JP4467329B2 - Drilling method - Google Patents
[go: Go Back, main page]

JP4467329B2 - Drilling method - Google Patents

Drilling method Download PDF

Info

Publication number
JP4467329B2
JP4467329B2 JP2004045984A JP2004045984A JP4467329B2 JP 4467329 B2 JP4467329 B2 JP 4467329B2 JP 2004045984 A JP2004045984 A JP 2004045984A JP 2004045984 A JP2004045984 A JP 2004045984A JP 4467329 B2 JP4467329 B2 JP 4467329B2
Authority
JP
Japan
Prior art keywords
rod
drilling
tip
casing
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004045984A
Other languages
Japanese (ja)
Other versions
JP2005232898A (en
Inventor
川 政 則 粂
部 宏 幸 阿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chemical Grouting Co Ltd
Original Assignee
Chemical Grouting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chemical Grouting Co Ltd filed Critical Chemical Grouting Co Ltd
Priority to JP2004045984A priority Critical patent/JP4467329B2/en
Publication of JP2005232898A publication Critical patent/JP2005232898A/en
Application granted granted Critical
Publication of JP4467329B2 publication Critical patent/JP4467329B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Description

本発明は、鉛直の削孔で、例えば地盤改良や杭打ち、或いは地中に連壁を構築する場合等における削孔工法に関する。   The present invention relates to a drilling method in the case of vertical drilling, for example, ground improvement, pile driving, or construction of a continuous wall in the ground.

従来、削孔する場合の設備として、例えば、全旋回式ケーシング掘削機と、自走式クレーンとを有し、移動作業が容易で且つ設備の安定性が良好な状態で作業が行えると共に、移動作業を含む掘削作業全体の効率を向上させることが出来る掘削設備が提案されている(例えば特許文献1参照)。   Conventionally, as an equipment for drilling, for example, it has a fully swivel casing excavator and a self-propelled crane, and it can be operated while moving work is easy and the stability of the equipment is good. A drilling facility that can improve the efficiency of the entire excavation work including the work has been proposed (see, for example, Patent Document 1).

また、削孔を行う場合の工法として、ロッドを用いて、そのロッド先端から、例えば高圧水のジェットを噴射して地盤を削孔する技術が公知である。   As a method for drilling, a technique is known in which a rod is used and a ground is drilled from the tip of the rod, for example, by jetting high pressure water.

上述した掘削設備や高圧水ジェットにより地盤を削孔する技術では、ケーシング或いはロッドによって鉛直方向下方にスラスト力を付加して削孔を行っている。
しかし、ケーシング或いはロッドによって鉛直方向下方にスラスト力を付加して削孔を行う従来技術においては、削孔中に、ケーシング又はロッドの中心線から偏心した箇所に固い地盤等が突き当たった場合には、ケーシング又はロッドに曲げの力が作用して、先端部分が、鉛直方向から「ずれた」方向(鉛直とは異なった方向)に傾いてしまうことがある。
その様な事態が生じると、目的とは異なった方向に削孔されてしまう、という問題が存在する。
In the technique of drilling the ground with the above-described excavation equipment or high-pressure water jet, drilling is performed by applying a thrust force vertically downward with a casing or a rod.
However, in the prior art in which a thrust is applied vertically by a casing or a rod to drill a hole, when a hard ground or the like hits a location eccentric from the center line of the casing or rod in the drilling hole A bending force may act on the casing or the rod, and the tip portion may be tilted in a direction “shifted” from the vertical direction (a direction different from the vertical direction).
When such a situation occurs, there is a problem that a hole is drilled in a direction different from the purpose.

そのような問題に対処するために、削孔用のケーシングの後端(地上側)を、例えば、送りワイヤ等で吊降ろし、ロッドを宙に浮かせた状態でロッド先端から高圧水によるジェットで地盤を削孔する技術、より詳細には、削孔ロッドに上方から推力を掛けずに、懸垂状態で削孔する吊掘り方式により削孔する技術が提案されている。   In order to deal with such a problem, the rear end (ground side) of the casing for drilling is suspended by, for example, a feed wire, and the rod is suspended in the air with a jet of high-pressure water from the tip of the rod. More specifically, there has been proposed a technique of drilling by a hanging digging method in which a drilling hole is drilled in a suspended state without applying thrust to the drilling rod from above.

しかし、係る吊掘り方式、すなわち、削孔ロッドに上方から推力を掛けずに、懸垂状態で削孔する吊掘り方式においても、削孔ロッドの先端が固い地盤に当接(着底)した際には、吊り下げられたロッドが削孔された孔の壁面に寄りかかるような状態となってしまう。その結果、削孔方向について所望の鉛直精度を維持することが出来ない。
更に、係る事態(削孔方向について所望の鉛直精度を維持することが出来ないという事態)を地上側で把握することが出来ないので、そのままの削孔方向にて、地盤の削孔が続けられてしまう恐れがある。
However, even in such a suspension digging method, that is, a suspension digging method in which a hole is drilled in a suspended state without applying thrust to the drilling rod from above, when the tip of the drilling rod comes into contact with the hard ground (bottom) In such a case, the suspended rod leans against the wall surface of the drilled hole. As a result, the desired vertical accuracy cannot be maintained in the drilling direction.
Furthermore, since it is impossible to grasp the situation (a situation where the desired vertical accuracy cannot be maintained in the drilling direction) on the ground side, the ground drilling can be continued in the same drilling direction. There is a risk that.

そのように、削孔方向の鉛直精度が確保されない状態で地中Gを削孔した場合には、特に地中深い領域(大深度領域)に地中固結体を造成して地盤改良を行う際においては、造成するべき予定領域とは異なった位置に地中固結体が造成されてしまう恐れがある。
また、例えば地中連壁を築造するため、図19及び図20で示す様に例えば6本の孔Hを削孔する際に、左から5番目の孔Hが右方に傾いて開けられた場合は符号Dで示されるような削孔されない部分、所謂「隙間(土壌が残されてしまった部分)」が生じてしまい、連壁に要求される止水性が確保されない恐れが生じてしまう。そして、係る隙間Dが生じてしまった場合は、その隙間Dを埋める、即ち、土壌Gが残された部分を再度削孔し直す作業、所謂「間詰め」の作業が発生してしまい、工事を遅延させてしまうという問題を抱えていた。
特に近年においては、工事における要求深度がより深くなっており、削孔方向の鉛直精度の要求も厳格になっている。しかしながら、係る厳格な要求に応えることが出来る様な削孔工法は、従来は提案されていない。
特開2001−032663号公報
As such, when the underground G is drilled in a state where the vertical accuracy in the drilling direction is not ensured, the ground is improved by creating an underground solid body particularly in the deep underground region (large depth region). In that case, there is a possibility that an underground solid body may be formed at a position different from the planned area to be formed.
Further, for example, in order to construct an underground connection wall, when drilling, for example, six holes H as shown in FIGS. 19 and 20, the fifth hole H from the left is inclined to the right. In such a case, a portion that is not drilled as indicated by the symbol D, that is, a so-called “gap (portion where the soil is left)” is generated, and there is a possibility that the water stop required for the continuous wall is not ensured. Then, when such a gap D has occurred, a work of filling the gap D, that is, a work of re-drilling the portion where the soil G is left, that is, a so-called “squeezing” operation, occurs. Had the problem of delaying.
Particularly in recent years, the required depth in construction has become deeper, and the vertical accuracy in the drilling direction has become stricter. However, no drilling method that can meet such strict requirements has been proposed.
JP 2001-032663 A

本発明は上述した従来技術の問題点に鑑みて提案されたものであり、削孔方向の鉛直精度を高め、大深度の削孔に対応可能な削孔工法の提供を目的としている。   The present invention has been proposed in view of the above-described problems of the prior art, and an object thereof is to provide a drilling method capable of increasing the vertical accuracy in the drilling direction and adapting to drilling at a deep depth.

本発明によれば、 筒状のケーシング(1C)とその下端部に設けられて高圧水のジェット(J)を噴射するノズルを有するとともに前記ケーシング(1C)内に設けられたモニタ(1M)とを備えたロッド(1)を有し、そのロッド(1)は懸垂した状態で回転しつつ一定速度で下降させて鉛直の削孔を形成するための削孔工法において、ロッド(1)の先端が前記一定速度で下降させたときに削孔できない固い地盤部分(K)に当接したことを判定する判定手段(8、30)を設け、ロッド(1)を一定速度で下降中にその先端が前記固い地盤部分(K)に当接したと判定手段(8、30)により判定したときにロッド(1)の下降を停止して停止した状態でノズルからジェット(J)を噴射して前記固い地盤部分(K)を削孔し、前記固い地盤部分(K)が削孔されて前記判定手段(8、30)によりロッド(1)の先端が前記固い地盤部分(K)と当接しなくなったと判定されたときに再びロッド(1)を下降させるようになっている。   According to the present invention, there is provided a cylindrical casing (1C) and a monitor (1M) provided in the casing (1C) having a nozzle that is provided at the lower end of the cylindrical casing (1C) and injects a jet (J) of high-pressure water. In the drilling method for forming a vertical drilling hole by lowering at a constant speed while rotating in a suspended state, the rod (1) has a rod (1) provided with a tip of the rod (1) Is provided with determination means (8, 30) for determining that it has come into contact with a hard ground portion (K) that cannot be drilled when lowered at a constant speed, and the tip of the rod (1) is lowered while being lowered at a constant speed. Is determined to have come into contact with the hard ground portion (K) by the determination means (8, 30), and the jet (J) is ejected from the nozzle in a state where the lowering of the rod (1) is stopped and stopped. Drilling a hard ground part (K), When the ground portion (K) is drilled and the determination means (8, 30) determines that the tip of the rod (1) is no longer in contact with the hard ground portion (K), the rod (1) is again inserted. It is designed to be lowered.

また本発明の削孔工法は、前記判定手段(8、30)はロッド(1)の上端に設けたアタッチメント(2)に取付けたフック(21)を備え、そのフック(21)には懸垂フック(12)に係合してリング状の吊具(9)が係合しており、前記アタッチメント(2)の上部に前記ロッド(1)の先端が前記固い地盤部分(K)に当接して前記吊具(9)が下がってきたときに押圧するスイッチ(8)が設けられ、そのスイッチ(8)からの信号を受けて前記吊具(9)を上下動する電動ワイヤブロック(10)を制御する制御盤(30)で構成されている。   Further, in the drilling method of the present invention, the determination means (8, 30) includes a hook (21) attached to an attachment (2) provided at an upper end of the rod (1), and the hook (21) has a hanging hook. (12) is engaged with a ring-shaped lifting tool (9), and the tip of the rod (1) is in contact with the hard ground portion (K) at the top of the attachment (2). A switch (8) that is pressed when the hanger (9) comes down is provided, and an electric wire block (10) that moves up and down the hanger (9) in response to a signal from the switch (8). It is comprised by the control panel (30) to control.

前記ノズルから噴射されるジェット(J)はクロスジェット(Jc)を構成している。   The jet (J) ejected from the nozzle constitutes a cross jet (Jc).

上述の構成を具備する本発明の削孔工法によれば、高圧のウォータジェット(J)を用いて削孔を行うので、通常に削孔が行われている場合には、削孔手段(1)の先端は常に宙に浮いている状態であり、削孔手段に曲げの原因となる推力を全く与えずに、重力のみが作用している状態で削孔することが出来る。   According to the drilling method of the present invention having the above-described configuration, drilling is performed using a high-pressure water jet (J). Therefore, when drilling is normally performed, the drilling means (1 ) Is always floating in the air, and the hole can be drilled in a state where only gravity is applied without giving any thrust that causes bending to the hole drilling means.

高圧のウォータジェット(J)による削孔が十分に行われないうちに削孔手段(1)が自重によって沈降すると、削孔手段(ケーシング、或いはロッド:1)は掘削孔(H)の底面に当接(着底)して、削孔精度(鉛直に対する精度)が悪くなる恐れが存在する。しかし、本発明では、削孔の沈降スピードを予めセットすることで、削孔スピードと、削孔手段(ケーシング、或いはロッド:1)の沈降スピードとをバランスさせて、削孔手段(1)が着底してしまうことを可能な限り防止することが出来る。   If the drilling means (1) sinks under its own weight before the high-pressure water jet (J) is not sufficiently drilled, the drilling means (casing or rod: 1) is placed on the bottom surface of the drilling hole (H). There is a risk that the accuracy of drilling (accuracy with respect to the vertical) may deteriorate due to contact (bottoming). However, in the present invention, by setting the settling speed of the drilling hole in advance, the drilling means (1) balances the drilling speed with the settling speed of the drilling means (casing or rod: 1). It is possible to prevent the bottoming as much as possible.

これに加えて本発明では、上記方法でジェット(J)による削孔の速度が、削孔手段(ケーシング、或いはロッド:1)の沈降スピードに対して、遅くなってしまった場合にも対処することが出来る。
係る場合において、着底スイッチ(8)によって削孔手段(1)が着底したことを検知したならば、判定手段(着底スイッチ:8)により削孔手段(1)の降下を停止して、同一の深度にて削孔手段(1)を回転し先端からジェット(J)を噴射する。そのため、吊り下げられた削孔手段(1)が削孔された孔(H)の壁面に寄りかかるような状態となってしまう以前の段階で、削孔手段(1)の下方がジェット(J)により掘削され、削孔手段(ロッド:1)の先端が削孔された孔(H)底面で掘削孔の孔壁へ寄りかかってしまうのを防止することが出来る。
In addition to this, the present invention deals with a case where the speed of drilling by the jet (J) becomes slower than the settling speed of the drilling means (casing or rod: 1) by the above method. I can do it.
In such a case, if it is detected by the bottom switch (8) that the hole drilling means (1) has bottomed, the descent of the hole drilling means (1) is stopped by the judging means (bottom switch: 8). The hole drilling means (1) is rotated at the same depth to jet a jet (J) from the tip. Therefore, in a stage before the suspended drilling means (1) is in a state of leaning against the wall surface of the drilled hole (H), the lower part of the drilling means (1) is jet (J). It is possible to prevent the drilling means (rod: 1) from leaning against the hole wall of the drilling hole at the bottom of the drilled hole (H).

削孔終了時は、削孔手段の下方部分(ジェット噴射部、モニタ:1M)をワイヤ等の牽引手段で引抜く(図示の例では、モニタ取外し装置Pを用いてモニタ1Mを吊り上げる)ことにより、削孔手段(ケーシング:1C)内に例えば薬液注入用チューブを建て込むことが出来る。   At the end of drilling, the lower part of the drilling means (jet injection part, monitor: 1M) is pulled out by pulling means such as a wire (in the example shown, the monitor 1M is lifted using the monitor removing device P). For example, a chemical solution injection tube can be built in the hole drilling means (casing: 1C).

なお、削孔対象地盤の変化や、削孔手段(ロッド:1)先端の図示しないノズル部の磨耗に対して、その下方の部分(モニタ部:1M)を交換することで対応可能である。   In addition, it can respond to the change of the drilling target ground and the wear of the nozzle part (not shown) at the tip of the drilling means (rod: 1) by replacing the lower part (monitor part: 1M).

以下、添付図面を参照して、本発明の実施形態について説明する。   Embodiments of the present invention will be described below with reference to the accompanying drawings.

先ず、図1〜図11を参照して第1実施形態を説明する。   First, a first embodiment will be described with reference to FIGS.

図1において、削孔手段であるロッド1は、筒状のケーシング1Cとその下端部に設けられた高圧水を噴射するノズルを有するモニタ1Mとで構成されており、そのモニタ1Mは、図2〜図4に示すように(図3、図4は後記にて説明する)ケーシング1Cの内周とは、例えばスプラインを介して回転方向は拘束され、上下方向は移動可能に係止されている。
図1に戻り、ロッド1の地上側であるその後端側には高圧水供給ラインLwが接続されるアタッチメント2が、相対回転自在に取付けられている。
In FIG. 1, a rod 1 as a hole drilling means is composed of a cylindrical casing 1C and a monitor 1M having a nozzle for injecting high-pressure water provided at its lower end, and the monitor 1M is shown in FIG. As shown in FIG. 4 (FIGS. 3 and 4 will be described later), the inner periphery of the casing 1C is constrained so that the rotational direction is restricted via a spline, for example, and the vertical direction is movably locked. .
Returning to FIG. 1, an attachment 2 to which a high-pressure water supply line Lw is connected is attached to the rear end side, which is the ground side of the rod 1, so as to be relatively rotatable.

ロッド1の中程には、ロッド1を包囲しつつ、ロッド1に回転力を与えるボーリングマシン3が図示しない支持部材によって設置されている。   In the middle of the rod 1, a boring machine 3 that surrounds the rod 1 and applies a rotational force to the rod 1 is installed by a support member (not shown).

ロッド1の前記ボーリングマシン3と地表4との間の領域には、図7及び図8に示す様に、回転軸51を有する1対のガイドローラ5とそのガイドローラ5を支持するガイドローラ支持部材6より構成されるケーシング(ロッド)回転治具7が設けてある。   As shown in FIGS. 7 and 8, a pair of guide rollers 5 having a rotation shaft 51 and a guide roller support for supporting the guide rollers 5 are provided in an area between the boring machine 3 and the ground surface 4 of the rod 1. A casing (rod) rotating jig 7 composed of the member 6 is provided.

前記ガイドローラ支持部材6は、下方が開放された箱状体61と、その箱状体61の下端の4隅から下方に延在し前記ガイドローラ5の回転軸51を回転支持する回転軸受部材62と、対向するガイドローラ5の回転軸受部材62の下端部を係合し合う1対のボルト63と1対のナット4と、前記箱状体61の上方に溶接されてロッド1を包囲するカバー部材65とで構成されている。   The guide roller support member 6 includes a box-like body 61 whose lower side is open, and a rotary bearing member that extends downward from four corners at the lower end of the box-like body 61 and rotatably supports the rotary shaft 51 of the guide roller 5. 62, a pair of bolts 63 and a pair of nuts 4 that engage with the lower end of the rotary bearing member 62 of the opposing guide roller 5 and a pair of nuts 4 are welded above the box-shaped body 61 to surround the rod 1. It is comprised with the cover member 65. FIG.

1対のガイドローラ5の各々におけるローラ表面は、ロッド(ケーシング)1の外周を包囲しつつ外周表面に接するように外径の異なる複数の円盤状体が円盤の中心を一致させて一体に連なるように構成されている。
そのように構成することで、ロッド1が回転しながら鉛直線からぶれることなく下方に吊下ろすことが出来る。
The roller surfaces of each of the pair of guide rollers 5 are integrally connected with a plurality of disk-like bodies having different outer diameters so that the centers of the disks coincide with each other so as to be in contact with the outer peripheral surface while surrounding the outer periphery of the rod (casing) 1. It is configured as follows.
With such a configuration, the rod 1 can be hung downward without rotating from the vertical line while rotating.

再び図1を参照して、前記アタッチメント2の上端には、アタッチメント2側の吊下げ用で逆U字状のフック21が取付けられ、また、アタッチメント2の上端中央には着底スイッチ8が取付けられている。なお、この着底スイッチ8と後記する制御盤30とにより、判定手段が構成されている。   Referring again to FIG. 1, an inverted U-shaped hook 21 is attached to the upper end of the attachment 2 for suspending the attachment 2, and a bottoming switch 8 is attached to the center of the upper end of the attachment 2. It has been. The bottoming switch 8 and a control panel 30 described later constitute a determining means.

前記アタッチメント2側のフック21には、リング状の吊具9が係合されている。吊具9はワイヤブロック10側のフック12と係合しており、フック12は昇降用ワイヤ(或いはチェーン)11の先端に取付けられており、電動ワイヤブロック10によってワイヤ(或いはチェーン)11を巻き上げ或いは巻き下ろすことにより、フック12は昇降させられる   A ring-shaped lifting tool 9 is engaged with the hook 21 on the attachment 2 side. The lifting tool 9 is engaged with a hook 12 on the wire block 10 side, and the hook 12 is attached to the tip of a lifting wire (or chain) 11, and the wire (or chain) 11 is wound up by the electric wire block 10. Alternatively, the hook 12 can be raised and lowered by unwinding.

前記着底スイッチ8は、図5に示すように、スイッチ機能を有するスイッチ本体部81とそのスイッチ本体の上部にコイルスプリング82を介して取付けられた可動部83とから構成されている。そして、前記リング状の吊具9が下がってきて可動部83を押圧した場合にスイッチが入る構造となっている。   As shown in FIG. 5, the bottom switch 8 includes a switch main body 81 having a switch function and a movable portion 83 attached to the upper portion of the switch main body via a coil spring 82. And when the said ring-shaped hanging tool 9 comes down and presses the movable part 83, it has a structure which switches on.

ロッド1が削孔しながら降下中に、例えば、ロッド1先端が固い地盤に当接した場合を想定する。そのまま昇降用ワイヤ11を下ろし続けると、先端が固い地盤に当接しているロッド1は下降を停止しているので、吊具9と、下降を停止したロッド1の上端のアタッチメント2の上面における前記着底スイッチ8の可動部83の上端とは、図5で示す様な位置関係から近接する。そして、吊具9と前記着底スイッチ8の可動部83の上端とが当接し、可動部83が押圧され、スプリング82も撓んで、着底スイッチ8はON(作動)の状態(図6)となる。   A case is assumed in which, for example, the tip of the rod 1 comes into contact with a hard ground while the rod 1 is being lowered while drilling. If the elevating wire 11 continues to be lowered as it is, the rod 1 whose tip is in contact with the hard ground has stopped descending, so that the suspension 9 and the upper surface of the attachment 2 at the upper end of the rod 1 that has stopped descending are stopped. The upper end of the movable portion 83 of the bottoming switch 8 is close to the positional relationship as shown in FIG. Then, the hanger 9 and the upper end of the movable portion 83 of the bottom switch 8 come into contact with each other, the movable portion 83 is pressed, the spring 82 is bent, and the bottom switch 8 is in an ON (actuated) state (FIG. 6). It becomes.

図1において、着底スイッチ8のON/OFF信号は、信号ラインLiを介して地上に設置した制御盤30に送られ、スイッチ8がONの状態であれば電動ワイヤブロック10に制御信号ラインLoを送り、電動ワイヤブロック10の作動を停止させる。
一方、スイッチ8の可動部83から吊具9が離れれば(図5の状態)、スイッチ8はOFF状態となって、OFF状態を検知した制御盤30は電動ワイヤブロック10に制御信号を送り、電動ワイヤブロック10を再び稼動させる。
In FIG. 1, the ON / OFF signal of the bottom switch 8 is sent to the control panel 30 installed on the ground via the signal line Li. If the switch 8 is in the ON state, the control signal line Lo is sent to the electric wire block 10. To stop the operation of the electric wire block 10.
On the other hand, if the hanging tool 9 is separated from the movable portion 83 of the switch 8 (the state shown in FIG. 5), the switch 8 is turned off, and the control panel 30 that has detected the off state sends a control signal to the electric wire block 10, The electric wire block 10 is operated again.

当該工法では、前述したようにロッド1先端から高圧のウォータジェットJを図示の例では真下方向に噴射して、地盤Gを削孔しているが、削孔中には、切削された土壌(地盤)Gと削孔用の水の混合物である泥水が削孔された孔から溢れ出てくる。
その孔Hの周囲には、例えば円環状に堀Nが掘ってあり、孔Hから溢れ出た泥水はその堀Nに集められる。
In the construction method, as described above, the high-pressure water jet J is jetted from the tip of the rod 1 in the illustrated direction in the downward direction to drill the ground G. In the drilling, Ground) Muddy water, which is a mixture of G and drilling water, overflows from the drilled hole.
A moat N is dug around the hole H, for example, in an annular shape, and muddy water overflowing from the hole H is collected in the moat N.

前記堀Nにはサンドポンプ40が設置してあり、サンドポンプ40で吸い揚げられた泥水は排水ラインLhを介して一旦リターンタンク41に貯められ、そのリターンタンク41から再び泥水は吸い揚げられ、マッドスクリーン42で固形分と水に分離され、水の部分が排水ラインLhを経由して泥水タンク43に一時貯留される。   A sand pump 40 is installed in the moat N, and the muddy water sucked up by the sand pump 40 is temporarily stored in the return tank 41 through the drain line Lh, and the muddy water is sucked up from the return tank 41 again. The mud screen 42 separates the solid content and water, and the water portion is temporarily stored in the muddy water tank 43 via the drain line Lh.

泥水タンク43に一時貯留され、濾過された水は、再び高圧ポンプ44によって高圧を与えられ、前記高圧水供給ラインLwを介して、ロッド1後端の前記アタッチメント2に削孔用高圧水として圧送される。   The water temporarily stored and filtered in the muddy water tank 43 is again given high pressure by the high-pressure pump 44, and is pumped as high-pressure water for drilling to the attachment 2 at the rear end of the rod 1 via the high-pressure water supply line Lw. Is done.

次に、図9〜図11を参照して、第1実施形態に係る工法によって削孔する工程を工程順に説明する。   Next, with reference to FIGS. 9-11, the process of drilling by the construction method which concerns on 1st Embodiment is demonstrated in order of a process.

先ず、図9において、ロッド1の先端に位置しているモニタ1Mのノズルから、高圧のウォータジェットJを下方に向けて噴射する。それと共に、ロッド1をボーリングマシン3によって旋回させながら、ロッド1を電動ワイヤブロック10(図1参照:図9では図示せず)を用いて徐々に下降させて、地盤を削孔していく。
図9で示されている状態は、地盤Gが比較的削孔し易い硬度の土壌、例えば粘土であることを想定しており、ロッド1先端から掘削孔Hの底までは、一定間隔以上の隙間が保たれている。
First, in FIG. 9, a high-pressure water jet J is jetted downward from the nozzle of the monitor 1 </ b> M located at the tip of the rod 1. At the same time, while turning the rod 1 by the boring machine 3, the rod 1 is gradually lowered using the electric wire block 10 (see FIG. 1; not shown in FIG. 9) to drill the ground.
The state shown in FIG. 9 assumes that the ground G is a soil having a hardness that is relatively easy to drill, for example, clay, and the distance from the tip of the rod 1 to the bottom of the excavation hole H is a certain interval or more. A gap is maintained.

図10では、固い地盤部分Kにロッド1の先端が当接した状態を想定している。図10で示す状態では、ロッド1の先端は、それ以上深い方(鉛直方向下方)へ削孔して進行することが出来なくなってしまっている。
一方、吊具9は未だ、昇降用ワイヤ11が下降を続けているので、図6で示したように着底スイッチ8の可動部83に当接し、吊具9の質量によってスイッチ8の可動部83を押圧する。
すると、スイッチ8が作動(ON)となり、その作動信号が図示しない信号ラインLiを介して図示しない制御盤30に伝えられる。係る作動信号が伝達された制御盤30は、図示しない制御信号ラインLoを介して、電動ワイヤブロック10に、電動ワイヤブロックの回転を停止させるべく制御信号を送る。
制御信号を受けた電動ワイヤブロック10は停止するが、電動ワイヤブロック10が停止した状態のまま、ロッド1先端からは高圧のウォータジェットJが噴射され続ける。高圧のウォータジェットJが噴射され続けて、硬い地盤Kと衝突し続ける状態が継続されれば、固い地盤Kも切削され、削孔される。
In FIG. 10, it is assumed that the tip of the rod 1 is in contact with the hard ground portion K. In the state shown in FIG. 10, the tip of the rod 1 can no longer travel by drilling deeper (downward in the vertical direction).
On the other hand, since the lifting / lowering wire 11 continues to descend, the lifting tool 9 is in contact with the movable part 83 of the bottoming switch 8 as shown in FIG. 83 is pressed.
Then, the switch 8 is activated (ON), and the activation signal is transmitted to the control panel 30 (not shown) via the signal line Li (not shown). The control panel 30 to which the operation signal is transmitted sends a control signal to the electric wire block 10 through the control signal line Lo (not shown) to stop the rotation of the electric wire block.
The electric wire block 10 that has received the control signal stops, but the high-pressure water jet J continues to be ejected from the tip of the rod 1 while the electric wire block 10 is stopped. If the state where the high-pressure water jet J is continuously injected and continues to collide with the hard ground K is continued, the hard ground K is also cut and drilled.

固い地盤Kが切削され、ロッド1先端と孔Hの底との間には隙間が生じれば、図11で示す様に、ロッド1は自重で降下を始め、吊具9が着底スイッチ8から離れ(図5の状態)、着底スイッチ8はOFF状態となる。
OFF状態を検知した制御盤30は、電動ワイヤブロック10を再び稼動させるべく制御信号を電動ワイヤブロック10に送り、制御信号を受信した電動ワイヤブロック10は再び回転を開始し、ロッド1を所定の速度で降下させていく。
If the hard ground K is cut and a gap is formed between the tip of the rod 1 and the bottom of the hole H, the rod 1 starts to descend by its own weight as shown in FIG. The bottom switch 8 is turned off after moving away from (from the state shown in FIG. 5).
The control panel 30 that has detected the OFF state sends a control signal to the electric wire block 10 to operate the electric wire block 10 again. The electric wire block 10 that has received the control signal starts to rotate again, and the rod 1 is moved to a predetermined position. Descent at a speed.

図9〜図11を参照して述べた各工程を繰り返しながら削孔を続けることにより、目的とする孔Hの削孔が完了する。   The drilling of the target hole H is completed by continuing the drilling while repeating the steps described with reference to FIGS.

上述したような構成及び工法の第1実施形態によれば、高圧のウォータジェットJを用いて削孔を行うので、通常に削孔が行われている場合は、ロッド1の先端は常に宙に浮いている状態であり、ケーシング1Cには重力のみが作用しているので、ケーシング1Cが鉛直方向から「ずれて」しまう原因となる(曲げの原因となる)力を全く受けない。従って、重力が作用する鉛直方向へ、正確に掘削を続けることが出来るのである。   According to the first embodiment of the configuration and method as described above, since the high-pressure water jet J is used for drilling, the tip of the rod 1 is always in the air when drilling is normally performed. Since it is in a floating state and only the gravity acts on the casing 1C, it does not receive any force that causes the casing 1C to “shift” from the vertical direction (causes bending). Therefore, excavation can be continued accurately in the vertical direction in which gravity acts.

高圧のウォータジェットJにより削孔が十分に行われないうちにロッド1が自重によって下方へ移動してしまうと(沈降すると)、ケーシング1Cは孔Hの壁面に寄りかかり、削孔精度(鉛直に対する精度)が悪くなる可能性がある。しかし、上述した通り、ケーシング1C先端が着底した場合には、ケーシング1Cの下降が停止して、削孔の進行スピード(或いは、ケーシング1Cの沈降スピード)がゼロとなり、その間も高圧のウォータジェットJを下方へ噴射しつづける。
そのため、ケーシング1Cが孔Hの壁面に寄りかかってしまう以前にケーシング1C下方の地盤が切削されて、孔の方向が鉛直方向から「ずれて」しまうことが防止される。
If the rod 1 moves downward due to its own weight before it is sufficiently drilled by the high-pressure water jet J (when it sinks), the casing 1C leans against the wall surface of the hole H, and drilling accuracy (accuracy with respect to the vertical). ) May be worse. However, as described above, when the front end of the casing 1C is bottomed, the lowering of the casing 1C stops, the drilling speed (or the settling speed of the casing 1C) becomes zero, and the high-pressure water jet is also in the meantime. Continue to inject J downward.
Therefore, the ground below the casing 1C is cut before the casing 1C leans against the wall surface of the hole H, and the direction of the hole is prevented from being “shifted” from the vertical direction.

換言すれば、上述した第1実施形態によれば、孔Hの削孔速度と、ケーシング1Cの沈降速度とを、常にバランスさせて、鉛直方向へ正確な削孔を行うことが出来るのである。   In other words, according to the first embodiment described above, the drilling speed of the hole H and the settling speed of the casing 1C can always be balanced to perform accurate drilling in the vertical direction.

削孔終了時は、図3、図4に示すように、ケーシング1C内にモニタ取外し装置Pを吊り降ろし、ケーシング1Cを残してモニタ1Mを引き上げることにより、ケーシング1C内には例えば薬液注入用チューブを建て込むことが出来る。
ここで、モニタ取外し装置Pを例えば昇降用ワイヤ11に取り付け、該ワイヤ11を巻き下ろしてモニタ取外し装置PでモニタM1を把持し、ワイヤ11を巻き上げることによりモニタ1Mを引き上げることが可能である。
At the end of drilling, as shown in FIGS. 3 and 4, the monitor detaching device P is suspended in the casing 1C, and the monitor 1M is pulled up while leaving the casing 1C. Can be built.
Here, it is possible to pull up the monitor 1M by attaching the monitor detaching device P to, for example, the lifting / lowering wire 11, rolling down the wire 11, holding the monitor M <b> 1 by the monitor detaching device P, and winding up the wire 11.

なお、削孔対象地盤の変化や、ロッド1先端のノズル部の磨耗に対して、モニタ部1Mはいつでも交換可能である。   It should be noted that the monitor unit 1M can be replaced at any time with respect to changes in the ground to be drilled and wear of the nozzle portion at the tip of the rod 1.

次に、図12を参照して第2実施形態を説明する。   Next, a second embodiment will be described with reference to FIG.

前記図1〜図11で示した第1実施形態は、ロッド1先端の図示しないノズルより噴射される高圧のウォータジェットJは、ロッド1の中心軸と平行な方向へストレートに噴射されるジェットを用いている。
それに対して、図12の第2実施形態では、ロッド先端部は図13に詳細を示すように、モニタ1Mからいわゆる「交差噴流(クロスジェット)」を噴射するように構成されている。すなわち、図13で示す様に、モニタ1Mの下端にはノズルの対が設けられており、該対となったノズルから噴射される一対の高圧ウォータジェットJcは、互いに噴射向きが異なり、所定距離Sにて互いに衝突し合うように構成されている。
In the first embodiment shown in FIGS. 1 to 11, the high-pressure water jet J injected from a nozzle (not shown) at the tip of the rod 1 is jetted straight in a direction parallel to the central axis of the rod 1. Used.
On the other hand, in the second embodiment of FIG. 12, the rod tip is configured to inject a so-called “cross jet” from the monitor 1M, as shown in detail in FIG. That is, as shown in FIG. 13, a pair of nozzles is provided at the lower end of the monitor 1M, and the pair of high-pressure water jets Jc ejected from the paired nozzles have different ejection directions and have a predetermined distance. S is configured to collide with each other.

第2実施形態では、「クロスジェット」を用いることにより、土壌を切削して削孔する範囲或いはウォータジェットの到達距離を、高精度にて制御することが出来る。   In the second embodiment, by using the “cross jet”, it is possible to control the range in which the soil is cut and drilled or the reach of the water jet with high accuracy.

そして、削孔用のウォータジェットがストレートジェットであるかクロスジェットであるかの点を除くと、第2実施形態の構成及び作用効果は、第1実施形態と同様である。   Except for the point of whether the water jet for drilling is a straight jet or a cross jet, the configuration and operational effects of the second embodiment are the same as those of the first embodiment.

次に、図14及び図15を参照して第3実施形態を説明する。   Next, a third embodiment will be described with reference to FIGS. 14 and 15.

図14及び図15の第3実施形態では、複数のロッド1B(図示の例では3連)及びその回転駆動を担う駆動手段3Bを有している。   14 and FIG. 15 includes a plurality of rods 1B (three in the illustrated example) and driving means 3B responsible for rotational driving thereof.

図14において、3本のロッド1Bは各々が連結手段5Bによって中心がぶれないようにガイドされている。   In FIG. 14, each of the three rods 1B is guided by the connecting means 5B so that the center does not move.

夫々のロッド1Bは駆動手段3Bによって回転駆動される。
駆動手段3Bは駆動手段収容器300内に収容されており、駆動手段収容器300の上端には着底スイッチ8が設けられている。
ここで、図14で示す機器(第3実施形態で使用する削孔機器)は、非常に重量が大きいので、単一のワイヤのみで昇降することは困難である。そのため、第3実施形態で使用する削孔機器を昇降するに際しては、図14で1部のみを示す複数の滑車で構成される手段302を配置し、該複数の滑車による倍力作用によって大重量の削孔機器を昇降している。
Each rod 1B is rotationally driven by the drive means 3B.
The driving means 3B is accommodated in the driving means container 300, and a bottom switch 8 is provided at the upper end of the driving means container 300.
Here, since the device shown in FIG. 14 (the hole drilling device used in the third embodiment) is very heavy, it is difficult to move up and down with only a single wire. Therefore, when the drilling device used in the third embodiment is moved up and down, means 302 composed of a plurality of pulleys showing only one part in FIG. 14 is arranged, and the weight is increased by the boosting action of the plurality of pulleys. Up and down drilling equipment.

駆動手段収容器300の上端には一対のブラケット310が溶接されており、前記手段302の下端にも一対のブラケット312が溶接されている。
ブラケット310、310、312、312は、連結ロッド314により結合されている。すなわち、駆動手段収容器300の上端に溶接されたブラケット310、310の各々には、長孔316が形成されており、前記手段302の下端に溶接された一対のブラケット312の各々には、貫通孔318が形成されている。そして、連結ロッド314は、長孔316、316、貫通孔318、318を貫通する様に挿入されており、以って、ブラケット310、310、312、312を結合している。
A pair of brackets 310 are welded to the upper end of the drive means container 300, and a pair of brackets 312 are also welded to the lower end of the means 302.
The brackets 310, 310, 312, 312 are coupled by a connecting rod 314. That is, a long hole 316 is formed in each of the brackets 310 and 310 welded to the upper end of the driving means container 300, and each of the pair of brackets 312 welded to the lower end of the means 302 penetrates each other. A hole 318 is formed. The connecting rod 314 is inserted so as to pass through the long holes 316 and 316 and the through holes 318 and 318, thereby connecting the brackets 310, 310, 312 and 312.

前記第1実施形態及び第2実施形態と同様に、ロッド1Bの先端が地盤に当接すると、駆動手段収容器300は下降を停止するのに対して、前記手段302及び連結ロッド314は下降を続行する。その結果、図15の矢印Bで示す様に、連結ロッド314はブラケット310及び長孔316に対して相対的に下降して、駆動手段収容器300上端のスイッチ8と当接するのである。   As in the first and second embodiments, when the tip of the rod 1B comes into contact with the ground, the drive means container 300 stops descending, while the means 302 and the connecting rod 314 descend. continue. As a result, as shown by an arrow B in FIG. 15, the connecting rod 314 descends relative to the bracket 310 and the long hole 316 and comes into contact with the switch 8 at the upper end of the drive means container 300.

上述した以外の構成及び作用については、第3実施形態は、前記第1実施形態或いは第2実施形態と実質的に同様である。   Regarding configurations and operations other than those described above, the third embodiment is substantially the same as the first embodiment or the second embodiment.

次に図16について説明する。
図16は、図1〜図11の第1実施形態における昇降用ワイヤ(第4実施形態では昇降用ケーブル110)よりも下方の設備Mを、移動式クレーン車Cに搭載した状態を示している。
昇降用のケーブル110は、クレーンCの巻き上げ機120によって昇降が出来るように構成されている。
Next, FIG. 16 will be described.
FIG. 16 shows a state in which the equipment M below the lifting wire (the lifting cable 110 in the fourth embodiment) in the first embodiment of FIGS. .
The lifting cable 110 is configured to be lifted and lowered by the hoisting machine 120 of the crane C.

そのように構成されることで、施工現場において、削孔エリアが広範囲に亙る場合は、そのまま、クレーンCを移動させるだけでよく、作業は効率的に進められる。
尚、昇降用ケーブル110よりも下方の設備Mは、上述した各実施形態で用いた設備と実質的に同様である。
With such a configuration, when the drilling area covers a wide range at the construction site, it is only necessary to move the crane C as it is, and the work can be efficiently performed.
The equipment M below the lifting cable 110 is substantially the same as the equipment used in the above-described embodiments.

図1或いは図5、図6で示す着底スイッチ8に代えて、図17、図18で示す様なタイプの着底スイッチを用いることも可能である。
図1、図5、図6のアタッチメント2に相当する部材が図17、図18のスイベル152であり、図1、図5、図6の逆U字状のフックに相当する部材が図17、図18におけるヨーク型エンド154である。
図17、図18において、ヨーク型エンド154の内側端面162Sには近接センサ162が配置されており、この近接センサ162が図1或いは図5、図6で示す着底スイッチ8に相当する。
Instead of the bottom switch 8 shown in FIG. 1, FIG. 5, or FIG. 6, it is also possible to use a bottom switch of the type shown in FIGS.
The member corresponding to the attachment 2 in FIGS. 1, 5, and 6 is the swivel 152 in FIGS. 17 and 18, and the member corresponding to the inverted U-shaped hook in FIGS. It is the yoke-type end 154 in FIG.
17 and 18, a proximity sensor 162 is disposed on the inner end surface 162S of the yoke-type end 154, and this proximity sensor 162 corresponds to the bottoming switch 8 shown in FIG. 1, FIG. 5, or FIG.

エンド型ヨーク154と、スイベル152とは、ロッド160によりせつぞくされている。すなわち、エンド型ヨーク154には貫通孔158、158が形成されており、スイベル152にも貫通孔160が形成されており、貫通孔158、160、158にロッド160が挿入され、以って、エンド型ヨーク154とスイベル152とが接続されているのである。   The end type yoke 154 and the swivel 152 are arranged by the rod 160. That is, the end type yoke 154 has through holes 158 and 158, the swivel 152 also has a through hole 160, and the rod 160 is inserted into the through holes 158, 160 and 158. The end type yoke 154 and the swivel 152 are connected.

特に図18で明確に示されている通り、エンド型ヨーク154の貫通孔158の内径は、ロッド156外径よりも符号Aで示す寸法だけ、大きくなっている。
また、図17で示す様に、スイベル152の頂面152Sと、近接センサ162が設けられているエンド型ヨーク154の内側端面162Sとの間の距離は、符号「A+ΔA」で示されている。
In particular, as clearly shown in FIG. 18, the inner diameter of the through hole 158 of the end type yoke 154 is larger than the outer diameter of the rod 156 by the dimension indicated by the symbol A.
In addition, as shown in FIG. 17, the distance between the top surface 152S of the swivel 152 and the inner end surface 162S of the end type yoke 154 on which the proximity sensor 162 is provided is indicated by reference sign “A + ΔA”.

図17、図18で示す着底スイッチ(近接センサ162)において、図17、図18では図示しないロッド1が削孔しながら降下中に、固い地盤に当接した場合に、そのまま昇降用ワイヤ11(図17、図18では図示せず)を下ろし続けると、先端が固い地盤に当接しているロッド1は下降を停止しているので、スイベル152及びロッド156が、エンド型ヨーク154及び貫通孔158に対して相対的に上昇する。
その結果、スイベル152の頂面152Sとエンド型ヨーク154の内側端面162Sとの間の距離は、距離A+ΔAよりも減少し、スイベル頂面152Sが近接センサ162に近接する。その結果、近接センサ162が作動して、ロッド1先端が着底したことが検知されるのである。
In the bottoming switch (proximity sensor 162) shown in FIGS. 17 and 18, when the rod 1 (not shown in FIGS. 17 and 18) is drilled while coming into contact with the hard ground, the lifting wire 11 is used as it is. When the rod 1 (not shown in FIG. 17 and FIG. 18) is continuously lowered, the rod 1 whose tip is in contact with the hard ground stops descending, so that the swivel 152 and the rod 156 are replaced with the end type yoke 154 and the through hole. Relative to 158.
As a result, the distance between the top surface 152S of the swivel 152 and the inner end surface 162S of the end type yoke 154 is smaller than the distance A + ΔA, and the swivel top surface 152S is close to the proximity sensor 162. As a result, the proximity sensor 162 is activated and it is detected that the tip of the rod 1 has reached the bottom.

その他の構成及び作用効果は、図1、図5、図6で説明した着底スイッチ8の場合と同様である。   Other configurations and operational effects are the same as those of the bottom switch 8 described with reference to FIGS. 1, 5, and 6.

図示の実施形態はあくまでも例示であり、本発明の技術的範囲を限定する趣旨の記述ではない。例えば、図1〜図11の第1実施形態におけるガイドローラ5のローラ表面は、ロッド1の外周表面に部分的、或いは全面で接するような滑らかな曲面で構成されていてもよい。   The illustrated embodiment is merely an example, and is not intended to limit the technical scope of the present invention. For example, the roller surface of the guide roller 5 in the first embodiment shown in FIGS. 1 to 11 may be formed of a smooth curved surface that partially or entirely contacts the outer peripheral surface of the rod 1.

本発明の実施形態の装置全体の構成を示すブロック図。The block diagram which shows the structure of the whole apparatus of embodiment of this invention. 図1のロッドの詳細を示す図。The figure which shows the detail of the rod of FIG. モニタの引き上げのための装置の挿入状態を示す図。The figure which shows the insertion state of the apparatus for pulling up a monitor. モニタの引き上げ状態を示す図。The figure which shows the raising state of a monitor. 図1の円Aで囲った部分を詳細に示した図で、非作動状態を示す図。The figure which showed the part enclosed with the circle | round | yen A of FIG. 1 in detail, and is a figure which shows a non-operation state. 図1の円Aで囲った部分を詳細に示した図で、作動状態を示す図。The figure which showed the part enclosed with the circle | round | yen A of FIG. 1 in detail, and is a figure which shows an operation state. ケーシング回転治具の詳細構成を示した側面図。The side view which showed the detailed structure of the casing rotation jig. 図7のY矢視図。Y arrow view of FIG. 本発明の第1実施形態における削孔工程の初期を示す工程図。Process drawing which shows the initial stage of the drilling process in 1st Embodiment of this invention. 本発明の第1実施形態における削孔工程で、ロッド先端が地盤に当接し、着底スイッチが作動した際の状態を示す工程図。The process figure which shows the state at the time of the drilling process in 1st Embodiment of this invention, when a rod front-end | tip contact | abutted the ground and the bottoming switch act | operated. 本発明の第1実施形態における削孔工程で、ロッド先端が地盤から離れ、着底スイッチが非作動に復帰した際の状態を示す工程図。The process figure which shows a state when the rod tip leaves | separates from the ground and the bottoming switch returns to non-operation in the drilling process in 1st Embodiment of this invention. 本発明の第2実施形態で用いられる装置の要部を示すブロック図。The block diagram which shows the principal part of the apparatus used by 2nd Embodiment of this invention. 図13のロッド先端部を示す図。The figure which shows the rod front-end | tip part of FIG. 本発明の第3実施形態で用いられる装置の要部を示すブロック図。The block diagram which shows the principal part of the apparatus used by 3rd Embodiment of this invention. 図14のA矢視部分拡大図。The A arrow partial enlarged view of FIG. 本発明で使用される装置の1例を示す全体構成図。The whole block diagram which shows an example of the apparatus used by this invention. 着底スイッチの別の例を示す部分断面図。The fragmentary sectional view which shows another example of a bottoming switch. 図17のS矢視図。The S arrow line view of FIG. 掘削した複数の掘削孔の1本が傾いて形成された場合に生じる隙間を説明する作業状態図。The operation state figure explaining the crevice which arises when one of a plurality of excavated excavation holes is inclined and formed. 図19のX−X断面図。XX sectional drawing of FIG.

符号の説明Explanation of symbols

1・・・ロッド
1C・・・ケーシング
1M・・・モニタ
2・・・アタッチメント
3・・・ボーリングマシン
4・・・地表
5・・・ガイドローラ
6・・・ガイドローラ支持部材
7・・・ケーシング回転治具
8・・・着底スイッチ
9・・・吊具
10・・・電動ワイヤブロック
11・・・昇降用ワイヤ
12、21・・・フック
30・・・制御盤
DESCRIPTION OF SYMBOLS 1 ... Rod 1C ... Casing 1M ... Monitor 2 ... Attachment 3 ... Boring machine 4 ... Ground surface 5 ... Guide roller 6 ... Guide roller support member 7 ... Casing Rotating jig 8 ... Bottoming switch 9 ... Hanging tool 10 ... Electric wire block 11 ... Lifting wire 12, 21 ... Hook 30 ... Control panel

Claims (3)

筒状のケーシング(1C)とその下端部に設けられて高圧水のジェット(J)を噴射するノズルを有するとともに前記ケーシング(1C)内に設けられたモニタ(1M)とを備えたロッド(1)を有し、そのロッド(1)は懸垂した状態で回転しつつ一定速度で下降させて鉛直の削孔を形成するための削孔工法において、ロッド(1)の先端が前記一定速度で下降させたときに削孔できない固い地盤部分(K)に当接したことを判定する判定手段(8、30)を設け、ロッド(1)を一定速度で下降中にその先端が前記固い地盤部分(K)に当接したと判定手段(8、30)により判定したときにロッド(1)の下降を停止して停止した状態でノズルからジェット(J)を噴射して前記固い地盤部分(K)を削孔し、前記固い地盤部分(K)が削孔されて前記判定手段(8、30)によりロッド(1)の先端が前記固い地盤部分(K)と当接しなくなったと判定されたときに再びロッド(1)を下降させることを特徴とする削孔工法。 A rod (1) having a cylindrical casing (1C) and a nozzle (1M) provided at the lower end of the casing (1C) and having a nozzle for injecting a jet (J) of high-pressure water. ), And the rod (1) rotates in a suspended state and descends at a constant speed to form a vertical drilling hole, the tip of the rod (1) descends at the constant speed Determination means (8, 30) is provided for determining that the hard ground portion (K) that cannot be drilled when contacted, and the rod (1) is lowered at a constant speed, the tip of the hard ground portion ( K) When it is determined by the determination means (8, 30) that it has come into contact with the rod (1), the solid ground portion (K) Drilling the hard ground part (K) When it is determined that the tip of the rod (1) is no longer in contact with the hard ground portion (K) by the determination means (8, 30) after being drilled, the rod (1) is lowered again. Drilling method. 前記判定手段(8、30)はロッド(1)の上端に設けたアタッチメント(2)に取付けたフック(21)を備え、そのフック(21)には懸垂フック(12)に係合してリング状の吊具(9)が係合しており、前記アタッチメント(2)の上部に前記ロッド(1)の先端が前記固い地盤部分(K)に当接して前記吊具(9)が下がってきたときに押圧するスイッチ(8)が設けられ、そのスイッチ(8)からの信号を受けて前記吊具(9)を上下動する電動ワイヤブロック(10)を制御する制御盤(30)で構成されている請求項1記載の削孔工法。 The determination means (8, 30) includes a hook (21) attached to an attachment (2) provided at the upper end of the rod (1), and the hook (21) engages with a suspension hook (12) to form a ring. A rod-shaped hanging tool (9) is engaged, and the tip of the rod (1) comes into contact with the hard ground portion (K) on the top of the attachment (2), and the hanging tool (9) is lowered. A control panel (30) for controlling the electric wire block (10) which is provided with a switch (8) to be pressed when it is moved and which receives a signal from the switch (8) and moves the hanging tool (9) up and down. The drilling method according to claim 1, wherein: 前記ノズルから噴射されるジェット(J)はクロスジェット(Jc)を構成している請求項1記載の削孔工法。 The drilling method according to claim 1, wherein the jet (J) ejected from the nozzle constitutes a cross jet (Jc).
JP2004045984A 2004-02-23 2004-02-23 Drilling method Expired - Fee Related JP4467329B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004045984A JP4467329B2 (en) 2004-02-23 2004-02-23 Drilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004045984A JP4467329B2 (en) 2004-02-23 2004-02-23 Drilling method

Publications (2)

Publication Number Publication Date
JP2005232898A JP2005232898A (en) 2005-09-02
JP4467329B2 true JP4467329B2 (en) 2010-05-26

Family

ID=35016135

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004045984A Expired - Fee Related JP4467329B2 (en) 2004-02-23 2004-02-23 Drilling method

Country Status (1)

Country Link
JP (1) JP4467329B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016135968A (en) * 2015-01-23 2016-07-28 株式会社川本製作所 Attaching/detaching device and drainage system

Also Published As

Publication number Publication date
JP2005232898A (en) 2005-09-02

Similar Documents

Publication Publication Date Title
US9512591B2 (en) Cleaning device for cleaning a bottom of a borehole and method for creating a foundation element
US6540443B2 (en) Apparatus for and a method of boring the ground
CN108005576B (en) Rotary drilling rig for separating slag and rotary drilling construction method
JP6081100B2 (en) Existing pile pulling device
JP6085484B2 (en) Pile driver
AU2010241465A1 (en) Underwater drilling arrangement and method for introducing a tubular foundation element into the bed of a body of water
AU716089B2 (en) Method and device for driving bore-holes, specially in the sea bed, using a guide tip.
US20090285637A1 (en) Pile mandrel with extendable reaming members
JP4467329B2 (en) Drilling method
CN114277797B (en) A steel pipe pile sinking device
JP5869401B2 (en) Casing supply method and excavation hole forming method
JP5869400B2 (en) Excavator
JP5670282B2 (en) Excavator and method for forming excavation hole
JP2011026936A (en) Method and device for extracting buried pile
JP2004131923A (en) Underground existing structure extraction method
CN213359995U (en) Rock crushing pile machine
CN108894724A (en) A kind of rock core drilling equipment for being mounted in excavator
JP4504752B2 (en) Construction method and apparatus for tubular precast concrete member
JP2011058280A (en) Concrete structure working apparatus
JP2002121988A (en) Drilling system and drilling equipment for soil
JPH02125022A (en) Drilling machine for caisson
JP2018150774A (en) High pressure injection device and high pressure injection method
JP2633154B2 (en) Vertical hole drilling method
JP2001032277A (en) Obstacle pile extracting method and device thereof
KR20110105245A (en) Grab core barrel with water spray function and excavator with same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090116

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090305

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090930

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091106

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100223

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100223

R150 Certificate of patent or registration of utility model

Ref document number: 4467329

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130305

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160305

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees