JP4500428B2 - Earth wall and earth wall elements - Google Patents
Earth wall and earth wall elements Download PDFInfo
- Publication number
- JP4500428B2 JP4500428B2 JP2000347552A JP2000347552A JP4500428B2 JP 4500428 B2 JP4500428 B2 JP 4500428B2 JP 2000347552 A JP2000347552 A JP 2000347552A JP 2000347552 A JP2000347552 A JP 2000347552A JP 4500428 B2 JP4500428 B2 JP 4500428B2
- Authority
- JP
- Japan
- Prior art keywords
- cylindrical portion
- steel material
- column
- earth pressure
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、大断面で中距離の地下トンネルを構築する際に好適な土圧壁およびそれに用いるエレメントに関する。
【0002】
【従来の技術】
現在、都市部でのトンネル工事には多くの場合シールド工法が採用されている。
また、短い距離で大きな断面のトンネル工事には、URT(アンダーレイルウェイトンネリング)工法が採用されている。
一方、大断面で100〜300m程度の中距離のトンネルを工事しようとする場合、シールド工法はシールド掘進機が高価格であるため採用されず、上記のURT工法となる。
ここで、URT工法は、断面が四角形の筒状のエレメントを複数用意し、発進立坑において、前端にオーガを配置したエレメントを先頭に後続のエレメントを順次継ぎ足しながら到達立坑まで押し込み、トンネルの外殻に対応する箇所にこのようなエレメントからなる柱体を連続状に形成し、これら柱体をなすエレメントの内部に間詰めコンクリートを充填して土圧壁を形成し、その後、土圧壁の内側を掘削していく工法である。
【0003】
【発明が解決しようとする課題】
しかしながらこのURT工法では、エレメントの前端に配置したオーガにより掘削を行ない、オーガでは円形の孔が掘削されるため、エレメントの四隅は孔が掘削されていない地盤部分に対して無理押しすることになり、トンネル長さは100m前後が限界となる。
一方、掘削された円形の孔に挿入され易いように、エレメントとして断面が円筒のものを用いて土圧壁を形成した場合には、互いに隣り合う柱体の間では、エレメントの円形部分と円形部分が接することになるため、それらエレメントの内部に充填される間詰めコンクリートの厚さがなくなるところが生じ、四角形のエレメントを用いる場合に比べ有効桁高を大きく確保することができない。
【0004】
そこで、エレメントとして断面が円筒状の円筒部と、この円筒部の一側が円筒部の内側に窪んだ係合部とからなるエレメントを用いることが考えられる。
すなわち、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体を、上記の中空状のエレメントをその長手方向に同軸上に並べられることで構成し、隣り合う柱体相互を、一方の柱体を構成するエレメントの各係合部に、他方の柱体を構成するエレメントの各円筒部の一部が収容されるように配置することが考えられる。
このような構成によれば、掘削された孔へのエレメントの挿入も円滑に行なわれ、また、大きな有効桁高を確保することが可能となる。
【0005】
しかしながら、大きな有効桁高が確保された土圧壁を構築することができても、隣り合う柱体は、円筒部と係合部とが単に係合しているのみで相互に連結されていないため、構築された土圧壁はその耐力に劣る不具合がある。
本発明は前記事情に鑑み案出されたものであって、本発明の目的は、耐力を格段と高めることができる土圧壁および土圧壁用エレメントを提供することにある。
【0006】
【課題を解決するための手段】
前記目的を達成するため本発明は、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体の内部にコンクリートが充填されて構成された土圧壁であって、前記各柱体は、円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなる中空状のエレメントがその長手方向に同軸上に並べられることで構成され、隣り合う柱体相互は、一方の柱体を構成するエレメントの各係合部に、他方の柱体を構成するエレメントの各円筒部の一部が係合されるように配置され、前記各柱体の長手方向に間隔をおいた複数箇所に、エレメントの係合部を通って各柱体の内部間を貫通する主鋼材が土圧壁の周囲に沿って連続するように配設され、これら柱体の内部にコンクリートが充填され、隣り合う柱体相互において、一方の柱体を構成するエレメントの係合部に、他方の柱体を構成するエレメントの円筒部の一部が係合された状態で、前記一方の柱体のエレメントの係合部の外側と、他方の柱体のエレメントの円筒部の外側に閉塞空間が構成され、前記コンクリートは前記閉塞空間にも充填され、前記主鋼材は前記閉塞空間を通るように配設されていることを特徴とする。
また、本発明は、構築すべきトンネルの外殻をなすように地中に複数埋設されそれらの内部にコンクリートが充填される土圧壁用エレメントであって、円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなり、前記係合部は、このエレメントの隣に配置されるエレメントの円筒部の一部が係合されるように構成され、前記係合部および前記係合部に係合される円筒部の箇所には、主鋼材挿通孔が貫設され、前記主鋼材挿通孔には取り外し可能に蓋板が取り付けられていることを特徴とする。
【0007】
本発明の土圧壁では、円筒部と係合部とが係合しているので、大きな有効桁高を確保でき、さらに、隣り合う柱体相互は、円筒部と係合部とが係合し、かつ、隣り合う柱体間に主鋼材が配設された状態で各柱体の内部にコンクリートが充填されるので、土圧壁の耐力は格段と高められる。
また、本発明のエレメントを用いれば、主鋼材挿通孔が蓋板で閉塞されているので、エレメントの内部に土砂が侵入することなく、掘削された孔へのエレメントの挿入が円滑に行なわれ、また、蓋板を取り外せば主鋼材挿通孔が露出するので、複数のエレメント間にわたり主鋼材挿通孔から主鋼材を簡単に配設することができる。
【0008】
【発明の実施の形態】
以下、本発明に係る土圧壁の実施の形態を図面を参照して説明する。
図1は本発明に係る土圧壁の断面正面図を示す。
実施の形態に係る土圧壁12は、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体14と、これら複数の柱体14の内部を貫通する複数の主鋼材16と、各柱体14の内部に充填されたコンクリートCにより矩形枠状に構成されている。
前記各柱体14は、図2(A)、(B)に示すように、円筒部1802と、この円筒部1802の少なくとも一側が前記円筒部1802の全長にわたって円筒部1802の内側に窪んだ係合部1804とからなる中空状のエレメント18がその長手方向に同軸上に並べられることで構成されている。
隣り合う柱体14相互は、一方の柱体14を構成するエレメント18の各係合部1804に、他方の柱体14を構成するエレメント18の各円筒部1802の一部が係合されるように配置されている。
前記主鋼材16は、前記各柱体14の長手方向に間隔をおいた複数箇所に、エレメント18の係合部1804を通って各柱体14の内部間を貫通し土圧壁12の周囲に沿って連続するように配設されている。
そして、これら柱体14の内部にコンクリートCが充填されている。
なお、本発明において主鋼材16とは、曲げ応力に抵抗させるため用いるものを広く含み、したがって、鉄筋や、H形鋼などの鋼材などの他、鋼材ではない繊維ロッドなどを広く含む。
【0009】
本実施の形態では、断面形状の異なる3種類の柱体14が用いられ、各柱体14に対応して3種類のエレメント18が用いられている。
すなわち、矩形枠をなす土圧壁12の上辺の中央と下辺の中央に位置する柱体14のエレメント18は、図2(A)に示すように、円筒部1802と、この円筒部1802の両側に設けられた係合部1804とで構成されている。
また、土圧壁12の下辺の両端に位置する柱体14のエレメント18は、図2(C)で示すように、円筒部1802のみで構成されている。
更に、前記の箇所を除く全ての柱体14のエレメント18、すなわち大半の柱体14を構成するエレメント18は、図2(B)で示すように、円筒部1802と、この円筒部1802の一側に設けられた係合部1804とで構成されている。
前記係合部1804は円筒部1802の内側に窪み円筒部1802の全長にわたって延在している。前記係合部1804は隣に配置されるエレメント18の円筒部1802の一部が収容できる寸法で構成されている。
【0010】
まず、前記エレメント18について図3乃至図5を参照して詳細に説明すると、図3はエレメントの斜視図、図4(A)はエレメントの断面正面図、(B)はエレメントの部分の側面図、図5(A)は蓋板を取り外した状態のエレメントの断面正面図、(B)は蓋板を取り外した状態のエレメントの部分の側面図を示しており、これらの図に示すエレメント18は、円筒部1802と、この円筒部1802の一側に設けられた係合部1804とで構成されている。
前記円筒部1802は、鋼管の一側を切り欠くことで構成されている。
前記係合部1804は、円筒部1802の一側が窪むように凹部状に設けられ、係合部1804は、円筒部1802の内側に配置され凹部の底部を構成する鋼板製の底板1810と、底板1810の両側から起立して凹部の両側を構成し円筒部1802に連結される鋼板製の側板1812とで構成されている。
このような構成からなる係合部1804に、隣に配置されるエレメント18の円筒部1802の一部が収容された状態で、円筒部1802の両端に位置する円筒部1802の縁が、隣に配置されるエレメント18の円筒部1802に当たり、図4(A)に示すように、底板1810の外側と、隣に配置されるエレメント18の円筒部1802の外側との間に閉塞された閉塞空間1850が形成されるように構成されている。
【0011】
図5(A)、(B)に示すように、前記円筒部1802の上下部には、円筒部1802を貫通する主鋼材挿通孔20が互いに等間隔をおき円筒部1802の長手方向に沿って多数形成されている。
また、前記底板1810の上下部にも、底板1810を貫通する主鋼材挿通孔20が互いに等間隔をおき底板1810の長手方向に沿って多数形成されている。
更に、前記上下の主鋼材挿通孔20よりも内側の底板1810箇所に、互いに等間隔をおき底板1810の長手方向に沿ってコンクリート充填孔22が上下に多数形成されている。
前記主鋼材挿通孔20は、主鋼材16が挿通できるように主鋼材16よりも大きな直径で形成され、円筒部1802の各主鋼材挿通孔20と底板1810の各主鋼材挿通孔20とにわたり主鋼材16が挿通されるように、円筒部1802の主鋼材挿通孔20と底板1810の主鋼材挿通孔20とは互いに対応した箇所に形成されている。
そして、図3および図4(A)、(B)に示すように、エレメント18の地中への埋設時に、エレメント18の内部に土砂が入らないように、これら主鋼材挿通孔20は取り外し可能な蓋板24により閉塞され、また、コンクリート充填孔22は取り外し可能な蓋板26により閉塞されている。
【0012】
蓋板24、26の円筒部1802や底板1810への取り付けは、例えば、キャップを嵌め込む形式のものでもよく、あるいは、スポット溶接などにより仮止めする形式のものでもよい。
本実施の形態では、蓋板24として薄い鋼板を用い、この鋼板を円筒部1802、底板1810の外面に、スポット溶接により仮止めしており、地中に埋設された後、エレメント18の内部から作業員がハンマーなどで叩くことにより簡単に取り外せ、主鋼材挿通孔20が露出するように構成されている。
また、蓋板26として、鍔部と有底円筒部からなる薄い鋼板製のキャップを用い、エレメント18の内側から有底円筒部をコンクリート充填孔22に嵌合し、鍔部を底板1810の内面に突き当てており、地中に埋設された後、エレメント18の内部から作業員が鍔部を剥がすことにより簡単に取り外せ、コンクリート充填孔22が露出するように構成されている。
なお、図2(A)に示すように、円筒部1802と、この円筒部1802の両側に設けられた係合部1804とからなるエレメント18では、各係合部1804に主鋼材挿通孔20、コンクリート充填孔22が形成され、これら主鋼材挿通孔20、コンクリート充填孔22は取り外し可能な蓋板24、26により閉塞されている。
また、図2(C)に示すように、円筒部1802のみからなるエレメント18では、互いに90度向きを変えた円筒部1802箇所に、前記と同様に、それぞれ主鋼材挿通孔20が形成され、これら主鋼材挿通孔20は取り外し可能な蓋板24により閉塞されている。
【0013】
次に、上記のようなエレメント18から柱体14により構成される土圧壁12をその構築手順に従ってより詳細に説明する。
図6(A)〜(E)および図7(A)〜(E)は柱体の構築方法の説明図、図8(A)〜(G)は最初に構築する柱体と次に構築する柱体の説明図を示している。
まず、土圧壁12の上辺の中央の柱体14が、図2(A)に示すエレメント18により構築され、次に、隣の柱体14が、図2(B)に示すエレメント18や図2(C)に示すエレメント18を用いて順次構築されていく。
土圧壁12を構築するに際して発進立坑32が設けられ、発進立坑32に円形状の発進坑口34が設けられる。
図6(A)、(B)に示すように、発進立坑32内に円形掘削機36および後続機械38を配置して駆動させ、推進用ジャッキ40により発進坑口34から押し出して掘進させ、これにより図8(A)に示すように円形掘削機36により円形の孔3602が掘削されていく。
次に、図6(B)乃至(E)に示すように、後続機械38の後端にエレメント18を連結して推進用ジャッキ40により発進坑口34から押し出し、次に、このエレメント18に次のエレメント18を連結して推進用ジャッキ40により押し出し、このように発進立坑32内でエレメント18を順次連結して押し出し、到達立坑42に向けて掘進させる。この状態を図8(B)に示す。
なお、直線状に並べられるエレメント18どうしの連結は、例えば、エレメント18の長手方向の後端を縮径しておき、次に打ち込むエレメント18の先端を前記縮径されたエレメント18の後端に嵌め込むなど、従来公知の種々の手段により行われる。
【0014】
このようにして順次エレメント18が連結されて押し出され、円形掘削機36が到達立坑42に近づいたならば、図6(E)に示すように、到達立坑42に到達坑口48を設ける。
そして、発進立坑32におけるエレメント18の押し出しにより、円形掘削機36が到達坑口48から到達立坑42内に突出し、続いて後続機械38が到達立坑42内に突出する。
発進立坑32におけるさらなるエレメント18の押し出しにより、先頭のエレメント18の先部を到達立坑42内に露出させ、到達立坑42内において円形掘削機36および後続機械38をエレメント18から取り外し、次のエレメント18を打ち込むために円形掘削機36および後続機械38を発進立坑32へ移動する。
【0015】
先頭のエレメント18の先部が到達立坑42に到達することで、相互に連結された多数のエレメント18からなり発進立坑32と到達立坑42との間で直線状に延在する柱体14が形成されることになる。
また、多数のエレメント18の両側の係合部1804も直線状に延在することになり、この係合部1804の外側は、円形掘削機36で掘削された円形の孔3602の内部に位置しているため、土が存在していない空間Kとなっている。そのため、次の柱体14を構築するに際して、係合部1804内に円形掘削機36の一部が位置して掘進する関係上、円形掘削機36が直進し易いように、図8(C)に示すように、前記空間K内に改良土Sが充填される。
すなわち、多数のエレメント18の両側の空間Kに、発進立坑32から到達立坑42に向けて(あるいは到達立坑42から発進立坑32に向けて液状の改良土Sが柱体14の全長にわたって充填され、固化される。これにより、次に孔3602を掘削する際に、円形掘削機36の受ける抵抗が周方向において均一となり、直進し易くなる。
【0016】
次に、図7(A)に示すように、発進立坑32から次のエレメント18を打ち込むに際して、発進立坑32に発進坑口34が設けられる。なお、今回打ち込まれるエレメント18は、図2(B)に示すように、係合部1804が円筒部1802の一側部にのみ設けられており、最初に打ち込まれたエレメント18の一方の係合部1804に、今回打ち込まれるエレメント18の円筒部1802の一部が収容されるように発進坑口34が設けられる。
そして、図7(A)に示すように、発進立坑32内に円形掘削機36および後続機械38を配置して駆動させ、推進用ジャッキ40により発進坑口34から押し出して掘進させる。
次に、図7(B)乃至(E)に示すように、後続機械38の後端にエレメント18を連結して推進用ジャッキ40により発進坑口34から押し出し、次に、このエレメント18に次のエレメント18を連結して推進用ジャッキ40により押し出し、このようにエレメント18を発進立坑32内で順次連結しては押し出し、到達立坑42まで掘進させる。
なお、今回の円形掘削機36により掘削では、最初に打ち込まれたエレメント18の一方の係合部1804に対応した部分でオーバーラップして円形孔3602が掘削されることになり、隣り合うエレメント18相互において、図8(E)に示すように、底板1810の外側と、隣に配置されるエレメント18の円筒部1802の外側との間の閉塞空間1850に改良土Sが充填された状態が残存する。
【0017】
このようにして順次エレメント18が連結されて押し出され、円形掘削機36が到達立坑42に近づいたならば、前記と同様に到達立坑42に到達坑口48を設ける。
そして、発進立坑32におけるエレメント18の押し出しにより、円形掘削機36、後続機械38が到達坑口48から到達立坑42内に突出する。
発進立坑32におけるさらなるエレメント18の押し出しにより、先頭のエレメント18の先部が到達坑口48から到達立坑42内に露出し、先頭のエレメント18の先部が到達立坑42内に露出したならば、到達立坑42内において円形掘削機36および後続機械38をエレメント18から取り外し、第3番目の柱体14を打ち込むために円形掘削機36および後続機械38を発進立坑32へ移動する。
これにより、図8(E)に示すように、最初に形成された柱体14に一部が重複した第2番目の柱体14が形成されることになる。
そして、前記と同様に、次の柱体14を構築するに際して、円形掘削機36が直進し易いように、図8(F)に示すように、前記空間K内に改良土Sが充填され図8(G)に示すように、改良土Sが充填されたのち次の円形孔3602が掘削される。
【0018】
このようにして円形掘削機36、後続機械38、エレメント18を用いて発進立坑32から到達立坑42への掘進を行ない、発進立坑32と到達立坑42との間で直線状に延在する柱体14を一部重複させつつ順次形成していき、最後には図1に示すように矩形枠状に連続する複数の柱体14が形成される。
次に、隣り合う柱体14の間の閉塞空間1850に残存した改良土Sを取り除き、隣り合う柱体14間にわたり主鋼材16を配設する。
より詳細に説明すると、まず、底板1810の外側と、隣に配置されるエレメント18の円筒部1802の外側との間の閉塞空間1850に充填された改良土Sを取り除く。
この改良土Sの取り除きは、発進立坑32から到達立坑42に向けて、あるいは到達立坑42から発進立坑32に向けて高圧水を噴射することで行なう。
【0019】
閉塞空間1850に充填された改良土Sを取り除いたならば、次に、各柱体14を構成するエレメント18に取着された蓋板24、26を取り外し、主鋼材挿通孔20およびコンクリート充填孔22を露出させる。
この場合、主鋼材挿通孔20を閉塞する蓋板24は、作業員がエレメント18の内部からハンマーにより叩くことにより取り外され、これにより蓋板24は閉塞空間1850の下部に落下することになる。また、コンクリート充填孔22を閉塞する蓋板26は、エレメント18の内部から適宜治具により蓋板26の鍔部をこじ開けることにより取り外され、取り外された蓋板26はエレメント18外に持ち出される。
【0020】
次に、複数の柱体14の内部を貫通するように複数の主鋼材16を配設する。
本実施の形態では、複数の柱体14により矩形枠が形成されているので、矩形枠をなす上辺と下辺においてそれぞれ連続して水平に延在するように、また、左右の辺においてそれぞれ連続して鉛直に延在するように主鋼材16を配設する。
この場合、主鋼材16として鉄筋やH形鋼などの撓ませることができないものを用いる場合には、適宜長さの主鋼材を主鋼材挿通孔20に挿通させた後、市販の機械式継手などを用いて直線状に連結することで配設する。主鋼材16として繊維ロッドなどを用いる場合には、これらのものは可撓可能であるので、長尺なものをそのままエレメント18内に持ち込んで配設される。
【0021】
複数の柱体14の内部を貫通して複数の主鋼材16が配設されたならば、次に、各柱体14の内部および閉塞空間1850の内部にコンクリートCが充填される。この場合、閉塞空間1850へのコンクリートCの充填は、柱体1850の内部に充填されるコンクリートCがコンクリート充填孔22から閉塞空間1850に流れ込むことで行われる。
そして、各柱体14の内部および閉塞空間1850の内部に充填されたコンクリートCが固化することで図1に示す土圧壁12が構築される。
その後、土圧壁12の内部を掘削し、大断面の地下空間を構築する。
【0022】
本実施の形態による土圧壁12によれば、隣り合う柱体14相互は、円筒部1802と係合部1804とが係合した構成であるので、大きな有効桁高を確保できることは無論のこと、隣り合う柱体14間に主鋼材16が配設された状態で各柱体14の内部にコンクリートCが充填されているので、土圧壁12の耐力を格段と高めることができ、大断面で100〜300m程度の中距離のトンネル施工に好適となる。
また、本実施の形態では、隣り合う柱体14間に生じる閉塞空間1850にも主鋼材16を挿通させ、コンクリートCを充填させたので、土圧壁12の耐力を高める上でより有利となる。
また、本実施の形態に係るエレメント18を用いれば、主鋼材挿通孔20が蓋板24で閉塞されているので、エレメント18の内部に土砂が侵入することなく、掘削された孔3602へのエレメント18の挿入を円滑に行なうことができる。
また、閉塞空間1850へコンクリートCを充填させるためのコンクリート充填孔22を予め複数設け、これらのコンクリート充填孔22を蓋板26により取り外し可能に閉塞させたので、隣り合う柱体14間に生じる閉塞空間1850にコンクリート充填孔22からコンクリートCを効率良く充填させることができ、土圧壁12の耐力を高める上でより有利となる。
【0023】
次に、耐力試験について説明する。
図9は3等分点2点載荷試験体の説明図で、(A)は断面が矩形の柱状をなす鉄筋コンクリート製の試験体の正面図、(B)は同側面図、(C)は本実施の形態の土圧壁を構成する部分の複数の柱体に相当する試験体の正面図、(D)は同側面図を示す。
図9(A)、(B)に示す試験体50では、試験体50の上下の辺に沿って3本ずつ主筋52が配設され、これら主筋52は、試験体50の延在方向に間隔をおいた複数のせん断補強筋54により連結されてる。
図9(C)、(D)に示す試験体56では、外径609.6mm、肉厚6.4mm、長さ450mmのエレメント18が、それらの円筒部1802と係合部1804を係合させ、さらに、主鋼材挿通孔20に主筋52が挿通され、エレメント18の内部と閉塞空間1850にコンクリートCが充填され、エレメント18から突出した主筋52部分にせん断補強筋54が配設されている。
【0024】
図10は荷重変形曲線で、(A)は図9(A)に示す試験体50の場合で、(B)は図9(B)に示す試験体56の場合を示している。
これらの図10(A)、(B)から、図9(B)に示す試験体56の場合のが、図9(A)に示す試験体50の場合よりもループ面積が大きく、エネルギ吸収能力が大きいことが明確である。
図11は図10(A)の荷重変形曲線と、図10(B)の荷重変形曲線を1つの図に重ねて示したもの(荷重ー変位曲線または包絡線)である。
この図11から、図9(B)に示す試験体56場合のが、図9(A)に示す試験体50の場合よりも荷重の最大値である最大耐力が大きいことが明確である。
【0025】
次に、図12を参照して第2の実施の形態について説明する。
第2の実施の形態に係る土圧壁12では、主鋼材16に加え、柱体14の長手方向に間隔をおいた複数箇所に、各エレメント18の係合部1804を通り土圧壁12の周囲に沿って延在するにPC鋼材(緊張材として使用される鋼材)60を配設したものである。
PC鋼材60を用いる場合には、図13(A)に示すように、エレメント18の係合部1804を構成する底板1810に、エレメント18の長手方向に間隔をおいてPC鋼材挿通孔62を複数形成しておき、これらPC鋼材挿通孔62を取り外し可能な蓋板64により閉塞しておく。あるいは、図13(B)に示すように、主鋼材挿通孔20を兼ね備えた長孔状のPC鋼材挿通孔62を複数形成しておき、これらPC鋼材挿通孔62を取り外し可能な蓋板64により閉塞しておく。なお、PC鋼材挿通孔62および蓋板64は、隣に配置され係合部1804に係合するエレメント18の円筒部1802箇所にも無論設けられる。
そして、連続する複数の柱体14が形成された後、蓋板64を取り外し、主鋼材16と共にPC鋼材60をPC鋼材挿通孔62に挿通して配設する。
【0026】
この場合、PC鋼材60としては、PC鋼線、PC鋼より線、PC鋼棒などが用いられ、PC鋼棒など撓ませることができないものを用いる場合には、適宜長さのPC鋼材60をPC鋼材挿通孔62に挿通させた後、市販の機械式継手を用いて連結される。
第2の実施の形態に係る土圧壁12では、隣り合う柱体14間に、主鋼材16に加えてPC鋼材60も配設されているので、土圧壁12の耐力を高める上でより一層有利となる。
【0027】
次に、図14を参照して参考例に係る土圧壁について説明する。
参考例に係る土圧壁12は、構築すべきトンネルの外殻をなすように地中に埋設された複数の柱体14と、これら複数の柱体14の内部を貫通する複数の主鋼材16と、各柱体14の内部に充填されたコンクリートCにより矩形枠状に構成されている点において第1の実施の形態と同様であるが、用いるエレメント68の断面形状が第1の実施の形態と異なっている。
すなわち、柱体14を構成するエレメント68の大半は、図15(A)に示すように、円筒部6802と、この円筒部6802の少なくとも一側が前記円筒部6802の全長にわたって円筒部6802の内側に窪んだ係合部1804とで中空状に形成されている。
【0028】
なお、参考例でも、第1の実施の形態と同様に、断面形状の異なる3種類の柱体14が用いられ、各柱体14に対応して3種類のエレメント68が用いられている。すなわち、矩形枠をなす土圧壁12の上辺の中央と下辺の中央に位置する柱体14のエレメント68は、図15(B)に示すように、円筒部6802と、この円筒部6802の両側に設けられた係合部6804とで構成され、土圧壁12の下辺の両端に位置する柱体14のエレメント18は、図15(C)で示すように、円筒部1802のみで構成され、残りの全ての柱体14を構成するエレメント68が、図15(A)に示すように、円筒部6802と、この円筒部6802の一側に設けられた係合部6804とで構成されている。
