JP4521791B2 - Grout construction method for exposed column base - Google Patents
[go: Go Back, main page]

JP4521791B2 - Grout construction method for exposed column base - Google Patents

Grout construction method for exposed column base Download PDF

Info

Publication number
JP4521791B2
JP4521791B2 JP09709999A JP9709999A JP4521791B2 JP 4521791 B2 JP4521791 B2 JP 4521791B2 JP 09709999 A JP09709999 A JP 09709999A JP 9709999 A JP9709999 A JP 9709999A JP 4521791 B2 JP4521791 B2 JP 4521791B2
Authority
JP
Japan
Prior art keywords
base plate
injection
funnel
grout material
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP09709999A
Other languages
Japanese (ja)
Other versions
JP2000291018A (en
Inventor
直樹 平島
眞 金井
隆史 海野
正開 田中
Original Assignee
岡部株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 岡部株式会社 filed Critical 岡部株式会社
Priority to JP09709999A priority Critical patent/JP4521791B2/en
Publication of JP2000291018A publication Critical patent/JP2000291018A/en
Application granted granted Critical
Publication of JP4521791B2 publication Critical patent/JP4521791B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、S造ないしSRC造の露出型柱脚のベースプレート下面に対するグラウト材注入方法に関する。
【0002】
【従来の技術】
露出型柱脚の施工においては、鉄骨柱の下端部に一体的に設置されるベースプレートと基礎コンクリートとの間の密着性が施工結果にきわめて重要な影響を与えることはいうまでもない。その施工方法としては、従来からそれらのベースプレートの下面と基礎コンクリートとの間に無収縮グラウト材等のグラウト材を注入して密着させるグラウト施工方法が広く採用されている。また、グラウト材の注入方法としては、ベースプレートの周囲に型枠を形成し、その型枠内部に通じた注入パイプを介してグラウト材を注入したり、ベースプレートの外側面と型枠との間に間隙を設けておき、平板等をガイドとして用いて前記間隙を介してグラウト材を注入するといった手法が知られている。また、ベースプレートの締付け部に注入口を形成した特殊の注入座金を用い、その注入座金の注入口に注入用ロートの細径部を挿入してグラウト材を注入するという手法も知られている。
【0003】
【発明が解決しようとする課題】
ところで、注入用ロートを用いる前記従来技術は、柱サイズが比較的小さい場合には有効な手法であったが、注入口が小さくグラウト材の注入速度にも限度があったため、柱サイズが大きくなりベースプレートが大型化されるに従い、注入作業に相当の時間がかかり、場合によってはベースプレート下面全体にグラウト材が充填される前に局部的に硬化が始ってしまい充填不良に至るといった問題が露呈してきている。本発明は、このような従来技術の問題点を解消するためになされたもので、グラウト材の単位時間当りの注入量の増大を図り、柱サイズの大型化にも充分対応し得る露出型柱脚のグラウト施工方法を提供することを目的とするものである。
【0004】
【課題を解決するための手段】
本発明は、前記課題を解決するため、ベースプレートの外側面に沿ってそのベースプレートの幅の略中央部に注入用ロートの設置スペースをあけた状態に型枠を形成し、該型枠によって前記ベースプレートの周囲を囲むとともに、下部に前記ベースプレートの下方の間隙部と連通可能な横長状の幅広の注入部を形成した注入用ロートを前記設置スペースに設置し、その注入用ロートの横長状の幅広の注入部を介してグラウト材をベースプレートの下方の間隙部に帯状に注入して、該帯状のグラウト材の注入流を前記ベースプレートの下部中央部に形成したレベル用モルタルによって両側に二分させるとともに、前記ベースプレートの四隅の締付ナットの下部にセットされる座金に形成した通気孔を介してエア抜きを行うという技術手段を採用した。これにより、横長状の幅広の注入部を介して多量のグラウト材を素早く注入できるので、従来のように充填不良を起すことは回避できる。しかも、前記注入用ロートをベースプレートの幅の略中央部に設置するようにしたので、横長状の幅広の前記注入部から基礎コンクリート上に帯状に注入される多量のグラウト材がベースプレートの下部中央部に形成されるレベル用モルタルの部分で二手に分れて両側からスムーズに流入するので、大型のベースプレートに対してもきわめて良好な充填状態が簡便に得られる。さらに、そのグラウト材の注入の際には、ベースプレートの少なくとも四隅の締付ナットの下部にセットされる座金に形成した通気孔を介してエア抜きを行うので、ベースプレートの四隅から的確に排気がなされ、各隅部にもグラウト材が順次充填されることから、素早い多量のグラウト材の注入にも拘らず、ベースプレートの下方の間隙部の隅々まで満遍なくスムーズかつ的確に充填することが可能である。
【0005】
【発明の実施の形態】
本発明が適用される露出型柱脚としては、柱サイズの大きいものが好適であるが、柱サイズの小さいものに適用した場合にもグラウト材の注入作業に関する作業性を向上できる。また、前記注入用ロートの具体的形状や材質に関しては自由な選定が可能であり、要はベースプレートの下方の間隙部の大きさ、すなわちグラウト材の総注入量や、グラウト材の硬化速度に応じて、充填不良を回避し得るに十分な注入速度が得られる大きさの横長状の幅広の注入部を備えるものであればよい。すなわち、注入用ロートの下部に設けられる注入部は、ベースプレートの下方の間隙部に連通して十分な注入量が得られる開口面積を有する横長状の幅広のものであれば、孔状ないし窓状のものでも切欠状のものでもよい。その注入部の幅寸法としては、柱サイズにもよるが大体ベースプレートの幅寸法の1/5〜2/3程度が適当である。また、注入部は注入用ロートの下部前面に形成したものでも底面に形成して浮かせることによりベースプレートの下方の間隙部に連通させるものでもよい。なお、注入用ロートに対するグラウト材の供給の仕方に関しては、注入用ロートの上方に大口の投入口を形成し、その投入口を介してグラウト材を流し込むようにしたり、注入用ロートに接続したグラウト材供給装置を介してグラウト材を供給するように構成することができる。また、注入用ロートの設置数に関しては、1箇所でも複数箇所でも必要に応じて選定することができる。
【0006】
【実施例】
以下、図面を用いて本発明の実施例に関して説明する。図1は注入用ロートを設置する直前の施工状態を示した平面図である。図中、1は鉄骨柱、2はその鉄骨柱1の下部に溶接されたベースプレート、3はアンカーボルトの締付ナットである。図示のように、本発明に係るグラウト施工方法においては、ベースプレート2の周囲に、その外側面に沿って桟木等からなる型枠4が形成される。その場合、ベースプレート2の幅の略中央部に注入用ロートの設置スペースを形成するため、型枠4の途中に図2に示したように注入用ロート5の下半部を挿入し得るコ字状部分を有するスペース金具6を設置する。このスペース金具6は、図示のように、本実施例ではベースプレート2の幅の略中央部に設置されている。なお、図中、7は保持金具で、両端部に直角に形成された当接片8,9を型枠4の外面に当接することにより、グラウト材の注入時に型枠4が撓まないように保持するためのものである。また、型枠4の角部の内側のベースプレート2の外側面との間には、ベースプレート2の角部のアールに沿って変形し得る可撓性を備える角部閉塞用の薄板10の両端部が狭持されるように構成されている。
【0007】
図3及び図4は前記型枠4の保持手段に関する他の実施例を示した部分拡大図である。図3の実施例は、ベースプレート2の角部のアールに沿った内壁部11と外壁部12を有する断面U字状の連結部材13を用い、その内壁部11と外壁部12との間に隣接する型枠4の端部を嵌合して連結するとともに、その型枠4の角部をアンカーボルト14の頭部に巻付けた保持バネ部材15により保持してグラウト材注入時の撓みを防止するように構成したものである。また、図4の実施例は、型枠4の各アンカーボルト14の近傍に釘16等を打付け、そのアンカーボルト14の頭部と釘16等との間を番線17などにより連結することによりグラウト材注入時の撓みを防止するように構成したものである。
【0008】
図5は注入用ロート5の設置状態を示した正面図である。図1のように、ベースプレート2の周囲に注入用ロート5の設置スペースをあけた状態に型枠4を形成する作業が終了した場合には、次に、図5に示したように前記スペース金具6に注入用ロート5の下半部を挿入してグラウト材の注入作業を行うことになる。なお、図中、18はレベル用モルタル、19は注入用ロート5に設けられた支柱である。
【0009】
しかして、グラウト材の注入作業は、図6の斜視図に示したように注入用ロート5の上部に形成された広口の投入口20を介してバケツ等に収容したグラウト材を流し込むことにより行われる。投入口20に投入されたグラウト材は自重により斜面21に沿って下部前面に形成された横長状の幅広の注入部22を介して図5のベースプレート2の下方の基礎コンクリート23との間隙部24に注入される。この場合、注入部22が横長状の幅広に形成されているので、多量のグラウト材を素早く間隙部24に注入できることから、作業性が向上されるとともに、前述のように、柱サイズの大きい柱脚の場合にも従来のように充填不良を起すようなことは解消される。特に、前述のように、注入用ロート5をベースプレート2の幅の略中央部に設置しているので、その横長状の幅広の注入部22から基礎コンクリート23上に帯状に注入されたグラウト材はベースプレート2の下部中央部に形成されたレベル用モルタル18の部分で二手に分れて両側からスムーズに流入されるので、きわめて良好な充填状態が簡便に得られる。なお、注入用ロート5の注入部22の幅寸法を前記ベースプレート2の幅の1/5〜2/3程度に設定すれば良好な作業性が得られる。また、グラウト材注入時のエア抜き手段としては、前記締付ナット3の下部にセットされる座金に通気孔を形成しておき、アンカーボルト14とベースプレート2に形成されたボルト挿通孔との間隙及びその座金に形成した通気孔を介してエア抜きを行うように構成している。
【0010】
図7〜図9は注入用ロートに関する他の実施例の斜視図を示したものである。図7の実施例として示した注入用ロート25は、前記注入用ロート5と同様の構成には同じ符号を援用すれば、前記注入部22の位置を下部前面から底面に変更して注入部26とした点でのみ相違する。そして、本実施例の場合には、本注入用ロート25を前記スペース金具6内に設置した状態において、その下部底面に形成された前記注入部26が基礎コンクリート23の上面から浮いた状態にセットされ、それらの注入部26と基礎コンクリート23との間隙を介してグラウト材が帯状にベースプレート2の下方の間隙部24に注入されることになる。
【0011】
また、図8及び図9の実施例として示した注入用ロート27,28は、それぞれ前記注入用ロート5,25に対応するものであり、同様に以上の実施例の符号を援用すれば、斜面21の下端部に水平部29、上端部に立上がり部30を形成して、それらの注入用ロート27,28内のグラウト材の収容容量の増大を図った点で特徴を有する。そして、他の構成においては、それぞれ前記注入用ロート5,25と異なるところはなく同様の機能を奏するものである。
【0012】
【発明の効果】
本発明によれば、次の効果を得ることができる。
(1)ベースプレートの外周部に沿って下部に横長状の幅広の注入部を形成した注入用ロートを設置し、その横長状の幅広の注入部を介してベースプレートの下方の間隙部に多量のグラウト材を帯状に注入するように構成したので、柱サイズの大型化に対しても素早い注入により充填不良の発生を確実に解消できるとともに、その注入作業に関する作業性も向上できる。
(2)しかも、注入用ロートをベースプレートの幅の略中央部に設置するようにしたので、横長状の幅広の注入部から基礎コンクリート上に帯状に注入されるグラウト材は、ベースプレートの下部中央部に形成されるレベル用モルタルの部分で二手に分れて両側からスムーズに流入され、大型のベースプレートに対してもきわめて良好な充填状態が簡便に得られる。
(3)さらに、そのグラウト材の注入の際には、ベースプレートの少なくとも四隅の締付ナットの下部にセットされる座金に形成した通気孔を介してエア抜きを行うので、ベースプレートの四隅から的確に排気がなされ、各隅部にもグラウト材が順次充填されることから、素早い多量のグラウト材の注入にも拘らず、ベースプレートの下方の間隙部の隅々まで満遍なくスムーズかつ的確に充填することが可能である。
【図面の簡単な説明】
【図1】 本発明の実施例における注入用ロートを設置する直前の施工状態を示した平面図である。
【図2】 同実施例の注入用ロート及びスペース金具を示した拡大斜視図である。
【図3】 型枠の保持手段に関する他の実施例を示した部分拡大図である。
【図4】 型枠の保持手段に関する他の実施例を示した部分拡大図である。
【図5】 前記注入用ロートの設置状態を示した正面図である。
【図6】 注入用ロートを示した拡大斜視図である。
【図7】 注入用ロートに関する他の実施例を示した拡大斜視図である。
【図8】 注入用ロートに関する他の実施例を示した拡大斜視図である。
【図9】 注入用ロートに関する他の実施例を示した拡大斜視図である。
【符号の説明】
1…鉄骨柱、2…ベースプレート、3…締付ナット、4…型枠、5…注入用ロート、6…スペース金具、7…保持金具、8,9…当接片、10…薄板、11…内壁部、12…外壁部、13…連結部材、14…アンカーボルト、15…保持バネ部材、16…釘、17…番線、18…レベル用モルタル、19…支柱、20…投入口、21…斜面、22…注入部、23…基礎コンクリート、24…間隙部、25…注入用ロート、26…注入部、27,28…注入用ロート、29…水平部、30…立上がり部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for injecting a grout material into the lower surface of a base plate of an S-type or SRC-type exposed column base.
[0002]
[Prior art]
Needless to say, in the construction of the exposed column base, the adhesion between the base plate and the foundation concrete integrally installed at the lower end of the steel column has a very important influence on the construction result. As the construction method, conventionally, a grout construction method in which a grout material such as a non-shrink grout material is injected and closely adhered between the lower surface of the base plate and the foundation concrete has been widely adopted. In addition, as a method for injecting the grout material, a mold is formed around the base plate, and the grout material is injected through an injection pipe leading to the inside of the mold, or between the outer surface of the base plate and the mold. A method is known in which a gap is provided and a grout material is injected through the gap using a flat plate or the like as a guide. There is also known a technique in which a special injection washer having an injection port formed in the tightening portion of the base plate is used, and a grout material is injected by inserting a small diameter portion of an injection funnel into the injection port of the injection washer.
[0003]
[Problems to be solved by the invention]
By the way, the prior art using an injection funnel is an effective method when the column size is relatively small, but the column size is increased because the injection port is small and the injection rate of the grout material is limited. As the base plate grows in size, it takes a considerable amount of time for the pouring operation, and in some cases, problems such as local hardening starting before the entire bottom plate is filled with grout material leading to poor filling. ing. The present invention has been made to solve such problems of the prior art, and is intended to increase the amount of grout material injected per unit time, and can be sufficiently adapted to increase the column size. The object is to provide a method for grouting the legs.
[0004]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, the present invention forms a mold frame in a state where an installation space for an injection funnel is opened at a substantially central portion of the width of the base plate along the outer surface of the base plate, and the base plate is formed by the mold frame. An injection funnel having a horizontally long injection portion formed in a lower portion thereof and communicating with a lower gap portion of the base plate is disposed in the installation space, and the injection funnel is provided with a horizontally wide injection funnel. the grout via the injection unit and injected into the strip into the gap portion of the lower base plate, to divide the injection flow of the band-like grout on both sides by the lower central portion to form levels mortars of the base plate Rutotomoni, adopted technical means of performing air bleeding through the vent hole formed in the washer is set at the bottom of the fastening nut of the four corners of the base plate It was. As a result, a large amount of grout material can be quickly injected through the horizontally long and wide injection portion, so that it is possible to avoid poor filling as in the conventional case. In addition, since the pouring funnel is installed at a substantially central portion of the width of the base plate, a large amount of grout material to be poured in a strip shape from the horizontally wide pouring portion onto the foundation concrete is formed at the lower central portion of the base plate. Since the level mortar portion is divided into two parts and smoothly flows from both sides, a very good filling state can be easily obtained even for a large base plate. In addition, when the grout material is injected, air is vented through the vent holes formed in the washer set at the lower part of the fastening nuts at least at the four corners of the base plate, so that the exhaust is accurately performed from the four corners of the base plate. In addition, since the grout material is sequentially filled in each corner, it is possible to fill the corners of the gap below the base plate smoothly and accurately evenly even though a large amount of grout is quickly injected. .
[0005]
DETAILED DESCRIPTION OF THE INVENTION
As the exposed type column base to which the present invention is applied, a column having a large column size is suitable. However, when applied to a column having a small column size, the workability regarding the grout material injection work can be improved. In addition, the specific shape and material of the injection funnel can be freely selected. In short, it depends on the size of the gap below the base plate, that is, the total injection amount of the grout material and the hardening rate of the grout material. Thus, it is sufficient if it is provided with a horizontally long and wide injection portion that is large enough to obtain an injection rate sufficient to avoid poor filling. In other words, the injection portion provided at the lower portion of the injection funnel is a hole or window if it is a horizontally long and wide opening having an opening area that can communicate with the gap below the base plate and obtain a sufficient injection amount. Or a notch-shaped one. As the width dimension of the injection portion, although it depends on the column size, about 1/5 to 2/3 of the width dimension of the base plate is appropriate. Further, the injection portion may be formed on the lower front surface of the injection funnel or may be formed on the bottom surface and floated to communicate with the gap portion below the base plate. Regarding the method of supplying the grout material to the injection funnel, a large inlet is formed above the injection funnel, and the grout material is poured through the inlet, or the grout connected to the injection funnel. The grout material can be supplied through the material supply device. In addition, the number of injection funnels can be selected at one place or a plurality of places as necessary.
[0006]
【Example】
Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a plan view showing a construction state immediately before installing an injection funnel. In the figure, 1 is steel columns, 2 a base plate welded to the lower portion of the steel columns 1, 3 is tightened Tsukena Tsu City of anchor bolts. As shown in the figure, in the grouting method according to the present invention, a mold frame 4 made of a pedestal or the like is formed around the base plate 2 along its outer surface. In that case, in order to form an installation space for the injection funnel substantially at the center of the width of the base plate 2, a U-shape that can insert the lower half of the injection funnel 5 as shown in FIG. A space metal fitting 6 having a shape portion is installed. As shown in the figure, the space fitting 6 is installed at a substantially central portion of the width of the base plate 2 in this embodiment. In the figure, reference numeral 7 denotes a holding metal fitting, and abutment pieces 8 and 9 formed at right angles on both ends are brought into contact with the outer surface of the mold frame 4 so that the mold frame 4 does not bend when the grout material is injected. It is for holding. Moreover, between the outer surface of the baseplate 2 inside the corner | angular part of the formwork 4, both ends of the thin plate 10 for corner | angular part obstruction | occlusion provided with the flexibility which can deform | transform along the radius of the corner | angular part of the baseplate 2 Is configured to be held.
[0007]
3 and 4 are partially enlarged views showing other embodiments relating to the holding means of the mold 4. The embodiment in FIG. 3 uses a U-shaped connecting member 13 having an inner wall portion 11 and an outer wall portion 12 along the rounded corners of the base plate 2, and is adjacent between the inner wall portion 11 and the outer wall portion 12. The ends of the mold 4 to be fitted are connected and connected, and the corners of the mold 4 are held by the holding spring members 15 wound around the heads of the anchor bolts 14 to prevent bending when the grout material is injected. It is comprised so that it may do. In the embodiment of FIG. 4, a nail 16 or the like is driven in the vicinity of each anchor bolt 14 of the mold 4 and the head of the anchor bolt 14 and the nail 16 or the like are connected by a wire 17 or the like. It is configured to prevent bending when the grout material is injected.
[0008]
FIG. 5 is a front view showing an installation state of the injection funnel 5. As shown in FIG. 1, when the work for forming the mold 4 is completed in a state where an installation space for the injection funnel 5 is opened around the base plate 2, the space fitting is then moved as shown in FIG. The lower half of the injection funnel 5 is inserted into 6 and the grout material injection operation is performed. In the figure, 18 is a level mortar, and 19 is a support provided on the injection funnel 5.
[0009]
Thus, the grout material injection operation is performed by pouring the grout material contained in a bucket or the like through the wide inlet 20 formed at the top of the injection funnel 5 as shown in the perspective view of FIG. Is called. The grout material thrown into the inlet 20 is provided with a gap 24 between the base concrete 2 below the base plate 2 in FIG. 5 through a horizontally long and wide injection part 22 formed on the lower front surface along the slope 21 by its own weight. Injected into. In this case, since the injection portion 22 is formed in a horizontally wide shape, a large amount of grout material can be quickly injected into the gap portion 24, so that workability is improved and a column having a large column size as described above. Even in the case of the legs, the occurrence of poor filling as in the conventional case is eliminated. In particular, as described above, since the pouring funnel 5 is installed at a substantially central portion of the width of the base plate 2, the grout material poured in a strip shape from the horizontally wide pouring portion 22 onto the foundation concrete 23 is Since the level mortar 18 formed in the lower center portion of the base plate 2 is divided into two hands and smoothly flows from both sides, a very good filling state can be easily obtained. If the width of the injection portion 22 of the injection funnel 5 is set to about 1/5 to 2/3 of the width of the base plate 2, good workability can be obtained. Further, as a means for venting air when injecting the grout material, a vent hole is formed in a washer set under the tightening nut 3, and a gap between the anchor bolt 14 and the bolt insertion hole formed in the base plate 2 is formed. And it is comprised so that air bleeding may be performed through the vent hole formed in the washer.
[0010]
7 to 9 show perspective views of other embodiments relating to the injection funnel. In the injection funnel 25 shown as the embodiment of FIG. 7, if the same reference numerals are used for the same configuration as the injection funnel 5, the position of the injection portion 22 is changed from the lower front surface to the bottom surface, and the injection portion 26 is changed. It is different only in the point. In the case of the present embodiment, in a state where the main injection funnel 25 is installed in the space fitting 6, the injection portion 26 formed on the bottom surface of the lower portion is set in a state of floating from the upper surface of the foundation concrete 23. Then, the grout material is injected into the gap portion 24 below the base plate 2 in a band shape through the gap between the injection portion 26 and the foundation concrete 23.
[0011]
Further, the injection funnels 27 and 28 shown as the embodiments of FIGS. 8 and 9 correspond to the injection funnels 5 and 25, respectively. A horizontal portion 29 is formed at the lower end portion of 21, and a rising portion 30 is formed at the upper end portion, thereby increasing the capacity of the grout material in the injection funnels 27 and 28. And in another structure, there is no place different from the said injection funnels 5 and 25, respectively, and there exists the same function.
[0012]
【The invention's effect】
According to the present invention, the following effects can be obtained.
(1) An injection funnel in which a horizontally wide injection portion is formed at the lower portion along the outer periphery of the base plate, and a large amount of grout is placed in the gap below the base plate through the horizontally wide injection portion. Since the construction is such that the material is injected in a strip shape, the filling failure can be surely eliminated by quick injection even when the column size is increased, and the workability regarding the injection work can be improved.
(2) In addition, since the pouring funnel is installed at a substantially central portion of the width of the base plate, the grout material to be poured in a strip shape from the horizontally long wide pouring portion onto the foundation concrete is the lower central portion of the base plate. The level mortar part formed in the two is divided into two parts and smoothly flows in from both sides, and a very good filling state can be easily obtained even for a large base plate.
(3) Furthermore, when the grout material is injected, air is vented through the vent holes formed in the washer set at the bottom of the fastening nuts at least at the four corners of the base plate. Since exhaust is performed and grout material is sequentially filled in each corner, it is possible to fill the corners of the gap below the base plate smoothly and accurately evenly, despite the rapid injection of a large amount of grout material. Is possible.
[Brief description of the drawings]
FIG. 1 is a plan view showing a construction state immediately before installing an injection funnel in an embodiment of the present invention.
FIG. 2 is an enlarged perspective view showing an injection funnel and a space fitting of the same embodiment.
FIG. 3 is a partially enlarged view showing another embodiment relating to the mold holding means.
FIG. 4 is a partially enlarged view showing another embodiment relating to the mold holding means.
FIG. 5 is a front view showing an installation state of the injection funnel.
FIG. 6 is an enlarged perspective view showing an injection funnel.
FIG. 7 is an enlarged perspective view showing another embodiment relating to the injection funnel.
FIG. 8 is an enlarged perspective view showing another embodiment related to the injection funnel.
FIG. 9 is an enlarged perspective view showing another embodiment related to the injection funnel.
[Explanation of symbols]
1 ... steel columns, 2 ... base plate, 3 ... clamping Tsukena Tsu DOO, 4 ... mold, 5 ... injection funnel, 6 ... Space fitting, 7 ... holding bracket, 8,9 ... contact piece, 10 ... sheet, DESCRIPTION OF SYMBOLS 11 ... Inner wall part, 12 ... Outer wall part, 13 ... Connecting member, 14 ... Anchor bolt, 15 ... Holding spring member, 16 ... Nail, 17 ... Number wire, 18 ... Level mortar, 19 ... Post, 20 ... Loading port, 21 ... Slope, 22 ... Injection part, 23 ... Foundation concrete, 24 ... Gap part, 25 ... Injection funnel, 26 ... Injection part, 27, 28 ... Injection funnel, 29 ... Horizontal part, 30 ... Rise part

Claims (1)

ベースプレートの外側面に沿ってそのベースプレートの幅の略中央部に注入用ロートの設置スペースをあけた状態に型枠を形成し、該型枠によって前記ベースプレートの周囲を囲むとともに、下部に前記ベースプレートの下方の間隙部と連通可能な横長状の幅広の注入部を形成した注入用ロートを前記設置スペースに設置し、その注入用ロートの横長状の幅広の注入部を介してグラウト材をベースプレートの下方の間隙部に帯状に注入して、該帯状のグラウト材の注入流を前記ベースプレートの下部中央部に形成したレベル用モルタルによって両側に二分させるとともに、前記ベースプレートの四隅の締付ナットの下部にセットされる座金に形成した通気孔を介してエア抜きを行うことを特徴とする露出型柱脚におけるグラウト施工方法。A mold frame is formed in a state where an installation space for the injection funnel is opened at a substantially central portion of the width of the base plate along the outer surface of the base plate. The mold frame surrounds the periphery of the base plate, and the base plate is formed below the base plate. An injection funnel that forms a horizontally wide injection portion that can communicate with the lower gap portion is installed in the installation space, and the grout material is placed under the base plate through the horizontally wide injection portion of the injection funnel. is injected into the strip to the gap portion, the injection flow of the band-like grout is divided into two sides by the level mortar formed on the lower center portion of the base plate Rutotomoni, the lower portion of the fastening nut of the four corners of the base plate A grout construction method for an exposed column base, wherein air is vented through a vent hole formed in a washer to be set.
JP09709999A 1999-04-02 1999-04-02 Grout construction method for exposed column base Expired - Lifetime JP4521791B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09709999A JP4521791B2 (en) 1999-04-02 1999-04-02 Grout construction method for exposed column base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09709999A JP4521791B2 (en) 1999-04-02 1999-04-02 Grout construction method for exposed column base

Publications (2)

Publication Number Publication Date
JP2000291018A JP2000291018A (en) 2000-10-17
JP4521791B2 true JP4521791B2 (en) 2010-08-11

Family

ID=14183184

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09709999A Expired - Lifetime JP4521791B2 (en) 1999-04-02 1999-04-02 Grout construction method for exposed column base

Country Status (1)

Country Link
JP (1) JP4521791B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208901A (en) * 2017-07-05 2019-01-15 五冶集团上海有限公司 A kind of funneling formwork erection method of constructional column concreting feed inlet

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798004A (en) * 2018-06-28 2018-11-13 中国建筑局(集团)有限公司 Exempt from to pick constructional column of chisel and pour template subassembly
CN110387900A (en) * 2019-08-16 2019-10-29 中国水利水电第四工程局有限公司 A Portable Grouting Groove Structure for Secondary Grouting of Fan Anchor Bolt Foundation

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0354401A (en) * 1989-07-24 1991-03-08 Mitsubishi Rayon Co Ltd Manufacture of large calipers
JPH0329343Y2 (en) * 1990-02-09 1991-06-21
JP2898786B2 (en) * 1991-06-12 1999-06-02 旭化成工業株式会社 Fixing method of column base on steel column base of building
JP2905313B2 (en) * 1991-07-02 1999-06-14 旭化成工業株式会社 Fixing method of column base on steel column base of building
JPH07112789A (en) * 1993-10-15 1995-05-02 Rikidou Sangyo:Kk Bucket device for concrete, etc.
JP3761668B2 (en) * 1996-07-17 2006-03-29 旭化成建材株式会社 Column base structure
JP3198074B2 (en) * 1997-06-04 2001-08-13 勤伍 内藤 Column base structure in steel structure and method of manufacturing the same
JP3788853B2 (en) * 1997-08-05 2006-06-21 岡部株式会社 Forming method for column base part mold and member for connecting dam plate of column base part form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208901A (en) * 2017-07-05 2019-01-15 五冶集团上海有限公司 A kind of funneling formwork erection method of constructional column concreting feed inlet

Also Published As

Publication number Publication date
JP2000291018A (en) 2000-10-17

Similar Documents

Publication Publication Date Title
JP4521791B2 (en) Grout construction method for exposed column base
JP3545700B2 (en) Stainless steel floor construction method and stainless steel floor
JP2008127873A (en) Block out flask, and recess forming method using the same
JP4416141B2 (en) How to install seismic isolation devices
JP3201980U (en) Slab concrete joint fence
JP2000129953A (en) Fitting method of base isolation device to foundation
JP3672748B2 (en) Construction method of the joint structure of steel middle legs
JP2868147B2 (en) Installation method of water stoppage plate and water stoppage plate
JPH1150466A (en) Forming method of column leg part form and member for sheathing connection of the column leg form
JP3973293B2 (en) Column base anchor device
KR20010095915A (en) Guide frame for anchoring bar
JP2639636B2 (en) Seawall revetment method using Kasagi block and Kasagi block
JP3898595B2 (en) Installation structure and construction method of precast lining members
CN112459262B (en) Novel Hafen groove and construction method thereof
JP2015105523A (en) Device and method for fixing column base
JPH0563585B2 (en)
JPS6319339A (en) Cloth foundation top construction method
JP3803272B2 (en) Reinforced earth method for cut slope
CN211074088U (en) Grouting pipe fixing tool for grouting sleeve
JP2002138501A (en) Fixing implement of form panel for retaining wall construction
JPH03272393A (en) Installation method for base plate for installing machine
JP3013207U (en) Concrete Kasagi block
JP2581209B2 (en) Concrete casting method
JPH11270186A (en) Mounting method of sliding plate for sliding bearing
JP2550354Y2 (en) Water stop plate fixing bracket

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060306

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080422

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080527

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080725

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080912

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100521

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100521

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

EXPY Cancellation because of completion of term