JP4514726B2 - Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device - Google Patents

Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device Download PDF

Info

Publication number
JP4514726B2
JP4514726B2 JP2006107863A JP2006107863A JP4514726B2 JP 4514726 B2 JP4514726 B2 JP 4514726B2 JP 2006107863 A JP2006107863 A JP 2006107863A JP 2006107863 A JP2006107863 A JP 2006107863A JP 4514726 B2 JP4514726 B2 JP 4514726B2
Authority
JP
Japan
Prior art keywords
power generation
day
generator
water
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2006107863A
Other languages
Japanese (ja)
Other versions
JP2007282431A (en
Inventor
智志 長倉
彰宏 中村
政明 菅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2006107863A priority Critical patent/JP4514726B2/en
Publication of JP2007282431A publication Critical patent/JP2007282431A/en
Application granted granted Critical
Publication of JP4514726B2 publication Critical patent/JP4514726B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、水力発電所の水力発電計画を作成するのに好適な水力発電計画作成方法及び水力発電計画作成装置に関するものである。   The present invention relates to a hydropower plan creation method and a hydropower plan creation device suitable for creating a hydropower plan for a hydropower plant.

貯水池(ダム)に貯水した水を利用して発電機により発電を行う水力発電所においては、梅雨期や台風期に流入する水によって貯水池が溢水することなく、年間を通じて要求される電力を発電することが求められている。このため、水力発電所では過去数十年間の降水量に基づいて貯水池の貯水量の年間運用計画(目標)を予め作成しておき、発電を行う際には貯水池の実際の貯水量や天気予報等から予想される流入量及び発電に使用する使用水量と、貯水池の年間運用計画とに基づいて、2週間程度の短期的な発電計画を作成して発電を行うようにしている。   In hydroelectric power plants that use the water stored in reservoirs (dams) to generate electricity with generators, the water that flows during the rainy season and typhoon season does not overflow the reservoir and generates the required power throughout the year. It is demanded. For this reason, hydropower plants have prepared in advance an annual operation plan (target) for the reservoir volume based on precipitation over the past few decades, and when generating electricity, the actual storage volume and weather forecast for the reservoir Based on the inflow expected from the above, the amount of water used for power generation, and the annual operation plan of the reservoir, a short-term power generation plan of about two weeks is created to generate power.

なお、特許文献1には水力発電所群に対する良質な日間発電計画案、及び代替案を実用的な処理時間で算出機により立案する方式が開示されている。また特許文献2には日(短期間)調整を行う調整池式水力発電所の溢水を防ぎ、高効率で運用し、制御する調整池式水力発電所の自動化システムが開示されている。
特開平5−91799号公報 特開平10−30546号公報
Patent Document 1 discloses a method for preparing a high-quality daily power generation plan for a hydroelectric power station group and an alternative with a calculator in a practical processing time. Patent Document 2 discloses an automated system for a regulating pond hydroelectric power plant that prevents flooding of a regulating pond hydroelectric power plant that performs day (short term) adjustment, operates and controls it with high efficiency.
JP-A-5-91799 Japanese Patent Laid-Open No. 10-30546

しかしながら、従来の水力発電所の発電計画は、上記したような貯水池の実際の貯水量や流入量、発電に使用する使用水量、及び貯水池の年間運用計画等に基づいて、発電所の作業者が経験を頼りに作成していた。このため、作業者によって発電計画が夫々異なったものとなり、必ずしも最適な発電計画により発電が行われていないという問題点があった。
本発明は上記したような点を鑑みてなされたものであり、水力発電所の最適な発電計画を自動的に作成する水力発電計画作成方法及び水力発電計画作成装置を提供することを目的とする。
However, the conventional hydropower plant power generation plan is based on the actual storage volume and inflow volume of the reservoir, the amount of water used for power generation, and the annual operation plan of the reservoir. It was created based on experience. For this reason, the power generation plan differs depending on the worker, and there is a problem that power generation is not necessarily performed by the optimum power generation plan.
The present invention has been made in view of the above points, and an object of the present invention is to provide a hydropower plan creation method and a hydropower plan creation device that automatically create an optimal power generation plan for a hydropower station. .

上記目的を達成するため、貯水池の貯水を利用して発電を行う発電機を備えた水力発電所の所定期間の発電計画を作成する水力発電計画作成方法であって、前記発電機を最高効率で毎日運転したときに、前記所定期間の最終日における前記貯水池の貯水量が所定量以上で且つ前記所定期間において発電に使用する平均使用水量が所定水量以上であるときは、前記発電機の運転日を毎日に決定する第1の運転日決定ステップと、前記第1の運転日決定ステップにおいて否定結果が得られたときに、前記発電機を日曜日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機の運転日を、前記日曜日を除いた日に決定する第2の運転日決定ステップと、前記第2の運転日決定ステップにおいて否定結果が得られたときに、前記発電機を日曜日と祝日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機を、前記日曜日は運転停止、前記祝日は運転停止又は電力需要のピーク時間のみ運転するピーク運転とし、前記発電機の運転日を前記日曜日及び祝日を除いた日に決定する第3の運転日決定ステップと、前記第3の運転日決定ステップにおいて否定結果が得られたときに、前記発電機を前記日曜日、祝日、土曜日において運転停止とし、前記発電機の運転日を前記日曜日、祝日、土曜日以外の日に決定する第4の運転日決定ステップと、前記所定期間における前記貯水池の貯水量、前記貯水池の年間計画貯水量、及び前記第1〜第4の運転日決定ステップにより決定された運転日から求められる1日あたりの平均取水量を、発電に使用する使用水量により除算して1日当たりの発電時間を算出する発電時間算出ステップと、前記発電時間算出ステップにより算出した発電時間と電力消費量が大きい時間帯とに基づいて前記発電機の運転時間を決定する運転時間決定ステップと、から成ることを特徴とする。 To achieve the above object, a hydroelectric plan generation method of generating power program for a predetermined period of hydroelectric power plant comprising a generator for generating electric power by utilizing the water of the reservoir, the generator at maximum efficiency When the water storage amount of the reservoir on the last day of the predetermined period is equal to or greater than a predetermined amount and the average amount of water used for power generation in the predetermined period is equal to or greater than the predetermined water amount when operated every day, the operation day of the generator When a negative result is obtained in the first operation date determination step and the first operation date determination step, the average water usage amount is equal to or greater than a predetermined water amount if the generator is not operated on Sunday. When a negative result is obtained in the second operation date determination step for determining the operation date of the generator on the date excluding the Sunday, and the second operation date determination step, If the generator is not operated on Sundays and holidays, if the average amount of water used is greater than or equal to a predetermined amount of water, the generator is stopped on Sundays, and the peak that operates only during peak hours of power outage or holidays on the holidays. A third operation day determination step for determining operation days of the generator excluding Sundays and holidays, and a negative result in the third operation day determination step; A fourth operation day determination step of stopping the machine on the Sundays, holidays, and Saturdays, and determining the operation days of the generator on a day other than the Sundays, holidays, and Saturdays; and the amount of water stored in the reservoir in the predetermined period , annual plans water volume of the reservoir, and the average intake per day obtained from the operation date determined by the first through fourth operating date determination step, used for power generation The operation time of the generator is determined based on a power generation time calculation step that calculates power generation time per day by dividing by the amount of water used, and a power generation time calculated by the power generation time calculation step and a time zone in which power consumption is large. And an operation time determination step.

請求項2に記載の本発明は、前記電力消費量が大きい時間帯は、季節毎に異なることを特徴とする。
請求項3に記載の本発明は、貯水池の貯水を利用して発電を行う発電機を備えた水力発電所の所定期間の発電計画を作成する水力発電計画作成装置であって、前記発電機を最高効率で毎日運転したときに、前記所定期間の最終日における前記貯水池の貯水量が所定量以上で且つ前記所定期間において発電に使用する平均使用水量が所定水量以上であるときに、前記発電機の運転日を毎日に決定する第1の運転日決定処理と、前記第1の運転日決定処理において否定結果が得られたときに、前記発電機を日曜日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機の運転日を、前記日曜日を除いた日に決定する第2の運転日決定処理と、前記第2の運転日決定処理において否定結果が得られたときに、前記発電機を日曜日と祝日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機を前記日曜日は運転停止、前記祝日は運転停止又は電力需要のピーク時間のみ運転するピーク運転とし、前記発電機の運転日を前記日曜日及び祝日を除いた日に決定する第3の運転日決定処理と、前記第3の運転日決定処理において否定結果が得られたときに、前記発電機を前記日曜日、祝日、土曜日において運転停止とし、前記発電機の運転日を前記日曜日、祝日、土曜日以外の日に決定する第4の運転日決定処理と、を実行する運転日決定手段と、前記所定期間における前記貯水池の貯水量前記貯水池の年間計画貯水量、及び前記運転日決定手段により決定された運転日から求められる1日あたりの平均取水量を、発電に使用する使用水量により除算して1日当たりの発電時間を算出する発電時間算出手段と、前記発電時間算出手段により算出した発電時間と電力消費量が大きい時間帯に基づいて前記発電機の運転時間を決定する運転時間決定手段と、を備えることを特徴とする。
The present invention according to claim 2 is characterized in that the time zone in which the power consumption is large differs for each season.
The present invention is defined in claim 3, a hydroelectric planning apparatus that creates a power program for a predetermined period of hydroelectric power plant comprising a generator for generating electric power by utilizing the water of the reservoir, the generator The generator when the amount of water stored in the reservoir on the last day of the predetermined period is equal to or greater than a predetermined amount and the average amount of water used for power generation in the predetermined period is equal to or greater than a predetermined amount of water when operated at maximum efficiency every day. When a negative result is obtained in the first operation day determination process for determining the operation day of the first day and the first operation day determination process, the average amount of water used is determined if the generator is not operated on Sunday. When the amount of water is equal to or greater than a predetermined amount of water, when a negative result is obtained in the second operation day determination process for determining the operation day of the generator on the day excluding the Sunday and the second operation day determination process On the generator on Sunday If the average amount of water used is not more than a predetermined amount of water if it is not operated on a public holiday, the generator is stopped on Sundays, and the holiday is set to a peak operation where the operation is stopped or only during peak hours of power demand. When a negative result is obtained in the third operation day determination process for determining the operation day of the machine on the day excluding the Sunday and holidays, and the third operation day determination process, the generator is connected to the Sunday, holidays, and shutdown in Saturday the operation date of the generator Sunday and holidays, and a fourth operational date determination process for determining the day than Saturday and operation date determining means for execution, said in the predetermined time period water storage reservoirs, annual plans water volume of the reservoir, and the average intake per day obtained from the operation date determined by the operation date determination unit, by using the amount of water to be used for power generation removal Power generation time calculation means for calculating the power generation time per day, and operation time determination means for determining the operation time of the generator based on the power generation time calculated by the power generation time calculation means and the time zone in which the power consumption is large And.

請求項4に記載の本発明は、前記電力消費量が大きい時間帯は、季節毎に異なることを特徴とする。
請求項に記載の本発明は、前記所定期間における水力発電計画が出力可能に構成されていることを特徴とする。
The present invention according to claim 4 is characterized in that the time zone in which the power consumption is large differs for each season.
The present invention described in claim 5 is characterized in that the hydropower generation plan in the predetermined period is configured to be output.

本発明によれば、発電機を最高効率で運転したときに使用する平均使用水量が所定水量以上となるように発電機を運転する運転日を決定すると共に、所定期間における貯水池の貯水量と貯水池の年間計画貯水量とから得られる1日あたりの平均取水量発電に使用する使用水量により除算して1日当たりの発電時間を算出し、算出した発電時間と電力消費量が大きい時間帯とに基づいて発電機の運転時間を決定することで、貯水池の貯水量に応じた最適な水力発電計画を自動的に作成することが可能になる。 According to the present invention, the operation date for operating the generator is determined so that the average amount of water used when the generator is operated at the highest efficiency is equal to or greater than the predetermined water amount, and the storage amount of the reservoir in the predetermined period and the reservoir the average intake amount per day obtained from the annual plan water volume by dividing by the use amount of water to be used for power generation is calculated per day of power generation time, calculated power generation time and to the power consumption is large time zone By determining the generator operating time based on this, it is possible to automatically create an optimal hydropower plan according to the amount of water stored in the reservoir.

以下、図面を参照しながら本発明の実施形態について説明する。
図1は本発明の実施形態である水力発電計画支援システムの構成を示した図である。
この図1に示す水力発電計画支援システムは、複数の水力発電計画作成装置1、1・・と、中央給電指令所2と、により構成され、各水力発電計画作成装置1、1・・と中央給電指令所2との間がローカルエリアネットワーク(LAN:Local Area Network)等を
介して接続されている。
水力発電計画作成装置1は、夫々の水力発電所に設置され、各水力発電所の発電計画等を作成する。
中央給電指令所2は、複数の発電所における給電制御を行うと共に、各水力発電計画作成装置1に対して必要な情報、例えば降水量に関する情報や電力需要に関する情報などを提供したり、或いは各水力発電計画作成装置1の発電計画に関する情報等を取得したりする。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a diagram showing a configuration of a hydroelectric power generation plan support system according to an embodiment of the present invention.
The hydropower plan support system shown in FIG. 1 includes a plurality of hydropower plan creation devices 1, 1... And a central power supply command station 2, and each hydropower plan creation device 1, 1. The power supply command station 2 is connected via a local area network (LAN) or the like.
The hydroelectric power generation plan creation device 1 is installed in each hydroelectric power plant and creates a power generation plan and the like for each hydroelectric power plant.
The central power supply command station 2 performs power supply control in a plurality of power plants, and provides necessary information to each hydropower plan creation device 1, for example, information on precipitation and information on power demand, or Information on the power generation plan of the hydroelectric power generation plan creation device 1 is acquired.

図2は水力発電計画作成装置1のハードウェアの構成例を示した図である。
この図2において、CPU(Central Processing Unit)11は、水力発電計画作成装置1全体の制御を司る。ROM(Read Only Memory)12は、プログラムデータ等が記憶されており、必要に応じてバス10を介してCPU11が読み出しを行うことで、ここに格納されたプログラムに従った処理を実行する。RAM(Random Access Memory)13には、CPU11が各種処理を実行するのに必要なデータやプログラム等が適宜保持される。ハードディスクドライブ(HDD)14は、記憶媒体としてハードディスク(HD)15を備えており、CPU11がHD15に対してデータやプログラム等の記録又は読み出しを行う。この場合、CPU11はHDD14のHD15に記憶されているアプリケーションプログラムを読み出し、RAM13に展開することで、そのアプリケーションプログラムに従った各種処理を実行する。
FIG. 2 is a diagram illustrating a hardware configuration example of the hydroelectric power generation plan creation apparatus 1.
In FIG. 2, a CPU (Central Processing Unit) 11 controls the entire hydroelectric power generation plan creation device 1. A ROM (Read Only Memory) 12 stores program data and the like, and the CPU 11 reads the data via the bus 10 as necessary, thereby executing processing according to the stored program. A RAM (Random Access Memory) 13 appropriately stores data, programs, and the like necessary for the CPU 11 to execute various processes. The hard disk drive (HDD) 14 includes a hard disk (HD) 15 as a storage medium, and the CPU 11 records or reads data, programs, and the like on the HD 15. In this case, the CPU 11 reads out an application program stored in the HD 15 of the HDD 14 and develops it in the RAM 13 to execute various processes according to the application program.

また内部バス10にはディスプレイ16が接続されると共に、入力手段であるキーボード17やマウス18が接続されている。
また内部バス10は、ローカルエリアネットワークインターフェース(LANI/F)19が接続されており、このLANI/F19を介してLANに接続される。また内部バス10にはプリンタI/Fを介してプリンタ20等の出力装置が接続されている。
このように構成される水力発電計画作成装置1は、CPU11がROM12またはHDD14のHD15に記憶されているプログラムをRAM13のワーク領域に展開して水力発電計画支援処理を実行するようにしている。
In addition, a display 16 is connected to the internal bus 10, and a keyboard 17 and a mouse 18 as input means are connected.
The internal bus 10 is connected to a local area network interface (LAN I / F) 19, and is connected to the LAN via the LAN I / F 19. Further, an output device such as a printer 20 is connected to the internal bus 10 via a printer I / F.
In the hydroelectric power generation plan creation device 1 configured as described above, the CPU 11 expands the program stored in the ROM 12 or the HD 15 of the HDD 14 in the work area of the RAM 13 and executes the hydroelectric power generation plan support process.

以下、本実施形態の水力発電計画作成装置1について詳細に説明する。
図3は本実施形態の水力発電計画作成装置の画面構成例を示した図である。
この図3に示す本実施形態の水力発電計画作成装置1は、MENUシート画面30、入力シート画面40、及び出力シート画面50を有する。各シート画面にはジャンプボタン(領域)が設けられており、マウス18等を操作して画面上のジャンプボタンをクリックすることにより、シート画面を切り換えることができる。また入力シート画面40において入力したデータは、即座に計算されて出力シート画面50に反映される。
Hereinafter, the hydroelectric power generation plan creating apparatus 1 of the present embodiment will be described in detail.
FIG. 3 is a diagram showing a screen configuration example of the hydroelectric power generation plan creating apparatus of the present embodiment.
3 has a MENU sheet screen 30, an input sheet screen 40, and an output sheet screen 50. Each sheet screen is provided with a jump button (area), and the sheet screen can be switched by operating the mouse 18 or the like and clicking the jump button on the screen. Data input on the input sheet screen 40 is immediately calculated and reflected on the output sheet screen 50.

図4は、MENUシート画面30の一例を示した図である。
図4に示すようにMENUシート画面30には、○×ダムの短期計画入力用の入力領域として、入力シート画面40に必要事項を入力して○×ダムの短期貯水池計画を作成するための短期計画作成領域31、入力シート画面40の入力に応じた出力結果を表示した出力シート画面50を画面上に表示する印刷シート表示領域32、及び短期計画入力用の使い方を表示する使い方領域33が設けられている。また、MENUシート画面30には○×ダムの年間計画入力用の入力領域として年間運用計画シートに年間計画を入力するための年間計画領域34と年間計画入力用の使い方領域35が設けられている。
FIG. 4 is a diagram showing an example of the MENU sheet screen 30.
As shown in FIG. 4, the MENU sheet screen 30 has an input area for inputting a short-term plan for xx dam, and a short term for creating a short-term reservoir plan for xx dam by inputting necessary items on the input sheet screen 40. A plan creation area 31, a print sheet display area 32 that displays an output sheet screen 50 that displays an output result corresponding to the input on the input sheet screen 40, and a usage area 33 that displays usage for short-term plan input are provided. It has been. In addition, the MENU sheet screen 30 is provided with an annual plan area 34 for inputting an annual plan in the annual operation plan sheet and an usage area 35 for inputting the annual plan as input areas for annual plan input of xx dams. .

ここで、先ず、貯水池(ダム)の年間運用計画について説明する。
先に述べたように、貯水池に貯水した水を利用して発電を行う水力発電所においては、梅雨期や台風期に流入する水によって貯水池から水が溢れたりすることなく、年間を通じて要求される電力を発電することが求められている。このため、水力発電所では過去数十年間の降水量に基づいて貯水池の貯水量の年間運用計画(目標)を予め作成するようにしている。
図5は貯水池の年間運用カーブの一例を示した図であり、破線Aは貯水池の高さ、破線Bは貯水池の過去数十年間の運用実績に基づいた運用上限水位、破線Cは洪水が発生した場合において貯水池から溢水を避けるために必要な許容水量(ポケット)を夫々示している。また実線Dは上記した運用上限水位、及び洪水時に必要な許容水量に基づいて作成された貯水池の年間運用カーブが示されている。なお、この貯水池の年間運用カーブは作業者が経験に基づいて作成したものである。
Here, the annual operation plan of the reservoir (dam) will be described first.
As mentioned earlier, hydroelectric power plants that generate electricity using the water stored in the reservoir are required throughout the year without water overflowing from the reservoir due to water flowing in during the rainy season or typhoon season. There is a need to generate electricity. For this reason, hydroelectric power plants prepare in advance an annual operation plan (target) for the amount of water stored in the reservoir based on precipitation over the past several decades.
Fig. 5 shows an example of the annual operation curve of the reservoir. The broken line A is the height of the reservoir, the broken line B is the upper limit water level based on the operation results of the reservoir for the past several decades, and the broken line C is flooded. In this case, the allowable water amount (pocket) necessary for avoiding overflow from the reservoir is shown. A solid line D indicates the annual operation curve of the reservoir created based on the above operational upper limit water level and the allowable water amount required during flooding. The annual operation curve of this reservoir was created by the workers based on experience.

本実施形態の水力発電計画作成装置1は、前記貯水池の貯水量が、予め作成した貯水池の年間運用カーブに応じた貯水量、即ち年間計画貯水量と等しくなるよう、2週間程度の短期発電計画を自動的に作成するようにした点に特徴を有する。
本実施形態の水力発電計画作成装置1により短期的な発電計画を自動的に作成するには、図4に示したMENUシート画面30の短期計画作成領域31をクリックして、図6に示すような入力シート画面40を表示させる。
The hydroelectric power generation plan creation device 1 of the present embodiment is a short-term power generation plan of about two weeks so that the water storage amount of the reservoir is equal to the water storage amount corresponding to the annual operation curve of the reservoir created in advance, that is, the annual planned water storage amount It is characterized in that it is created automatically.
In order to automatically create a short-term power generation plan by the hydroelectric power generation plan creation apparatus 1 of the present embodiment, the short-term plan creation area 31 on the MENU sheet screen 30 shown in FIG. 4 is clicked, as shown in FIG. The input sheet screen 40 is displayed.

図6(a)は短期的な発電計画を自動作成する前の入力シート画面を示した図、図6(b)は短期発電計画作成後の入力シート画面を示した図である。
図6(a)(b)において、領域41は短期発電計画を作成する日付、曜日、及び祝日を入力するための領域であり、日付領域、曜日領域、及び祝日の場合にチェックを入れるチェックボックスが設けられている。
領域42は、図5に示した年間運行カーブに基づいた年間計画貯水量を入力する年間計画貯水量入力領域と、前日の24時における貯水量を入力する24時貯水量入力領域と、河川などから予測される流入量を入力する流入量予測入力領域とが設けられている。なお、予め作成された年間計画貯水量は、領域41の日付領域に日付を入力することで、HD15等に記憶された年間運行カーブのデータから自動的に入力される。また、流入量予測表示領域に入力される流入量は、作業者が天気予報等の情報に基づいてキーボード17やマウス18を利用して入力したり、或いは中央給電指令所2からLAN等を介して伝送されてきた情報を自動的に入力したりすることができる。
FIG. 6A is a diagram showing an input sheet screen before automatically creating a short-term power generation plan, and FIG. 6B is a diagram showing an input sheet screen after creating the short-term power generation plan.
6 (a) and 6 (b), an area 41 is an area for inputting a date, day of the week, and holiday for creating a short-term power generation plan, and a check box for checking in the case of the date area, day of the week, and holiday. Is provided.
The area 42 includes an annual planned storage amount input area for inputting the annual planned storage amount based on the annual operation curve shown in FIG. 5, a 24-hour storage amount input area for inputting the storage amount at 24 o'clock the previous day, a river, etc. And an inflow amount prediction input area for inputting an inflow amount predicted from the above. The annual planned water storage amount created in advance is automatically input from the data of the annual operation curve stored in the HD 15 or the like by inputting the date in the date area of the area 41. The inflow amount input to the inflow amount prediction display area is input by the operator using the keyboard 17 and the mouse 18 based on information such as the weather forecast, or from the central power supply command station 2 via the LAN or the like. It is possible to automatically input the transmitted information.

領域43には、図6(b)に示すように短期発電計画を作成したときに、領域42の年間計画貯水量入力領域に入力された年間計画貯水量、24時貯水量表示領域に入力された24時貯水量、及び流入量予測表示領域に入力された流入量予測等に基づいて算出される水力発電所の運転日、運転開始時間(並列時間)及び運転終了時間(解列時間)が自動的に入力される。また運転を午前と午後に分けて運転する場合は、運転予定1に午前の並列及び解列時間が入力され、運転予定2に午後の並列及び解列時間が入力される。なお、運転日及び並列時間及び解列時間の算出方法については後述する。   In the area 43, when the short-term power generation plan is created as shown in FIG. 6B, the annual planned water storage amount input in the annual planned water storage amount input area in the area 42 and the 24-hour water storage amount display area are input. The operation date, operation start time (parallel time), and operation end time (disconnection time) of the hydroelectric power plant calculated based on the 24-hour water storage amount, the inflow amount prediction input into the inflow amount prediction display area, and the like. Automatically entered. When the operation is divided into morning and afternoon, the morning parallel and disconnection time is input to the operation schedule 1, and the parallel and disconnection time of the afternoon is input to the operation schedule 2. In addition, the calculation method of an operation day, a parallel time, and a disconnection time is mentioned later.

領域44は、発電機等のメンテナンスを行うために発電機を停止する場合などに開始時間、終了時間、コメントなどを入力する作業制約入力領域であり、作業者が日程に従ってキーボード17やマウス18を利用して入力したり、或いは中央給電指令所2からLAN等を介して伝送されてきた情報を自動的に入力したりすることが考えられる。
領域45は、作業者が月間作業計画などを確認して該当日の各種情報、例えばメンテナンスの情報などを入力するための記事入力領域である。
領域46には、入力された24時貯水量と年間計画貯水量とがグラフにより示されており、図6(a)に示す短期発電計画作成前のグラフと、図6(b)に示す短期発電計画作成後のグラフを夫々比較すると明らかなように、短期発電計画作成後の24時貯水量の方が年間計画貯水量に沿ったものとなっている。
An area 44 is a work constraint input area for inputting a start time, an end time, a comment, and the like when the generator is stopped for maintenance of the generator and the like. The operator presses the keyboard 17 and the mouse 18 according to the schedule. It is conceivable to input using information or to automatically input information transmitted from the central power supply command station 2 via a LAN or the like.
An area 45 is an article input area for an operator to check a monthly work plan and input various types of information on the day, for example, maintenance information.
In the area 46, the inputted 24 hour water storage amount and the annual planned water storage amount are shown by a graph. The graph before the short-term power generation plan shown in FIG. 6 (a) and the short-term power generation shown in FIG. 6 (b) are shown. As is clear from the comparison of the graphs after the generation plan, the 24-hour water storage after the short-term generation plan is in line with the annual planned storage amount.

また図7は入力シート画面40の他の例を示した図であり、(a)は短期発電計画を自動作成する前の入力シート画面、(b)は短期発電計画を自動作成後の入力シート画面を示した図である。
図6には夏期間(7/11〜7/22)の入力シート画面40が示されているのに対して、図7には冬期間(11/21〜12/2)の入力シート画面40が示されている。
FIG. 7 is a diagram showing another example of the input sheet screen 40, where (a) is an input sheet screen before automatically creating a short-term power generation plan, and (b) is an input sheet after automatically creating a short-term power generation plan. It is the figure which showed the screen.
6 shows the input sheet screen 40 in the summer period (7/11 to 7/22), whereas FIG. 7 shows the input sheet screen 40 in the winter period (11/21 to 12/2). It is shown.

以下、本実施形態の水力発電計画作成装置1により実行される短期発電計画作成方法について具体的に説明する。
図8は、本実施形態の水力発電計画作成装置1が実行する短期発電計画作成方法の一例を示したフローチャートである。なお、この図8に示す処理は、水力発電計画作成装置1のCPU11がHD15に予め記録されているプログラムを実行することにより実現されるものである。
この場合、先ず、ステップS1において、貯水池の貯水量が条件Aを満たすか否かの判別を行う。ここで、条件Aは、水力発電所の発電機を土曜日、日曜日、祝日において運転しても短期発電計画の最終日の水位が高水位(170米個日)であり、且つ、発電に使用する平均使用水量が10[トン/秒]以上である。なお、[米個日]=[トン・デイ]は、貯水池の1日あたりの貯水量を表す単位である。また、平均使用水量とは、発電機を最高効率で運転した時の使用水量[トン/秒]の平均を指す。
そして、ステップS1において条件Aを満たすと判別した場合は、ステップS2に進み、発電機の運転日を毎日に決定する。即ち、貯水池の貯水量と予想流入量とに基づいて発電機を運転する運転日を決定する。
Hereinafter, a short-term power generation plan creation method executed by the hydropower generation plan creation apparatus 1 of the present embodiment will be specifically described.
FIG. 8 is a flowchart showing an example of a short-term power generation plan creation method executed by the hydropower generation plan creation apparatus 1 of the present embodiment. Note that the processing shown in FIG. 8 is realized by the CPU 11 of the hydropower generation plan creating apparatus 1 executing a program recorded in advance on the HD 15.
In this case, first, in step S1, it is determined whether or not the amount of water stored in the reservoir satisfies the condition A. Here, the condition A is that the water level of the last day of the short-term power generation plan is a high water level (170 US days) even when the hydroelectric power plant generator is operated on Saturdays, Sundays, and holidays, and is used for power generation. The average amount of water used is 10 [tons / second] or more. [US Day] = [Ton Day] is a unit representing the amount of water stored in the reservoir per day. In addition, the average amount of water used refers to the average of the amount of water used [ton / second] when the generator is operated at the highest efficiency.
And when it determines with satisfy | filling the conditions A in step S1, it progresses to step S2 and determines the operation day of a generator every day. That is, the operation day for operating the generator is determined based on the water storage amount of the reservoir and the expected inflow amount.

ここで、発電機の運転とは連続運転又はピーク運転を指し、連続運転とは0〜24hの間フルまたは最高効率で運転することを意味する。またピーク運転とはピーク時間のみ運転することを意味する。そして、ステップS8において発電時間を計算した後、ステップS9において運転時間(発電パターン)を決定する。なお、発電時間の計算方法と、運転時間の決定方法については後述する。
一方、ステップS1において否定結果が得られた場合、即ち貯水池の貯水量が条件Aを満たさないと判別した場合は、ステップS3に進み、条件Bを満たすか否かの判別を行う。ここで、条件Bは、発電機を日曜日に運転しなければ平均使用水量が10[トン/秒]以上である。
Here, the operation of the generator refers to continuous operation or peak operation, and the continuous operation refers to operation at full or maximum efficiency for 0 to 24 hours. Moreover, peak operation means driving only during peak hours. Then, after calculating the power generation time in step S8, the operation time (power generation pattern) is determined in step S9. A method for calculating the power generation time and a method for determining the operation time will be described later.
On the other hand, when a negative result is obtained in step S1, that is, when it is determined that the amount of water stored in the reservoir does not satisfy the condition A, the process proceeds to step S3 to determine whether or not the condition B is satisfied. Here, in the condition B, the average water consumption is 10 [ton / second] or more unless the generator is operated on Sunday.

そして、ステップS3において、条件Bを満たすと判別した場合は、ステップS4に進み、発電機の運転日を、日曜日を除いた日に、その運転形態を連続運転に決定する。そして、ステップS8において発電時間を計算した後、ステップS9において運転時間を決定する。
一方、ステップS3において否定結果が得られた場合は、ステップS5に進み、貯水池の貯水量が条件Cを満たすか否かの判別を行う。ここで、条件Cは、発電機を日曜日と祝日に運転しなければ平均使用水量が10[トン/秒]以上である。そして、ステップS5において、条件Cを満たすと判別した場合は、ステップS6に進み、日曜日は運転停止、祝日は運転停止又はピーク運転、その他の曜日は運転に決定する。そして、ステップS8において発電時間を計算した後、ステップS9において運転時間を決定する。
一方、ステップS5において否定結果が得られた場合は、ステップS7に進み、土曜日、日曜日、祝日は運転を停止して、その他の曜日は運転に決定する。そして、ステップS8において発電時間を計算した後、ステップS9において運転時間を決定する。
And when it determines with satisfy | filling the conditions B in step S3, it progresses to step S4 and the driving | running mode of a generator is determined to be a continuous operation on the day except Sunday. Then, after calculating the power generation time in step S8, the operation time is determined in step S9.
On the other hand, if a negative result is obtained in step S3, the process proceeds to step S5, and it is determined whether or not the amount of water stored in the reservoir satisfies condition C. Here, as for condition C, if the generator is not operated on Sundays and public holidays, the average amount of water used is 10 [tons / second] or more. If it is determined in step S5 that the condition C is satisfied, the process proceeds to step S6, and the operation is determined to be stopped on Sundays, stopped or peaked on holidays, and driven on other days of the week. Then, after calculating the power generation time in step S8, the operation time is determined in step S9.
On the other hand, if a negative result is obtained in step S5, the process proceeds to step S7, and driving is stopped on Saturdays, Sundays, and holidays, and driving is determined on other days. Then, after calculating the power generation time in step S8, the operation time is determined in step S9.

ここで、ステップS8における発電時間の計算方法について説明する。
先ず、計算における前提条件として、当日貯水量[米個日]を、
当日貯水量[米個日]=前日貯水量[米個日]+(平均流入量[トン/秒]−平均取水量[トン/秒])×24[時間]×3600[秒]
但し、水1[m3]=1[トン]とする。
とする。
また1日あたりの平均取水量[トン/秒]は、
1日あたりの平均取水量[トン/秒]=最終日貯水量[米個日]−年間計画貯水量[米個日]/対象日数[日]
とする。ここで、最終日貯水量は作成する短期計画の最終日を指し、対象日数は作成する短期計画の日数を指す。
これにより、発電時間は、
発電時間[時間]=1日あたりの平均取水量[トン/秒]/使用水量[トン/秒]×24[時間]
と求めることができる。
Here, a method for calculating the power generation time in step S8 will be described.
First of all, as a precondition in the calculation,
Day-of-day water storage [US individual day] = Previous-day water storage [US individual day] + (average inflow [ton / second] −average water intake [ton / second]) × 24 [hour] × 3600 [second]
However, water 1 [m 3 ] = 1 [ton].
And
The average daily intake [ton / second] is
Average daily water intake [tons / second] = Last day water storage [US individual days]-Annual planned water storage [US individual days] / Target days [days]
And Here, the final day water storage volume indicates the final day of the short-term plan to be created, and the target days indicate the number of days of the short-term plan to be created.
As a result, the power generation time is
Power generation time [hour] = average water intake per day [ton / second] / water consumption [ton / second] x 24 [hour]
It can be asked.

次に、ステップS9における運転時間の決定方法について説明する。
上記のように条件ごとの発電時間が計算されると、ステップS9においては、その発電時間に伴って運転パターンを決定する。
図9は運転パターンの一例を示した図であり、(a)には夏パターン、(b)には冬パターンが夫々示されている。
例えば図9(a)に示す夏パターン(5/1〜10/30)の期間においては、日中の電力消費量が大きいため、発電時間が1[時間(h)]〜12[時間(h)]の場合は、14:00を中心にして前後の時間を等しく割り振るようにする。また発電時間が12[h]〜16[h]の場合は、8:00を基準にしてそれ以降の時間に運転時間を割り振り、16[h]以上の場合は24:00を基準にしてそれ以前の時間に運転時間を割り振るようにする。
Next, the operation time determination method in step S9 will be described.
When the power generation time for each condition is calculated as described above, in step S9, the operation pattern is determined according to the power generation time.
FIG. 9 is a diagram showing an example of an operation pattern, in which (a) shows a summer pattern and (b) shows a winter pattern.
For example, in the period of the summer pattern (5/1 to 10/30) shown in FIG. 9A, since the power consumption during the day is large, the power generation time is 1 [hour (h)] to 12 [hour (h). In the case of]), the time before and after is centered around 14:00. When the power generation time is 12 [h] to 16 [h], the operation time is assigned to the time after 8:00, and when it is 16 [h] or more, it is set to 24:00. Allocate driving time to the previous time.

これに対して、図9(b)に示す冬パターン(11/1〜4/30)の期間においては、朝晩の電力消費量が大きいため、発電時間が1[h]〜4[h]の場合は、8:00を基準にしてそれ以降の時間に運転時間を割り振るようにする。また発電時間が4[h]〜7[h]の場合は8:00〜12:00までと、17:00を基準にしたそれ以降の時間に運転時間を割り振り、7[h]〜12[h]の場合は8:00〜12:00までと、20:00を基準にしてそれ以前の時間に運転時間を割り振るようにする。また12[h]〜16[h]の場合は8:00を基準にしてそれ以降の時間に運転時間を割り振り、16[h]以上の場合は24:00を基準にしてそれ以前の時間に運転時間を割り振るようにしている。   On the other hand, in the period of the winter pattern (11/1 to 4/30) shown in FIG. 9B, the power generation time is 1 [h] to 4 [h] because the morning and evening power consumption is large. In this case, the operation time is allocated to the subsequent time with 8:00 as a reference. Further, when the power generation time is 4 [h] to 7 [h], the operation time is assigned to the time from 8:00 to 12:00 and the time after 17:00, and 7 [h] to 12 [h] In the case of h], the operation time is assigned to the time before 8:00 to 12:00 and the time before 20:00. In the case of 12 [h] to 16 [h], the operation time is allocated to the time after 8:00, and when it is 16 [h] or more, the operation time is set to the time before 24:00. The operation time is allocated.

このように本実施の形態の水力発電計画作成装置1によれば、貯水池の貯水量と貯水池への予想流入量とに基づいて発電機を運転する運転日を決定すると共に、所定期間における貯水池の貯水量と貯水池の年間計画貯水量とから得られる1日あたりの平均取水量及び発電に使用する使用水量から発電時間を算出し、算出した発電時間に基づいて発電機の運転時間を決定することで、貯水池の貯水量に応じた最適な水力発電計画を自動的に作成することが可能になる。
また、本実施形態では、運転日を決定する際には、曜日や祝日といった運転日の電力需要に応じて運転時間を決定したり、或いは季節毎の電力需要に応じて運転時間を決定しているので、電力需要に応じた最適な水力発電計画を作成することができる。
As described above, according to the hydropower generation plan creation device 1 of the present embodiment, the operation day for operating the generator is determined based on the storage amount of the reservoir and the expected inflow amount to the reservoir, and the reservoir of the reservoir in the predetermined period is determined. Calculate the power generation time from the average daily intake volume obtained from the storage volume and the annual planned storage volume of the reservoir and the amount of water used for power generation, and determine the generator operating time based on the calculated power generation time Thus, it is possible to automatically create an optimal hydropower plan according to the amount of water stored in the reservoir.
In this embodiment, when determining the operation day, the operation time is determined according to the power demand on the operation day such as a day of the week or a holiday, or the operation time is determined according to the power demand for each season. Therefore, it is possible to create an optimal hydropower plan according to the power demand.

図10、図11は出力シート画面の一例を示した図であり、図10は上記図6に示した夏パターンの入力シート画面40により作成される出力シート画面50が、図11には上記図7に示した冬パターンの入力シート画面40により作成される出力シート画面50が夫々示されている。このような出力シート画面50は、上記図4に示したMENUシート画面30の印刷シート表示領域32をクリックすることにより画面上に表示されるものである。
またこのような出力シート画面50は所定の印刷操作を行うことによりプリンタ20を介して出力することが可能である。
10 and 11 show examples of output sheet screens. FIG. 10 shows an output sheet screen 50 created by the summer pattern input sheet screen 40 shown in FIG. 6, and FIG. 7, output sheet screens 50 created by the winter pattern input sheet screen 40 shown in FIG. Such an output sheet screen 50 is displayed on the screen by clicking the print sheet display area 32 of the MENU sheet screen 30 shown in FIG.
Such an output sheet screen 50 can be output via the printer 20 by performing a predetermined printing operation.

なお、これまで説明した本実施形態においては、約2週間(11日)の短期発電計画を作成する場合を例に挙げて説明したが、これはあくまでも一例であり、短期発電計画の期間は2週間以上に設定しても、或いは2週間より短い期間に設定しても良いことは言うまでもない。
但し、発電計画期間を長く設定した場合は天候不順による流入量の大幅な変化により短期発電計画に基づいて発電を行った場合でも、実際の貯水量が年間計画貯水量から大きく外れてしまう虞があるので、実際の貯水量と年間計画貯水量との差が所定値以上になった場合に画面上に警告メッセージなどを表示して作業者に短期発電計画の再作成を促すようにすることが望ましい。
In the embodiment described so far, the case where a short-term power generation plan for about two weeks (11 days) is created is described as an example, but this is only an example, and the period of the short-term power generation plan is 2 Needless to say, it may be set to a week or more, or a period shorter than two weeks.
However, if the power generation plan period is set to be long, even if power generation is performed based on the short-term power generation plan due to a significant change in inflow due to bad weather, the actual water storage amount may deviate significantly from the annual planned water storage amount. Therefore, when the difference between the actual water storage amount and the annual planned water storage amount exceeds the predetermined value, a warning message etc. may be displayed on the screen to prompt the worker to recreate the short-term power generation plan. desirable.

本発明の実施形態である水力発電計画支援システムの構成を示した図。The figure which showed the structure of the hydroelectric power generation plan assistance system which is embodiment of this invention. 水力発電計画作成装置のハードウェアの構成例を示した図。The figure which showed the structural example of the hardware of a hydroelectric power generation plan preparation apparatus. 本実施形態の水力発電計画作成装置の画面構成例を示した図。The figure which showed the example of a screen structure of the hydroelectric power generation plan preparation apparatus of this embodiment. MENUシート画面の一例を示した図。The figure which showed an example of the MENU sheet | seat screen. 貯水池の年間運用カーブの一例を示した図。The figure which showed an example of the annual operation curve of a reservoir. 夏パターンの入力シート画面の一例を示した図。The figure which showed an example of the input sheet screen of a summer pattern. 冬パターンの入力シート画面の一例を示した図。The figure which showed an example of the input sheet screen of a winter pattern. 本実施形態の水力発電計画作成装置が実行する短期発電計画作成方法の一例を示したフローチャート。The flowchart which showed an example of the short-term power generation plan preparation method which the hydroelectric power generation plan preparation apparatus of this embodiment performs. 運転パターンの一例を示した図。The figure which showed an example of the driving | running pattern. 夏パターンの出力シート画面の一例を示した図。The figure which showed an example of the output sheet screen of a summer pattern. 冬パターンの出力シート画面の一例を示した図。The figure which showed an example of the output sheet screen of a winter pattern.

符号の説明Explanation of symbols

1…水力発電計画作成装置、2…中央給電指令所、10…内部バス、11…CPU、12…ROM、13…RAM、14…HDD、15…HD、16…ディスプレイ、17…キーボード、18…マウス、19…LANI/F、20…プリンタ、30…MENUシート画面、40…入力シート画面、50…出力シート画面 DESCRIPTION OF SYMBOLS 1 ... Hydroelectric power generation plan preparation apparatus, 2 ... Central power supply command station, 10 ... Internal bus, 11 ... CPU, 12 ... ROM, 13 ... RAM, 14 ... HDD, 15 ... HD, 16 ... Display, 17 ... Keyboard, 18 ... Mouse, 19 ... LAN I / F, 20 ... Printer, 30 ... MENU sheet screen, 40 ... Input sheet screen, 50 ... Output sheet screen

Claims (5)

貯水池の貯水を利用して発電を行う発電機を備えた水力発電所の所定期間の発電計画を作成する水力発電計画作成方法であって、
前記発電機を最高効率で毎日運転したときに、前記所定期間の最終日における前記貯水池の貯水量が所定量以上で且つ前記所定期間において発電に使用する平均使用水量が所定水量以上であるときは、前記発電機の運転日を毎日に決定する第1の運転日決定ステップと、
前記第1の運転日決定ステップにおいて否定結果が得られたときに、前記発電機を日曜日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機の運転日を、前記日曜日を除いた日に決定する第2の運転日決定ステップと、
前記第2の運転日決定ステップにおいて否定結果が得られたときに、前記発電機を日曜日と祝日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機を前記日曜日は運転停止、前記祝日は運転停止又は電力需要のピーク時間のみ運転するピーク運転とし、前記発電機の運転日を前記日曜日及び祝日を除いた日に決定する第3の運転日決定ステップと、
前記第3の運転日決定ステップにおいて否定結果が得られたときに、前記発電機を前記日曜日、祝日、土曜日において運転停止とし、前記発電機の運転日を前記日曜日、祝日、土曜日以外の日に決定する第4の運転日決定ステップと、
前記所定期間における前記貯水池の貯水量、前記貯水池の年間計画貯水量、及び前記第1〜第4の運転日決定ステップにより決定された運転日から求められる1日あたりの平均取水量を、発電に使用する使用水量により除算して1日当たりの発電時間を算出する発電時間算出ステップと、
前記発電時間算出ステップにより算出した発電時間と電力消費量が大きい時間帯とに基づいて前記発電機の運転時間を決定する運転時間決定ステップと、
から成ることを特徴とする水力発電計画作成方法。
A hydroelectric power generation plan creation method for creating a power generation plan for a predetermined period of a hydroelectric power plant equipped with a generator that generates electric power using water stored in a reservoir,
When the generator is operated every day at maximum efficiency, when the amount of water stored in the reservoir on the last day of the predetermined period is equal to or greater than a predetermined amount and the average amount of water used for power generation in the predetermined period is equal to or greater than the predetermined amount of water A first operation day determination step for determining the operation day of the generator every day;
When a negative result is obtained in the first operation date determination step, if the average amount of water used is not less than a predetermined amount of water unless the generator is operated on Sunday, the operation date of the generator is A second operation day determination step for determining a day excluding Sunday;
When a negative result is obtained in the second operation day determination step, if the average amount of water used is not less than a predetermined amount of water unless the generator is operated on Sundays and public holidays, the generator is A third operation day determination step for determining the operation day of the generator as a day excluding the Sunday and holidays;
When a negative result is obtained in the third operating day determination step, the generator is shut down on Sundays, holidays, and Saturdays, and the operating days of the generator are set to days other than the Sundays, holidays, and Saturdays. A fourth operating day determination step to determine;
For the power generation, the water storage amount of the reservoir in the predetermined period, the annual planned water storage amount of the reservoir, and the average water intake amount per day obtained from the operation day determined by the first to fourth operation day determination steps are used for power generation. A power generation time calculating step for calculating the power generation time per day by dividing by the amount of water used;
An operation time determination step of determining the operation time of the generator based on the power generation time calculated by the power generation time calculation step and a time zone in which the power consumption is large;
A hydroelectric power generation plan creation method characterized by comprising:
前記電力消費量が大きい時間帯は、季節毎に異なることを特徴とする請求項1に記載の水力発電計画作成方法。   The method for creating a hydroelectric power generation plan according to claim 1, wherein the time period in which the power consumption is large differs for each season. 貯水池の貯水を利用して発電を行う発電機を備えた水力発電所の所定期間の発電計画を作成する水力発電計画作成装置であって、
前記発電機を最高効率で毎日運転したときに、前記所定期間の最終日における前記貯水池の貯水量が所定量以上で且つ前記所定期間において発電に使用する平均使用水量が所定水量以上であるときに、前記発電機の運転日を毎日に決定する第1の運転日決定処理と、前記第1の運転日決定処理において否定結果が得られたときに、前記発電機を、日曜日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機の運転日を、前記日曜日を除いた日に決定する第2の運転日決定処理と、前記第2の運転日決定処理において否定結果が得られたときに、前記発電機を日曜日と祝日に運転しなければ前記平均使用水量が所定水量以上であるときは、前記発電機を前記日曜日は運転停止、前記祝日は運転停止又は電力需要のピーク時間のみ運転するピーク運転とし、前記発電機の運転日を前記日曜日及び祝日を除いた日に決定する第3の運転日決定処理と、前記第3の運転日決定処理において否定結果が得られたときに、前記発電機を前記日曜日、祝日、土曜日において運転停止とし、前記発電機の運転日を前記日曜日、祝日、土曜日以外の日に決定する第4の運転日決定処理と、を実行する運転日決定手段と、
前記所定期間における前記貯水池の貯水量前記貯水池の年間計画貯水量、及び前記運転日決定手段により決定された運転日から求められる1日あたりの平均取水量を、発電に使用する使用水量により除算して1日当たりの発電時間を算出する発電時間算出手段と、
前記発電時間算出手段により算出した発電時間と電力消費量が大きい時間帯に基づいて前記発電機の運転時間を決定する運転時間決定手段と、を備えることを特徴とする水力発電計画作成装置。
A hydroelectric power generation plan creation device for creating a power generation plan for a predetermined period of a hydroelectric power plant equipped with a generator that generates electric power using water stored in a reservoir,
When the generator is operated every day at maximum efficiency, when the amount of water stored in the reservoir on the last day of the predetermined period is a predetermined amount or more and the average amount of water used for power generation in the predetermined period is a predetermined amount or more When a negative result is obtained in the first operation day determination process for determining the operation day of the generator every day and the first operation day determination process, the generator must be operated on Sunday. When the average amount of water used is equal to or greater than a predetermined amount of water, a negative result is obtained in the second operation day determination process and the second operation day determination process in which the operation day of the generator is determined on a date other than the Sunday. When the generator is not operated on Sundays and holidays, if the average amount of water used is equal to or greater than a predetermined amount of water, the generator is shut down on Sundays, and the generator is shut down or on demand. Peak of A negative result was obtained in the third operation day determination process and the third operation day determination process in which the operation day of the generator was determined to be the day excluding the Sunday and public holidays, and the peak operation was performed only during the operation. A fourth operation day determination process in which the generator is stopped on the Sundays, holidays, and Saturdays, and the operation days of the generator are determined on days other than the Sundays, holidays, and Saturdays. Day determination means;
Storage volume of the reservoir in the predetermined period, the division annual plans water volume of the reservoir, and the average intake per day obtained from been operated date determined by the operation date determination unit, by using the amount of water to be used for power generation Power generation time calculating means for calculating the power generation time per day,
A hydroelectric power generation plan creation device comprising: an operation time determination unit that determines an operation time of the generator based on a power generation time calculated by the power generation time calculation unit and a time zone in which power consumption is large.
前記電力消費量が大きい時間帯は、季節毎に異なることを特徴とする請求項3に記載の水力発電計画作成装置。   4. The hydropower generation plan creation device according to claim 3, wherein the time period in which the power consumption is large differs for each season. 前記所定期間における水力発電計画が出力可能に構成されていることを特徴とする請求項3又は4に記載の水力発電計画作成装置。   The hydroelectric power generation plan creation apparatus according to claim 3 or 4, wherein the hydroelectric power generation plan in the predetermined period is configured to be output.
JP2006107863A 2006-04-10 2006-04-10 Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device Expired - Lifetime JP4514726B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006107863A JP4514726B2 (en) 2006-04-10 2006-04-10 Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006107863A JP4514726B2 (en) 2006-04-10 2006-04-10 Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device

Publications (2)

Publication Number Publication Date
JP2007282431A JP2007282431A (en) 2007-10-25
JP4514726B2 true JP4514726B2 (en) 2010-07-28

Family

ID=38683293

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006107863A Expired - Lifetime JP4514726B2 (en) 2006-04-10 2006-04-10 Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device

Country Status (1)

Country Link
JP (1) JP4514726B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102042786B1 (en) * 2012-09-13 2019-11-08 한국전력공사 Apparatus for calculating power generating available time and method for operating thereof
CN118261374B (en) * 2024-03-28 2025-04-11 四川水利职业技术学院 A method for optimizing the operation of a run-of-river water diversion power station
JP7758242B1 (en) * 2025-04-17 2025-10-22 富士電機株式会社 Optimal operation planning device, optimal operation planning method and program

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0313614A (en) * 1989-06-08 1991-01-22 Toshiba Corp Operation pattern creating device for river system generator
JPH03290520A (en) * 1990-04-05 1991-12-20 Hitachi Ltd Water system operation method and equipment
JPH0591799A (en) * 1991-09-26 1993-04-09 Kansai Electric Power Co Inc:The Hydropower plant group-day power generation planning method
JPH1030546A (en) * 1996-07-10 1998-02-03 Toshiba Eng Co Ltd Automated system for regulating pondage type hydraulic power plant
JP4109789B2 (en) * 1998-04-08 2008-07-02 株式会社東芝 Power generation operation management system
JP2001142866A (en) * 1999-11-12 2001-05-25 Fuji Electric Co Ltd Power generation planning techniques for hydropower plants.
JP2005278335A (en) * 2004-03-25 2005-10-06 Toshiba Corp Power consignment operation plan creation support system and power consignment operation plan creation support program
JP2005285032A (en) * 2004-03-31 2005-10-13 Ffc Ltd Daily power generation planning system for hydroelectric power stations
JP2006039838A (en) * 2004-07-26 2006-02-09 Mitsubishi Electric Corp Water-based power generation operation plan creation support device

Also Published As

Publication number Publication date
JP2007282431A (en) 2007-10-25

Similar Documents

Publication Publication Date Title
EP2388666B1 (en) System and method for enhancement of power generation facilities
CN103595076B (en) A kind of active power distribution method improving the tired uniformity of wind turbine generator
US7707125B2 (en) Utility management system and method
US8428753B2 (en) System and method for planning the operation of, monitoring processes in, simulating, and optimizing a combined power generation and water desalination plant
Dorsey-Palmateer Effects of wind power intermittency on generation and emissions
CN111555281A (en) Method and device for simulating flexible resource allocation of power system
US20140316838A1 (en) Decision support system (dss) for maintenance of a plurality of renewable energy generators in a renewable power plant
US20130332220A1 (en) Service planning tool for wind turbines
JP2018532215A (en) Simulation method and system
CN112491080A (en) New energy installation layout planning method and system
Kanté et al. Long-term optimization of hydro & solar power electricity generation in the Taoussa area of Mali using the MESSAGE model
Guo et al. Modelling long-term operational dynamics of grid-connected hydro-photovoltaic hybrid systems
Nofuentes et al. Tools for the profitability analysis of grid‐connected photovoltaics
JP4514726B2 (en) Hydroelectric power generation plan creation method and hydroelectric power generation plan creation device
Hernandez-Negron et al. A hypothesis for experience curves of related technologies with an application to wind energy
Twaróg Modelling a pumped storage power plant on the example of the Porąbka Żar power plant
CN105244921B (en) Unserved capacity optimal distribution method in the electric power system dispatching of the water phosgene of fire containing wind
CN215870793U (en) Workshop load transfer system of drainage basin step power plant
CN105896535A (en) Wind farm generation right replacement capacity evaluation method for minimizing wind curtailment capacity
Gesino Power reserve provision with wind farms: Grid integration of wind power
CN113394789B (en) Integrated scheduling method for power system considering high-proportion renewable energy access
JP7155689B2 (en) Power generation pattern generator and power generation pattern generation program
JP2017201443A (en) Operation plan creating device, program and operation plan creating method
JPH0370805B2 (en)
Nøvik et al. The challenge of a real, complex hybrid project

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090410

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20090501

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20090518

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090721

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090918

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20091208

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100305

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20100305

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20100407

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100506

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100511

R150 Certificate of patent or registration of utility model

Ref document number: 4514726

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130521

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130521

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130521

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130521

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140521

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250