前記係合部6804は、内側に窪む円筒面状に形成され、隣り合う柱体14相互において、一方の柱体14を構成するエレメント68の係合部6804に、他方の柱体14を構成するエレメント68の円筒部6802の一部が係合された状態で、一方の柱体14のエレメント68の係合部6804の外側と、他方の柱体14のエレメント68の円筒部6802の外側とがほぼ密着するように構成されている。
【0029】
第1の実施の形態と同様に、エレメント68の円筒部6802の上下部と、係合部6804の上下部には、エレメント68を貫通する主鋼材挿通孔20(不図示)が主鋼材16よりも大きな直径で、互いに等間隔をおきエレメント68の長手方向に沿って多数形成されている。
そして、これら主鋼材挿通孔20は、エレメント68の地中への埋設時に、エレメント68の内部に土砂が入らないように、蓋板24により閉塞され、蓋板24は、エレメント68の内側に取り外し可能に取着されている。
なお、参考例では、隣り合う柱体14相互がほぼ密着し、隣り合う柱体14間に閉塞空間1850が生じないので、エレメント68にコンクリート充填孔22は設けられていない。
参考例による土圧壁12によれば、第1の実施の形態と同様に、大きな有効桁高を確保できることは無論のこと、隣り合う柱体14間に主鋼材16が配設された状態で各柱体14の内部にコンクリートCが充填されているので、土圧壁12の耐力を格段と高めることができる。
また、第2の実施の形態のように、主鋼材16に加えてPC鋼材60も用いれば、土圧壁12の耐力を高める上でより有利となる。
なお、土圧壁12の形状は矩形形状に限らず、円形などであってもよく、その形状は任意である。
【0030】
次に、エレメントの別実施例について説明する。
図16(A)は別実施例に係るエレメントの断面図、(B)はエレメントの一部の平面図を示す。
このエレメント78は、第1の実施の形態で用いたエレメント18に空気抜き路80を付加したものであり、空気抜き路80は空気路82と複数の管体84とで構成されている。
空気路82は、エレメント78の内部で係合部7804に隣接した箇所に、エレメント78の全長にわたって延在しエレメント78の両端においてそれぞれ端部が開放されている。空気抜き路82は、本実施の形態では、円筒部7802の上端と、底板1810の上端から突出して円筒部7802の内壁に連結された連結板1810Aと、側板1812とにより断面がほぼ三角形状に形成されている。
【0031】
前記複数の管体84は、エレメント78が埋設された際に、エレメント78の上部の上端に位置する箇所と前記空気路82とにわたって延在するようにエレメント78の延在方向に間隔をおいて複数設けられている。前記各管体84は、エレメント78の内面に取着され、管体84がエレメント78内部の上端に位置する端部84Aは開放され、管体84の他方の端部84Bは空気路82に連通されている。
このようなエレメント78を用いて土圧壁12を構築すれば、コンクリートCの柱体14への充填時、エレメント78内に残存しがちな空気は、端部84Aから管体84、空気路82を通って、発進立坑32から到達立坑42に向けて、あるいは到達立坑42から発進立坑32に向けて柱体14の外部に排出され、これにより各柱体14の内部にコンクリートCが確実に充填され、土圧壁12の耐力を高める上で有利となる。
【0032】
【発明の効果】
以上の説明で明らかなように本発明の土圧壁によれば、円筒部と係合部とが係合しているので、大きな有効桁高を確保できることは無論のこと、隣り合う柱体相互に主鋼材が配設された状態で各柱体の内部にコンクリートが充填されるので、土圧壁の耐力を格段と高められることが可能となる。
また、本発明のエレメントを用いれば、主鋼材挿通孔が蓋板で閉塞されているので、エレメントの内部に土砂が侵入することなくエレメントを埋設でき、また、蓋板を取り外せば主鋼材挿通孔が露出するので、複数のエレメント間にわたり主鋼材を簡単に配設することができる。
【図面の簡単な説明】
【図1】 土圧壁の断面正面図である。
【図2】 (A)、(B)、(C)は土圧壁に用いるエレメントの説明図である。
【図3】 エレメントの斜視図である。
【図4】 (A)は蓋板が取着された状態のエレメントの断面正面図、(B)は同側面図である。
【図5】 (A)は蓋板を外した状態のエレメントの断面正面図、(B)は同側面図である。
【図6】 (A)乃至(E)は第1番目の柱体を形成する際の発進立坑から到達立坑への掘進状態の説明図である。
【図7】 (A)乃至(E)は第2番目の柱体を形成する際の発進立坑から到達立坑への掘進状態の説明図である。
【図8】 (A)乃至(G)は柱体を形成したのち改良土を充填する説明図である。
【図9】 3等分点2点載荷試験体の説明図で、(A)は断面が矩形の柱状をなす鉄筋コンクリート製の試験体の正面図、(B)は同側面図、(C)は本実施の形態の土圧壁を構成する部分の複数の柱体に相当する試験体の正面図、(D)は同側面図である。
【図10】 荷重変形曲線で、(A)は図9(A)に示す試験体50の場合で、(B)は図9(B)に示す試験体56の場合を示している。
【図11】 図10(A)の荷重変形曲線と、図10(B)の荷重変形曲線を1つの図に重ねて示した図である。
【図12】 第2の実施の形態に係る土圧壁の断面正面図である。
【図13】 (A)、(B)は第2の実施の形態に係る土圧壁に用いるエレメントの説明図である。
【図14】 参考例に係る土圧壁の断面正面図である。
【図15】 (A)、(B)、(C)は参考例に係る土圧壁に用いるエレメントの説明図である。
【図16】 (A)は空気抜き路を備えるエレメントの断面正面図、(B)は同平面図である。
【符号の説明】
12 土圧壁
14 柱体
16 主鋼材
18、68、78 エレメント
1802、6802、7802 円筒部
1804、6804、7804 係合部
20 主鋼材挿通孔
22 コンクリート充填孔
24、26 蓋板
80 空気抜き路
82 空気路
84 管体[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a earth wall suitable for constructing a medium-distance underground tunnel with a large cross section and an element used therefor.
[0002]
[Prior art]
Currently, shield construction methods are often used for tunnel construction in urban areas.
Also, URT (Under Rail Tunneling) method is adopted for tunnel construction with a short distance and large cross section.
On the other hand, when attempting to construct a medium-distance tunnel of about 100 to 300 m with a large cross section, the shield method is not adopted because the shield machine is expensive, and the above URT method is used.
Here, the URT method prepares a plurality of cylindrical elements with a rectangular cross section, and at the starting shaft, pushes the element with the auger at the front end to the leading shaft while sequentially adding the subsequent elements to the reaching shaft, and the outer shell of the tunnel Columns made of such elements are continuously formed at the locations corresponding to, and the earthen walls are formed by filling the interior of the elements that form these columns with padded concrete, and then the inside of the wall It is a method of drilling.
[0003]
[Problems to be solved by the invention]
However, in this URT method, excavation is performed by an auger placed at the front end of the element, and a circular hole is excavated in the auger, so the four corners of the element are forced against the ground part where the hole is not excavated. The tunnel length is limited to around 100m.
On the other hand, when earth pressure walls are formed using a cylindrical cross section as an element so that it can be easily inserted into an excavated circular hole, the circular portion of the element and the circular shape are between adjacent columns. Since the portions are in contact with each other, the thickness of the interstitial concrete filled in the elements is lost, and it is not possible to secure a large effective digit height as compared with the case where the square elements are used.
[0004]
Therefore, it is conceivable to use an element including a cylindrical portion having a cylindrical cross section and an engaging portion in which one side of the cylindrical portion is recessed inside the cylindrical portion.
That is, a plurality of pillars embedded in the ground so as to form an outer shell of a tunnel to be constructed is configured by arranging the hollow elements coaxially in the longitudinal direction thereof, and adjacent pillars It is conceivable to arrange each other so that a part of each cylindrical portion of the element constituting the other pillar is accommodated in each engaging portion of the element constituting one pillar.
According to such a configuration, the element can be smoothly inserted into the excavated hole, and a large effective girder can be secured.
[0005]
However, even if an earth pressure wall with a large effective girder height can be constructed, adjacent column bodies are simply not engaged with each other because the cylindrical portion and the engaging portion are simply engaged. Therefore, the constructed earth pressure wall has a defect inferior in its yield strength.
The present invention has been devised in view of the above circumstances, and an object of the present invention is to provide an earth pressure wall and an earth wall element that can significantly increase the proof stress.
[0006]
[Means for Solving the Problems]
In order to achieve the above object, the present invention is an earth pressure wall configured by filling concrete into a plurality of pillars embedded in the ground so as to form an outer shell of a tunnel to be constructed, Each columnar body has a hollow element composed of a cylindrical portion and an engagement portion in which at least one side of the cylindrical portion is recessed inside the cylindrical portion over the entire length of the cylindrical portion, and is arranged coaxially in the longitudinal direction. The adjacent column bodies are arranged such that a part of each cylindrical portion of the element constituting the other column body is engaged with each engagement portion of the element constituting one column body. The main steel material penetrating the inside of each column through the engaging portion of the element is arranged at a plurality of positions spaced in the longitudinal direction of each column so as to continue along the periphery of the earth pressure wall. These columns are filled with concrete. In the adjacent column bodies, the one column body in a state where a part of the cylindrical portion of the element constituting the other column body is engaged with the engaging portion of the element constituting one column body A closed space is formed outside the engaging portion of the element and the cylindrical portion of the other column element, the concrete is also filled in the closed space, and the main steel material passes through the closed space. Arranged It is characterized by that.
The present invention also provides an earth wall element that is embedded in the ground so as to form an outer shell of a tunnel to be constructed, and in which concrete is filled, and includes a cylindrical portion and at least the cylindrical portion. One side is formed with an engaging part that is recessed inside the cylindrical part over the entire length of the cylindrical part, and the engaging part is engaged with a part of the cylindrical part of the element arranged next to the element. A main steel material insertion hole is formed through the engagement portion and the cylindrical portion engaged with the engagement portion, and a lid plate is removably attached to the main steel material insertion hole. It is characterized by that.
[0007]
In the earth pressure wall according to the present invention, since the cylindrical portion and the engaging portion are engaged, a large effective digit height can be secured, and the cylindrical portion and the engaging portion are engaged with each other between adjacent column bodies. In addition, since the concrete is filled in each column with the main steel material disposed between the adjacent columns, the proof stress of the earth pressure wall is significantly increased.
In addition, if the element of the present invention is used, the main steel material insertion hole is closed with the cover plate, so that the insertion of the element into the excavated hole is smoothly performed without the intrusion of earth and sand inside the element, Further, since the main steel material insertion hole is exposed when the cover plate is removed, the main steel material can be easily arranged from the main steel material insertion hole between the plurality of elements.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of earth pressure walls according to the present invention will be described below with reference to the drawings.
FIG. 1 shows a cross-sectional front view of a earth pressure wall according to the present invention.
The
As shown in FIGS. 2A and 2B, each of the
In the
The
The concrete body C is filled with concrete C.
In the present invention, the
[0009]
In the present embodiment, three types of
That is, the
In addition, the
Further, the
The
[0010]
First, the
The
The engaging
In a state in which a part of the
[0011]
As shown in FIGS. 5 (A) and 5 (B), main steel material insertion holes 20 penetrating the
In addition, a large number of main steel material insertion holes 20 penetrating through the
Further, a number of concrete filling holes 22 are formed at the
The main steel
As shown in FIGS. 3 and 4 (A) and 4 (B), when the
[0012]
The
In the present embodiment, a thin steel plate is used as the
In addition, a thin steel plate cap having a flange portion and a bottomed cylindrical portion is used as the
In addition, as shown in FIG. 2A, in the
In addition, as shown in FIG. 2 (C), in the
[0013]
Next, the
6 (A) to (E) and FIGS. 7 (A) to (E) are explanatory diagrams of the method of constructing the column, and FIGS. 8 (A) to (G) are the columns to be constructed first and the columns to be constructed next. The explanatory view of a pillar object is shown.
First, the
When constructing the
As shown in FIGS. 6A and 6B, the
Next, as shown in FIGS. 6 (B) to (E), the
The
[0014]
When the
Then, by pushing out the
By pushing out the
[0015]
When the leading portion of the leading
Further, the engaging
That is, the space K on both sides of the
[0016]
Next, as shown in FIG. 7A, when the
Then, as shown in FIG. 7A, the
Next, as shown in FIGS. 7 (B) to (E), the
In this excavation by the
[0017]
When the
The
When the
As a result, as shown in FIG. 8E, the
In the same manner as described above, when the
[0018]
In this way, the
Next, the improved soil S remaining in the
More specifically, first, the improved soil S filled in the
The removal of the improved soil S is performed by injecting high-pressure water from the starting
[0019]
Once the improved soil S filled in the
In this case, the
[0020]
Next, a plurality of
In the present embodiment, since the rectangular frame is formed by the plurality of
In this case, when using a
[0021]
If the plurality of
And the
Then, the inside of the
[0022]
According to the
Moreover, in this Embodiment, since the
Further, when the
In addition, a plurality of concrete filling holes 22 for filling the
[0023]
Next, the proof stress test will be described.
9A and 9B are explanatory views of a test piece with a trisection point and a two-point loading. FIG. 9A is a front view of a test piece made of reinforced concrete having a rectangular cross section, FIG. 9B is a side view thereof, and FIG. The front view of the test body corresponding to the some pillar body of the part which comprises the earth pressure wall of embodiment, (D) shows the same side view.
In the
In the
[0024]
10A and 10B are load deformation curves. FIG. 10A shows the case of the
10A and 10B, the case of the
FIG. 11 shows the load deformation curve of FIG. 10 (A) and the load deformation curve of FIG. 10 (B) superimposed on one figure (load-displacement curve or envelope).
From FIG. 11, it is clear that the maximum proof stress, which is the maximum value of the load, is larger in the case of the
[0025]
Next, a second embodiment will be described with reference to FIG.
In the
When the
Then, after the plurality of
[0026]
In this case, as the
In the
[0027]
Next, referring to FIG. Reference example The earth pressure wall concerning will be described.
Reference example The
That is, as shown in FIG. 15A, most of the
[0028]
In addition, Reference example However, as in the first embodiment, three types of
The engaging
[0029]
Similar to the first embodiment, a main steel material insertion hole 20 (not shown) penetrating the
These main steel material insertion holes 20 are closed by the
In addition, Reference example Then, since the
Reference example According to the
Further, if the
The shape of the
[0030]
Next, another embodiment of the element will be described.
FIG. 16A is a cross-sectional view of an element according to another embodiment, and FIG. 16B is a plan view of a part of the element.
This
The
[0031]
The plurality of
If the
[0032]
【The invention's effect】
As is apparent from the above description, according to the earth pressure wall of the present invention, since the cylindrical portion and the engaging portion are engaged, it is needless to say that a large effective digit height can be secured, and adjacent column bodies are mutually connected. Since the concrete is filled in each column with the main steel material disposed on the wall, the proof stress of the earth pressure wall can be remarkably increased.
In addition, if the element of the present invention is used, the main steel material insertion hole is closed by the cover plate, so that the element can be embedded without intruding earth and sand inside the element, and if the cover plate is removed, the main steel material insertion hole Is exposed, the main steel material can be easily arranged between the plurality of elements.
[Brief description of the drawings]
FIG. 1 is a cross-sectional front view of an earth pressure wall.
FIGS. 2A, 2B, and 2C are explanatory diagrams of elements used for earth pressure walls.
FIG. 3 is a perspective view of an element.
4A is a sectional front view of an element with a cover plate attached, and FIG. 4B is a side view thereof.
5A is a cross-sectional front view of an element with a cover plate removed, and FIG. 5B is a side view thereof.
FIGS. 6A to 6E are explanatory views of the state of excavation from the starting shaft to the reaching shaft when forming the first columnar body.
FIGS. 7A to 7E are explanatory views of a state of excavation from a start shaft to a reach shaft when forming the second column body.
FIGS. 8A to 8G are explanatory views of filling the improved soil after forming the pillars.
FIG. 9 is an explanatory diagram of a test piece with three equal points and two points. (A) is a front view of a reinforced concrete specimen having a rectangular cross section, (B) is a side view, and (C) is a side view. The front view of the test body corresponding to the some pillar body of the part which comprises the earth pressure wall of this Embodiment, (D) is the same side view.
10A and 10B are load deformation curves, in which FIG. 9A shows the case of the
FIG. 11 is a diagram in which the load deformation curve of FIG. 10A and the load deformation curve of FIG.
FIG. 12 is a cross-sectional front view of a earth pressure wall according to a second embodiment.
FIGS. 13A and 13B are explanatory diagrams of elements used for earth pressure walls according to the second embodiment. FIGS.
FIG. 14 Reference example It is a cross-sectional front view of the earth pressure wall which concerns on.
FIG. 15 (A), (B), (C) Reference example It is explanatory drawing of the element used for the earth pressure wall which concerns on.
FIG. 16A is a sectional front view of an element having an air vent path, and FIG. 16B is a plan view thereof.
[Explanation of symbols]
12 Earth wall
14 Column
16 Main steel
18, 68, 78 elements
1802, 6802, 7802 Cylindrical part
1804, 6804, 7804 Engagement part
20 Main steel material insertion hole
22 Concrete filling hole
24, 26 Cover plate
80 Air vent
82 Airway
84 Tube
Claims (7)
前記各柱体は、円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなる中空状のエレメントがその長手方向に同軸上に並べられることで構成され、
隣り合う柱体相互は、一方の柱体を構成するエレメントの各係合部に、他方の柱体を構成するエレメントの各円筒部の一部が係合されるように配置され、
前記各柱体の長手方向に間隔をおいた複数箇所に、エレメントの係合部を通って各柱体の内部間を貫通する主鋼材が土圧壁の周囲に沿って連続するように配設され、
これら柱体の内部にコンクリートが充填され、
隣り合う柱体相互において、一方の柱体を構成するエレメントの係合部に、他方の柱体を構成するエレメントの円筒部の一部が係合された状態で、前記一方の柱体のエレメントの係合部の外側と、他方の柱体のエレメントの円筒部の外側に閉塞空間が構成され、
前記コンクリートは前記閉塞空間にも充填され、
前記主鋼材は前記閉塞空間を通るように配設されている、
ことを特徴とする土圧壁。An earth pressure wall constructed by filling concrete inside a plurality of pillars embedded in the ground so as to form the outer shell of the tunnel to be constructed,
Each of the pillars has a hollow element composed of a cylindrical portion and an engaging portion in which at least one side of the cylindrical portion is recessed inside the cylindrical portion over the entire length of the cylindrical portion, and is arranged coaxially in the longitudinal direction. Composed of
The adjacent column bodies are arranged such that a part of each cylindrical portion of the element constituting the other column body is engaged with each engagement portion of the element constituting one column body,
Arranged so that the main steel material passing through the inside of each column through the engaging portion of the element continues along the circumference of the earth pressure wall at a plurality of positions spaced in the longitudinal direction of each column. And
These pillars are filled with concrete ,
In an adjacent column body, an element of one column body is engaged with an engagement portion of an element configuring one column body and a part of a cylindrical portion of an element configuring the other column body is engaged. A closed space is formed on the outside of the engaging portion of the other and on the outside of the cylindrical portion of the other column element
The concrete is also filled in the enclosed space,
The main steel material is disposed so as to pass through the enclosed space,
Earthen wall characterized by that.
円筒部と、この円筒部の少なくとも一側が前記円筒部の全長にわたって円筒部の内側に窪んだ係合部とからなり、
前記係合部は、このエレメントの隣に配置されるエレメントの円筒部の一部が係合されるように構成され、
前記係合部および前記係合部に係合される円筒部の箇所には、主鋼材挿通孔が貫設され、
前記主鋼材挿通孔には取り外し可能に蓋板が取り付けられている、
ことを特徴とする土圧壁用エレメント。A plurality of earth wall elements that are buried in the ground to form the outer shell of a tunnel to be built and filled with concrete.
The cylindrical portion and at least one side of the cylindrical portion is composed of an engaging portion that is recessed inside the cylindrical portion over the entire length of the cylindrical portion,
The engaging portion is configured such that a part of a cylindrical portion of an element arranged next to the element is engaged,
A main steel material insertion hole is provided through the engagement portion and the cylindrical portion that is engaged with the engagement portion,
A lid plate is removably attached to the main steel material insertion hole,
An earth pressure wall element characterized by that.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000347552A JP4500428B2 (en) | 2000-11-15 | 2000-11-15 | Earth wall and earth wall elements |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2000347552A JP4500428B2 (en) | 2000-11-15 | 2000-11-15 | Earth wall and earth wall elements |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002146777A JP2002146777A (en) | 2002-05-22 |
| JP4500428B2 true JP4500428B2 (en) | 2010-07-14 |
Family
ID=18821264
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000347552A Expired - Fee Related JP4500428B2 (en) | 2000-11-15 | 2000-11-15 | Earth wall and earth wall elements |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4500428B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4287716B2 (en) * | 2003-08-05 | 2009-07-01 | 大成建設株式会社 | Element water stop joint and element water stop joint construction method |
| JP2006045928A (en) * | 2004-08-05 | 2006-02-16 | Fujita Corp | Earth pressure wall |
| JP4660665B2 (en) * | 2006-02-28 | 2011-03-30 | 大成建設株式会社 | Multiple digging machine |
| CN107882211B (en) * | 2017-12-15 | 2024-07-30 | 西藏涛扬建筑设计有限公司 | Constraint combined wall structure for building |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS4987206U (en) * | 1972-11-15 | 1974-07-29 | ||
| JPS5245121A (en) * | 1975-10-07 | 1977-04-09 | Kubota Ltd | Steel pipe sheet pile |
| JPS5295811A (en) * | 1976-02-06 | 1977-08-11 | Giken Koei Kk | Method of building underground wall in poor subsoil |
| JPS5938497A (en) * | 1982-08-27 | 1984-03-02 | 日本国有鉄道 | Tunnel lining body |
| JPH0631535B2 (en) * | 1988-11-02 | 1994-04-27 | 日立造船株式会社 | Continuous wall and method of constructing continuous wall |
| JPH083516Y2 (en) * | 1990-06-05 | 1996-01-31 | 石川島建材工業株式会社 | Basic element for tunnel construction |
| JP3298711B2 (en) * | 1993-08-30 | 2002-07-08 | 石川島建材工業株式会社 | Tunnel construction method using elements for tunnel lining |
| JP3567401B2 (en) * | 1996-06-07 | 2004-09-22 | 清水建設株式会社 | Large section tunnel and its construction method |
| JPH10227199A (en) * | 1997-02-18 | 1998-08-25 | Ohbayashi Corp | Construction method of large sectional tunnel |
| JP3150661B2 (en) * | 1998-08-05 | 2001-03-26 | 稔 山本 | Construction method of outer lining of large section tunnel |
| JP4017777B2 (en) * | 1999-01-21 | 2007-12-05 | 石川島建材工業株式会社 | Tunnel construction method |
| JP3485249B2 (en) * | 1999-01-25 | 2004-01-13 | 株式会社推研 | Construction method of earth pressure wall |
| JP4062464B2 (en) * | 1999-04-14 | 2008-03-19 | 株式会社フジタ | Tunnel construction method |
-
2000
- 2000-11-15 JP JP2000347552A patent/JP4500428B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002146777A (en) | 2002-05-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102226859B1 (en) | The building method of hybrid cip and earth retaining wall thereof | |
| KR102503780B1 (en) | Constructing Method of Pile with Steel Pipe Reinforcement, Pile constructed by such Method, and Retaining Wall having such Piles | |
| JP4500428B2 (en) | Earth wall and earth wall elements | |
| JP2008101467A (en) | Rock fall prevention fence | |
| KR102127859B1 (en) | Pile wall, Construction method thereof | |
| CN105569329A (en) | Unilateral formwork support basement construction method and basement | |
| KR101669669B1 (en) | Construction methods of approaching dual tunnel | |
| CN109915150A (en) | A kind of pile foundation pre-reinforced supporting structure for controlling tunnel settlement and its construction method | |
| JP2001164569A (en) | All-casing cast-in-place pile construction method | |
| JP2006045928A (en) | Earth pressure wall | |
| JP4243520B2 (en) | Hollow element for construction of foundation beam and construction method of foundation structure using this hollow element | |
| JPH08303178A (en) | Vertical shaft for shield excavation | |
| KR100768473B1 (en) | Construction method of underground structures using underground plunge with straightness and induction drainage | |
| JP2011226116A (en) | Pipe roof and constructing method thereof | |
| KR100711574B1 (en) | Soil Nail | |
| KR100441966B1 (en) | Applying Method of Casing as the Concrete Filled Tube | |
| CN212641741U (en) | A ring beam structure connecting pile-clad concrete columns and reinforced concrete floors | |
| JPS6018769B2 (en) | Construction method of underground structure | |
| JP4621538B2 (en) | Joining device for driving pile and upper column | |
| JP2020059983A (en) | Base floor structure and construction method of base floor | |
| CN111677519B (en) | Reinforcing structure and reinforcing method for shield launching end and shield launching method | |
| JP2572680B2 (en) | Underground structure by reverse strike method | |
| CN210917326U (en) | H-shaped spliced precast concrete pile and foundation pit supporting device | |
| JP3455157B2 (en) | Shoring construction method | |
| JP4445110B2 (en) | Structure of retaining wall penetration and method for forming the same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20070911 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090123 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100114 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100311 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100401 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100419 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130423 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4500428 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130423 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140423 Year of fee payment: 4 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |