Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4500428B2 - Earth wall and earth wall elements - Google Patents
[go: Go Back, main page]

JP4500428B2 - Earth wall and earth wall elements - Google Patents

Earth wall and earth wall elements Download PDF

Info

Publication number
JP4500428B2
JP4500428B2 JP2000347552A JP2000347552A JP4500428B2 JP 4500428 B2 JP4500428 B2 JP 4500428B2 JP 2000347552 A JP2000347552 A JP 2000347552A JP 2000347552 A JP2000347552 A JP 2000347552A JP 4500428 B2 JP4500428 B2 JP 4500428B2
Authority
JP
Japan
Prior art keywords
cylindrical portion
steel material
column
earth pressure
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2000347552A
Other languages
Japanese (ja)
Other versions
JP2002146777A (en
Inventor
輝勝 笹谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP2000347552A priority Critical patent/JP4500428B2/en
Publication of JP2002146777A publication Critical patent/JP2002146777A/en
Application granted granted Critical
Publication of JP4500428B2 publication Critical patent/JP4500428B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、大断面で中距離の地下トンネルを構築する際に好適な土圧壁およびそれに用いるエレメントに関する。
【0002】
【従来の技術】
現在、都市部でのトンネル工事には多くの場合シールド工法が採用されている。
また、短い距離で大きな断面のトンネル工事には、URT(アンダーレイルウェイトンネリング)工法が採用されている。
一方、大断面で100〜300m程度の中距離のトンネルを工事しようとする場合、シールド工法はシールド掘進機が高価格であるため採用されず、上記のURT工法となる。
ここで、URT工法は、断面が四角形の筒状のエレメントを複数用意し、発進立坑において、前端にオーガを配置したエレメントを先頭に後続のエレメントを順次継ぎ足しながら到達立坑まで押し込み、トンネルの外殻に対応する箇所にこのようなエレメントからなる柱体を連続状に形成し、これら柱体をなすエレメントの内部に間詰めコンクリートを充填して土圧壁を形成し、その後、土圧壁の内側を掘削していく工法である。
【0003】
【発明が解決しようとする課題】
しかしながらこのURT工法では、エレメントの前端に配置したオーガにより掘削を行ない、オーガでは円形の孔が掘削されるため、エレメントの四隅は孔が掘削されていない地盤部分に対して無理押しすることになり、トンネル長さは100m前後が限界となる。
一方、掘削された円形の孔に挿入され易いように、エレメントとして断面が円筒のものを用いて土圧壁を形成した場合には、互いに隣り合う柱体の間では、エレメントの円形部分と円形部分が接することになるため、それらエレメントの内部に充填される間詰めコンクリートの厚さがなくなるところが生じ、四角形のエレメントを用いる場合に比べ有効桁高を大きく確保することができない。
【0004】
そこで、エレメントとして断面が円筒状の円筒部と、この円筒部の一側が円筒部の内側に窪んだ係合部とからなるエレメントを用いることが考えられる。
すなわち、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体を、上記の中空状のエレメントをその長手方向に同軸上に並べられることで構成し、隣り合う柱体相互を、一方の柱体を構成するエレメントの各係合部に、他方の柱体を構成するエレメントの各円筒部の一部が収容されるように配置することが考えられる。
このような構成によれば、掘削された孔へのエレメントの挿入も円滑に行なわれ、また、大きな有効桁高を確保することが可能となる。
【0005】
しかしながら、大きな有効桁高が確保された土圧壁を構築することができても、隣り合う柱体は、円筒部と係合部とが単に係合しているのみで相互に連結されていないため、構築された土圧壁はその耐力に劣る不具合がある。
本発明は前記事情に鑑み案出されたものであって、本発明の目的は、耐力を格段と高めることができる土圧壁および土圧壁用エレメントを提供することにある。
【0006】
【課題を解決するための手段】
前記目的を達成するため本発明は、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体の内部にコンクリートが充填されて構成された土圧壁であって、前記各柱体は、円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなる中空状のエレメントがその長手方向に同軸上に並べられることで構成され、隣り合う柱体相互は、一方の柱体を構成するエレメントの各係合部に、他方の柱体を構成するエレメントの各円筒部の一部が係合されるように配置され、前記各柱体の長手方向に間隔をおいた複数箇所に、エレメントの係合部を通って各柱体の内部間を貫通する主鋼材が土圧壁の周囲に沿って連続するように配設され、これら柱体の内部にコンクリートが充填され、隣り合う柱体相互において、一方の柱体を構成するエレメントの係合部に、他方の柱体を構成するエレメントの円筒部の一部が係合された状態で、前記一方の柱体のエレメントの係合部の外側と、他方の柱体のエレメントの円筒部の外側に閉塞空間が構成され、前記コンクリートは前記閉塞空間にも充填され、前記主鋼材は前記閉塞空間を通るように配設されていることを特徴とする。
また、本発明は、構築すべきトンネルの外殻をなすように地中に複数埋設されそれらの内部にコンクリートが充填される土圧壁用エレメントであって、円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなり、前記係合部は、このエレメントの隣に配置されるエレメントの円筒部の一部が係合されるように構成され、前記係合部および前記係合部に係合される円筒部の箇所には、主鋼材挿通孔が貫設され、前記主鋼材挿通孔には取り外し可能に蓋板が取り付けられていることを特徴とする。
【0007】
本発明の土圧壁では、円筒部と係合部とが係合しているので、大きな有効桁高を確保でき、さらに、隣り合う柱体相互は、円筒部と係合部とが係合し、かつ、隣り合う柱体間に主鋼材が配設された状態で各柱体の内部にコンクリートが充填されるので、土圧壁の耐力は格段と高められる。
また、本発明のエレメントを用いれば、主鋼材挿通孔が蓋板で閉塞されているので、エレメントの内部に土砂が侵入することなく、掘削された孔へのエレメントの挿入が円滑に行なわれ、また、蓋板を取り外せば主鋼材挿通孔が露出するので、複数のエレメント間にわたり主鋼材挿通孔から主鋼材を簡単に配設することができる。
【0008】
【発明の実施の形態】
以下、本発明に係る土圧壁の実施の形態を図面を参照して説明する。
図1は本発明に係る土圧壁の断面正面図を示す。
実施の形態に係る土圧壁12は、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体14と、これら複数の柱体14の内部を貫通する複数の主鋼材16と、各柱体14の内部に充填されたコンクリートCにより矩形枠状に構成されている。
前記各柱体14は、図2(A)、(B)に示すように、円筒部1802と、この円筒部1802の少なくとも一側が前記円筒部1802の全長にわたって円筒部1802の内側に窪んだ係合部1804とからなる中空状のエレメント18がその長手方向に同軸上に並べられることで構成されている。
隣り合う柱体14相互は、一方の柱体14を構成するエレメント18の各係合部1804に、他方の柱体14を構成するエレメント18の各円筒部1802の一部が係合されるように配置されている。
前記主鋼材16は、前記各柱体14の長手方向に間隔をおいた複数箇所に、エレメント18の係合部1804を通って各柱体14の内部間を貫通し土圧壁12の周囲に沿って連続するように配設されている。
そして、これら柱体14の内部にコンクリートCが充填されている。
なお、本発明において主鋼材16とは、曲げ応力に抵抗させるため用いるものを広く含み、したがって、鉄筋や、H形鋼などの鋼材などの他、鋼材ではない繊維ロッドなどを広く含む。
【0009】
本実施の形態では、断面形状の異なる3種類の柱体14が用いられ、各柱体14に対応して3種類のエレメント18が用いられている。
すなわち、矩形枠をなす土圧壁12の上辺の中央と下辺の中央に位置する柱体14のエレメント18は、図2(A)に示すように、円筒部1802と、この円筒部1802の両側に設けられた係合部1804とで構成されている。
また、土圧壁12の下辺の両端に位置する柱体14のエレメント18は、図2(C)で示すように、円筒部1802のみで構成されている。
更に、前記の箇所を除く全ての柱体14のエレメント18、すなわち大半の柱体14を構成するエレメント18は、図2(B)で示すように、円筒部1802と、この円筒部1802の一側に設けられた係合部1804とで構成されている。
前記係合部1804は円筒部1802の内側に窪み円筒部1802の全長にわたって延在している。前記係合部1804は隣に配置されるエレメント18の円筒部1802の一部が収容できる寸法で構成されている。
【0010】
まず、前記エレメント18について図3乃至図5を参照して詳細に説明すると、図3はエレメントの斜視図、図4(A)はエレメントの断面正面図、(B)はエレメントの部分の側面図、図5(A)は蓋板を取り外した状態のエレメントの断面正面図、(B)は蓋板を取り外した状態のエレメントの部分の側面図を示しており、これらの図に示すエレメント18は、円筒部1802と、この円筒部1802の一側に設けられた係合部1804とで構成されている。
前記円筒部1802は、鋼管の一側を切り欠くことで構成されている。
前記係合部1804は、円筒部1802の一側が窪むように凹部状に設けられ、係合部1804は、円筒部1802の内側に配置され凹部の底部を構成する鋼板製の底板1810と、底板1810の両側から起立して凹部の両側を構成し円筒部1802に連結される鋼板製の側板1812とで構成されている。
このような構成からなる係合部1804に、隣に配置されるエレメント18の円筒部1802の一部が収容された状態で、円筒部1802の両端に位置する円筒部1802の縁が、隣に配置されるエレメント18の円筒部1802に当たり、図4(A)に示すように、底板1810の外側と、隣に配置されるエレメント18の円筒部1802の外側との間に閉塞された閉塞空間1850が形成されるように構成されている。
【0011】
図5(A)、(B)に示すように、前記円筒部1802の上下部には、円筒部1802を貫通する主鋼材挿通孔20が互いに等間隔をおき円筒部1802の長手方向に沿って多数形成されている。
また、前記底板1810の上下部にも、底板1810を貫通する主鋼材挿通孔20が互いに等間隔をおき底板1810の長手方向に沿って多数形成されている。
更に、前記上下の主鋼材挿通孔20よりも内側の底板1810箇所に、互いに等間隔をおき底板1810の長手方向に沿ってコンクリート充填孔22が上下に多数形成されている。
前記主鋼材挿通孔20は、主鋼材16が挿通できるように主鋼材16よりも大きな直径で形成され、円筒部1802の各主鋼材挿通孔20と底板1810の各主鋼材挿通孔20とにわたり主鋼材16が挿通されるように、円筒部1802の主鋼材挿通孔20と底板1810の主鋼材挿通孔20とは互いに対応した箇所に形成されている。
そして、図3および図4(A)、(B)に示すように、エレメント18の地中への埋設時に、エレメント18の内部に土砂が入らないように、これら主鋼材挿通孔20は取り外し可能な蓋板24により閉塞され、また、コンクリート充填孔22は取り外し可能な蓋板26により閉塞されている。
【0012】
蓋板24、26の円筒部1802や底板1810への取り付けは、例えば、キャップを嵌め込む形式のものでもよく、あるいは、スポット溶接などにより仮止めする形式のものでもよい。
本実施の形態では、蓋板24として薄い鋼板を用い、この鋼板を円筒部1802、底板1810の外面に、スポット溶接により仮止めしており、地中に埋設された後、エレメント18の内部から作業員がハンマーなどで叩くことにより簡単に取り外せ、主鋼材挿通孔20が露出するように構成されている。
また、蓋板26として、鍔部と有底円筒部からなる薄い鋼板製のキャップを用い、エレメント18の内側から有底円筒部をコンクリート充填孔22に嵌合し、鍔部を底板1810の内面に突き当てており、地中に埋設された後、エレメント18の内部から作業員が鍔部を剥がすことにより簡単に取り外せ、コンクリート充填孔22が露出するように構成されている。
なお、図2(A)に示すように、円筒部1802と、この円筒部1802の両側に設けられた係合部1804とからなるエレメント18では、各係合部1804に主鋼材挿通孔20、コンクリート充填孔22が形成され、これら主鋼材挿通孔20、コンクリート充填孔22は取り外し可能な蓋板24、26により閉塞されている。
また、図2(C)に示すように、円筒部1802のみからなるエレメント18では、互いに90度向きを変えた円筒部1802箇所に、前記と同様に、それぞれ主鋼材挿通孔20が形成され、これら主鋼材挿通孔20は取り外し可能な蓋板24により閉塞されている。
【0013】
次に、上記のようなエレメント18から柱体14により構成される土圧壁12をその構築手順に従ってより詳細に説明する。
図6(A)〜(E)および図7(A)〜(E)は柱体の構築方法の説明図、図8(A)〜(G)は最初に構築する柱体と次に構築する柱体の説明図を示している。
まず、土圧壁12の上辺の中央の柱体14が、図2(A)に示すエレメント18により構築され、次に、隣の柱体14が、図2(B)に示すエレメント18や図2(C)に示すエレメント18を用いて順次構築されていく。
土圧壁12を構築するに際して発進立坑32が設けられ、発進立坑32に円形状の発進坑口34が設けられる。
図6(A)、(B)に示すように、発進立坑32内に円形掘削機36および後続機械38を配置して駆動させ、推進用ジャッキ40により発進坑口34から押し出して掘進させ、これにより図8(A)に示すように円形掘削機36により円形の孔3602が掘削されていく。
次に、図6(B)乃至(E)に示すように、後続機械38の後端にエレメント18を連結して推進用ジャッキ40により発進坑口34から押し出し、次に、このエレメント18に次のエレメント18を連結して推進用ジャッキ40により押し出し、このように発進立坑32内でエレメント18を順次連結して押し出し、到達立坑42に向けて掘進させる。この状態を図8(B)に示す。
なお、直線状に並べられるエレメント18どうしの連結は、例えば、エレメント18の長手方向の後端を縮径しておき、次に打ち込むエレメント18の先端を前記縮径されたエレメント18の後端に嵌め込むなど、従来公知の種々の手段により行われる。
【0014】
このようにして順次エレメント18が連結されて押し出され、円形掘削機36が到達立坑42に近づいたならば、図6(E)に示すように、到達立坑42に到達坑口48を設ける。
そして、発進立坑32におけるエレメント18の押し出しにより、円形掘削機36が到達坑口48から到達立坑42内に突出し、続いて後続機械38が到達立坑42内に突出する。
発進立坑32におけるさらなるエレメント18の押し出しにより、先頭のエレメント18の先部を到達立坑42内に露出させ、到達立坑42内において円形掘削機36および後続機械38をエレメント18から取り外し、次のエレメント18を打ち込むために円形掘削機36および後続機械38を発進立坑32へ移動する。
【0015】
先頭のエレメント18の先部が到達立坑42に到達することで、相互に連結された多数のエレメント18からなり発進立坑32と到達立坑42との間で直線状に延在する柱体14が形成されることになる。
また、多数のエレメント18の両側の係合部1804も直線状に延在することになり、この係合部1804の外側は、円形掘削機36で掘削された円形の孔3602の内部に位置しているため、土が存在していない空間Kとなっている。そのため、次の柱体14を構築するに際して、係合部1804内に円形掘削機36の一部が位置して掘進する関係上、円形掘削機36が直進し易いように、図8(C)に示すように、前記空間K内に改良土Sが充填される。
すなわち、多数のエレメント18の両側の空間Kに、発進立坑32から到達立坑42に向けて(あるいは到達立坑42から発進立坑32に向けて液状の改良土Sが柱体14の全長にわたって充填され、固化される。これにより、次に孔3602を掘削する際に、円形掘削機36の受ける抵抗が周方向において均一となり、直進し易くなる。
【0016】
次に、図7(A)に示すように、発進立坑32から次のエレメント18を打ち込むに際して、発進立坑32に発進坑口34が設けられる。なお、今回打ち込まれるエレメント18は、図2(B)に示すように、係合部1804が円筒部1802の一側部にのみ設けられており、最初に打ち込まれたエレメント18の一方の係合部1804に、今回打ち込まれるエレメント18の円筒部1802の一部が収容されるように発進坑口34が設けられる。
そして、図7(A)に示すように、発進立坑32内に円形掘削機36および後続機械38を配置して駆動させ、推進用ジャッキ40により発進坑口34から押し出して掘進させる。
次に、図7(B)乃至(E)に示すように、後続機械38の後端にエレメント18を連結して推進用ジャッキ40により発進坑口34から押し出し、次に、このエレメント18に次のエレメント18を連結して推進用ジャッキ40により押し出し、このようにエレメント18を発進立坑32内で順次連結しては押し出し、到達立坑42まで掘進させる。
なお、今回の円形掘削機36により掘削では、最初に打ち込まれたエレメント18の一方の係合部1804に対応した部分でオーバーラップして円形孔3602が掘削されることになり、隣り合うエレメント18相互において、図8(E)に示すように、底板1810の外側と、隣に配置されるエレメント18の円筒部1802の外側との間の閉塞空間1850に改良土Sが充填された状態が残存する。
【0017】
このようにして順次エレメント18が連結されて押し出され、円形掘削機36が到達立坑42に近づいたならば、前記と同様に到達立坑42に到達坑口48を設ける。
そして、発進立坑32におけるエレメント18の押し出しにより、円形掘削機36、後続機械38が到達坑口48から到達立坑42内に突出する。
発進立坑32におけるさらなるエレメント18の押し出しにより、先頭のエレメント18の先部が到達坑口48から到達立坑42内に露出し、先頭のエレメント18の先部が到達立坑42内に露出したならば、到達立坑42内において円形掘削機36および後続機械38をエレメント18から取り外し、第3番目の柱体14を打ち込むために円形掘削機36および後続機械38を発進立坑32へ移動する。
これにより、図8(E)に示すように、最初に形成された柱体14に一部が重複した第2番目の柱体14が形成されることになる。
そして、前記と同様に、次の柱体14を構築するに際して、円形掘削機36が直進し易いように、図8(F)に示すように、前記空間K内に改良土Sが充填され図8(G)に示すように、改良土Sが充填されたのち次の円形孔3602が掘削される。
【0018】
このようにして円形掘削機36、後続機械38、エレメント18を用いて発進立坑32から到達立坑42への掘進を行ない、発進立坑32と到達立坑42との間で直線状に延在する柱体14を一部重複させつつ順次形成していき、最後には図1に示すように矩形枠状に連続する複数の柱体14が形成される。
次に、隣り合う柱体14の間の閉塞空間1850に残存した改良土Sを取り除き、隣り合う柱体14間にわたり主鋼材16を配設する。
より詳細に説明すると、まず、底板1810の外側と、隣に配置されるエレメント18の円筒部1802の外側との間の閉塞空間1850に充填された改良土Sを取り除く。
この改良土Sの取り除きは、発進立坑32から到達立坑42に向けて、あるいは到達立坑42から発進立坑32に向けて高圧水を噴射することで行なう。
【0019】
閉塞空間1850に充填された改良土Sを取り除いたならば、次に、各柱体14を構成するエレメント18に取着された蓋板24、26を取り外し、主鋼材挿通孔20およびコンクリート充填孔22を露出させる。
この場合、主鋼材挿通孔20を閉塞する蓋板24は、作業員がエレメント18の内部からハンマーにより叩くことにより取り外され、これにより蓋板24は閉塞空間1850の下部に落下することになる。また、コンクリート充填孔22を閉塞する蓋板26は、エレメント18の内部から適宜治具により蓋板26の鍔部をこじ開けることにより取り外され、取り外された蓋板26はエレメント18外に持ち出される。
【0020】
次に、複数の柱体14の内部を貫通するように複数の主鋼材16を配設する。
本実施の形態では、複数の柱体14により矩形枠が形成されているので、矩形枠をなす上辺と下辺においてそれぞれ連続して水平に延在するように、また、左右の辺においてそれぞれ連続して鉛直に延在するように主鋼材16を配設する。
この場合、主鋼材16として鉄筋やH形鋼などの撓ませることができないものを用いる場合には、適宜長さの主鋼材を主鋼材挿通孔20に挿通させた後、市販の機械式継手などを用いて直線状に連結することで配設する。主鋼材16として繊維ロッドなどを用いる場合には、これらのものは可撓可能であるので、長尺なものをそのままエレメント18内に持ち込んで配設される。
【0021】
複数の柱体14の内部を貫通して複数の主鋼材16が配設されたならば、次に、各柱体14の内部および閉塞空間1850の内部にコンクリートCが充填される。この場合、閉塞空間1850へのコンクリートCの充填は、柱体1850の内部に充填されるコンクリートCがコンクリート充填孔22から閉塞空間1850に流れ込むことで行われる。
そして、各柱体14の内部および閉塞空間1850の内部に充填されたコンクリートCが固化することで図1に示す土圧壁12が構築される。
その後、土圧壁12の内部を掘削し、大断面の地下空間を構築する。
【0022】
本実施の形態による土圧壁12によれば、隣り合う柱体14相互は、円筒部1802と係合部1804とが係合した構成であるので、大きな有効桁高を確保できることは無論のこと、隣り合う柱体14間に主鋼材16が配設された状態で各柱体14の内部にコンクリートCが充填されているので、土圧壁12の耐力を格段と高めることができ、大断面で100〜300m程度の中距離のトンネル施工に好適となる。
また、本実施の形態では、隣り合う柱体14間に生じる閉塞空間1850にも主鋼材16を挿通させ、コンクリートCを充填させたので、土圧壁12の耐力を高める上でより有利となる。
また、本実施の形態に係るエレメント18を用いれば、主鋼材挿通孔20が蓋板24で閉塞されているので、エレメント18の内部に土砂が侵入することなく、掘削された孔3602へのエレメント18の挿入を円滑に行なうことができる。
また、閉塞空間1850へコンクリートCを充填させるためのコンクリート充填孔22を予め複数設け、これらのコンクリート充填孔22を蓋板26により取り外し可能に閉塞させたので、隣り合う柱体14間に生じる閉塞空間1850にコンクリート充填孔22からコンクリートCを効率良く充填させることができ、土圧壁12の耐力を高める上でより有利となる。
【0023】
次に、耐力試験について説明する。
図9は3等分点2点載荷試験体の説明図で、(A)は断面が矩形の柱状をなす鉄筋コンクリート製の試験体の正面図、(B)は同側面図、(C)は本実施の形態の土圧壁を構成する部分の複数の柱体に相当する試験体の正面図、(D)は同側面図を示す。
図9(A)、(B)に示す試験体50では、試験体50の上下の辺に沿って3本ずつ主筋52が配設され、これら主筋52は、試験体50の延在方向に間隔をおいた複数のせん断補強筋54により連結されてる。
図9(C)、(D)に示す試験体56では、外径609.6mm、肉厚6.4mm、長さ450mmのエレメント18が、それらの円筒部1802と係合部1804を係合させ、さらに、主鋼材挿通孔20に主筋52が挿通され、エレメント18の内部と閉塞空間1850にコンクリートCが充填され、エレメント18から突出した主筋52部分にせん断補強筋54が配設されている。
【0024】
図10は荷重変形曲線で、(A)は図9(A)に示す試験体50の場合で、(B)は図9(B)に示す試験体56の場合を示している。
これらの図10(A)、(B)から、図9(B)に示す試験体56の場合のが、図9(A)に示す試験体50の場合よりもループ面積が大きく、エネルギ吸収能力が大きいことが明確である。
図11は図10(A)の荷重変形曲線と、図10(B)の荷重変形曲線を1つの図に重ねて示したもの(荷重ー変位曲線または包絡線)である。
この図11から、図9(B)に示す試験体56場合のが、図9(A)に示す試験体50の場合よりも荷重の最大値である最大耐力が大きいことが明確である。
【0025】
次に、図12を参照して第2の実施の形態について説明する。
第2の実施の形態に係る土圧壁12では、主鋼材16に加え、柱体14の長手方向に間隔をおいた複数箇所に、各エレメント18の係合部1804を通り土圧壁12の周囲に沿って延在するにPC鋼材(緊張材として使用される鋼材)60を配設したものである。
PC鋼材60を用いる場合には、図13(A)に示すように、エレメント18の係合部1804を構成する底板1810に、エレメント18の長手方向に間隔をおいてPC鋼材挿通孔62を複数形成しておき、これらPC鋼材挿通孔62を取り外し可能な蓋板64により閉塞しておく。あるいは、図13(B)に示すように、主鋼材挿通孔20を兼ね備えた長孔状のPC鋼材挿通孔62を複数形成しておき、これらPC鋼材挿通孔62を取り外し可能な蓋板64により閉塞しておく。なお、PC鋼材挿通孔62および蓋板64は、隣に配置され係合部1804に係合するエレメント18の円筒部1802箇所にも無論設けられる。
そして、連続する複数の柱体14が形成された後、蓋板64を取り外し、主鋼材16と共にPC鋼材60をPC鋼材挿通孔62に挿通して配設する。
【0026】
この場合、PC鋼材60としては、PC鋼線、PC鋼より線、PC鋼棒などが用いられ、PC鋼棒など撓ませることができないものを用いる場合には、適宜長さのPC鋼材60をPC鋼材挿通孔62に挿通させた後、市販の機械式継手を用いて連結される。
第2の実施の形態に係る土圧壁12では、隣り合う柱体14間に、主鋼材16に加えてPC鋼材60も配設されているので、土圧壁12の耐力を高める上でより一層有利となる。
【0027】
次に、図14を参照して参考例に係る土圧壁について説明する。
参考例に係る土圧壁12は、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体14と、これら複数の柱体14の内部を貫通する複数の主鋼材16と、各柱体14の内部に充填されたコンクリートCにより矩形枠状に構成されている点において第1の実施の形態と同様であるが、用いるエレメント68の断面形状が第1の実施の形態と異なっている。
すなわち、柱体14を構成するエレメント68の大半は、図15(A)に示すように、円筒部6802と、この円筒部6802の少なくとも一側が前記円筒部6802の全長にわたって円筒部6802の内側に窪んだ係合部1804とで中空状に形成されている。
【0028】
なお、参考例でも、第1の実施の形態と同様に、断面形状の異なる3種類の柱体14が用いられ、各柱体14に対応して3種類のエレメント68が用いられている。すなわち、矩形枠をなす土圧壁12の上辺の中央と下辺の中央に位置する柱体14のエレメント68は、図15(B)に示すように、円筒部6802と、この円筒部6802の両側に設けられた係合部6804とで構成され、土圧壁12の下辺の両端に位置する柱体14のエレメント18は、図15(C)で示すように、円筒部1802のみで構成され、残りの全ての柱体14を構成するエレメント68が、図15(A)に示すように、円筒部6802と、この円筒部6802の一側に設けられた係合部6804とで構成されている。
前記係合部6804は、内側に窪む円筒面状に形成され、隣り合う柱体14相互において、一方の柱体14を構成するエレメント68の係合部6804に、他方の柱体14を構成するエレメント68の円筒部6802の一部が係合された状態で、一方の柱体14のエレメント68の係合部6804の外側と、他方の柱体14のエレメント68の円筒部6802の外側とがほぼ密着するように構成されている。
【0029】
第1の実施の形態と同様に、エレメント68の円筒部6802の上下部と、係合部6804の上下部には、エレメント68を貫通する主鋼材挿通孔20(不図示)が主鋼材16よりも大きな直径で、互いに等間隔をおきエレメント68の長手方向に沿って多数形成されている。
そして、これら主鋼材挿通孔20は、エレメント68の地中への埋設時に、エレメント68の内部に土砂が入らないように、蓋板24により閉塞され、蓋板24は、エレメント68の内側に取り外し可能に取着されている。
なお、参考例では、隣り合う柱体14相互がほぼ密着し、隣り合う柱体14間に閉塞空間1850が生じないので、エレメント68にコンクリート充填孔22は設けられていない。
参考例による土圧壁12によれば、第1の実施の形態と同様に、大きな有効桁高を確保できることは無論のこと、隣り合う柱体14間に主鋼材16が配設された状態で各柱体14の内部にコンクリートCが充填されているので、土圧壁12の耐力を格段と高めることができる。
また、第2の実施の形態のように、主鋼材16に加えてPC鋼材60も用いれば、土圧壁12の耐力を高める上でより有利となる。
なお、土圧壁12の形状は矩形形状に限らず、円形などであってもよく、その形状は任意である。
【0030】
次に、エレメントの別実施例について説明する。
図16(A)は別実施例に係るエレメントの断面図、(B)はエレメントの一部の平面図を示す。
このエレメント78は、第1の実施の形態で用いたエレメント18に空気抜き路80を付加したものであり、空気抜き路80は空気路82と複数の管体84とで構成されている。
空気路82は、エレメント78の内部で係合部7804に隣接した箇所に、エレメント78の全長にわたって延在しエレメント78の両端においてそれぞれ端部が開放されている。空気抜き路82は、本実施の形態では、円筒部7802の上端と、底板1810の上端から突出して円筒部7802の内壁に連結された連結板1810Aと、側板1812とにより断面がほぼ三角形状に形成されている。
【0031】
前記複数の管体84は、エレメント78が埋設された際に、エレメント78の上部の上端に位置する箇所と前記空気路82とにわたって延在するようにエレメント78の延在方向に間隔をおいて複数設けられている。前記各管体84は、エレメント78の内面に取着され、管体84がエレメント78内部の上端に位置する端部84Aは開放され、管体84の他方の端部84Bは空気路82に連通されている。
このようなエレメント78を用いて土圧壁12を構築すれば、コンクリートCの柱体14への充填時、エレメント78内に残存しがちな空気は、端部84Aから管体84、空気路82を通って、発進立坑32から到達立坑42に向けて、あるいは到達立坑42から発進立坑32に向けて柱体14の外部に排出され、これにより各柱体14の内部にコンクリートCが確実に充填され、土圧壁12の耐力を高める上で有利となる。
【0032】
【発明の効果】
以上の説明で明らかなように本発明の土圧壁によれば、円筒部と係合部とが係合しているので、大きな有効桁高を確保できることは無論のこと、隣り合う柱体相互に主鋼材が配設された状態で各柱体の内部にコンクリートが充填されるので、土圧壁の耐力を格段と高められることが可能となる。
また、本発明のエレメントを用いれば、主鋼材挿通孔が蓋板で閉塞されているので、エレメントの内部に土砂が侵入することなくエレメントを埋設でき、また、蓋板を取り外せば主鋼材挿通孔が露出するので、複数のエレメント間にわたり主鋼材を簡単に配設することができる。
【図面の簡単な説明】
【図1】 土圧壁の断面正面図である。
【図2】 (A)、(B)、(C)は土圧壁に用いるエレメントの説明図である。
【図3】 エレメントの斜視図である。
【図4】 (A)は蓋板が取着された状態のエレメントの断面正面図、(B)は同側面図である。
【図5】 (A)は蓋板を外した状態のエレメントの断面正面図、(B)は同側面図である。
【図6】 (A)乃至(E)は第1番目の柱体を形成する際の発進立坑から到達立坑への掘進状態の説明図である。
【図7】 (A)乃至(E)は第2番目の柱体を形成する際の発進立坑から到達立坑への掘進状態の説明図である。
【図8】 (A)乃至(G)は柱体を形成したのち改良土を充填する説明図である。
【図9】 3等分点2点載荷試験体の説明図で、(A)は断面が矩形の柱状をなす鉄筋コンクリート製の試験体の正面図、(B)は同側面図、(C)は本実施の形態の土圧壁を構成する部分の複数の柱体に相当する試験体の正面図、(D)は同側面図である。
【図10】 荷重変形曲線で、(A)は図9(A)に示す試験体50の場合で、(B)は図9(B)に示す試験体56の場合を示している。
【図11】 図10(A)の荷重変形曲線と、図10(B)の荷重変形曲線を1つの図に重ねて示した図である。
【図12】 第2の実施の形態に係る土圧壁の断面正面図である。
【図13】 (A)、(B)は第2の実施の形態に係る土圧壁に用いるエレメントの説明図である。
【図14】 参考例に係る土圧壁の断面正面図である。
【図15】 (A)、(B)、(C)は参考例に係る土圧壁に用いるエレメントの説明図である。
【図16】 (A)は空気抜き路を備えるエレメントの断面正面図、(B)は同平面図である。
【符号の説明】
12 土圧壁
14 柱体
16 主鋼材
18、68、78 エレメント
1802、6802、7802 円筒部
1804、6804、7804 係合部
20 主鋼材挿通孔
22 コンクリート充填孔
24、26 蓋板
80 空気抜き路
82 空気路
84 管体
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a earth wall suitable for constructing a medium-distance underground tunnel with a large cross section and an element used therefor.
[0002]
[Prior art]
Currently, shield construction methods are often used for tunnel construction in urban areas.
Also, URT (Under Rail Tunneling) method is adopted for tunnel construction with a short distance and large cross section.
On the other hand, when attempting to construct a medium-distance tunnel of about 100 to 300 m with a large cross section, the shield method is not adopted because the shield machine is expensive, and the above URT method is used.
Here, the URT method prepares a plurality of cylindrical elements with a rectangular cross section, and at the starting shaft, pushes the element with the auger at the front end to the leading shaft while sequentially adding the subsequent elements to the reaching shaft, and the outer shell of the tunnel Columns made of such elements are continuously formed at the locations corresponding to, and the earthen walls are formed by filling the interior of the elements that form these columns with padded concrete, and then the inside of the wall It is a method of drilling.
[0003]
[Problems to be solved by the invention]
However, in this URT method, excavation is performed by an auger placed at the front end of the element, and a circular hole is excavated in the auger, so the four corners of the element are forced against the ground part where the hole is not excavated. The tunnel length is limited to around 100m.
On the other hand, when earth pressure walls are formed using a cylindrical cross section as an element so that it can be easily inserted into an excavated circular hole, the circular portion of the element and the circular shape are between adjacent columns. Since the portions are in contact with each other, the thickness of the interstitial concrete filled in the elements is lost, and it is not possible to secure a large effective digit height as compared with the case where the square elements are used.
[0004]
Therefore, it is conceivable to use an element including a cylindrical portion having a cylindrical cross section and an engaging portion in which one side of the cylindrical portion is recessed inside the cylindrical portion.
That is, a plurality of pillars embedded in the ground so as to form an outer shell of a tunnel to be constructed is configured by arranging the hollow elements coaxially in the longitudinal direction thereof, and adjacent pillars It is conceivable to arrange each other so that a part of each cylindrical portion of the element constituting the other pillar is accommodated in each engaging portion of the element constituting one pillar.
According to such a configuration, the element can be smoothly inserted into the excavated hole, and a large effective girder can be secured.
[0005]
However, even if an earth pressure wall with a large effective girder height can be constructed, adjacent column bodies are simply not engaged with each other because the cylindrical portion and the engaging portion are simply engaged. Therefore, the constructed earth pressure wall has a defect inferior in its yield strength.
The present invention has been devised in view of the above circumstances, and an object of the present invention is to provide an earth pressure wall and an earth wall element that can significantly increase the proof stress.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the present invention is an earth pressure wall configured by filling concrete into a plurality of pillars embedded in the ground so as to form an outer shell of a tunnel to be constructed, Each columnar body has a hollow element composed of a cylindrical portion and an engagement portion in which at least one side of the cylindrical portion is recessed inside the cylindrical portion over the entire length of the cylindrical portion, and is arranged coaxially in the longitudinal direction. The adjacent column bodies are arranged such that a part of each cylindrical portion of the element constituting the other column body is engaged with each engagement portion of the element constituting one column body. The main steel material penetrating the inside of each column through the engaging portion of the element is arranged at a plurality of positions spaced in the longitudinal direction of each column so as to continue along the periphery of the earth pressure wall. These columns are filled with concrete. In the adjacent column bodies, the one column body in a state where a part of the cylindrical portion of the element constituting the other column body is engaged with the engaging portion of the element constituting one column body A closed space is formed outside the engaging portion of the element and the cylindrical portion of the other column element, the concrete is also filled in the closed space, and the main steel material passes through the closed space. Arranged It is characterized by that.
The present invention also provides an earth wall element that is embedded in the ground so as to form an outer shell of a tunnel to be constructed, and in which concrete is filled, and includes a cylindrical portion and at least the cylindrical portion. One side is formed with an engaging part that is recessed inside the cylindrical part over the entire length of the cylindrical part, and the engaging part is engaged with a part of the cylindrical part of the element arranged next to the element. A main steel material insertion hole is formed through the engagement portion and the cylindrical portion engaged with the engagement portion, and a lid plate is removably attached to the main steel material insertion hole. It is characterized by that.
[0007]
In the earth pressure wall according to the present invention, since the cylindrical portion and the engaging portion are engaged, a large effective digit height can be secured, and the cylindrical portion and the engaging portion are engaged with each other between adjacent column bodies. In addition, since the concrete is filled in each column with the main steel material disposed between the adjacent columns, the proof stress of the earth pressure wall is significantly increased.
In addition, if the element of the present invention is used, the main steel material insertion hole is closed with the cover plate, so that the insertion of the element into the excavated hole is smoothly performed without the intrusion of earth and sand inside the element, Further, since the main steel material insertion hole is exposed when the cover plate is removed, the main steel material can be easily arranged from the main steel material insertion hole between the plurality of elements.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of earth pressure walls according to the present invention will be described below with reference to the drawings.
FIG. 1 shows a cross-sectional front view of a earth pressure wall according to the present invention.
The earth wall 12 according to the embodiment includes a plurality of column bodies 14 embedded in the ground so as to form an outer shell of a tunnel to be constructed, and a plurality of main steel materials penetrating through the insides of the plurality of column bodies 14. 16 and concrete C filled in each column 14 is formed in a rectangular frame shape.
As shown in FIGS. 2A and 2B, each of the column bodies 14 includes a cylindrical portion 1802 and an engagement in which at least one side of the cylindrical portion 1802 is recessed inside the cylindrical portion 1802 over the entire length of the cylindrical portion 1802. A hollow element 18 composed of a joint 1804 is arranged coaxially in the longitudinal direction.
In the adjacent column bodies 14, a part of each cylindrical portion 1802 of the element 18 constituting the other column body 14 is engaged with each engagement portion 1804 of the element 18 constituting the one column body 14. Is arranged.
The main steel material 16 penetrates between the insides of the column bodies 14 through the engaging portions 1804 of the element 18 at a plurality of positions spaced in the longitudinal direction of the column bodies 14 and around the earth pressure wall 12. It is arrange | positioned so that it may follow along.
The concrete body C is filled with concrete C.
In the present invention, the main steel material 16 includes a wide range of materials used for resisting bending stress, and therefore includes not only steel bars such as reinforcing bars and H-shaped steel but also fiber rods that are not steel materials.
[0009]
In the present embodiment, three types of column bodies 14 having different cross-sectional shapes are used, and three types of elements 18 are used corresponding to the respective column bodies 14.
That is, the element 18 of the columnar body 14 located at the center of the upper side and the lower side of the earth pressure wall 12 forming a rectangular frame includes a cylindrical part 1802 and both sides of the cylindrical part 1802 as shown in FIG. It is comprised with the engaging part 1804 provided in this.
In addition, the element 18 of the column 14 located at both ends of the lower side of the earth pressure wall 12 is composed of only a cylindrical portion 1802 as shown in FIG.
Further, the elements 18 of all the column bodies 14 except for the above-described portions, that is, the elements 18 constituting most of the column bodies 14 are, as shown in FIG. 2B, a cylindrical portion 1802 and one of the cylindrical portions 1802. It is comprised with the engaging part 1804 provided in the side.
The engaging portion 1804 is recessed inside the cylindrical portion 1802 and extends over the entire length of the cylindrical portion 1802. The engaging portion 1804 is configured to have a size that can accommodate a part of the cylindrical portion 1802 of the element 18 disposed adjacent thereto.
[0010]
First, the element 18 will be described in detail with reference to FIGS. 3 to 5. FIG. 3 is a perspective view of the element, FIG. 4 (A) is a sectional front view of the element, and (B) is a side view of the element portion. 5A is a sectional front view of the element with the cover plate removed, and FIG. 5B shows a side view of the element part with the cover plate removed. The cylindrical portion 1802 and the engaging portion 1804 provided on one side of the cylindrical portion 1802 are configured.
The cylindrical portion 1802 is configured by cutting out one side of a steel pipe.
The engaging portion 1804 is provided in a concave shape so that one side of the cylindrical portion 1802 is recessed. The engaging portion 1804 is disposed inside the cylindrical portion 1802 and includes a steel plate bottom plate 1810 and a bottom plate 1810 constituting the bottom of the concave portion. The side plate 1812 is made of a steel plate that stands up from both sides of the plate and constitutes both sides of the recess and is connected to the cylindrical portion 1802.
In a state in which a part of the cylindrical portion 1802 of the element 18 disposed next to the engaging portion 1804 having such a configuration is accommodated, the edges of the cylindrical portion 1802 positioned at both ends of the cylindrical portion 1802 are adjacent to each other. 4A, the closed space 1850 closed between the outside of the bottom plate 1810 and the outside of the cylindrical portion 1802 of the adjacent element 18 is contacted with the cylindrical portion 1802 of the arranged element 18. Is formed.
[0011]
As shown in FIGS. 5 (A) and 5 (B), main steel material insertion holes 20 penetrating the cylindrical portion 1802 are equidistant from each other at the upper and lower portions of the cylindrical portion 1802 along the longitudinal direction of the cylindrical portion 1802. Many are formed.
In addition, a large number of main steel material insertion holes 20 penetrating through the bottom plate 1810 are formed at equal intervals along the longitudinal direction of the bottom plate 1810 in the upper and lower portions of the bottom plate 1810.
Further, a number of concrete filling holes 22 are formed at the bottom plate 1810 at the inner side of the upper and lower main steel material insertion holes 20 at regular intervals along the longitudinal direction of the bottom plate 1810.
The main steel material insertion hole 20 is formed with a diameter larger than that of the main steel material 16 so that the main steel material 16 can be inserted. The main steel material insertion hole 20 extends mainly between the main steel material insertion holes 20 of the cylindrical portion 1802 and the main steel material insertion holes 20 of the bottom plate 1810. The main steel material insertion hole 20 of the cylindrical portion 1802 and the main steel material insertion hole 20 of the bottom plate 1810 are formed at locations corresponding to each other so that the steel material 16 is inserted.
As shown in FIGS. 3 and 4 (A) and 4 (B), when the element 18 is buried in the ground, these main steel material insertion holes 20 can be removed so that earth and sand do not enter the element 18. The concrete filling hole 22 is closed by a removable cover plate 26.
[0012]
The lid plates 24 and 26 may be attached to the cylindrical portion 1802 or the bottom plate 1810 by, for example, a type in which a cap is fitted, or a type in which the lid plates 24 and 26 are temporarily fixed by spot welding or the like.
In the present embodiment, a thin steel plate is used as the cover plate 24, and this steel plate is temporarily fixed to the outer surface of the cylindrical portion 1802 and the bottom plate 1810 by spot welding, and after being embedded in the ground, from the inside of the element 18 The main steel material insertion hole 20 is exposed so that the operator can easily remove it by hitting it with a hammer or the like.
In addition, a thin steel plate cap having a flange portion and a bottomed cylindrical portion is used as the cover plate 26, the bottomed cylindrical portion is fitted into the concrete filling hole 22 from the inside of the element 18, and the flange portion is an inner surface of the bottom plate 1810. After being buried in the ground, an operator can easily remove the buttock from the inside of the element 18 to expose the concrete filling hole 22.
In addition, as shown in FIG. 2A, in the element 18 including the cylindrical portion 1802 and the engaging portions 1804 provided on both sides of the cylindrical portion 1802, the main steel material insertion holes 20 are provided in the respective engaging portions 1804. A concrete filling hole 22 is formed, and the main steel material insertion hole 20 and the concrete filling hole 22 are closed by removable cover plates 24 and 26.
In addition, as shown in FIG. 2 (C), in the element 18 composed only of the cylindrical portion 1802, the main steel material insertion holes 20 are respectively formed in the cylindrical portion 1802 places whose directions are changed by 90 degrees with each other, These main steel material insertion holes 20 are closed by a removable cover plate 24.
[0013]
Next, the earth pressure wall 12 constituted by the column body 14 from the element 18 as described above will be described in detail according to the construction procedure.
6 (A) to (E) and FIGS. 7 (A) to (E) are explanatory diagrams of the method of constructing the column, and FIGS. 8 (A) to (G) are the columns to be constructed first and the columns to be constructed next. The explanatory view of a pillar object is shown.
First, the central column 14 on the upper side of the earth pressure wall 12 is constructed by the element 18 shown in FIG. 2A, and then the adjacent column 14 is replaced by the element 18 shown in FIG. The elements 18 are sequentially constructed using the element 18 shown in FIG.
When constructing the earth pressure wall 12, a start shaft 32 is provided, and a circular start shaft 34 is provided in the start shaft 32.
As shown in FIGS. 6A and 6B, the circular excavator 36 and the succeeding machine 38 are arranged and driven in the start shaft 32, and are pushed out from the start port 34 by the propulsion jack 40, thereby being advanced. As shown in FIG. 8A, a circular hole 3602 is excavated by the circular excavator 36.
Next, as shown in FIGS. 6 (B) to (E), the element 18 is connected to the rear end of the succeeding machine 38 and pushed out from the starting pit 34 by the propulsion jack 40. The elements 18 are connected and pushed out by the propulsion jack 40, and the elements 18 are sequentially connected and pushed out in the start shaft 32 in this way, and are advanced toward the reaching shaft 42. This state is shown in FIG.
The elements 18 arranged in a straight line are connected to each other by, for example, reducing the rear end of the element 18 in the longitudinal direction and then connecting the front end of the element 18 to be driven next to the rear end of the reduced element 18. It is performed by various conventionally known means such as fitting.
[0014]
When the elements 18 are sequentially connected and pushed out in this way and the circular excavator 36 approaches the arrival shaft 42, the arrival shaft 48 is provided in the arrival shaft 42 as shown in FIG.
Then, by pushing out the element 18 in the starting shaft 32, the circular excavator 36 protrudes from the reaching shaft 48 into the reaching shaft 42, and then the subsequent machine 38 protrudes into the reaching shaft 42.
By pushing out the further element 18 in the starting shaft 32, the tip of the leading element 18 is exposed in the reaching shaft 42, and the circular excavator 36 and the succeeding machine 38 are removed from the element 18 in the reaching shaft 42, and the next element 18 The circular excavator 36 and the succeeding machine 38 are moved to the start shaft 32.
[0015]
When the leading portion of the leading element 18 reaches the reaching shaft 42, the column body 14 is formed which includes a plurality of elements 18 connected to each other and extends linearly between the starting shaft 32 and the reaching shaft 42. Will be.
Further, the engaging portions 1804 on both sides of the multiple elements 18 also extend in a straight line, and the outside of the engaging portions 1804 is located inside a circular hole 3602 excavated by the circular excavator 36. Therefore, the space K is free of soil. Therefore, when the next column body 14 is constructed, a part of the circular excavator 36 is located in the engaging portion 1804 and is excavated so that the circular excavator 36 can easily go straight. As shown in FIG. 3, the space K is filled with the improved soil S.
That is, the space K on both sides of the multiple elements 18 is filled with the liquid improved soil S over the entire length of the column 14 from the start shaft 32 toward the arrival shaft 42 (or from the arrival shaft 42 toward the start shaft 32). As a result, when the hole 3602 is next excavated, the resistance received by the circular excavator 36 becomes uniform in the circumferential direction, and it is easy to go straight.
[0016]
Next, as shown in FIG. 7A, when the next element 18 is driven from the start shaft 32, a start shaft 34 is provided in the start shaft 32. As shown in FIG. 2B, the element 18 to be driven this time has an engaging portion 1804 provided only on one side of the cylindrical portion 1802, and one of the elements 18 that has been driven first is engaged. The start well 34 is provided in the part 1804 so that a part of the cylindrical part 1802 of the element 18 to be driven this time is accommodated.
Then, as shown in FIG. 7A, the circular excavator 36 and the succeeding machine 38 are arranged and driven in the start shaft 32, and are pushed out from the start port 34 by the propulsion jack 40 for excavation.
Next, as shown in FIGS. 7 (B) to (E), the element 18 is connected to the rear end of the succeeding machine 38 and pushed out from the starting pit 34 by the propulsion jack 40. The elements 18 are connected and pushed out by the propulsion jack 40, and the elements 18 are sequentially connected and pushed out in the start shaft 32 in this way, and are advanced to the reaching shaft 42.
In this excavation by the circular excavator 36, the circular hole 3602 is excavated by overlapping at a portion corresponding to one of the engaging portions 1804 of the element 18 that is first driven, and the adjacent element 18 is excavated. As shown in FIG. 8 (E), the closed soil 1850 between the outside of the bottom plate 1810 and the outside of the cylindrical portion 1802 of the adjacent element 18 remains filled with the improved soil S. To do.
[0017]
When the elements 18 are sequentially connected and pushed out in this way and the circular excavator 36 approaches the arrival shaft 42, the arrival shaft 48 is provided in the arrival shaft 42 as described above.
The circular excavator 36 and the succeeding machine 38 protrude from the arrival well 48 into the arrival shaft 42 by pushing out the element 18 in the start shaft 32.
When the further element 18 is pushed out in the start shaft 32, the leading portion of the leading element 18 is exposed in the reaching shaft 42 from the reaching well port 48, and the leading portion of the leading element 18 is exposed in the reaching shaft 42. In the shaft 42, the circular excavator 36 and the subsequent machine 38 are removed from the element 18, and the circular excavator 36 and the subsequent machine 38 are moved to the start shaft 32 to drive the third column 14.
As a result, as shown in FIG. 8E, the second column 14 partially overlapping the column 14 formed first is formed.
In the same manner as described above, when the next column 14 is constructed, the space K is filled with the improved soil S as shown in FIG. As shown in FIG. 8 (G), after the improved soil S is filled, the next circular hole 3602 is excavated.
[0018]
In this way, the circular excavator 36, the succeeding machine 38, and the element 18 are used to excavate from the starting shaft 32 to the reaching shaft 42, and the column extending linearly between the starting shaft 32 and the reaching shaft 42. 14 are sequentially formed while partially overlapping each other, and finally, a plurality of column bodies 14 that are continuous in a rectangular frame shape are formed as shown in FIG.
Next, the improved soil S remaining in the closed space 1850 between the adjacent column bodies 14 is removed, and the main steel material 16 is disposed between the adjacent column bodies 14.
More specifically, first, the improved soil S filled in the closed space 1850 between the outside of the bottom plate 1810 and the outside of the cylindrical portion 1802 of the element 18 disposed next to the bottom plate 1810 is removed.
The removal of the improved soil S is performed by injecting high-pressure water from the starting shaft 32 toward the reaching shaft 42 or from the reaching shaft 42 toward the starting shaft 32.
[0019]
Once the improved soil S filled in the closed space 1850 is removed, the cover plates 24 and 26 attached to the elements 18 constituting each column 14 are then removed, and the main steel material insertion holes 20 and the concrete filling holes are removed. 22 is exposed.
In this case, the cover plate 24 that closes the main steel material insertion hole 20 is removed by an operator from the inside of the element 18 with a hammer, and the cover plate 24 falls to the lower part of the closed space 1850. Further, the lid plate 26 that closes the concrete filling hole 22 is removed from the inside of the element 18 by appropriately opening the collar portion of the lid plate 26 with a jig, and the removed lid plate 26 is taken out of the element 18.
[0020]
Next, a plurality of main steel materials 16 are disposed so as to penetrate the inside of the plurality of column bodies 14.
In the present embodiment, since the rectangular frame is formed by the plurality of pillars 14, the upper and lower sides forming the rectangular frame are continuously extended horizontally, and the left and right sides are respectively continuous. The main steel material 16 is disposed so as to extend vertically.
In this case, when using a main steel material 16 that cannot be bent, such as a reinforcing bar or H-shaped steel, a main steel material having an appropriate length is inserted into the main steel material insertion hole 20, and then a commercially available mechanical joint or the like is used. It arrange | positions by connecting linearly using. When a fiber rod or the like is used as the main steel material 16, these are flexible, so that a long one is brought into the element 18 as it is.
[0021]
If the plurality of main steel members 16 are disposed through the insides of the plurality of pillars 14, then the concrete C is filled into the insides of the pillars 14 and the closed space 1850. In this case, the filling of the concrete C into the closed space 1850 is performed by the concrete C filled in the column 1850 flowing into the closed space 1850 from the concrete filling hole 22.
And the earth pressure wall 12 shown in FIG. 1 is constructed | assembled because the concrete C with which the inside of each pillar 14 and the inside of the enclosed space 1850 was solidified is solidified.
Then, the inside of the earth pressure wall 12 is excavated and a large-section underground space is constructed.
[0022]
According to the earth pressure wall 12 according to the present embodiment, the adjacent column bodies 14 are configured such that the cylindrical portion 1802 and the engaging portion 1804 are engaged with each other. Since the concrete C is filled in each column 14 with the main steel material 16 disposed between the adjacent columns 14, the proof stress of the earth pressure wall 12 can be remarkably increased, and the large cross section Therefore, it is suitable for tunnel construction at a medium distance of about 100 to 300 m.
Moreover, in this Embodiment, since the main steel material 16 was inserted also into the enclosed space 1850 produced between the adjacent column bodies 14, and it filled with the concrete C, it becomes more advantageous when raising the yield strength of the earth pressure wall 12. FIG. .
Further, when the element 18 according to the present embodiment is used, the main steel material insertion hole 20 is closed by the cover plate 24, so that the earth and sand do not enter the element 18 and the element into the excavated hole 3602 is obtained. 18 can be smoothly inserted.
In addition, a plurality of concrete filling holes 22 for filling the closed space 1850 with the concrete C are provided in advance, and these concrete filling holes 22 are detachably closed by the cover plate 26, so that the blockage between the adjacent column bodies 14 occurs. The space 1850 can be efficiently filled with the concrete C from the concrete filling hole 22, which is more advantageous in increasing the proof stress of the earth pressure wall 12.
[0023]
Next, the proof stress test will be described.
9A and 9B are explanatory views of a test piece with a trisection point and a two-point loading. FIG. 9A is a front view of a test piece made of reinforced concrete having a rectangular cross section, FIG. 9B is a side view thereof, and FIG. The front view of the test body corresponding to the some pillar body of the part which comprises the earth pressure wall of embodiment, (D) shows the same side view.
In the test body 50 shown in FIGS. 9A and 9B, three main bars 52 are arranged along the upper and lower sides of the test body 50, and these main bars 52 are spaced in the extending direction of the test body 50. Are connected by a plurality of shear reinforcement bars 54.
In the test body 56 shown in FIGS. 9C and 9D, the element 18 having an outer diameter of 609.6 mm, a thickness of 6.4 mm, and a length of 450 mm causes the cylindrical portion 1802 and the engaging portion 1804 to engage with each other. Further, the main reinforcing bar 52 is inserted into the main steel material insertion hole 20, the concrete C is filled in the inside of the element 18 and the closed space 1850, and the shear reinforcing bar 54 is disposed in the main reinforcing bar 52 portion protruding from the element 18.
[0024]
10A and 10B are load deformation curves. FIG. 10A shows the case of the test body 50 shown in FIG. 9A, and FIG. 10B shows the case of the test body 56 shown in FIG.
10A and 10B, the case of the test body 56 shown in FIG. 9B has a larger loop area than the case of the test body 50 shown in FIG. It is clear that is large.
FIG. 11 shows the load deformation curve of FIG. 10 (A) and the load deformation curve of FIG. 10 (B) superimposed on one figure (load-displacement curve or envelope).
From FIG. 11, it is clear that the maximum proof stress, which is the maximum value of the load, is larger in the case of the test body 56 shown in FIG. 9B than in the case of the test body 50 shown in FIG. 9A.
[0025]
Next, a second embodiment will be described with reference to FIG.
In the earth pressure wall 12 according to the second embodiment, in addition to the main steel material 16, the earth pressure wall 12 passes through the engaging portions 1804 of each element 18 at a plurality of positions spaced in the longitudinal direction of the column body 14. A PC steel material (steel material used as a tension material) 60 is provided to extend along the periphery.
When the PC steel material 60 is used, as shown in FIG. 13A, a plurality of PC steel material insertion holes 62 are provided in the bottom plate 1810 constituting the engaging portion 1804 of the element 18 at intervals in the longitudinal direction of the element 18. These PC steel material insertion holes 62 are closed by a removable cover plate 64. Alternatively, as shown in FIG. 13B, a plurality of long hole-shaped PC steel material insertion holes 62 having the main steel material insertion holes 20 are formed, and the PC steel material insertion holes 62 can be removed by a cover plate 64 that can be removed. Block it. Needless to say, the PC steel material insertion hole 62 and the cover plate 64 are also provided at the cylindrical portion 1802 of the element 18 that is arranged next to and engages with the engaging portion 1804.
Then, after the plurality of continuous pillars 14 are formed, the cover plate 64 is removed, and the PC steel material 60 is inserted into the PC steel material insertion hole 62 together with the main steel material 16.
[0026]
In this case, as the PC steel material 60, a PC steel wire, a PC steel wire, a PC steel bar, or the like is used. When a PC steel bar or the like that cannot be bent is used, a PC steel material 60 having an appropriate length is used. After being inserted into the PC steel material insertion hole 62, they are connected using a commercially available mechanical joint.
In the earth pressure wall 12 according to the second embodiment, since the PC steel material 60 is also disposed between the adjacent column bodies 14 in addition to the main steel material 16, the earth pressure wall 12 is more effective in increasing the proof stress. It becomes even more advantageous.
[0027]
Next, referring to FIG. Reference example The earth pressure wall concerning will be described.
Reference example The earth pressure wall 12 according to the present invention includes a plurality of pillars 14 embedded in the ground so as to form an outer shell of a tunnel to be constructed, a plurality of main steel materials 16 penetrating through the insides of the plurality of pillars 14, Although it is the same as that of 1st Embodiment in the point comprised by the rectangular frame shape by the concrete C with which the inside of each pillar 14 was filled, the cross-sectional shape of the element 68 to be used differs from 1st Embodiment. ing.
That is, as shown in FIG. 15A, most of the elements 68 constituting the column body 14 are a cylindrical portion 6802 and at least one side of the cylindrical portion 6802 is located inside the cylindrical portion 6802 over the entire length of the cylindrical portion 6802. A hollow engagement portion 1804 is formed.
[0028]
In addition, Reference example However, as in the first embodiment, three types of column bodies 14 having different cross-sectional shapes are used, and three types of elements 68 are used corresponding to each column body 14. That is, the element 68 of the column 14 positioned at the center of the upper side and the lower side of the earth pressure wall 12 forming the rectangular frame includes a cylindrical part 6802 and both sides of the cylindrical part 6802 as shown in FIG. The element 18 of the column 14 located at both ends of the lower side of the earth pressure wall 12 is composed of only the cylindrical portion 1802, as shown in FIG. As shown in FIG. 15A, the elements 68 constituting all the remaining pillars 14 are constituted by a cylindrical portion 6802 and an engaging portion 6804 provided on one side of the cylindrical portion 6802. .
The engaging portion 6804 is formed in a cylindrical surface recessed inward, and the other column body 14 is formed in the engaging portion 6804 of the element 68 constituting one column body 14 between the adjacent column bodies 14. In a state in which a part of the cylindrical portion 6802 of the element 68 to be engaged is engaged, the outside of the engaging portion 6804 of the element 68 of one column 14 and the outside of the cylindrical portion 6802 of the element 68 of the other column 14 Are configured to be in close contact with each other.
[0029]
Similar to the first embodiment, a main steel material insertion hole 20 (not shown) penetrating the element 68 is formed in the upper and lower portions of the cylindrical portion 6802 and the upper and lower portions of the engaging portion 6804 of the element 68 from the main steel material 16. Also, a large number are formed along the longitudinal direction of the element 68 at equal intervals from each other.
These main steel material insertion holes 20 are closed by the cover plate 24 so that earth and sand do not enter the element 68 when the element 68 is buried in the ground, and the cover plate 24 is removed inside the element 68. It is attached as possible.
In addition, Reference example Then, since the adjacent column bodies 14 are almost in close contact with each other and no closed space 1850 is generated between the adjacent column bodies 14, the concrete filling hole 22 is not provided in the element 68.
Reference example According to the earth pressure wall 12, as in the first embodiment, it is a matter of course that a large effective girder can be secured, and each column with the main steel material 16 disposed between the adjacent column bodies 14 is provided. Since the concrete 14 is filled in the body 14, the proof stress of the earth pressure wall 12 can be remarkably increased.
Further, if the PC steel material 60 is used in addition to the main steel material 16 as in the second embodiment, it is more advantageous in increasing the proof stress of the earth pressure wall 12.
The shape of the earth pressure wall 12 is not limited to a rectangular shape, and may be a circle or the like, and the shape is arbitrary.
[0030]
Next, another embodiment of the element will be described.
FIG. 16A is a cross-sectional view of an element according to another embodiment, and FIG. 16B is a plan view of a part of the element.
This element 78 is obtained by adding an air vent path 80 to the element 18 used in the first embodiment, and the air vent path 80 includes an air path 82 and a plurality of pipes 84.
The air passage 82 extends over the entire length of the element 78 at a location adjacent to the engaging portion 7804 inside the element 78, and ends thereof are opened at both ends of the element 78. In the present embodiment, the air vent path 82 is formed in a substantially triangular cross section by the upper end of the cylindrical portion 7802, the connecting plate 1810A that protrudes from the upper end of the bottom plate 1810 and is connected to the inner wall of the cylindrical portion 7802, and the side plate 1812. Has been.
[0031]
The plurality of pipes 84 are spaced apart in the extending direction of the element 78 so that when the element 78 is embedded, the plurality of pipes 84 extend over a portion located at the upper end of the upper portion of the element 78 and the air passage 82. A plurality are provided. Each tubular body 84 is attached to the inner surface of the element 78, and the tubular body 84 is an end portion located at the upper end inside the element 78. 84A Is opened, and the other end 84 </ b> B of the tube body 84 is communicated with the air passage 82.
If the earth pressure wall 12 is constructed using such an element 78, the air that tends to remain in the element 78 when the concrete C column 14 is filled becomes 84A From the start shaft 32 toward the arrival shaft 42 or from the arrival shaft 42 toward the departure shaft 32, and is discharged to the outside of the column body 14. Concrete C is reliably filled inside, which is advantageous in increasing the proof stress of the earth pressure wall 12.
[0032]
【The invention's effect】
As is apparent from the above description, according to the earth pressure wall of the present invention, since the cylindrical portion and the engaging portion are engaged, it is needless to say that a large effective digit height can be secured, and adjacent column bodies are mutually connected. Since the concrete is filled in each column with the main steel material disposed on the wall, the proof stress of the earth pressure wall can be remarkably increased.
In addition, if the element of the present invention is used, the main steel material insertion hole is closed by the cover plate, so that the element can be embedded without intruding earth and sand inside the element, and if the cover plate is removed, the main steel material insertion hole Is exposed, the main steel material can be easily arranged between the plurality of elements.
[Brief description of the drawings]
FIG. 1 is a cross-sectional front view of an earth pressure wall.
FIGS. 2A, 2B, and 2C are explanatory diagrams of elements used for earth pressure walls.
FIG. 3 is a perspective view of an element.
4A is a sectional front view of an element with a cover plate attached, and FIG. 4B is a side view thereof.
5A is a cross-sectional front view of an element with a cover plate removed, and FIG. 5B is a side view thereof.
FIGS. 6A to 6E are explanatory views of the state of excavation from the starting shaft to the reaching shaft when forming the first columnar body.
FIGS. 7A to 7E are explanatory views of a state of excavation from a start shaft to a reach shaft when forming the second column body.
FIGS. 8A to 8G are explanatory views of filling the improved soil after forming the pillars.
FIG. 9 is an explanatory diagram of a test piece with three equal points and two points. (A) is a front view of a reinforced concrete specimen having a rectangular cross section, (B) is a side view, and (C) is a side view. The front view of the test body corresponding to the some pillar body of the part which comprises the earth pressure wall of this Embodiment, (D) is the same side view.
10A and 10B are load deformation curves, in which FIG. 9A shows the case of the test body 50 shown in FIG. 9A, and FIG. 10B shows the case of the test body 56 shown in FIG. 9B.
FIG. 11 is a diagram in which the load deformation curve of FIG. 10A and the load deformation curve of FIG.
FIG. 12 is a cross-sectional front view of a earth pressure wall according to a second embodiment.
FIGS. 13A and 13B are explanatory diagrams of elements used for earth pressure walls according to the second embodiment. FIGS.
FIG. 14 Reference example It is a cross-sectional front view of the earth pressure wall which concerns on.
FIG. 15 (A), (B), (C) Reference example It is explanatory drawing of the element used for the earth pressure wall which concerns on.
FIG. 16A is a sectional front view of an element having an air vent path, and FIG. 16B is a plan view thereof.
[Explanation of symbols]
12 Earth wall
14 Column
16 Main steel
18, 68, 78 elements
1802, 6802, 7802 Cylindrical part
1804, 6804, 7804 Engagement part
20 Main steel material insertion hole
22 Concrete filling hole
24, 26 Cover plate
80 Air vent
82 Airway
84 Tube

Claims (7)

構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体の内部にコンクリートが充填されて構成された土圧壁であって、
前記各柱体は、円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなる中空状のエレメントがその長手方向に同軸上に並べられることで構成され、
隣り合う柱体相互は、一方の柱体を構成するエレメントの各係合部に、他方の柱体を構成するエレメントの各円筒部の一部が係合されるように配置され、
前記各柱体の長手方向に間隔をおいた複数箇所に、エレメントの係合部を通って各柱体の内部間を貫通する主鋼材が土圧壁の周囲に沿って連続するように配設され、
これら柱体の内部にコンクリートが充填され、
隣り合う柱体相互において、一方の柱体を構成するエレメントの係合部に、他方の柱体を構成するエレメントの円筒部の一部が係合された状態で、前記一方の柱体のエレメントの係合部の外側と、他方の柱体のエレメントの円筒部の外側に閉塞空間が構成され、
前記コンクリートは前記閉塞空間にも充填され、
前記主鋼材は前記閉塞空間を通るように配設されている、
ことを特徴とする土圧壁。
An earth pressure wall constructed by filling concrete inside a plurality of pillars embedded in the ground so as to form the outer shell of the tunnel to be constructed,
Each of the pillars has a hollow element composed of a cylindrical portion and an engaging portion in which at least one side of the cylindrical portion is recessed inside the cylindrical portion over the entire length of the cylindrical portion, and is arranged coaxially in the longitudinal direction. Composed of
The adjacent column bodies are arranged such that a part of each cylindrical portion of the element constituting the other column body is engaged with each engagement portion of the element constituting one column body,
Arranged so that the main steel material passing through the inside of each column through the engaging portion of the element continues along the circumference of the earth pressure wall at a plurality of positions spaced in the longitudinal direction of each column. And
These pillars are filled with concrete ,
In an adjacent column body, an element of one column body is engaged with an engagement portion of an element configuring one column body and a part of a cylindrical portion of an element configuring the other column body is engaged. A closed space is formed on the outside of the engaging portion of the other and on the outside of the cylindrical portion of the other column element
The concrete is also filled in the enclosed space,
The main steel material is disposed so as to pass through the enclosed space,
Earthen wall characterized by that.
前記各柱体の長手方向に間隔をおいた複数箇所に、各エレメントの係合部を通り土圧壁の周囲に沿って延在するPC鋼材が各柱体の内部に配設されていることを特徴とする請求項記載の土圧壁。PC steel material extending along the periphery of the earth pressure wall through the engaging portion of each element is disposed in each column body at a plurality of positions spaced in the longitudinal direction of each column body. The earth wall according to claim 1 . 構築すべきトンネルの外殻をなすように地中に複数埋設されそれらの内部にコンクリートが充填される土圧壁用エレメントであって、
円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなり、
前記係合部は、このエレメントの隣に配置されるエレメントの円筒部の一部が係合されるように構成され、
前記係合部および前記係合部に係合される円筒部の箇所には、主鋼材挿通孔が貫設され、
前記主鋼材挿通孔には取り外し可能に蓋板が取り付けられている、
ことを特徴とする土圧壁用エレメント。
A plurality of earth wall elements that are buried in the ground to form the outer shell of a tunnel to be built and filled with concrete.
The cylindrical portion and at least one side of the cylindrical portion is composed of an engaging portion that is recessed inside the cylindrical portion over the entire length of the cylindrical portion,
The engaging portion is configured such that a part of a cylindrical portion of an element arranged next to the element is engaged,
A main steel material insertion hole is provided through the engagement portion and the cylindrical portion that is engaged with the engagement portion,
A lid plate is removably attached to the main steel material insertion hole,
An earth pressure wall element characterized by that.
一方のエレメントの係合部に、他方のエレメントの円筒部の一部が係合された状態で、前記一方のエレメントの係合部の外側と、他方の柱体のエレメントの円筒部の外側に閉塞空間が構成され、前記係合部には前記閉塞空間へコンクリートを充填するためのコンクリート充填孔が形成され、前記コンクリート充填孔に取り外し可能に蓋板が取り付けられていることを特徴とする請求項記載の土圧壁用エレメント。In a state where a part of the cylindrical portion of the other element is engaged with the engaging portion of one element, the outer side of the engaging portion of the one element and the outer side of the cylindrical portion of the element of the other column A closed space is formed, a concrete filling hole for filling the closed space with concrete is formed in the engagement portion, and a lid plate is removably attached to the concrete filling hole. Item 3. Earth pressure wall element. 蓋板は、エレメントの内部からエレメントの外方にハンマーで叩いた時にエレメントの外側に外れるように取着されていることを特徴とする請求項記載の土圧壁用エレメント。4. The earth pressure wall element according to claim 3 , wherein the cover plate is attached so as to come out of the element when it is struck with a hammer from the inside of the element to the outside of the element. 蓋板は、エレメントの内側に外れるようにエレメントに取着されていることを特徴とする請求項記載の土圧壁用エレメント。The earth pressure wall element according to claim 3 , wherein the cover plate is attached to the element so as to be detached from the inside of the element. 前記エレメントの内部に空気抜き路が設けられ、前記空気抜き路は、エレメントの内部の前記係合部に隣接した箇所で、エレメントの全長にわたって延在しエレメントの両端においてそれぞれ端部が開放された空気路と、エレメントの延在方向に間隔をおいた複数箇所でエレメント内部の上端に位置する箇所と前記空気路とにわたって延在する管体とで構成され、前記管体がエレメント内部の上端に位置する端部は開放され、前記管体の他方の端部は前記空気路に連通されていることを特徴とする請求項記載の土圧壁用エレメント。An air vent path is provided inside the element, and the air vent path extends over the entire length of the element at a location adjacent to the engaging portion inside the element and is open at both ends of the element. And at a plurality of locations spaced in the extending direction of the element, a portion located at the upper end inside the element and a tubular body extending over the air passage, and the tubular body is located at the upper end inside the element 4. The earth pressure wall element according to claim 3 , wherein an end portion is opened and the other end portion of the pipe body is communicated with the air passage.
JP2000347552A 2000-11-15 2000-11-15 Earth wall and earth wall elements Expired - Fee Related JP4500428B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000347552A JP4500428B2 (en) 2000-11-15 2000-11-15 Earth wall and earth wall elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000347552A JP4500428B2 (en) 2000-11-15 2000-11-15 Earth wall and earth wall elements

Publications (2)

Publication Number Publication Date
JP2002146777A JP2002146777A (en) 2002-05-22
JP4500428B2 true JP4500428B2 (en) 2010-07-14

Family

ID=18821264

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000347552A Expired - Fee Related JP4500428B2 (en) 2000-11-15 2000-11-15 Earth wall and earth wall elements

Country Status (1)

Country Link
JP (1) JP4500428B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4287716B2 (en) * 2003-08-05 2009-07-01 大成建設株式会社 Element water stop joint and element water stop joint construction method
JP2006045928A (en) * 2004-08-05 2006-02-16 Fujita Corp Earth pressure wall
JP4660665B2 (en) * 2006-02-28 2011-03-30 大成建設株式会社 Multiple digging machine
CN107882211B (en) * 2017-12-15 2024-07-30 西藏涛扬建筑设计有限公司 Constraint combined wall structure for building

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4987206U (en) * 1972-11-15 1974-07-29
JPS5245121A (en) * 1975-10-07 1977-04-09 Kubota Ltd Steel pipe sheet pile
JPS5295811A (en) * 1976-02-06 1977-08-11 Giken Koei Kk Method of building underground wall in poor subsoil
JPS5938497A (en) * 1982-08-27 1984-03-02 日本国有鉄道 Tunnel lining body
JPH0631535B2 (en) * 1988-11-02 1994-04-27 日立造船株式会社 Continuous wall and method of constructing continuous wall
JPH083516Y2 (en) * 1990-06-05 1996-01-31 石川島建材工業株式会社 Basic element for tunnel construction
JP3298711B2 (en) * 1993-08-30 2002-07-08 石川島建材工業株式会社 Tunnel construction method using elements for tunnel lining
JP3567401B2 (en) * 1996-06-07 2004-09-22 清水建設株式会社 Large section tunnel and its construction method
JPH10227199A (en) * 1997-02-18 1998-08-25 Ohbayashi Corp Construction method of large sectional tunnel
JP3150661B2 (en) * 1998-08-05 2001-03-26 稔 山本 Construction method of outer lining of large section tunnel
JP4017777B2 (en) * 1999-01-21 2007-12-05 石川島建材工業株式会社 Tunnel construction method
JP3485249B2 (en) * 1999-01-25 2004-01-13 株式会社推研 Construction method of earth pressure wall
JP4062464B2 (en) * 1999-04-14 2008-03-19 株式会社フジタ Tunnel construction method

Also Published As

Publication number Publication date
JP2002146777A (en) 2002-05-22

Similar Documents

Publication Publication Date Title
KR102226859B1 (en) The building method of hybrid cip and earth retaining wall thereof
KR102503780B1 (en) Constructing Method of Pile with Steel Pipe Reinforcement, Pile constructed by such Method, and Retaining Wall having such Piles
JP4500428B2 (en) Earth wall and earth wall elements
JP2008101467A (en) Rock fall prevention fence
KR102127859B1 (en) Pile wall, Construction method thereof
CN105569329A (en) Unilateral formwork support basement construction method and basement
KR101669669B1 (en) Construction methods of approaching dual tunnel
CN109915150A (en) A kind of pile foundation pre-reinforced supporting structure for controlling tunnel settlement and its construction method
JP2001164569A (en) All-casing cast-in-place pile construction method
JP2006045928A (en) Earth pressure wall
JP4243520B2 (en) Hollow element for construction of foundation beam and construction method of foundation structure using this hollow element
JPH08303178A (en) Vertical shaft for shield excavation
KR100768473B1 (en) Construction method of underground structures using underground plunge with straightness and induction drainage
JP2011226116A (en) Pipe roof and constructing method thereof
KR100711574B1 (en) Soil Nail
KR100441966B1 (en) Applying Method of Casing as the Concrete Filled Tube
CN212641741U (en) A ring beam structure connecting pile-clad concrete columns and reinforced concrete floors
JPS6018769B2 (en) Construction method of underground structure
JP4621538B2 (en) Joining device for driving pile and upper column
JP2020059983A (en) Base floor structure and construction method of base floor
CN111677519B (en) Reinforcing structure and reinforcing method for shield launching end and shield launching method
JP2572680B2 (en) Underground structure by reverse strike method
CN210917326U (en) H-shaped spliced precast concrete pile and foundation pit supporting device
JP3455157B2 (en) Shoring construction method
JP4445110B2 (en) Structure of retaining wall penetration and method for forming the same

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090123

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100311

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100401

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100419

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130423

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4500428

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130423

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140423

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees