Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4515437B2 - Method for producing filled steel pipe concrete column - Google Patents
[go: Go Back, main page]

JP4515437B2 - Method for producing filled steel pipe concrete column - Google Patents

Method for producing filled steel pipe concrete column Download PDF

Info

Publication number
JP4515437B2
JP4515437B2 JP2006301622A JP2006301622A JP4515437B2 JP 4515437 B2 JP4515437 B2 JP 4515437B2 JP 2006301622 A JP2006301622 A JP 2006301622A JP 2006301622 A JP2006301622 A JP 2006301622A JP 4515437 B2 JP4515437 B2 JP 4515437B2
Authority
JP
Japan
Prior art keywords
steel pipe
concrete
filled
height
bending moment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006301622A
Other languages
Japanese (ja)
Other versions
JP2008115646A (en
Inventor
健司 川嶋
行男 中村
大志 榊原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Inc
NTT Inc USA
Original Assignee
Nippon Telegraph and Telephone Corp
NTT Inc USA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp, NTT Inc USA filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2006301622A priority Critical patent/JP4515437B2/en
Publication of JP2008115646A publication Critical patent/JP2008115646A/en
Application granted granted Critical
Publication of JP4515437B2 publication Critical patent/JP4515437B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、鋼管製柱状体の内部にコンクリートを充填して補強する充填型鋼管コンクリート柱に関する。   The present invention relates to a filled steel pipe concrete column that is reinforced by filling concrete inside a steel pipe columnar body.

図1は、従来の充填型鋼管コンクリート柱の横断面図(a)及び縦断面図(b)である。この充填型鋼管コンクリート柱1は、鋼管4内部の軸線方向全体に渡って充填コンクリート2が充填され、充填コンクリート2の中心部かつ軸線方向にほぼ全長に及ぶ長さで1本のまたは複数本を束ねた太径の異形鉄筋5が、直角4方向に水平なスペーサ6で鋼管柱状体の中心部に位置を固定して埋設され、この異形鉄筋5が軸力の一部を負担する構成となっている。また、充填型鋼管コンクリート柱1の上部には塞ぎ板3が設けられている(特許文献1を参照)。   FIG. 1 is a transverse sectional view (a) and a longitudinal sectional view (b) of a conventional filled steel pipe concrete column. This filled steel pipe concrete column 1 is filled with filled concrete 2 over the entire axial direction inside the steel pipe 4, and one or more of the filled steel pipe concrete pillars 1 have a length extending almost the entire length in the center and axial direction of the filled concrete 2. The bundled large-diameter deformed reinforcing bars 5 are embedded in the central portion of the steel pipe columnar body with spacers 6 horizontal in four directions at right angles, and the deformed reinforcing bars 5 bear a part of the axial force. ing. Moreover, the closing board 3 is provided in the upper part of the filling type steel pipe concrete pillar 1 (refer patent document 1).

図2は、一般的なコンクリート製電柱の断面図(a)及び鋼管製電柱の断面図(b)である。図2(a)において、コンクリート製電柱11は、円周上の所定の間隔で設けられた鉄筋12、及び当該鉄筋12を覆うように円柱状に形成されたコンクリート13により構成されている。このコンクリート製電柱11の高強度化は、外径を太くしたり、鉄筋12の量を増加したり、または、コンクリート13の肉厚を厚くしたりすることによって実現される。   FIG. 2 is a cross-sectional view (a) of a general concrete utility pole and a cross-sectional view (b) of a steel pipe utility pole. In FIG. 2A, the concrete utility pole 11 is composed of reinforcing bars 12 provided at predetermined intervals on the circumference and concrete 13 formed in a columnar shape so as to cover the reinforcing bars 12. The increase in strength of the concrete electric pole 11 is realized by increasing the outer diameter, increasing the amount of the reinforcing bars 12, or increasing the thickness of the concrete 13.

また、図2(b)において、鋼管製電柱21は、所定の外径及び内径の肉厚を有する円柱状の鋼管22により構成されている。この鋼管製電柱21の高強度化は、鋼管22の外形を太くしたり、その肉厚を厚くしたりすることによって実現される。   Moreover, in FIG.2 (b), the steel pipe utility pole 21 is comprised by the cylindrical steel pipe 22 which has the thickness of a predetermined | prescribed outer diameter and internal diameter. The high strength of the steel pipe utility pole 21 is realized by increasing the outer shape of the steel pipe 22 or increasing its thickness.

また、充填型鋼管コンクリート柱の例として、鋼管内の仕切りによって、充填したコンクリートの間に中空領域を設け、使用目的にあった十分な強度を実現すると共に、コンクリートの使用量を少なくして軽量化及び低コスト化を図るものが知られている(特許文献2を参照)。さらに、既設の鋼管柱の強度を容易にかつ経済的に増加させることを可能とする鋼管柱の補強方法も知られている(特許文献3を参照)。   In addition, as an example of a filled steel pipe concrete column, a partition in the steel pipe provides a hollow area between the filled concrete, realizing sufficient strength for the purpose of use, and reducing the amount of concrete used and lightweight There is known a technique for reducing the cost and cost (see Patent Document 2). Furthermore, a method for reinforcing a steel pipe column that makes it possible to easily and economically increase the strength of an existing steel pipe column is also known (see Patent Document 3).

特開平5−321402号公報JP-A-5-321402 特開平5−051999号公報JP-A-5-051999 特開2005−60992号公報JP 2005-60992 A

しかしながら、図1に示した充填型鋼管コンクリート柱1では、塞ぎ板3が設けられている上層部(天端部分)まで充填コンクリート2を充填する必要がある。このため、充填型鋼管コンクリート柱1全体として重量が重くなり、運搬が困難になって作業性が悪くなるという問題があった。   However, in the filled steel pipe concrete column 1 shown in FIG. 1, it is necessary to fill the filled concrete 2 up to the upper layer portion (top end portion) where the closing plate 3 is provided. For this reason, there existed a problem that weight became heavy as the whole filling type steel pipe concrete pillar 1, and conveyance became difficult and workability | operativity worsened.

また、図2(a)に示したコンクリート製電柱11では、高強度化の実現に際して必要荷重を満足するために、鉄筋12の量を増加したり、コンクリート13の肉厚を厚くしたりする必要がある。このため、コンクリート製電柱11全体として重量が重くなり、運搬が困難になって作業性が悪くなるという、図1の充填型鋼管コンクリート柱1と同様の問題があった。   Further, in the concrete utility pole 11 shown in FIG. 2 (a), it is necessary to increase the amount of the reinforcing bars 12 or increase the thickness of the concrete 13 in order to satisfy the required load when realizing high strength. There is. For this reason, there was a problem similar to that of the filled steel pipe concrete column 1 of FIG.

また、図2(b)に示した鋼管製電柱21では、図2(a)のコンクリート製電柱11と同程度の強度を有するように、コンクリート製電柱11よりも軽くかつ細く形成することができる。このため、コンクリート製電柱11よりも運搬が困難にならないから、作業の困難性を低減することができる。しかしながら、高強度化の実現に際して必要荷重を満足するためには、鋼管22の外径を太くしなければならないから、鋼管製電柱21を狭除道路や住宅地等に設置する場合に、設置スペースや美観を配慮する必要があった。   Further, the steel pipe utility pole 21 shown in FIG. 2 (b) can be formed lighter and thinner than the concrete utility pole 11 so as to have the same strength as the concrete utility pole 11 of FIG. 2 (a). . For this reason, since it does not become difficult to carry compared with the concrete electric pole 11, the difficulty of work can be reduced. However, since the outer diameter of the steel pipe 22 must be increased in order to satisfy the required load when realizing high strength, the installation space is required when installing the steel pipe utility pole 21 on a narrow road or a residential area. It was necessary to consider aesthetics.

そこで、本発明は上記課題を解決するためになされたものであり、その目的は、必要な強度を満足すると共に、軽量化及びコスト低減を図ることが可能な充填型鋼管コンクリート柱の製造方法を提供することにある。   Therefore, the present invention has been made to solve the above-mentioned problems, and its object is to provide a method for producing a filled steel pipe concrete column that satisfies the required strength and can achieve weight reduction and cost reduction. It is to provide.

一般に、電柱のケーブル架渉位置は、法令等の制約により地際部から概ね6mの高さであり、その高さの箇所(荷重作用点)に荷重が加わる。そこで、本発明では、実際の必要曲げモーメントを考慮して、従来のように電柱全長に渡ってコンクリートを充填する必要がないことに着目した。つまり、本発明は、必要な強度を満足する高さを求め、その高さを参照して、必要最小限のコンクリートにより補強を行うことを特徴とする。これにより、必要荷重が大きい地際部付近を補強すると共に、コンクリートが充填された上部については鋼管が持つ強度で対応することができる。つまり、必要な強度を満足すると共にコンクリートの使用量を少なくでき、軽量化及びコスト低減化を実現することができる。   In general, the cable crossing position of the utility pole is approximately 6 m from the ground due to restrictions of laws and regulations, and a load is applied to the height (load application point). Therefore, in the present invention, attention is paid to the fact that it is not necessary to fill concrete over the entire length of the utility pole as in the past in consideration of the actual required bending moment. In other words, the present invention is characterized in that a height that satisfies the required strength is obtained, and that the reinforcement is performed with the minimum necessary concrete with reference to the height. Thereby, while reinforcing the vicinity of the ground part where a required load is large, the upper part filled with concrete can be handled by the strength of the steel pipe. That is, the required strength can be satisfied, the amount of concrete used can be reduced, and weight reduction and cost reduction can be realized.

すなわち、本発明による充填型鋼管コンクリート柱の製造方法は、鋼管製柱状体の内部にコンクリートを充填する充填型鋼管コンクリート柱の製造方法において、地際部からの所定の高さの荷重作用点に加わる荷重により、地際部からの高さにおける必要曲げモーメントを求め、前記鋼管製柱状体に使用される鋼材の降伏強度、及び前記鋼管の地際部における断面係数により、降伏曲げモーメントを求め、前記必要曲げモーメントが降伏曲げモーメントよりも大きい、地際部からの高さに対する必要曲げモーメントの領域を補強領域とし、該補強領域を補強の必要な領域としてコンクリートを充填することを特徴とする。   That is, the method for producing a filled steel pipe concrete column according to the present invention is a method for producing a filled steel pipe concrete column in which concrete is filled in a steel pipe columnar body. By the applied load, the required bending moment at the height from the ground part is obtained, the yield strength of the steel material used for the steel pipe columnar body, and the section modulus at the ground part of the steel pipe, the yield bending moment is obtained, A region of the necessary bending moment with respect to the height from the ground where the necessary bending moment is larger than the yield bending moment is used as a reinforcing region, and concrete is filled with the reinforcing region as a region requiring reinforcement.

また、本発明による充填型鋼管コンクリート柱の製造方法は、前記補強領域を補強の必要な領域として、鋼管製柱状体の内部にコンクリートを充填すると共に鋼棒を埋設することを特徴とする。   The method for producing a filled steel pipe concrete column according to the present invention is characterized in that the reinforcing region is used as a region requiring reinforcement, and the steel tube columnar body is filled with concrete and a steel rod is embedded.

また、本発明による充填型鋼管コンクリート柱の製造方法は、前記地際部からhの高さの荷重作用点に加わる荷重をT、地際部からyの高さにおける必要曲げモーメントをm(y)=T(h−y)、鋼管製柱状体に使用される鋼材の降伏強度をσ、鋼管の地際部における断面係数をZ、降伏曲げモーメントをm=σZとした場合に、前記補強領域をy<h=h−m/Tとし、少なくとも前記hの高さで、請求項1におけるコンクリートを充填し、請求項2における鋼棒を埋設することを特徴とする。 Further, in the method of manufacturing a filled steel pipe concrete column according to the present invention, the load applied to the load acting point at the height of h from the ground portion is T, and the required bending moment at the height of y from the ground portion is m (y ) = T (hy), where the yield strength of the steel used for the steel pipe columnar body is σ, the section modulus at the ground part of the steel pipe is Z, and the yield bending moment is m y = σZ, the reinforcement The region is y <h c = h−m y / T, the concrete according to claim 1 is filled at least at the height of h c , and the steel rod according to claim 2 is embedded.

以上のように、本発明によれば、必要な強度を満足すると共に、軽量化及びコスト低減を図ることが可能な充填型鋼管コンクリート柱の製造方法を実現することができる。   As described above, according to the present invention, it is possible to realize a method for manufacturing a filled steel pipe concrete column that satisfies the required strength and can achieve weight reduction and cost reduction.

以下、本発明の実施の形態について図面を用いて詳細に説明する。
図3は、電柱の荷重作用点に加わる荷重T及び地際部における最大の必要曲げモーメントmを説明する図である。図3において、充填型鋼管コンクリート柱100である電柱には、ケーブル架渉により、斜線部分に示す電柱と地面との境界部分である地際部から垂直の高さhの位置を荷重作用点として、その荷重作用点に荷重Tが加わっている。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 3 is a diagram for explaining the load T applied to the load application point of the utility pole and the maximum required bending moment m at the ground. In FIG. 3, the electric pole which is the filled steel pipe concrete pillar 100 has a vertical height h position from the ground part which is a boundary part between the electric pole and the ground shown by the hatched portion as a load application point due to cable crossing. A load T is applied to the load application point.

ここで、地際部における必要曲げモーメントm(0)を、以下の式により算出する。
m(0)=m=T×h ・・・(1)
このとき、地際部から高さyにおける必要曲げモーメントm(y)を、以下の式により算出する。
m(y)=m(0)×(1−y/h)=T×(h−y) ・・・(2)
ここで、必要曲げモーメントm(y)とは、高さhの荷重作用点に荷重Tが加わることに伴う、高さyのモーメントをいう。
Here, the required bending moment m (0) at the subterranean part is calculated by the following equation.
m (0) = m = T × h (1)
At this time, a required bending moment m (y) at a height y from the ground is calculated by the following equation.
m (y) = m (0) * (1-y / h) = T * (hy) (2)
Here, the required bending moment m (y) refers to a moment of height y that accompanies the application of a load T to a load application point of height h.

図4は、電柱の地際部からの高さと必要曲げモーメントとの関係を示す図である。図4において、x軸は必要曲げモーメントm、y軸は地際部からの高さyを示す。また、点Hは、高さhの荷重作用点を示し、点Mは、点Hからの垂線と地際部との交点を示す。このx,y軸上の直線は(2)式により表され、x=m(y)としたときの式となる。   FIG. 4 is a diagram showing the relationship between the height of the utility pole from the ground and the required bending moment. In FIG. 4, the x-axis indicates the required bending moment m, and the y-axis indicates the height y from the ground. Point H represents a load application point having a height h, and point M represents an intersection between a perpendicular line from the point H and the ground part. The straight line on the x and y axes is expressed by equation (2), and is an equation when x = m (y).

図5は、鋼管製電柱の断面係数を説明する図である。鋼管101の内径をd1、外径をd2とすると、断面係数Zは図5に示す式で表される。また、この鋼管製電柱に使用される鋼材で規定された降伏強度をσとして、降伏曲げモーメントmを、以下の式により算出する。
=σ×Z ・・・(3)
ここで、降伏曲げモーメントmとは、無補強時における鋼管製電柱に破壊が生じるモーメントをいう。
FIG. 5 is a diagram for explaining a section modulus of a steel pipe utility pole. When the inner diameter of the steel pipe 101 is d1 and the outer diameter is d2, the section modulus Z is expressed by the equation shown in FIG. Further, as the yield strength defined by steel used for this steel pipe electric pole sigma, the yield bend moment m y, is calculated by the following equation.
m y = σ × Z (3)
Here, the yield bend moment m y, refers to a moment destruction steel pipe utility pole when unreinforced occurs.

また、(2)式の必要曲げモーメントm(y)と、(3)式の降伏曲げモーメントmとを比較し、以下の式により不足曲げモーメントを算出する。
m(y)−m ・・・(4)
そして、この値が正となるyの領域を求める。そして、この領域を、コンクリートの充填高さ及び鋼棒(図1における異形鉄筋5に相当する)の埋設長さを求めるための、必要最小限の補強領域として設定する。すなわち、正の不足曲げモーメントの領域を補強領域として設定する。ここで、コンクリートの充填高さ及び鋼棒の埋設長さは、図3において、地際部からの高さに相当する大きさをいう。コンクリートをその高さに充填する場合、実際は、その高さに加えて地中にもコンクリートが充填される。鋼棒を埋設する場合についても同様である。
Further, (2) requires bending moment m (y) of the equation (3) comparing the yield bend moment m y of equation to calculate the shortage bending moment according to the following equation.
m (y) -m y ··· ( 4)
Then, a region of y where this value is positive is obtained. And this area | region is set as a minimum reinforcement area | region for calculating | requiring the filling height of concrete and the embedding length of the steel bar (equivalent to the deformed reinforcing bar 5 in FIG. 1). That is, a positive under-bending moment region is set as the reinforcing region. Here, the filling height of the concrete and the embedding length of the steel bar refer to the size corresponding to the height from the ground part in FIG. When concrete is filled to its height, in fact, concrete is also filled into the ground in addition to its height. The same applies to the case of embedding steel bars.

そして、必要強度を満足するように、補強領域から得られるコンクリートの充填高さ及び鋼棒の埋設高さになるように、コンクリートを充填し、鋼棒を埋設する。このように、設定された補強領域から得られる高さを参照して、コンクリート等の充填材及び補強材による補強を行う。   Then, the concrete is filled and the steel bar is buried so that the concrete filling height obtained from the reinforcing region and the steel bar burying height are obtained so as to satisfy the required strength. Thus, with reference to the height obtained from the set reinforcement area | region, reinforcement with fillers and reinforcement materials, such as concrete, is performed.

次に、補強領域について具体的に説明する。図6は、荷重作用点及び必要曲げモーメントを考慮した補強領域を説明する図である。図4と同様に、x軸は必要曲げモーメントmを示し、y軸は地際部からの高さyを示し、右下がりの直線lは必要曲げモーメントmと高さyとの関係を示している。この直線lが示された図を「地際部からの高さ(h)−必要曲げモーメント(m)」図(HM図)という。   Next, the reinforcing region will be specifically described. FIG. 6 is a diagram for explaining a reinforcing region in consideration of a load application point and a necessary bending moment. As in FIG. 4, the x-axis shows the required bending moment m, the y-axis shows the height y from the ground, and the straight line l to the right shows the relationship between the required bending moment m and the height y. Yes. A diagram showing the straight line 1 is referred to as a “height from the ground (h) −necessary bending moment (m)” diagram (HM diagram).

図6に示したHM図において、直線lは、以下の式で表される。
y=h−hx/m(0)=h−x/T ・・・(5)
ここで、直線lとy軸との交点が点Hであり、x軸との交点が点Mである。
In the HM diagram shown in FIG. 6, the straight line 1 is expressed by the following equation.
y = h−hx / m (0) = h−x / T (5)
Here, the intersection of the straight line 1 and the y axis is the point H, and the intersection of the x axis is the point M.

次に、鋼管製電柱の降伏曲げモーメントm(x=m)である直線aをHM図に引き、この直線aと直線lとの交点を点Aとする。そして、直線l及び直線aが引かれたHM図において、直線aと直線lとx軸とにより囲まれた領域を、必要強度を満足するための必要最小限の補強領域として設定する。 Then, pull the HM view of line a is the yield bending moment m y of steel pipe electric pole (x = m y), the intersection of the straight line a and the straight line l and the point A. Then, in the HM diagram in which the straight line l and the straight line a are drawn, a region surrounded by the straight line a, the straight line l, and the x axis is set as a minimum necessary reinforcing region for satisfying the required strength.

このように設定された補強領域をカバーするための、すなわち必要強度を満足するためのコンクリートの充填高さ及び鋼棒の埋設長さを示すhは、以下の式で表される。
=h−my/T ・・・(6)
となる。
H c indicating the filling height of the concrete and the buried length of the steel rod for covering the reinforcing region set in this way, that is, for satisfying the required strength, is expressed by the following equation.
h c = h-m y / T ··· (6)
It becomes.

このように、必要強度を満足するための必要最小限の補強領域をカバーする高さhでコンクリートが充填され、鋼棒が埋設された充填型鋼管コンクリート柱100は、必要最小限の充填コンクリートの充填高さ及び鋼棒の埋設長さに設定された電柱モデルになる。 Thus, the concrete is filled at a height h c that covers the minimum necessary reinforcement area for satisfying the required strength, filled steel concrete column 100 steel bar is embedded, the minimum filling concrete It becomes a utility pole model set to the filling height of steel and the buried length of steel bars.

次に、本発明の実施の形態による充填型鋼管コンクリート柱100の製造方法について説明する。図7は、その製造方法を示すフロー図である。まず、荷重作用点の高さhを決定し(ステップS71)、その荷重作用点に加わる荷重Tを決定する(ステップS72)。そして、必要曲げモーメントm(y)を(2)式により算出する(ステップS73)。これらのステップ71から73までが、充填型鋼管コンクリート柱100の製造工程における条件設定部である。   Next, the manufacturing method of the filling type steel pipe concrete pillar 100 by embodiment of this invention is demonstrated. FIG. 7 is a flowchart showing the manufacturing method. First, the height h of the load application point is determined (step S71), and the load T applied to the load application point is determined (step S72). Then, the required bending moment m (y) is calculated by the equation (2) (step S73). These steps 71 to 73 are condition setting sections in the manufacturing process of the filled steel pipe concrete column 100.

そして、充填型鋼管コンクリート柱100を構成する鋼管製電柱の降伏曲げモーメントmを(3)式により算出し(ステップS74)、ステップ73における必要曲げモーメントm(y)とステップ74における降伏曲げモーメントmとから、不足曲げモーメントを式(4)により算出する(ステップS75)。そして、補強領域を設定し、この補強領域をカバーするための高さhを(6)式により算出し、ステップ75において算出した不足曲げモーメントを補強領域として鋼管製電柱を補強し、充填型鋼管コンクリート柱100を形成する(ステップS76)。すなわち、この補強領域をカバーする高さhでコンクリートを充填し、鋼棒を埋設する。これらのステップ74から76までが、充填型鋼管コンクリート柱100の製造工程における解析処理部である。 Then, the yield bend moment m y of steel pipe electric pole constituting a filled steel concrete column 100 (3) is calculated by equation (step S74), the bending yield in need bending moment m (y) and the step 74 in the step 73 the moment and a m y, the lack of the bending moment is calculated by equation (4) (step S75). Then, set the reinforcing region, the height h c for covering the reinforcing region (6) is calculated by equation, the steel tube electric pole reinforced insufficient bending moment calculated in step 75 as a reinforcing region, filled The steel pipe concrete pillar 100 is formed (step S76). That is, the concrete was filled at a height h c that covers the reinforcing region, burying the steel bar. These steps 74 to 76 are analysis processing units in the manufacturing process of the filled steel pipe concrete column 100.

以上のように、本発明の実施の形態によれば、必要曲げモーメントと降伏曲げモーメントとから不足曲げモーメントを算出し、この不足曲げモーメントによる補強領域から得られる高さに、鋼管製電柱の鋼管内にコンクリートを充填するようにした。これにより、充填型鋼管コンクリート柱100としての必要強度を満足することができる。   As described above, according to the embodiment of the present invention, the insufficient bending moment is calculated from the required bending moment and the yield bending moment, and the height obtained from the reinforced region by the insufficient bending moment is set to the steel pipe of the steel pipe utility pole. The inside was filled with concrete. Thereby, the required intensity | strength as the filling type steel pipe concrete pillar 100 can be satisfied.

また、本発明の実施の形態によれば、前述した不足曲げモーメントによる補強領域から得られる高さにコンクリートを充填することに加えて、鋼管内に鋼棒を1本または複数本埋設するようにした。これにより、さらに引張荷重にも十分耐え得る強度を満足することができる。また、埋設する鋼棒は引張に強いから、鋼管製電柱の外側への座屈止め効果を高めることができる。   Further, according to the embodiment of the present invention, in addition to filling the concrete with the height obtained from the reinforcing region due to the insufficient bending moment, one or more steel bars are embedded in the steel pipe. did. Thereby, the intensity | strength which can fully endure a tensile load can be satisfied. Moreover, since the steel rod to embed is strong to tension, the effect of preventing buckling to the outside of the steel pipe pole can be enhanced.

また、本発明の実施の形態によれば、鋼管製電柱の降伏強度σ、鋼管の外径及び内径または肉厚が決定すれば、降伏曲げモーメントmを算出することができ、そして、不足曲げモーメントを算出することにより、コンクリート及び鋼棒の必要補強量を求めることができる。これにより、図1に示した充填型鋼管コンクリート柱1のような全長に渡ってコンクリートを充填するものに比べて、コンクリートを部分的に充填すれば済むから、コンクリートの使用量を大幅に削減することができ、軽量化が図れ、安価になる。さらに、必要曲げモーメントが最大である地際部分の必要強度を満足することができる。この結果、過剰品質を避け、使用目的にあった経済的な電柱構造を実現することができる。 Further, according to the embodiment of the present invention, the yield strength of the steel pipe electric pole sigma, be determined outer and inner diameters or the thickness of the steel pipe, it is possible to calculate the yield bend moment m y, and shortage bending By calculating the moment, the required amount of reinforcement of the concrete and steel bar can be obtained. Thereby, compared with what fills concrete over the full length like the filling type steel pipe concrete pillar 1 shown in FIG. 1, since it only has to fill concrete partially, the usage-amount of concrete is reduced significantly. Can be made lighter and less expensive. Furthermore, it is possible to satisfy the required strength of the ground portion where the required bending moment is maximum. As a result, it is possible to avoid an excessive quality and realize an economical utility pole structure suitable for the purpose of use.

以上、実施の形態を挙げて本発明を説明したが、本発明は上記実施の形態に限定されるものではなく、その技術思想を逸脱しない範囲で種々変形可能である。例えば、補強材として鋼棒の例を示したが、この鋼材は1本の鉄筋であってもよいし、複数本の鉄筋であってもよい。また、鋼棒は、必ずしも図1に示すような異形鉄筋5である必要はない。   The present invention has been described with reference to the embodiment. However, the present invention is not limited to the above embodiment, and various modifications can be made without departing from the technical idea thereof. For example, although the example of the steel bar was shown as a reinforcing material, this steel material may be one rebar or a plurality of rebars. Moreover, the steel bar does not necessarily need to be the deformed reinforcing bar 5 as shown in FIG.

(a)は従来の充填型鋼管コンクリート柱の横断面図であり、(b)は縦断面図である。(A) is a cross-sectional view of a conventional filled steel pipe concrete column, and (b) is a vertical cross-sectional view. (a)は一般的なコンクリート製電柱の断面図であり、(b)は鋼管製電柱の断面図である。(A) is sectional drawing of a general concrete utility pole, (b) is sectional drawing of a steel pipe utility pole. 電柱の荷重作用点に加わる荷重T及び地際部における最大の必要曲げモーメントmを説明する図である。It is a figure explaining the maximum required bending moment m in the load T added to the load action point of a utility pole, and a subterranean part. 電柱の地際部からの高さと必要曲げモーメントとの関係を示す図である。It is a figure which shows the relationship between the height from the ground part of a utility pole, and required bending moment. 鋼管製電柱の断面係数を説明する図である。It is a figure explaining the section modulus of a steel pipe electric pole. 荷重作用点及び必要曲げモーメントを考慮した補強領域を説明する図である。It is a figure explaining the reinforcement area | region which considered the load application point and the required bending moment. 本発明の実施の形態に係る充填型鋼管コンクリート柱の製造方法を示すフロー図である。It is a flowchart which shows the manufacturing method of the filling type steel pipe concrete pillar which concerns on embodiment of this invention.

符号の説明Explanation of symbols

1,100 充填型鋼管コンクリート柱
2 充填コンクリート
3 塞ぎ板
4 鋼管
5 異形鉄筋
6 スペーサ
11 コンクリート製電柱
12 鉄筋
13 コンクリート
21 鋼管製電柱
22,101 鋼管
1,100 Filled steel pipe concrete pillar 2 Filled concrete 3 Closing plate 4 Steel pipe 5 Deformed bar 6 Spacer 11 Concrete electric pole 12 Reinforcing bar 13 Concrete 21 Steel pipe electric pole 22, 101 Steel pipe

Claims (3)

鋼管製柱状体の内部にコンクリートを充填する充填型鋼管コンクリート柱の製造方法において、
地際部からの所定の高さの荷重作用点に加わる荷重により、地際部からの高さにおける必要曲げモーメントを求め、
前記鋼管製柱状体に使用される鋼材の降伏強度、及び前記鋼管の地際部における断面係数により、降伏曲げモーメントを求め、
前記必要曲げモーメントが降伏曲げモーメントよりも大きい、地際部からの高さに対する必要曲げモーメントの領域を補強領域とし、
該補強領域を補強の必要な領域としてコンクリートを充填することを特徴とする充填型鋼管コンクリート柱の製造方法。
In the method of manufacturing a filled steel pipe concrete column in which concrete is filled into the steel pipe columnar body,
The required bending moment at the height from the ground part is obtained by the load applied to the load application point of the predetermined height from the ground part,
According to the yield strength of the steel material used for the steel pipe columnar body, and the section modulus at the ground part of the steel pipe, the yield bending moment is obtained,
The required bending moment is greater than the yield bending moment, and the region of the required bending moment relative to the height from the ground is used as the reinforcing region.
A method for producing a filled steel pipe concrete column, characterized by filling concrete with the reinforcing region as a region requiring reinforcement.
請求項1に記載の充填型鋼管コンクリート柱の製造方法において、
前記補強領域を補強の必要な領域として、鋼管製柱状体の内部にコンクリートを充填すると共に鋼棒を埋設することを特徴とする充填型鋼管コンクリート柱の製造方法。
In the manufacturing method of the filled-type steel pipe concrete pillar of Claim 1,
A method for producing a filled-type steel pipe concrete column, characterized in that concrete is filled in a steel pipe columnar body and a steel rod is buried while the reinforcing area is a necessary area.
請求項1または2に記載の充填型鋼管コンクリート柱の製造方法において、
前記地際部からhの高さの荷重作用点に加わる荷重をT、地際部からyの高さにおける必要曲げモーメントをm(y)=T(h−y)、鋼管製柱状体に使用される鋼材の降伏強度をσ、鋼管の地際部における断面係数をZ、降伏曲げモーメントをm=σZとした場合に、
前記補強領域をy<h=h−m/Tとし、
少なくとも前記hの高さで、請求項1におけるコンクリートを充填し、請求項2における鋼棒を埋設することを特徴とする充填型鋼管コンクリート柱の製造方法。
In the manufacturing method of the filling type steel pipe concrete pillar of Claim 1 or 2,
The load applied to the load acting point at the height of h from the ground part is T, the required bending moment at the height of y from the ground part is m (y) = T (hy), and used for the steel pipe columnar body. the yield strength of the steel to be sigma, the section modulus at Chisai portion of the steel pipe Z, the yield bend moment when the m y = σZ,
The reinforcing region is y <h c = h−m y / T,
At a height of at least the h c, filled with concrete in claim 1, method for producing a filled steel tube concrete columns, characterized by embedding the steel rods in claim 2.
JP2006301622A 2006-11-07 2006-11-07 Method for producing filled steel pipe concrete column Active JP4515437B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006301622A JP4515437B2 (en) 2006-11-07 2006-11-07 Method for producing filled steel pipe concrete column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006301622A JP4515437B2 (en) 2006-11-07 2006-11-07 Method for producing filled steel pipe concrete column

Publications (2)

Publication Number Publication Date
JP2008115646A JP2008115646A (en) 2008-05-22
JP4515437B2 true JP4515437B2 (en) 2010-07-28

Family

ID=39501813

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006301622A Active JP4515437B2 (en) 2006-11-07 2006-11-07 Method for producing filled steel pipe concrete column

Country Status (1)

Country Link
JP (1) JP4515437B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278876A (en) * 2014-10-27 2015-01-14 国家电网公司 Splicing method of concrete tower pole

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4902609B2 (en) * 2008-08-21 2012-03-21 博保 皆吉 Reinforcing body for steel pipe column and method for reinforcing steel pipe column using the reinforcing body
CN107060369A (en) * 2017-04-20 2017-08-18 金陵科技学院 One kind building recovery primary and secondary robot and method of work

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0551999A (en) * 1991-08-21 1993-03-02 Ohbayashi Corp Partially filled steel pipe concrete column
JP2884279B2 (en) * 1992-05-25 1999-04-19 株式会社竹中工務店 Filled steel pipe concrete column
JPH09209450A (en) * 1996-02-07 1997-08-12 Daiwa House Ind Co Ltd Beam-column connection construction and steel frame using it
JP4069064B2 (en) * 2003-12-01 2008-03-26 エヌ・ティ・ティ・インフラネット株式会社 Steel tube column reinforcing method and reinforcing material placement aid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278876A (en) * 2014-10-27 2015-01-14 国家电网公司 Splicing method of concrete tower pole

Also Published As

Publication number Publication date
JP2008115646A (en) 2008-05-22

Similar Documents

Publication Publication Date Title
JP5654725B2 (en) Shear reinforcement member
KR20100076576A (en) Concrete-filled steel tube
CN105714984B (en) Square and special-shaped concrete-filled steel tubular columns with built-in round tubes and tie bars and construction methods thereof
CN105064613A (en) Built-in FRP local restraint concrete composite member
JP2012057443A (en) Steel pipe reinforced concrete composite pile and manufacturing method for the same
JP5483055B2 (en) Mixed structural beam
JP2009249930A (en) Load-carrying material
KR101458435B1 (en) Half precast concrete column manufacturing method using saddle-type ties and dual hoops and constructing method using the same
JP4515437B2 (en) Method for producing filled steel pipe concrete column
CN201232294Y (en) High strength anti-shock reinforcement cage
JP2009114815A (en) Reinforcing structure of hollow concrete structure and method of reinforcing hollow concrete structure
JP3678625B2 (en) Reinforced reinforced concrete-filled steel pipe columns and concrete-filled double steel pipe columns considering fire resistance
JP5999862B1 (en) Seismic reinforcement structure of steel structure made of H-shaped steel
KR101178255B1 (en) Non-synthetic arch rib for which steel and reinforced concrete were used and the arch bridge construction technique for which this was used
US11970874B2 (en) Pole assembly
KR101847544B1 (en) Precast concrete slab having shear reinforcement function
JP4104158B2 (en) Installation method of opening reinforcement in reinforced concrete building
KR20160142985A (en) Concrete Girder With Coupler And Method For Constructing Rhamen Bridge Using The Same
JP2012017575A (en) Junction structure and junction method of precast concrete member
JP5690091B2 (en) Load-bearing material for protective structures such as rockfall, avalanche and earth and sand collapse
JP4505249B2 (en) Reinforced concrete member joining structure and method for joining reinforced concrete members
CN216304401U (en) Prefabricated pier of sectional type
JP4373392B2 (en) PCa material
JP4947469B2 (en) Precast prestressed reinforced concrete beam and method for producing precast prestressed reinforced concrete beam
JP2012167475A (en) Pc ground tank and construction method of the same

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20081017

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090916

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100511

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100512

R150 Certificate of patent or registration of utility model

Ref document number: 4515437

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130521

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140521

Year of fee payment: 4

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350