Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4464996B2 - Brace bracket and ceiling structure - Google Patents
[go: Go Back, main page]

JP4464996B2 - Brace bracket and ceiling structure - Google Patents

Brace bracket and ceiling structure Download PDF

Info

Publication number
JP4464996B2
JP4464996B2 JP2007202239A JP2007202239A JP4464996B2 JP 4464996 B2 JP4464996 B2 JP 4464996B2 JP 2007202239 A JP2007202239 A JP 2007202239A JP 2007202239 A JP2007202239 A JP 2007202239A JP 4464996 B2 JP4464996 B2 JP 4464996B2
Authority
JP
Japan
Prior art keywords
locking
brace
bolt
suspension bolt
locking piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007202239A
Other languages
Japanese (ja)
Other versions
JP2009035960A (en
Inventor
俊夫 小林
健二 荻原
智一 荒井
勝彦 大迫
宏一 吉田
恵介 渡辺
努 星川
修司 九野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Kirii Construction Materials Co Ltd
Original Assignee
East Japan Railway Co
Kirii Construction Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co, Kirii Construction Materials Co Ltd filed Critical East Japan Railway Co
Priority to JP2007202239A priority Critical patent/JP4464996B2/en
Publication of JP2009035960A publication Critical patent/JP2009035960A/en
Application granted granted Critical
Publication of JP4464996B2 publication Critical patent/JP4464996B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、天井構造において補強ブレースを取り付けるためのブレース金具と、このブレース金具を利用して構成された天井構造に関する。   The present invention relates to a brace fitting for attaching a reinforcing brace in a ceiling structure and a ceiling structure configured using the brace fitting.

従来、天井構造として、天井躯体(上層階の床版)に吊持された吊りボルトを介して格子状の天井枠で天井板を保持するものがある。このような天井構造においては、補強ブレースにより耐震強度を向上させている。   Conventionally, as a ceiling structure, there is one in which a ceiling plate is held by a lattice-like ceiling frame via suspension bolts suspended on a ceiling frame (a floor slab of an upper floor). In such a ceiling structure, the seismic strength is improved by reinforcing braces.

前記従来の天井構造において、補強ブレースは、上側が吊りボルトの上部に係止されて、下側が隣接する他の吊りボルトの下部または天井枠に固定されている。   In the conventional ceiling structure, the reinforcing brace is locked to the upper part of the suspension bolt on the upper side and fixed to the lower part of the other suspension bolt or the ceiling frame on the lower side.

補強ブレースの吊りボルトへの係止は、補強ブレースが所定の角度により取り付けられるように、ブレース金具を介して行われる。   The reinforcement brace is locked to the suspension bolt through the brace fitting so that the reinforcement brace is attached at a predetermined angle.

従来、補強ブレースの吊りボルトへの係止に使用するブレース金具としてさまざまな形状のものが開発されている。例えば、特許文献1には、図6に示すように、ブレース材のボルト部103が螺入されるナット部110と、このナット部110から上下に延設されて吊りボルト102への係止部121、131が形成された二股状の係止片120、130とで構成されており、かつ、それぞれの係止片120、130の角度をボルト部103が任意の傾斜角(略45度)をもって螺入され、係止部121、131の形成位置を前記傾斜角が享受されるよう形成されたブレース金具101が開示されている。   Conventionally, various shapes of brace metal fittings used for locking a reinforcing brace to a suspension bolt have been developed. For example, in Patent Document 1, as shown in FIG. 6, a nut portion 110 into which a brace bolt portion 103 is screwed, and a locking portion that extends vertically from the nut portion 110 to a suspension bolt 102. 121 and 131 are formed with bifurcated locking pieces 120 and 130, and the angle of each locking piece 120 and 130 is such that the bolt portion 103 has an arbitrary inclination angle (approximately 45 degrees). There is disclosed a brace fitting 101 that is screwed and formed so that the inclination angle is enjoyed at the position where the locking portions 121 and 131 are formed.

そして、このブレース金具101を利用した補強ブレース取付構造は、係止部121、131を吊りボルト102に係止するとともに、ナット部110に螺入されたボルト部103の先端を吊りボルト102に当接させることにより行う。   The brace mounting structure using the brace fitting 101 locks the locking portions 121 and 131 to the suspension bolt 102 and the tip of the bolt portion 103 screwed into the nut portion 110 against the suspension bolt 102. It is done by touching.

このような、従来のブレース金具101を利用した補強ブレース取付構造によれば、吊りボルト102に対して、係止部121,131とボルト部103の先端との3点支持構造が形成される。   According to the reinforcing brace mounting structure using the conventional brace fitting 101 as described above, a three-point support structure of the locking portions 121 and 131 and the tip of the bolt portion 103 is formed on the suspension bolt 102.

特開2003−138688号公報(段落番号[0012]、図3−図4)JP 2003-138688 A (paragraph number [0012], FIG. 3 to FIG. 4)

しかしながら、前記従来のブレース金具101は、地震時等において、補強ブレースに引張力が作用した場合、ボルト部103の先端と吊りボルト102との間に隙間が形成されて、係止部121、131の片側2点のみの支持構造となる。そのため、補強ブレースが落下してしまう場合があった。   However, in the conventional brace fitting 101, when a tensile force acts on the reinforcing brace during an earthquake or the like, a gap is formed between the tip of the bolt portion 103 and the suspension bolt 102, and the locking portions 121 and 131 are formed. This is a support structure of only two points on one side. Therefore, the reinforcing brace sometimes falls.

また、施工誤差等により吊りボルトが垂直に配置されていないような場合に3点支持構造を確保すると、吊りボルトに対して所定の角度(例えば45°)に固定されてしまい、補強ブレースの下端が所望の位置に配置されない場合がある。この場合、吊りボルトの角度の調整を行う必要があり、施工に手間がかかるという問題点を有していた。   In addition, if a three-point support structure is secured when the suspension bolt is not arranged vertically due to construction errors or the like, it is fixed at a predetermined angle (for example, 45 °) with respect to the suspension bolt, and the lower end of the reinforcing brace May not be arranged at a desired position. In this case, it is necessary to adjust the angle of the suspension bolt, and there is a problem in that it takes time for construction.

本発明は、前記の問題点を解決するものであり、簡易かつ確実に補強ブレースの固定を行うことを可能としたブレース金具およびこのブレース金具を利用した天井構造を提案することを課題とする。   The present invention solves the above-described problems, and an object of the present invention is to propose a brace fitting capable of simply and reliably fixing a reinforcing brace and a ceiling structure using the brace fitting.

前記の課題を解決するために、本発明のブレース金具は、補強ブレースの先端に取り付けられた状態で天井躯体から吊持された吊りボルトに係止されるものであって、前記補強ブレースの先端に設けられた取付ボルトを螺挿する基板と、前記基板の上部から延設されるとともに前記吊りボルトへの係止が可能な第一係止部が形成された第一係止片と、前記基板の下部から延設されるとともに前記吊りボルトへの係止が可能な第二係止部が形成された第二係止片と、前記第一係止片と前記第二係止片との間に配設されて、前記吊りボルトへの係止が可能な第三係止部が形成された第三係止片と、を備え、前記第三係止部の位置が、前記取付ボルトの先端面と前記吊りボルトとの当接点の高さから前記先端面の上端から該取付ボルトの軸方向の延長線上の高さの範囲内となるように、前記第三係止片が配置されていることを特徴としているIn order to solve the above-described problems, the brace fitting of the present invention is locked to a suspension bolt suspended from a ceiling casing in a state of being attached to the distal end of the reinforcing brace, and the distal end of the reinforcing brace A board for screwing the mounting bolts provided thereon, a first locking piece extending from the top of the board and having a first locking part capable of locking to the suspension bolt; and A second locking piece extending from the bottom of the substrate and having a second locking portion capable of locking to the suspension bolt; and the first locking piece and the second locking piece. And a third locking piece formed with a third locking portion that can be locked to the suspension bolt, and the position of the third locking portion is the position of the mounting bolt. The mounting bolt extends in the axial direction from the upper end of the tip surface from the height of the contact point between the tip surface and the suspension bolt. To be within a range of line height, the third locking piece is characterized in that it is arranged.

かかるブレース金具は、基板に螺挿された取付ボルトと、第一係止片と、第二係止片と、第三係止片と、の4点により、吊りボルトに係止されるため、補強ブレースの吊りボルトへの取り付けをより確実に行うことが可能となる。また、吊りボルトが、施工誤差等により、傾斜しているような場合であっても、第三係止部を原点として、補強ブレースの角度を変化させることで、第三係止部と、取付ボルトの先端と、第一係止部または第二係止部と、による三点支持を確保することが可能となる。   Since the brace bracket is locked to the suspension bolt by four points of the mounting bolt screwed into the substrate, the first locking piece, the second locking piece, and the third locking piece, The reinforcement brace can be more reliably attached to the suspension bolt. In addition, even if the suspension bolt is inclined due to construction errors, etc., by changing the angle of the reinforcing brace with the third locking portion as the origin, it is possible to It is possible to ensure three-point support by the tip of the bolt and the first locking portion or the second locking portion.

また、第三係止部が吊りボルトと取付ボルトとの当接点に近い位置に配置されるため、吊りボルトを第三係止部と取付ボルトとにより把持した状態を維持するため、吊りボルトと取付ボルトとが離れにくく、補強ブレースが落下しにくい。また、第三係止片は取付ボルトの略延長線上に配置されることで、補強ブレースから伝達される応力の向きに沿った位置に第三係止片が配置されている。そのため、第三係止片の基部にかかる負担が最小限ですみ、第三係止片の小断面化(薄肉化)が可能となる。 In addition , since the third locking portion is disposed at a position close to the contact point between the suspension bolt and the mounting bolt, the suspension bolt is maintained in order to maintain the state where the suspension bolt is gripped by the third locking portion and the mounting bolt. The mounting bolt is difficult to separate and the reinforcing brace is difficult to fall. Moreover, the third locking piece is arranged on a substantially extended line of the mounting bolt, so that the third locking piece is arranged at a position along the direction of the stress transmitted from the reinforcing brace. Therefore, the load applied to the base portion of the third locking piece is minimal, and the third locking piece can be reduced in cross section (thinned).

また、前記ブレース金具について、前記第一係止部、第二係止部および第三係止部にネジ加工が施されていれば、第一係止部、第二係止部、第三係止部が、それぞれ吊りボルトのネジと噛みあい、より確実な吊りボルトへの係止が可能となる。
ここで、ネジ加工とは、吊りボルトの雄ネジに対応して形成された雌ネジであってもいいし、吊りボルトのネジ形状における谷部分に挿入可能な山切りであってもよく、その形状は限定されるものではない。
Further, in the brace fitting, if the first locking portion, the second locking portion, and the third locking portion are threaded, the first locking portion, the second locking portion, the third locking portion. The stop portions engage with the screws of the suspension bolts, respectively, and can be more securely locked to the suspension bolts.
Here, the screw processing may be a female screw formed corresponding to the male screw of the suspension bolt, or may be a mountain cut that can be inserted into a valley portion in the thread shape of the suspension bolt. The shape is not limited.

なお、前記第三係止部は、前記第一係止部および前記第二係止部よりも前記基板側に突出していてもよい。第一係止部と第二係止部とを結ぶ直線よりも、第三係止部が基板側にわずかに突出していれば、吊りボルトが傾斜しているなどの誤差が生じた場合であっても、第三係止部を原点に補強ブレースの角度を調節することが可能であるとともに、複数の係止部(第一係止部、第二係止部、第三係止部)による吊りボルトへの係止が可能なため好適である。   The third locking portion may protrude toward the substrate side from the first locking portion and the second locking portion. If the third locking part protrudes slightly toward the board side from the straight line connecting the first locking part and the second locking part, an error such as an inclination of the suspension bolt has occurred. However, the angle of the reinforcing brace can be adjusted with the third locking portion as the origin, and a plurality of locking portions (first locking portion, second locking portion, third locking portion) can be used. This is suitable because it can be locked to the suspension bolt.

また、本発明の天井構造は、天井躯体に吊持された吊りボルトと、前記ブレース金具を介して上端が前記吊りボルトに取り付けられた補強ブレースと、前記吊りボルトを介して前記天井躯体から所定の間隔をあけて配置された天井枠とを備えており、前記第一係止部または前記第二係止部のうちの少なくとも一方と、前記第三係止部と、前記基板に螺挿された取付ボルトの先端とが前記吊りボルトに係止されることにより、前記補強ブレースが該吊りボルトに取り付けられることを特徴としている。   Further, the ceiling structure of the present invention includes a suspension bolt suspended from a ceiling casing, a reinforcing brace having an upper end attached to the suspension bolt via the brace bracket, and a predetermined height from the ceiling casing via the suspension bolt. And at least one of the first locking portion or the second locking portion, the third locking portion, and the board is screwed into the substrate. The reinforcing brace is attached to the suspension bolt by engaging the tip of the mounting bolt with the suspension bolt.

かかる天井構造によれば、ブレース金具が、第一係止部または第二係止部のうちの少なくとも一方と、第三係止部と、基板に螺挿された取付ボルトの先端との3点または4点により、吊りボルトに係止されているため、補強ブレースが確実に取り付けられている。そのため、強風時や地震時等に作用する応力に対して、十分な耐力を有した天井構造が提供される。   According to such a ceiling structure, the brace bracket has three points: at least one of the first locking portion or the second locking portion, the third locking portion, and the tip of the mounting bolt screwed into the board. Or since it is latched by the suspension bolt by 4 points | pieces, the reinforcement brace is attached reliably. Therefore, a ceiling structure having a sufficient proof strength against a stress acting in a strong wind or an earthquake is provided.

本発明のブレース金具およびこのブレース金具を利用した天井構造によれば、簡易、かつ、確実に補強ブレースの固定を行うことが可能となった。   According to the brace fitting of the present invention and the ceiling structure using the brace fitting, the reinforcing brace can be fixed easily and reliably.

本発明の好適な実施の形態について、図面を参照して説明する。なお、説明において、同一要素には同一の符号を用い、重複する説明は省略する。
また、説明において、各方向は、図1に示す方向に統一するものとする。
Preferred embodiments of the present invention will be described with reference to the drawings. In the description, the same reference numerals are used for the same elements, and duplicate descriptions are omitted.
In the description, each direction is unified to the direction shown in FIG.

ここで、図1は、本実施形態に係るブレース金具の全体を示す図であって、(a)は右後方から望む斜視図、(b)は右前方から望む斜視図である。図2は、図1に示すブレース金具を示す図であって、(a)は右側から望む側面図、(b)は前方から望む正面図である。図3は、図1に示すブレース金具の細部を示す図であって、(a)は第一係止片を下方から望む平面図、(b)は第二係止片を下方から望む平面図、(c)は第三係止片を下方から望む平面図をそれぞれ。図4(a)は、本実施形態に係る天井構造を右側から望む側面図であって、(b)は、補強ブレースの取付部の詳細を示す拡大図である。図5(a)および(b)は、ブレース金具の取付状況を示す図であって、右側から望む側面図である。   Here, FIG. 1 is a figure which shows the whole brace metal fitting which concerns on this embodiment, Comprising: (a) is a perspective view desired from the right rear, (b) is a perspective view desired from the right front. 2A and 2B are diagrams showing the brace fitting shown in FIG. 1, wherein FIG. 2A is a side view viewed from the right side, and FIG. 2B is a front view viewed from the front. 3 is a diagram showing details of the brace fitting shown in FIG. 1, wherein (a) is a plan view of the first locking piece viewed from below, and (b) is a plan view of the second locking piece viewed from below. , (C) is a plan view of the third locking piece viewed from below. FIG. 4A is a side view of the ceiling structure according to the present embodiment viewed from the right side, and FIG. 4B is an enlarged view showing details of the attachment portion of the reinforcing brace. 5 (a) and 5 (b) are views showing a mounting state of the brace fitting, and are side views desired from the right side.

本実施形態に係るブレース金具1は、補強ブレース3(図4参照)の先端に取り付けられた状態で天井躯体から吊持された吊りボルトに係止するための部材であって、図1に示すように、基板10と、第一係止片11と、第二係止片12と、第三係止片13とから構成されている。
なお、ブレース金具1を構成する材料は限定されるものではなく、適宜公知の材料の中から選定して使用することが可能である。また、ブレース金具1の部材厚も限定されるものではなく、適宜設定すればよい。
A brace fitting 1 according to the present embodiment is a member for locking to a suspension bolt suspended from a ceiling casing in a state of being attached to the tip of a reinforcing brace 3 (see FIG. 4), and is shown in FIG. Thus, it is comprised from the board | substrate 10, the 1st locking piece 11, the 2nd locking piece 12, and the 3rd locking piece 13. As shown in FIG.
In addition, the material which comprises the brace metal fitting 1 is not limited, It can select and use from well-known materials suitably. The member thickness of the brace fitting 1 is not limited, and may be set as appropriate.

このブレース金具1は、図1および図2に示すように、金属板を折り曲げることにより、基板10と第一係止片11と第二係止片12が形成されている。また、図1(b)に示すように、ブレース金具1には、ブレース金具1の左側側面について曲げ加工を施すことにより、壁部10c、11c、12cが立設されている。さらに、壁部12cの上端には、壁部12cの上の部分を第二係止片12と平行をなすように折り曲げることで形成された第三係止片13が延設されている。なお、ブレース金具1は、壁部10c、11c、12cが形成されていることより、上下方向に折り曲げる応力(上下方向の圧縮力)に対する耐力が増強されている。   As shown in FIGS. 1 and 2, the brace fitting 1 is formed with a substrate 10, a first locking piece 11, and a second locking piece 12 by bending a metal plate. Moreover, as shown in FIG.1 (b), the wall parts 10c, 11c, and 12c are standingly arranged in the brace metal fitting 1 by bending about the left side surface of the brace metal fitting 1. As shown in FIG. Further, a third locking piece 13 formed by bending the upper part of the wall 12c so as to be parallel to the second locking piece 12 is extended to the upper end of the wall 12c. In addition, the brace metal fitting 1 has enhanced strength against stress that is bent in the vertical direction (compressive force in the vertical direction) because the walls 10c, 11c, and 12c are formed.

基板10は、略L字形の金属板を折り曲げることにより形成された、矩形状の中間部分であって、補強ブレース3の先端に設けられた取付ボルトを螺挿するためのボルト孔10aが形成されている。また、基板10は、左側端部を前方に折り曲げることにより形成された壁部10cを有している。
なお、基板10の形状は矩形に限定されるものではなく、適宜設定すればよい。
The substrate 10 is a rectangular intermediate portion formed by bending a substantially L-shaped metal plate, and is formed with a bolt hole 10a for screwing a mounting bolt provided at the tip of the reinforcing brace 3. ing. The substrate 10 has a wall portion 10c formed by bending the left end portion forward.
The shape of the substrate 10 is not limited to a rectangle, and may be set as appropriate.

ボルト孔10aは、内径が取付ボルトの外径に応じて形成された略円形の孔であって、このボルト孔10aの内周面10bには、取付ボルトのネジ形状に応じてネジ加工が施されている。   The bolt hole 10a is a substantially circular hole whose inner diameter is formed according to the outer diameter of the mounting bolt, and the inner peripheral surface 10b of the bolt hole 10a is threaded according to the screw shape of the mounting bolt. Has been.

なお、ボルト孔10aは、螺挿された取付ボルトの先端が吊りボルトと当接することが可能となるような位置に形成されていればよく、その形成位置は限定されるものではないが、本実施形態では、図1(b)に示すように、基板10の高さ方向は略中間付近、左右方向は右よりに形成されている。なお、ボルト孔10aは、図2(b)に示すように、正面視で、その中心が、第一係止片11の係止部11aの中心と一致するように形成されている。   The bolt hole 10a only needs to be formed at a position where the tip of the screwed mounting bolt can come into contact with the suspension bolt, and the formation position is not limited. In the embodiment, as shown in FIG. 1B, the height direction of the substrate 10 is formed near the middle, and the right and left direction is formed from the right. As shown in FIG. 2B, the bolt hole 10 a is formed so that the center thereof coincides with the center of the locking portion 11 a of the first locking piece 11 as viewed from the front.

壁部10cは、基板10の耐力を増強するために形成された部分である。基板10の壁部10cは、図1(b)および図2(a)に示すように、第一係止片11の壁部11cおよび第二係止片12の壁部12cと比較して、壁高が低く形成されており、第一係止片11および第二係止片12の形成時の折り曲げ加工にともない基板10が変形することが防止されている。つまり、壁部10cを低く形成することで、折り曲げ加工時に発生する金属部材の余剰部分の逃げ場を形成している。   The wall portion 10c is a portion formed to increase the proof stress of the substrate 10. As shown in FIG. 1B and FIG. 2A, the wall portion 10c of the substrate 10 is compared with the wall portion 11c of the first locking piece 11 and the wall portion 12c of the second locking piece 12, The wall height is low and the substrate 10 is prevented from being deformed due to the bending process when the first locking piece 11 and the second locking piece 12 are formed. That is, by forming the wall portion 10c low, an escape area for the surplus portion of the metal member generated during the bending process is formed.

第一係止片11は、図1および図2に示すように、略L字形の金属板について、基板10の上方の部分を前側に折り曲げることにより、基板10の上部から延設されるように形成された矩形状部分である。
本実施形態では、基板10と第一係止片11とがなす内角φ1が85°以上95°以下の範囲内となるように、形成されている。なお、基板10と第一係止片11とのなす内角φ1の角度は限定されるものではないが、本実施形態では、内角φ1の角度を90°程度として、第一係止片11と基板10に螺挿された取付ボルトとが平行となるように構成している。これにより、天井構造として使用する際に、補強ボルトに作用する引張力が直接吊りボルトに伝達されるように構成され、第一係止片11への負担が軽減されて、ブレース金具1の薄肉化を図っている。
As shown in FIGS. 1 and 2, the first locking piece 11 extends from the upper part of the substrate 10 by bending the upper part of the substrate 10 forward with respect to the substantially L-shaped metal plate. It is the formed rectangular part.
In the present embodiment, the inner angle φ1 formed by the substrate 10 and the first locking piece 11 is formed to be in the range of 85 ° to 95 °. Note that the angle of the inner angle φ1 formed by the substrate 10 and the first locking piece 11 is not limited, but in this embodiment, the angle of the inner angle φ1 is about 90 °, and the first locking piece 11 and the substrate It is comprised so that the attachment bolt screwed in 10 may become parallel. Thereby, when using as a ceiling structure, it is comprised so that the tension | tensile_strength which acts on a reinforcement bolt may be directly transmitted to a suspension bolt, the burden to the 1st locking piece 11 is reduced, and the thin wall of the brace metal fitting 1 is comprised. We are trying to make it.

第一係止片11の左側には、図1(b)および図2(a)に示すように、端部を前下方向に折り曲げることにより形成された壁部11cを有している。壁部11cの形状は限定されるものではないが、本実施形態では、図2(a)に示すように、基板10に近づくにつれて壁の高さが低くなるようなテーパを有していることで、折り曲げ加工時に基板10および第一係止片11に変形が生じることが防止されている。つまり、壁部11cのテーパが、折り曲げ加工時に発生する金属部材の余剰部分の逃げ場を形成している。   On the left side of the first locking piece 11, as shown in FIG. 1B and FIG. 2A, there is a wall portion 11c formed by bending the end portion in the front downward direction. Although the shape of the wall part 11c is not limited, in this embodiment, as shown to Fig.2 (a), it should have a taper that the height of a wall becomes low as it approaches the board | substrate 10. FIG. Thus, deformation of the substrate 10 and the first locking piece 11 during the bending process is prevented. That is, the taper of the wall portion 11c forms a refuge for the surplus portion of the metal member generated during the bending process.

また、第一係止片11には、図3(a)に示すように、略長方形に形成された板材の一部が切り欠かれることにより、吊りボルトへの係止が可能な第一係止部11aが形成されている。   In addition, as shown in FIG. 3A, the first locking piece 11 has a first engagement that can be locked to the suspension bolt by cutting out a part of a substantially rectangular plate. A stop 11a is formed.

第一係止部11aは、図3(a)に示すように、右側が開口するように形成された略L字形の凹部であって、その先端(上端)は、吊りボルトの外径に応じた内径を有する円弧を呈している。また、第一係止部11aの円弧状部分の内周面11bには、吊りボルトのネジ形状に応じたネジ加工が施されている(図1(a)参照)。   As shown in FIG. 3A, the first locking portion 11a is a substantially L-shaped recess formed so that the right side is open, and the tip (upper end) thereof corresponds to the outer diameter of the suspension bolt. An arc having an inner diameter is exhibited. Further, the inner peripheral surface 11b of the arc-shaped portion of the first locking portion 11a is threaded according to the screw shape of the suspension bolt (see FIG. 1 (a)).

なお、本実施形態では、第一係止片11に凹部(第一係止部11a)を形成して、フック状(鉤形)に形成することで、吊りボルトへの係止が可能に構成するものとしたが、第一係止片11の形状は限定されるものではなく、適宜、公知の形状に形成することが可能である。   In addition, in this embodiment, the recessed part (1st latching | locking part 11a) is formed in the 1st latching piece 11, and it is comprised so that the latching to a suspension bolt is possible by forming in a hook shape (saddle shape). However, the shape of the first locking piece 11 is not limited and can be appropriately formed in a known shape.

第二係止片12は、図1および図2に示すように、略L字形の金属板について、基板10の下方の部分を前側に折り曲げることにより、基板10の下部から延設された矩形状部分である。本実施形態では、基板10と第二係止片12とがなす内角φ2が130°以上150°以下の範囲内となるように、形成されている。なお、基板10と第二係止片12とのなす内角φ2の角度は限定されるものではないが、本実施形態では、内角φ2の角度を140°程度として、補強ブレース3が吊りボルトに取り付けられた状態で、40°程度に傾斜するように、構成されている。   As shown in FIGS. 1 and 2, the second locking piece 12 is a rectangular shape that extends from the lower portion of the substrate 10 by bending a lower portion of the substrate 10 forward of a substantially L-shaped metal plate. Part. In the present embodiment, the inner angle φ2 formed by the substrate 10 and the second locking piece 12 is formed in a range of 130 ° to 150 °. Note that the angle of the inner angle φ2 formed by the substrate 10 and the second locking piece 12 is not limited, but in this embodiment, the angle of the inner angle φ2 is set to about 140 ° and the reinforcing brace 3 is attached to the suspension bolt. In such a state, it is configured to be inclined at about 40 °.

また、第二係止片12の左側には、図1(a)および図2(a)に示すように、端部を上方に折り曲げることにより形成された壁部12cを有している。壁部12cの形状は限定されるものではないが、本実施形態では、図2(a)に示すように、基板10に近づくにつれて壁の高さが低くなるようなテーパを有していることで、折り曲げ加工時に基板10および第二係止片12に変形が生じることが防止されている。つまり、壁部12cのテーパが、折り曲げ加工時に発生する金属部材の余剰部分の逃げ場を形成している。
さらに、壁部12cは、壁部12cを構成する金属片の上部分を右方向に折り曲げることにより第三係止片13が一体に形成されている。
Moreover, as shown to Fig.1 (a) and FIG.2 (a), it has the wall part 12c formed by bending an edge part upwards on the left side of the 2nd locking piece 12. As shown in FIG. Although the shape of the wall portion 12c is not limited, in the present embodiment, as shown in FIG. 2A, the wall portion 12c has a taper such that the height of the wall decreases as the substrate 10 is approached. Thus, the substrate 10 and the second locking piece 12 are prevented from being deformed during the bending process. That is, the taper of the wall portion 12c forms a refuge for the surplus portion of the metal member generated during the bending process.
Further, the wall portion 12c is integrally formed with the third locking piece 13 by bending the upper portion of the metal piece constituting the wall portion 12c in the right direction.

また、第二係止片12は、図3(b)に示すように、その一部が切り欠かれることにより、吊りボルトへの係止が可能な第二係止部12aが形成されている。   Moreover, as shown in FIG.3 (b), the 2nd latching | locking piece 12 has the 2nd latching | locking part 12a which can be latched to a suspending bolt, when the part is notched. .

第二係止部12aは、図3(b)に示すように、右側が開口するように形成された略L字形の凹部であって、その先端(前端)は、吊りボルトの外径に応じた内径を有する円弧を呈している。また、第二係止部12aの円弧状部分の内周面12bには、吊りボルトのネジ形状に応じたネジ加工が施されている(図1(a)参照)。   As shown in FIG. 3B, the second locking portion 12a is a substantially L-shaped recess formed so that the right side is open, and the tip (front end) thereof corresponds to the outer diameter of the suspension bolt. An arc having an inner diameter is exhibited. Further, the inner peripheral surface 12b of the arc-shaped portion of the second locking portion 12a is threaded according to the thread shape of the suspension bolt (see FIG. 1 (a)).

なお、本実施形態では、第二係止片12に凹部(第二係止部12a)を形成することで、フック状(鉤形)に形成し、吊りボルトへの係止が可能に構成するものとしたが、第二係止片12の形状は限定されるものではなく、適宜、公知の形状に形成することが可能である。   In addition, in this embodiment, by forming a recessed part (second locking part 12a) in the second locking piece 12, it is formed in a hook shape (saddle shape) and can be locked to a suspension bolt. However, the shape of the second locking piece 12 is not limited and can be appropriately formed in a known shape.

第三係止片13は、図1(b)および図2(b)に示すように、壁部12cの上の部分を右方向に折り曲げることにより形成された部分であって、第二係止片12と平行となるように、かつ、第一係止片11と第二係止片12との間に配設されるように形成されている。   As shown in FIGS. 1B and 2B, the third locking piece 13 is a portion formed by bending the upper portion of the wall portion 12c in the right direction, and the second locking piece 13 It is formed so as to be parallel to the piece 12 and disposed between the first locking piece 11 and the second locking piece 12.

また、第三係止片13には、図1(a)および(b)に示すように、吊りボルトへの係止が可能な第三係止部13aが形成されている。第三係止片13は、第三係止部13aの高さが、基板10に螺挿された取付ボルトの先端面と、吊りボルトを挟んで対向する位置となるように、形成されている(図4(b)参照)。なお、第三係止片13の形状等は限定されるものではないが、取付ボルト3aの先端と吊りボルト2との当接点の高さから、取付ボルト3aの上面の軸方向の延長線と吊りボルト2の第三係止片13側面との交差点の高さまでの範囲h内に、第三係止部13aが位置するように形成されていれば、補強ブレース3の力の伝達性に優れているため、好適である。   Further, as shown in FIGS. 1A and 1B, the third locking piece 13 is formed with a third locking portion 13 a that can be locked to the suspension bolt. The third locking piece 13 is formed so that the height of the third locking portion 13a is opposite to the tip surface of the mounting bolt screwed into the substrate 10 with the suspension bolt interposed therebetween. (See FIG. 4 (b)). The shape or the like of the third locking piece 13 is not limited. From the height of the contact point between the tip of the mounting bolt 3a and the suspension bolt 2, the extension line in the axial direction of the upper surface of the mounting bolt 3a If the third locking portion 13a is formed within the range h up to the height of the intersection with the side surface of the third locking piece 13 of the suspension bolt 2, the force transmission of the reinforcing brace 3 is excellent. Therefore, it is preferable.

第三係止部13aは、図3(c)に示すように、第三係止片13の先端部(後端部)に形成された凹部であって、吊りボルトの外径に応じた内径を有する円弧を呈している。また、第三係止部13aの円弧状部分の内周面13bには、吊りボルトのネジ形状に応じたネジ加工が施されている(図1(a)参照)。   The 3rd latching | locking part 13a is a recessed part formed in the front-end | tip part (rear end part) of the 3rd latching piece 13, as shown in FIG.3 (c), Comprising: The internal diameter according to the outer diameter of a suspension bolt A circular arc having Further, the inner peripheral surface 13b of the arc-shaped portion of the third locking portion 13a is subjected to screw processing corresponding to the screw shape of the suspension bolt (see FIG. 1 (a)).

本実施形態では、第三係止部13aを、第一係止部11aおよび第二係止部12aと比較して、わずかに後側に突出するように形成している。第三係止部13aの突出長は限定されるものではなく、吊りボルトのボルト径や補強ブレースの設置角度等に応じて適宜設定すればよいが、第一係止部11a、第二係止部12a、第三係止部13aが同時に吊りボルト2に当接することを妨げない程度にわずかな寸法であるものとする。本実施形態では、ボルト径が9mm〜12mmの吊りボルトに対して、第一係止部11aと第二係止部12aとを結ぶ直線よりも第三係止部13aが0.1mm〜2.5mm突出するように形成する。なお、第三係止部13aは、第一係止部11aおよび第二係止部12aと比較して、必ずしも後側に突出している必要はないことはいうまでもない。   In the present embodiment, the third locking portion 13a is formed so as to slightly protrude rearward as compared with the first locking portion 11a and the second locking portion 12a. The protruding length of the third locking portion 13a is not limited, and may be appropriately set according to the bolt diameter of the suspension bolt, the installation angle of the reinforcing brace, etc. It is assumed that the dimensions are small enough not to prevent the portion 12a and the third locking portion 13a from simultaneously contacting the suspension bolt 2. In this embodiment, with respect to a suspension bolt having a bolt diameter of 9 mm to 12 mm, the third locking portion 13a is 0.1 mm to 2 mm than the straight line connecting the first locking portion 11a and the second locking portion 12a. It is formed so as to protrude 5 mm. In addition, it cannot be overemphasized that the 3rd latching | locking part 13a does not necessarily protrude to the back side compared with the 1st latching | locking part 11a and the 2nd latching | locking part 12a.

ここで、本実施形態では、第三係止片13を、第二係止片12の壁部12cの上端に一体に形成することで、第二係止片12から上方向に延設させて形成するものとしたが、第三係止片13の形成方法は限定されるものではなく、例えば、第一係止片11の壁部11cに一体に形成することで、第一係止片11から下方向に延設されるように形成してもよい。   Here, in the present embodiment, the third locking piece 13 is formed integrally with the upper end of the wall portion 12c of the second locking piece 12 so as to extend upward from the second locking piece 12. However, the method of forming the third locking piece 13 is not limited. For example, the first locking piece 11 can be formed integrally with the wall portion 11c of the first locking piece 11. You may form so that it may extend below from.

また、本実施形態では、同一の金属板の一部を折り曲げることにより第二係止片12の壁部12cから延設する形で第三係止片13を形成するものとしたが、例えば、断面L字の別部材を第二係止片12に固定することにより第三係止片13を形成してもよい。また、第二係止片12の上端面に第三係止片13の下端面をつき合わせた状態で、第二係止片12に第三係止片13を接合してもよい。   In the present embodiment, the third locking piece 13 is formed so as to extend from the wall portion 12c of the second locking piece 12 by bending a part of the same metal plate. The third locking piece 13 may be formed by fixing another member having an L-shaped cross section to the second locking piece 12. Further, the third locking piece 13 may be joined to the second locking piece 12 with the lower end surface of the third locking piece 13 attached to the upper end surface of the second locking piece 12.

次に、本実施形態に係る天井構造Aについて、説明する。
天井構造Aは、図4(a)に示すように、天井躯体Bに所定の間隔をあけて複数本吊持された吊りボルト2,2と、前記ブレース金具1を介して上端が吊りボルト2に取り付けられた補強ブレース3と、吊りボルト2,2を介して天井躯体Bから所定の間隔をあけて配置された天井枠4とを備えて構成されている。
Next, the ceiling structure A according to the present embodiment will be described.
As shown in FIG. 4A, the ceiling structure A has a plurality of suspension bolts 2 and 2 suspended at a predetermined interval from a ceiling casing B, and a suspension bolt 2 at the upper end via the brace fitting 1. And a ceiling frame 4 disposed at a predetermined interval from the ceiling frame B via suspension bolts 2 and 2.

吊りボルト2は、先端に、天井枠4を吊持するための取付部材2aが取り付けられており、外周面にはネジ加工が施されている。吊りボルト2のボルト径は限定されるものではなく、吊りボルト2の配置ピッチや天井躯体Bの全体重量等に応じて適宜設定すればよい。   The suspension bolt 2 is attached at its tip with an attachment member 2a for suspending the ceiling frame 4, and the outer peripheral surface is threaded. The bolt diameter of the suspension bolt 2 is not limited, and may be set as appropriate according to the arrangement pitch of the suspension bolt 2, the overall weight of the ceiling casing B, and the like.

補強ブレース3は、図4(a)に示すように、上端がブレース金具1を介して吊りボルト2の上方に取り付けられており、下端が天井枠4に固定されることで、天井枠4を吊持している。本実施形態では、補強ブレース3と水平面とがなす角度が40°程度となるように配置する。なお、補強ブレース3と水平面とがなす角度は、40°程度に限定されるものではなく、適宜設定すればよいが、天井構造を耐力の向上の観点からすれば、30°〜50°の範囲内、好ましくは35°〜45°の範囲内となるように設定する。   As shown in FIG. 4A, the reinforcing brace 3 has an upper end attached to the upper part of the suspension bolt 2 via the brace fitting 1 and a lower end fixed to the ceiling frame 4. Suspended. In the present embodiment, the reinforcing brace 3 and the horizontal plane are arranged so that the angle is about 40 °. The angle formed between the reinforcing brace 3 and the horizontal plane is not limited to about 40 °, and may be set as appropriate. However, from the viewpoint of improving the proof stress, the angle is in the range of 30 ° to 50 °. Of these, it is preferably set to be in the range of 35 ° to 45 °.

補強ブレース3の上端には、取付ボルト3aとしての羽子板ボルトが固定されている。そして、この羽子板ボルトをブレース金具1の螺挿した状態で、ブレース金具1が吊りボルト2に係止されている。   A battledore bolt as a mounting bolt 3 a is fixed to the upper end of the reinforcing brace 3. The brace fitting 1 is locked to the suspension bolt 2 in a state in which the brace plate bolt is screwed into the brace fitting 1.

なお、補強ブレース3の吊りボルト2への取り付けは、まず、ブレース金具1の基板10に補強ブレース3の取付ボルト3aを螺挿した状態で、吊りボルト2の左側から、第一係止部11aおよび第二係止部12aに吊りボルト2を滑り込ませながら、ブレース金具1の第一係止部11a,第二係止部12a,第三係止部13aを吊りボルト2に係止させる。   The reinforcing brace 3 is attached to the suspension bolt 2 by first attaching the first fixing portion 11a from the left side of the suspension bolt 2 with the attachment bolt 3a of the reinforcement brace 3 screwed into the substrate 10 of the brace fitting 1. And the 1st latching | locking part 11a, the 2nd latching | locking part 12a, and the 3rd latching | locking part 13a of the brace metal fitting 1 are made to latch on the suspension bolt 2, sliding the suspension bolt 2 in the 2nd latching | locking part 12a.

次に、図4(b)に示すように、ブレース金具1の第一係止部11a、第二係止部12a、第三係止部13aが、吊りボルト2に係止された状態で、補強ブレース3を補強ブレース3の中心を軸に回転させることで、取付ボルト3aの先端が吊りボルト2に当接するようにブレース金具1に螺挿する。   Next, as shown in FIG. 4 (b), the first locking portion 11a, the second locking portion 12a, and the third locking portion 13a of the brace fitting 1 are locked to the suspension bolt 2, By rotating the reinforcing brace 3 around the center of the reinforcing brace 3, it is screwed into the brace fitting 1 so that the tip of the mounting bolt 3a contacts the suspension bolt 2.

これにより、第一係止部11aまたは第二係止部12aのうちの少なくとも一方と、第三係止部13aと、基板10に螺挿された取付ボルト3aの先端とが吊りボルト2に係止されて、補強ブレース3が吊りボルト2に取り付けられる(図5(a)および(b)参照)。なお、ブレース金具1が弾性変形することにより、第一係止部11a、第二係止部12a、第三係止部13aおよび取付ボルト3aのすべての点が吊りボルト2にと当接するのが好ましい。   Thereby, at least one of the first locking portion 11a or the second locking portion 12a, the third locking portion 13a, and the tip of the mounting bolt 3a screwed into the substrate 10 are engaged with the suspension bolt 2. The reinforcement brace 3 is attached to the suspension bolt 2 after being stopped (see FIGS. 5A and 5B). In addition, all the points of the 1st latching | locking part 11a, the 2nd latching | locking part 12a, the 3rd latching | locking part 13a, and the attachment bolt 3a contact | abut the suspension bolt 2 because the brace metal fitting 1 elastically deforms. preferable.

天井枠4は、縦部材と横部材とにより格子状に形成された部材であって、照明器具や化粧板等が設置可能に構成された部材である。そして、図4(a)に示すように、吊りボルト2の先端に固定された取付部材2a,2aおよび吊りボルト2に係止された補強ブレース3を介して、吊持されることにより、天井躯体Bと所定の間隔をあけて配置されている。   The ceiling frame 4 is a member formed in a lattice shape by a vertical member and a horizontal member, and is a member configured to be able to install a lighting fixture, a decorative board, and the like. Then, as shown in FIG. 4A, the ceiling is suspended by being attached via attachment members 2a, 2a fixed to the tip of the suspension bolt 2 and a reinforcing brace 3 locked to the suspension bolt 2. The casing B is arranged at a predetermined interval.

以上、本実施形態にかかるブレース金具1およびこのブレース金具1を利用した天井構造Aによれば、第一係止部11aまたは第二係止部12aのうちの少なくとも一方と、第三係止部13aと、基板10に螺挿された取付ボルト3aの先端との3点または4点により、吊りボルト2に係止されているため、補強ブレース3が確実に取り付けられる。そのため、強風時や地震時等に作用する応力に対して、十分な耐力を有した天井構造Aが提供される。   As described above, according to the brace fitting 1 according to the present embodiment and the ceiling structure A using the brace fitting 1, at least one of the first locking portion 11a or the second locking portion 12a and the third locking portion. The reinforcing brace 3 is securely attached because it is locked to the suspension bolt 2 by three or four points 13a and the tip of the mounting bolt 3a screwed into the substrate 10. Therefore, the ceiling structure A having sufficient proof stress against the stress acting during strong winds or earthquakes is provided.

また、吊りボルト2が、施工誤差等により、垂直ではなく、傾斜しているような場合であっても、第三係止部13aと吊りボルト2との当接点を中心として、補強ブレース3の角度を変化させることで補強ブレース3を簡易に所定の角度で設置することができる。この時の吊りボルト2への補強ブレース3の取り付けは、第三係止部13aと、取付ボルト3aの先端と、第一係止部11aまたは第二係止部12aと、による三点支持が確保されているため、取り付け精度の確実性が確保されている。   Even if the suspension bolt 2 is not vertical due to construction errors or the like but is inclined, the reinforcing brace 3 is centered on the contact point between the third locking portion 13a and the suspension bolt 2. By changing the angle, the reinforcing brace 3 can be easily installed at a predetermined angle. The reinforcing brace 3 is attached to the suspension bolt 2 at this time by three-point support by the third locking portion 13a, the tip of the mounting bolt 3a, and the first locking portion 11a or the second locking portion 12a. Since it is secured, the certainty of the mounting accuracy is secured.

また、第三係止部13aの位置が、吊りボルト2を挟んで取付ボルト3aの先端面と対向する位置に配置されているため、第三係止部13aと取付ボルト3aとにより、吊りボルト2を把持することで、取り付け性能が向上する。また、第三係止部13aと取付ボルト3aとの位置関係により、補強ブレース3から吊りボルト2への応力の伝達性能が優れている。そのため、第三係止片の基部にかかる負担が最小限ですみ、第三係止片の小断面化(薄肉化)が可能となる。また、第三係止部13aと取付ボルト3aとが近い位置に配置されているため、取付ボルト3aが吊りボルト2から離れにくく、補強ブレース3が落下しにくい。   Moreover, since the position of the 3rd latching | locking part 13a is arrange | positioned in the position which opposes the front end surface of the attachment bolt 3a on both sides of the suspension bolt 2, a suspension bolt is carried out by the 3rd latching | locking part 13a and the attachment bolt 3a. By gripping 2, the mounting performance is improved. Further, due to the positional relationship between the third locking portion 13a and the mounting bolt 3a, the stress transmission performance from the reinforcing brace 3 to the suspension bolt 2 is excellent. Therefore, the load applied to the base of the third locking piece is minimal, and the third locking piece can be reduced in cross section (thinned). Moreover, since the 3rd latching | locking part 13a and the attachment bolt 3a are arrange | positioned in the near position, the attachment bolt 3a is hard to leave | separate from the suspension bolt 2, and the reinforcement brace 3 does not fall easily.

また、第一係止部11a、第二係止部12aおよび第三係止部13aにネジ加工が施されているため、それぞれが吊りボルト2のネジと噛みあい、より確実な吊りボルト2への係止が可能となる。   In addition, since the first locking portion 11a, the second locking portion 12a, and the third locking portion 13a are threaded, each meshes with the screw of the suspension bolt 2 to make the suspension bolt 2 more reliable. Can be locked.

また、第三係止部13aが第一係止部11aおよび第二係止部12aよりも基板10側に突出しているため、補強ブレース3の角度を変化させて、第一係止部11aまたは第二係止部12aと吊りボルト2との接触を解除することで吊りボルト2に対するブレース金具1の高さ位置の調整を容易に行うことが可能となる。   Moreover, since the 3rd latching | locking part 13a protrudes in the board | substrate 10 side rather than the 1st latching | locking part 11a and the 2nd latching | locking part 12a, the angle of the reinforcement brace 3 is changed and the 1st latching | locking part 11a or It is possible to easily adjust the height position of the brace fitting 1 with respect to the suspension bolt 2 by releasing the contact between the second locking portion 12a and the suspension bolt 2.

また、本実施形態にかかる天井構造Aによれば、仮に、地震時や強風時において補強ブレース3に引張力が作用することで吊りボルト2と取付ボルト3aとの間に隙間が形成された場合であっても、第一係止部11a、第二係止部12a、第三係止部13aの3点による係止が確保されているため、補強ブレース3が落下することがない。   Further, according to the ceiling structure A according to the present embodiment, if a gap is formed between the suspension bolt 2 and the mounting bolt 3a by applying a tensile force to the reinforcing brace 3 during an earthquake or a strong wind. Even so, since the locking by the three points of the first locking part 11a, the second locking part 12a, and the third locking part 13a is secured, the reinforcing brace 3 does not fall.

また、地震時や強風時等により、天井構造Aに応力が作用することで、吊りボルト2または補強ブレース3の角度が変化する場合であっても、図5(a)および(b)に示すように、第二係止部12aと第三係止部13aと取付ボルト3a、または、第一係止部11aと第三係止部13aと取付ボルト3aの3点支持により係止されて、補強ブレース3が落下することが防止されている。   Further, even when the angle of the suspension bolt 2 or the reinforcement brace 3 changes due to the stress acting on the ceiling structure A due to an earthquake or a strong wind, it is shown in FIGS. As described above, the second locking portion 12a and the third locking portion 13a and the mounting bolt 3a, or the first locking portion 11a, the third locking portion 13a and the mounting bolt 3a are locked by three-point support, The reinforcing brace 3 is prevented from falling.

以上、本発明について、好適な実施の形態の一例を説明した。しかし、本発明は、前記各実施の形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜設計変更が可能である。
例えば、前記実施形態では、補強ブレースとして、形鋼等からなる部材に羽子板ボルトを固定したものを使用する場合について説明したが、補強ブレースの構成は限定されるものではなく、例えば、鋼棒やボルト棒を使用する等、適宜公知のブレース部材を使用することが可能である。
Heretofore, an example of a preferred embodiment has been described for the present invention. However, the present invention is not limited to the above-described embodiments, and the design of the respective components can be appropriately changed without departing from the spirit of the present invention.
For example, in the above-described embodiment, the case where a brace plate bolt fixed to a member made of a shape steel or the like is used as the reinforcement brace has been described. However, the configuration of the reinforcement brace is not limited, for example, a steel bar, It is possible to use a known brace member as appropriate, such as using a bolt rod.

また、前記実施形態では、補強ブレースの下端を天井枠に固定するものとしたが、補強ブレースの下端の固定箇所は限定されるものではなく、上端が固定された吊りボルトと隣接する他の吊りボルトの下部や、他の吊りボルトの下端に取り付けられた取付部材に固定してもよい。
また、前記実施形態では、ブレース金具について、右側が開口するように第一係止部および第二係止部を形成するものとしたが、第一係止部および第二係止部の開口は左側であってもよく、ブレース金具の形状は前記のものに限定されない。
In the above embodiment, the lower end of the reinforcing brace is fixed to the ceiling frame. However, the fixing position of the lower end of the reinforcing brace is not limited, and other suspension bolts adjacent to the suspension bolt with the upper end fixed. You may fix to the attachment member attached to the lower part of a volt | bolt and the lower end of another suspension bolt.
Moreover, in the said embodiment, although the 1st latching | locking part and the 2nd latching | locking part shall be formed so that the right side may open about a brace metal fitting, opening of a 1st latching | locking part and a 2nd latching | locking part is The left side may be sufficient and the shape of a brace metal fitting is not limited to the above.

また、壁部は、必要に応じて形成すればよく、ブレース金具を構成する材料が、補強ブレースに作用する応力に対して十分な耐力を有している場合には、壁部を形成する必要はない。
また、前記実施形態では、一枚の金属板に加工を施すことにより、基板、第一係止片および第二係止片を形成するものとしたが、基板、第一係止片および第二係止片として、それぞれ別の部材により形成したものを接合することによりブレース金具を構成してもよい。
In addition, the wall portion may be formed as necessary, and the wall portion needs to be formed when the material constituting the brace bracket has sufficient proof stress against the stress acting on the reinforcing brace. There is no.
Moreover, in the said embodiment, although the board | substrate, the 1st locking piece, and the 2nd locking piece were formed by processing one metal plate, the board | substrate, the 1st locking piece, and the 2nd You may comprise a brace metal fitting by joining what was formed by a separate member as a locking piece, respectively.

また、前記実施形態では、第一係止部、第二係止部、第三係止部にそれぞれネジ加工を施すものとしたが、例えば、一部のみにネジ加工を施したり、いずれにもネジ加工を施さない等、ネジ加工は必要に応じて行えばよい。
また、前記実施形態では、ネジ加工として、吊りボルトの雄ネジに対応して形成された雌ネジを加工するものとしたが、単に、吊りボルトのネジ形状における谷部分に挿入可能な凸部を形成(山切り)するものでもよく、その形状は限定されるものではない。
In the above embodiment, the first locking portion, the second locking portion, and the third locking portion are each threaded. However, for example, only a part is threaded, Threading may be performed as necessary, such as without threading.
Further, in the embodiment, as the screw processing, the female screw formed corresponding to the male screw of the suspension bolt is processed, but the convex portion that can be simply inserted into the valley portion in the screw shape of the suspension bolt is provided. It may be formed (cleaved), and its shape is not limited.

本発明の好適な実施形態に係るブレース金具の全体を示す図であって、(a)は右後方から望む斜視図、(b)は右前方から望む斜視図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the whole brace metal fitting which concerns on suitable embodiment of this invention, Comprising: (a) is a perspective view desired from the right rear, (b) is a perspective view desired from the right front. 本発明の好適な実施形態に係るブレース金具を示す図であって、(a)は右側から望む側面図、(b)は前方から望む正面図である。It is a figure which shows the brace metal fitting which concerns on suitable embodiment of this invention, Comprising: (a) is a side view desired from the right side, (b) is a front view desired from the front. 本発明の好適な実施形態に係るブレース金具の細部を示す図であって、(a)は第一係止片を下方から望む平面図、(b)は第二係止片を下方から望む平面図、(c)は第三係止片を下方から望む平面図をそれぞれ示している。It is a figure which shows the detail of the brace metal fitting which concerns on suitable embodiment of this invention, Comprising: (a) is a top view which desires a 1st locking piece from the downward direction, (b) is a plane which desires a 2nd locking piece from the downward direction The figure and (c) have each shown the top view which desires a 3rd locking piece from the downward direction. (a)は、本発明の好適な実施形態に係る天井構造を右側から望む側面図であって、(b)は、同補強ブレースの取付部の詳細を示す拡大図である。(A) is a side view which desires the ceiling structure which concerns on suitable embodiment of this invention from right side, (b) is an enlarged view which shows the detail of the attaching part of the reinforcement brace. (a)および(b)は、ブレース金具の取付状況を示す図であって、右側から望む側面図である。(A) And (b) is a figure which shows the attachment condition of a brace metal fitting, Comprising: It is a side view desired from the right side. 従来のブレース金具を示す側面図である。It is a side view which shows the conventional brace metal fittings.

符号の説明Explanation of symbols

1 ブレース金具
10 基板
10a ボルト孔
11 第一係止片
11a 第一係止部
12 第二係止片
12a 第二係止部
13 第三係止片
13a 第三係止部
2 吊りボルト
3 補強ブレース
4 天井枠
A 天井構造
B 天井躯体
DESCRIPTION OF SYMBOLS 1 Brace metal fitting 10 Board | substrate 10a Bolt hole 11 1st latching piece 11a 1st latching part 12 2nd latching piece 12a 2nd latching part 13 3rd latching piece 13a 3rd latching part 2 Hanging bolt 3 Reinforcement brace 4 Ceiling frame A Ceiling structure B Ceiling frame

Claims (3)

補強ブレースの先端に取り付けられた状態で天井躯体から吊持された吊りボルトに係止されるブレース金具であって、
前記補強ブレースの先端に設けられた取付ボルトを螺挿する基板と、
前記基板の上部から延設されるとともに前記吊りボルトへの係止が可能な第一係止部が形成された第一係止片と、
前記基板の下部から延設されるとともに前記吊りボルトへの係止が可能な第二係止部が形成された第二係止片と、
前記第一係止片と前記第二係止片との間に配設されて、前記吊りボルトへの係止が可能な第三係止部が形成された第三係止片と、を備え
前記第三係止部の位置が、前記取付ボルトの先端面と前記吊りボルトとの当接点の高さから前記先端面の上端から該取付ボルトの軸方向の延長線上の高さの範囲内となるように、前記第三係止片が配置されていることを特徴とする、
レース金具。
A brace fitting that is secured to a suspension bolt that is suspended from a ceiling housing in a state of being attached to the tip of a reinforcing brace,
A board into which a mounting bolt provided at the tip of the reinforcing brace is screwed;
A first locking piece extending from the top of the substrate and having a first locking portion capable of locking to the suspension bolt;
A second locking piece extending from the bottom of the substrate and having a second locking portion that can be locked to the suspension bolt;
A third locking piece disposed between the first locking piece and the second locking piece and having a third locking portion that can be locked to the suspension bolt. ,
The position of the third locking portion is within a range from the height of the contact point between the tip surface of the mounting bolt and the suspension bolt to the height on the axial extension line of the mounting bolt from the upper end of the tip surface. As described above, the third locking piece is arranged,
Brace bracket.
前記第一係止部、第二係止部および第三係止部にネジ加工が施されていることを特徴とする、
請求項1に記載のブレース金具。
The first locking part, the second locking part and the third locking part are subjected to screw processing,
The brace bracket according to claim 1 .
天井躯体に吊持された吊りボルトと、
請求項1または請求項2に記載のブレース金具を介して上端が前記吊りボルトに取り付けられた補強ブレースと、
前記吊りボルトを介して前記天井躯体から所定の間隔をあけて配置された天井枠と、を備えた天井構造であって、
前記第一係止部または前記第二係止部のうちの少なくとも一方と、前記第三係止部と、前記基板に螺挿された取付ボルトの先端とが前記吊りボルトに係止されることにより、前記補強ブレースが該吊りボルトに取り付けられることを特徴とする、
天井構造。
A suspension bolt suspended from the ceiling frame;
Reinforcing braces whose upper ends are attached to the suspension bolts via the brace fitting according to claim 1 or 2 ,
A ceiling frame disposed at a predetermined interval from the ceiling casing via the suspension bolt,
At least one of the first locking portion or the second locking portion, the third locking portion, and a tip of a mounting bolt screwed into the substrate are locked to the suspension bolt. The reinforcing brace is attached to the suspension bolt by
Ceiling structure.
JP2007202239A 2007-08-02 2007-08-02 Brace bracket and ceiling structure Active JP4464996B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007202239A JP4464996B2 (en) 2007-08-02 2007-08-02 Brace bracket and ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007202239A JP4464996B2 (en) 2007-08-02 2007-08-02 Brace bracket and ceiling structure

Publications (2)

Publication Number Publication Date
JP2009035960A JP2009035960A (en) 2009-02-19
JP4464996B2 true JP4464996B2 (en) 2010-05-19

Family

ID=40438114

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007202239A Active JP4464996B2 (en) 2007-08-02 2007-08-02 Brace bracket and ceiling structure

Country Status (1)

Country Link
JP (1) JP4464996B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012012887A (en) * 2010-07-02 2012-01-19 Parts Kobo Co Ltd Fastener
JP5719188B2 (en) * 2011-02-04 2015-05-13 株式会社桐井製作所 Brace mounting bracket and ceiling structure
JP6058893B2 (en) * 2012-01-13 2017-01-11 株式会社オクジュー Brace material mounting bracket and brace material mounting method using the same
JP6329381B2 (en) * 2014-02-14 2018-05-23 株式会社サワタ Bracing attachment device

Also Published As

Publication number Publication date
JP2009035960A (en) 2009-02-19

Similar Documents

Publication Publication Date Title
JP4464996B2 (en) Brace bracket and ceiling structure
JP4871069B2 (en) Suspended ceiling foundation structure and joint metal fittings
JP6125925B2 (en) Ceiling structure and brace lower fixture
JP5732950B2 (en) Seismic structure of suspended ceiling
JP2013181285A (en) Earthquake-resistant structure for partition wall
JP5507937B2 (en) Field edge holder
JP2018115460A (en) Brace top connection bracket, brace bottom connection bracket, and ceiling foundation structure
JP5633202B2 (en) Ceiling fire extinguishing system
JP6489613B2 (en) Suspension ceiling fall prevention structure
JP2009270699A (en) Support mounting tool
JP2017193902A (en) Hanger for t-bar
JP5374070B2 (en) Ceiling support structure
JP4787607B2 (en) Suspended ceiling hanging bracket
JP5553964B2 (en) Column base structure
JP2018150793A (en) Metal fixture for vertically-provided member, and ceiling fall prevention structure using metal fixture
JP2009235786A (en) Upper slide mounting structure of alc panel
JP5568264B2 (en) Hanging bracket for square steel
JP2007196721A (en) Board fixing structure
JP6198500B2 (en) Ceiling reinforcement bracket
JP6429278B2 (en) Self-weight receiving hardware for lightweight cellular concrete panel mounting structure and lightweight cellular concrete panel mounting structure using the same
JP4082358B2 (en) Building structures and assembly buildings
KR101153710B1 (en) Combination device for steel cables
JP3166377U (en) Battledore bolt
JP2007198123A (en) Hanger reinforcement for ceiling structure and ceiling structure using the reinforcement
JP2020183680A (en) Ceiling substrate material fitting device

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091001

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091006

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100202

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100219

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130226

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4464996

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140226

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250