けられてもよい。また、組立ライン1内での位置を指示する番地プレートとしては、各ステーションにおける開始位置及び終了位置に設けられる番地プレート8u,8d以外に、例えば部品組立ステーションにおけるAGV10の作業位置をあらわす番地プレート65a,65b,65c,65dおよび各分岐経路の分岐位置における分岐指示用の番地プレート62a,62b,62c,62d等の、各ステーションにおける開始位置と終了位置との間の所定位置を指示する番地プレート、若しくは、異なるステーション間の所定位置を指示する番地プレートが設けられてもよい。   In the assembly line 1 shown in FIG. 1, the address plates 8 u and 8 d are provided in the vicinity of the magnetic guiding path 9. However, if the address plate detection sensor 106 of each AGV 10 can detect the magnetic guiding path 9. It may be provided at any position such as above. In addition to the address plates 8u and 8d provided at the start and end positions in each station, for example, an address plate 65a representing the working position of the AGV 10 in the component assembly station is used as the address plate for indicating the position in the assembly line 1. , 65b, 65c, 65d and branching instruction address plates 62a, 62b, 62c, 62d, etc. at the branching positions of the branching paths, address plates indicating a predetermined position between the start position and the end position at each station, Alternatively, an address plate that indicates a predetermined position between different stations may be provided.

更に、この組立ライン1においては、情報処理端末5,6(図2参照)と共に、ライン全体を管理・制御するための制御システムを構成するAGV中央制御盤3が設置されている。この制御システムは、基本的に、AGV10を含む各構成との通信により取得された情報に基づき各構成の状況を把握し、組立ライン1が効率的に機能するように制御する。図2は、AGV中央制御盤3及び情報端末5,6からなる制御システム及びそれにより制御されるAGV10を概略的に示す図である。AGV中央制御盤3は、各AGV10とのデータ送受信用に、その本体に取り付けられ、制御盤3の近傍で走行するAGV10との通信を行うためのアンテナ3aを有し、また、制御盤3から遠方で走行するAGV10との通信を行うための無線機4と接続されている。   Further, in this assembly line 1, together with the information processing terminals 5 and 6 (see FIG. 2), an AGV central control panel 3 constituting a control system for managing and controlling the entire line is installed. This control system basically grasps the status of each component based on information acquired by communication with each component including the AGV 10 and controls the assembly line 1 to function efficiently. FIG. 2 is a diagram schematically showing a control system including the AGV central control panel 3 and the information terminals 5 and 6, and the AGV 10 controlled thereby. The AGV central control panel 3 is attached to the main body for data transmission / reception with each AGV 10, and has an antenna 3 a for communicating with the AGV 10 traveling in the vicinity of the control panel 3. It is connected to a wireless device 4 for communicating with the AGV 10 that travels far away.

図2に示すように、無線機4は、3本のアンテナ4A,4B及び4Cを有しており、各アンテナ4A,4B及び4Cには、それぞれ、組立ライン1に採用される複数のAGV10が振り分けられてなる3グループのいずれかが割り当てられ、アンテナ4A,4B及び4Cは、各グループに属するAGV10との通信に用いられる。この組立ライン1では、所定の番号が付与された計14台のAGV10が採用され、例えば、アンテナ4Aには、AGV1〜5号機が、また、アンテナ4Bには、AGV6〜10号機が、更に、アンテナ4Cには、AGV11〜14号機が割り当てられ、互いに対応するアンテナ4A〜4CとACV1〜14号機との間で通信が行われる。   As shown in FIG. 2, the wireless device 4 has three antennas 4A, 4B, and 4C, and each of the antennas 4A, 4B, and 4C has a plurality of AGVs 10 used in the assembly line 1, respectively. Any one of the three groups thus allocated is assigned, and the antennas 4A, 4B, and 4C are used for communication with the AGV 10 belonging to each group. In this assembly line 1, a total of 14 AGVs 10 assigned predetermined numbers are employed. For example, the antenna 4A includes AGVs 1 to 5, the antenna 4B includes AGVs 6 to 10, and AGVs 11-14 are assigned to the antenna 4C, and communication is performed between the corresponding antennas 4A-4C and ACVs 1-14.

AGV中央制御盤3は、AGV10やID読取りユニット32,42,52等の各構成とのアンテナ3a又は無線機4のアンテナ4A〜4Cを介した通信により、各AGV10の位置及び動作状況や各部品ピッキングステーション30,40,50における部品ストック状況等の情報を取得し、その後、組立ライン1を効率的に機能させるために、必要に応じて、所定の制御プログラムに基づき各構成に対して自動的に動作指示を与える。かかるAGV中央制御盤3の動作指示の1つとして、各AGV10が部品組立ステーション60へ進入するに際し、AGV10が選択すべき分岐経路を指示することも含まれる。このようなAGV10とAGV中央制御盤3との間で行われる分岐経路を選択するため制御(以下、分岐経路選択制御という)の詳細については後述する。   The AGV central control panel 3 communicates with the components such as the AGV 10 and the ID reading units 32, 42, and 52 via the antenna 3a or the antennas 4A to 4C of the wireless device 4 to detect the position and operating status of each AGV 10 and each component. In order to obtain information such as parts stock status at the picking stations 30, 40, 50, and then to make the assembly line 1 function efficiently, it is automatically performed for each component based on a predetermined control program as necessary. Is given an operation instruction. As one of the operation instructions of the AGV central control panel 3, when each AGV 10 enters the parts assembly station 60, the AGV 10 indicates a branch path to be selected. Details of control for selecting a branch path performed between the AGV 10 and the AGV central control panel 3 (hereinafter referred to as branch path selection control) will be described later.

なお、動作指示を各構成に対して与える方法としては、AGV中央制御盤3が所定の制御プログラムに基づき動作指示を与える方法以外に、AGV中央制御盤3と各構成との通信により取得された各種情報が情報処理端末5,6を介して組立ライン1の管理者に提示され、これに応じて、管理者が、情報処理端末5,6を介して組立ライン1内の各構成に動作指示を与えることもできる。   In addition to the method in which the AGV central control panel 3 gives an operation instruction based on a predetermined control program, the operation instruction is obtained by communication between the AGV central control panel 3 and each component. Various types of information are presented to the administrator of the assembly line 1 via the information processing terminals 5 and 6, and in response to this, the administrator instructs the components in the assembly line 1 to operate via the information processing terminals 5 and 6 Can also be given.

続いて、図2とともに図3A,3B,3Cを参照しながら、AGV10の詳細な構成について説明する。図3A〜3Cは、それぞれ、AGV10の側面図,平面図及び正面図である。図3A及び3Bの左側が、AGV10の前側に対応し、また、図3Cは、AGV10の前面を示している。AGV10は、進行方向に沿って前後方向に延びる本体101を備え、該本体101上には、第1〜3の部品ピッキングステーション30,40,50で供給される各種組付部品を収納するための部品棚102f,102rが、それぞれ前側及び後ろ側に設けられている。また、前側の部品棚102f上には、例えば車種情報,全作業時間や各作業ステーション毎の作業時間等の経過時間,作業内容を含む各種情報を表示する情報表示用モニタ103が設置され、他方、後ろ側の部品棚102r上には、AGV中央制御盤3との通信を行うためのアンテナ104が取り付けられている。   Next, the detailed configuration of the AGV 10 will be described with reference to FIGS. 3A, 3B, and 3C together with FIG. 3A to 3C are a side view, a plan view, and a front view of the AGV 10, respectively. The left side of FIGS. 3A and 3B corresponds to the front side of the AGV 10, and FIG. 3C shows the front surface of the AGV 10. The AGV 10 includes a main body 101 that extends in the front-rear direction along the traveling direction. On the main body 101, various assembly parts supplied from the first to third part picking stations 30, 40, and 50 are stored. Parts shelves 102f and 102r are provided on the front side and the rear side, respectively. On the front part shelf 102f, for example, an information display monitor 103 for displaying various types of information including vehicle type information, total work time, elapsed time such as work time for each work station, and work contents is installed. On the rear component shelf 102r, an antenna 104 for communicating with the AGV central control panel 3 is attached.

本体101上の前側及び後ろ側の部品棚102f,102rの間には、組立対象であるインパネを固定する治具120が積載されるスペースが確保される。図3Aでは、このスペースに対して積載された治具120を仮想線で示す。また、本体101上のスペースには、積載された治具120の滑り落ちを防止するために、アンチバックユニット121が取り付けられている。   Between the front and rear component shelves 102f and 102r on the main body 101, a space for loading the jig 120 for fixing the instrument panel to be assembled is secured. In FIG. 3A, the jig | tool 120 loaded with respect to this space is shown with a virtual line. An anti-back unit 121 is attached to the space on the main body 101 in order to prevent the loaded jig 120 from sliding down.

また、AGV10の駆動手段としては、床面と対向する本体101の裏面側に、1つの操舵用前輪109f及び一対の駆動用後輪109rが設けられるとともに、本体101の内部には、駆動用後輪109rを駆動させるモータ(不図示)と、モータの駆動電力を供給するバッテリ110とが搭載されている。なお、バッテリ110は、電力を消費するモータ以外の構成にも電力供給を行うものである。   Further, as a driving means of the AGV 10, one steering front wheel 109f and a pair of driving rear wheels 109r are provided on the back surface side of the main body 101 facing the floor surface. A motor (not shown) for driving the wheel 109r and a battery 110 for supplying motor driving power are mounted. The battery 110 also supplies power to components other than the motor that consumes power.

更に、本体101の前側面には、AGV10の前方に存在する障害物を検出するための障害物センサ108が設けられるとともに、障害物センサ108の下側に配置され、AGV10の最前方で本体101の幅方向に延びるバンパー114が取り付けられている。なお、万一このバンパー114が障害物に接触した場合には、AGV10を即時停止させるような走行速度制御が行われてもよい。   Further, an obstacle sensor 108 for detecting an obstacle existing in front of the AGV 10 is provided on the front side surface of the main body 101, and is disposed below the obstacle sensor 108. A bumper 114 extending in the width direction is attached. In the unlikely event that the bumper 114 comes into contact with an obstacle, traveling speed control may be performed so that the AGV 10 is immediately stopped.

また、更に、本体101の側面には、図2に示されるように、誘導路9を構成する磁気テープを検出するための磁気誘導センサ105が設けられている。また、本体101の側面には、組立ライン1内での各AGV10の位置を把握するために、各作業ステーションの開始位置及び終了位置に設けられた番地プレート8u及び8dを検出するための番地プレート検出センサ106と、組立対象となる車種や組付部品等の生産情報が書込み/書換え可能であるID記憶部107と、が設けられている。本体101の側面には、図3Aに示されるように、例えば移載ステーション20,部品組立ステーション60及び自動充電ステーション70にてAGV10を停止させる際に定位置停止を可能とすべく位置検出を行う定位置停止センサ111と、移載ステーション20における積載及び取出し機構(コンベヤ21A,21B)との通信に利用される光伝送器112と、自動充電ステーション70での充電に際して充電器71側の電力供給用電極と接触させられる自動充電用電極113と、が設けられている。   Furthermore, as shown in FIG. 2, a magnetic induction sensor 105 for detecting a magnetic tape constituting the guide path 9 is provided on the side surface of the main body 101. Further, on the side surface of the main body 101, in order to grasp the position of each AGV 10 in the assembly line 1, the address plate for detecting the address plates 8u and 8d provided at the start position and the end position of each work station. A detection sensor 106 and an ID storage unit 107 in which production information such as a vehicle type and an assembly part to be assembled can be written / rewritten are provided. As shown in FIG. 3A, for example, when the AGV 10 is stopped at the transfer station 20, the parts assembly station 60, and the automatic charging station 70, the position of the side surface of the main body 101 is detected. Optical transmitter 112 used for communication between the fixed position stop sensor 111 and the loading and unloading mechanisms (conveyors 21A and 21B) in the transfer station 20, and power supply on the charger 71 side when charging at the automatic charging station 70 And an automatic charging electrode 113 that is brought into contact with the electrode for use.

また、AGV10の稼動状態をあらわす手段として、図3Aに示されるように、その点灯様式によってAGV10の稼動状態をあらわす1つの稼動表示灯115が、周囲の作業者にとって容易に目視可能であるように、AGV10の前側に配設されている。更に、この稼動表示灯115の左右には、その点灯様式若しくは点灯の組合せによってAGV10の進行方向をあらわす一対の方向指示灯116が配設されている。   Further, as a means for representing the operation state of the AGV 10, as shown in FIG. 3A, one operation indicator lamp 115 representing the operation state of the AGV 10 by its lighting mode is easily visible to surrounding workers. , Disposed on the front side of the AGV 10. Further, a pair of direction indicator lamps 116 are provided on the left and right sides of the operation indicator lamp 115 to indicate the traveling direction of the AGV 10 depending on the lighting style or combination of lighting.

AGV10では、更に、走行起動ボタン118a,非常停止ボタン118b及び走行停止ボタン118cを備えた操作ユニット117が、各作業ステーションにおける作業者にとって容易に操作可能であるように、作業者側に面して配設されている。走行起動ボタン118aは、AGV10を、それが起動しているものの停止している状態から発進させ走行状態とするためのボタンである。また、非常停止ボタン118bは、AGV10を、それが走行している状態から即時に停止させるためのボタンである。更に、走行停止ボタン118cは、AGV10を、それが走行している状態から走行停止させ、運転可能状態で停止させるためのボタンである。また、特に図示しないが、このAGV10では、該AGV10を、それが起動していない状態、すなわち各種センサ類や回路構成も機能していない状態から起動させるためのAGV運転スイッチが設けられている。このスイッチがオンされることで、AGV10は駆動前のスタンバイ状態となる。AGV10では、非常時における安全性を確保すべく、前述した操作ユニット117に加えて、例えば組立ライン1内で支障が生じ、AGV10を停止させる必要がある場合に、実際の作業者のみならずAGV10の周囲にいる者がAGV10を容易に停止させることができるように、非常停止ボタン118bがAGV10の前側面及び後ろ側面に配設されている。   Further, in the AGV 10, an operation unit 117 having a travel start button 118a, an emergency stop button 118b, and a travel stop button 118c faces the worker side so that it can be easily operated by the worker at each work station. It is arranged. The travel start button 118a is a button for causing the AGV 10 to start from a state where it has been started but stopped to enter a travel state. The emergency stop button 118b is a button for immediately stopping the AGV 10 from the state in which it is traveling. Further, the travel stop button 118c is a button for stopping the AGV 10 from a state in which the AGV 10 is traveling and stopping the AGV 10 in an operable state. Further, although not particularly illustrated, the AGV 10 is provided with an AGV operation switch for starting the AGV 10 from a state where the AGV 10 is not started, that is, a state where various sensors and circuit configurations are not functioning. When this switch is turned on, the AGV 10 enters a standby state before driving. In the AGV 10, in order to ensure safety in an emergency, in addition to the operation unit 117 described above, for example, when trouble occurs in the assembly line 1 and it is necessary to stop the AGV 10, not only the actual worker but also the AGV 10 An emergency stop button 118b is provided on the front side surface and the rear side surface of the AGV 10 so that a person around the vehicle can easily stop the AGV 10.

また、本体101の内部には、AGV10に装備される各構成を制御する制御ユニット119が搭載されている。この制御ユニット119は、AGV10に装備される各構成を制御するもので、例えば、番地プレート検出センサ106により検出される番地プレート8u,8dから組立ライン1内での位置情報を取得し、その位置情報に対応した信号をAGV中央制御盤3や無線機4へアンテナ104から送信させたり、ID記憶部107に書き込まれた生産情報を取得し、その生産情報に対応した信号を情報表示用モニタ103に出力させたりする。また、例えば、制御ユニット119は、起動ボタン118aがオンされた場合に、AGV10を起動させ、他方、停止ボタン118bがオンされた場合に、AGV10を即時停止させる。更に、制御ユニット119は、AGV10を誘導路9に沿って走行させるべく、磁気誘導センサ105による誘導路9の検出状態が維持されるように、操舵用前輪109fをステアリング制御する。   In addition, a control unit 119 for controlling each component installed in the AGV 10 is mounted inside the main body 101. The control unit 119 controls each component equipped in the AGV 10, and acquires position information in the assembly line 1 from the address plates 8u and 8d detected by the address plate detection sensor 106, for example. A signal corresponding to the information is transmitted from the antenna 104 to the AGV central control panel 3 or the wireless device 4, production information written in the ID storage unit 107 is acquired, and the signal corresponding to the production information is displayed on the information display monitor 103. To output. For example, the control unit 119 starts the AGV 10 when the start button 118a is turned on, and immediately stops the AGV 10 when the stop button 118b is turned on. Further, the control unit 119 performs steering control on the steering front wheels 109f so that the detection state of the guide path 9 by the magnetic induction sensor 105 is maintained so that the AGV 10 travels along the guide path 9.

また、更に、制御ユニット119は、組立ライン1における各種状態に応じて、モータ(不図示)やバッテリ110等の駆動手段を制御し、AGV10の走行速度を制御する。基本的に、制御ユニット119は、AGV10が一定の走行速度で走行するように駆動手段を制御するが、例えば、障害物センサ108により障害物が検出された場合には、AGV10を減速させる若しくは停止させるように駆動手段を制御する。   Furthermore, the control unit 119 controls driving means such as a motor (not shown) and the battery 110 according to various states in the assembly line 1 to control the traveling speed of the AGV 10. Basically, the control unit 119 controls the driving means so that the AGV 10 travels at a constant traveling speed. For example, when an obstacle is detected by the obstacle sensor 108, the AGV 10 is decelerated or stopped. The drive means is controlled so that

本実施形態では、制御ユニット119が、更に、AGV10の部品組立ステーション60への進入に際し、AGV10に搭載されたバッテリ110の消費電力量の平均化及び各AGV10の部品組立ステーション60における分岐経路62A〜62Dへの進入時の待機時間の短縮化を図り、AGV中央制御盤3と通信しつつ協働し、AGV10の消費電力量や各分岐経路での残り作業時間等の条件に基づき、AGV10が走行すべき経路として、分岐経路62A,62B,62C,62Dのいずれかを選択する分岐経路選択制御を行う。   In the present embodiment, when the control unit 119 further enters the component assembly station 60 of the AGV 10, the power consumption of the battery 110 mounted on the AGV 10 is averaged and the branch paths 62A to 62A to Reduce the waiting time when entering 62D, cooperate with the AGV central control panel 3 while communicating, and the AGV 10 travels based on conditions such as the power consumption of the AGV 10 and the remaining work time in each branch path Branch route selection control for selecting one of the branch routes 62A, 62B, 62C, and 62D as a route to be performed is performed.

図4に、分岐経路選択制御が実行される部品組立ステーション60をより詳しく示す。部品組立ステーション60では、番地プレート8u及び8dで特定される開始位置及び終了位置が設定されるとともに、各分岐経路上62A〜62Dに、番地プレート65a〜65dで特定される作業位置と、該作業位置の前後において番地プレート64a〜64d及び66a〜66dでそれぞれ特定されるバッファ位置(前バッファ位置及び後バッファ位置)とが設定されている。各AGV10は、前バッファ位置,作業位置,後バッファ位置にそれぞれ設けられた番地プレート64a〜64d,65a〜65d,66a〜66dを検出することで、それ自体の所在を特定し、必要に応じて停止する。   FIG. 4 shows the parts assembly station 60 in which the branch path selection control is executed in more detail. In the component assembling station 60, the start position and end position specified by the address plates 8u and 8d are set, and the work positions specified by the address plates 65a to 65d are set on the branch paths 62A to 62D, and the work Before and after the position, buffer positions (front buffer position and rear buffer position) specified by the address plates 64a to 64d and 66a to 66d are set. Each AGV 10 identifies its own location by detecting address plates 64a to 64d, 65a to 65d, and 66a to 66d provided at the front buffer position, the working position, and the rear buffer position, respectively. Stop.

作業位置では、AGV10が停止し、作業者69A〜69Dが、AGV10に積載されたワークに対して、同じくAGV10に積載された組付部品を組み付ける作業を行い、ワークの組立が行われる。図4に示す状態では、全ての分岐経路62A〜62Dにおける作業位置に、AGV10が停止している。また、前バッファ位置では、その下流側の作業位置にて他のAGV10に対する組立作業が行われている場合に、AGV10が停止し、作業位置が空き状態になるまで待機する。図4に示す状態では、分岐経路62C上に設定された前バッファ位置に、AGV10が待機している。更に、後バッファ位置では、各分岐経路から共通した走行経路9へのAGV10の送り出しが、他の分岐経路におけるAGV10と干渉せずスムーズに行われるように、AGV10が停止して待機する。図4に示す状態では、分岐経路62B上に設定された後バッファ位置に、AGV10が待機している。
なお、AGV10は、作業位置にて他のAGV10が停止していない場合には、前バッファ位置に停止することなく、作業位置まで進められ、また、同様に、他の分岐経路におけるAGV10との干渉の惧れがない場合には、後バッファ位置に停止することなく、走行する。
At the work position, the AGV 10 is stopped, and the workers 69A to 69D perform the work of assembling the assembly parts similarly loaded on the AGV 10 to the work loaded on the AGV 10, and the work is assembled. In the state shown in FIG. 4, the AGV 10 is stopped at the work positions in all the branch paths 62A to 62D. Further, at the front buffer position, when the assembly work for another AGV 10 is being performed at the downstream work position, the AGV 10 stops and waits until the work position becomes empty. In the state shown in FIG. 4, the AGV 10 stands by at the previous buffer position set on the branch path 62C. Furthermore, at the rear buffer position, the AGV 10 stops and waits so that the AGV 10 is smoothly sent from each branch route to the common travel route 9 without interfering with the AGV 10 on the other branch routes. In the state shown in FIG. 4, the AGV 10 stands by at the rear buffer position set on the branch path 62B.
If the other AGV 10 is not stopped at the work position, the AGV 10 is advanced to the work position without stopping at the previous buffer position. Similarly, the AGV 10 interferes with the AGV 10 in other branch paths. When there is no concern, the vehicle travels without stopping at the rear buffer position.

分岐経路選択制御は、各AGV10が、部品組立ステーション60における開始位置に到達し、番地プレート8uを検出した時点から開始される。この分岐経路選択制御は、AGV中央制御盤3とAGV10との間で、以下に説明する3つの選択条件に基づき行われる。なお、分岐経路選択制御においては、それが実行される時点で、前バッファ位置にAGV10が待機していない分岐経路が選択対象として扱われるが、以下では、全ての分岐経路における前バッファ位置にAGV10が待機しておらず、全ての分岐経路62A〜62Dが選択対象として扱われる場合を例に挙げて説明する。   The branch path selection control is started when each AGV 10 reaches the start position in the component assembly station 60 and detects the address plate 8u. This branch path selection control is performed between the AGV central control panel 3 and the AGV 10 based on the following three selection conditions. In the branch path selection control, a branch path for which the AGV 10 is not waiting at the previous buffer position is treated as a selection target at the time when the branch path selection control is executed. Will be described as an example in which all the branch paths 62A to 62D are treated as selection targets.

まず、選択条件の1つとして、AGV10が各分岐経路を通過する場合に消費されるバッテリ10の電力量(各分岐経路における消費電力量)の大小関係が用いられる。前述したように、分岐経路62A,62B,62C,62Dを通過した場合における走行長(厳密には部品組立ステーション60において番地プレート8uが設定された開始位置から番地プレート8dが設定された終了位置までの走行長)L,L,L,Lの間には、
<L<L<L
という大小関係がある。AGV10に搭載されたバッテリ110の消費電力量は走行長に比例するもので、分岐経路62A,62B,62C,62Dを通過した場合に消費される電力量P,P,P,Pの間には、
<P<P<P
という大小関係がある。本実施形態では、選択条件の1つとして各分岐経路における消費電力量の大小関係が判断され、複数のAGV10間での消費電力量の平均化を図り、基本的に、分岐経路を選択する時点で消費電力量が比較的大きいAGV10に対しては、バッテリ110の電力量を確保するために、走行長の短い分岐経路が選択され、他方、消費電力量が比較的小さいAGV10に対しては、走行長の長い分岐経路が選択される。
First, as one of the selection conditions, the magnitude relationship of the amount of power of the battery 10 (the amount of power consumed in each branch path) consumed when the AGV 10 passes through each branch path is used. As described above, the travel length when passing through the branch paths 62A, 62B, 62C, 62D (strictly, from the start position where the address plate 8u is set in the parts assembly station 60 to the end position where the address plate 8d is set) The travel length of L A , L B , L C , and L D
L A <L B <L C <L D
There is a big and small relationship. The amount of power consumed by the battery 110 mounted on the AGV 10 is proportional to the travel length, and the amount of power P A , P B , P C , P D consumed when passing through the branch paths 62A, 62B, 62C, 62D. In between
P A <P B <P C <P D
There is a big and small relationship. In this embodiment, as one of the selection conditions, the magnitude relationship of the power consumption in each branch path is determined, the power consumption is averaged among a plurality of AGVs 10, and basically, the branch path is selected. For AGV10 having a relatively large amount of power consumption, a branch path having a short travel length is selected in order to secure the amount of power of battery 110, while for AGV10 having a relatively small amount of power consumption, A branch route having a long travel length is selected.

また、選択条件の1つとして、各分岐経路上に設定された作業位置における作業終了までの残り時間(以下、作業残り時間という)T,T,T,Tが概算される。この作業残り時間を概算するために、各AGV10においては、それに積載されるワークの種類毎に予測された作業時間(以下、予測作業時間という)Txが記憶される。具体的には、移載ステーション20の下流側で、AGV10に搭載されたID記憶部107にID書込みユニット2により書き込まれる生産情報に基づき、ワークの種類が判断され、その種類に応じた予測作業時間Tが制御ユニット119に記憶される。作業残り時間を概算するために、予測作業時間Tに加えて、各分岐経路上における実作業時間Tが計測される。具体的には、AGV10により分岐経路上に設定された番地プレート65a〜65dが検出され、AGV10が作業位置に停止された時点からの経過時間がタイマー(不図示)で計測される。
以上のように取得された予測作業時間T及び実作業時間Tにより、分岐経路62A,62B,62C,62D上での作業残り時間T,T,T,Tが、T−Tとして概算される。
Further, as one of the selection conditions, the remaining time (hereinafter referred to as the remaining work time) T A , T B , T C , T D at the work position set on each branch path is estimated. To estimate the work time remaining in each AGV 10, the predicted operation time for each type of workpiece to be loaded thereto (hereinafter, referred to as the predicted operation time) T x is stored. Specifically, on the downstream side of the transfer station 20, the type of the work is determined based on the production information written by the ID writing unit 2 in the ID storage unit 107 mounted on the AGV 10, and the prediction work corresponding to the type is performed. The time T x is stored in the control unit 119. To approximate the working time remaining, in addition to the predicted operation time T x, actual operation time T y on each branch path is measured. Specifically, the address plates 65a to 65d set on the branch path are detected by the AGV 10, and the elapsed time from when the AGV 10 is stopped at the work position is measured by a timer (not shown).
Based on the predicted work time T x and the actual work time T y acquired as described above, the remaining work times T A , T B , T C , and T D on the branch paths 62A, 62B, 62C, and 62D are expressed as T x. It is estimated as -T y.

更に、選択条件の1つとして、組立ライン1内で稼動する全てのAGV10の消費電力量に対する、分岐経路選択対象であるAGV10の消費電力量の大小関係(順位)が判断される。より詳しくは、分岐経路選択対象であるAGV10の消費電力量が、全体のなかで中央より上位にあるか若しくは下位にあるかが判断される。本実施形態では、全14台のADV10が稼動しており、分岐経路選択対象であるAGV10の消費電力量が、1位〜7位にある場合には、中央より上位にあり(すなわち全AGV10の中で消費電力量が多い方であり)、他方、8〜14位にある場合には、中央より下位にある(すなわち全AGV10の中で消費電力量が少ない方である)と判断される。   Furthermore, as one of the selection conditions, the magnitude relationship (order) of the power consumption of the AGV 10 that is the branch path selection target with respect to the power consumption of all the AGVs 10 operating in the assembly line 1 is determined. More specifically, it is determined whether the power consumption of the AGV 10 that is a branch path selection target is higher or lower than the center in the whole. In the present embodiment, when all 14 ADVs 10 are operating and the power consumption of the AGV 10 that is a branch path selection target is in the first to seventh ranks, it is higher than the center (that is, all the AGVs 10 On the other hand, when it is in the 8th to 14th ranks, it is determined that the power consumption is lower than the center (that is, the power consumption is smaller among all the AGVs 10).

続いて、上記選択条件に基づき分岐経路が選択される幾つかの実施例を説明する。
(実施例1)
まず、各分岐経路62A,62B,62C,62D上での作業残り時間T,T,T,Tの大小関係が、
<T<T<T
である場合、作業終了までの順位(以下、作業終了順位という)についての重み付け係数Tf[i]は、
Tf[i]=Tf[62A,62B,62C,62D]
=Tf[2,4,1,3]
と設定される。
Subsequently, several embodiments in which a branch route is selected based on the selection condition will be described.
Example 1
First, the magnitude relationship between the remaining work times T A , T B , T C , and T D on the branch paths 62A, 62B, 62C, and 62D
T C <T A <T D <T B
, The weighting coefficient Tf [i] for the rank until the end of work (hereinafter referred to as work end rank) is
Tf [i] = Tf [62A, 62B, 62C, 62D]
= Tf [2,4,1,3]
Is set.

また、分岐経路選択対象であるAGV10の消費電力量が、中央より上位にある、すなわち全AGV10の中で消費電力量が比較的多い方であると判断された場合、バッテリ110の電力量を確保するために、走行長の短い分岐経路が選択されることが望ましいため、走行長の昇順に基づき、分岐経路を選択する上での優先順位についての重み付け係数Cs[i]は、
Cs[i]=Cs[62A,62B,62C,62D]
=Cs[1,2,3,4]
と設定される。
In addition, when it is determined that the power consumption of the AGV 10 that is the branch path selection target is higher than the center, that is, the power consumption of the AGV 10 is relatively large among all the AGVs 10, the power consumption of the battery 110 is secured. Therefore, since it is desirable to select a branch route with a short travel length, the weighting coefficient Cs [i] for the priority in selecting a branch route based on the ascending order of the travel length is
Cs [i] = Cs [62A, 62B, 62C, 62D]
= Cs [1,2,3,4]
Is set.

そして、作業終了順位についての重み付け係数Tf[i]と、消費電力量に基づく分岐経路選択順位についての重み付け係数Cs[i]とが積算され、分岐経路を選択する上での総合的な優先順位についての係数Cp[i]が算出される。
Cp[i]=Cp[2×1,4×2,1×3,3×4]
=Cp[2,8,3,12]
すなわち、分岐経路62A,62B,62C,62Dを選択する優先順位は、62A→62C→62B→62Dとなる。この結果に基づき、分岐経路選択対象であるAGV10が走行すべき分岐経路として、分岐経路62Aが選択される。
Then, the weighting coefficient Tf [i] for the work end order and the weighting coefficient Cs [i] for the branch path selection order based on the power consumption are integrated, and the overall priority order for selecting the branch path. A coefficient Cp [i] for is calculated.
Cp [i] = Cp [2 × 1, 4 × 2, 1 × 3, 3 × 4]
= Cp [2,8,3,12]
That is, the priority order for selecting the branch paths 62A, 62B, 62C, and 62D is 62A → 62C 62B → 62D. Based on this result, the branch path 62A is selected as the branch path on which the AGV 10 as the branch path selection target should travel.

また、一方、分岐経路選択対象であるAGV10の消費電力量が、中央より下位にある、すなわち全AGV10の中で消費電力量が少ない方であると判断された場合、走行長の長い分岐経路が選択されることが望ましいため、走行長の降順に基づき、分岐経路選択順位についての重み付け係数Cs[i]は、
Cs[i]=Cs[62A,62B,62C,62D]
=Cs[4,3,2,1]
と設定される。
On the other hand, if it is determined that the power consumption of the AGV 10 that is the branch path selection target is lower than the center, that is, the power consumption of the entire AGV 10 is smaller, the branch path having a long travel length is determined. Since it is desirable that the weighting coefficient Cs [i] for the branch route selection order is based on the descending order of the travel length,
Cs [i] = Cs [62A, 62B, 62C, 62D]
= Cs [4, 3, 2, 1]
Is set.

そして、作業終了順位についての重み付け係数Tf[i]と、分岐経路選択順位についての重み付け係数Cs[i]とが積算され、分岐経路を選択する上での総合的な優先順位についての係数Cp[i]が算出される。
Cp[i]=Cp[2×4,4×3,1×2,3×1]
=Cp[8,12,2,3]
すなわち、分岐経路を選択する優先順位は、62C→62D→62A→62Bとなる。この結果に基づき、分岐経路選択対象であるAGV10が走行すべき分岐経路として、分岐経路62Cが選択される。
Then, the weighting coefficient Tf [i] for the work end order and the weighting coefficient Cs [i] for the branch path selection order are integrated, and the coefficient Cp [ i] is calculated.
Cp [i] = Cp [2 × 4, 4 × 3, 1 × 2, 3 × 1]
= Cp [8, 12, 2, 3]
That is, the priority order for selecting the branch route is 62C → 62D 62A → 62B. Based on this result, the branch path 62C is selected as the branch path on which the AGV 10 as the branch path selection target should travel.

(実施例2)
上記実施例1では、選択条件の1つとして、全てのAGV10のなかで分岐経路選択対象となるAGV10の消費電力量が中央より上位であるか下位にあるかが判断されたが、その代わりに、全てのAGV10の消費電力量の平均値が求められ、各AGV10の消費電力量が、その平均値以上であるか平均値未満であるかが判断されてもよい。それ以外の選択条件(AGV10が各分岐経路を通過する場合におけるバッテリ10の消費される電力量と、各分岐経路上に設定された作業位置における作業残り時間)は、前述した実施形態における場合と同様である。
(Example 2)
In the first embodiment, as one of the selection conditions, it is determined whether the power consumption of the AGV 10 that is a branch path selection target is higher or lower than the center among all the AGVs 10. The average value of the power consumption of all the AGVs 10 may be obtained, and it may be determined whether the power consumption of each AGV 10 is equal to or greater than the average value. Other selection conditions (the amount of power consumed by the battery 10 when the AGV 10 passes through each branch path and the remaining work time at the work position set on each branch path) are the same as in the above-described embodiment. It is the same.

まず、各分岐経路上での作業残り時間T,T,T,Tの大小関係が、
<T<T<T
である場合、作業終了順位についての重み付け係数Tf[i]は、
Tf[i]=Tf[62A,62B,62C,62D]
=Tf[2,4,1,3]
となる。
First, the magnitude relationship between the remaining work times T A , T B , T C , and T D on each branch path is
T C <T A <T D <T B
, The weighting coefficient Tf [i] for the work end rank is
Tf [i] = Tf [62A, 62B, 62C, 62D]
= Tf [2,4,1,3]
It becomes.

続いて、分岐経路選択対象であるAGV10の消費電力量が、全AGV10の消費電力量の平均値以上であると判断された場合、できるだけ消費電力量の少ないように、走行長の短い分岐経路が選択されることが望ましいため、走行長の昇順に基づき、分岐経路選択順位についての重み付け係数Cs[i]は、
Cs[i]=Cs[62A,62B,62C,62D]
=Cs[1,2,3,4]
となる。
Subsequently, when it is determined that the power consumption of the AGV 10 that is the branch path selection target is equal to or greater than the average value of the power consumption of all the AGVs 10, a branch path with a short travel length is set so that the power consumption is as small as possible. Since it is desirable that the weighting coefficient Cs [i] for the branch route selection order is based on the ascending order of the travel length,
Cs [i] = Cs [62A, 62B, 62C, 62D]
= Cs [1,2,3,4]
It becomes.

そして、作業終了順位についての重み付け係数Tf[i]と、消費電力量に基づく分岐経路選択順位についての重み付け係数Cs[i]とが積算され、分岐経路を選択する上での総合的な優先順位についての係数Cp[i]が算出される。
Cp[i]=Cp[2×1,4×2,1×3,3×4]
=Cp[2,8,3,12]
すなわち、分岐経路62A,62B,62C,62Dを選択する優先順位は、62A→62C→62B→62Dとなる。この結果に基づき、分岐経路選択対象であるAGV10が走行すべき分岐経路として、分岐経路62Aが選択される。
Then, the weighting coefficient Tf [i] for the work end order and the weighting coefficient Cs [i] for the branch path selection order based on the power consumption are integrated, and the overall priority order for selecting the branch path. A coefficient Cp [i] for is calculated.
Cp [i] = Cp [2 × 1, 4 × 2, 1 × 3, 3 × 4]
= Cp [2,8,3,12]
That is, the priority order for selecting the branch paths 62A, 62B, 62C, and 62D is 62A → 62C 62B → 62D. Based on this result, the branch path 62A is selected as the branch path on which the AGV 10 as the branch path selection target should travel.

また、一方、分岐経路選択対象であるAGV10の消費電力量が、全AGV10の消費電力量の平均値未満であると判断された場合、走行長の長い分岐経路が選択されることが望ましいため、走行長の降順に基づき、分岐経路選択順位についての重み付け係数Cs[i]は、
Cs[i]=Cs[62A,62B,62C,62D]
=Cs[4,3,2,1]
となる。
On the other hand, when it is determined that the power consumption of the AGV10 that is the branch path selection target is less than the average value of the power consumption of all the AGV10, it is desirable to select a branch path having a long travel length. Based on the descending order of travel length, the weighting coefficient Cs [i] for the branch route selection order is:
Cs [i] = Cs [62A, 62B, 62C, 62D]
= Cs [4, 3, 2, 1]
It becomes.

そして、作業終了順位についての重み付け係数Tf[i]と、消費電力量に基づく分岐経路選択順位についての重み付け係数Cs[i]とが積算され、分岐経路を選択する上での総合的な優先順位についての係数Cp[i]が算出される。
Cp[i]=Cp[2×4,4×3,1×2,3×1]
=Cp[8,12,2,3]
すなわち、分岐経路62A,62B,62C,62Dを選択する優先順位は、62C→62D→62A→62Bとなる。この結果に基づき、分岐経路選択対象であるAGV10が走行すべき分岐経路として、分岐経路62Cが選択される。
Then, the weighting coefficient Tf [i] for the work end order and the weighting coefficient Cs [i] for the branch path selection order based on the power consumption are integrated, and the overall priority order for selecting the branch path. A coefficient Cp [i] for is calculated.
Cp [i] = Cp [2 × 4, 4 × 3, 1 × 2, 3 × 1]
= Cp [8, 12, 2, 3]
That is, the priority order for selecting the branch paths 62A, 62B, 62C, 62D is 62C → 62D 62A → 62B. Based on this result, the branch path 62C is selected as the branch path on which the AGV 10 as the branch path selection target should travel.

図5には、AGV10側で制御ユニット119により実行される上記実施例1及び2に共通した分岐経路選択制御処理についてのフローチャートを示す。まず、AGV10の発進に際して、AGV10が起動されたか否かが判断され(♯11)、その結果、AGV10が起動されていないと判断される場合には、再度♯11が繰り返され、他方、AGV10が起動されたと判断される場合には、続いて、AGV10が発進させられる(♯12)。   FIG. 5 shows a flowchart of the branch path selection control process common to the first and second embodiments, which is executed by the control unit 119 on the AGV 10 side. First, when the AGV 10 starts, it is determined whether or not the AGV 10 is activated (# 11). As a result, if it is determined that the AGV 10 is not activated, # 11 is repeated again, while the AGV 10 is If it is determined that it has been activated, then AGV 10 is started (# 12).

その後、走行経路が複数の分岐経路62A,62B,62C,62Dに分岐する番地、すなわち、選択すべき分岐経路をAGV中央制御盤3へ問い合せるための番地に到着したか否か、より詳しくは、部品組立ステーション60の開始位置をあらわす番地プレート8uが検出されたか否かが判断され(♯13)、その結果、番地プレート8uが検出されていないと判断される場合には、♯22へ進み、他方、番地プレート8uが検出されたと判断される場合には、AGV10が即時に停止させられる(♯14)。   Thereafter, whether or not the travel route has arrived at an address for branching into a plurality of branch routes 62A, 62B, 62C, 62D, that is, an address for inquiring the branch route to be selected to the AGV central control panel 3, It is determined whether or not the address plate 8u representing the start position of the component assembly station 60 has been detected (# 13). As a result, if it is determined that the address plate 8u has not been detected, the process proceeds to # 22. On the other hand, if it is determined that the address plate 8u has been detected, the AGV 10 is immediately stopped (# 14).

AGV10の停止後には、AGV10に搭載されたバッテリ110の消費電力量が算出される(♯15)。その後、選択すべき分岐経路をAGV中央制御盤3に対して問い合せるために送信される電文に、♯15で算出された消費電力量をあらわす情報が組み込まれ(♯16)、その電文がAGV中央制御盤3へ送信される(♯17)。なお、本実施形態では、AGV中央制御盤3に送信される電文に、消費電力量をあらわす情報とともに、電文の送信元であるAGV10の識別用ID(本実施形態では、1〜14号機中のいずれであるかをあらわす識別子),番地プレート8uに基づく位置情報等が含まれるが、これに限定されることなく、分岐経路を選択する上で有用な種々の情報であれば、いかなる情報が含まれてもよい。   After the AGV 10 is stopped, the power consumption of the battery 110 mounted on the AGV 10 is calculated (# 15). Thereafter, information indicating the power consumption calculated in # 15 is incorporated in the message transmitted to inquire the AGV central control panel 3 about the branch path to be selected (# 16), and the message is transmitted to the AGV center. It is transmitted to the control panel 3 (# 17). In the present embodiment, the message transmitted to the AGV central control panel 3 includes the information indicating the amount of power consumption and the identification ID of the AGV 10 that is the transmission source of the message (in this embodiment, in the units 1 to 14). Identifiers indicating which one is), position information based on the address plate 8u, and the like are included. However, the present invention is not limited to this, and any information is included as long as it is various information useful for selecting a branch path. May be.

AGV中央盤3から返信されてきた選択すべき分岐経路を指示する電文が受信されたか否かが判断され(♯18)、その結果、電文が受信されていないと判断される場合に、再度♯18が繰り返され、他方、電文が受信されたと判断される場合には、引き続き、受信された電文に含まれる情報に基づき、AGV10の走行条件(例えば選択すべき分岐経路など)が設定されるとともに(♯19)、消費電力量を積算するための各種条件(例えば選択された分岐経路における電力消費率など)が設定された上で(♯20)、AGV10が発進させられる(♯21)。その後、AGV10が停止させられたか否かが判断され、その結果、AGV10が停止させられていないと判断される場合には、♯11へ戻り、それ以降のステップが繰り返される。他方、AGV10が停止させられたと判断される場合には、処理が即時終了される。以上で処理が終了される。   It is determined whether or not a telegram indicating the branch path to be selected returned from the AGV central board 3 is received (# 18). As a result, if it is determined that a telegram has not been received, # 18 is repeated and, on the other hand, if it is determined that the message has been received, the traveling condition of the AGV 10 (for example, a branch route to be selected) is set based on the information included in the received message. (# 19) After various conditions for integrating the power consumption (for example, the power consumption rate in the selected branch path) are set (# 20), the AGV 10 is started (# 21). Thereafter, it is determined whether or not the AGV 10 has been stopped. As a result, if it is determined that the AGV 10 has not been stopped, the process returns to # 11 and the subsequent steps are repeated. On the other hand, if it is determined that the AGV 10 has been stopped, the processing is immediately terminated. The process is thus completed.

また、一方、図6は、図5に示すAGV10側での分岐経路選択制御処理に対応して、AGV中央制御盤10側で行われる分岐経路選択制御処理についてのフローチャートを示す。まず、AGV中央制御盤3がAGV10の運用に際して起動しているか否かが判断される(♯31)。その結果、AGV中央制御盤10が起動していないと判断される場合には、再度♯31が繰り返される。他方、AGV中央制御盤10が起動したと判断される場合には、各AGV10の消費電力量の算出要件が設定される(♯32)。消費電力量を算出するには、後述する各種の方法A1〜A7,B1〜B5が採用可能であるが、ここでは、これら各種の方法を採用した場合に用いられる算出要件(例えばAGV10が所定の経路を走行する場合における電力消費率)が設定される。更に、AGV10に指示すべき分岐経路の選択条件(例えば番地プレート62bでの左折指示など)が設定される(♯33)。   On the other hand, FIG. 6 shows a flowchart of the branch path selection control process performed on the AGV central control panel 10 side corresponding to the branch path selection control process on the AGV 10 side shown in FIG. First, it is determined whether or not the AGV central control panel 3 is activated when the AGV 10 is operated (# 31). As a result, when it is determined that the AGV central control panel 10 is not activated, # 31 is repeated again. On the other hand, if it is determined that the AGV central control panel 10 has been activated, the calculation requirements for the power consumption of each AGV 10 are set (# 32). Various methods A1 to A7 and B1 to B5, which will be described later, can be used to calculate the power consumption. Here, calculation requirements used when these various methods are used (for example, AGV10 is a predetermined value). The power consumption rate when traveling on a route) is set. Further, a branch route selection condition (for example, a left turn instruction at the address plate 62b) to be instructed to the AGV 10 is set (# 33).

その後、AGV10が選択すべき走行経路の問い合せについての情報を含む電文が、AGV10から受信されたか否かが判断され(♯34)、その結果、電文が受信されていないと判断される場合には、再度♯34が繰り返される。他方、電文が受信されたと判断される場合には、各AGV10の消費電力量が算出され(♯35)、更に、AGV10が分岐経路62A,62B,62C,62Dを選択する上での優先順位が決定される(♯36)。そして、決定された優先順位に基づき採用される分岐経路を指示する情報が、AGV10へ送信される電文に含めるように設定される(♯37)。   Thereafter, it is determined whether or not a telegram including information on an inquiry about a travel route to be selected by the AGV 10 has been received from the AGV 10 (# 34), and as a result, it is determined that a telegram has not been received. Then, # 34 is repeated again. On the other hand, if it is determined that a message has been received, the power consumption of each AGV 10 is calculated (# 35), and the priority order for the AGV 10 to select the branch paths 62A, 62B, 62C, 62D is determined. Determined (# 36). Information indicating the branch route to be adopted based on the determined priority order is set so as to be included in the message transmitted to AGV 10 (# 37).

その後、♯37で作成された電文が、問い合せ元であるAGV10へ送信される(♯38)。そして、AGVが運行停止されたか否かが判断される(♯39)。その結果、AGV10が運行停止されていないと判断される場合には、♯34へ戻り、それ以降のステップが繰り返される。他方、AGV10が運行停止されたと判断される場合には、処理が即時終了される。   Thereafter, the electronic message created in # 37 is transmitted to the inquiry source AGV10 (# 38). Then, it is determined whether or not the AGV is stopped (# 39). As a result, when it is determined that the operation of the AGV 10 is not stopped, the process returns to # 34 and the subsequent steps are repeated. On the other hand, when it is determined that the operation of the AGV 10 has been stopped, the process is immediately terminated.

以上のように、組立ライン1では、AGV10が、走行経路がそれぞれ異なる走行長を有する複数の分岐経路に分岐する手前の所定位置(本実施形態では、部品組立ステーション60の開始位置)に到着した時点で、AGV中央制御盤3に対して、選択すべき分岐経路を問い合わせることに応答して、AGV中央制御盤3が、各AGV10の分岐経路への進入までの待機時間の短縮化及び全AGV10間での消費電力量の平均化を図り、適切な分岐経路を求め、それをAGV10に対して指示する。これにより、各AGV10に搭載されるバッテリ110の容量を抑制することができ、コスト削減が可能である。   As described above, in the assembly line 1, the AGV 10 has arrived at a predetermined position (in this embodiment, the start position of the component assembly station 60) before branching into a plurality of branch paths each having a different travel length. At that time, in response to inquiring of the AGV central control panel 3 about the branch path to be selected, the AGV central control panel 3 shortens the waiting time until each AGV 10 enters the branch path and all the AGVs 10. Averaging power consumption is averaged, an appropriate branch path is obtained, and this is instructed to the AGV 10. Thereby, the capacity | capacitance of the battery 110 mounted in each AGV10 can be suppressed, and cost reduction is possible.

また、各AGV10の消費電力量が平均化されることにより、各AGV10に搭載されたバッテリ110の維持管理が容易になる。この場合には、更に、各バッテリ110の充電に要する時間が平均化されるため、自動充電ステーション70において、特定のAGV10の充電作業の長期化を回避し、それに伴い、各AGV10が充電を行うために待機する時間の長期化を回避することができ、生産ラインの稼動効率を向上させることができる。   In addition, since the power consumption of each AGV 10 is averaged, the maintenance of the battery 110 mounted on each AGV 10 is facilitated. In this case, since the time required for charging each battery 110 is further averaged, in the automatic charging station 70, it is avoided that the charging operation of the specific AGV 10 is prolonged, and accordingly, each AGV 10 performs charging. Therefore, it is possible to avoid lengthening the waiting time and to improve the operation efficiency of the production line.

前述した分岐経路選択制御では、各AGV10の消費電力量が、それが全AGV10の順位の中央より上位にあるか下位にあるかを判断すべく算出されるが、その算出方法としては種々のものが採用可能である。以下、各AGV10において消費電力量が個別に算出される例A1〜A7を挙げる。   In the branch path selection control described above, the power consumption amount of each AGV 10 is calculated to determine whether it is higher or lower than the center of the rank of all AGVs 10, but there are various calculation methods. Can be adopted. Hereinafter, examples A1 to A7 in which the power consumption amount is individually calculated in each AGV 10 will be described.

(A1)
AGV10に電力量計(不図示)が取り付けられ、その電力量計で計測される消費電力量の積算値q[Wh]が制御ユニット119に取り込まれ積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σq[Wh]
(A1)
A watt-hour meter (not shown) is attached to the AGV 10, and an integrated value q 1 [Wh] of the power consumption measured by the watt-hour meter is taken into the control unit 119 and integrated, whereby the total power consumption Q 0 is calculated. That is,
Total power consumption Q 0 = Σq 1 [Wh]

(A2)
制御ユニット119により、組立ライン1内における所定の経路を走行するときに消費される電力量qが予め記憶されるとともに、各経路を走行した回数nが逐次記憶され、それらが積算されることで、各時点での総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σ(q[Wh]×n
(A2)
The control unit 119, together with the amount of power q 2 consumed is stored in advance when traveling a predetermined path in the assembly line 1, the number n 1 that travels each path is sequentially stored, they are integrated Thus, the total power consumption Q 0 at each time point is calculated. That is,
Total power consumption Q 0 = Σ (q 2 [Wh] × n 1 )

(A3)
制御ユニット119により、組立ライン1内における所定の経路の総走行長l[m]と、各経路を走行する場合の単位長さ当たりの消費電力量(電力消費率)r[Wh/m]とが予め記憶されるとともに、各経路を走行した回数nが逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σ(l[m]×r[Wh/m]×n
なお、経路毎に電力消費率r[Wh/m]が異なる場合には、任意の経路の電力消費率を基準として、各経路の電力消費率についての相対電力消費比率を補正係数として予め求めておき、この補正係数で各AGV10の走行長の補正を行う。
(A3)
The control unit 119 causes the total travel length l 1 [m] of a predetermined route in the assembly line 1 and the power consumption (power consumption rate) r 1 [Wh / m] per unit length when traveling on each route. ] Is stored in advance, and the number of times n 1 traveled on each route is sequentially stored, and the total power consumption Q 0 is calculated by integrating them. That is,
Total power consumption Q 0 = Σ (l 1 [m] × r 1 [Wh / m] × n 1 )
When the power consumption rate r 1 [Wh / m] is different for each route, the relative power consumption ratio for the power consumption rate of each route is obtained in advance as a correction coefficient based on the power consumption rate of an arbitrary route. The travel length of each AGV 10 is corrected with this correction coefficient.

(A4)
制御ユニット119により、所定の経路の一部である区間の長さ(区間長)lと、各区間を走行する場合の単位長さ当たりの消費電力量(電力消費率)r[Wh/m]とが予め記憶されるとともに、各区間を走行した回数(区間走行回数)nが逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σ(l[m]×r[Wh/m]×n
なお、経路毎に電力消費率r[Wh/m]が異なる場合には、任意の経路の電力消費率を基準として、各経路の電力消費率についての相対電力消費比率を補正係数として予め求めておき、この補正係数で各AGV10の区間走行回数の補正を行う。
(A4)
The control unit 119, the length of the segment that is part of the predetermined path (the section length) l 2, the power consumption per unit length in the case of traveling the respective sections (power consumption rate) r 2 [Wh / m] is stored in advance, and the number of times of traveling in each section (section travel count) n 2 is sequentially stored, and the total power consumption Q 0 is calculated by adding them. That is,
Total power consumption Q 0 = Σ (l 2 [m] × r 2 [Wh / m] × n 2 )
When the power consumption rate r 2 [Wh / m] is different for each route, the relative power consumption ratio for the power consumption rate of each route is obtained in advance as a correction coefficient based on the power consumption rate of an arbitrary route. In addition, the number of times of traveling of each AGV 10 is corrected with this correction coefficient.

(A5)
制御ユニット119により、AGV10が組立ライン1内における所定の経路を走行した場合の消費電力p[W]が予め記憶されるとともに、各経路での走行時間t[h]と各経路を走行した回数nとが逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σ(t[h]×p[W]×n
(A5)
The control unit 119 stores power consumption p 1 [W] when the AGV 10 travels along a predetermined route in the assembly line 1 in advance and travels along the travel time t 1 [h] in each route and each route. The total number of times n 1 is stored in succession and integrated to calculate the total power consumption Q 0 . That is,
Total power consumption Q 0 = Σ (t 1 [h] × p 1 [W] × n 1 )

(A6)
制御ユニット119により、AGV10の移動量パルス(すなわちパルスモータの1パルス)当たりの消費電力量(電力消費率)r[Wh/パルス]が予め記憶されるとともに、移動量パルスの積算値I[パルス]が逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=r[Wh/パルス]×I[パルス]
なお、経路毎に電力消費率r[Wh/パルス]が異なる場合には、任意の経路の電力消費率を基準として、各経路の電力消費率についての相対電力消費比率を補正係数として予め求めておき、この補正係数で各AGV10の移動量パルスの積算値の補正を行う。
(A6)
The control unit 119 pre-stores power consumption (power consumption rate) r 3 [Wh / pulse] per movement amount pulse of the AGV 10 (that is, one pulse of the pulse motor), and an integrated value I 1 of the movement amount pulse. [Pulse] is sequentially stored and integrated to calculate the total power consumption Q 0 . That is,
Total power consumption Q 0 = r 3 [Wh / pulse] × I 1 [pulse]
When the power consumption rate r 3 [Wh / pulse] is different for each route, the relative power consumption ratio for the power consumption rate of each route is obtained in advance as a correction coefficient based on the power consumption rate of an arbitrary route. In addition, the integrated value of the movement amount pulse of each AGV 10 is corrected with this correction coefficient.

(A7)
制御ユニット119により、AGV10の走行時間当たりの消費電力量(電力消費率)r[Wh/分]が予め記憶されるとともに、走行時間の積算値Tが逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=r[Wh/分]×T[分]
なお、経路毎に電力消費率r[Wh/分]が異なる場合には、任意の経路の電力消費率を基準として、各経路の電力消費率についての相対電力消費比率を補正係数として予め求めておき、この補正係数で各AGV10の走行時間の積算値の補正を行う。
(A7)
The control unit 119 stores the power consumption (power consumption rate) r 4 [Wh / min] per travel time of the AGV 10 in advance, and the travel time integrated value T 1 is sequentially stored and integrated. Thus, the total power consumption Q 0 is calculated. That is,
Total power consumption Q 0 = r 4 [Wh / min] × T 1 [min]
When the power consumption rate r 4 [Wh / min] is different for each path, the relative power consumption ratio for the power consumption rate of each path is obtained in advance as a correction coefficient based on the power consumption rate of an arbitrary path. The accumulated value of the travel time of each AGV 10 is corrected with this correction coefficient.

以上、AGV10側でその消費電力量が概算される例を取り上げたが、これに限定されることなく、AGV中央制御盤3側で消費電力量が概算されてもよい。以下では、AGV中央制御盤3で各AGV10の消費電力量が算出される例B1〜B5を挙げる。   The example in which the power consumption amount is estimated on the AGV 10 side has been described above, but the power consumption amount may be estimated on the AGV central control panel 3 side without being limited thereto. Hereinafter, examples B1 to B5 in which the power consumption of each AGV 10 is calculated by the AGV central control panel 3 will be described.

(B1)
各AGV10に電力量計(不図示)が取り付けられ、その電力量計で計測される消費電力量の積算値q[Wh]がAGV10の制御ユニット119に取り込まれ、例えば1周回毎にAGV中央制御盤3へ送信される。AGV中央制御盤3では、送信されてきた積算値qが逐次記憶され、その積算値qが積算されることで、総消費電力量Qが積算される。すなわち、
総消費電力量Q=Σq[Wh]
(B1)
A watt-hour meter (not shown) is attached to each AGV 10, and the integrated value q 1 [Wh] of the power consumption measured by the watt-hour meter is taken into the control unit 119 of the AGV 10, for example, at the center of the AGV every round. It is transmitted to the control panel 3. The AGV central control panel 3, the stored integration value q 1, which has been transmitted sequentially by the integrated value q 1 is integrated, total power consumption Q 0 is integrated. That is,
Total power consumption Q 0 = Σq 1 [Wh]

(B2)
AGV中央制御盤3において、組立ライン1内の所定の経路の総走行長l[m]と、各経路を走行する場合の単位長さ当たりの消費電力量(電力消費率)r[Wh/m]とが予め記憶されるとともに、各分割経路の選択についてAGV10に指示した回数nが逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σ(l[m]×r[Wh/m]×n
(B2)
In the AGV central control panel 3, the total travel length l 1 [m] of a predetermined route in the assembly line 1 and the power consumption (power consumption rate) r 1 [Wh] per unit length when traveling on each route. / M] is stored in advance, and the number of times n 3 instructed to the AGV 10 for selection of each divided path is sequentially stored, and the total power consumption Q 0 is calculated by adding them. That is,
Total power consumption Q 0 = Σ (l 1 [m] × r 1 [Wh / m] × n 3 )

(B3)
AGV中央制御盤3において、所定の経路の一部である区間の長さ(区間長)lと、各区間を走行するときの電力消費率r[Wh/m]とが予め記憶されるとともに、各区間の選択についてAGV10に指示した回数nが逐次記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=Σ(l[m]×r[Wh/m]×n
(B3)
In AGV central control panel 3, the length of the segment that is part of the predetermined path (the section length) l 2, is stored in advance and the power consumption rate r 2 [Wh / m] at the time of traveling each section At the same time, the number of times n 4 instructed to the AGV 10 for selection of each section is sequentially stored, and these are integrated to calculate the total power consumption Q 0 . That is,
Total power consumption Q 0 = Σ (l 2 [m] × r 2 [Wh / m] × n 4 )

(B4)
AGV中央制御盤3において、AGV10の移動量パルス(つまりパルスモータの1パルス)当たりの電力消費率r[Wh/パルス]と、AGV10の制御ユニット119に取り込まれ1周回毎に送信されてきた移動量パルスの積算値I[パルス]とが記憶され、それらが積算されることで、総消費電力量Qが算出される。
総消費電力量Q=r[Wh/パルス]×I[パルス]
(B4)
In the AGV central control panel 3, the power consumption rate r 3 [Wh / pulse] per movement pulse (that is, one pulse of the pulse motor) of the AGV 10 and the control unit 119 of the AGV 10 are taken in and transmitted every round. The accumulated value I 1 [pulse] of the movement amount pulse is stored, and the total power consumption Q 0 is calculated by integrating them.
Total power consumption Q 0 = r 3 [Wh / pulse] × I 1 [pulse]

(B5)
AGV10の走行時間当たりの電力消費率r[Wh/分]と、AGV10の制御ユニット119に取り込まれ1周回毎に送信されてきたAGV10の走行時間の積算値Tとが記憶され、それらが積算されることで、総消費電力量Qが算出される。すなわち、
総消費電力量Q=r[Wh/分]×T[分]
(B5)
The power consumption rate r 4 [Wh / min] per travel time of the AGV 10 and the integrated value T 1 of the travel time of the AGV 10 that is taken into the control unit 119 of the AGV 10 and transmitted every round are stored. by being integrated, total power consumption Q 0 is calculated. That is,
Total power consumption Q 0 = r 4 [Wh / min] × T 1 [min]

なお、本発明は、例示された実施形態に限定されるものでなく、本発明の要旨を逸脱しない範囲において、種々の改良及び設計上の変更が可能であることは言うまでもない。   It should be noted that the present invention is not limited to the illustrated embodiments, and it goes without saying that various improvements and design changes can be made without departing from the scope of the present invention.

前述した実施形態では、部品組立ステーション60にのみ分岐経路が設定されていたが、これに限定されることなく、例えば自動充電ステーション70等の他のステーションにおいて分岐経路が設定されてもよい。この場合にも、AGV中央制御盤3とAGV10との間で、前述した実施形態と同様に分岐経路選択制御を行うことにより、上記と同様の効果を達成することができる。また、各AGV10の消費電力量を算出する上では、ワークの積載負荷も考慮に入れてもよい。   In the above-described embodiment, the branch path is set only in the component assembly station 60. However, the present invention is not limited to this, and the branch path may be set in another station such as the automatic charging station 70, for example. Also in this case, the same effects as described above can be achieved by performing branch path selection control between the AGV central control panel 3 and the AGV 10 in the same manner as in the above-described embodiment. In calculating the power consumption of each AGV 10, the work load may be taken into consideration.

本発明の実施形態に係るAGVを用いた組立ラインシステムのレイアウトを示す図である。It is a figure which shows the layout of the assembly line system using AGV which concerns on embodiment of this invention. AGV中央制御盤及び情報端末からなる制御システム及びそれにより制御されるAGVを概略的に示す図である。It is a figure which shows schematically the control system which consists of AGV central control panel and an information terminal, and AGV controlled by it. AGVの側面図である。It is a side view of AGV. AGVの平面図である。It is a top view of AGV. AGVの正面図である。It is a front view of AGV. 部品組立ステーションをより詳細に示す図である。It is a figure which shows a components assembly station in detail. AGV側で行われる分岐経路選択制御についてのフローチャートである。It is a flowchart about the branch route selection control performed by the AGV side. AGV中央制御盤側で行われる分岐経路選択制御についてのフローチャートである。It is a flowchart about the branch route selection control performed by the AGV central control panel side.

符号の説明Explanation of symbols

1…組立ライン
2…ID書込みユニット
3…AGV中央制御盤
8u,8d…番地プレート
10…AGV
20…移載ステーション
30,40,50…部品ピッキングステーション
32,42,52…ID読取りユニット
60…部品組立ステーション
70…自動充電ステーション
39,49,59,69A,69B,69C,69D…作業者
64a,64b,64c,64d…前バッファ位置用番地プレート
65a,65b,65c,65d…作業位置用番地プレート
66a,66b,66c,66d…後バッファ位置用番地プレート
101…AGV本体
102f,102r…部品棚
103…情報表示用モニタ
104…アンテナ
105…磁気誘導センサ
106…番地プレート検出センサ
107…ID記憶部
108…障害物センサ
110…バッテリ
119…制御ユニット
DESCRIPTION OF SYMBOLS 1 ... Assembly line 2 ... ID writing unit 3 ... AGV central control panel 8u, 8d ... Address plate 10 ... AGV
DESCRIPTION OF SYMBOLS 20 ... Transfer station 30, 40, 50 ... Parts picking station 32, 42, 52 ... ID reading unit 60 ... Parts assembly station 70 ... Automatic charge station 39, 49, 59, 69A, 69B, 69C, 69D ... Worker 64a 64b, 64c, 64d ... front buffer position address plates 65a, 65b, 65c, 65d ... work position address plates 66a, 66b, 66c, 66d ... rear buffer position address plates 101 ... AGV main body 102f, 102r ... parts shelf DESCRIPTION OF SYMBOLS 103 ... Information display monitor 104 ... Antenna 105 ... Magnetic induction sensor 106 ... Address plate detection sensor 107 ... ID memory | storage part 108 ... Obstacle sensor 110 ... Battery 119 ... Control unit

Claims (11)

ワークを積載し搬送する複数の無人搬送車がそれぞれ搭載されたバッテリの駆動力により所定の走行経路に沿って周回走行する生産ラインであって、該所定の走行経路の一部には、それぞれ走行長が異なるように分岐され、それぞれに上記ワークに対して作業者による所定の同一作業が行われる作業領域が設定される複数の分岐経路が設定されている生産ライン内で、該複数の分岐路のいずれかを選択して上記所定の走行経路を周回走行するよう無人搬送車の運行を制御する無人搬送車運行制御システムにおいて、
上記各無人搬送車について当該各無人搬送車が上記所定の走行経路に沿って走行した場合のバッテリの消費電力量を算出する消費電力量算出手段と、
上記各無人搬送車の1つが上記分岐経路手前の分岐地点に到着した時点で、当該分岐地点に到着した無人搬送車について上記消費電力量算出手段により算出された消費電力量が、全無人搬送車の消費電力量の中で上位にあるか下位にあるかを比較判断する第1比較手段と、
上記第1比較手段により上記分岐地点に到着した無人搬送車の消費電力量が、全無人搬送車の消費電力量の中で上位にあると判断された場合は、走行長が短い分岐経路の優先順位が高くなるよう重み付け順位を設定する一方、全無人搬送車の消費電力量の中で下位にあると判断された場合は、走行長が長い分岐経路の優先順位が高くなるよう重み付け順位を設定する第1重み付け順位設定手段と、
上記各分岐経路の作業領域において作業開始から作業終了までに必要であると予測される予測作業時間を上記ワークの種類に応じて予め記憶する予測作業時間記憶手段と、
上記作業領域に停止した時点からの経過時間を実作業時間として計測する実作業時間計測手段と、
上記予測作業時間記憶手段により記憶された予測作業時間と、上記実作業時間計測手段により計測された実作業時間とに基づき、各作業領域での作業完了までの作業残り時間を算出する作業残り時間算出手段と、
上記無人搬送車が上記分岐地点に到着した時点で、上記作業残り時間算出手段により算出された各作業領域の作業残り時間を比較して各分岐経路での作業終了順位を求める第2比較手段と、
上記第2比較手段により求められた各分岐経路間の作業終了順位に基づいて作業残り時間が短い分岐経路の優先順位が高くなるよう重み付け順位を設定する第2重み付け順位設定手段と、
上記分岐地点に到着した無人搬送車が走行すべき分岐経路を選択し、該無人搬送車に対して指示する運行制御手段であって、上記無人搬送車の1つが上記分岐地点に到着した時点で、上記第1重み付け順位設定手段により設定された重み付け順位と、上記第2重み付け順位設定手段により設定された重み付け順位とを積算することにより総合的な重み付け順位を設定し、該総合的な重み付け順位に基づいて上記分岐地点に到着した無人搬送車が走行すべき分岐経路を選択する運行制御手段と、を有していることを特徴とする無人搬送車運行制御システム。
A production line that travels along a predetermined travel route by a driving force of a battery on which a plurality of automatic guided vehicles for loading and transporting workpieces is mounted, and a part of the predetermined travel route is traveling the length is branched differently, given the same work by the operator against the workpiece more at the production line the branch path is set to the work area is set done each of said plurality of branches through In the automatic guided vehicle operation control system for controlling the operation of the automatic guided vehicle so as to go around the predetermined traveling route by selecting any of the roads,
A power consumption amount calculating means for calculating a power consumption amount of a battery when each of the automatic guided vehicles travels along the predetermined travel route for each of the automatic guided vehicles;
When one of the automatic guided vehicles arrives at the branch point before the branch path, the power consumption calculated by the power consumption calculating means for the automatic guided vehicle that has arrived at the branch point is the total automatic guided vehicle. First comparison means for comparing and determining whether the power consumption amount is higher or lower than
If it is determined by the first comparison means that the power consumption of the automatic guided vehicle that has arrived at the branch point is higher than the power consumption of all the automatic guided vehicles, priority is given to the branch route with a short travel length. While setting the weighting order so that the rank is higher, if it is determined that it is lower in the power consumption of all automatic guided vehicles, set the weighting order so that the priority of the branch route with a longer travel length is higher First weighting order setting means for
Predicted work time storage means for storing in advance the predicted work time predicted to be necessary from the work start to the work end in the work area of each branch path according to the type of the work;
An actual work time measuring means for measuring an elapsed time from the time when the work area is stopped as an actual work time;
Based on the predicted work time stored by the predicted work time storage means and the actual work time measured by the actual work time measurement means, the remaining work time for calculating the remaining work time until the work is completed in each work area. A calculation means;
Second comparing means for comparing the remaining work times of the respective work areas calculated by the remaining work time calculating means at the time when the automatic guided vehicle arrives at the branch point to obtain a work end rank on each branch route; ,
Second weighting order setting means for setting the weighting order so that the priority order of the branch path having a short remaining work time becomes higher based on the work end order between the respective branch paths obtained by the second comparing means;
An operation control means for selecting a branch route on which the automatic guided vehicle that has arrived at the branch point should travel and instructing the automatic guided vehicle when one of the automatic guided vehicles arrives at the branch point. The total weighting rank is set by integrating the weighting rank set by the first weighting rank setting means and the weighting rank set by the second weighting rank setting means, and the total weighting rank is set. And an operation control means for selecting a branch route on which the automated guided vehicle that has arrived at the branch point should travel.
上記第1比較手段は、全無人搬送車の消費電力量についての降順を求め、上記分岐地点に到着した無人搬送車についての順位が中央より上位にある場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で上位にあると判断し、また、一方、上記分岐地点に到着した無人搬送車についての順位が中央より下位にある場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で下位にあると判断することを特徴とする請求項1に記載の無人搬送車運行制御システム。   The first comparison means obtains the descending order of the power consumption of all the automatic guided vehicles, and when the order of the automatic guided vehicles that have arrived at the branch point is higher than the center, the unmanned that has arrived at the branch point When it is judged that the power consumption of the transport vehicle is higher in the power consumption of all the automatic guided vehicles, and on the other hand, when the rank of the automatic transport vehicle that arrives at the branch point is lower than the center, 2. The automatic guided vehicle operation control system according to claim 1, wherein it is determined that the power consumption amount of the automatic guided vehicle arriving at the branch point is lower than the power consumption amount of all the automatic guided vehicles. 上記第1比較手段は、全無人搬送車の消費電力量の平均値を求め、上記分岐地点に到着した無人搬送車の消費電力量が該平均値以上である場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で上位にあると判断し、また、一方、上記分岐地点に到着した無人搬送車の消費電力量が該平均値未満である場合には、上記分岐地点に到着した無人搬送車の消費電力量が全無人搬送車の消費電力量の中で下位にあると判断することを特徴とする請求項1に記載の無人搬送車運行制御システム。   The first comparing means obtains an average value of the power consumption of all the automatic guided vehicles, and when the power consumption of the automatic guided vehicle that has arrived at the branch point is equal to or greater than the average value, the first comparison unit arrives at the branch point. It is determined that the power consumption of the automated guided vehicle is higher than the power consumption of all the automated guided vehicles. On the other hand, the power consumption of the automated guided vehicle arriving at the branch point is less than the average value. 2. The automatic guided vehicle according to claim 1, wherein the power consumption of the automatic guided vehicle that has arrived at the branch point is determined to be lower than the power consumption of all the automatic guided vehicles. Navigation control system. 上記消費電力量算出手段は、上記無人搬送車に装備された電力量計であることを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The automatic guided vehicle operation control system according to any one of claims 1 to 3, wherein the power consumption calculating means is a watt hour meter installed in the automatic guided vehicle. 上記消費電力量算出手段は、上記生産ライン内における所定の走行経路を走行するときに消費される電力量と、上記所定の走行経路を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The power consumption calculating means integrates the amount of power consumed when traveling on a predetermined travel route in the production line and the number of times of traveling on the predetermined travel route, thereby The automatic guided vehicle operation control system according to any one of claims 1 to 3, wherein the power consumption is calculated. 上記消費電力量算出手段は、上記生産ライン内における所定の走行経路の総走行長と、上記所定の走行経路を走行する場合の単位長さ当たりの消費電力量と、上記所定の走行経路を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The power consumption amount calculation means travels along the predetermined travel route, the total travel length of the predetermined travel route in the production line, the power consumption per unit length when traveling on the predetermined travel route, and the predetermined travel route. The automatic guided vehicle operation control system according to any one of claims 1 to 3, wherein the power consumption of the automatic guided vehicle is calculated by integrating the number of times of the automatic guided vehicle. 上記消費電力量算出手段は、所定の走行経路の一部である区間の長さと、各区間を走行する場合の単位長さ当たりの消費電力量と、上記各区間を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The power consumption calculating means integrates the length of a section that is a part of a predetermined travel route, the power consumption per unit length when traveling in each section, and the number of times of traveling in each section. The automatic guided vehicle operation control system according to any one of claims 1 to 3, wherein the power consumption of the automatic guided vehicle is calculated. 上記消費電力量算出手段は、上記無人搬送車が上記生産ライン内における所定の走行経路を走行した場合の消費電力と、上記所定の走行経路での走行時間と、上記所定の走行経路を走行した回数とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The power consumption calculation means travels the power consumption when the automatic guided vehicle travels on a predetermined travel route in the production line, the travel time on the predetermined travel route, and the predetermined travel route. The automatic guided vehicle operation control system according to any one of claims 1 to 3, wherein the power consumption of the automatic guided vehicle is calculated by integrating the number of times. 上記消費電力量算出手段は、上記無人搬送車のパルスモータの1パルス当たりの消費電力量と、上記パルスモータのパルスの積算値とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The power consumption calculation means calculates the power consumption of the automatic guided vehicle by integrating the power consumption per pulse of the pulse motor of the automatic guided vehicle and the integrated value of the pulse of the pulse motor. The automatic guided vehicle operation control system according to any one of claims 1 to 3. 上記消費電力量算出手段は、上記無人搬送車の走行時間当たりの消費電力量と、走行時間の積算値とを積算することにより、上記無人搬送車の消費電力量を算出することを特徴とする請求項1〜3のいずれか一に記載の無人搬送車運行制御システム。   The power consumption calculation means calculates the power consumption of the automatic guided vehicle by integrating the power consumption per travel time of the automatic guided vehicle and the integrated value of the travel time. The automatic guided vehicle operation control system according to any one of claims 1 to 3. 上記無人搬送車が、該無人搬送車に積載されるワークに組み付けられるワーク組付部品を収納する部品棚を備えていることを特徴とする請求項1〜10のいずれか1つに記載の無人搬送車運行制御システム。   The said unmanned conveyance vehicle is equipped with the components shelf which accommodates the workpiece | work assembly | attachment components assembled | attached to the workpiece | work loaded on this automatic guided vehicle, The unmanned one of Claims 1-10 characterized by the above-mentioned. Transport vehicle operation control system.
JP2004225483A 2004-08-02 2004-08-02 Automated guided vehicle operation control system Expired - Fee Related JP4457801B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004225483A JP4457801B2 (en) 2004-08-02 2004-08-02 Automated guided vehicle operation control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004225483A JP4457801B2 (en) 2004-08-02 2004-08-02 Automated guided vehicle operation control system

Publications (2)

Publication Number Publication Date
JP2006048210A JP2006048210A (en) 2006-02-16
JP4457801B2 true JP4457801B2 (en) 2010-04-28

Family

ID=36026707

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004225483A Expired - Fee Related JP4457801B2 (en) 2004-08-02 2004-08-02 Automated guided vehicle operation control system

Country Status (1)

Country Link
JP (1) JP4457801B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20250001555A (en) * 2023-06-29 2025-01-07 주식회사 에이치디시 Air conditioner manufacturing automation system using AGV

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4835271B2 (en) * 2006-06-05 2011-12-14 マツダ株式会社 Part picking system and part picking method
US7890228B2 (en) 2008-12-01 2011-02-15 Savant Automation, Inc. Power source monitoring system for AGVs and method
JP6275187B2 (en) * 2016-04-28 2018-02-07 本田技研工業株式会社 Vehicle control system, vehicle control method, and vehicle control program
JP7351757B2 (en) * 2020-01-24 2023-09-27 株式会社日立製作所 How to control a moving robot
CN113923520B (en) * 2021-11-25 2024-02-02 北京天创绿能科技发展有限公司 Mobile multi-LED screen combined arrangement method and system using transport trolley
CN114919447B (en) * 2021-12-31 2023-05-23 广州蓝海机器人系统有限公司 AGV charging system and control method
WO2024157341A1 (en) * 2023-01-24 2024-08-02 株式会社Fuji Transport system
JP7828935B2 (en) * 2023-09-14 2026-03-12 株式会社三井E&S Electric material handling equipment charging system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20250001555A (en) * 2023-06-29 2025-01-07 주식회사 에이치디시 Air conditioner manufacturing automation system using AGV
KR102854134B1 (en) * 2023-06-29 2025-09-03 주식회사 에이치디시 Air conditioner manufacturing automation system using AGV

Also Published As

Publication number Publication date
JP2006048210A (en) 2006-02-16

Similar Documents

Publication Publication Date Title
JP4539887B2 (en) Charging management method and system for self-propelled vehicles for transportation
CN106681321B (en) On-line dispatching control system of RFID-based intelligent navigation car for unmanned transportation
US11543818B2 (en) Cargo transport system and automated guided vehicle
JP4457801B2 (en) Automated guided vehicle operation control system
ES2328389T3 (en) INSTALLATION FOR THE TRANSPORT OF ARTICLES AND METHOD TO CONTROL THE INSTALLATION.
JP2000047728A (en) Mobile robot system charging controller
JP2009213337A (en) Battery charging system
JP2763759B2 (en) Assembly line system
JP2023015574A (en) Charging quantity calculation device and charging system
JP7143953B2 (en) parking assistance system
JP2005352855A (en) Production line system
JP5785824B2 (en) Electric transport vehicle
CN117055482A (en) An AGV car for an unmanned smart warehouse and its material handling method
JP3466075B2 (en) Automatic guided vehicle control system
JP4315078B2 (en) Charge control system
JP4265462B2 (en) Work system using automated guided vehicle
US20230045958A1 (en) Vehicle and mobile terminal utilized therefor
US12279376B2 (en) Transfer system and controlling method thereof
US20240005227A1 (en) Delivery system, control method of delivery system, and storage medium
JPS63261404A (en) Automatic carrying and traveling controller
JP2646738B2 (en) Charge area management device for unmanned vehicle system
JP3044185B2 (en) Assembly line system
JP2646737B2 (en) Charge area management device for unmanned vehicle system
JPH01295604A (en) Carriage controller
JP2819728B2 (en) Operation control device for multiple automatic guided vehicles

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070605

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20070605

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080917

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090414

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090611

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090714

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090909

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091117

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091215

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100119

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100201

R150 Certificate of patent or registration of utility model

Ref document number: 4457801

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130219

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140219

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees